1 3rd WEPA International Workshop and the 7th Annual Meeting SEPTEMBER 2011 POLICY RESPONSES TO ATTAIN THE WATER QUALITY TARGET: MALAYSIA EXPERIENCE Mohd Said bin Dikon Department of Irrigation and Drainage, Malaysia Introduction Contents Water Quality Status Main Policy Responses Water Quality Initiatives Conclusion 1

2 Malaysia 2

3 Malaysia Comprises two distinct bodies of land Federal Territories and 13 States Total land area 329,750 km 2 Population - about 26 million A multi-racial, multi-cultural country Climate - warm and humid Annual average rainfall Peninsular Malaysia Sabah Sarawak 2,500 mm 3,000 mm 3,500 mm Definitions River means any river, stream, creek or other natural water course, and/or any tributary, distributary or artificial deviation thereof (National Land Code 1965). River means a body of inland water flowing for the most part on the surface of the land but which may flow underground for part of its course. River basin means the area of land from which h all surface runoff flows through a sequence of streams, rivers and, possibly, lakes into the sea at a single river mouth, estuary or delta (Adapted from EU Water Framework Directive 2000). 6 3

4 River Basins in Malaysia List of River Basins - updated based on the definition of river and river basin Classify rivers into 3 categories - based on the Provision of Federal Constitution Category 1 - river wholly within a state (state river) Category 2 - river shared more than one state (national river) Category 3 - river shared with other country (international river) 7 River Basin in Malaysia Total Nos. of River Basin Main River Basin (>80km 2 ) Peninsular Malaysia 1, Sabah 1, Sarawak Grand Total 2,

5 5

6 River Basin in Malaysia Main river basin(189) 95% of land area in Malaysia Small river basin(2797) 5% of land area in Malaysia 12 6

7 7

8 8

9 Trend of River Water Quality in Malaysia Year 1990 ~ 2009* 9

10 Reforms in the Malaysia Water Sector In 1998, National Water Resources Council (NWRC) has been set up. In 2003, the NWRC has decided that the formulation of Integrated River Basin Management (IRBM) master plans be carried out for all the 189 river basins. Cabinet Reshuffle in March 2004, 11 agencies from 4 different ministries were combined in the Ministry of Natural Resources and Environment (NRE). Reforms in the Malaysia Water Sector (contd) the Department of Water Supply ppy and the Department of Sewerage Services were moved to the Ministry of Energy, Green Technology and Water. The Federal Constitution was amended in January 2005 to transfer matters related to water supply services from the State list to the Concurrent list. The amendment enabled the Federal Government to regulate the water supply services while ownership and control of water resources, dams and catchment areas remained with the state governments. 10

11 The Federal Constitution of Malaysia List I - Federal List 9. Shipping, navigation and fisheries, including - (a) Shipping and navigation on the high seas and in tidal and inland waters; 10. Communications and transport, including - (d) Regulation of traffic by land, water and air other than on rivers outside harbour areas wholly within one State; 11. Federal works and power, including - (b) Water supplies, rivers and canals, except those wholly within one State or regulated by an agreement between all the States concerned; production, distributions by supply 21 of water power; List II - State List 6. State works and water, that is to say - (c) Subject to the Federal List, water (including rivers and canals but excluding water supplies and services); control of silt; riparian rights. List III - Concurrent List 8. Drainage and irrigation. 9. Rehabilitation of mining land and land which has suffered soil erosion. 9D. Subject to the Federal List, water supplies and services

12 Water Resources Management 1. Ministry of Natural Resources and Environment. 2. Ministry of Energy, Green Technology and Water. 3. Ministry of Agriculture u and Agro-based Industry Ministry of Natural Resources and Environment 1. Management age e of the implementation pe e tato of policies, strategies and programmes relating to natural resources and environment. 2. Enforcement and monitoring the implementation of and compliance with policies, i legislation l and guidelines relating to the management, conservation and natural resources and the environment. 12

13 Ministry of Energy, Green Technology and Water 1. Formulation and implementation of national policy on water supply services and sewerage services industry. 2. Formulating licensing and supervising policy and framework. 3. Formulating and determining tariffs. Ministry of Agriculture and Agro-based Industry 1. Agricultural irrigation and drainage. 2. To regulate the paddy and rice industry under the Control of Paddy and Rice Act To formulate, plan and implement the National Agriculture Policy. 13

14 MELAKA RIVER CLEANING AND BEAUTIFICATION PROJECT 14

15 PROJECT OBJECTIVES 2.1 Improve water quality at Sungai Melaka. 22B 2.2 Beautify and preserve the river corridor. 2.3 Making the Melaka River as one of the main tourism products in the State of Melaka. 24An 2.4 alternative route of public transport by rivers (water taxi) Melaka River Basin Melaka River Basin = 670km 2 Melaka River Main Trunk = 80km 15

16 Melaka River Cleaning and Beautification Project 6km Melaka River Cleaning and Beautification Project Parcel 2 3.5km Melaka River Cleaning and Beautification Project - Parcel 1 6k km Melaka River Cleaning and Beautification Project Parcel 2 3.5km Melaka River Cleaning and Beautification Project - Parcel 1 16

17 MELAKA RIVER CLEANING AND BEAUTIFICATION PROJECT - PARCEL 1 17

18 Headworks at Btg. Melaka River Tampin River Kg. Gadek Batang Melaka River Melaka Pindah JUS DAM DURIAN TUNGGAL DAM MELAKA RIVER Durian Tunggal Regulator Melaka River Existing Bunded Storage Durian Tunggal River Gate at Malim Weir Malim Weir Cheng River Cheng Industrial Area Taman Merdeka Regulator Taman Merdeka Klebang Tidal Barrage Malim River Malim Jaya Industrial Area Melaka River Putat River Melaka River Tidal Barrage Historical Melaka City Batu Hampar Tidal Barrage Scope of Work 1. Construction of bank protection (river wall) 2. Construction of pedestrian walkways. (river walk) 3. Dredging of rivers 4. Construction of sewage treatment center based in Kota Laksamana 5. Construction of sewerage system with bypass (Intercept) of wastewater from the existing drainage system and led to Waste Water Treatment Plant 6. Construction of Tidal barrage 7. Construction and upgrading of vehicle and pedestrian bridge 8. Landscaping and beautification 18

