Welcome to the BC Hydro public open house

Size: px
Start display at page:

Download "Welcome to the BC Hydro public open house"

Transcription

1 Welcome to the BC Hydro public open house West Kelowna Transmission Project We re here to share the most recent project information and to gather your comments on what we know so far. We hope you ll share your local knowledge of the project study area with us. Our project team is here to answer your questions. Please take the time to fill out a feedback form before you leave.

2 West Kelowna Transmission Project We re planning for a new, secondary transmission line to strengthen the transmission network delivering clean, reliable electricity to the communities of West Kelowna and Peachland. The existing transmission line into the area has provided reliable power to the communities for decades. A new transmission line will provide a second source of power for the area, also called redundancy.

3 Why it s important Approximately 22,000 customers are served by the Westbank and a single 138 kilovolt transmission line. The West Kelowna Transmission Project will add a second power source for the area. We ve prioritized the West Kelowna area as needing a redundant supply of power because of: The large number of customers served by a single transmission line. The challenge of restoring power on the existing transmission line resulting from its 80 kilometre length, remote location and rough terrain. The risk of destructive forces like forest fires and landslides. In the meantime, we ll continue to monitor and manage any risks to the existing transmission line. What s redundant supply? Redundant supply means there is more than one source (for example, a transmission Iine) providing power to the community or back-up power. That way, if one source is taken out of service, the other can still supply the community with electricity.

4 Area served by Westbank Served from Lake Country by BC Hydro Westbank Kelowna served by FortisBC West Kelowna Okanagan Lake Peachland Summerland Each colour represents areas served by Westbank

5 Our electricity system Generation Transmission s Distribution Electricity is generated Electricity is Voltage is reduced at Low voltage by BC Hydro and moved from where substations to provide electricity is provided independent it s produced to power suitable for use in to neighbourhoods power producers. where it s used. your home or business. and businesses.

6 West Kelowna Transmission Project West Kelowna Transmission Project Valleyview Kamloops 1 B 5 5A Falkland Armstrong Spallumcheen nk'maplqs kwiltca'na Nicola 1 Vernon Vernon Terminal To FortisBC spáxomin Project Study Area 500 kv Transmission Line kv Transmission Line 138 kv Transmission Line Transmission Alternative 1 Transmission Alternative 2 Transmission Alternative 3a Transmission Alternative 3b Proposed FortisBC Highway Okanagan Nation Communities C Westbank tsinstik ptum e West Kelowna 3b 3a Kelowna Saucier (FortisBC) DG Bell (FortisBC) 33 British Columbia Peachland Okanagan Lake 5 MI 10 KM Alternative routes shown are conceptual. B15-182b Mar2016

7 Alternative 1 To Vernon Terminal Project Study Area 500 kv Transmission Line 230 kv Transmission Line 138 kv Transmission Line Transmission Alternative 1 Transmission Alternative 2 Transmission Alternative 3a Transmission Alternative 3b Proposed FortisBC Highway Okanagan Nation Communities Falkland nk'maplqs Armstrong Spallumcheen Vernon Vernon Terminal Build a new transmission line on the west side of Okanagan Lake, connecting Westbank to Vernon 1 To FortisBC Terminal. We would need 2 new rights-of-way. C Peachland Westbank tsinstik ptum e West Kelowna 3b Okanagan Lake 3a Kelowna Saucier (FortisBC) DG Bell (FortisBC) 33 Routing hasn t yet been identified (conceptual only). Until recently, we d presented a second option on this alternative: connecting a new line from Westbank to the existing line running between Vernon Terminal and Valleyview substations. We ve determined this option is not technically possible as a connection to the existing line could weaken our system in the area.

8 Alternative 1 To Vernon Terminal To help you see how each of the alternatives stack-up against each other, we ve colour-coded some of the considerations: High Risk Moderate Risk Low Risk Key considerations for this alternative include: Safety Safety is our key priority in every decision we make. This alternative has high overall potential safety risk. There are a number of potential high safety risks on this alternative because of challenging terrain and access for our workers. It s expected that this alternative would require the most helicopter access, the highest level of clearing and the most access road construction, all of which increase hazards for our workers. Environment This alternative has high overall potential environmental risk. This alternative has the largest environmental footprint, as the potential line length is the longest at an estimated 110 kilometres. A leading factor for increased environmental risk on this alternative are the poor geotechnical conditions, for example the steep slopes and loose soil conditions found in this area. It s expected that this alternative would pose a high level of risk to wildlife and fisheries, due to the sensitive areas included in this alternative, such as Fintry Park. Socio-economic This alternative has high potential socio-economic risk. New rights-of-way would be required in developed and urbanized areas in West Kelowna and Vernon, with a high potential for visual impacts and impacts on private property. Cost It s anticipated that this alternative would have the highest cost of all alternatives, largely due to line length, difficult terrain and construction methods. First Nations This consideration is not colour coded, as we re currently collaborating with the Okanagan Nation and other First Nations to obtain their input on the alternatives. Stakeholders This consideration is not colour coded, as we re currently consulting with stakeholders to obtain their input on the alternatives.

9 Alternative 2 To Nicola Falkland Build a new transmission line from Westbank to Nicola kwiltca'na Nicola Ver Sub using a different route 1 than the existing spáxomin transmission line. Project Study Area 500 kv Transmission Line kv Transmission Line 138 kv Transmission Line We would need Transmission Alternative 1 Transmission Alternative 2 Transmission Alternative 3a Transmission Alternative 3b Proposed FortisBC Highway Okanagan Nation Communities C Westbank tsinstik ptum e West Kelowna 3b 3a Kelow Sau new rights-of-way. Routing hasn t yet been identified British Columbia Peachland Okanagan Lake (conceptual only). 5 MI 10 KM Alternative routes shown are conceptual. What are rights-of-way? Our power lines cross all kinds of property: residential, agricultural, industrial, commercial and recreational. We negotiate with the land owner (private property owners, First Nations, municipalities and the provincial and federal Crown) to acquire rights-of-way to construct, operate and maintain a power line and the right to keep the rights-of-way clear of all structures, fire hazards, vegetation and any other use that might interfere with our power lines.

10 Alternative 2 To Nicola To help you see how each of the alternatives stack-up against each other, we ve colour-coded some of the considerations: High Risk Moderate Risk Low Risk Key considerations for this alternative include: Safety Safety is our key priority in every decision we make. This alternative has low overall potential safety risk. There are low potential safety risks for our workers because of existing access roads and large sections of non-mountainous terrain. It s expected that this alternative could require a small amount of helicopter access and a moderate amount of clearing. Environment This alternative has moderate overall potential environmental risk. This alternative has a moderate environmental footprint; the potential line length is the second longest at an estimated 72 kilometres. This alternative has low potential impact to fisheries and wildlife, and relatively low geotechnical risks. Socio-economic This alternative has moderate potential socio-economic risk. New rights-of-way would be required. This alternative is the least developed and urbanized, with a large amount of rural and crown land and the potential to partially use existing rights-of-way. Cost It s anticipated that this alternative would have the lowest cost of all alternatives, largely due to construction methods and the type of infrastructure being built. First Nations This consideration is not colour coded, as we re currently collaborating with the Okanagan Nation and other First Nations to obtain their input on the alternatives. Stakeholders This consideration is not colour coded, as we re currently consulting with stakeholders to obtain their input on the alternatives.

