1 March 1, 2017 Ms. Katie Robertson Oregon Department of Environmental Quality 800 SE Emigrant, Suite 330 Pendleton, Oregon Re: Monitoring Well MW 25 Abandonment Fashion Cleaners Site (ECSI #1004) 623 Klamath Avenue Klamath Falls, Oregon /Task 2 Dear Ms. Robertson: This letter summarizes the abandonment of monitoring well MW 25 at the Fashion Cleaners site near the intersection of Klamath Avenue and 6th Street in Klamath Falls, Oregon (Figure 1). Abandonment activities were conducted on September 26, 2016, and included abandoning MW 25 by overdrilling in anticipation of building upgrades at the Kern Building adjacent to the former dry cleaner property (Figure 2). All work was completed for the Oregon Department of Environmental Quality (DEQ) under Task Order Preparatory Activities Hart Crowser conducted a competitive bid solicitation for private utility locating, well abandoning, and for picking up and disposing of investigation derived waste (IDW). Based on cost and the ability to complete work within the required timeframe, the following subcontractors were selected: APS Locates of Portland, Oregon, to perform private utility locates at the abandonment location; Stratus Corporation (Stratus) of Gaston, Oregon, for abandonment of MW 25; and Waste Management of Portland, Oregon, to pick up and dispose of the IDW. Access to the well location was granted by an access agreement that DEQ has with the affected property owner. Abandonment Activities Well abandonment activities, including mobilization to the site, occurred on September 26, 2016, and were completed within one day. Monitoring well MW 25 was abandoned by overdrilling by Stratus, an Oregon licensed driller, in accordance with OWRD regulations (Oregon Administrative Rule ). A copy of the decommissioning log is presented in Attachment A. Photographs of the abandonment activities are included in Attachment B SW Macadam Avenue, Suite 100 Portland, Oregon Fax Tel
2 Oregon Department of Environmental Quality /Task 2 March 1, 2017 Page 2 Hart Crowser arrived on site the morning of September 26th with APS Locates to perform underground utility location in the area around MW 25 prior to abandonment activities. Abandonment by overdrilling consisted of removing the flush mounted monument and pulling the well riser casing and well screen from the ground (Photographs 1 and 2). Upon casing and screen removal, the well bore was overdrilled using a push probe drill rig with an auger head attachment to 27 feet below ground surface (bgs; Photograph 3). Hydrated bentonite chips were used to backfill the hole to approximately 2 feet bgs. Concrete was then placed on over the bentonite as a surface seal from 2 feet bgs to approximately 4 inches bgs, where asphalt patch was used to complete the backfilling to match the surrounding surfaces (Photograph 4). Investigation derived waste (IDW), including well casing, concrete, steel monument, bentonite/concrete bags, and personal protective equipment, was disposed of by Stratus as solid waste. Additional IDW generated during abandonment activities included approximately 7 cubic feet of soil cuttings generated during overdrilling and approximately 50 gallons of decontamination water. This IDW was containerized in two separate, labelled 55 gallon drums and stored on the site. Because tetrachloroethylene was detected at the site, a review of analytical data from the IDW samples was conducted. Based on the results, the DEQ issued a No Longer Contained In Determination on November 14, 2016, allowing the soil and decontamination water to be disposed of as non hazardous waste. The IDW was picked up on January 5, 2017, and delivered to Waste Management s disposal facility on January 31, The No Longer Contained In Determination and final disposal receipt are provided in Attachment C. Limitations Work performed by Hart Crowser for this project and in preparation of this letter was conducted in accordance with generally accepted professional practices in the same or similar localities, related to the nature of the work accomplished at the time our services were performed. This letter is for specific application to the referenced project and for the exclusive use of the DEQ. No other warranty, express or implied, is made. If you have any questions regarding this letter, please feel free to contact us. Sincerely, HART CROWSER, INC.
