1 Project Data Sheet Due Dilligence (Stockpile Survey) Project Stockpile Survey, Redcar Area 280 Ha Client Tata Steel UK Ltd Year 2010 As part of a due diligence assessment of Tata s Redcar works, TerraConsult were requested to survey the material stockpiles at the site. There were 142 different stockpiles of coal, coke, iron ore and other bulk materials to be surveyed over an area of 2.0 km by 1.4 km. Tata required both the volumes and the densities of the stockpiles to be surveyed in order to determine the tonnages of each of the individual stockpiles. The quantity of stocks within the bed below the stockpiles (the carpet) was also to be surveyed. This survey was required to be carried out in mid- December 2010 with the report due in mid-january Individual stockpiles varied in size with plan areas varying from less than 50 m 2 to over 19,000 m 2. There was also a requirement that there was no access onto the stockpiles. TerraConsult carried out the stockpile volumetric survey by commissioning an aerial LiDAR survey to gather data at 0.25 m centres across the site giving 52 Million data points. This was ground truthed by conventional land survey techniques. Densities of the stockpiles were determined by sampling and testing the materials on site using box density methods in accordance with appropriate British Standards. The stockpile carpet survey was carried out by excavating a series of trial pits across the site to confirm thickness with the in situ density being measured by Nuclear Density Gauge methods. During the survey period there was a significant snow fall. The aerial survey was carried out in the short window before the snow arrived. In spite of the tight deadlines and the difficult weather conditions, TerraConsult were able to complete the survey safely and on time. There was over 1.5 Million m 3 of bulk materials stockpiled on the site. Michael Young Tata Steel Steel House Redcar, Teeside TS10 5QW Telephone:
2 Project Data Sheet Environmental Monitoring Project Keekle Head Area 70 ha Client Endecom UK Ltd Year (ongoing) TerraConsult were commissioned by Endecom UK to carry out site investigation and environmental monitoring services at the former Keekle Head opencast coal mine near Distington, Cumbria. The work was required to support the design of a proposed landfill facility accepting low level radioactive waste. Following a comprehensive desk study, TerraConsult were responsible for designing and procuring the intrusive investigation works which involved a combination of rotary drilling (open hole and coring), cable percussive boring and trial pitting. Field testing carried out as part of the contract included detailed permeability testing (falling head, instrumented packer tests and pumping tests), soakaway and plate bearing tests. Alongside the investigation works TerraConsult were commissioned to carry out a detailed programme of environmental monitoring and testing. The principle aim of this was to establish baseline conditions at the site. TerraConsult arranged the installation of dust monitoring gauges to assess the levels and chemistry of ambient dust across the site. TerraConsult also oversaw the installation of a weather station which records site specific weather data at hourly intervals. Following the investigation works, TerraConsult carried out a detailed programme of environmental monitoring. Groundwater level measurements were taken using both conventional dip-meters and down-well data loggers, the latter providing continuous data-sets which could then be analysed against the on-site measured rainfall data. In some areas the presence of artesian conditions also required the use of bourdon pressure gauges. A sampling programme was designed covering groundwater, surface water and river sediment. The relevant test suites were designed to characterise the baseline chemistry of the site and included both routine determinands and radiological elements. Subject to planning approval, the monitoring data will be used to underpin the scheme s Environmental Safety Case. Phil Holland Development Manager Endecom UK Ltd, Unit 4 Tustin Court Preston PR2 2YQ Telephone:
3 Project Data Sheet Land Regeneration Project Widnes Waterfront, Widnes Area 8 Ha Client New Earth Solutions Ltd. Year 2009 The Widnes Waterfront development site is for a new waste treatment centre. The site is situated adjacent to the Mersey estuary and a landfill that has taken hazardous wastes. The site has been used for over 130 years for a series of chemical works with the last works being a pesticide factory which was demolished in the early 1990s. The initial phase of works comprised a detailed desk study together with a surface geophysical investigation. This was followed by a comprehensive intrusive site investigation. Complex ground, groundwater and chemical conditions were encountered. There are three different aquifers at the site. The two upper aquifers were influenced by the 10 m tidal range in the estuary and were both contaminated with DNAPL, LNAPL and dissolved phase products. The