1 Do Australian Clean Up Projects Currently Accord with the Concept of Sustainable Remediation? Peter Nadebaum Australasian Land and Groundwater Association SuRF Australia, CRC CARE, GHD Pty Ltd
2 Clean Up in Australia Each project: Must achieve the project objectives Must comply with regulatory requirements Must be acceptable to stakeholders Balance of risk and cost Australian regulatory system Flexible Allows range of endpoints/solutions Does this encourage solutions that accord with the concepts of Sustainable Remediation?
3 Australian remediation system Key requirements: Performance objective (not mandated clean up method) Comply with regulatory requirements relating to protection of human health and the environment ( no adverse effect ) Allows consideration of Land use (eg industrial - less sensitive) Groundwater use (uses that are relevant) Consultation with stakeholders (for larger projects)
4 What constitutes Sustainable Remediation? No formal framework in place at this time CRC CARE is preparing a National Framework SuRF Australia has prepared a Framework for Sustainable Remediation - draws on UK Framework Key requirements: Meets regulatory requirements Acceptable level of risk Achieves a balance between environmental, social and economic factors? Also at what point in the project cycle is sustainability considered?
5 Case examples: Filled quarries: 10 deep uncontrolled landfills reconstituted, capped and developed for mixed residential use (South Australia) Harbour land: 25 ha of deep uncontrolled filling and hydrocarbon contamination developed for mixed high value commercial and residential use (Northern Territory) Industrial badly contaminated filled site: remediated for high value residential development (New South Wales) Petroleum pipeline: leak resulting in extensive NAPL plume (Victoria) All sites involved consultation with EPA and stakeholders
6 Risk and balance of environmental, social, economic factors? Identified allowable options for each, and assessed 1. Risk that something goes wrong [final solution/clean up works] 2. Sustainable Remediation: indicators of impact (SuRF Australia/UK Framework) Environmental Social Economic 1. impacts on air; 2. impacts on soil; 3. impacts on water; 4. impacts on ecology; 5. use of natural resources and generation of wastes; 6. intrusiveness. 1. impacts on human health and safety; 2. ethical and equity considerations; 3. impacts on neighborhoods or regions; 4. community involvement and satisfaction; 5. compliance with policy objectives and strategies; 6. uncertainty and evidence. 1. direct economic costs and benefits; 2. indirect economic costs and benefits 3. employment and capital gain; 4. induced economic benefit; 5. life-span and project risks ; 6. project flexibility. Ranked in terms of impact: 1 3 low (best); 4 7 medium; 8 10 high (worst)
7 Ten Filled quarries residential and park land PAHs and metals Options: 1.Adopted: pre-validate, excavate, sort, reuse as fill or landfill, cap, control land use 2.Excavate and landfill 3.Existing + treat PAHs + stabilise metals 4.Existing but relocate more contaminated material to separate cell 5.No excavation, cap, pile
8 Risk The quarries - The adopted solution provides a reasonable balance of risk vs impact Impact (of the works) - Other options have either higher risk or higher impact
9 Harbour Land Hydrocarbons, NAPL, heavy metals (spilt ore), pesticides, asbestos, solid waste
10 Harbour Land Approach: Identify and remove unacceptable soil/napl contamination Confirm residual soil contamination not a health risk Redirect groundwater so not an environmental risk
11 Harbour Land
12 Harbour land - options 1. Existing: assess risk, remove/landfill unacceptable soil/napl from building footprints, redirect groundwater/skim/discharge, CUTEP 2. Excavate all soil and landfill, redirect groundwater 3. Excavate all soil and landfill, groundwater MNA 4. Excavate all soil and landfill, treat groundwater 5. Excavate soil, sort, treat and return to site or landfill, treat groundwater CUTEP: Clean up to the extent practicable
13 Risk Harbour land - The adopted solution provides a reasonable balance of risk vs impact - Other options have higher risk and higher impact Impact (of the works) Note: - Complete clean up: although final site condition has lower risk, the overall risk is increased by the clean up work - Groundwater treatment: difficult and unlikely to be successful; diversion likely to be lower risk and lower impact
14 Petroleum Pipeline leak Rural location, fractured rock, groundwater used for stock Options: 1. Existing excavate/ landfill source, MPE, skim, CUTEP 2. Less recovery + CUTEP 3. Full recovery CUTEP: Clean UP to Extent Practicable