19 Layout Plan PHASE 1 (completed) PHASE 2 (completed) PHASE 1 (completed) Implementation Schedule NO PROJECT COST (RM) PERIOD Implementing Agency NOTE 1. Phase I 91,200, Historical Melaka City Council(HMCC) -Ministry of Tourisme -Completed 2. Phase II 50,000, Phase III 93,000, Phase IV 90,398, TOTAL 324,598, HMCC HMCC HMCC -NRE -Completed -NRE -Completed -NRE -Completed 19

20 Pengkalan Niru Before & After Before After Before After Site Photo Before & After Before Before Before After After After 20

21 Laksamana Point After Kg. Nelayan Before After After 21

22 Dataran Hang Tuah Before After After After Bunga Raya Before Before Before After After After 22

23 New Structures Site Under Construction photos Tidal Barrage Completed New Tidal Barrage Completed 23

24 1 0 Before Hang Jebat Bridge After Pasar Bridge Before After 1 0 Before After Chan Koon Cheng Bridge 24

25 Kg. Jawa Bridge 1 0 Before After Before After Old Bus Station Bridge 1 0 Riverwall and riverwalk at Kg Mortem - after 25

26 Riverwall And Riverwalk at Muara Melaka River - after 1 0 MELAKA RIVER CLEANING AND BEAUTIFICATION PROJECT - PARCEL 2 26

27 Background 1. Under the 10 th Malaysia Plan, Federal Government has approved RM285 million for the implementation of Melaka River Cleaning and Beautification Project - Parcel Project s Objectives 2.1 To improve water quality and water quantity of Melaka River 2.2 To Beautify and Rehabilitation of River Corridor 2.3 To promote Melaka River as one of the tourism product 2.4 To promote Melaka River as an alternative transportation mode (water taxi) 3. Project s Location 3.1 Jambatan Hang Jebat Batu Hampar TCG (6km) 53 PROJECT s MAJOR COMPONENTS River Improvement work (Widening and Deepening) Riverbank protection works Main terminal/water taxi station, River information centre Storm Water Treatment Plants Jetty/ Pick up points Beautification works by landscaping components Beautification of existing bridges Gross Pollutant Traps (GPTs) Pedestrian Bridge Automatic WQ monitoring station (SCADA) Boardwalk Decorative lighting Public amenities, etc. 27

28 6km Melaka River Cleaning and Beautification Project Parcel 2 3.5km Melaka River Cleaning and Beautification Project Melaka River Cleaning and Beautification Project - Parcel 1 28

29 OVERALL ZONING Rumpun Bahagia Bridge ZONE 4 ZONE 3 TAMAN RUMPUN BAHAGIA MELAKA SENTRAL Batu Hampar TCG ZONE 5 Pa ackage 2-3km Tun Razak Bridge ( AMJ Highway) TESCO Melaka Sentral Bridge ZONE 2 JUSCO COMMERCIAL AREA ZONE 1 Hang Jebat Bridge ackage 1-3km Pa Panglima Awang Bridge TAMAN REMPAH CONCEPTUAL IDEAS ZONE 1 PANGLIMA AWANG BRIDGE River Info Center Location Dragon Boat Jetty Option 2 for Water Taxi Station & River Info Center Site EXISTING CHINESE TENPLE Jebat Esplanade HANG JEBAT BRIDGE UITM S BUILDING Option 2 for Water Taxi Station & River Info Center Site Jetty Pick Up Point Proposed Alternative Site For River Info Center Location 29

30 Front View Perspektif TAMPAK HADAPAN Perspective View from Melaka RIver Side View Perspective View from Melaka RIver 30

31 PROPOSAL Jetty Pick Up Point - Right PROPOSAL JEBAT ESPLANADE Left 31

32 PROPOSAL LEGARAN JEBAT Left PROPOSAL JEBAT ESPLANADE Left 32

33 PROPOSAL JEBAT ESPLANADE Left Decorative Pole Light Shelter With Malacca Architecture Esplanade Decorative Torch Planter Box PROPOSAL JEBAT ESPLANADE Left Decorative Pole Light Shelter With Malacca Architecture Esplanade Decorative Torch Planter Box 33

34 PROPOSAL JEBAT ESPLANADE Left Shelter With Malacca Architecture Decorative Pole Light Planter Box Decorative Torch CONCEPTUAL IDEAS ZONE 1 PANGLIMA AWANG BRIDGE EXISTING CHINESE TENPLE River Info Center Location Dragon Boat Jetty Jebat Esplanade Option 2 for Water Taxi Station & River Info Center Site HANG JEBAT BRIDGE UITM S BUILDING Option 2 for Water Taxi Station & River Info Center Site Jetty Pick Up Point Proposed Alternative Site For River Info Center Location 34

35 PROPOSAL JEBAT ESPLANADE Right PROPOSAL JEBAT ESPLANADE Right 35

36 PROPOSAL JETTY AT CHINESE TEMPLE - Right PROPOSAL JETTY AT CHINESE TEMPLE - Right Water Taxi Jetty with Chinese Architecture Design. AFTER 36

37 PROPOSAL JETTY AT CHINESE TEMPLE - Right Water Taxi Jetty with Chinese Architecture Design. AFTER Night View ZONE 2 Water Taxi Station No. 2 Tun Razak Bridge(Lebuh AMJ) Nature Walk Natural Waterfall Pedestrian Bridge Modern Village Esplanade Board Walk Treatment Plan (Recreational Area) Melaka River Walk Terrace Plaza Viewing Vew Tower Urban Esplanade Wetland Board Walk Green Wall Screening Panglima Awang Bridge 37

38 PROPOSAL River Esplanade -Right PROPOSAL River Esplanade -Right 38

39 PROPOSAL River Esplanade -Right PROPOSAL MELAKA RIVER WALK - Right 39

40 PROPOSAL MELAKA RIVER WALK - Right PROPOSAL MELAKA RIVER WALK - Right 40

41 PROPOSAL WATER TAXI STATION -Right PROPOSAL WATER TAXI STATION -Right 41

42 PROPOSAL WATER TAXI STATION -Right PROPOSAL Melaka River Walk - Right 42

43 PROPOSAL Melaka River Walk - Right ZONE 2 Water Taxi Station No. 2 Tun Razak Bridge(Lebuh AMJ) Nature Walk Natural Waterfall Pedestrian Bridge Modern Village Esplanade Board Walk Treatment Plan (Recreational Area) Melaka River Walk Terrace Plaza Viewing Vew Tower Urban Esplanade Wetland Board Walk Green Wall Screening Panglima Awang Bridge 43

