ROADMAP FOR A BETTER FUTURE CITARUM
|
|
- Cameron Hopkins
- 6 years ago
- Views:
Transcription
1 ROADMAP FOR A BETTER FUTURE CITARUM National Steering Committee for Water Resources - Citarum Roadmap Coordination Meeting Jakarta, April 12 th 2010 Deputy Minister for Infrastructure Affairs, State Ministry of National Development Planning 1
2 MUARA GEMBONG BEKASI CITARUM AT A GLANCE Length: 269 Km Catchment area: 6,614 Km 2 River basin territory : 12,000 Km 2 Flows from South to North ending in the Java Sea (Gunung Wayang to Tanjung Karawang) JATILUHUR DAM Citarum covers : 9 districts CIRATA DAM OUTLET CITARUM UPSTREAM (SAGULING DAM) UPPER CITARUM RIVER BASIN (1)KAB. BANDUNG (2)KAB.BANDUNG BARAT (3)KAB.CIANJUR (4)KAB.PURWAKARTA (5)KAB.KERAWANG(6)KAB.BEKASI (7)KAB.SUBANG (8)KAB.INDRAMAYU (9)KAB.SUMEDANG 3 cities (1)KOTA BEKASI (2)KOTA BANDUNG (3)KOTA CIMAHI Average rainfall:2,300mm/year Average flow: 5.7 bilion/m 3 /year 2
3 CITARUM AT A GLANCE Water resources for: Bandung, Cimahi, Cianjur, Purwakarta, Bekasi, Karawang, Total population in the basin: 15,303,758(50% Urban) (Data BPS 2009) and 80% of Jakarta raw water Irrigation 420,000 ha Total Population in West Java 41,483,729 (Gov. West Java Statistic) DAMS CAPACITIES AND POWER GENERATION - Jatiluhur 1963: 3,000 million m MW - Saguling 1986: 982 million m MW - Cirata 1988: 2,165 million m 3-1,000 MW 3
4 PROBLEMS IN CITARUM 4
5 INDUSTRIAL AND DOMESTIC POLLUTION Needs for : Law enforcement Industrial and domestic waste water treatment plants Provision of sanitation facilities Low cost water treatment technology 1,500 industries in Bandung and surrounding: 280 ton of chemical waste dumped into Citarum everyday Lack of sanitation and waste water treatment facilities Water quality monitoring in the late 1990s shows that annual average of BoD concentrations as high as 300 mg/liter. BoD concentrations at the Saguling reservoir inlet still go up to as high as 130mg/l during dry season (Indonesia Power and Padjajaran University survey in 2004) 5 Ciwalengke, Majalaya
6 ORGANIC WASTE 190 Ton waste from farming dumped into the river everyday 8,000 cows produce 24 kg of waste each Potential for : Organic fertilizer production to supply the Citarum downstream farms Cattles in Pangalengan 6 Biogas generation
7 SOLID WASTE The annual uncollected garbage that invariably ends up accumulating in the drainage system and rivers amounts to 500,000 m 3 /year Batujajar Bridge - Photo: The Sun, 2009 West Tarum Canal Needs for : Behavioral change Recycle, Reuse, Reduce (3R) facilities Organic fertilizer facilities Improved solid waste management Biogas generation individual plants 7
8 FISHERIES AND HYACINTHS Fish cages in Saguling Uncontrolled expansion of fish cage operations is exacerbating the effects of polluted water Improper or excessive fish feeding in the floating cages adds to the waste load as unconsumed feed accumulates on the reservoir bed Excess of water hyacinths in waterways Needs for : Provision of alternative source of incomes for communities Biogas generation from hyacinths Public awareness campaign, fish cage regulation control, and law enforcement 8
9 MAJOR FLOODS RECORD Major floods in Bandung were recorded in 1931, 1945, 1977, 1982, 1984, 1986, 1998, 2005, Flood in DayeuhkolotKab. Bandung (Pikiran Rakyat, Friday, 19 Feb 2010) 9
10 KARAWANG S FLOOD MARCH
11 WATERSHED DEGRADATION Average annual sedimentation into the three reservoirs estimated at 8 million m 3 /year This has caused flood in rainy season and water scarcity in the dry season (ASER 2008, BPLHD) Neglasari, Kertasari Needs for: Conservation and reforestation Capacity building to farmers to adopt sustainable farming practices Provision of alternative source of incomes Land rehabilitation Wayang Mount 11
12 INFRASTRUCTURE ISSUES Lack of proper infrastructures for flood and water supply Poor operation and maintenance Citarum river degraded banks Needs for : Development of raw water and flood protection infrastructures Proper operation and maintenance funding allocation Increase involvement of local communities in riverbank maintenance 12
13 RESERVOIRS OPERATIONS Saguling and Cirata dams operated by Indonesia Power and Juanda dam operated by PJTII Greater coordination required Updating of the operation procedures for flood and drought 13
14 GROUNDWATER OVER EXTRACTION Subsidence is severe and basin wide: Not only at Dayeuh Kolot, but many other places From 1988 more than 3-4 meter subsidence Severe impact on river hydraulics (and flooding) Irreversible aquifer damage starting Profile Transect of Subsidence Annual Average, Needs for : Increase surface raw water supply Groundwater recharge Ground water pricing and licensing regulation improvement Law enforcement 14
15 COASTAL DEGRADATION Muara Gembong, Bekasi Coastal abrasion Biodiversity degradation Needs for : Abrasion level: ha/year (South sea) and 370 ha/year (North sea) Sea pollutant index: Mangrove rehabilitation showing heavy pollution level Source: ASER Coastal protection 2008, BPLHD Dyke and coastal infrastructures Muara Bendera 15
16 CITARUM ROADMAP & ICWRMIP 16