15 Risk The Petroleum Leak - The adopted solution provides a reasonable balance of risk vs impact - Full clean up has lowest final site risk, but with a much greater impact of the clean up works (particularly greater resource usage) Impact (of the works) Note: The adopted solution requires ongoing administrative controls (hence higher risk than a full clean up approach)
16 Heavily contaminated site chlorinated organics, dioxins, metals Options 1.Adopted: assess health risk, excavate most contaminated soil and return to site + contain at depth less contaminated soil, contain groundwater 2.Full soil treatment + groundwater containment 3.Full soil treatment + groundwater treatment 4.In-situ treatment not feasible
17 Risk The heavily contaminated site - The adopted solution provides a reasonable balance of risk vs impact - Other options have higher impact with little or no reduction in overall risk Impact (of the works) Note: Full treatment will provide lowest risk, but with considerably greater impact especially increased cost and use of resources
18 Note The ranking has been qualitative and indicative - does depend on the considerations applied it is not absolute risk has been ranked in terms of likelihood of something going wrong and the result not being acceptable other perspectives could be applied impact has been ranked in terms of adverse impact of the works (benefit is similar in most cases) Focus on major impacts of each option not whether sustainable methods have been applied to particular options
19 Findings In assessing options, need to consider both risk (outcome might not be acceptable) and impact of the works If the risk is too high do not consider
20 Findings, cont d For each example the option adopted appears to provide a reasonable balance in terms of risk (final site condition and clean up works) vs impact of the works The approach being adopted in Australia does appear to (informally) apply the principles of sustainable remediation and management But there are sites where the Australian system did not achieve balanced solutions Particularly where the endpoint is not risk-based, but is policy based. Eg asbestos ( none allowable ) Debate about landfill levies zero waste policy The application of Clean Up to the Extent Practicable is important in achieving sustainable outcomes
21 Findings, cont d Similar ranking using only the most important indicators suggests simplification This analysis post remediation The approach could be used to assess clean up and management options prior to adoption to better understand the factors involved 20
22 Conclude In Australia the current regulatory regime has flexibility and allows different clean up and management solutions allows options that provide a reasonable balance in terms of risk and impact The current process for selecting a remedial solution does not necessarily lead to an imbalance in risk vs impact ie generally does not force a solution that costs too much for benefit realised Risk is the primary basis for selecting acceptable options Risk-based Sustainable Remediation
Sustainable remediation in New Zealand
Sustainable remediation in New Zealand Joanne Ferry and Peter Cochrane Tonkin & Taylor Ltd jferry@tonkin.co.nz Introduction What is sustainable remediation? The practice of demonstrating, in terms of environmental,
More informationRegulation of leased federal airports in Australia
Regulation of leased federal airports in Australia With a focus on contaminated sites Presentation for International Committee On Contaminated Land History of Australian airports 1996 decision to privatise
More informationtechnical report Safe on-site retention of contaminants Part 2: A risk-based approach
CRC for Contamination Assessment and Remediation of the Environment no. 16 technical report Safe on-site retention of contaminants Part 2: A risk-based approach P. Nadebaum CRC for Contamination Assessment
More information3.11 HAZARDOUS MATERIALS
3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general areas of potentially contaminated properties along the proposed
More informationEmbedding Sustainability in Contaminated Site Management
Embedding Sustainability in Contaminated Site Management Practical Experiences Insert then choose Picture select your picture. Right click your picture and Send to back. Alan Thomas ERM, Oxford, UK Lance
More informationSustainable Approach in Contaminated Soil Management: Lessons Learned From 20 Years of Practice
RemTech 2009 October 14-16, 2009, Banff, AB, Canada Sustainable Approach in Contaminated Soil Management: Lessons Learned From 20 Years of Practice Christian Bélanger, Ph.D. General Director, Technical
More informationWater - policy and government regulation for heavy oil and oilsands development