44 PROPOSAL GREEN WALL - Left PROPOSAL GREEN WALL - Left 44

45 PROPOSAL GREEN WALL - Left PROPOSAL FIREFLY & WILDLIFE HABITAT - Left 45

46 PROPOSAL FIREFLY & WILDLIFE HABITAT - Left Nature observation deck is made from timber to blend with natural setting. Restoration of original habitat for indigenous flora and fauna at the river of Sungai Melaka. Nature appreciation through boardwalk experience. PROPOSAL FIREFLY & WILDLIFE HABITAT - Left Night view of bird sanctuary and small animal habitat. 46

47 PROPOSAL FIREFLY & WILDLIFE HABITAT - Left Night view of bird sanctuary and small animal habitat. PROPOSAL FIREFLY & WILDLIFE HABITAT - Left Night view of bird sanctuary and small animal habitat. 47

48 PROPOSAL KAMPUNG ENAM ESPLANADE - Left PROPOSAL KAMPUNG ENAM ESPLANADE - Left 48

49 PROPOSAL Pedestrian Bridge - Left PROPOSAL Pedestrian Bridge - Left 49

50 PROPOSAL BRIDGE 02 - JAMBATAN TUN RAZAK (AMJ) BEFOR E PROPOSAL BRIDGE 02 - JAMBATAN TUN RAZAK (AMJ) Adaptation of the Masjid Selat Melaka s architecture Islamic decorative pattern AFTER 50

51 RIVER DREDGING Melaka River Cleaning and Beautification Project 6km Melaka River Cleaning and Beautification Project Parcel 2 3.5km Melaka River Cleaning and Beautification Project - Parcel 1 51

52 Cross Section 37m TYPICAL CROSS SECTION OF RIVER DREDGING

53 PROPOSED EQUIPMENT SPECIFICATION FOR SG MELAKA RIVER DREDGING MODULAR TYPE CUTTER SUCTION DREDGER Principal Particulars 1) 5-PIECE Hull allows Transport by trucks 2) Separate Engines for Dredge Pump and Hydraulic System and Generator 3) Size of 6m (Width) x 18m (Length) Length Overall 18.0 m Dia. discharge pipe Pump Power 300 kw Mean draught with full bunkers Dia suction pipe 300 mm Pump output Cutter Power 40 kw Dredging Depth 12.8 m Breath including side 6.0 m pontoons Depth 2.44 m No. of Engines mm 1.55 m 125 m3/hr 53

54 GEOTUBE DEWATERING 54

55 3 Stages of Geotube Dewatering Containment Stage: Filling of tubes with slurry waste and Ashland polymers Dewatering Stage: Drainage of free water from tube Large volume reduction Repeating Cycles: Until tube is full with dry solids Consolidation Stage: Drainage of pore water from tube D i i f i d fill 55

56 Geotube Dewatering Performance Aquaculture Sludge Effluent Coal Sludge Effluent Oil Sludge Effluent Sewage Digester Sludge Effluent 56

57 Dry Solids - Typical Results Final Solids Result Depend On: Polymer selection and dosage Type of waste Age of waste Time for dewatering Waste Material / Solids Initial Solids Final Solids Biosolids 1% to 4% 15% to 25%+ Agriculture 2% to 4% 20% to 30%+ Mineral Processing 3% to 10% 40% to 75%+ Industrial Waste Water 4% to 10% 25% to 75%+ Contaminated Sediments 10% to 14% 35% to 75%+ Dry Solids Handling Options On-site disposal Recycled Off-site disposal 57

58 Type of Geotube Item Description Circumference Length Layflat width Fill height Working width Fill volume m m m m B1 (m) m 3 1 Geotube GT500D/4.4m/7.6m Geotube GT500D/8.8m/15.3m Geotube GT500D/8.8m/27.5m8m/27 5m Geotube GT500D/13.7m/30.6m Geotube GT500D/18.3m/30.6m Geotube GT500D/18.3m/61.4m Geotube GT500D/27.5m/30.6m Geotube GT500D/27.5m/61.4m Geotube GT500D/36.6m/30.6m Geotube GT500D/36.6m/61.4m B1 Fill Height Geotube Installation Step by Step Process

59 Geotube Installation Step 1 Grade Site to Remove Debris, Sharp Objects Level From Side to Side, With No More Than a 0.5% Grade From End to End Geotube Installation Construct Containment Berm 1/3 to 2/3 the Height of the Geotube Unit Around the Perimeter Create Drainage: Dig Trench Inside Unroll Geotube Containment Berm, Bag Over Sloped for Positive Drainage Media Drainage to Lower on the Upper End End of Cell of the Dewatering Cell. Align Using Handling Straps. 59

60 Geotube Installation Cont d Install an In-line Mixing Manifold System Include: Injection Port 90-degree Elbows for Mixing Sample Port Pump Some Sludge Through a Return Line - Final Check Of Floc and Polymer Dose Before Pumping Geotube Unit Connect a Flexible Line to the Filling Port Pinch Valves are the Preferred Method to Control the Waste Stream GEOTUBE 60

61 61

62 RIVERBANK PROTECTION RIVER BANK PROTECTION TYPE 1 62

63 RIVER BANK PROTECTION TYPE 2 RIVER BANK PROTECTION TYPE 3 63

64 RIVER BANK PROTECTION TYPE 4 RIVER BANK PROTECTION TYPE 5 64

65 65

66 INTERCEPTOR DRAIN POLLUTION CONTROL PLAN CONCEPT Planning Approach Consider efforts by IWK and DoE Prevent entry into designated receiving i water Provide treatment Possible Components 1. Interceptor drains/tunnels 2. Sewerage Collection and treatment upgrading 3. Treatment Plant (SW runoff and DWF) 4. Community Treatment Facilities for Industrial Parks, Markets, Pasar Malam & Eateries 5. In stream Treatment Facilities 6. Off stream Treatment Facilities 66