cocktail of contaminants included: heavy metals, sulphate, hydrocarbons, BTEX, chlorinated solvents, carbon disulphide and pesticides. Extensive numerical modelling was carried out, following the Source Pathway Receptor methodology. Initial site specific clean-up criteria were derived for the site, calculated using a Tiered approach. Subsequent Tier 3 DQRA modelling allowed less stringent clean-up criteria to be employed but remediation of both free phase and dissolved products is required. A three stage Remedial Options Appraisal was carried out to determine the technically suitable remediation methods, and assess the costs and sustainability of the various possible methods. The remedial strategy was agreed with the Environment Agency and the local council. The site is programmed to be remediated in Ted Bleszynski New Earth Solutions Ltd 35 Black Moor Road, Ebblake Industrial Estate, Verwood, Dorset, BH31 6AT Telephone:
4 Project Data Sheet Land Regeneration Project Aquinas College, Stockport Area 5.2 Ha Client Vinci Construction Ltd Year Aquinas College is a 5.2 Ha. development site for a new College of Further Education building. The new college building was being developed on part of the college s existing grounds most recently used as playing fields / soft landscaping. The former college building was demolished and the land landscaped as part of this redevelopment project. The site, located in Stockport, Greater Manchester lies approximately 2 km from the M60 Motorway. The majority of the site area was previously used as an informal, unrecorded tip which took a variety of industrial waste from a number of sources including mercury contaminated material likely to have originated from the local hat making industry. TerraConsult were appointed by the contractor at tender stage to re-assess the original designer s Remediation Plan and Waste Assessment. The original remediation design by others required removal of 10,000 m 3 of soil from one particular area of the site (primarily due to risks to controlled waters), of which 2,500 m 3 had been assessed to be hazardous waste. TerraConsult re-interpreted the existing data and carried out additional investigation and detailed risk assessment. Rapid onsite characterisation of metal concentrations was achieved by the use of a portable XRay Fluorescence meter (XRF). The XRF results were also confirmed by a sub set of samples also sent to an MCERTs accredited laboratory. The additional data enabled a Tier 3 controlled waters risk assessment and further human health risk assessments to be undertaken, as well as a reclassification of waste types. The re-assessment enabled the volume of material requiring removal from the site to be reduced from 10,000 m 3 to only 40 m 3 from two hotspot locations. Overall, TerraConsult s work enabled a saving to the Client of around 685,000 due to reduced waste disposal and reduced need for imported material Peter Dodd Vinci Construction Ltd Birchwood Corporate 500, Longbarn Boulevard, Warrington, WA2 0XF Tel:
5 Project Data Sheet Quarry Remediation & Restoration Project Delph Lane Quarry, Whiston, Merseyside Value 900,000 Client NW Land Development Ltd Year 2002/03 & Delph Lane Quarry was a 30 m deep vertical sided Triassic red sandstone quarry in Whiston, Merseyside, which remained undeveloped for years despite being in an area short of development land. Permission to backfill was difficult to obtain due to the presence of a water supply borehole adjacent to the site and the Environment Agency was concerned about potential pollution. The availability of suitable excavated spoil from a quarry in St Helens, provided a potential catalyst to restore the site at an economic cost. Following extensive geochemical testing, numerical modelling and a detailed hydrogeological risk assessment, the Agency allowed the infilling under a strict Quality Assurance regime with professional full time supervision by TerraConsult. This was provided throughout the contract and included control of the loading at source and chemical testing of the fill placed. The geotechnical aspects were as important as the potential pollution issues in respect of constructing housing over the backfilled quarry as soon as practicable. Compaction trials prior to construction, a significant testing regime during infilling, continuous settlement monitoring and attention to detail provided fill which the monitoring continues to demonstrate is performing as predicted. In 2005, the site was purchased by a national home builder, David Wilson Homes. TerraConsult also worked for David Wilson Homes carrying out a geological assessment of a Regionally Important Geological and Geomorphological Site (RIGS) designated rock face and design and supervision of the remediation of an area of contaminated land adjacent to the quarry. Construction of all houses on the site was completed in late Paul Edwards North West Land Development Limited Edley, Central Avenue, Eccleston Park, Prescot, Merseyside, L34 2QL