17 INVOLVED SECTORS FOR IWRM IN CITARUM 1. Planning and programming Bappenas Bappeda Prov/Dist 2. Water Resources Management MoPW/DGWR PWRS/DWRS 3. Agriculture MoA Prov/Dist Agriculture Agencies 4. Health - MoH Prov/Dist Health Agencies 5. Disaster management BNPB - Multisector 6. Environment MoE PLHLD Prov/Dist 7. Forestry - MoFr Prov/Dist Forestry Agencies 8. Groundwater management MoME - Prov/Dist Mine Agencies 9. Spatial planning MoPW DGSP - Bappeda Prov/Dist 10. Research and technology MoPW RCW BPPT LIPI - Universities 11. Solid waste management MoPW DGHSH - Prov/Dist Agencies 12. Water supply and sanitation MoPW DGHSH - Prov/Dist Agencies 13. Coastal management MoFM Prov/Dist Agencies 14. Community and local government empowerment MoHA - DGRD Vertical and horizontal integration with National, Provincial and Districts plans 17
18 CITARUM ROADMAP FINANCING Estimated cost to financing Intervention Activities Citarum Roadmap 35 intervention activities will be funded by the ICWRMIP Other funding resources; Government (APBN&APBD), Private sectors, other donors (JICA, WB, IDB, UNDP, ) etc. Funding is still required CITARUM ROADMAP USD 3.5 Billion P3 P4, P5,...,... P2 INVESTMENT PROGRAM (ICWRMIP) P1 PROJECT-1 Funding by ADB through Grants 18 and Loan
19 ICWRMIP PROJECT-1 SUB COMPONENTS Roadmap Management Roadmap Institutional Strengthening (TA A1) Institutional Strengthening for IWRM in 6 Ci s River Basin Territory (TA B1) Spatial Planning for The 6 CIs River Basin Territory (TA B2) West Tarum Canal Rehabilitation Project Improved Land and Water Management Support for Community and CSO Driven Initiatives for Improved Water Supply and Sanitation Detailed Engineering Design for Upgrading Bandung Water Sources Development of Key Policies and Strategies for Water Resources Management in CRB (TA B3) Development and Implementation of a Basin River Quality Improvement Strategy and Action Plans 4.2 Watershed Management and Biodiversity Conservation Upper Citarum Basin Flood Management (TA C1) 5.2 Climate Change Adaptation and Mitigation (TA E1) Decision Support System for Integrated Water Resources Management in Citarum River Basin (TA D1) Program Management Independent Monitoring and Evaluation 19
20 20
21 Improved Land and Water Management ORGANIC SRI Ministry of Agriculture 21
22 Support for Community and CSO Driven Initiatives for Improved Water Supply and Sanitation Water supply and sanitation facilities Ministry of Health 22
23 Development and Implementation of a Basin River Quality Improvement Strategy and Action Plans Biogas, 3R, waste management, riverbank gardening State Ministry of Environment 23
24 Watershed Management and Biodiversity Conservation Model conservation villages 24
25 WEST JAVA PROVINCE PLAN FOR CITARUM A. Institutional 1. Establishment a strategic board for upper Citarum rehabilitation 2. Empowerement of groups and cadre of environment community care 3. Development ofan integrated master plan of Citarum D. Rehabiltation and Restoration 1. Normalization Citarum River (Sapan-Nanjung) and 9 tributaries 2. Construction 22 reservoirs, 3 polder/retension and recharge well 3. Construction 2 canal (north and south ) 4. Multistakehoders regrening and critical land rehabilatation through incentive system 5. Land banking 6. Rehabilating of settlement and industri at river bank or flood plain B. Socio-Economic-Culture 1. Changing livehood which is more condusevely for cultivator living at conservasion area 2. Settlement Relocation through flat housing 3. Gradually Industry Relocation 4. Reviving local wisdom 5. Revitalization types of housing (familiar with flooding) 6. Village base development C. Control and Monitoring 1. STOP logging(esp. IN CONSERVATION AREA) 2. Moratorium license for land use change mainly for flood plain area 3. Prohibitationof one seasonal hillside farm at Steep Slope> 30% 4. Curb of river bank line 5. Domestic, industrial, agriculture and husbandry waste controll 7.Establishment new economic areas 8. Optimalization of the Use Inactive HGU ( Ha), located in Upper 6. Establishment environmental police 7. Cooperation with TNI in order protecting forest Citarum 25
26 EXAMPLES OF DISTRICT PLANS FOR CITARUM Contribution from Cianjur District by APBD Dinas Forestry and Agriculture Regulate Cirata s Lakebank Water spring protection in Agrabinta, Sindangbarang sub districts Development of agroforestry model for degraded land in Campaka sub district Environmental protection agency Water resources conservation of water spring in Cidaun and Sindangbarang sub districts Improved watershed conservation and water spring in Cidaun and Naringgul sub districts. Improved community participation for natural resources conservation in Cianjur and Ciranjangsub districts Contribution from West Bandung District by APBD Environmental protection agency Construction of Infiltration Well (shallow and deep well) Organic waste Biogas plant in West Bandung District Improved community participation on solid waste management in Cipatat sub district 26
27 BRIEF LOOK FLOOD MANAGEMENT PLAN FOR THE UPPER CITARUM 27
28 FLOODMANAGEMENT IN THE UPPER CITARUM BASIN : Study and Master Plan by JICA : Detailed Design (IP-347) : Construction First Phase (IP-405) DATA BY BBWSC CITARUM : Construction Second Phase (IP-497).: Upper Citarum Basin Urgent Flood Control Project Implementation Program Construction Stage IIIThird Phase 28
29 FLOOD MANAGEMENT PROGRAM IN THE UPPER CITARUM DATA BY BBWSC CITARUM 29