67 67

68 STORM WATER TREATMENT PLANT STORM WATER TREATMENT PLANT 68

69 137 ACTIVATED SLUDGE PROCESS - most common - easy to operate

70 Activated Sludge Process Why use Activated sludge? It uses microorganism process Most reliable process and low cost to operate Well known system 139 Activated Sludge Process Influent Aeration Tank MLSS Sedimentation Tank Effluent Diffuser O2 Return Activated Sludge (RAS) Waste Activated Sludge (WAS) MLSS = Mixed Liquor Suspended Solids 2000 mg/l

71 AIR BUBBLES (oxygen) NEEDED BY MICROORGANISM Diffusers 141 Extended Aeration Process - 21 hrs Aeration Tank with diffusers is designed to have long retention time of about 18 hours Secondary Settling Tank (SST) - 3 hrs Sludge Wasting Sludge Recycle Line Aeration Tank SST HRT = 18 h 3hr Inluent Return sludge Sludge Wasting

72 Fine bubble aeration 143 SEQUENCING BATCH REACTOR SBR

73 SEQUENCING BATCH REACTOR Why use SBR? It is a biological aeration process. Decant influent Mixed Fill influent React Fill Popular due to simplicity and smaller area requirement Wasted sludge Effluent discharge Settle React It does not require additional sedimentation tank 145 Equalisation tank Aeration tank Air blower Decanter PLC control system 3 outlets for effluent discharge (manual decanting SBR)

74 SBR aeration sequence is controlled 147 Decanter unit - KEE

75 Decanter unit - USFILTER FRP Foam Filled Float Assembly Draw Tube with Solids Excluding Plugs FRP Discharge pipe TWL BWL Automatic Effluent Decant Valve Hinged Knee Brace Assembly Steel Reinforced Rubber Flexible Connector Elbow and Spool Rest position when tank Is drained Decanter Rest Support 149 Sequencing Batch Reactor SBR Decanter system

76 SBR aeration tank ( 2 x 8 hrs = 16 hr) Settling and decanting Filling and Aeration in progress

77

78 Air headers provide oxygen to the bottom of tank 155 Membrane air diffusers

79 BIOFIL SYSTEM USING BIOFILM ON PLASTIC MEDIA 157 AEROBIC BIOFIL TARGET AMMONIA REMOVAL Cosmo balls GREASE TRAP GRIT CHAMBER EQUALISATION TANK AERATION TANK COSMO-BALL MEDIA CLARIFIER DISINFECTION PUMP SUMP AIR BLOWER FINAL DISCHARGE SLUDGE TANK

80 BioFil System (12 hrs) Nitrified effluent recycle line Layout Plan New Process (in EA 1 st module) 1.5 hr 1.5 hr 3 hr 3 hr Raw BOD 100 mg/l AN 10 mg/l Clarifier Nitrified effluent recycle line Cosmo balls Cosmo balls Clarifier 1.5Qpeak Treated BOD 5 mg/l AN < 3 mg/l Anaerobic 1.5 hr Anoxic 1.5 hr Aerobic 2 stages - 6 hr RAS WAS 159 Innovative technology use of Cosmo-ball media for Biofil system 80

81 BioFil STP Fabrication is completed -cosmo-balls are secured in a cage 161 View of biomedia cage in Aeration tank 81

82 VIEW 1 VIEW Highly effective treatment process able to remove Ammonia N to less than 3 mg/l. A compact system (50% smaller) only 12 hours, vs existing 24 hours tank

83 High density of stable microbial biomass on media Suitable for upgrade STP to Category I in sensitive catchment th t areas. 165 BioFil The new process is suitable for IWK to upgrade their STP easily at reduced time and cost in sensitive catchment areas

84 167 GROSS POLLUTANTS TRAP 84

85 Operation Process of the CDS Stormwater Unit Polluted Runoff Unpolluted Waterways Stormwater (with trash & debris) Solids Collection Sump (trash & debris) Stormwater (water only) CDS Model Showing Flows 85

86 Concealed Storage Area Maintenance By Lift Basket 86

87 Maintenance By Vacuum Suction Method Using Vacuum Suction Truck WETLAND 87

88 CONCEPTUAL IDEAS ZONE 2 Water Taxi Station No. 2 Jambatan Tun Razak (Lebuh AMJ) Nature Walk Natural Waterfall Pedestrian Bridge Modern Village Esplanade Board Walk Treatment Plan (Recreational Area) Melaka River Walk Terrace Plaza Viewing Vew Tower Urban Esplanade Wetland Board Walk Green Wall Screening Jambatan Panglima Awang 88

89 WETLAND Phyto Remediation System 89

90 BACK TO PRODUCT LIST 90

91 RIVER OF LIFE for Greater Kuala Lumpur 91

92 RIVER OF LIFE for Greater Kuala Lumpur. KLANG RIVER BASIN Upper Klang River Catchment 2 States WPKL Selangor Main River involved Sg. Klang Sg Ampang Sg. Gombak SgBatu Sg Bunus Sg. Jinjang Sg Kuyoh 183 RIVER OF LIFE RIVER CLEANING In order to bring life to the river, pollution must be reduced and water must be treated Areas Aspiration of focusin cleaning river Sg. Batu Sg. Klang Sg. Gombak MP Sepang Sg. Ampang Upstream Pollution source 31 polluting factories 484 squatter households multipoint and 1 regional sewage treatment plants (STP) that needs significant and long overdue upgrade Length: 73km (Sg. Batu-25km, Sg. Gombak-30 km, Sg. Ampang-18 km) Local authority: Ampang Jaya & Selayang Kuala Lumpur Pollution source: 304 polluting factories 838 squatter households multipoint and 7 regional STPs that need significant upgrade and regionalisation Length: 40 km (Sg. Klang) Local authority: DBKL Tackling the pollution sources is key to transform and maintain Klang river as Class IIB (recreational use with body contact) 1 Squatter households within 500m radius of the river SOURCE: KLCH, BULETIN J/KUASA PERANCANG N. SELANGOR 2010 BI 2/2010; DOE S DATABASE 2009, IWK inputs

