How to Stop Designing Mouldy Buildings (and mainstream the thermal bridge) Simon McGuinness, MRIAI

Size: px
Start display at page:

Download "How to Stop Designing Mouldy Buildings (and mainstream the thermal bridge) Simon McGuinness, MRIAI"

Transcription

1 How to Stop Designing Mouldy Buildings (and mainstream the thermal bridge) Simon McGuinness, MRIAI

2 TGD - D.2 Mould growth & surface condensation The key factor used in assessing the risk of mould growth or surface condensation in the vicinity of thermal bridges is the temperature factor (frsi). For dwellings, the value of frsi should be greater than or equal to 0.75, so as to avoid the risk of mould growth and surface condensation.

3 TGD - D.2 Mould growth & surface condensation The key factor used in assessing the risk of mould growth or surface condensation in the vicinity of thermal bridges is the temperature factor (frsi). For dwellings, the value of frsi should be greater than or equal to 0.75, so as to avoid the risk of mould growth and surface condensation. For f Rsi > 0.75 T si > 15degC

4 TGD - D.4 Calculation procedures The calculation procedure to establish temperature factor (frsi) is outlined in BRE IP 1/06. Details should be assessed in accordance with the methods described in I.S. EN ISO: Which in turn references I.S. EN ISO:13788 as indispensable for the application of this document.

5 TGD - D.4 Calculation procedures The calculation procedure to establish temperature factor (frsi) is outlined in BRE IP 1/06. Details should be assessed in accordance with the methods described in I.S. EN ISO: Which in turn references I.S. hen ISO:13788 as indispensable for the application of this document.

6 ISO hen 13788: 2012 (December 2013) Walls, Floors, Ceilings frsi calculation 0.25 m2k/w surface resistance 0.25 m2k/w surface resistance 0.25 m2k/w surface resistance

7 ISO hen 13788: 2012 (December 2013) 0.10 ^ 0.13 > 0.25 ^ 0.25 >

8 ISO hen 13788: 2012 (December 2013) 0.10 ^ 0.13 > 0.25 ^ 0.25 >

9 Gable/Eaves cavity wall example ACD 1.09 ACD 1.15

10 Gable/Eaves cavity wall example ACD 1.09 (Eaves) and ACD 1.15 (Gable) Under construction In Dublin in 2015

11 Gable/Eaves cavity wall 3D model

12 3-D Thermal Modelling Fails frsi

13 Add 2.5 thermal blocks & mineral wool

14 Thermal Modelling barely passes frsi

15 What does the responsible educator do? Double-checked the standards Revised the syllabus Warned previous Thermal Modeller graduates Advised the regulators Advised the RIAI Issued three blog postings on BRegsForum Tweeted on social media Asked for clarification from the Minister

16 Minister of State for the Environment, Community and Local Government (Deputy Paudie Coffey) I refer to the reply to Question No. 788 of 15 April 2015 which addressed the approach to calculating the temperature factor in the vicinity of thermal bridges at junctions and around openings in accordance with Appendix D of Technical Guidance Document L

17 Minister of State for the Environment, Community and Local Government (Deputy Paudie Coffey) I refer A surface to the reply resistance to Question value of No is only of 15 used April in very 2015 specific which addressed situations as the outlined approach in section to 4.4 calculating of the EN ISO the temperature standard factor in which the vicinity is of rather of thermal limited bridges relevance at junctions in this context and around and, for openings that reason, in accordance it has not been with referenced Appendix at D of Technical Appendix Guidance D of TGD Document L 2011 or L referred. to in the reply to Question No. 788 of 15 April 2015.

18 Minister of State for the Environment, Community and Local Government (Deputy Paudie Coffey) I refer A surface to the reply resistance to Question value of No is only of 15 used April in very 2015 specific which addressed situations as the outlined approach in section to 4.4 calculating of the EN ISO the temperature standard factor in which the vicinity is of rather of thermal limited bridges relevance at junctions in this context and around and, for openings that reason, in accordance it has not been with referenced Appendix at D of Technical Appendix Guidance D of TGD Document L 2011 or L referred. to in the reply to Question No. 788 of 15 April 2015.

19 Minister of State for the Environment, Community and Local Government (Deputy Paudie Coffey) I refer A surface to the reply resistance to Question value of No is only of 15 used April in very 2015 specific which addressed situations as the outlined approach in section to 4.4 calculating of the EN ISO the temperature standard factor in which the vicinity is of rather of thermal limited bridges relevance at junctions in this context and around and, for openings that reason, in accordance it has not been with referenced Appendix at D of Technical Appendix Guidance D of TGD Document L 2011 or L referred. to in the reply to Question No. 788 of 15 April 2015.