6 Project Data Sheet Brownfield Remediation Project Pioneer Business Park, Ellesmere Port Area 12 Ha Client Vinci Construction Ltd Year 2005 Pioneer Business Park is a 12 Ha. warehouse development site, with the one warehouse building itself occupying 6.5 Ha. The site, situated adjacent to the M53 Motorway at Ellesmere Port, was formerly a large scale hydrocarbon storage, blending and distribution facility operational between 1958 and TerraConsult were appointed to review the site history and previous investigations for the development and provide detailed recommendations for remediation. This identified significant gaps in data, including the location of large ponds at the site prior to its development as a hydrocarbon storage facility. These areas were targeted as the infilled ponds had been potentially acting as sinks for hydrocarbon contamination over the years. This proved to be the case. Laboratory and geotechnical data obtained from the Site Investigation enabled extensive numerical modelling to be carried out, following the Source Pathway Receptor methodology. Initial site specific clean-up criteria were derived for the site, calculated using a Tiered approach. A subsequent DQRA modelling allowed less stringent clean-up criteria to be employed, therefore reducing the quantity of material required to be removed from site, saving significant costs. TerraConsult also supervised the remediation which included decontamination of the areas of the former ponds by pumping and treating the hydrocarbon contaminated groundwater. A large amount of free product and hydrocarbon contaminated sludge were removed from site by tanker. TerraConsult also carried out Construction Quality Assurance (CQA) validation of the engineered earthworks over the site. John Roberts Vinci Construction Ltd Birchwood Corporate 500, Longbarn Boulevard, Birchwood Warrington, WA2 0XF Tel:
South London Energy from Waste, Beddington Lane Initial Contaminated Land Assessment, July 2011
South London Energy from Waste, Beddington Lane Initial Contaminated Land Assessment, July 2011 Infrastructure Planning SOUTH LONDON ENERGY FROM WASTE BEDDINGTON LANE SITE INITIAL CONTAMINATED LAND ASSESSMENT
More informationGroundwater Monitoring At Harwell
Research Sites Restoration Ltd is owned by Babcock International Group and operates on behalf of the Nuclear Decommissioning Authority Groundwater Monitoring At Harwell Jon Blackmore MSc (ENG) CGeol CEnv
More informationGround Electromagnetic Survey (GEM-2) technique to map the hydrocarbon contaminant dispersion in the subsurface at Barry Docks, Wales, UK
Ground Electromagnetic Survey (GEM-2) technique to map the hydrocarbon contaminant dispersion in the subsurface at Barry Docks, Wales, UK Rahman YACCUP 1 and Peter BRABHAM 2# (1) Researcher, Malaysian
More informationGroundWater capability
GroundWater capability www.ramboll.co.uk About Ramboll Ramboll is a leading engineering, design and consultancy company founded in Denmark in 1945. We employ close to 10,000 experts and have a significant
More informationRADIOLOGICAL AND NUCLEAR SERVICES
RADIOLOGICAL AND NUCLEAR SERVICES RSK IS THE LARGEST PRIVATELY OWNED ENVIRONMENTAL, ENGINEERING AND RADIOLOGICAL TECHNICAL SERVICES COMPANY IN THE UK. FORMED IN 1989, WE NOW EMPLOY MORE THAN 1000 EMPLOYEES
More informationVertaseFLI. The UK experience and its applicability to the Irish market. Presented by Dr Chris Piddington
VertaseFLI The UK experience and its applicability to the Irish market Presented by Dr Chris Piddington FLI Eire Landfill Lining Brightwater FLI Water Engineering FLI Eire Special Projects World Wide ABiC
More informationKirkstallForge -Paving the Way for a new urban regeneration project in Leeds
KirkstallForge -Paving the Way for a new urban regeneration project in Leeds 0 Project Team Commercial Estates Group Ltd (CEG) - Client WYG - Environmental and Engineering Consultant Rebecca Reynolds Geotechnical
More informationA combination of high vacuum extraction and in situ chemical oxidation for the recovery and destruction of chlorinated hydrocarbons
A combination of high vacuum extraction and in situ chemical oxidation for the recovery and destruction of chlorinated hydrocarbons Project of the Year 500k to 2mill PROJECT SETTING Figure 1: The Mersey
More informationCAPABILITY STATEMENT. Ground and Environmental Services Limited. Unit 2 Montpelier Business Park Dencora Way Ashford Kent TN23 4FG
Ground and Environmental Services Limited Unit 2 Montpelier Business Park Dencora Way Ashford Kent TN23 4FG 01233 646237 CAPABILITY STATEMENT March 2012 air quality assessment contaminated land ecology
More informationMATERIALS MANAGEMENT PLAN (MMP)
MATERIALS MANAGEMENT PLAN (MMP) CONTENTS 1. INTRODUCTION...5 1.1 Background...5 1.2 Scope...5 1.3 Conclusions from the Environmental Impact Assessments...6 2. THE USE OF SITE-DERIVED MATERIALS...7 2.2
More informationOSHA 40-Hour EPA-Approved Hazardous Waste Operations and Emergency Response Training
KEITH L. ETCHELLS, PG, CHg Education BS Environmental Geology, Colorado State University, 1999 Professional Licenses Professional Geologist California (No. 8028) Professional Hydrogeologist California