93 RIVER OF LIFE RIVER CLEANING Transforming the Klang river requires an integrated approach that stops pollution at the source Aspiration Key initiatives Summary description Class III (unsafe for body contact) Decrease ammoniacal nitrogen 1 from 0.9 to 0.3 mg/l Decrease biological oxygen demand 2 from 6 to 3 mg/l Decrease suspended solids 3 from 150 to 50 mg/l Class IIB (recreational use with body contact) 1 Sewage and sullage management 2 Squatter 3 Drainage and relocation flow management 4 Promote, enforce, and manage river cleanliness 1 Upgrade existing sewage systems to decrease pollutants from entering into the river 2 Enforce the zero-squatter policy through local authorities to prevent squatter waste 3 Upgrade drainage systems to prevent flooding and maintain water quantity 4 Enforce water waste guidelines for residents, factories, and commercial outlets through local authorities 1 Ammoniacal nitrogen (AN) is a toxic pollutant often found in sewage and landfill 2 Higher biological oxygen demand (BOD) BOD indicates higher presence of microorganisms, suggesting higher pollution 3 Suspended solid (SS) is organic and inorganic particle (e.g., waste, sand) that increases turbidity and reduces oxygen content SOURCE: Lab analysis 93

94 Conclusion Policy begin with Federal Constitution Rightly placed policy will help in attaining water quality target Clean and beautiful river invites public appreciation of water and nature Generates country economy through eco-tourism and inline with IWRM approach Integrated Water Resources Management (IWRM) Defined as : the process that promotes the coordinated development and management of resources in the natural environment (water, land, flora and fauna) in order to maximise the resultant economic and social welfare in an equitable manner without compromising the sustainability of vital eco-systems (Integrated Water Resources Management, Global Water Partnership Technical,Advisory Committee Background Papers, No. 4, 2000.) 94

95 95

INTERNATIONAL SYMPOSIUM ON HARMONISING ENVIRONMENTAL CONSIDERATIONS WITH SUSTAINABLE DEVELOPMENT POTENTIAL OF RIVER BASINS.

INTERNATIONAL SYMPOSIUM ON HARMONISING ENVIRONMENTAL CONSIDERATIONS WITH SUSTAINABLE DEVELOPMENT POTENTIAL OF RIVER BASINS. INTERNATIONAL SYMPOSIUM ON HARMONISING ENVIRONMENTAL CONSIDERATIONS WITH SUSTAINABLE DEVELOPMENT POTENTIAL OF RIVER BASINS 24-26 March 2010 IRBM in Malaysia DID Initiatives by Department of Irrigation

More information

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY ISAM SEQUENCING BATCH REACTOR PROCESS TRUST FLUIDYNE S EXPERIENCE The Fluidyne ISAM Sequencing Batch Reactor (SBR) system incorporates the latest and most innovative technology and over two decades of

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

Attachment N o F Control & Monitoring

Attachment N o F Control & Monitoring Attachment N o F Control & Monitoring Attachment F1: Treatment, Abatement and Control Systems Air There is no treatment or abatement systems required for the minor air emission points or the potential

More information

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY

CORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY ISAM SEQUENCING BATCH REACTOR PROCESS TRUST FLUIDYNE S EXPERIENCE The Fluidyne ISAM Sequencing Batch Reactor (SBR) system incorporates the latest and most innovative technology and over three decades of

More information

FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT

FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT FOR Proposed Residential Apartment project by M/s. DS-Max Properties Pvt Ltd, at Sy No. 27/2 & 27/3 at Valagerahalli Village, Kengeri Hobli, Bangalore

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

Feasibility Report on Sewage Treatment Plant (STP)

Feasibility Report on Sewage Treatment Plant (STP) Feasibility Report on Sewage Treatment Plant (STP) FOR Proposed Commercial Building project Commercial Office Building by M/s. Bhagavath Sannidhi Estates Pvt Ltd.at Sy No 55/1 of Devarabeesanahalli Village,

More information

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes FATIHAH SUJA 1, RAKMI ABDUL RAHMAN 2 AND OTHMAN JAAFAR 3 1,3 Department

More information

COMBI-TREAT IMPROVED SBR TECHNOLOGY. 2.1Process Diagram:

COMBI-TREAT IMPROVED SBR TECHNOLOGY. 2.1Process Diagram: COMBI-TREAT IMPROVED SBR TECHNOLOGY Conventional SBR is improved by introducing Combi-Treat Unit ahead of CLSBR (Constant Level SBR) Unit to generate power from Bio-gas and to reduce organic load in CLSBR

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

WATER QUALITY MANAGEMENT IN MALAYSIA, POLICY AND ACTION PLANS

WATER QUALITY MANAGEMENT IN MALAYSIA, POLICY AND ACTION PLANS WATER QUALITY MANAGEMENT IN MALAYSIA, POLICY AND ACTION PLANS Department of Environment Ministry of Natural Resources & Environment Level 1-4, Podium Blok 2 & 3, Lot G43, Presint 4, Federal Government

More information

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1 Nitrogen removal Nitrogen present in meat processing wastewater are termed a nutrient, since they are essential elements for life. They largely derive from proteins dissolved into wastewater from meat

More information

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1 Nitrogen removal Nitrogen present in meat processing wastewater are termed a nutrient, since they are essential elements for life. They largely derive from proteins dissolved into wastewater from meat

More information

WASTE WATER TREATMENT SYSTEM

WASTE WATER TREATMENT SYSTEM WASTE WATER TREATMENT SYSTEM Manual Coarse and Mechanical Fine Screens: We manufacture high quality screens that are widely used for removing suspended particles from the waste water. These screens are

More information

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities Advanced Wastewater Treatment and Disposal Systems Wastewater Utility Operation and Management for Small Communities Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems

Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems 1 Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems General Features KEE Process packaged and purpose-built activated sludge process systems are suitable for

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Turbo4bio System For the Treatment of Sewage & Organic Effluents

Turbo4bio System For the Treatment of Sewage & Organic Effluents Turbo4bio System For the Treatment of Sewage & Organic Effluents Dr.Hans. H.Badreddine President Turbo4bio Page 1 Executive Summary The Turbo4bio system has been patented in the UK and Europe by Hans Bioshaft

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates five Wastewater Treatment Plants namely: Adelaide, Greenway, Oxford, Pottersburg

More information

ISAM INTEGRATED SURGE ANOXIC MIX

ISAM INTEGRATED SURGE ANOXIC MIX ISAM INTEGRATED SURGE ANOXIC MIX P r o v e n T e c h n o l o g y FLUIDYNE S ISAM IS A TOTAL TREATMENT SYSTEM incorporating BOD, TSS and nitrogen removal along with sludge reduction in an integrated system.