Water - policy and government regulation for heavy oil and oilsands development Robert George, Alberta Environment and Sustainable Resource Development, Edmonton, Alberta Summary This presentation outlines
More informationNovember Contaminated Land Assessment in NSW
November 2015 Contaminated Land Assessment in NSW Contaminated Site Assessment and Management Process Prompts for assessing site contamination: Acquisition or divestment of property Site rezoning or DA
More informationLecture 1: Introduction to Soil Remediation Engineering
ENGI 9621 Soil Remediation Engineering Lecture 1: Introduction to Soil Remediation Engineering Spring 2012 Faculty of Engineering & Applied Science 1 1.1 Definition of soil remediation engineering a sub-discipline
More informationSection 3.11: Hazardous Materials
Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general
More informationENVIRONMENTAL EXPERTISE FROM THE GROUND UP
ENVIRONMENTAL EXPERTISE FROM THE GROUND UP Remedy Performance Reporting Driving Remediation System Optimization and Site Progression Kevin Michael Lienau, PE Corporate Engineering Manager Agenda A Programmatic
More informationFrom Wasteland to Green Parkland The West Melbourne Gasworks
MGP 2006 International Conference Reading UK 2-4 April 2006 From Wasteland to Green Parkland The West Melbourne Gasworks Ken Mival - Senior Principal - URS Australia (Presenter) Warren Pump Senior Principal
More informationPhase 1 ESA Phase 2 ESA Site Assessment. Cleanup Planning Cleanup CNFA NFA. Gas Tank Removal at Closed Gas Station
Phase 1 ESA Phase 2 ESA Site Assessment Cleanup Planning Cleanup CNFA NFA Gas Tank Removal at Closed Gas Station Hazardous Substance - Hazardous waste, CERCLA hazardous substances, petroleum, other substances
More informationIMPROVED MANAGEMENT OF DRINKING WATER QUALITY. Peter Nadebaum
IMPROVED MANAGEMENT OF DRINKING WATER QUALITY Paper Presented by : Peter Nadebaum Authors: P.R. Nadebaum, L.M. Adlem, A.J. Baker, K. Walsh Egis Consulting Aust. Pty Ltd & CRC for Water Quality & Treatment
More informationEnvironmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range
Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range 1 Presentation Agenda OU-1/FGGM-83, Former Trap & Skeet Range Focused Feasibility Study (FFS) OU-3/FGGM-87, Former Nike
More information19 April
19 April 2012 Christopher McElwain Manager Waste Management Environment Protection Authority PO Box A290 SYDNEY SOUTH NSW 1232 christopher.mcelwain@environment.nsw.gov.au Dear Chris The Australian Sustainable
More informationManagement & Remediation of Sites in the Petroleum Industry:
Management & Remediation of Sites in the Petroleum Industry: A Framework for the Developing World Kevin Van Hook AECOM Houston, Texas October 15, 2014 An IPIECA Good Practice Guide Lead Author AECOM Key
More informationFACTS ABOUT: Vapor Intrusion
Maryland Department of the Environment FACTS ABOUT: Vapor Intrusion The Land Restoration Program (LRP) is charged with assessing and cleaning up uncontrolled hazardous waste sites throughout Maryland to
More informationIntroduction and Summary
Introduction and Summary 1 In 1994 the Office of Technology Assessment (OTA) was asked to evaluate technical alternatives to incineration for cleaning up the Texarkana Wood Preserving Company Superfund
More informationClyde Street Remediation Project The Project Location
The Project Location The Project Site Who is Jemena? Jemena is an Australian infrastructure company that builds, owns and manages a combination of major electricity, gas and water assets in Australia.
More informationThe National Remediation Framework
CRC CARE Webinar The National Remediation Framework Dr Bruce Kennedy Executive Policy Adviser CRC CARE 16 April 2014 COOPERATIVE RESEARCH CENTRE FOR CONTAMINATION ASSESSMENT AND REMEDIATION OF THE ENVIRONMENT
More informationour Groundwater Resources
Protecting our Groundwater Resources by Dr Richard Evans Principal Hydrogeologist Sinclair Knight Merz Significance ifi of Groundwater in Australia Availability: 25,000,000 ML/ year Use: 6,000,000 ML/
More informationBrownfield Re-use + Sustainable Remediation = Sustainable Development
Brownfield Re-use + Sustainable Remediation = Sustainable Development Environmental Services Association of Alberta (ESAA) October 16, 2014; Banff, Alberta Presenter: Francisco Perello, Ph.D, P.Eng. OUTLINE
More informationMISSOURI DEPARTMENT OF NATURAL RESOURCES. Monitored Natural Attenuation of Groundwater Contamination at Voluntary Cleanup Program Sites
MISSOURI DEPARTMENT OF NATURAL RESOURCES Monitored Natural Attenuation of Groundwater Contamination at Voluntary Cleanup Program Sites Technical Bulletin 1/2002 Hazardous Waste Program The chemical, physical