11 Alternative 3 To Fortis BC Build a new Project Study Area 500 kv Transmission Line 230 kv Transmission Line 138 kv Transmission Line Transmission Alternative 1 Transmission Alternative 2 Transmission Alternative 3a Transmission Alternative 3b Proposed FortisBC Highway 1 Vernon Vernon Terminal To FortisBC transmission line, including a submarine cable across Okanagan Okanagan Nation Communities Lake, connecting 2 Westbank to the FortisBC system. West Kelowna Kelowna We would need C Westbank tsinstik ptum e 3b 3a Saucier (FortisBC) DG Bell (FortisBC) 33 new rights-of-way. Routing hasn t yet Peachland Okanagan Lake been identified (conceptual only). WE VE EXPLORED TWO OPTIONS FOR ALTERNATIVE 3: 3a: Connecting Westbank to DG Bell in the FortisBC system. 3b: FortisBC building a new substation in West Kelowna and a transmission line crossing Okanagan Lake to Saucier (part of the FortisBC system in Kelowna). We would then build a transmission line from Westbank to the new FortisBC substation.

12 Alternative 3 (options a and b) To Fortis BC To help you see how each of the alternatives stack-up against each other, we ve colour-coded some of the considerations: High Risk Moderate Risk Low Risk Key considerations for this alternative include: Safety Safety is our key priority in every decision we make. This alternative has low overall potential safety risk. There are low potential safety risks for our workers because of the relatively short transmission line or cable length. This alternative will require a submarine cable in Okanagan Lake or a cable attached to the bridge itself. Environment This alternative has moderate overall potential environmental risk. This alternative has the smallest environmental footprint having the shortest potential line length (3a: estimated 31 kilometres, 3b: estimated 14 kilometres). It also includes a crossing of Okanagan Lake, creating a moderate potential impact to fish and fisheries habitat. Socio-economic This alternative has high potential socio-economic risk. New rights-of-way would be required in developed and urbanized areas in West Kelowna and Kelowna, with a high potential for visual impacts and impacts on private property. Cost 3a: It s anticipated that this option would have a moderate cost compared to the other alternatives, largely due to the requirement of submarine cable and undergrounding a portion of the transmission line. 3b: It s anticipated that this option would have a moderate cost compared to the other alternatives, largely due to the requirement of a new substation, submarine cable and undergrounding a portion of the transmission line. First Nations This consideration is not colour coded, as we re currently collaborating with the Okanagan Nation and other First Nations to obtain their input on the alternatives. Stakeholders This consideration is not colour coded, as we re currently consulting with stakeholders to obtain their input on the alternatives.

13 Project area substations DG Bell FortisBC - Kelowna (Alternative 3a) Nicola (Alternative 2) OKANAGAN LAKE DOROTHEA WALKER ELEMENTARY 500 kv Transmission Lines 230 kv Transmission Lines 138 kv Transmission Lines GORDON DRIVE LAKESHORE ROAD CRAWFORD ROAD NICOLA LAKE ANNE MCCLYMONT ELEMENTARY MISSION RIDGE PARK STEWART ROAD W STEWART ROAD E DG BELL SUBSTATION FORTIS BC QUILCHENA NICOLA SUBSTATION WESTRIDGE DRIVE DOUGLAS LAKE ROAD DOUGLAS LAKE Saucier FortisBC - Kelowna (Alternative 3b) CITY HALL OKANAGAN LAKE RICHTER STREET HARVEY AVENUE SAUCIER STREET SAUCIER SUBSTATION - FORTIS BC CENTRAL SCHOOL PANDOSY STREET SUTHERLAND AVENUE

14 Project area substations Vernon Vernon (Alternative 1) FRANCIS STREET VERNON SECONDARY SCHOOL POTTERY ROAD E VERNON ROAD HIGHWAYVIEW ROAD HILLVIEW ELEMENTARY VERNON SUBSTATION HILLVIEW GOLFCOURSE 69 kv Transmission Lines 138 kv Transmission Lines 230 kv Transmission Lines Westbank West Kelowna (Alternatives 1, 2 and 3) SHANNON LAKE SHANNON RIDGE ROAD SHANNON LAKE ELEMENTARY KINSMEN ATHLETIC PARK NEIGHBOURS PUB SHANNON WAY WESTBANK SUBSTATION SHANNON LAKE ROAD GREEN ACRES REECE ROAD OLD OKANAGAN HIGHWAY WALMART OKANAGAN HIGHWAY 138 kv Transmission Lines

15 What other alternatives did we look at? Do nothing This alternative was screened as it doesn t address the need for redundancy in West Kelowna. Local generation We studied the possibility of installing generators near Westbank. While this alternative could provide a similar level of reliability as a new transmission line, it s anticipated that this alternative would cost significantly more than the transmission line alternatives. This alternative is not in line with the province s Clean Energy Act, which includes reducing green house gas emissions as a key objective. Due to these factors, we screened local generation from the alternatives being studied. Options for Alternative 1 Until recently, we d presented a second option on Alternative 1, of connecting a new line from Westbank to the existing line running between Vernon Terminal and Valleyview substations, in the area between Spallumcheen and Falkland. We ve screened this option as not technically possible. When a transmission line has three end-points (in this instance Vernon Terminal, Valleyview and Westbank substations), it s difficult to quickly isolate a problem on any section of the transmission line. The resulting lengthy time to isolate the problem will negatively impact the rest of our system.

16 Project timeline PROJECT ANNOUNCEMENT IDENTIFICATION Initial studies Identify leading alternative Additional studies Confirm preferred alternative DEFINITION Preliminary design Regulatory approvals IMPLEMENTATION Final design Procurement Construction Commissioning OPERATIONS Feb October 2020 earliest We re still in the early stages of this project. Consultation is ongoing throughout Identification, Definition and Implementation.