More information

Aqua-Aerobic MBR Topics

Aqua-Aerobic MBR Topics Aqua-Aerobic MBR Topics Aqua-Aerobic Systems KMS Partnership Traditional MBR Approach Aqua-Aerobic Time-managed Biological Approach Bioreactor Operation & Membrane Integration Traditional Membrane Issues

More information

Compact Waste Water Treatment MBR /MBBR Technology

Compact Waste Water Treatment MBR /MBBR Technology Compact Waste Water Treatment MBR /MBBR Technology 1 Minimal Operation and Maintenance Costs and use of Chemicals 2 Recycle and Reuse water for Irrigation and Recreation 3 Save Water, Energy, Money and

More information

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing - 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants by Glenn Thesing Through retrofitting IFAS systems, communities can upgrade and expand wastewater treatment without the expense and complication

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,

More information

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge Contents Contents General Information Abbreviations and Acronyms... 6 Chapter 1 Wastewater Treatment and the Development of Activated Sludge... 8 The Importance of Wastewater Treatment... 8 The Scope of

More information

OUTLINE OF PRESENTATION

OUTLINE OF PRESENTATION International Symposium on HARMONISING ENVIRONMENTAL CONSIDERATIONS WITH SUSTAINABLE DEVELOPMENT POTENTIAL of River Basins PROTECTING WATER RESOURCES - ISSUES AND CHALLENGES by: NOORHASHIM BIN BARON National

More information

INFRASTRUCTURE & OPERATION

INFRASTRUCTURE & OPERATION SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process

More information

SBR PROCESS FOR WASTEWATER TREATMENT

SBR PROCESS FOR WASTEWATER TREATMENT SBR PROCESS FOR WASTEWATER TREATMENT IMR E&T S.r.l. Maria Vittoria Marra maria.vittoria.marra@imr.it www.imr.it Purification of wastewater A process aimed at removing organic and inorganic contaminants

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

BIOLOGICAL WASTEWATER BASICS

BIOLOGICAL WASTEWATER BASICS BIOLOGICAL WASTEWATER BASICS PRESENTATION GOALS EXPLAIN DIFFERENT TYPES OF WASTEWATER EXPLAIN THE DIFFERENT BIOLOGICAL SYSTEMS AND HOW THEY FUNCTION. COMPARE AND CONTRAST AEROBIC AND ANAEROBIC SYSTEMS

More information

by M k h GROVER Degremont

by M k h GROVER Degremont Innovative Technologies for Urban Waste Water Treatment by M k h GROVER Mukesh Degremont 4th March2013 Sewage a complex waste water URBAN WASTE WATER - SEWAGE Source of Foul odour Infectious Diseases Surface

More information

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Domestic Waste Water (Sewage): Collection, Treatment & Disposal Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected

More information

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three

More information

RIVER OF LIFE. Nurazizi bin Mokhtar Director of Physical Planning Department Kuala Lumpur City Hall

RIVER OF LIFE. Nurazizi bin Mokhtar Director of Physical Planning Department Kuala Lumpur City Hall RIVER OF LIFE Nurazizi bin Mokhtar Director of Physical Planning Department Kuala Lumpur City Hall GREATER KUALA LUMPUR / KLANG VALLEY The Greater Kuala Lumpur/Klang Valley (GKL/KV) National Key Economic

More information

ITS MANAGEMENT IN MALAYSIA DEPARTMENT OF IRRIGATION AND DRAINAGE

ITS MANAGEMENT IN MALAYSIA DEPARTMENT OF IRRIGATION AND DRAINAGE WATER RELATED DISASTER AND ITS MANAGEMENT IN MALAYSIA FLOODS BACKGROUND INTRODUCTIONS WATER RELATED DISASTERS IN MALAYSIA FLOODS LANDSLIDES DROUGHT TSUNAMIES FLOODS LANDSLIDES (DID) To provide engineering

More information

Module 17: The Activated Sludge Process - Part III Answer Key

Module 17: The Activated Sludge Process - Part III Answer Key Module 17: The Activated Sludge Process - Part III Answer Key What other differences can you see between Complete Mix and Step Aeration? One of the features that make Complete Mix Aeration different from

More information

Waste water treatment

Waste water treatment Waste water treatment Responsible water management means the treatment and disposal of the generated waste water, for which suitable and effective wastewater treatment plants and systems are needed. Based

More information

Performance Evaluation of 137 MLD Sewage Treatment Plant at Kasna U.P., INDIA Faheem Khan, Nitin Sharma, Avneet Kr.

Performance Evaluation of 137 MLD Sewage Treatment Plant at Kasna U.P., INDIA Faheem Khan, Nitin Sharma, Avneet Kr. Performance Evaluation of 137 MLD Sewage Treatment Plant at Kasna U.P., INDIA Faheem Khan, Nitin Sharma, Avneet Kr. Singh, Shobha Ram Abstract These The present study has been undertaken to assess the

More information

FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS

FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS Uttarahalli village, FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT FOR M/s. PRESTIGE ESTATES PROJECTS LTD, BENGALURU PROJECT : DEVELOPMENT OF RESIDENTIAL APARTMENT BEARING SY. Nos. 115,116 & 117 AT UTTARAHALLI

More information

SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE

SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE 411 033. INTRODUCTION SEWAGE TREATMENT FACILITIES ARE LIMITED IN OUR COUNTRY AND MANY OF THE TREATMENT FACILITIES

More information

Module 19 : Aerobic Secondary Treatment Of Wastewater. Lecture 24 : Aerobic Secondary Treatment Of Wastewater

Module 19 : Aerobic Secondary Treatment Of Wastewater. Lecture 24 : Aerobic Secondary Treatment Of Wastewater 1 P age Module 19 : Aerobic Secondary Treatment Of Wastewater Lecture 24 : Aerobic Secondary Treatment Of Wastewater 2 P age 19.1 Activated Sludge Process Conventional biological treatment of wastewater

More information

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan

More information

19. AEROBIC SECONDARY TREATMENT OF WASTEWATER

19. AEROBIC SECONDARY TREATMENT OF WASTEWATER 19. AEROBIC SECONDARY TREATMENT OF WASTEWATER 19.1 Activated Sludge Process Conventional biological treatment of wastewater under aerobic conditions includes activated sludge process (ASP) and Trickling

More information

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program DISCUSSION PAPER Capital Regional District Core Area Wastewater Management Program Macaulay/McLoughlin Point Wastewater Treatment Plant Discussion Paper Liquid Process Alternatives Evaluation 034-DP-1