More informationCHLORINATED SOLVENTS. The Value of Modified Active Gas Sampling in Assessing Remedial Options and Risk
CHLORINATED SOLVENTS The Value of Modified Active Gas Sampling in Assessing Remedial Options and Risk Introduction Issues with chlorinated solvent impacted sites Review traditional approaches to assessment
More informationNew Jersey DEP Site Remediation Program. Technical Guidance Committees
New Jersey DEP Site Remediation Program Technical Guidance Committees George Nicholas Lead - DEP/SRP Technical Guidance Development Technical Guidance Committees Composed of 5 DEP Staff and 7 Stakeholders
More informationVariation of NEPM Schedule B1
Variation of NEPM Schedule B1 CRC CARE s Role Prashant Srivastava Outline q The NEPM Review and recommendations q CRC CARE and its petroleum program q Health Screening Levels (HSLs) Project q NEPM variation
More informationManufactured Gas Plant Site Remediation - Program 50
Manufactured Gas Plant Site Remediation - Program 50 Program Description Program Overview More than 1,500 former manufactured gas plant (MGP) sites in the United States require either investigation or
More informationAtlantic PIRI The Atlantic RBCA approach
Atlantic PIRI The Atlantic RBCA approach Atlantic PIRI (who we are) Atlantic RBCA (what it is) Our mandate and strategic vision (what is expected of us and where we want to go?) The approach (why does
More informationContaminated Sites: How many are there, where are they, and what is being done about them? AWMA Meeting Victoria September 25, 2012
Contaminated Sites: How many are there, where are they, and what is being done about them? AWMA Meeting Victoria September 25, 2012 Provincial Distribution of Sites 2 Historical Context: 1980s - 1993 Approaching
More informationCleanup Sites. Design Considerations for Waste Rock. Nobis Engineering, Inc. - Brett Kay. Ely Copper Mine 1873
Design Considerations for Waste Rock Cleanup Sites Ely Copper Mine 1873 Nobis Engineering, Inc. - Brett Kay Site Setting Vershire, VT General Site area - 350 acres Dwight Hill, Ely & Schoolhouse Brooks
More informationLNAPL Extraction Practicability Assessment. Transpacific Industries Group Ltd Tullamarine Closed Landfill
LNAPL Extraction Practicability Assessment Transpacific Industries Group Ltd Tullamarine Closed Landfill Background In the IRP s view, the Stage 1 LNAPL Extraction Trial (Baildown Tests) has been appropriately
More informationTighes Hill Remediation Project Update
3 September 2015 Tighes Hill Remediation Project Update This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply)
More informationUsing Mass Balance to Assist in Determining Remedial Options. Stephen Thomson URS New Zealand Limited
Using Mass Balance to Assist in Determining Remedial Options Stephen Thomson URS New Zealand Limited Presentation Outline Introduction. Example Site. Mass Balance. Calculations. Outcomes. Introduction
More informationVertaseFLI. The UK experience and its applicability to the Irish market. Presented by Dr Chris Piddington
VertaseFLI The UK experience and its applicability to the Irish market Presented by Dr Chris Piddington FLI Eire Landfill Lining Brightwater FLI Water Engineering FLI Eire Special Projects World Wide ABiC
More informationConstruction Environment Management Plan (CEMP) Requirements
Australia Pacific Airports (Melbourne) Issue No: 3 Issue Date: 19 December 2016 Construction Environment Management Plan (CEMP) Requirements DOCUMENT No. PP002 DOCUMENT CONTROLLER: APPROVED: NAME: Jesse
More informationMINING AND UPSTREAM PETROLEUM PRODUCTION. CONTAMINATED SITES ASSESSMENT AND REMEDIATION THE REGULATORY REGIMES AND THE POTENTIAL FOR LIABILITY
MINING AND UPSTREAM PETROLEUM PRODUCTION. CONTAMINATED SITES ASSESSMENT AND REMEDIATION THE REGULATORY REGIMES AND THE POTENTIAL FOR LIABILITY Ecoforum Conference, Sydney. May, 2009 Abstract Increasing
More informationDivision of Waste Management. Landfill Redevelopment and Chapter
Division of Waste Management Landfill Redevelopment and Chapter 62-780 Interaction of Chapters 701 and 780 How is Chapter 62-780 applied at old and existing landfills? 62-780 applies to sites with a discharge
More informationSubmission on the Landfill Levy Review
Submission on the Landfill Levy Review Status of this submission This submission has been prepared through the Municipal Waste Advisory Council (MWAC) for the Western Australian Local Government Association
More informationGoldSET. CSVA 2010 Conference. GoldSET A Sustainability Evaluation Tool for Engineering Projects
GoldSET CSVA 2010 Conference GoldSET A Sustainability Evaluation Tool for Engineering Projects Mustapha Ouyed, Eng. Vincent Guimont-Hébert, B.Eng, GHG-IQ November 2010 Copyright Golder Associates 2009.