More informationEnvironment Agency Guidance on Requirements for Land Contamination Reports. July 2005
Environment Agency Guidance on Requirements for Land Contamination Reports July 2005 ENVIRONMENT AGENCY GUIDANCE ON REQUIREMENTS FOR LAND CONTAMINATION REPORTS Context Who is this guidance aimed at? Developers,
More informationResource efficient remediation
Case study Resource efficient remediation Achieving savings through remediation and onsite reuse of contaminated material Bellway, Taylor Wimpey and Hydrock Costs and savings achieved by housing developers
More informationGeothermal. Raeburn Drilling and Geotechnical (Northern) Ltd can carry out the following works: GEOTHERMAL & RENEWABLE ENERGY
GEOTHERMAL & RENEWABLE ENERGY Geothermal Raeburn Drilling and Geotechnical (Northern) Limited, as part of the Raeburn Group of Companies offers the opportunity to complement your development with new technology.
More informationSPECIFICATION FOR JET GROUTING
SPECIFICATION FOR JET GROUTING 1.0 GENERAL The Specialist Contractor shall construct jet grout columns of nominal diameter and spacing as specified in the drawing(s) to the requirements of the Contract.
More information2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS
Section 2 Earthworks and Geotechnical Requirements 2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS CONTENTS 2 EARTHWORKS AND GEOTECHNICAL REQUIREMENTS... I 2.1 Introduction... 2-1 2.1.1 Objectives... 2-1 2.1.2
More informationOweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B
Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International
More informationFormer Gasworks, Dock Road, Limerick. Baseline Report
Former Gasworks, Dock Road, Limerick In accordance with Article 22(2) of the Industrial Emissions Directive March 2014 For Bord Gais Ellesmere Port Exchange Station Mercury Court Tithebarn Street Liverpool
More information(this cover page left intentionally blank)
4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant
More informationSPECIFICATIONS FOR STRUCTURAL EXCAVATION
SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition
More informationGuidance note completing form WRC consent to investigate a groundwater source
Guidance note completing form WRC consent to investigate a groundwater source This guidance will help you fill in application form WRC. This is so we can give you consent to drill and pump test a borehole
More informationCreamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y
Containment, Caps & Liners While excavation and treatment are common solutions for many soil and groundwater remediation projects, containment can sometimes be a more appropriate and more economical alternative.,
More informationTonight s presentation will provide information about the status of the Luckey Site and about ongoing and future Corps activities.
Good evening everyone. Thank you for coming to our information session for the Luckey Site. Please make sure you have a handout package and take your seats. My name is Duane Lenhardt and I am the U.S.
More informationFractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation.
Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation. Abstract William F. Simons, P.G., M.S. and Paul D. Steinberg, P.E.,
More information#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)
#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology
More informationCase Study: Overcoming challenges and obstacles to remediate a former de-waxing facility in Richmond, BC
Tyler Joyce, C. Tech. Stantec Kate Schendel, M.Sc., P.Ag. Vancouver Fraser Port Authority Case Study: Overcoming challenges and obstacles to remediate a former de-waxing facility in Richmond, BC Agenda
More informationConceptual Site Models for Environmental Investigations and Remediation
Remediation Technology Symposium (RemTech) 2012 Conceptual Site Models for Environmental Investigations and Remediation October 18, 2012 Tai T. Wong, P.Eng. Authors and Presenter Authors: James Carss,
More informationDepartment of Toxic Substances Control
Matthew Rodriguez Secretary for Environmental Protection Department of Toxic Substances Control Deborah O. Raphael, Director 9211 Oakdale Avenue Chatsworth, CA 91311 Edmund G. Brown Jr. Governor STATEMENT
More informationFLOWING FLUID ELECTRICAL CONDUCTIVITY PROFILING AN INVENTIVE AND COST EFFECTIVE ALTERNATIVE TO CONVENTIONAL DOWNHOLE HYDRAULIC PROFILING TECHNIQUES
FLOWING FLUID ELECTRICAL CONDUCTIVITY PROFILING AN INVENTIVE AND COST EFFECTIVE ALTERNATIVE TO CONVENTIONAL DOWNHOLE HYDRAULIC PROFILING TECHNIQUES Abstract S.D. Mohr 1 and L. Smith 2 1 Environmental Resources
More informationCMYK. Pantone. Westbay System. Greyscale. Black on White. White on Black. Multi-level Technology for Subsurface Characterization and Monitoring
CMYK Pantone Westbay System Greyscale Black on White White on Black Multi-level Technology for Subsurface Characterization and Monitoring Is Groundwater Monitoring Important? WHY GROUNDWATER MONITORING?
More informationCONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL
SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability
More information8 Geology, Hydrology & Hydrogeology
Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning
More informationWestbay System. Multilevel Technology for Subsurface Characterization and Monitoring
Westbay System Multilevel Technology for Subsurface Characterization and Monitoring Is Groundwater Monitoring Important? WHY GROUNDWATER MONITORING? Groundwater is an essential resource of great social,
More informationThis Minewater Treatment Scheme is located in the village of Clough Foot, near Todmorden, West Yorkshire. The
Clough Foot Minewater Treatment Scheme delivering environment improvements within the Upper Calder valley by J Bagnall This Minewater Treatment Scheme is located in the village of Clough Foot, near Todmorden,
More informationINTRODUCTION. 1 Proposed Plan for the Former Lee Field Naval Air Station Landfill Area 2 Site
1 Proposed Plan for the Former Lee Field Naval Air Station Landfill Area 2 Site U.S. Army Corps of Engineers, Jacksonville District Formerly Used Defense Site Program PROPOSED PLAN for the LANDFILL AREA
More informationOweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement
Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction
More informationTighes Hill Remediation Project Update
3 September 2015 Tighes Hill Remediation Project Update This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply)
More informationKilford Town Closed Landfill.
Kilford Town Closed Landfill. Introduction Below is a worked example of the application of the EPA Code of Practice Matrices to a fictional unregulated closed landfill. This example will show the user
More informationSPECIFICATION FOR ENGINEERED FILLS
SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some
More informationLand Contamination Reports
Land Contamination Reports Advice for Consultants and Developers www.south-norfolk.gov.uk Introduction and background This leaflet is aimed at consultants who have been appointed to carry out a site investigation
More informationRainwater harvesting for Aquifer Storage and Recovery - Case Studies in Goa
Rainwater harvesting for Aquifer Storage and Recovery - Case Studies in Goa Dr. A.G. CHACHADI, Professor in Geology Department of Earth Science Goa University Goa 403 206 E-Mail: chachadi1@gmail.com CSE
More information2010 Symposium ~ IMWA 2010 ~ Mid-Conference Excursion 5 Belinda Campbell, David Forrester. Sydney Tar Ponds and Collieries
~ IMWA 2010 ~ 2010 Symposium Conference Theme: Mine Water & Innovative Thinking Mid-Conference Excursion 5 Belinda Campbell, David Forrester Sydney Tar Ponds and Collieries International Mine Water Association
More informationPROPOSED MIXED USE DEVELOPMENT
J Routledge & Sons PROPOSED MIXED USE DEVELOPMENT Land at Tanhouse Lane, Widnes Environmental Statement: Non-Technical Summary Planning Application: 05/00057/OUTEIA Tanhouse Lane Environmental Statement
More informationTELLUS HOLDINGS LTD. The use of Geological Repositories for the long-term management of Energy from Waste fly ash
TELLUS HOLDINGS LTD The use of Geological Repositories for the long-term management of Energy from Waste fly ash Steve Reece, Technical Services Manager Energy from Waste National Conference October 2016
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationTools and Applications for On Site Chemical Analysis
Tools and Applications for On Site Chemical Analysis East Land Quality Forum 31 October 2011 Paul Tilley paul.tilley@esg.co.uk Contents On Site Analysis Overview Range of Equipment and Determinands Considerations
More informationGeotechnical & Materials Testing Specialists
Geotechnical & Materials Testing Specialists Telephone: 01302 768098 Email: Web: awatkins@prosoils.co.uk Professional Soils Laboratory Ltd, 5 / 7 Hexthorpe Road, Hexthorpe, Doncaster, South Yorkshire DN4
More informationSCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B