More information

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL Alvin C. Firmin CDM Jefferson Mill, 670 North Commercial Street Suite 201 Manchester, New Hampshire 03101 ABSTRACT Sequencing

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates six Wastewater Treatment Plants namely: Greenway, Pottersburg, Vauxhall, Adelaide,

More information

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water Optimising the re-use and recycling of waste water The ECO Smart aerobic wastewater treatment system is a selfcontained wastewater treatment system that utilizes a combination of anaerobic as well as aerobic

More information

EHS SMART-Treat Onsite Moving Media Treatment System

EHS SMART-Treat Onsite Moving Media Treatment System EHS SMART-Treat Onsite Moving Media Treatment System Sampling &Testing Protocol for SMART-Treat Wastewater Treatment System SAMPLING DURING OPERATION OF THE TREATMENT SYSTEM-IF DESIRED Sampling and analytical

More information

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge

More information

ROADMAP TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN MALAYSIA

ROADMAP TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN MALAYSIA ROADMAP TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN MALAYSIA JICA region focused training course on flood hazard mapping JFY 2005 HAZALIZAH BINTI HAMZAH Civil Engineer Hydrology and Water Resources Division

More information

Case Study. Biological Help for the Human Race. Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia.

Case Study. Biological Help for the Human Race. Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia. Case Study BiOWiSH Aqua Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia BiOWiSH Aqua Executive Summary The main objective of the study was to quantify the cost savings of using

More information

I. THE ROLE OF FLOOD HAZARD MAPS TO MITIGATE FLOOD DAMAGE IN MALAYSIA

I. THE ROLE OF FLOOD HAZARD MAPS TO MITIGATE FLOOD DAMAGE IN MALAYSIA I. THE ROLE OF FLOOD HAZARD MAPS TO MITIGATE FLOOD DAMAGE IN MALAYSIA A.1 Flood Status in Malaysia Malaysia has along history of flooding, the country being exposed to monsoon winds and heavy conventional

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers. Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,

More information

BIO-BATCH TM. Sequencing Batch Reactor (SBR) Water & Wastewater Treatment

BIO-BATCH TM. Sequencing Batch Reactor (SBR) Water & Wastewater Treatment BIO-BATCH Sequencing Batch Reactor (SBR) Napier-Reid s Bio-Batch SBR is an effective aerobic biological system to remove pollutants i.e. BOD, COD, Suspended Solids, Nitrogen and Phosphorous from municipal

More information

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of Eco Water (QLD) Pty Ltd.

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of Eco Water (QLD) Pty Ltd. All information contained within this manual is the property of Eco Water (QLD) Pty Ltd. Any duplication, alteration and/or redistribution is forbidden without written expressed permission of Eco Water

More information

Advantages & Applications of MBBR Technologies

Advantages & Applications of MBBR Technologies Advantages & Applications of MBBR Technologies Wastewater Technologies Attached Growth Suspended Growth Static Fixed film Trickling filters Rope media Web media Biological active filters (BAF) Dynamic

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

Wastewater Plant Tour. There Is Gold In Them There Plants

Wastewater Plant Tour. There Is Gold In Them There Plants Wastewater Plant Tour There Is Gold In Them There Plants Why Should I Be Interested In Wastewater Treatment? Every municipality has at least one treatment facility. Many manufactures will have treatment

More information

Sewage Treatment - overview

Sewage Treatment - overview Foundation for Water Research 2005 Information Note FWR - WFD15 Sewage - overview Introduction Mains water supplied to households is used for many purposes, other than drinking and food preparation, notably

More information

Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal

Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal Nathan Antonneau, P.E. Presentation Outline Typical Flowsheet Configurations Process Reconfiguration - ISBR

More information

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd.

EARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd. Any duplication, alteration and/or redistribution is forbidden without written expressed permission of EcoWater (QLD)

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia. Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.

More information

Packaged Wastewater Treatment Systems for Individual Homes and Small Communities. Mark Gross Orenco Systems, Inc. Sutherlin, OR USA.

Packaged Wastewater Treatment Systems for Individual Homes and Small Communities. Mark Gross Orenco Systems, Inc. Sutherlin, OR USA. Packaged Wastewater Treatment Systems for Individual Homes and Small Communities Mark Gross Orenco Systems, Inc. Sutherlin, OR USA Abstract Packaged or pre-engineered wastewater treatment systems are required

More information

Where does drinking water come from?

Where does drinking water come from? Water Quality Where does drinking water come from? When you think about where your drinking water comes from, it's important to consider not just the part of the river or lake that you can see, but the

More information

EVW 2 Hynds Commercial Wastewater Systems April 2013

EVW 2 Hynds Commercial Wastewater Systems April 2013 Hynds Commercial Wastewater Systems High quality sewage treatment systems Fully designed by qualified engineers Small footprint EVW 2 Hynds Commercial Wastewater Systems April 2013 0800 425 433 www.hyndsenv.co.nz

More information

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS

OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS OPERATION AND MANAGEMENT OF WASTEWATER TREATMENT PLANTS Authors: Andrea Giordano Luigi Petta ENEA, Ente per le Nuove Tecnologie, l Energia e l Ambiente Bologna, Italy Keywords: Maintenance, Wastewater,

More information

Tour of Regional Water Reclamation Facility

Tour of Regional Water Reclamation Facility Name: Date: Tour of Regional Water Reclamation Facility High School Physical Science Fall Module 3 Regional Water Reclamation Facility NGSSS Big Idea: Standard 17 Interdependence Benchmark Code & Description:

More information

American Water College 2010

American Water College 2010 Vocabulary Activated Sludge (Part 1) Activated Sludge Sludge particles produced in raw or settled wastewater (primary effluent) by the growth of organisms (including zoogleal bacteria) in aeration tanks

More information

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX Municipal Wastewater Treatment Plant Site Visit Report Thursday, October 2, 2014 Prepared by: Elora Arana, Environmental Studies student Prepared for: Dr. Heather Wilkinson, Professor BESC 489/411 Texas

More information

Decantech. Decantech SBR SBR Technology For Sewage Treatment Plants. Parchure Engineers Pvt. Ltd. Pune