More informationContaminated Land Management
Contaminated Land Management Helen Jones WSP Speaker Introduction Helen Jones WSP 2 Technical Executive in Contaminated Land Management at WSP. BSc Hon degree in Engineering Geology 22 years experience
More informationAssessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK
Assessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK 25th May 2004 History of the Llandarcy Refinery Commissioned in 1921 UK s oldest refinery
More informationAIR-BASED REMEDIATION TECHNOLOGY SELECTION LOGIC. Air-Based Remediation Technologies
AIR-BASED REMEDIATION TECHNOLOGY SELECTION LOGIC Overview Identify important site/project parameters Present general decision logic to select potentially applicable air-based remediation technologies Apply
More informationMultiphase Extraction (MPE):
Multiphase Extraction (MPE): Remediation Trials in New Zealand 2010 Richard Howard Senior Environmental Scientist URS New Zealand Ltd CHRISTCHURCH 2 Contents Background to Multiphase Extraction (MPE) Introduce
More information11 CONTAMINATED LAND ENTER HERE BACK TO CONTENTS
11 CONTAMINATED LAND ENTER HERE BACK TO CONTENTS 11 Contaminated Land This chapter provides a description of Arrow s approach to contaminated land within the Project area. Potential contaminated land issues
More informationRenewable Heat for Renewable Cities: Geoexchange Heating and Cooling: Introduction and Case Study of St Peters College Sports Centre
: Geoexchange Heating and Cooling: Introduction and Case Study of St Peters College Sports Centre Presented by: Yale Carden, GeoExchange Australia Pty Ltd, 1 June 2016 Presentation Overview Start With
More informationSan Jacinto River Waste Pits Superfund Site Technical Document Review: Remedial Alternatives Memorandum (RAM)
San Jacinto River Waste Pits Superfund Site Technical Document Review: Remedial Alternatives Memorandum (RAM) By Jennifer Ronk and Cheyenne Morgan, Houston Advanced Research Center What is the purpose
More informationManufactured Gas Plant Site Management - Program 50
Manufactured Gas Plant Site Management - Program 50 Program Description Program Overview More than 1,500 manufactured gas plant (MGP) sites in the United States require either investigation or remediation,
More informationRCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series
United States Environmental Protection Agency Office of Solid Waste RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series EPA March 2000 www. FACT SHEET #3 FINAL REMEDY
More informationSustainable and Innovative Remediation of the Remote and Historic Hay Camp Abattoir and Warden Station Wood Buffalo National Park
Sustainable and Innovative Remediation of the Remote and Historic Hay Camp Abattoir and Warden Station Wood Buffalo National Park Brent O'Rae, B.Sc. (Env.), PMP Contaminated Sites Specialist Resource Conservation,
More informationCase Study Using the Decision Analysis Process to Select a Remediation Strategy for an Upstream Oil and Gas Facility
Case Study Using the Decision Analysis Process to Select a Remediation Strategy for an Upstream Oil and Gas Facility M.K. BURKHOLDER, Decision Frameworks Inc. J.E. ARMSTRONG, Komex International Limited
More informationOptimizing Long Term Monitoring at a BP Site Using Multi-Objective Optimization Software
Optimizing Long Term Monitoring at a BP Site Using Multi-Objective Optimization Software Barbara Minsker, Moiré Inc. June 15, 2004 Conference On Accelerating Site Closeout, Improving Performance, and Reducing
More informationHybrid Water Accounts for Australia Workshop on SEEA-Water Rio de Janeiro September 2009
Hybrid Water Accounts for Australia Workshop on SEEA-Water Rio de Janeiro 23-24 September 2009 Gemma Van Halderen Australian Bureau of Statistics Presentation outline 1. Why is combining monetary and physical
More informationUSACE Updates. Site-Wide Remedial Investigation (RI) Report Overview BUILDING STRONG
USACE Updates Site-Wide Remedial Investigation (RI) Report Overview CERCLA Process Site-Wide RI Table of Contents Two primary guidance documents were followed in preparing the Site-Wide Remedial Investigation
More informationVolume of flared hydrocarbon Million m Volume of vented hydrocarbon Million m
Santos Ltd Sustainability Performance Data 2017 All data are reported for the 2017 calendar year and as Santos gross operated unless otherwise stated. Data are presented to nearest significant figure.