30 URGENT PLAN FOR IMPLEMENTATION Conservation in 7 sub catchment Upper Citarum rehabilitation (nine tributaries) Urgent dredging, bank rehabilitation and shortcuts Curug Jompong normalization Dam and retention area construction Local drainage system improvement Embankment and Polder in Dayeuh Kolot 30
31 UPPER CITARUM FLOOD MANAGEMENT AND MODELING - PUSLITBANG Understanding the hydrology and hydraulics of the Bandung Basin through the development and updating of the 1D/2D flood hazard modelling framework Measures: Avoid yearly floods (urgent, no-regret measures) Long-term measures (to be included in long-term plan Flood Management Strategy 31
32 BANDUNG METROPOLITAN WATER DEMAND Projection NO District/Cities Unit KOTA BANDUNG L/S 4,000 5,700 2 KABUPATEN BANDUNG, KABUPATEN BANDUNG BARAT, KOTA CIMAHI KABUPATEN 3 SUMEDANG - KEC. JATINANGOR - KEC. CIMANGGUNG - KEC. TANJUNGSARI L/S 3,500 6,000 L/S METROPOLITAN BANDUNG L/S 7,800 12,200 32
33 UPGRADING BANDUNG BULK WATER SUPPLY 33
34 CURRENT AND FUTURE FOREIGN FUNDING PROJECTS IN THE CITARUM RIVER BASIN 34
35 FOREIGN FUNDING PROJECTS IN THE CITARUM RIVER BASIN Asian Development Bank (ADB) Integrated Citarum Water Resources Management Investment Program (ICWRMIP) Loans: USD 20 m (2500-INO) USD 30 m (2501-INO SF) Grant: USD 3.75 m (GEF Grant) Technical Assistances: USD 8.0 m (ADB Grant) USD 2.55 m (ADB Grant for CCAM) Effectiveness: 03 Jun Jun 2014 (Loan signed: 22 April 2009) Infrastructure Resources Sector Development Project IRSDP Loan No INO Dutch Government Grant No INO. USD 2.0 M World Bank Water Resources and Irrigation Sector Management Program (WISMP APL2) Rehabilitation of Jatihulur Irrigation Canals Loans: USD 25 m (IBRD Loan no 4711-IND) USD 45 m (IDA Credit no: 3807-IND) Grant: USD 14 m (Grant TF no: ) 24 Nov Dec 2010 Dam operational improvement and safety (DOISP) US $ 50 M (loan nr: 7669-ID) Effectiveness: 06 June Dec 2013 Islamic Development Bank IDB The Coonstruction of Transfer Water Inter IDBBasin (Cibatarua-Cilaki Project) (USD 75 m) loan IDB: USD M GOI: USD M 35
36 FOREIGN FUNDING PROJECTS IN THE CITARUM RIVER BASIN FondsD etude Et D aide Au SecteurPrive (FASEP) Japan International Cooperation Agency (JICA) Design of Jakarta Raw Water Transmission Improvement Projectfor the Rehabilitation of the Raw Water Transmission of the West Tarum Canal between Bekasi&Cawang Urban Flood Control System Improvement in Selected Cities (including Bandung Construction of Cikapundung diversion channel) Japan International Cooperation Agency (JICA) Loan No. IP-551 Loan amount: Yen 7,490 million Effectiveness: Loan period:
37 PROPOSED PROJECT Japan International Cooperation Agency (JICA) Trade and Development Agency (TDA US Embassy) Loan IP- Upper Citarum Basin Urgent Flood Control Project Implementation Program Construction Stage III Project costs: Yen 7,791 million Feasibility Study for Wastewater Treatment Technology and Service Options for the Upper Citarum River Basin Cost of the study: US $ 796,000 Proposed loan: Yen 6,300 million 37
38 WHAT S NEXT? Vertical and Horizontal Planning Alignment 38
39 COMMITMENT TO WORK TOGETHER Identify contributions and plans of: National, Provincial and Districts agencies Private sector Communities NGOs Identification of gaps and overlaps Provide recommendations for synchronization and alignment of the various stakeholders plans Allocate budget for Citarum in the coming 15 years 39
40 THANK YOU 40
Support for Community and CSO Driven Initiatives for Improved Water Supply and Sanitation
ICWRMIP SUB COMPONENT 2.3 INTEGRATED CITARUM WATER RESOURCES MANAGEMENT & INVESTMENT PROGRAM drh. Wilfried H Purba, MM, MKes Directorate of Environment Health Directorate General of Disease Control and
More informationExperiences in Mainstreaming CC into IWRM at CRB
Experiences in Mainstreaming CC into IWRM at CRB Yuli Suharnoto Low Carbon Asia Research Network (LoCARNet) 3 rd Annual Meeting Bogor 25 November 2014 Outline Introduction Citarum River Basin (CRB) TA
More information인도네시아찌다룸강유역거주자의수질관리인식도조사
KCID Vol. 22 No. 2 ISSN 1225-8253 (Print) ISSN 2383-5044 (Online) 인도네시아찌다룸강유역거주자의수질관리인식도조사 장정렬 * Survey on the Attitude of the Residents for Water Quality Management in the Citarum River Watershed, Indonesia
More informationROADMAP FOR INTEGRATED WATER RESOURCES MANAGEMENT IN THE CITARUM RIVER BASIN
ROADMAP FOR INTEGRATED WATER RESOURCES MANAGEMENT IN THE CITARUM RIVER BASIN MARCH 2010 ROADMAP FOR INTEGRATED WATER RESOURCE MANAGEMENT IN THE CITARUM RIVER BASIN FOREWORD The process for the development
More informationA preliminary assessment towards integrated BBWQM through priority analysis in the UCR Basin, Indonesia
Available online at www.sciencedirect.com Procedia Environmental Sciences 4 (2011) 331 335 Urban Environmental Pollution 2010 A preliminary assessment towards integrated BBWQM through priority analysis
More informationMember s Annual Report 2007
Member s Annual Report 2007 Date of preparation: 4/15/2008 Name of the editor: Herman Idrus, CES 1. About the organization (1) Name of the organization and postal address of the office Jasa Tirta II Public
More informationMANAGER TRAINEE AND CERTIFICATION
MANAGER TRAINEE AND CERTIFICATION As The Pollution Control Program Implementation in Adhitia Pramadhita, Resmiani, Setiawan Wangsaatmaja International Forum on Water Environmental Governance in Asia (March
More informationEXPERIENCE IN MANAGING CITARUM RIVER BASIN