Decantech. Decantech SBR SBR Technology For Sewage Treatment Plants. Parchure Engineers Pvt. Ltd. Pune Decantech SBR SBR Technology For Sewage Treatment Plants By Parchure Engineers Pvt. Ltd. Pune Decantech SBR is the latest offering by Parchure Engineers Pvt. Limited. It is based on the Sequential Batch

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA

PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA PROGRESS OF WATER ENVIRONMENTAL GOVERNANCE/MANAGEMENT AND FUTURE CHALLENGES IN MALAYSIA BY SYAZRIN SYIMA SHARIFUDDIN NATIONAL HYDRAULIC RESEARCH INSTITUTE OF MALAYSIA (NAHRIM) PRESENTATION OUTLINE Introduction

More information

Field Trip Report to Indah Water Konsortium (IWK) Sdn. Bhd Due date : 25 / 11 / 2013 Lecturer s name : Ms. Sherina Binti Kamal

Field Trip Report to Indah Water Konsortium (IWK) Sdn. Bhd Due date : 25 / 11 / 2013 Lecturer s name : Ms. Sherina Binti Kamal Group members : Student ID : Susan Silvarajoo 112415012 Nuramelia Syahirah bt Kushaini 112415011 Nur Halimah Hamizah binti Hamdan Nick Othman Abdullah B10090051 B12090007 Field Trip Report to Indah Water

More information

Stormwater Manufactured Treatment Devices (MTDs)

Stormwater Manufactured Treatment Devices (MTDs) Supplemental Technical Specification for Stormwater Manufactured Treatment Devices (MTDs) SCDOT Designation: SC-M-815-13 (08/13) 1.0 Stormwater Manufactured Treatment Devices Stormwater Manufactured Treatment

More information

Fabric Drop Inlet Protection

Fabric Drop Inlet Protection Fabric Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Block

More information

CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES

CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES Don McEntee Chartered Engineer Dublin City Council November 2006 CONSTRUCTED WETLANDS OPPORTUNITIES FOR LOCAL AUTHORITIES In September 2006 the

More information

TECHNICAL BROCHURE WASTEWATER TREATMENT SYSTEMS

TECHNICAL BROCHURE WASTEWATER TREATMENT SYSTEMS WASTEWATER TREATMENT SYSTEMS by PUMPING & WATER TREATMENT The system most preferred by customers who clearly understand the economic value in purchasing an expertly designed and professionally built system

More information

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-442-9-938 Prepared by: Table of Contents Section 1: Overview...

More information

Transformation of Wastewater Impoundment into Yingcheng Reservoir at Sino-Singapore Tianjin Eco-City

Transformation of Wastewater Impoundment into Yingcheng Reservoir at Sino-Singapore Tianjin Eco-City Transformation of Wastewater Impoundment into Yingcheng Reservoir at Sino-Singapore Tianjin Eco-City Sino-Singapore Tianjin Eco-City Catching World Attention This project caught world attention in 2011.

More information

Sludge recycling (optional) Figure Aerobic lagoon

Sludge recycling (optional) Figure Aerobic lagoon 19.4 Aerated Lagoon Aerated lagoons are one of the aerobic suspended growth processes. An aerated lagoon is a basin in which wastewater is treated either on a flow through basis or with solids recycle.

More information

NITROGEN REMOVAL GRANT WEAVER, PE & WWTP OPERATOR PRESIDENT THE WATER PLANET COMPANY. Create Optimal Habitats

NITROGEN REMOVAL GRANT WEAVER, PE & WWTP OPERATOR PRESIDENT THE WATER PLANET COMPANY.   Create Optimal Habitats NITROGEN REMOVAL Create Optimal Habitats Recognize the Importance of People Skills Full-scale Experimentation GRANT WEAVER, PE & WWTP OPERATOR Regulatory Support Utility Support PRESIDENT THE WATER PLANET

More information

AquaNereda Aerobic Granular Sludge Technology

AquaNereda Aerobic Granular Sludge Technology Aerobic Granular Sludge AquaNereda Aerobic Granular Sludge Technology The AquaNereda Aerobic Granular Sludge (AGS) Technology is an innovative biological wastewater treatment technology that provides advanced

More information

Anderson Water Pollution Control Plant

Anderson Water Pollution Control Plant City of Anderson Wastewater Division Public Works Director Jeff Kiser Chief Plant Operator Plant Supervisor Operator III Operator I Phil DeBlasio Mike Hansen Tony Hinchliff Vacant Collections Supervisor

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

Course: Wastewater Management

Course: Wastewater Management Course: Wastewater Management Prof. M. M. Ghangrekar Questions 1 1. Describe advantages and disadvantages offered by the water carriage system. 2. What are the possible adverse effects when untreated or

More information

6.2 Umgeni Water Owned Wastewater Works

6.2 Umgeni Water Owned Wastewater Works 6. WASTEWATER 6.1 Overview Umgeni Water owns and operates the Darvill and Ixopo Wastewater Works (WWW), but manages a number of other WWW on behalf of Municipalities. Management contracts are in place

More information

SECTION 6.0 NEWPCC CENTRATE TREATMENT

SECTION 6.0 NEWPCC CENTRATE TREATMENT SECTION 6.0 NEWPCC CENTRATE TREATMENT 6.1 CENTRATE FLOWS AND LOADS 6.1.1 Background The digested sludge dewatering system at the North End Water Pollution Control Centre (NEWPCC) operates on a continuous

More information

COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL ACTIVATED SLUDGE (AS) PROCESSES

COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL ACTIVATED SLUDGE (AS) PROCESSES Sixteenth International Water Technology Conference, IWTC 16 2012, Istanbul, Turkey 1 COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL

More information

Appendix D JWPCP Background and NDN

Appendix D JWPCP Background and NDN Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240

More information

Akiki Engineering Est.

Akiki Engineering Est. Akiki Engineering Est. Water & Steam Experts 3.1. Wastewater Treatment Catalogue October 7, 2010 Contents Rectangular Plant, Extended Aeration......................... 3 Circular Plant, Extended Aeration...........................

More information

membrane bioreactors MBR vs. Conventional Activated Sludge Systems CAS

membrane bioreactors MBR vs. Conventional Activated Sludge Systems CAS membrane bioreactors MBR vs. Conventional Activated Sludge Systems CAS Features What of MBR is a Membrane technology Bioreactor? compared to conventional processes Membrane Bioreactors MBR, combine fine

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information