3 Oregon Department of Environmental Quality /Task 2 March 1, 2017 Page 3 ANTHONY CHAVEZ, RG Task Order Manager RICHARD D. ERNST, RG Program Manager Attachments: Figure 1 Vicinity Map Figure 2 Site Plan Attachment A Decommissioning Log Attachment B Photograph Log Attachment C IDW Disposal Documentation cc: Steve Campbell, DEQ (Headquarters)
4 Washington Portland OREGON Idaho Klamath Falls California Nevada Document Path: F:\Notebooks\ _DEQ Well Abandonments-Multiple Sites\GIS\T2-FashionCleaners\ T2_Fashion_Vmap.mxd Date: 2/1/2017 User Name: melissaschweitzer 0 1,000 2,000 4,000 Feet Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, OpenStreetMap contributors, and the GIS User Community N Project Location Fashion Cleaners Site Klamath Falls, Oregon Vicinity Map /17 Figure 1
5 File: F:\Notebooks\ _DEQ Well Abandonments-Multiple Sites\CAD\T2-FashionCleaners\ T2-Fashion_MWLocs.dwg Layout:WellAbandon Date: Author: melissaschweitzer Mueller Building Former Unocal Site MW-25 MW-15 MW-9 MW-13 MW-12 LEGEND MW-27 MW-10 West Sump MW-18 6th Street Kern Sump S-2 MW-14 Mueller Sump Kern Sump S-1 Kern Building MW-5 MW-1 MW-6 MW-2 MW-8 Antique Building Sump S-1 MW-28 MW-10 MW-19C MW-4 MW-24 MW-26 MW-23 MW-26D MW-22 MW-3 MW-19A MW-7 MW-18 Antique Building Sump S-2 MW-25D MW-19B West Sump KOTI TV Building MW-21 MW-20 East Sump KOTI Parking Monitoring Well Decommissioned (September 2016) Intermediate Monitoring Well Shallow Monitoring Well Sump Monitoring Well Decommissioned (May 2015) Scale in Feet MW-25 Former Fashion Cleaners Boundary 7th Street MW-27 MW-16 Public Parking Parking Walnut Avenue Main Street Fashion Cleaners Site Klamath Falls, Oregon Site Plan Klamath Avenue US Bank Drive-Through /17 Figure 2
6 ATTACHMENT A Decommissioning Log /Task 2 March 1, 2017
7 STATE OF OREGON MONITORING WELL REPORT (as required by ORS & OAR ) KLAM /21/2016 WELL I.D. LABEL# L 4437 START CARD # Page 1 of 2 (1) LAND OWNER Owner Well I.D. MW-25 First Name Last Name Company FASHION CLEANERS Address 623 KLAMATH AVE City KLAMATH FALLS State OR Zip (2) TYPE OF WORK New Deepening Alteration (repair/recondition) Abandonment Conversion (3) DRILL METHOD Rotary Air Rotary Mud Cable Hollow Stem Auger Cable Mud Reverse Rotary Other (4) CONSTRUCTION Depth of Completed Well ft. Special Standard MONUMENT/VAULT From To Piezometer Well (6) LOCATION OF WELL (legal description) County KLAMATH Twp S N/S Range 9.00 E E/W WM Sec 32 NW 1/4 of the NE 1/4 Tax Lot 4900 Tax Map Number Lot Lat ' " or DMS or DD Long ' " or DMS or DD Street address of well Nearest address 623 KLAMATH AVE KLAMATH FALLS, OR (7) STATIC WATER LEVEL Date SWL(psi) SWL(ft) Existing Well / Predeepening Completed Well Flowing Artesian? Dry Hole? WATER BEARING ZONES Depth water was first found SWL Date From To Est Flow SWL(psi) + + SWL(ft) BORE HOLE Diameter From 0 To 27 CASING Dia. Gauge Material From Steel To Wld Thrd Plastic (8) WELL LOG Ground Elevation concrete bentonite chips Material From 0 2 To 2 27 LINER Dia. Gauge Material From Steel To Wld Thrd Plastic SEAL From Material Amount To Grout weight FILTER From To Material Size of pack (5) WELL TESTS Yield gal/min Drawdown Drill stem/pump depth Duration (hr) Temperature Supervising Geologist/Engineer Water quality concerns? From To SCREEN Casing/Liner Diameter From To Slot Size F Lab analysis Yes By Yes (describe below) Description Material Pump Bailer Air Flowing Artesian Amount Units Date Started 9/26/2016 Completed 9/26/2016 (unbonded) Monitor Well Constructor Certification I certify that the work I performed on the construction, deepening, alteration, or abandonment of this well is in compliance with Oregon monitoring well construction standards. Materials used and information reported above are true to the best of my knowledge and belief. License Number Date 10/21/2016 Password : (if filing electronically) Signed LARS-ERIC LJUNGQVIST (E-filed) (bonded) Monitor Well Constructor Certification I accept responsibility for the construction, deepening, alteration, or abandonment work performed on this well during the construction dates reported above. All work performed during this time is in compliance with Oregon monitoring well construction standards. This report is true to the best of my knowledge and belief. License Number 1537 Date 10/21/2016 Password : (if filing electronically) Signed SCOTT FLAHERTY (E-filed) Contact Info (optional) Scott Flaherty ORIGINAL - WATER RESOURCES DEPARTMENT THIS REPORT MUST BE SUBMITTED TO THE WATER RESOURCES DEPARTMENT WITHIN 30 DAYS OF COMPLETION OF WORK Form Version:
8 ATTACHMENT B Photograph Log /Task 2 March 1, 2017
9 Photograph 1 Photograph shows monitoring well MW 25 after the flush mounted monument was removed. The top of the PVC well casing is visible within the hole. Photograph taken facing south. Photograph 2 Photograph shows the PVC well casing and well screen being removed prior to overdrilling. Photograph taken facing southwest /Task 2 March 1, 2017
10 Photograph 3 Photograph shows overdrilling using the auger attachment on the push probe drill rig. Photograph taken facing south. Photograph 4 Photograph shows the asphalt patch over the MW 25 abandonment site. IDW drums can be seen along the building pending disposal. Photograph taken facing northwest /Task 2 March 1, 2017
11 ATTACHMENT C IDW Disposal Documentation /Task 2 March 1, 2017
12
13
November 30, 2017
Post Office Box 151 Bakersfield, CA 9332 Tel: (661) 616-65 Fax: (661) 616-655 November 3, 217 Pamela Creedon, Executive Officer Central Valley Regional Water Quality Control Board 1685 E Street Fresno,
More informationW Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot. Section.