JASA TIRTA II PUBLIC CORPORATION EXPERIENCE IN MANAGING CITARUM RIVER BASIN Bangkok Chiang Mai, Thailand July 26 th August 6 th 2004 Integrated Waetr Resources Management (IWRM) Training Course ORIENTATION
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,
More informationMember s Annual Report 2005
Member s Annual Report 2005 Date of preparation: 31 /July/2006 Name of the editor: Herman Idrus, Reni Mayasari, Tenti Utami, Ary Ramayansyah 1. About the organization (1) Name of the organization JASA
More informationNATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS
NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS Abdul Malik Sadat Idris Director of Water Resources and Irrigation Indonesia Ministry of National Development Planning Jakarta,
More informationSubject: - Development of Fisheries Floating Nets for Resettlement Program of Hydropower Project Cirata Dam
IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 14-05: Development of Regional Industries Cirata Hydro Electric Power
More informationINTEGRATED WATER RESOURCES MANAGEMENT IN CITARUM RIVER BASIN - INDONESIA
INTEGRATED WATER RESOURCES MANAGEMENT IN CITARUM RIVER BASIN - INDONESIA Presented by Reni Mayasari Jasa Tirta II Public Corporation - Indonesia 1. Introduction Water resources management for the Citarum
More informationPolicy of Water related Disaster Preparedness in Indonesia
Policy of Water related Disaster Preparedness in Indonesia by : Imam Santoso Director General for Water Resources Ministry of Public Works and Housing 1. Potency of Water Resources in Indonesia INDONESIA
More informationAssessing Impact of Land Use and Climate Changes on River Flow and Electricity Generation: Case Study at Citarum Watershed of Bandung District
Assessing Impact of Land Use and Climate Changes on River Flow and Electricity Generation: Case Study at Citarum Watershed of Bandung District Rizaldi Boer, Delon Martinus, Ahmad Faqih and Perdinan Laboratory
More informationForeword. Jatiluhur, February 26 th, JASA TIRTA II PUBLIC CORPORATION President Director, Ir. Djendam Gurusinga, Dipl. HE NIK.
Foreword This report is the annual report of the Jasa Tirta Public Corporation of the year 2006, a part of the activities of the Company as member of the Network of Asian River Basin Organization (NARBO).
More informationRoadmaps for river basin development. CRBOM Small Publications Series No. 3. Sri Hernowo M
1 CRBOM Small Publications Series No. 3 Roadmaps for river basin development by Sri Hernowo M Center for River Basin Organizations and Management, Solo, Central Java, Indonesia July 2009 The 'Small Publications'
More informationIndonesia: Integrated Water Resources Management Program
Environmental Assessment Report Summary Initial Environmental Examination Project Number: 37049 December 2006 Indonesia: Integrated Water Resources Management Program Prepared by [Author(s)] [Firm] [City,
More informationIN JASA TIRTA II PUBLIC CORPORATION
INTEGRATED WATER RESOURCES MANAGEMENT AND ITS DEVELOPING CAPACITY IN JASA TIRTA II PUBLIC CORPORATION Presented by Djendam Gurusinga The 2 nd Southeast Asia Water Forum August 29 th September 3 rd, 2005
More informationMember s Annual Report 2009
Member s Annual Report 2009 Date of preparation: 30/06/2010 Name of the editor: Herman Idrus, CES 1. About the organization (1) Name of the organization and postal address of the office Jasa Tirta II Public
More informationWATER SUPPLY OF JAKARTA
WATER SUPPLY OF JAKARTA Prof.Dr. Djoko M. Hartono Environmental Engineering Study Program. Civil Engineering Department, Faculty of Engineering University of Indonesia SMART ENGINEERING TOKYO 2018 UNITED
More informationLAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES
LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization
More informationBudhi Gunawan. Padjadjaran University. International Conference on Sustainability Science in Asia March 2011
Socio-ecological Dimension of Human-Nature Relation and Potential for Developing a Community-based Natural Resource Management System: a Case in a Degraded Watershed of West Java, Indonesia Budhi Gunawan
More informationNational Dialogue on Water Environment partnership in Asia
National Dialogue on Water Environment partnership in Asia 25-26 26.09.08 Prepared by Mr. Phourng Lina Deputy Director of Siem Reap Provincial Department of Environmental Contents 1.Introduction 2.Environmental
More informationThematic WS 3: Water-Food-Energy Nexus
Thematic WS 3: Water-Food-Energy Nexus The Role of PJT II to Ascertain the National Food & Energy Resilience Through the Adoption of IWRM Delivered by: Djoko Saputro President Director Jakarta, February
More informationAquatic Ecosystem Restoration:
Aquatic Ecosystem Restoration: Lessons Learned from ADB 13 September 2016 Qingfeng Zhang Director, Environment and Natural Resources Division, East Asia Department Concurrently Chair, Water Sector Group
More informationKeywords - Integrated water resources management, decision support system, capacity development
Abstract - The water resources of the rivers systems (CRB) are critical to social and economic development of the country. They are essential for urban and industrial development particularly in Jakarta
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationJICA efforts in supporting adaptation to climate change
Twenties Asia-Pacific Seminar on Climate Change Promoting Strategic Development of Resilient Asia-Pacific JICA efforts in supporting adaptation to climate change March 15, 2012 Hiroshi ENOMOTO Deputy Director,