More informationChartered Member of Engineers Australia Member of Australian Geomechanics Society
CURRICULUM VITAE BEng (Civil) Hons, CPEng, NER, MIEAust Perth, Western Australia Education Professional Membership BEng Civil (Hons), BCom, University of Western Australia, Western Australia, Australia,
More informationCentral Plateau Inner Area Cleanup Principles
Central Plateau Inner Area Cleanup Principles What are Cleanup Principles? Cleanup Principles are the initial conditions and approaches to developing cleanup decisions in the Inner Area These Principles
More information4.14 HAZARDOUS MATERIALS
4.14 HAZARDOUS MATERIALS INTRODUCTION The presence of hazardous materials is a part of everyday life that could affect residents, workers, and visitors within the County. Certain activities can pose a
More informationAchieving sustainable remediation a framework and guidance from the UK
Achieving sustainable remediation a framework and guidance from the UK Prof Paul Bardos, r3 environmental technology ltd and University of Brighton Sustainable Remediation Forum-UK Steering Group Member
More informationContaminated Land Auditing Charting Complex Waters
Presentation to Environmental Health Association Perth, September 2013 Contaminated Land Auditing Charting Complex Waters Roger Parker Principal Accredited Contaminated Site Auditor Content of Presentation
More informationContent of the presentation
Content of the presentation Status of and policy on contaminated sites in Finland Anna-Maija Pajukallio 20.9.2006 Nordrocs, Malmö Contaminated sites in Finland Inventories Authorities Remediations Some
More informationBS Geology, Lamar University, Beaumont, Texas, May 1989
MONTE MARKLEY, P.G. Education BS Geology, Lamar University, Beaumont, Texas, May 1989 Professional Licenses Professional Geologist Kansas Missouri Professional Affiliations Kansas Geological Society National
More informationModelling Uncertainty Analysis for Contaminant Risk Assessment
Modelling Uncertainty Analysis for Contaminant Risk Assessment Paul J Martin, M.Sc., P.Eng. Martinus (Barry) Brouwers, M.A.Sc. Daron Abbey, M.Sc., P.Geo., Sarah Katvala, M.Sc., P.Ag. Matrix Solutions Inc.
More informationModelling Uncertainty Analysis for Contaminant Risk Assessment
Modelling Uncertainty Analysis for Contaminant Risk Assessment Paul J Martin, M.Sc., P.Eng. Martinus (Barry) Brouwers, M.A.Sc. Daron Abbey, M.Sc., P.Geo., Sarah Katvala, M.Sc., P.Ag. Matrix Solutions Inc.
More informationFrom Risk to Remediation
From Risk to Remediation Australia s most comprehensive training to manage and remediate contaminated sites globally. 4 MARCH 8 MARCH 2019 UNIVERSITY OF NEWCASTLE Knowledge & experiences you can t Google.
More informationPROCEDURES FOR EVALUATION OF RESPONSE ACTION ALTERNATIVES AND REMEDY SELECTION FOR REMEDIAL RESPONSE PROGRAM SITES
Page: 1 PURPOSE: BACKGROUND: This policy describes the process and criteria used by the Division of Emergency and Remedial Response (DERR) in the analysis of response action alternatives for state authority
More informationSOIL AND GROUNDWATER REMEDIATION IN IRAQ
SOIL AND GROUNDWATER REMEDIATION IN IRAQ www.rsk.co.uk RSK PROVIDES A COMPREHENSIVE, FULLY INTEGRATED, RISK-BASED AND DESIGN-LED SOIL AND GROUNDWATER REMEDIATION SERVICE IN IRAQ. WE DESIGN, FABRICATE,
More informationRICHARD ENGLISH ON BEHALF OF THE WATER RIGHTS TRUST
DIGGING DEEPER RICHARD ENGLISH ON BEHALF OF THE WATER RIGHTS TRUST Setting the Scene Aggregate Usage Cleanfilling How much aggregate have we been using? How much will we use in the future? NB : Remaining
More informationRemediation of the Former Gasworks, High Wycombe, UK
Remediation of the Former Gasworks, High Wycombe, UK Apr-4-06 MGP Symposium, Reading UK, April 2006 Presented By Stuart Arch Apr-4-06 4/4/06 WPREpresentation1.ppt 1 Site Setting Contents of Presentation
More informationNovember 8, 2016 International Petroleum Environmental Conference. Tim Nickels Pastor, Behling & Wheeler, LLC
November 8, 2016 International Petroleum Environmental Conference Tim Nickels Pastor, Behling & Wheeler, LLC Long term, non-voluntary constant inhalation exposure to toxic compounds Non-voluntarily inhale