17 Trans-Can ad Ü a Highway y wa gh Hi No 1 Notes: Monte Creek Park Notes Red: provincial parks and protected areas, lands classified as Red: provincial parks and protected areas, lands classified as Very High Very High Conservation Ranking as defined by the Central Conservation Ranking as defined by the Central Okanagan Biodiversity Strategy Okanagan Biodiversity Strategy 5A Pillar Park Orange: Wildlife Habitat Areas, Conservancy Areas, Resource Management Orange: Wildlife Habitat Areas, Conservancy Areas, Resource Zones, rarezones, and sensitive ecosystems (e.g., grasslands), ungulate winter range Management rare and sensitive ecosystems (e.g., grasslands), McConnell Lake Park ungulate winter range COLUMBIA SHUSWAP Walloper Lake Park Lac Le Jeune Park Monte Lake Park o Sal m Roche Lake Park y wa h g Hi nr iver Highway tt rri A e -M s op STUMP LAKE Ew e r C re e k Highwa y A o ml a K g Hi o5 N ay hw NORTH OKANAGAN THOMPSON-NICOLA Nas w hito Cr eek Vernon W h ite m an NICOLA LAKE Truman Dagnus Locheed Park C r eek Monck Park Kekuli Bay Park Ellison Park Kalamalka Lake Park KALAMALKA LAKE DOUGLAS LAKE ek as Cr e Fintry Park ug l Lake Country High way Do WOOD LAKE Wrinkly Face Park PENNASK LAKE Lambly Pennask Lake Park C reek Po we rs CENTRAL OKANAGAN Cr e ek Pennask Creek Park Bear Creek Park Trepanier Park 7 ay 9 w h ig lla H a h i u Coq C Kelowna City of West Kelowna Hi gh wa y OKANAGAN LAKE Westbank Park C Peachland Eneas Lakes Park Okanagan Mountain Park Darke Lake Park OKANAGAN-SIMILKAMEEN Okanagan Lake Park ay hw Hig Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community LEGEND Alternative 1 Alternative 2 Notes: 1. Intended for Illustration purposes only. 2. Original in colour. Alternative 3 Roads Streams CLIENT NAME: PROJECT LOCATION: Okanagan District Boundary Parks and Protected Areas Lakes West Kelowna Transmission Line Project Wildlife and Terrestrial Ecosystems Low environmental sensitivity Moderate environmental sensitivity High environmental sensitivity Very high environmental sensitivity 0 3,750 7,500 15,000 22,500 30,000 Meters BY: SS CHK'D: SH DATE: 2015/11/05 SCALE: 1:175,000 PROJ COORD SYS: NAD 1983 UTM Zone 11N REF No: REV: Project Path: MXD Path: \\Sli2606\projects\LOB\EIAM-BC\Current Projects\BC Hydro\WEST KELOWNA\630167\4.0 Execution\4.5 GIS and Drawings\GIS\MXD\Terrestrial\630167_01_002_Wildlife_Terrestrial_Risk_Map_Rev0_SizeD.mxd Myra-Bellevue Park

18 Trans-Can a y wa gh Hi Notes: Notes da Highwa Ü y No 1 Monte Creek Park 5A Red: parks and Red:provincial steep slopes prone protected to failure areas, lands classified as Very High Conservation Ranking as defined by the Central Okanagan Orange:Biodiversity water, moderate slopes prone to failure Strategy Pillar Park Orange: Wildlife Habitat Areas, Conservancy Areas, Resource Management Zones, rare and sensitive ecosystems (e.g., grasslands), McConnell Lake Park ungulate winter range COLUMBIA SHUSWAP Walloper Lake Park Lac Le Jeune Park Monte Lake Park Sal m Roche Lake Park ay hw g i H on R iver Highway g Hi t t ri A er M s op STUMP LAKE Ew e r C re e k Highwa y A o ml a K o5 N ay hw NORTH OKANAGAN THOMPSON-NICOLA Nas w hito Cr eek Vernon W h ite NICOLA LAKE m an Truman Dagnus Locheed Park C r eek Monck Park Kekuli Bay Park Ellison Park Kalamalka Lake Park KALAMALKA LAKE DOUGLAS LAKE ek as Cr e Fintry Park ug l Lake Country High way Do WOOD LAKE Wrinkly Face Park PENNASK LAKE Lambly Pennask Lake Park C reek Po we rs CENTRAL OKANAGAN Cr e ek Pennask Creek Park Bear Creek Park Trepanier Park way h g i ah ihall u q Co C Kelowna Hi gh wa y City of West Kelowna Westbank Park OKANAGAN LAKE C Peachland Eneas Lakes Park Okanagan Mountain Park Darke Lake Park OKANAGAN-SIMILKAMEEN Okanagan Lake Park ay hw Hig Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community LEGEND Alternative 1 Alternative 2 Notes: 1. Intended for Illustration purposes only. 2. Original in colour. Alternative 3 Roads Streams CLIENT NAME: PROJECT LOCATION: Okanagan District Boundary Parks and Protected Areas West Kelowna Transmission Line Project Geo-hazards and Terrain Lakes Low environmental sensitivity Moderate environmental sensitivity High environmental sensitivity Very high environmental sensitivity 0 3,750 7,500 15,000 22,500 30,000 Meters BY: SS CHK'D: SH DATE: 2015/11/05 SCALE: 1:175,000 PROJ COORD SYS: NAD 1983 UTM Zone 11N REF No: REV: Project Path: MXD Path: \\Sli2606\projects\LOB\EIAM-BC\Current Projects\BC Hydro\WEST KELOWNA\630167\4.0 Execution\4.5 GIS and Drawings\GIS\MXD\GeoHazards\630167_03_002_GeoHazards_Risk_Map_Rev0_SizeD.mxd Myra-Bellevue Park

19 Trans-Can a y wa gh Hi Notes: Notes da Highwa Ü y No 1 Monte Creek Park 5A Red: Indian IndianReserves, Reserves, visual visual quality quality importance importance Red: Orange: community property, Orange:private privateproperty, property, community Pillar Park recreation areas (e.g., public beaches, campgrounds) property, recreation areas (e.g., public beaches, campgrounds) McConnell Lake Park COLUMBIA SHUSWAP Walloper Lake Park Lac Le Jeune Park Monte Lake Park Sal m Roche Lake Park ay hw g i H on R iver Highway g Hi t t ri A er M s op STUMP LAKE Ew e r C re e k Highwa y A o ml a K o5 N ay hw NORTH OKANAGAN THOMPSON-NICOLA Nas w hito Cr eek Vernon W h ite NICOLA LAKE m an Truman Dagnus Locheed Park C r eek Monck Park Kekuli Bay Park Ellison Park Kalamalka Lake Park KALAMALKA LAKE DOUGLAS LAKE ek as Cr e Fintry Park ug l Lake Country High way Do WOOD LAKE Wrinkly Face Park PENNASK LAKE Lambly Pennask Lake Park C reek Po we rs CENTRAL OKANAGAN Cr e ek Pennask Creek Park Bear Creek Park Trepanier Park way h g i ah ihall u q Co C Kelowna City of West Kelowna Hi gh wa y OKANAGAN LAKE Westbank Park C Myra-Bellevue Park Okanagan Mountain Park Darke Lake Park OKANAGAN-SIMILKAMEEN Okanagan Lake Park ay hw Hig Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community LEGEND Alternative 1 Alternative 2 Notes: 1. Intended for Illustration purposes only. 2. Original in colour. Alternative 3 Roads Streams CLIENT NAME: PROJECT LOCATION: Okanagan District Boundary Parks and Protected Areas West Kelowna Transmission Line Project Socio-economy and Community Lakes Moderate environmental sensitivity High environmental sensitivity Very high environmental sensitivity 0 3,750 7,500 15,000 22,500 30,000 Meters BY: SS CHK'D: SH DATE: 2015/11/05 SCALE: 1:175,000 PROJ COORD SYS: NAD 1983 UTM Zone 11N REF No: REV: Project Path: MXD Path: \\Sli2606\projects\LOB\EIAM-BC\Current Projects\BC Hydro\WEST KELOWNA\630167\4.0 Execution\4.5 GIS and Drawings\GIS\MXD\SocioEc\630167_05_008_SocioEc_Risk_Map_Rev0_SizeD.mxd Peachland Eneas Lakes Park

20 Collaborating with First Nations We place a high value on our relationship with First Nations; the input and participation of First Nations is crucial to all of our projects. We re collaborating with the Okanagan Nation and other First Nations to understand and address their interests throughout the life of the project. We re collaborating with the Okanagan Nation and other First Nations to find opportunities for their participation in work at different stages of the project.