W-29-30-8-2 Legend Urban Municipality Township label Section label Cadastral Surface Parcel To wn sh ip River Lot Section Quarter Section Date: February 14, 2017 Scale 1:18,056 μ Sources: Esri, HERE, DeLorme,
More informationSection :18,056. Scale. Legend. Building. Corral. Dam. Dugout. Gate. Graveyard. Power. Pump. Spring. Trough. Well. Windmill. Fence.
Section 06-04-21-2 Legend Building Corral Dam Dugout Gate Graveyard Power Pump Spring Trough Well Windmill Fence Trail Waterline Field Hay Plots Pasture Boundary - SPP Date: February 15, 2017 Scale 1:18,056
More informationLongview, WA. Kalama, WA PROJECT SITE. PROJECT: Kalama Manufacturing and Marine Export Facility Project FIGURE 1: VICINITY MAP
Longview, WA Esri, HERE, DeLorme, MapmyIndia, OpenStreetMap contributors, and the GIS user community PROJECT SITE 0 2,875 5,750 11,500 Feet PURPOSE: Construct a facility to manufacture and exp IN: Columbia
More informationWATER QUALITY MONITORING PLAN PROPOSED SPRINGS EQUESTRIAN CENTER RESCUE, CALIFORNIA (APN )
WATER QUALITY MONITORING PLAN PROPOSED SPRINGS EQUESTRIAN CENTER RESCUE, CALIFORNIA (APN 115-410-05-100) BSK PROJECT E1506501S PREPARED FOR: ESSENTIAL PROPERTIES GROUP, INC. 970 RESERVE DRIVE, BUILDING
More informationBROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING
Failure to follow these criteria, or to obtain approval for variation to these criteria, is a citationable offense and bears an associated civil penalty, as provided in Section 27-38(h) (9), of the Broward
More informationShallow Interval Soil Metal Sampling Platte to Park Hill 39 th Avenue Channel Project Area City and County of Denver, Colorado
Page intentionally left blank to accommodate double-sided printing July 31, 2017 Shallow Interval Soil Metal Sampling Platte to Park Hill 39 th Avenue Channel Project Area City and County of Denver, Colorado
More informationW and SE Legend. Urban Municipality. Township label. Section label. Cadastral Surface Parcel. To wn sh ip. River Lot.
W and SE-15-12-2-2 Legend Urban Municipality Township label Section label Cadastral Surface Parcel To wn sh ip River Lot Section Quarter Section First Nations Park Regional Park Date: February 23, 2017
More informationPublic Notice. 2. APPLICANT: Shepherd of the Valley Lutheran Retirement Services, Inc Silica Road. Austintown, Ohio 44515
Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application
More informationMatre Forestry Consulting, Inc Lafayette Plaza Dr Suite 204 Albany GA Office (229) Fax (229)
Matre Forestry Consulting, Inc. 2549 Lafayette Plaza Dr Suite 204 Albany GA 31707 Office (229) 639 4973 Fax (229) 255 2910 www.matreforestry.com Re: Webster GA 135 Dear Interested Parties, Matre Forestry
More informationCost Estimate for Removal and Disposal of Contaminated Soil
14432 SE Eastgate Way, Suite 100 Bellevue, WA 98007 tel: 425-519-8300 Mr. Mark Menard Sound Transit 401 South Jackson Street Seattle, Washington 98104-2820 Subject: Cost Estimate for Disposal of Contaminant-Impacted
More information2010 Utility Plan Amendment Boxelder Sanitation District
2010 Utility Plan Amendment Boxelder Sanitation District For inclusion of the Harmony Ridge Development November 7, 2014 1612 Specht Point Rd. Ste. 105 Fort Collins, Colorado 80525-9770 p 970.484.7477
More informationPublic Notice. Notice No Revision 1-proposed mitigation change Closing Date: January 3, 2018
Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application
More informationOREGON ADMINISTRATIVE RULES WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 200 WATER SUPPLY WELL CONSTRUCTION STANDARDS TABLE 200-1
OREGON ADMINISTRATIVE RULES WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 200 WATER SUPPLY WELL CONSTRUCTION STANDARDS TABLE 200-1 WHICH SET OF STANDARDS APPLIES? The Department currently regulates the
More informationINVESTIGATION RESULTS
September 13, 2011 Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Revised Work Plan for Supply Well IN 1 Destruction
More informationVOCs, including fuel oxygenates, via EPA Analytical Method The second soil sample from MW-24 (MW ) was analyzed for Total Organic Carbon.