SCHEDULE 3.1 DETAILED CONSTRUCTION PLAN Part B: Narrative Area B SCHEDULE 3-1 DETAILED CONSTRUCTION PLAN Part B Narrative: Work Area B We will carry out the excavation for Work Area B as per Company s
More informationContaminated Land Assessment Guidance
Contaminated Land Assessment Guidance Protocols published by agreement between Water UK and the Home Builders Federation Published by Water UK January 2014 Introduction In January 2011, UK Water Industry
More informationWAR Wairarapa Aggregates Ltd
WAR080518 Wairarapa Aggregates Ltd Supplementary report to Hearing Panel Deirdre Ross 1. Purpose of report The purpose of this report is to provide comments on the briefs of evidence provided by the applicant
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationScottish Contaminated Land Forum 8 th September 2011
Scottish Contaminated Land Forum 8 th September 2011 Philip Norville Business Development Manager DEC UK and Ireland Site location - Chesterfield Overall view of the 98 hectare site Operational 1952 1992
More informationContaminated Land Management
Contaminated Land Management Helen Jones WSP Speaker Introduction Helen Jones WSP 2 Technical Executive in Contaminated Land Management at WSP. BSc Hon degree in Engineering Geology 22 years experience
More informationProgress in solving the problem of contaminated sites in Slovakia
Progress in solving the problem of contaminated sites in Slovakia ongoing project project in preparation Remediation of Environmental burdens at priority sites RNDr. Vlasta Jánová, PhD. RNDr. Želmíra Greifová
More informationEnvironmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment
Ministry of the Environment Soil Management A Guide for Best Management Practices The Ministry of the Environment (ministry) encourages the beneficial reuse of excess soils in a manner promoting sustainability
More informationground stability unexploded ordnance utility services infrastructure surveying and monitoring environment and archaeology foundations and geotechnics
environment and archaeology foundations and geotechnics utility services infrastructure surveying and monitoring ground stability unexploded ordnance Reduce the risk of the unknown contents How Zetica
More informationMINING, MINERALS & EXTRACTIVE INDUSTRIES
MINING, MINERALS & EXTRACTIVE INDUSTRIES 01 Mining, Minerals & Extractive Industries Mining, Minerals & Extractive Industries 02 SLR Consulting is a leading consultancy operating within the mining, minerals
More informationGuide for Developers Contaminated Land
Guide for Developers Contaminated Land Page 1 of 25 Introduction This guidance is aimed at owners, property developers, architects and surveyors who want to know what information they should submit to
More informationProceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007
Page 1 of 6 Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007 Vertical groundwater barriers for contaminated site reclamation Christopher
More information(No. of pages excluding this page = 10)
SPECIALIST CONSULTANT STUDIES 3-65 BIG ISLAND MINING PTY LTD (No. of pages excluding this page = 10) Ltd BIG ISLAND MINING PTY LTD 3-66 SPECIALIST CONSULTANT STUDIES This page has intentionally been left
More informationContaminated Land - Managing the Risk
Contaminated Land - Managing the Risk Signatures removed from electronic version Submitted by... Peter Wigley Nominated Responsible Manager Approved by... Tom Stevenson Chairman, Civil Engineering Subject
More informationEnvironmental Health Information Sheet
Environmental Health Information Sheet U.S. Steel Duluth Works - Saint Louis River NPL Site July 1998 This information sheet provides a general outline of health issues associated with the U.S. Steel Duluth
More informationManaging Risks on Brownfield Sites
Managing Risks on Brownfield Sites Breakfast presentation at CGL Exeter 18 May 2017 Providing Ground Solutions Today s Speakers Bryn Jones Regional Director CGL Exeter Dan Matthews Director CGL Godalming
More informationTreating 1,2 Dichloroethane in a Mixed Plume Kent, UK A Remediation Case Study on the Power of ISCO and ENA