21 Stakeholder engagement We want to develop mutually beneficial relationships with communities, stakeholders and members of the public by: Encouraging your participation; Providing you with timely information; Receiving your input; and Letting you know the outcomes of the engagement process. SO FAR WE VE: Launched a project website at bchydro.com/wktp. Informed the public about the project through local media and direct mail. Held public open houses in June 2015 and November 2015, and posted communication and consultation summaries online for each. Met with the City of West Kelowna, District of Peachland, Central Okanagan Regional District, City of Vernon, Township of Spallumcheen and City of Kelowna. GOING FORWARD WE LL: Continue meeting with and updating key municipalities, regional districts and other stakeholder groups. Provide project updates to interested stakeholders. Hold additional public open houses, as we move forward with this project. Consultation will be ongoing throughout the life of the West Kelowna Transmission Project.

22 Next steps After this consultation period is complete, we ll assess the alternatives to identify a leading alternative for further study. We plan to complete that process and share that information with you before the end of For more information, please visit bchydro.com/wktp or contact us at , or stakeholderengagement@bchydro.com. Your input is needed to help us evaluate the alternatives, please fill out a feedback form before you leave. Thank you!

West Kelowna Transmission Project. Stakeholder Communication and Consultation Summary NOVEMBER 2016 DECEMBER 2017 JANUARY 2018 BCH17-925

West Kelowna Transmission Project. Stakeholder Communication and Consultation Summary NOVEMBER 2016 DECEMBER 2017 JANUARY 2018 BCH17-925 West Kelowna Transmission Project Stakeholder Communication and Consultation Summary NOVEMBER 2016 DECEMBER 2017 JANUARY 2018 BCH17-925 Table of contents Table of contents... 1 Introduction... 2 Overview...

More information

W and SE Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot.

W and SE Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot. W and SE-15-12-2-2 Legend Urban Municipality Township label Section label Cadastral Surface Parcel To wn sh ip River Lot Section Quarter Section First Nations Park Regional Park Date: February 23, 2017

More information

Public Notice. 2. APPLICANT: Shepherd of the Valley Lutheran Retirement Services, Inc Silica Road. Austintown, Ohio 44515

Public Notice. 2. APPLICANT: Shepherd of the Valley Lutheran Retirement Services, Inc Silica Road. Austintown, Ohio 44515 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

Public Notice. Notice No Revision 1-proposed mitigation change Closing Date: January 3, 2018

Public Notice. Notice No Revision 1-proposed mitigation change Closing Date: January 3, 2018 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

Section :18,056. Scale. Legend. Building. Corral. Dam. Dugout. Gate. Graveyard. Power. Pump. Spring. Trough. Well. Windmill. Fence.

Section :18,056. Scale. Legend. Building. Corral. Dam. Dugout. Gate. Graveyard. Power. Pump. Spring. Trough. Well. Windmill. Fence. Section 06-04-21-2 Legend Building Corral Dam Dugout Gate Graveyard Power Pump Spring Trough Well Windmill Fence Trail Waterline Field Hay Plots Pasture Boundary - SPP Date: February 15, 2017 Scale 1:18,056

More information

W Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot. Section.

W Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot. Section. W-29-30-8-2 Legend Urban Municipality Township label Section label Cadastral Surface Parcel To wn sh ip River Lot Section Quarter Section Date: February 14, 2017 Scale 1:18,056 μ Sources: Esri, HERE, DeLorme,

More information

KIUC Pumped Storage. April 2015

KIUC Pumped Storage. April 2015 KIUC Pumped Storage April 2015 Where Kauai Gets Its Power Fuel Mix 2009 Fuel Mix 2015 Hydro 9% Biomass 12% Hydro 9% Oil 91% Oil 62% Solar 17% 2 Renewable Energy Outlook for 2023 Oil/gas 34% Hydro 18% Biomass

More information

November 30, 2017

November 30, 2017 Post Office Box 151 Bakersfield, CA 9332 Tel: (661) 616-65 Fax: (661) 616-655 November 3, 217 Pamela Creedon, Executive Officer Central Valley Regional Water Quality Control Board 1685 E Street Fresno,

More information

Peace Region Electricity Supply Project open house

Peace Region Electricity Supply Project open house Peace Region Electricity Supply Project open house Welcome! Please take a look at our materials to learn more about the project and what to expect during construction. Project team members are here to

More information

Matre Forestry Consulting, Inc Lafayette Plaza Dr Suite 204 Albany GA Office (229) Fax (229)

Matre Forestry Consulting, Inc Lafayette Plaza Dr Suite 204 Albany GA Office (229) Fax (229) Matre Forestry Consulting, Inc. 2549 Lafayette Plaza Dr Suite 204 Albany GA 31707 Office (229) 639 4973 Fax (229) 255 2910 www.matreforestry.com Re: Webster GA 135 Dear Interested Parties, Matre Forestry

More information

Facility Site Proposed Laydown/Parking

Facility Site Proposed Laydown/Parking Site Location Document Path: T:\GIS\_Power_Station\MXD\Required_Maps\Figure_01-1 Facility_Location.mxd Legend Facility Site Proposed Laydown/Parking County, OH 0 500 1,000 2,000 Feet O USGS 7.5 Minute

More information

WESTERN AUSTRALIA. Kings Park, Perth WHERE SHOULD ALL THE TREES GO? STATE BY STATE

WESTERN AUSTRALIA. Kings Park, Perth WHERE SHOULD ALL THE TREES GO? STATE BY STATE WESTERN AUSTRALIA Kings Park, Perth WHERE SHOULD ALL THE TREES GO? STATE BY STATE WHAT S HAPPENING? Average canopy cover urban WA is 19.95% down 2.32% from 22.27% in 2011. 41% of urban LGAs in WA have

More information

Longview, WA. Kalama, WA PROJECT SITE. PROJECT: Kalama Manufacturing and Marine Export Facility Project FIGURE 1: VICINITY MAP

Longview, WA. Kalama, WA PROJECT SITE. PROJECT: Kalama Manufacturing and Marine Export Facility Project FIGURE 1: VICINITY MAP Longview, WA Esri, HERE, DeLorme, MapmyIndia, OpenStreetMap contributors, and the GIS user community PROJECT SITE 0 2,875 5,750 11,500 Feet PURPOSE: Construct a facility to manufacture and exp IN: Columbia

More information

Evaluating Suspended-Sediment Dynamics and Turbidity in the Upper Esopus Creek Watershed: A Comprehensive Study

Evaluating Suspended-Sediment Dynamics and Turbidity in the Upper Esopus Creek Watershed: A Comprehensive Study Evaluating Suspended-Sediment Dynamics and Turbidity in the Upper Esopus Creek Watershed: A Comprehensive Study Jason Siemion, Dany Davis, Michael R. McHale, and Matthew Cashman A few questions this presentation