More informationAPPENDIX K-2 IRP SITES
APPENDIX K-2 IRP SITES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SCHOFIELD BARRACKS In order to prioritize the investigation and remediation activities
More informationFill Material and Soil Management
Fill Material and Soil Management What You Need to Know The purpose of this fact sheet is to describe how fill material and excess soil can be reused properly during the cleanup and redevelopment of properties
More informationCONTAMINATED SOIL LEGAL INSTRUMENTS AND MANAGEMENT
WORKSHOP ON MERCURY MANAGEMENT AND DECONTAMINATION IN THE FRAMEWORK OF THE MEDITERRANEAN REGIONAL PLAN ON MERCURY CONTAMINATED SOIL LEGAL INSTRUMENTS AND MANAGEMENT Joan Bartoll Catalan waste Agency ALMADÉN,
More informationSUSTAINABLE REMEDIATION & BROWNFIELD RE-DEVELOPMENT Former industrial site in St. Laurent, Montreal, Qc
SUSTAINABLE REMEDIATION & BROWNFIELD RE-DEVELOPMENT Former industrial site in St. Laurent, Montreal, Qc François Dubé, B. A. Sc. David Harper, M.Sc., P. Geo. Introduction Kilmer Brownfield Equity Fund
More information3/24/2014 Gorham Silver Site: a case study in risk communication
Gorham Silver Site: a case study in risk communication Robert Vanderslice, PhD Rhode Island Department of Health and the Brown University Superfund Research Program 1 Gorham Silver History and fun facts:
More informationI-ROX. Chemical Reduction-Oxidation (REDOX) Technology
I-ROX Chemical Reduction-Oxidation (REDOX) Technology 1.0 TECHNOLOGY OVERVIEW The I-ROX remediation products and application technology represent a new innovative tool for in-situ and ex-situ remediation
More informationEnvironmental Aspects, Impacts, and Risk ISO 14001:
1. PURPOSE: This document describes the procedure for identification of environmental risks, opportunities, aspects and impacts for the City of Dallas (City) Environmental Management System (EMS) and determining
More informationSummary of Investigations & Remedial Activities
Summary of Investigations & Remedial Activities Former Farmland Industries Nitrogen Manufacturing Plant Lawrence, Kansas November 9, 2009 Topics of Discussion Previous Investigations/Remedial Actions (Pre-2000s)
More informationA trial of Sustainable Remediation or Green Remediation in Japan and the Japan-specific Problems
A trial of Sustainable Remediation or Green Remediation in Japan and the Japan-specific Problems Yasuhide Furukawa*, Tetsuo Yasutaka #, Makoto Nakashimaʻ Tetsuro Satouʻ, Keisuke Ohmura Takenaka corporation*,
More informationOregon Guidance for Assessing and Remediating Vapor Intrusion in Buildings
Department of Environmental Quality Overview of Oregon Guidance for Assessing and Remediating Vapor Intrusion in Buildings Brownfields and Land Revitalization 2011 Conference Spokane, Washington May 13,
More informationComments on Joint Review Panel Environmental Assessment Report Sydney Tar Ponds and Coke Ovens Sites Remediation Project
Comments on Joint Review Panel Environmental Assessment Report Sydney Tar Ponds and Coke Ovens Sites Remediation Project G. Fred Lee, PhD, PE, DEE G. Fred Lee & Associates 27298 E. El Macero Drive, El
More informationECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)
ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon
More informationSydney Olympic Park Sustainability Planning and Policy. Pakinee Chaikaew ID No
Sydney Olympic Park Sustainability Planning and Policy Pakinee Chaikaew ID No. 4837979 Contents Introduction History of Sydndy Olympic Park Contamination of the site Homebush Bay remediation Risk Assessment
More informationManufactured Gas Plant Site Management - Program 50
Manufactured Gas Plant Site Management - Program 50 Program Description Program Overview Most former manufactured gas plants (MGPs) ceased operation by the 1960s, but by-products and wastes, often disposed
More informationGrid Soil Sampling Outside of Source Areas
Voluntary Remediation Program (VRP) (307) 777-7752 http://deq.state.wy.us/volremedi/index.asp Grid Soil Sampling Outside of Source Areas In its 2000 session, the Wyoming Legislature created new opportunities,
More informationEnvironmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment
Ministry of the Environment Soil Management A Guide for Best Management Practices The Ministry of the Environment (ministry) encourages the beneficial reuse of excess soils in a manner promoting sustainability
More informationPhase II/III Environmental Site Assessments
Draft Analysis of Brownfields Cleanup Alternatives Remediation of Contaminated Former Drycleaning and Dye Works 69 East Main Street, Meriden, CT 06450 Prepared by the City of Meriden I. Introduction &
More informationPetroleum Remediation Program Consultants Day Agenda May 24, 2017
Petroleum Remediation Program Consultants Day Agenda May 24, 2017 8:00-8:45: Sign-In, Breakfast 8:45-8:55: Welcome and Introduction (Sarah Larsen) 8:55-9:10: Petroleum Remediation Program Goals, Measures,
More informationEastland Woolen Mill. Background Information. Eastland Woolen Mill Background Information
Superfund Site Textile Mill 25 miles northwest of Bangor, Maine Wool products Fabric finishing and dying Dye-aid Chlorobenzene, Dichlorobenzene (1,2; 1,3, and 1,4), and Trichlorobenzene (1,2,4 and 1,2,3)
More informationInfrastructure Element
Infrastructure Element 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 INFRASTRUCTURE ELEMENT GOAL 1: To provide for environmentally
More informationThe 3 rd International conference on Sustainable Remediation. Case Studies
The 3 rd International conference on Sustainable Remediation Case Studies Eco-efficient Risk Management of a Creosote Contaminated Site Pirjo Tuomi (PhD, Golder Associates, Finland) Hannu Hautakangas (MSc,
More informationA Clean, Green Remediation
A Clean, Green Remediation How Green Remediation can make hazardous waste cleanup more eco-friendly, from beginning to end and at the same time help the bottom line By Robert J. Young, PG Vice President,
More informationKirkstallForge -Paving the Way for a new urban regeneration project in Leeds
KirkstallForge -Paving the Way for a new urban regeneration project in Leeds 0 Project Team Commercial Estates Group Ltd (CEG) - Client WYG - Environmental and Engineering Consultant Rebecca Reynolds Geotechnical
More informationJohanna Heywood, PE, PG
Johanna Heywood, PE, PG MEMPHIS BROWNFIELD WORKSHOP, SEPTEMBER 10, 2014 Past use of the site Chemicals used on-site Surrounding property usage Does not generally confirm or delineate contaminated areas
More informationSustainable Water Future for the City of Los Angeles
Sustainable Water Future for the City of Los Angeles National Research Council Pathways to Urban Sustainability: Challenges & Opportunities April 29, 2015 Nancy Sutley Chief Sustainability & Economic Development
More informationSite Background December 2005
Site Background December 2005 The South of Runway 18-36 Area consists of the lowland area surrounding the southern portion of runway 18-36. It extends from the East Canal of the airport ditch system on
More informationNational Standard for Environmental Risk Management of Industrial Chemicals
National Standard for Environmental Risk Management of Industrial Chemicals Information Paper on the pathway for design and implementation of the National Standard December 2015 CONTENTS Purpose... 3 Overview
More informationForthcoming Events Calender
The Australian Land & Groundwater Association Newsletter ISSUE #6 SEPT 2009 Contents: Pg. 2 E10 Pg. 3 NSW Pg. 4 NSW Pg. 5 Qld Pg. 6 SA Pg. 7 Vic Forthcoming Events Calender SEPTEMBER The 3rd International
More informationExample Application of Long Term Stewardship for the Chlorinated Vapor Intrusion Pathway (and VOC sources)
Example Application of Long Term Stewardship for the Chlorinated Vapor Intrusion Pathway (and VOC sources) Megan Hamilton Director of Vapor Intrusion and Risk Assessment EnviroForensics March 24, 2015
More informationA T Adams Consulting. West Belconnen Project Environment protection matters Summary report. report prepared for: Riverview Group
A T Adams Consulting West Belconnen Project Environment protection matters Summary report report prepared for: Riverview Group 9 April 2015 TABLE OF CONTENTS 1.0 -------- Introduction 2 1.1. ------- This