December 5, 2012 Mrs. Jenny Herman Maryland Department of the Environment Oil Control Program 1800 Washington Boulevard Baltimore, Maryland 212301719 Re: Additional Monitoring Well Installation Report
More information2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT
Northern Indiana Public Service Company Bailly Generating Station Chesterton, Indiana CCR Management Unit Referred to as Bailly Boiler Slag Pond 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION
More informationBass Lake Wastewater Treatment Feasibility Report
Bass Lake Wastewater Treatment Feasibility Report Feasibility Study Prepared for: Town of St. Joseph Prepared by: Thomas Dye, PE Table of Contents EXECUTIVE SUMMARY... I 1.0 INTRODUCTION... 1.1 2.0 EXISTING
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA 95814-2922 408 Permission Section PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF
More informationSubject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese Company, Hilmar, Merced County, CA
October 1, 2009 Mr. Jan Alfson California Regional Water Quality Control Board Fresno Branch Office 1685 E Street Fresno, CA 93706 Subject: Aquifer Test Observation Well Installation Work Plan Hilmar Cheese
More informationFacility Site Proposed Laydown/Parking
Site Location Document Path: T:\GIS\_Power_Station\MXD\Required_Maps\Figure_01-1 Facility_Location.mxd Legend Facility Site Proposed Laydown/Parking County, OH 0 500 1,000 2,000 Feet O USGS 7.5 Minute
More informationEvaluating Suspended-Sediment Dynamics and Turbidity in the Upper Esopus Creek Watershed: A Comprehensive Study
Evaluating Suspended-Sediment Dynamics and Turbidity in the Upper Esopus Creek Watershed: A Comprehensive Study Jason Siemion, Dany Davis, Michael R. McHale, and Matthew Cashman A few questions this presentation
More informationJune 28, Test Well Flow Rate Report MSD Underground Injection Control Wells City of Richlawn Louisville, Kentucky 40207
June 28, 2018 Mr. Chad McCormick, P.E. 503 Washburn Avenue, Suite 101 Louisville, Kentucky 40222 ECS Project No. 61:1132 GEM Project No. G-5155 Reference: Test Well Flow Rate Report MSD Underground Injection
More informationPine Ridge Estate. Scott Saults Associate Broker Scott s Cell:
Pine Ridge Estate A must-see country home sitting on 85± acres Southeast of Crawford, NE. Property Highlights List Price $729,000 Location Legal Description 13 miles Southeast of Crawford, NE Part of the
More informationOAR Table 240-1
OAR 690-240-0005 Table 240-1 WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 240 CONSTRUCTION, MAINTENANCE, ALTERATION, CONVERSION AND ABANDONMENT OF MONITORING WELLS, GEOTECHNICAL HOLES AND OTHER HOLES
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationKIUC Pumped Storage. April 2015
KIUC Pumped Storage April 2015 Where Kauai Gets Its Power Fuel Mix 2009 Fuel Mix 2015 Hydro 9% Biomass 12% Hydro 9% Oil 91% Oil 62% Solar 17% 2 Renewable Energy Outlook for 2023 Oil/gas 34% Hydro 18% Biomass
More informationSECTION GEOTECHNICAL INSTRUMENTATION
SECTION 13510 GEOTECHNICAL INSTRUMENTATION PART 1 GENERAL 1.1 WORK INCLUDED A. This section covers the work necessary for furnishing and installing new piezometers, movement monuments, and inclinometers
More informationWESTERN AUSTRALIA. Kings Park, Perth WHERE SHOULD ALL THE TREES GO? STATE BY STATE
WESTERN AUSTRALIA Kings Park, Perth WHERE SHOULD ALL THE TREES GO? STATE BY STATE WHAT S HAPPENING? Average canopy cover urban WA is 19.95% down 2.32% from 22.27% in 2011. 41% of urban LGAs in WA have
More informationCAT BRANCH W16O016 & W16O017 OUTFALL RETROFITS FINAL DESIGN REPORT
Prepared for: Anne Arundel County Department of Public Works CAT BRANCH W16O016 & W16O017 OUTFALL RETROFITS FINAL DESIGN REPORT APRIL 2018 CONTRACT #: B552301 Prepared by: Consultants & Designers, Inc.