More informationExploring Ways to Benchmark River Basin Performance
Exploring Ways to Benchmark River Basin Performance Chris Morris, Senior Water Resources Engineer NARBO Third General Meeting, 21 February 2008, Surakarta. Where are we? 2 Citarum River Basin Strategic
More informationWELCOME TO. The First General Meeting Network of Asian River Basin Organisation
WELCOME TO The First General Meeting Network of Asian River Basin Organisation Prepared by : Dr. THENG TARA Director Department of Water Resource Management Batu, East Java,Indonesia, 24-26 February 2004
More informationStudy on Effects of Land Use Change. on Hydrological Characteristic of Watersheds ADB. IN THE 6 CI's RIVER BASIN TERRITORY - PACKAGE B DRAFT REPORT
ADB TA 7189-INO: INSTITUTIONAL STRENGTHENING FOR INTEGRATED WATER RESOURCES MANAGEMENT (IWRM) IN THE 6 CI's RIVER BASIN TERRITORY - PACKAGE B DRAFT REPORT Study on Effects of Land Use Change on Hydrological
More informationIntegrated Water Resources Conservation Management for a Sustainable Food Security
2nd International Conference on Sustainable Agriculture and Food Security: A Comprehensive Approach Volume 2017 Conference Paper Integrated Water Resources Conservation Management for a Sustainable Food
More informationPrepared by: Hopeton Peterson & Doneika Simms of the The Planning Institute of Jamaica (PIOJ) May 10, 2012
Prepared by: Hopeton Peterson & Doneika Simms of the The Planning Institute of Jamaica (PIOJ) May 10, 2012 Objectives Highlight expected climate risks and discuss how they will affect Jamaica s rural areas
More informationAPPENDIX DECREE NUMBER 112 IN 2003 ON STANDARD QUALITY OF DEMESTIC WASTE BY MINISTRY OF LIVING ENVIRONMENT
APPENDIX 2.3.1 DECREE NUMBER 112 IN 2003 ON STANDARD QUALITY OF DEMESTIC WASTE BY MINISTRY OF LIVING ENVIRONMENT Draft Management Criteria for Appendix 2.3.1 Sewerage Service Providers Dec. No. 112 in
More informationCOMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW
COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW Section 1: Description of the project (Final Version of 17
More informationRiver/Lake Basin Approaches to Water Resources Management:
River/Lake Basin Approaches to Water Resources Management: A Review of Project Experiences: Focus on Management Issues and Policy Responses Kenji Oya 1 UNCRD/ILEC/UNEP Joint Project on River/Lake Basin
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Report No.: AB5273 Project Name Water and Irrigation Sector Management Program 2 (WISMP 2) Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5273 Project Name Water
More informationWater Resources Management in Cambodia
Water Resources Management in Cambodia Prepared by : SAO SAMPHOIS CHHUN BUNNARITH Ministry of Water Resources and Meteorology June 2004 Contents General Information Water Resources Policies Institutional
More informationPham Thi Nguyet Nga Vietnam Environment Administration (VEA) Ministry of Natural Resources and Environment (MONRE)
Current situation of water quality in Vietnam and recent policy responses Pham Thi Nguyet Nga Vietnam Environment Administration (VEA) Ministry of Natural Resources and Environment (MONRE) Main content
More informationMAKING ROADS WORK FOR WATER
MAKING ROADS WORK FOR WATER FRANK VAN STEENBERGEN FVANSTEENBERGEN@METAMETA.NL Dream and opportunity To have roads for systematically used for water recharge/retention, storage and water management all
More informationK water s s Collaboration Activity in the Citarum River Basin
NARBO 3 rd General Meeting, 22 February 2008, Solo Indonesia K water s s Collaboration Activity in the Citarum River Basin Dr. Ick Hwan Ko Director K water Research Center Water Issues in the Citarum Basin
More informationChallenges and Opportunities
The 18th Asia-Pacific Seminar on Climate Change 2 3 March 2009, Hanoi, Viet Nam Viet Nam-Climate Change Adaptation: Challenges and Opportunities Nguyen Mong Cuong Task Leader, Vulnerability and Adaptation
More informationIntegrated Water Resource Management in Refugee Hosting Catchments
Integrated Water Resource Management in Refugee Hosting Catchments Dr. Callist Tindimugaya Commissioner, Water Resources Planning and Regulation Ministry of Water and Environment 1 Introduction- water
More information3. Present Situation of Environmental Problems
3. Present Situation of Environmental Problems 3.1 Natural Environment The goals, issues and programmes regarding the natural environment of the Ten Year Perspective Development Plan 2001-2011 are shown
More informationConference on New Thinking on Water Governance 2-3 July 2009 Lee Kuan Yew School of Public Policy National University of Singapore
Conference on New Thinking on Water Governance 2-3 July 2009 Lee Kuan Yew School of Public Policy National University of Singapore National Presentation: Establishment of Local River Basin Organization
More informationPresentation to the National Climate Change Country Team and Other Stakeholders. Suva, 29 March, John E. Hay (GOPA Team Leader)
Presentation to the National Climate Change Country Team and Other Stakeholders Suva, 29 March, 2011 John E. Hay (GOPA Team Leader) Presentation to the National Climate Change Country Team and Other Stakeholders
More informationFACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.