More information

Notice No Closing Date: April 7, 2019

Notice No Closing Date: April 7, 2019 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

Tyndall 115 kv Transmission Line and Distribution Supply Centre Environmental Assessment Report

Tyndall 115 kv Transmission Line and Distribution Supply Centre Environmental Assessment Report MANITOBA HYDRO Tyndall 115 kv Transmission Line and Distribution Supply Centre Environmental Assessment Report Prepared By: Transmission Planning and Design Division Licensing and Environmental Assessment

More information

NEW SOUTH WALES. Wendy s Secret Garden

NEW SOUTH WALES. Wendy s Secret Garden NEW SOUTH WALES Wendy s Secret Garden WHERE SHOULD ALL THE TREES GO? STATE BY STATE NSW WHAT S HAPPENING? Average canopy cover for urban NSW is 26.64% down 0.83% from 27.47% in 2009. The highest canopy

More information

Metro North Transmission Project Project Update October 2017

Metro North Transmission Project Project Update October 2017 Metro orth Transmission Project Project Update October 2017 Project Update Since October 2016, our focus has been on completing the necessary field work to help develop our preliminary design and preferred

More information

PN Comment Period: February 9, 2015 to March 9, 2015

PN Comment Period: February 9, 2015 to March 9, 2015 Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (Delmarva Power and Light Co/North Baltimore District Salisbury to Worcester) 2014-61657 PN 15-11 Comment Period:

More information

Bass Lake Wastewater Treatment Feasibility Report

Bass Lake Wastewater Treatment Feasibility Report Bass Lake Wastewater Treatment Feasibility Report Feasibility Study Prepared for: Town of St. Joseph Prepared by: Thomas Dye, PE Table of Contents EXECUTIVE SUMMARY... I 1.0 INTRODUCTION... 1.1 2.0 EXISTING

More information

1.0 Introduction and background

1.0 Introduction and background 1.0 Introduction and background 1.1 Purpose of the document This Environmental Assessment Report (EA Report) for the proposed Birtle Transmission Project (the Project ) is in support of an application

More information

JOINT PUBLIC NOTICE December 3, 2018

JOINT PUBLIC NOTICE December 3, 2018 JOINT PUBLIC NOTICE December 3, United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Water Permits Division 7400 Leake Avenue

More information

1.0 Introduction and background

1.0 Introduction and background .0 Introduction and background. Purpose of the document This (EA Report) for the proposed Poplar Bluff Transmission Project (the Project ) is in support of an application to obtain a license for a Class

More information

A. BC Hydro, Sue Foster, Project Manager & Sabrina Locicero, Stakeholder Engagement (15 Min) Re: West Kelowna Transmission Line Project - Update

A. BC Hydro, Sue Foster, Project Manager & Sabrina Locicero, Stakeholder Engagement (15 Min) Re: West Kelowna Transmission Line Project - Update DISTRICT OF PEACHLAND COMMITTEE OF THE WHOLE AGENDA Council Chambers Community Centre 4450-6th Street Peachland Tuesday, September 5, 2017 at 9:00 A.M. Mission Statement Our Mission is to provide our taxpayers,

More information

Lake Country. Our Home. Our Future.

Lake Country. Our Home. Our Future. 3. Environment and Sustainability 3.1 Existing Conditions, Goals, Objectives and Existing Conditions The District of Lake Country is renewing its commitment to protecting and enhancing the environmental

More information

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Rancho Paloma Residential Development Public Notice/Application No.: SPL-2014-00044-PC Project: Rancho

More information

Page 1 of 5. FrontCounterBC Kamloops 441 Columbia Street Kamloops, BC V2C 2T3

Page 1 of 5. FrontCounterBC Kamloops 441 Columbia Street Kamloops, BC V2C 2T3 FrontCounterBC Kamloops 441 Columbia Street Kamloops, BC V2C 2T3 Date: August 13, 2014 Investigation Plan: General Commercial (Solar Energy) Application for Investigative Licence Site name: Brenda Mine

More information

Pine Ridge Estate. Scott Saults Associate Broker Scott s Cell:

Pine Ridge Estate. Scott Saults Associate Broker Scott s Cell: Pine Ridge Estate A must-see country home sitting on 85± acres Southeast of Crawford, NE. Property Highlights List Price $729,000 Location Legal Description 13 miles Southeast of Crawford, NE Part of the

More information

We re here to share information about the project so you can see how it might affect you, your community, and the environment.

We re here to share information about the project so you can see how it might affect you, your community, and the environment. Welcome Revelstoke 6 Project We re here to share information about the project so you can see how it might affect you, your community, and the environment. Is there anything else that needs to be considered?

More information

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 01 STONY MOUNTAIN PIPELINE Laricina will develop and follow an environmental protection plan that meets or exceeds

More information

JOINT PUBLIC NOTICE May 30, 2016

JOINT PUBLIC NOTICE May 30, 2016 JOINT PUBLIC NOTICE May 30, 2016 United States Army State of Louisiana Corps of Engineers Department of Environmental Quality New Orleans District Water Quality Certifications Section Regulatory Branch

More information

4.0 BASIS OF CUMULATIVE ANALYSIS

4.0 BASIS OF CUMULATIVE ANALYSIS 4.0 BASIS OF CUMULATIVE ANALYSIS CEQA Guidelines Section 15355 provides the following definition of cumulative impacts: Cumulative impacts refer to two or more individual effects which, when considered

More information

2010 Utility Plan Amendment Boxelder Sanitation District

2010 Utility Plan Amendment Boxelder Sanitation District 2010 Utility Plan Amendment Boxelder Sanitation District For inclusion of the Harmony Ridge Development November 7, 2014 1612 Specht Point Rd. Ste. 105 Fort Collins, Colorado 80525-9770 p 970.484.7477

More information

NREX is intended to provide useful, landscape-level information during the early stages of project planning. 10:48:08 AM 1:72,223.

NREX is intended to provide useful, landscape-level information during the early stages of project planning. 10:48:08 AM 1:72,223. Service Layer Credits: Transmission Lines: Data Owner - Wyoming Infrastructure Authority, Service Provider - Wyoming Geographic Information Science Center Sources: Esri, HERE, DeLorme, USGS, Intermap,

More information

To: Steve Lines From: Fiona Christiansen. File: Date: September 15, 2015

To: Steve Lines From: Fiona Christiansen. File: Date: September 15, 2015 Memo To: From: Fiona Christiansen Greenstone Gold Mines (GGM) Guelph ON Office File: 160960946 Date: CONTEXT As part of the provincial individual environmental assessment (EA) process for the Hardrock

More information

OKANAGAN WATER PROJECTS GET FUNDS TO MOVE AHEAD

OKANAGAN WATER PROJECTS GET FUNDS TO MOVE AHEAD April 17, 2018 FOR IMMEDIATE RELEASE OKANAGAN WATER PROJECTS GET FUNDS TO MOVE AHEAD Kelowna, B.C. The Okanagan Basin Water Board (OBWB) has approved $300,000 in funding to 18 projects to help conserve

More information

Welcome. Metro North Transmission Project Burnaby Community Information Open House March 8, About the Metro North Transmission Project

Welcome. Metro North Transmission Project Burnaby Community Information Open House March 8, About the Metro North Transmission Project Welcome Metro North Transmission Project Burnaby Community Information Open House March 8, 207 Thank you for attending this Community Information Open House about the Metro North Transmission Project.