More information2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT
Northern Indiana Public Service Company R.M. Schahfer Generating Station Wheatfield, Indiana CCR Management Unit Referred to as Schahfer Landfill Phase V and Phase VI 2017 ANNUAL GROUNDWATER MONITORING
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan BAILLY GENERATING STATION CCR SURFACE IMPOUNDMENT INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Chesterton, Indiana Pursuant to 40 CFR 257.82 Submitted To: Northern Indiana
More informationEnvironmental Management Chapter
Environmental Management Chapter 335-9-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER WELL STANDARDS PROGRAM ADMINISTRATIVE CODE CHAPTER 335-9-1 LICENSING AND CERTIFICATION OF
More information2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT
Northern Indiana Public Service Company Bailly Generating Station Chesterton, Indiana CCR Management Unit Referred to as Bailly Primary 2 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT
More informationThis report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description
September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:
More informationAddendum No. 1 ASR Monitoring Well Drilling
Addendum No. 1 ASR Monitoring Well Drilling TMWA Bid No.: 2019-002 TMWA Capital Project No.: 15-0052 September 6, 2018 The following information, clarifications, changes and modifications are by reference
More informationWELL PERMIT APPLICATION
Application #: WWA- PROPERTY OWNER INFORMATION Applicant Name Contact Name Mailing Address WELL PERMIT APPLICATION Permit #: WELL Street City/State Zip Code LICENSED CONTRACTOR DECLARATION Licensed under
More informationP Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer
2. Field Program 2.1 Health and Safety Plan Prior to beginning the field program, CH2M HILL developed a health and safety plan (H&SP). The H&SP provided a summary of potential physical hazards that could
More informationTHE REPUBLIC OF UGANDA THE WATER ACT (Cap. 152) The Water Resources Regulations, 1998
Complete this form if you want to register, or to obtain a permit for, a borehole or use of groundwater. If you are applying for a permit to use water from a borehole, you must attach the borehole completion
More informationDRAFT FINAL Spokane River. Field Sampling Report
DRAFT FINAL - 2015 Spokane River Field Sampling Report SPOKANE RIVER REGIONAL TOXICS TASK FORCE WASHINGTON AND IDAHO Prepared for SRRTTF Prepared by Gravity Consulting, L.L.C. 32617 SE 44 th St Fall City,
More informationTreatment System Locations. Treatment System Sampling Activities and Analytical Results. June 15, 2011
June 15, 2011 Mr. David Anderson Oregon Department of Environmental Quality Eastern Region 475 NE Bellevue Drive, Suite 110 Bend, Oregon 97701-7415 Re: Status Report: May 2011 Keno Area Wide Groundwater
More informationSUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS
I. SCOPE OF WORK SUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS The Department of Environmental Protection, Bureau of Abandoned Mine Reclamation requires a contractor to conduct subsurface rotary
More informationJ ~~the following information: media type (soil cuttings and so forth), sampling location (well ID, Earth & Environmental
File: 18G LIAIG CA AGRA Earth-&-- ~~~~fl~~~~~~~u~~~~~fl ~~~~~~Environmental, Inc. Earth & Environmental 600 University Avenue Suite 5E Fairbanks, Alaska U.S.A. 99709-3695 Tel (907) 479-7586 354 CES/CEVR
More informationPN Comment Period: February 9, 2015 to March 9, 2015
Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (Delmarva Power and Light Co/North Baltimore District Salisbury to Worcester) 2014-61657 PN 15-11 Comment Period:
More informationNye County Comptroller Accounting Contracts Finance Grants Purchasing
Pahrump Office: 2101 E. Calvada Blvd., #200 Pahrump, NV 89048 Tonopah Office: PO Box 3999 101 Radar Road Tonopah, NV 89049 Nye County Comptroller Accounting Contracts Finance Grants Purchasing November
More informationACP BIOLOGICAL CONTROL MOVES TOWARD GRID RELEASE STRATEGY
MULTI-AGENCY PARTNERSHIP ACP BIOLOGICAL CONTROL MOVES TOWARD GRID RELEASE STRATEGY David Morgan, Grace Radebough, Alejandro Muniz Female Tamarixia radiata. 62 Citrograph Magazine Spring 2014 Adult Tamarixia
More informationApril 16, Dear Mr. Beedie:
April 16, 2012 Mr. Michael Beedie, P.E. City of Ft. Walton Beach Engineering Services Department 105 Miracle Strip Parkway SW Ft. Walton Beach, FL 32548 Re: Proposal for a Supplemental Site Assessment
More informationAbout TransCanada. At TransCanada, our mission is to safely, responsibly and reliably transport energy used by millions of North Americans every day.