1 FACTSHEET INTRODUCTION World Water Day, on 22 March every year, is about focusing attention on the importance of water. This year s theme, Nature for Water, explores nature-based solutions (NBS) to the
More informationDomestic adaptation to climate change in Rwanda
Annex I Expert Global Forum on Sustainable Development: Key Issues for the Post-2012 Climate Change Framework OECD, Paris 4-5 March 2009 Domestic adaptation to climate change in Rwanda By URAMUTSE Charles
More informationROLES OF RBOs OR PUBLIC AGENCIES ON WATER RESOURCES MANAGEMENT, WATER ALLOCATION AND RELATED ISSUES IN VIETNAM. Presented by NAM VU PHUONG
ROLES OF RBOs OR PUBLIC AGENCIES ON WATER RESOURCES MANAGEMENT, WATER ALLOCATION AND RELATED ISSUES IN VIETNAM Presented by NAM VU PHUONG The 4 nd NARBO TRAINNING November 6 th November 10 th, 2006 MASL
More informationCLIMATE CHANGE ASSESSMENT (SUMMARY)
Chongqing Longxi River Basin Integrated Flood and Environmental Risk Management Project (RRP PRC 51005) CLIMATE CHANGE ASSESSMENT (SUMMARY) I. Basic Project Information Project Title: Chongqing Longxi
More informationDecision-making under Deep Uncertainty Conference 2017
Decision-making under Deep Uncertainty Conference 2017 BANGLADESH DELTA PLAN 2100 A challenge in meeting the uncertainties of long-term planning Giasuddin Choudhury Oxford, 15 November, 2017 Background
More informationImproving Water Security for the future through IWRM and better Water Governance in the Red Thai Binh river basin (Vietnam)
Improving Water Security for the future through IWRM and better Water Governance in the Red Thai Binh river basin (Vietnam) By Nguyen Thuy Hang, Staff member Division for Science and Technology Institute
More informationCo-Benefit Approach in JICA
Co-Benefit Approach in JICA The 18 th Asia-Pacific Seminar on Climate Change Ha Noi, 3th March 2009 by Akiko URAKAMI, Office for Climate Change Japan International Cooperation Agency (JICA) Table of Contents
More informationTitle Action Plan toward Effective Flood Hazard Mapping in My Country
Title Action Plan toward Effective Flood Hazard Mapping in My Country JICA region focused training course on flood hazard mapping Sep 2006 LAI TUAN ANH Division of Geodesy Department of Planning and Management
More informationParticipants of the Stakeholder Meeting for Preliminary Results (Jan.2011)
7.8 Results of Public Consultation -2 (Discussion on the Results of SEA) In the process of evaluating the development options, two stakeholder meetings were held in order to inform the results and discuss
More informationJasa Tirta II Public Corporation I N D O N E S I A
THE 2 nd THEMATIC WORKSHOP ON WATER ALOCATION AND WATER RIGHT Prepared by : Herman Idrus Jasa Tirta II Public Corporation I N D O N E S I A Manila, 5 ~ 9 June 2006 Session 3 Proposal, Processes and Evaluations
More informationCONCLUDING REPORT. Roadmap toward Effective flood Hazard Mapping in. Lao PDR. By: Mr. Anousone SISA-AD. Lao PDR
CONCLUDING REPORT IN Roadmap toward Effective flood Hazard Mapping in Lao PDR By: Mr. Anousone SISA-AD Lao PDR JICA TRAINING COURSE ON FLOOD HAZARD MAPPING 31/Nov-02/Dec/2005 0 Title: Roadmap toward Effective
More informationSECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities
Pehur High Level Canal Extension Project (RRP PAK 47024) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT Sector Road Map 1. Sector Performance, Problems, and Opportunities
More informationSOLUTIONS FOR SUSTAINABLE WATER USE AND MANAGEMENT IN DA NANG CITY
MINISTRY OF NATURAL RESOURCES AND ENVIRONMENT DEPARTMENT OF WATER RESOURCES MANAGEMENT SOLUTIONS FOR SUSTAINABLE WATER USE AND MANAGEMENT IN DA NANG CITY September 2018 DR. NGUYEN MINH KHUYEN DEPUTY DIRECTOR
More informationWater Security Agency. Plan for saskatchewan.ca
Water Security Agency Plan for 2016-17 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 8 Financial Summary...