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration Background Addendum to Mitigated Negative Declaration Date of Publication of the Addendum: Date of Final MND: May 2, 2016 Case No.: 2013.1761E Project Title: PG&E Gas Transmission Line 109 Cañada Road,

More information

PART IV WATER QUANTITY MONITORING, TECHNOLOGICAL ADVANCES AND CONCLUSIONS

PART IV WATER QUANTITY MONITORING, TECHNOLOGICAL ADVANCES AND CONCLUSIONS PART IV WATER QUANTITY MONITORING, TECHNOLOGICAL ADVANCES AND CONCLUSIONS 17.1 INTRODUCTION CHAPTER 17 Water Quantity Monitoring The Okanagan Study has revealed the need for an improved monitoring system

More information

Going to Town in Fort Worth

Going to Town in Fort Worth Going to Town in Fort Worth Central Reclaimed Water Delivery System Feasibility Study Sarah Seamands, PE & Ellen McDonald Ph.D., PE Frank Crumb, PE & Andy Cronberg PE Project sponsored by: With funding

More information

Amisk Hydroelectric Project Update

Amisk Hydroelectric Project Update Amisk Hydroelectric Project Update AHP Development Corporation (AHP) is providing an update on the Amisk Hydroelectric Project ( Amisk /the Project ). Amisk is a proposed run-of-river hydroelectric project,

More information

PART 1: ROUTING UPDATE

PART 1: ROUTING UPDATE PART 1: ROUTING UPDATE TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PIPELINE CORRIDOR... 2 Page 2.1 Overview of Pipeline Corridor Selection and Optimization Process... 2 2.2 Environmental, Socio-Economic

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health

More information

Public Notice ISSUED: August 9, 2016 EXPIRES: September 8, 2016

Public Notice ISSUED: August 9, 2016 EXPIRES: September 8, 2016 APPLICANT: Jeff Richards REFER TO: MVP-2014-03152-RMM Public Notice ISSUED: August 9, 2016 EXPIRES: September 8, 2016 SECTION: 404 - Clean Water Act 10 - Rivers and Harbor Act 1. APPLICATION FOR PERMIT

More information

3901 Industrial Boulevard Indianapolis, IN 46240

3901 Industrial Boulevard Indianapolis, IN 46240 Joint Public Notice Public Notice No. Open Date: Close Date: LRL-2015-844-sam 6 Jul 2016 8 Aug 2016 US Army Corps of Engineers Louisville District Please address all comments and inquiries to: U.S. Army

More information

For Lease Beaver Marsh Rd Mount Vernon, WA

For Lease Beaver Marsh Rd Mount Vernon, WA For Lease 15573 Beaver Marsh Rd Mount Vernon, WA 3,000 +/- sf shop building on 1.01 +/- acres Formerly operated as BFF Trucking Good truck/tractor or auto shop Zoned SSB: Small Scale Business $2,500 per

More information

WATER QUALITY MONITORING PLAN PROPOSED SPRINGS EQUESTRIAN CENTER RESCUE, CALIFORNIA (APN )

WATER QUALITY MONITORING PLAN PROPOSED SPRINGS EQUESTRIAN CENTER RESCUE, CALIFORNIA (APN ) WATER QUALITY MONITORING PLAN PROPOSED SPRINGS EQUESTRIAN CENTER RESCUE, CALIFORNIA (APN 115-410-05-100) BSK PROJECT E1506501S PREPARED FOR: ESSENTIAL PROPERTIES GROUP, INC. 970 RESERVE DRIVE, BUILDING

More information

ACP BIOLOGICAL CONTROL MOVES TOWARD GRID RELEASE STRATEGY

ACP BIOLOGICAL CONTROL MOVES TOWARD GRID RELEASE STRATEGY MULTI-AGENCY PARTNERSHIP ACP BIOLOGICAL CONTROL MOVES TOWARD GRID RELEASE STRATEGY David Morgan, Grace Radebough, Alejandro Muniz Female Tamarixia radiata. 62 Citrograph Magazine Spring 2014 Adult Tamarixia

More information

Runoff Water Management in Bailadila Range, Kirandul, India

Runoff Water Management in Bailadila Range, Kirandul, India GIS in Water Resources Final Project Report Runoff Water Management in Bailadila Range, Kirandul, India Anamika Kumari Under Guidance of Dr. David R. Maidment December 1, 215 Contents 1. Introduction 1

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 4: State Road 400 (SR 400)/Interstate 4 (I-4) from East of SR 15-600/US 17-92 (Seminole/Volusia County Line) to ½ Mile East of SR 472 Volusia County (79110),

More information

How to manage ponderosa pine ecosystems in BC s protected areas after the pine beetle

How to manage ponderosa pine ecosystems in BC s protected areas after the pine beetle How to manage ponderosa pine ecosystems in BC s protected areas after the pine beetle Alan Vyse, and the Py research group Thompson Rivers University The project team André Arsenault Jeremy De Waard Tom

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 64

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 64 Brannigan Creek ± N2-Soils-104 DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD 51 50 N2-Soils-106

More information

BACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the

BACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the BACKGROUND INFORMATION for the INITIAL FEDERAL PUBLIC COMMENT PERIOD on the Comprehensive Study pursuant to the Canadian Environmental Assessment Act of the Ajax Mine Project Kamloops, British Columbia

More information

Electricity Planning in the Parry Sound-Muskoka area

Electricity Planning in the Parry Sound-Muskoka area Electricity Planning in the Parry Sound-Muskoka area Local Advisory Committee Meeting #1 June 20, 2016 Presentation Outline Role of the Local Advisory Committee Overview of regional planning process &

More information

Moose Winter Range Mapping, Boundary Forest District, British Columbia

Moose Winter Range Mapping, Boundary Forest District, British Columbia Moose Winter Range Mapping, Boundary Forest District, British Columbia Les W. Gyug, Registered Professional Biologist Okanagan Wildlife Consulting 3 130 Ensign Way Westbank, B.C. V4T 1T9 Prepared for B.C.