About TransCanada Wholly Owned Natural Gas Pipeline Partially Owned Natural Gas Pipeline Natural Gas Pipeline Under Construction Natural Gas Pipeline In Development Liquids Pipeline Liquids Pipeline Under
More information111 North County Farm Road, Wheaton, Illinois 60187 (630) 682-7400 www.dupagehealth.org June 21, 2012 Shaw Environmental c/o Ashley Warren 1607 E. Main Street St. Charles, IL 60174 Re: Naperville Sportsman
More informationAgenda Rio Linda / Elverta Community Water District Planning Committee
Agenda Rio Linda / Elverta Community Water District Planning Committee Visitor s Depot Center Tuesday, November 7, 217 673 Front Street 2: pm Rio Linda, CA 95673 Public documents relating to any open session
More informationAir Quality Analysis Technical Memorandum
Air Quality Analysis Technical Memorandum Segment 4: State Road 400 (SR 400)/Interstate 4 (I-4) from East of SR 15-600/US 17-92 (Seminole/Volusia County Line) to ½ Mile East of SR 472 Volusia County (79110),
More informationDocument Separator DSO00. Document ID Number
Document Separator DSO00 Document ID Number 27869 LEONARD, STREET AND DEINARD PROFESSIONAL ASSOCIATION November 1 I, 2004 Tiffany R. Johnson 612-335-7065 tiffany.johnson@leonard.corn VIA HAND DELIVERY
More information4.0 BASIS OF CUMULATIVE ANALYSIS
4.0 BASIS OF CUMULATIVE ANALYSIS CEQA Guidelines Section 15355 provides the following definition of cumulative impacts: Cumulative impacts refer to two or more individual effects which, when considered
More informationADDENDUM #1. January 29 th, 2019
ADDENDUM #1 January 29 th, 2019 PROJECT: Virginia Polytechnic Institute & State University, Blacksburg, Virginia Shanks Hall Roof Replacement (0006) IFB 0058280 1. The bid due date has been extended to
More informationAPPENDIX K. Groundwater Monitoring Results
APPENDIX K Groundwater Monitoring Results RESULTS OF SOIL GAS INVESTIGATION The McKinley Village Property Sacramento, California Prepared for: RCI McKinley, LLC and Holland & Knight, LLP 13 June 2013
More information3901 Industrial Boulevard Indianapolis, IN 46240
Joint Public Notice Public Notice No. Open Date: Close Date: LRL-2015-844-sam 6 Jul 2016 8 Aug 2016 US Army Corps of Engineers Louisville District Please address all comments and inquiries to: U.S. Army
More informationIN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B
IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B SITE: CHAMPAIGN FORMER MGP SITE CHAMPAIGN, ILLINOIS JULY 24, 2013 PREPARED FOR: PSC INDUSTRIAL OUTSOURCING, LP 210 WEST SAND BANK
More informationSeptember 3, 2013 Via
September 3, 2013 Via email: sadler@adeq.state.ar.us Mr. Bill Sadler, PG Geology Supervisor Solid Waste Management Division Arkansas Department of Environmental Quality 5301 Northshore Drive North Little
More informationAddendum to Mitigated Negative Declaration
Background Addendum to Mitigated Negative Declaration Date of Publication of the Addendum: Date of Final MND: May 2, 2016 Case No.: 2013.1761E Project Title: PG&E Gas Transmission Line 109 Cañada Road,
More informationUnderground Heterogeneity 9/5/2017. Groundwater Monitoring Well Construction. Groundwater Sampling. Groundwater Movement and Related Terms.