More informationPolicies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response
Policies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response Christophe Crepin & Thu Thi Le Nguyen May 15, 2012 Second FAO/WB Expert Meeting Contents
More informationPolicies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response
Policies, Institutions & Climate Change: How Policy-Based Lending & Policy Dialogue can support Climate Change Response Christophe Crepin & Thu Thi Le Nguyen May 15, 2012 Second FAO/WB Expert Meeting Contents
More informationGlobal debate on irrigation water use
INCREASING or REDUCING IRRIGATION WATER Global debate on irrigation water use Increasing by 15-20% for food security or Reducing by 10% for eco-environment What to do? Global issues on the water saving
More informationSECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES (ENDANGERED RESERVOIRS) 1
Risk Mitigation and Strengthening of Endangered Reservoirs in Shandong Province Project (RRP PRC 40683) SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES (ENDANGERED RESERVOIRS) 1 A. Reservoir
More informationSustainable Water Resource Management Framework: IWRM in Korea
Sustainable Water Resource Management Framework: IWRM in Korea Dooho Park KOWACO Network of Asian River Basin Organizations First General Meeting February 24-26, 2004 . Background & Objectives. Water Resources
More informationPAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name
PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA
More informationCollaboration Effort to Maintain the Water Resources Degradation at Batu Municipality, East Java, Indonesia
Collaboration Effort to Maintain the Water Resources Degradation at Batu Municipality, East Java, Indonesia Prayogo Tri Budi Water Resources Engineering Department, Engineering Faculty, Brawijaya University
More informationCCAI Demonstration Projects in Viet Nam. Dr. Nguyen Anh Duc National CCAI Coordinator, Viet Nam National Mekong Committee
1 CCAI Demonstration Projects in Viet Nam Dr. Nguyen Anh Duc National CCAI Coordinator, Viet Nam National Mekong Committee Outline Project: Preliminary Study on Climate Change Adaptation Plan in Kien Giang
More informationNATIONAL WATER POLICY,
NATIONAL WATER POLICY, RESULTS AND CHALLENGES TODAY PRESENTED BY DEPUTY DIRECTOR OF PLANNING IN THE MINISTRY OF AGRICUTLURE, IRRIGATION AND WATER DEVELOPMNENT PRESENTATION OUTLINE BACKGROUND PURPOSE OF
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japan ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: Republic of Tunisia Project: Mejerda River Flood Control Project Loan Agreement: July 17, 2014 Loan Amount: 10,398
More informationCambodia s Strategic Program for Climate Resilience (SPCR): Status of Various Projects (as of Oct. 2012)
Cambodia s Strategic Program for Climate Resilience (SPCR): Status of Various Projects (as of Oct. 2012) Ancha Srinivasan, Ph.D. Asian Development Bank SPCR for Cambodia In Brief Endorsed by PPCR SC June
More informationLecture 1 Integrated water resources management and wetlands
Wetlands and Poverty Reduction Project (WPRP) Training module on Wetlands and Water Resources Management Lecture 1 Integrated water resources management and wetlands 1 Water resources and use The hydrological
More informationThe Republic of Korea s Country Partnership Strategy for the Republic of Indonesia The Government of the Republic of Korea
The Republic of Korea s Country Partnership Strategy for the Republic of Indonesia 2016-2020 The Government of the Republic of Korea March 2017 1 Table of Contents I. Summary... 3 II. Priority Cooperation
More informationWATER RESOURCES MANAGEMENT IN THE 6 CIS RIVER BASIN TERRITORY
POLA SUMMARY WATER RESOURCES MANAGEMENT IN THE 6 CIS RIVER BASIN TERRITORY YEAR 2012 DIRECTORATE GENERAL WATER RESOURCES MINISTRY OF PUBLIC WORKS TABLE OF CONTENTS Page 1. Background 3 2. Problems 4 2.1.
More informationTh PRC to ay i s t ld e wor
Book Launch ADB-IUCN joint publication WaterWealth: Investing in Basin Management in Asia and the Pacific Auditorium i B and C 14 March 2013, 17:00-17:3017:30 The PRC today is the world s second largest
More informationWater Resources in Japan and the development of IWRM in Kiso River
Water Resources in Japan and the development of IWRM in Kiso River 1. Water resources in Japan 1.1 Water resources development in Japan (1) Climate Japan is situated in Asia Monsoon Area. The average annual
More informationUPSTREAM-DOWNSTREAM INTEGRATION Lessons Learned from INTERDAWM Project, Indonesia
UPSTREAM-DOWNSTREAM INTEGRATION Lessons Learned from INTERDAWM Project, Indonesia By : Mardjono Notodihardjo Chairman, Sembrani Foundation, Indonesia ABSTRACT Discussion had been raised on the need of
More informationINDONESIAN WETLANDS MANAGEMENT POLICY
INDONESIAN WETLANDS MANAGEMENT POLICY by : Ir. Sonny Partono. MM Director of Directorate of Conservation Area and Protected Forest Management, Directorate of Forest Protection and Nature Conservation Ministry
More informationMekong Climate Change and Adaptation Initiative and the Mekong River Commission
The real threat: climate change impacts in Lower Mekong Basin Mekong Climate Change and Adaptation Initiative and the Mekong River Commission By Jeremy Bird Chief Executive Officer Mekong River Commission
More information- Researcher at Research Center for Population, Indonesian Institute of Sciencies (LIPI)