More information

Assistant Deputy Minister, Regional Operations South Area

Assistant Deputy Minister, Regional Operations South Area Ministry of Forests, Lands, Natural Resource Operations and Rural Development Area The Ministry of Forests, Lands, Natural Resource Operations and Rural Development is the Province s land manager, responsible

More information

Ellison Official Community Plan Bylaw No.1124 Schedule A

Ellison Official Community Plan Bylaw No.1124 Schedule A Ellison Official Community Plan Bylaw No.1124 Schedule A Adopted: February 27, 2006 CONSOLIDATED COPY Revised March 29, 2017 Planning Section - Development Services Regional District of Central Okanagan

More information

Public Notice ISSUED: March 17, 2016 EXPIRES: April 17, 2016

Public Notice ISSUED: March 17, 2016 EXPIRES: April 17, 2016 SPONSOR: Stanley Antolick Public Notice ISSUED: March 17, 2016 EXPIRES: April 17, 2016 REFER TO: 2015-01201-LMG SECTION:404 - Clean Water Act 1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL 2. SPECIFIC

More information

Public Notice. Name of Applicant: Mr. Ken Primos Klaas Partners, LLC 212 Waterford Square Suite 300 Madison, Mississippi 39910

Public Notice. Name of Applicant: Mr. Ken Primos Klaas Partners, LLC 212 Waterford Square Suite 300 Madison, Mississippi 39910 US Army Corps of Engineers. Vicksburg District 4155 Clay Street Vicksburg, MS 39183-3435 www.mvk.usace.army.mil Public Notice APPLICATION NO.: RVH-MVK-2004-164 EVALUATOR: Mr. Randy Holder PHONE NO.: (601)

More information

Peace River Regional District REPORT

Peace River Regional District REPORT Peace River Regional District REPORT A-2 To: From: Chair and Directors Bruce Simard, GM of Development Services Date: September 23, 2015 Subject: Invitation to Working Group for Environmental Assessment

More information

CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT

CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT WATER BALANCE FOR THE LOWER COLORADO RIVER AUTHORITY: AN INVESTIGATION INTO THE ROLE OF MUNICIPAL WATER DEMAND BRUK BERHANU ENVIRONMENTAL AND WATER RESOURCES

More information

Columbia River Treaty Frequently Asked Questions (FAQs)

Columbia River Treaty Frequently Asked Questions (FAQs) Columbia River Treaty Frequently Asked Questions (FAQs) Spring 2012 Columbia River Treaty 1. What is the Columbia River Treaty? The Columbia River Treaty is a trans-boundary water management agreement

More information

Weyerhaeuser Co. Ltd., Forest Licence A Tolko Industries Ltd., Forest Licences A18667, A18672, A74912

Weyerhaeuser Co. Ltd., Forest Licence A Tolko Industries Ltd., Forest Licences A18667, A18672, A74912 Audit of Forest Planning and Practices within the Penticton and Mission Creek Community Watersheds Weyerhaeuser Co. Ltd., Forest Licence A18674 Tolko Industries Ltd., Forest Licences A18667, A18672, A74912

More information

DRAFT FINAL Spokane River. Field Sampling Report

DRAFT FINAL Spokane River. Field Sampling Report DRAFT FINAL - 2015 Spokane River Field Sampling Report SPOKANE RIVER REGIONAL TOXICS TASK FORCE WASHINGTON AND IDAHO Prepared for SRRTTF Prepared by Gravity Consulting, L.L.C. 32617 SE 44 th St Fall City,

More information

WHO ARE WE? Willow Ridge Wind Project

WHO ARE WE? Willow Ridge Wind Project Willow Ridge WELCOME This is the Second Public Open House for the, where project staff are available to answer any questions and recieve input from attendees.this process is being undertaken as part of

More information

Draft Conceptual Stormwater Management Plan Report

Draft Conceptual Stormwater Management Plan Report Draft Conceptual Stormwater Management Plan Report October 2016 TABLE OF CONTENTS Page No. ACRONYMS AND ABBREVIATIONS... AC-1 EXECUTIVE SUMMARY... ES-1 1.0 SITE DESCRIPTION... 1 1.1 Existing Site Soil

More information

PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY

PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY Natural Areas in Prince George The City of Prince George is dominated by natural, undeveloped areas within city limits and in adjacent

More information

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals

Phase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals Phase 1 - Technical Assessment Kettle River Watershed Management Plan Request for Proposals Closing date and time: 4:00 PM, January 28, 2011 Pacific Standard Time Location of proposal closing: Regional

More information

Pomeroy Hotel, Fort St. John (11308 Alaska Road) Attending open houses Providing feedback online: Hudson s Hope.

Pomeroy Hotel, Fort St. John (11308 Alaska Road) Attending open houses Providing feedback online:   Hudson s Hope. WELCOME Project Definition Consultation APRIL 10 MAY 31, 2012 We Want to Hear From You Project Definition Consultation, Spring 2012 takes place April 10 through May 31, 2012. Consultation materials are

More information

Conceptual Stormwater Management Plan Report

Conceptual Stormwater Management Plan Report February 2017 February 2017 Prepared by: Sadik Ahmed, M.A.Sc. Stormwater Engineer Prepared by: Zeeshan Merchant, B.Sc., P.Eng. Water and Wastewater Engineer Reviewed by: Yousry Hamdy, M.Sc., P.Eng. Water

More information

Shallow Interval Soil Metal Sampling Platte to Park Hill 39 th Avenue Channel Project Area City and County of Denver, Colorado

Shallow Interval Soil Metal Sampling Platte to Park Hill 39 th Avenue Channel Project Area City and County of Denver, Colorado Page intentionally left blank to accommodate double-sided printing July 31, 2017 Shallow Interval Soil Metal Sampling Platte to Park Hill 39 th Avenue Channel Project Area City and County of Denver, Colorado

More information

CAT BRANCH W16O016 & W16O017 OUTFALL RETROFITS FINAL DESIGN REPORT

CAT BRANCH W16O016 & W16O017 OUTFALL RETROFITS FINAL DESIGN REPORT Prepared for: Anne Arundel County Department of Public Works CAT BRANCH W16O016 & W16O017 OUTFALL RETROFITS FINAL DESIGN REPORT APRIL 2018 CONTRACT #: B552301 Prepared by: Consultants & Designers, Inc.

More information

Preparatory Activities

Preparatory Activities March 1, 2017 Ms. Katie Robertson Oregon Department of Environmental Quality 800 SE Emigrant, Suite 330 Pendleton, Oregon 97801 Re: Monitoring Well MW 25 Abandonment Fashion Cleaners Site (ECSI #1004)

More information

APPENDIX F Land Use Within 500M of Landfill Site

APPENDIX F Land Use Within 500M of Landfill Site APPENDIX F Land Use Within 500M of Landfill Site June 30, 2016 Project No. 1650598 (1000) Peter Raabe, P.Eng., Director of Environmental Services City of Brockville 1 King Street West P.O. Box 5000 Brockville,

More information

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure

More information

FortisBC Energy Inc Kingsvale - Oliver Pipeline Reinforcement Project ( KORP ) Presentation to RDOS

FortisBC Energy Inc Kingsvale - Oliver Pipeline Reinforcement Project ( KORP ) Presentation to RDOS FortisBC Energy Inc Kingsvale - Oliver Pipeline Reinforcement Project ( KORP ) Presentation to RDOS March 15, 2012 Terasen Gas Inc. Name Change to FortisBC Energy Inc. On March 01, 2011, Terasen Gas Inc

More information

for the January 2018 MRB Group Project No

for the January 2018 MRB Group Project No Town of Canandaigua 5440 Route 5 & 20 West Canandaigua, New York 14424 PRELIMINARY ENGINEERING REPORT for the TOWN OF CANANDAIGUA WATER BOOSTER STATION, TRANSMISSION MAIN, & STORAGE TANKS January 2018

More information

OVERVIEW. What is Drought? Provincial Response Lessons Learned Some suggestions for OWSC