Groundwater Monitoring Well Construction Groundwater Sampling Groundwater Movement and Related Terms Stormwater overland flow = rate of precipitation - rate of infiltration Infiltration rate affected by
More informationINTRODUCTION. US 101 and OR 6 in downtown Tillamook and across Hoquarton Slough. The location of the
ALASKA CALIFORNIA COLORADO FLORIDA MISSOURI OREGON WASHINGTON WISCONSIN November 25, 2013 Karen Tatman, PE Quincy Engineering, Inc. 200 Hawthorne Ave. SE, Suite E-530 Salem, Oregon 97301-4996 RE: FINAL
More informationMUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig
Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water
More informationWater Well Decommissioning Guidelines
Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well
More informationThis work will be completed in support of the corrective measures evaluation. The objectives of this study are as follows:
Peter Quackenbush Hazardous Waste Section Michigan Department of Environmental Quality 525 West Allegan Constitution Hall, 1S PO Box 30242 Lansing, Michigan, 48909 ARCADIS of Michigan, LLC 10559 Citation
More informationGoing to Town in Fort Worth
Going to Town in Fort Worth Central Reclaimed Water Delivery System Feasibility Study Sarah Seamands, PE & Ellen McDonald Ph.D., PE Frank Crumb, PE & Andy Cronberg PE Project sponsored by: With funding
More informationAddendum No. 1. Remedial Assessment and Evaluation Services, Northern AUM Region, Cove and Sweetwater Areas
Request for Proposal DRILLING SERVICES USEPA REMEDIAL ASSESSMENT AND EVALUATION SERVICES (RAES), FORMER KERR MCGEE ABANDONED URANIUM MINES (AUM) PRIMARILY LOCATED WITHIN THE NORTHERN CHUSKA MOUNTAINS Addendum
More informationSampling Plan Supplement PG&E Topock Interim Measures Drilling Program
TECHNICAL MEMORANDUM Sampling Plan Supplement PG&E Topock Interim Measures Drilling Program Date: April 13, 2004 Introduction This sampling plan supplement describes the methods and procedures for drilling,
More informationSeptember 9, Corzo Castella Carballo Thompson Salman, P.A. 901 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 33134
September 9, 2009 Corzo Castella Carballo Thompson Salman, P.A. 90 Ponce de Leon Boulevard Suite 900 Coral Gables, Florida 3334 Attn: Mr. Ian John, E.I. Re: Exfiltration Test Results Glenroyal East Phase
More informationJoe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17
Client: Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17 Legend Structure Wetland Features 0-18 in 18-36 in 36-48 in > 48 in Max Temporary Pool Watershed ± 0 0.05 0.1 0.2 Miles 0
More informationMonitoring Well Construction
Meeting logistics Monitoring Well Construction Presenter: Art Becker, MGWC, CPG, Past President NGWA President of Drilling and Safety Consultants LLC Please turn off cell phones or switch to vibrate Presentation
More informationJoe Landowner Location: Carroll, Iowa Twp/Rng/Sec: 082N 034W 08. Information and Estimated Cost Maximum pool surface area
Client: Joe Landowner Location: Carroll, Iowa Twp/Rng/Sec: 082N 034W 08 Legend Structure Pool Features Max Temporary Pool Existing Tile Watershed ± 0 0.015 0.03 0.06 Miles 0 0.0225 0.045 0.09 Kilometers
More informationContaminated Media Management Plan. DEQ UST Site # Del Oeste Veterinary Clinic Prairie Road Eugene, Oregon
Contaminated Media Management Plan DEQ UST Site #20-97-7034 Del Oeste Veterinary Clinic 90238 Prairie Road Eugene, Oregon March 2014 This page left intentionally blank. 2 Overview This Contaminated Media
More informationAttachment B: Field Forms and Notes
Attachment B: Field Forms and Notes Field forms Dalton, Olmsted & Fuglevand, Inc. Environmental Consultants T117 Early Action Area, Port
More informationDES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH
DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH 03302 0095 Underground Storage Tank Closure Report Concord Steam 123 Pleasant Street Concord, NH NHDES Site Number: 198608003 Project
More informationJune 25, Oregon Department of Environmental Quality 300 SE Reed Market Road Bend, Oregon Attention: Mr. Cliff Walkey
June 25, 2008 Oregon Department of Environmental Quality 300 SE Reed Market Road Bend, Oregon 97702 Attention: Mr. Cliff Walkey Subject: Interim Removal Action Measure Report Redmond Army Airfield File
More informationInterim Source Removal Summary Groundwater Extraction System Former American Beryllium Company Site Tallevast, Florida
Interim Source Removal Summary Groundwater Extraction System Former American Beryllium Company Site Tallevast, Florida Soil and Groundwater Sampling Program On August 3, 2008, approximately 5,000 gallons
More informationInformation for File # MVP DAS
Information for File # MVP-2012-05243-DAS Applicant: City of Red Wing Corps Contact: David Studenski Address: 1114 South Oak Street, La Crescent, MN 55947 E-Mail: david.a.studenski@usace.army.mil Phone:
More informationNEW SOUTH WALES. Wendy s Secret Garden
NEW SOUTH WALES Wendy s Secret Garden WHERE SHOULD ALL THE TREES GO? STATE BY STATE NSW WHAT S HAPPENING? Average canopy cover for urban NSW is 26.64% down 0.83% from 27.47% in 2009. The highest canopy
More informationAPPENDIX F Land Use Within 500M of Landfill Site
APPENDIX F Land Use Within 500M of Landfill Site June 30, 2016 Project No. 1650598 (1000) Peter Raabe, P.Eng., Director of Environmental Services City of Brockville 1 King Street West P.O. Box 5000 Brockville,
More informationSUB-SLAB DEPRESSURIZATION SYSTEM DESIGN AND INSTALLATION
SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN AND INSTALLATION Prepared for: 1500 East Bannister Road, Room 2101 Kansas City, Missouri, 64131-3088 Prepared by: 6750 Antioch Road, Suite 305 Merriam, Kansas 66204
More informationExisting System Evaluation Report for Onsite Wastewater Systems
Existing System Evaluation Report for Onsite Wastewater Systems State of Oregon Department of Environmental Quality Onsite Program 165 East 7 th Avenue, Suite 100 Eugene, Oregon 97401 For more information,
More informationAPPENDIX A GENERAL FIELD PROCEDURES
APPEIX A GENERAL FIELD PROCEDURES The following sections outline the general field procedures and protocols followed by Pinnacle Environmental Technologies (Pinnacle) in the completion of field tasks.