Chemical Oxidation Enhanced Aerobic Biodegradation Treating 1,2 Dichloroethane in a Mixed Plume Kent, UK A Remediation Case Study on the Power of ISCO and ENA with Royal HaskoningDHV Geology Contaminant
More informationDraft. Scope of Work. Task 1 RCRA Facility Investigation and Corrective Measures Study
Draft Scope of Work Task 1 RCRA Facility Investigation and Corrective Measures Study DRAFT Table of Contents Task 1 RCRA Facility Investigation and Corrective Measures Study... 2 Scope of Work:... 2 Technical
More informationEFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES
EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES Albert L. Lamarre Lawrence Livermore National Laboratory Kathy Angleberger U.S. Dept. of Energy Michael
More informationAssessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK
Assessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK 25th May 2004 History of the Llandarcy Refinery Commissioned in 1921 UK s oldest refinery
More informationStage 4 Geotechnical Investigations Information Sheet
Stage 4 Geotechnical Investigations Information Sheet Geotechnical specialists will use a range of equipment to examine ground conditions by either excavating small shallow test pits of soil, using a mechanical
More informationFor personal use only
ASX Announcement 25 February 2016 Mulga Rock Project Definitive Feasibility Study Update Vimy Resources Limited ( Vimy ASX: VMY) is pleased to provide the following operational update on the Mulga Rock
More informationIntroduction to Brownfields: Site Assessment and Cleanup
consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Barry Giroux, P.E., LEP, Senior Project Manager TAB Technical Assistance for Brownfields Team
More informationTo reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER
To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER 1 COMPONENTS OF ENGINEERED LANDFILL a) A Liner System b) A Leachate Collection Facility c) A Gas Control
More informationWitness Statement - Amendment C207 to the Hume Planning Scheme (Sunbury South Precinct Structure Plan)
Witness Statement - Amendment C207 to the Hume Planning Scheme (Sunbury South Precinct Structure Plan) 1. Name and Address Mr Slavko Kacavenda c/- GHD 180 Lonsdale Street Melbourne 2. Qualifications and
More informationBUILDING THE MERSEY GATEWAY a step by step guide
BUILDING THE MERSEY GATEWAY a step by step guide BUILDING THE MERSEY GATEWAY a step by step guide Bridge pylons Elevated approach viaduct Supporting piers Main bridge deck Stay cables INTRODUCTION Construction
More informationCOMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS
DIVISION 02 EXISTING CONDITIONS 02 01 00 MAINTENANCE OF EXISTING CONDITIONS 1. Maintenance of site remediation, underground storage tank removal, facility remediation, and hazardous waste drum handling
More informationRock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon
Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS
More informationPROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL
PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL Order in Council No. 113, Approved and Ordered February 29, 20 16 -'- k.~ tietde lfi'lt Ss 9117s Administrator Executive Council
More informationStrength. Performance. Passion. Paris Pit CAP. April 30, Permit To Take Water Application Holcim (Canada) Inc.
Strength. Performance. Passion. Paris Pit CAP April 30, 2013 Permit To Take Water Application 2012 Holcim (Canada) Inc. Agenda Welcome Minutes from Last Meeting Dufferin Paris Pit - General Update Review
More informationD.T Version Pilot Action FUA Jaworzno. Page 1
D.T 2.8.1 Pilot Action FUA Jaworzno Version 1 03.2017 Page 1 1. FUNCTIONAL URBAN AREA (FUA) JAWORZNO The FUA Jaworzno is located in the southern part of Poland, in the eastern part of the Province of Silesia.
More informationIntroduction to Brownfields: Site Assessment and Cleanup
consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Ileen S. Gladstone, P.E., LSP, LEED AP Vice President & Senior Practice Leader TAB Technical Assistance
More informationMultilevel Systems, Remediation & Drive-Points.