OVERVIEW. What is Drought? Provincial Response Lessons Learned Some suggestions for OWSC DEALING WITH DROUGHT Presentation to: Okanagan Water Stewardship Council 14 December 2006 Wenda Mason Water Stewardship Division Ministry of Environment OVERVIEW What is Drought? Provincial Response Lessons

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 9

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 9 DOCUMENT PATH: G:\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD ± Soils-124 Soils-122 -Soils-124 S 91 90 89 88 87

More information

Proposed Northwest Transmission Line

Proposed Northwest Transmission Line Proposed Northwest Transmission Line Public open houses: Smithers March 31, 2009 Hudson Bay Lodge Terrace April 1, 2009 Coast Inn of the West Stewart April 2, 2009 Al Lawrence Memorial Arena Overview About

More information

Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17

Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17 Client: Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17 Legend Structure Wetland Features 0-18 in 18-36 in 36-48 in > 48 in Max Temporary Pool Watershed ± 0 0.05 0.1 0.2 Miles 0

More information

ADDENDUM #1. January 29 th, 2019

ADDENDUM #1. January 29 th, 2019 ADDENDUM #1 January 29 th, 2019 PROJECT: Virginia Polytechnic Institute & State University, Blacksburg, Virginia Shanks Hall Roof Replacement (0006) IFB 0058280 1. The bid due date has been extended to

More information

About TransCanada. At TransCanada, our mission is to safely, responsibly and reliably transport energy used by millions of North Americans every day.

About TransCanada. At TransCanada, our mission is to safely, responsibly and reliably transport energy used by millions of North Americans every day. About TransCanada Wholly Owned Natural Gas Pipeline Partially Owned Natural Gas Pipeline Natural Gas Pipeline Under Construction Natural Gas Pipeline In Development Liquids Pipeline Liquids Pipeline Under

More information

Public Notice ISSUED: July 1, 2015 EXPIRES: July 31, 2015

Public Notice ISSUED: July 1, 2015 EXPIRES: July 31, 2015 APPLICANT: REFER TO: Larry Jacobson, Hiawatha Beach Resort 2014-00041-WAB Public Notice ISSUED: July 1, 2015 EXPIRES: July 31, 2015 SECTION 404 - Clean Water Act SECTION 10 Rivers and Harbors Act 1. APPLICATION

More information

I N F O R M A T I O N B U L L E T I N

I N F O R M A T I O N B U L L E T I N 2013ENV0014-000316 Feb. 21, 2013 I N F O R M A T I O N B U L L E T I N Ministry of Environment Ministry of Forests, Lands and Natural Resource Operations B.C. continues acting on conserving biodiversity

More information

ROUND 2 OPEN HOUSE. Keeyask Transmission Project EA Report Appendix D: Public Involvement Materials D-81

ROUND 2 OPEN HOUSE. Keeyask Transmission Project EA Report Appendix D: Public Involvement Materials D-81 ROUND 2 OPEN HOUSE D-81 This page is intentionally left blank. D-82 Open House Report Round Two Public Involvement Program for the proposed Keeyask Transmission Project Location: Gillam Recreation Centre

More information

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver. In July 2000, City Council adopted an Environmental Protection Program for the City of North Vancouver. Chapter 8 Environment 8.1 RELATIONSHIP TO OUR VISION The Environment is core to our vision of a sustainable

More information

JOINT PUBLIC NOTICE November 16, 2015

JOINT PUBLIC NOTICE November 16, 2015 JOINT PUBLIC NOTICE November 16, 2015 United States Army State of Louisiana Corps of Engineers Department of Environmental Quality New Orleans District Water Quality Certifications Section Regulatory Branch

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 1: from west of CR 532 (Polk/Osceola County Line) to west of SR 528 Beachline Expressway June, 2014 Stantec 615 Crescent Executive Court Suite 248 Lake

More information

JOINT PUBLIC NOTICE. October 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

JOINT PUBLIC NOTICE. October 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana JOINT PUBLIC NOTICE October 16, 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services

More information

SUMMERLAND REGIONAL ORGANIC MANAGEMENT CONSULTANT TASK 2 FEASIBILITY ASSESSMENT FILE: 704-ENVSWM NOVEMBER 17, 2015 ISSUED FOR USE

SUMMERLAND REGIONAL ORGANIC MANAGEMENT CONSULTANT TASK 2 FEASIBILITY ASSESSMENT FILE: 704-ENVSWM NOVEMBER 17, 2015 ISSUED FOR USE ORGANIC MANAGEMENT CONSULTANT TASK 2 FEASIBILITY ASSESSMENT FILE: 704-ENVSWM03094-01 NOVEMBER 17, 2015 ISSUED FOR USE SUMMERLAND REGIONAL Feasibility Assessment Report_IFU.docx 1.0 INTRODUCTION The following

More information

Welcome to our Open House!

Welcome to our Open House! Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If

More information

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project EA Certificate #E14-06 Amendment #4, Additional Construction Camps and Stand-by Compressor Units Requested

More information

Central Okanagan Business Walk. Findings October 1, 2015

Central Okanagan Business Walk. Findings October 1, 2015 2015 Central Okanagan Business Walk Findings October 1, 2015 A Executive Summary: The Central Okanagan Economic Development Commission (COEDC) facilitated the first Business Walk in Canada in October,

More information

FortisBC Cost of Service Analysis

FortisBC Cost of Service Analysis FortisBC Cost of Service Analysis Public Open House May 2009 1 Goals of COSA Public Consultation Explain Cost of Service Gather Input Answer Questions Encourage Ongoing Participation 2 1 The Public Consultation

More information

4 Chain of Lakes and Quarry Operations Impacts

4 Chain of Lakes and Quarry Operations Impacts Zone 7 Water gency 4.1 Program Description and Quarry Operations Impacts The Chain of Lakes/Mining rea Monitoring Program includes water level measurements and water quality analysis for many of the mining

More information

West Kelowna Transmission Project. Wildfire Risk Assessment. October 2016

West Kelowna Transmission Project. Wildfire Risk Assessment. October 2016 October 2016 Submitted by: Bruce A. Blackwell B.A. Blackwell & Associates Ltd. 270 18 Gostick Place North Vancouver, BC V7M 3G3 Phone: 604-986-8346 Email: bablackwell@bablackwell.com GST No.: 132457983

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA SEP

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA SEP DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA 30260-1777 REPLY TO ATTENTION OF Regulatory Division SAS-2000-03600 SEP - 4 2014 PUBLIC NOTICE

More information

Do you travel across the region for work, to visit family or to access services?

Do you travel across the region for work, to visit family or to access services? Do you travel across the region for work, to visit family or to access services? Transportation across the region provides a vital connection to jobs, health care, education, recreation, shopping, emergency

More information

COMMISSION. OGC File: LNG Canada Development Inc th Avenue SW Calgary, AB T2P 0J4. Attention: Surface Land Administrator

COMMISSION. OGC File: LNG Canada Development Inc th Avenue SW Calgary, AB T2P 0J4. Attention: Surface Land Administrator COMMISSION OGC File: 9642638 LNG Canada Development Inc. 400-4th Avenue SW Calgary, AB T2P 0J4 Attention: Surface Land Administrator Re: Approval for Changes in and About a Stream Date of issuance: July

More information