More informationPetroleum Restoration Program SITE ASSESSMENT PRP Workshop
Petroleum Restoration Program SITE ASSESSMENT 2017 PRP Workshop Pre-Assessment Following should be included in Task 1 on new site assessment (no previous assessment, or new ATC on site) 1-1. File Review.
More informationREPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No.
REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. 1583-12-129 Prepared for: City of Winston-Salem Engineering 100
More informationAppendix VIII. Guidelines for groundwater bores and wells
Appendix VIII Guidelines for groundwater bores and wells Appendix VIII Guidelines for groundwater bores and wells 1. Construction Bores used for water supply are normally constructed by drilling, either
More information4 Chain of Lakes and Quarry Operations Impacts
Zone 7 Water gency 4.1 Program Description and Quarry Operations Impacts The Chain of Lakes/Mining rea Monitoring Program includes water level measurements and water quality analysis for many of the mining
More informationfor the January 2018 MRB Group Project No
Town of Canandaigua 5440 Route 5 & 20 West Canandaigua, New York 14424 PRELIMINARY ENGINEERING REPORT for the TOWN OF CANANDAIGUA WATER BOOSTER STATION, TRANSMISSION MAIN, & STORAGE TANKS January 2018
More informationCCR Groundwater Monitoring System
CCR Groundwater Monitoring System Omaha Public Power District North Omaha Station North Omaha Ash Landfill Omaha, Nebraska June 2016 This page intentionally left blank. OPPD North Omaha Ash Landfill CCR
More informationPWSID: PWS Name: Rush City PWS Type: Community PWS Status: Active
Minnesota Public Water Supplies http://mdh-app2/pwss_reports/pwswellinfo.aspx 1 of 3 2/2/2015 11:40 AM 1 PWSID: 1130013 PWS Name: Rush City PWS Type: Community PWS Status: Active Public Water Supply Sources:
More informationApril 17, Dear Mr. Stella:
April 17, 1998 Mr. Micheal Stella, P.E. Associate Civil Engineer City of Fremont Development and Environmental Services Department 39550 Liberty Street P.0. Box 5006 Fremont, CA 94537-5006 RE: Proposal
More informationSECTION WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES
SECTION 01 48 00 - WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials and incidentals required and perform tightness testing of water-containing
More information4 Chain of Lakes and Quarry Operations Impacts
Zone 7 Water gency 4.1 Program Description 4 Chain of Lakes and Quarry Operations Impacts The Chain of Lakes/Mining rea Monitoring Program includes water level measurements and water quality analysis for
More informationPublic Notice ISSUED: August 9, 2016 EXPIRES: September 8, 2016
APPLICANT: Jeff Richards REFER TO: MVP-2014-03152-RMM Public Notice ISSUED: August 9, 2016 EXPIRES: September 8, 2016 SECTION: 404 - Clean Water Act 10 - Rivers and Harbor Act 1. APPLICATION FOR PERMIT
More informationCHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2
CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted September 5, 1989 Table of Contents Page Part 1 Introduction...2 32-1 Purpose...2 32-2 Applicability...2 32-3 Definitions...2 32-4
More informationPlanning for and Managing Artesian Well Conditions
2018 BCGWA Trade Show Convention and AGM Planning for and Managing Artesian Well Conditions Robert Stadeli Scope of Todays Discussion Planning Phase Execution Phase Geological Challenges Case Studies Conclusions
More informationClarifier Soil Sampling Work Plan - Phase 2
Clarifier Soil Sampling Work lan - hase 2 GM GS Bedford Facility 105 GM Drive Bedford, Indiana E ID# IND006036099 OC Docket No. RCR 05 2014 0011 GHD 6400 Shafer Court Suite 400 Rosemont Illinois 60018
More informationREQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION
REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as
More information1. Regulation Requirements
16644 est Bernardo Drive, Suite 301 San Diego, CA 92127 Phone: 858.674.6559 Fax: 858.674.6586 www.geosyntec.com STRUCTURAL STABILITY AND FACTOR OF SAFETY ASSESSMENT ASH POND 2 JOLIET 29 STATION OCTOBER
More informationTypical Specifications of Compaction Grouting Scope
Typical Specifications of Compaction Grouting Scope This section covers compaction with Sand/Cement/Flyash grout including the installation of injection pipes. Compaction grouting is sometimes referred