TWIN SEA (Twin Institute in Indonesia and for South East Asia) Flood Governance of Jakarta, Indonesia: Identifying societal and political processes in climate change adaptation (case study on relocation
More information2. Irrigation and Drainage Sub-sector. Guideline:
Sub-sector Guideline: (1) Irrigation (Adaptation Project) (2) Irrigation (BAU Development with Adaptation Options) (3) Drainage (Adaptation Project) (4) Drainage (BAU Development with Adaptation Options)
More informationNational Ecosystems and Landscapes Restoration Program of El Salvador
National Ecosystems and Landscapes Restoration Program of El Salvador Rationale/Background Ecosystem restoration and degraded lands rehabilitation are necessary measures to reverse the high degree of environmental
More informationAssociated Event : SDG 6 on Water and Sanitation
Associated Event : SDG 6 on Water and Sanitation Ir. (Dr.) Keizrul bin Abdullah Chairperson, Network of Asian River Basin Organizations (NARBO) The Role of River Basin Organizations (RBOs) in Fostering
More informationIndonesia. Upland Plantation and Land Development Project at Citarik Sub-watershed
Indonesia Upland Plantation and Land Development Project at Citarik Sub-watershed Evaluator: Ishimori, Koichiro Value Frontier Co., Ltd. Field survey: November and December 2008 1. Project Profile and
More informationCover Page for Project/Program Approval Request. Cover Page for Project/Program Approval Request
Cover Page for Project/Program Approval Request Cover Page for Project/Program Approval Request 1. Country/Region: Cambodia 2. CIF Project ID#: XPCRKH011A 3. Source of Funding: FIP PPCR SREP 4. Project/Program
More informationProgress of Water Environmental Governance/Management and Future Challenges in Sri Lanka
AYUBOWAN Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka By Dr. R M S K Ratnayake Director Central Environmental Authority Sri Lanka Democratic Socialist Republic
More informationIWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management
i KINGDOM OF CAMBODIA Nation Religion King IWRM best practices in the 4-Ps Pilot Basin - towards Integrated River Basin Management contributed to International Conference on WATERSHED MANAGEMENT: "From
More informationSECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1
Country Partnership Strategy: Philippines, 2011 2016 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 A. Sector Performance, Problems, and Opportunities 1. Sector importance and growth
More informationCompetition for Water Demands, Management conflicts and Inter- related Issues in MalwathuOya Basin of Sri Lanka
Competition for Water Demands, Management conflicts and Inter- related Issues in MalwathuOya Basin of Sri Lanka Eng S M D L K De Alwis Resident Engineer, Nachchaduwa NARBO 4 th Training Programme 9 th
More informationNam Theun 2. TNC workshop April 2014
Nam Theun 2 1 TNC workshop April 2014 The Hydropower Project Build, Operate, Transfer 25 year concession for Nam Theun Power Co. US$1.3 Billion cost, financed by 27 parties (1/3 Equity; 2/3 debt) Generating
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationWEATHER PROOFING: MANAGING WATER WITH ROADS
WEATHER PROOFING: MANAGING WATER WITH ROADS FRANK VAN STEENBERGEN FVANSTEENBERGEN@METAMETA.NL CERTIFIED IRF WORKSHOP 18 SEPTEMBER 2015 Program 1. Introduction 2. Discussion on designs and guidelines for
More informationIndonesia: Rising to the Challenge on Sanitation for Sustainable
Indonesia: Rising to the Challenge on Sanitation for Sustainable Human Settlements Dwityo A. Soeranto Deputy Director for Foreign Cooperation Directorate General for Human Settlements Ministry of Public
More informationWater Issues in Asia with special reference to the Greater Mekong Region and Thailand
Water Issues in Asia with special reference to the Greater Mekong Region and Thailand Mingsarn Kaosa-ard Social Research Institute Chiang Mai University June 14, 2008 1 Presentation today Current water
More informationFrom the 11 th NESD* Plan to Action:
The Fifth Regional Workshop on Integrated Resource Management in Asian Cities 17-19 June 2015, Chiang Mai, Thailand The Urban Nexus From the 11 th NESD* Plan to Action: An Integrated Resource Management
More informationPILOT PROGRAM FOR CLIMATE RESILIENCE (PPCR) By SC Approval Date PIPELINE SUMMARY - APRIL 2012 FY2012-FY2014. Investment Type
PILOT PROGRAM FOR CLIMATE RESILIENCE (PPCR) By PIPELINE SUMMARY - APRIL 2012 FY2012-FY2014 FY2012 XPCRNE030A XPCRNE032A XPCRBO008A XPCRBD002A for the Improvement of Climate Forecasting Systems and Operationalization
More informationMekong Climate Change and Adaptation Initiative of the Mekong River Commission
Mekong Climate Change and Adaptation Initiative of the Mekong River Commission H. E. Mr. Kol Vathana Mekong River Commission; Deputy Secretary General Cambodia National Mekong Committee Mekong is one of
More informationDOMESTIC WASTEWATER MANAGEMENT SECTOR TO ACHIEVE UNIVERSAL ACCESS IN INDONESIA
DOMESTIC WASTEWATER MANAGEMENT SECTOR TO ACHIEVE UNIVERSAL ACCESS IN INDONESIA SRI DARWATI Research Institute for Human Settlement Ministry of Public Works and Housing Source of presentation : Directorate
More informationDOMESTIC WASTEWATER MANAGEMENT SECTOR TO ACHIEVE UNIVERSAL ACCESS IN INDONESIA
DOMESTIC WASTEWATER MANAGEMENT SECTOR TO ACHIEVE UNIVERSAL ACCESS IN INDONESIA SRI DARWATI Research Institute for Human Settlement Ministry of Public Works and Housing Source of presentation : Directorate
More information