Multilevel Systems, Remediation & Drive-Points www.solinst.com High Resolution Monitoring Target and Identify the extent of contamination Use a Drive-Point Profiler or DrivePoint Piezometer to determine
More informationThe Role of the Resident Engineer. Liam Geoghegan MSc
The Role of the Resident Engineer Liam Geoghegan MSc Inroduction Liam Geoghegan, RPS Consulting Engineers Experience in Road Construction Projects since 1991 I have worked for Local Authorities, Consulting
More informationGroundwater Protection Plan in Response to Release of Fracking Fluids in Shallow Sandstone
Groundwater Protection Plan in Response to Release of Fracking Fluids in Shallow Sandstone Presented by: Aziz Shaikh tetratech.com Presentation Outline Fracking Incident Groundwater Protection Plan: Objectives
More informationPlume Area Treatment Example
Page 1 of 5 H R C T E C H N I C A L B U L L E T I N # 2. 5. 1 Plume Area Treatment Example HRC injection grids are commonly employed at project sites where a localized plume of chlorinated solvent contamination
More informationCF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE
CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE 001 First Draft W Hession 12.02.2014 Introduction This document
More informationGeneral Professional Practice Guidelines for Environmental Geoscience
General Professional Practice Guidelines for Environmental Geoscience Contents 1. Introduction... 1 2. Qualified Person... 2 3. Geoscientific Concept... 2 4. Quality Control and Quality Assurance... 2
More informationDECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013
DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental
More informationBritish Columbia s New Guidance for Groundwater Site Characterization
Guy C. Patrick Victoria, BC October 29, 2010 British Columbia s New Guidance for Groundwater Site Characterization Better Investigations for Better Decision Making BC Ministry of Environment, 2010. Technical
More informationEmbedding Sustainability in Contaminated Site Management
Embedding Sustainability in Contaminated Site Management Practical Experiences Insert then choose Picture select your picture. Right click your picture and Send to back. Alan Thomas ERM, Oxford, UK Lance
More informationSEVERN ROAD RESOURCE RECOVERY CENTRE. Chapter 2 Site and Surroundings. September
SEVERN ROAD RESOURCE RECOVERY CENTRE Chapter 2 Site and Surroundings September 2009-1 - SITE AND SURROUNDINGS 2.1 The development site consists of the northern part of the Sevalco Plant which historically
More informationOre mineral: a mineral from which one or more metals can be extracted.
1 Ore mineral: a mineral from which one or more metals can be extracted. Gangue minerals: minerals that accompany ore minerals but are of little or no worth. Ore: a body of rock containing one or more
More informationFor 100 years private mining and refining
June 2001 programs and initiatives The Deloro Mine Site Cleanup Project Through its cleanup actions the Ministry of the Environment has reduced the loadings of arsenic to the Moira River by more than 80
More informationMABU. Geotechnical Consultancy. A company driven by quality. Vat no : reg no. 2008/048475/23
2016 MABU Geotechnical Consultancy Vat no. 4050248519: reg no. 2008/048475/23 A company driven by quality introduction Mabu Geotechnical Consultancy is a specialist Geotechnical/ Engineering Geological
More informationLIFE Project Number LIFE03 ENV/GR/ Layman s Report
LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas
More informationMultiphase Extraction (MPE):
Multiphase Extraction (MPE): Remediation Trials in New Zealand 2010 Richard Howard Senior Environmental Scientist URS New Zealand Ltd CHRISTCHURCH 2 Contents Background to Multiphase Extraction (MPE) Introduce
More informationOMC Canada An In- solvent Remediation 2
October, 2014 OMC Canada An In- solvent Remediation 2 Operated from approximately 1913 to 1990 in Peterborough, Ontario Manufactured outboard motors (Johnson/Evinrude), lawnmowers (Lawnboy), chainsaws
More information2. Assessing the potential risk to Groundwater
Page no: 1 of 11 1. Introduction 1.1 This document provides guidance on the protection of the water environment from cemetery developments. It is for developers and local authorities intending to expand
More informationCarbon, Energy and Groundwater A summary from a hydrogeology and physics perspective. Dr. Phil Hayes UK Groundwater Forum 26 May 2010
Carbon, Energy and Groundwater A summary from a hydrogeology and physics perspective Dr. Phil Hayes UK Groundwater Forum 26 May 2010 Themes / content A. The CO2 challenge and the geosphere (+other issues)
More informationTidal Implications For Development of a Risk Management Program in a Coastal Environment
Tidal Implications For Development of a Risk Management Program in a Coastal Environment Erin Robson, M.Eng., P.Eng. and Ian Mitchell, M.Sc., P.Geo. 21/10/2010 Outline Goals / Objectives Site Description
More informationP Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer
2. Field Program 2.1 Health and Safety Plan Prior to beginning the field program, CH2M HILL developed a health and safety plan (H&SP). The H&SP provided a summary of potential physical hazards that could
More informationPiling & Contaminated Land. Dr Derek Egan Technical Director Keller Ltd
Piling & Contaminated Land Dr Derek Egan Technical Director Keller Ltd FEDERATION OF PILING SPECIALISTS The FPS began in 1963 with 5 companies. Now we have 18 members accounting for circa 500M of specialist
More information