20 Minister of State for the Environment, Community and Local Government (Deputy Paudie Coffey) I refer A surface to the reply resistance to Question value of No is only of 15 used April in very 2015 specific which addressed situations as the outlined approach in section to 4.4 calculating of the EN ISO the temperature standard factor in which the vicinity is of rather of thermal limited bridges relevance at junctions in this context and around and, for openings that reason, in accordance it has not been with referenced Appendix at D of Technical Appendix Guidance D of TGD Document L 2011 or L referred. to in the reply to Question No. 788 of 15 April 2015.?

21 Can the Design Certifier Rely on the ACDs to deliver a Mould-free Compliant Design? On the basis of our work in the last 12 months, it is significantly less than certain that he or she can.

22 Can the Design Certifier Rely on the ACDs to deliver a Mould-free Compliant Design? On the basis of our work in the last 12 months, it is significantly less than certain that he or she can.

23 How did it impact on the DIT nzeb Retrofit Project 2015? Current BER: 363 kwh/m2a Target: 45 kwh/m2a Saving Per Unit: 318 kwh/m2a Cabra alone: 3,800 similar houses Total Savings: 1,208, 400 kwh/m2a Money Saved: 9million per year Would fund 200 retrofits per year In 19 years it would be complete

24 How did it impact on the DIT nzeb Retrofit Project 2015? Current BER: 363 kwh/m2a Target: 45 kwh/m2a Saving Per Unit: 318 kwh/m2a Cabra alone: 3,800 similar houses Total Savings: 1,208, 400 kwh/m2a Money Saved: 9million per year Would fund 200 retrofits per year In 19 years it would be complete

25 Thermal Modelling used to check for frsi

26 Thermal Modelling used to check for frsi

27 Thermal Modelling used to check for frsi

28 How to reduce the cost of retrofit 560 per ACD x 178 ACDs x 2 U-values = 100,000 Would take 3 months and employ 5 researchers, or 10,332 cost per home x 1.3 Million homes = 13,431,600,000

29 How to reduce the cost of retrofit 560 per ACD x 178 ACDs x 2 U-values = 100,000 Would take 3 months and employ 5 researchers, or One of these is cost optimal 10,332 cost per home x 1.3 Million homes = 13,431,600,000

30 The Dublin School of Architecture and Building looks forward to working with Government and the construction industry to resolve all the technical issues necessary to achieve nzeb Retrofit safely, cost effectively and speedily. By working together, we are confident we can achieve our national targets.

Certified Thermal Details and Products Scheme

Certified Thermal Details and Products Scheme Certified Thermal Details and Products Scheme Marmox Thermoblock (100 mm and 140 mm blocks) Prepared for: Date: 13 August 2015 Report Number: Mark Bowman, UK technical manager HPR357-1002 BRE Scotland

More information

Acceptable Construction Details, Thermal Bridging and Air Permeability. Sean Armstrong, Technical Adviser, Building Standards, DEHLG

Acceptable Construction Details, Thermal Bridging and Air Permeability. Sean Armstrong, Technical Adviser, Building Standards, DEHLG Acceptable Construction Details, Thermal Bridging and Air Permeability Sean Armstrong, Technical Adviser, Building Standards, DEHLG Outline Overview of TGD L Overview of Guidance wrt Airtightness and Thermal

More information

Roadstone Thermal Liteblock System

Roadstone Thermal Liteblock System Roadstone Thermal Liteblock System March 2016. V2 Quarry Locations Cork 1. Ballygarvan 2. Carrigtwohill 3. Castlemore 4. Classis 5. Keim 6. Mallow 7. Midleton Clare 8. Ballyquinn 9. Bunratty 10. Ryan s

More information

ACTAVO BUILDING SOLUTIONS. #rapidhousing National Conference, 22 June 2018

ACTAVO BUILDING SOLUTIONS. #rapidhousing National Conference, 22 June 2018 ACTAVO BUILDING SOLUTIONS #rapidhousing National Conference, 22 June 2018 WHO WE ARE Actavo operates in diverse and demanding markets offering a breadth of services, from energy to events, business support

More information

The mal B idging. Thermal Bridging Part L1A A Practical Guide

The mal B idging. Thermal Bridging Part L1A A Practical Guide The mal B idging Thermal Bridging Part L1A A Practical Guide Thermal Bridging Part L1A This paper discusses Thermal Bridging in SAP 2009, and to how gain compliance with Part L1A 2010. It is aimed primarily

More information

NSAI Agrément. Form Title WEP AUDIT REPORT Reference F-IAB-031 Page Page 1 of 10 Revision. NSAI Approved Thermal Modellers Scheme

NSAI Agrément. Form Title WEP AUDIT REPORT Reference F-IAB-031 Page Page 1 of 10 Revision. NSAI Approved Thermal Modellers Scheme Form Title WEP UDIT REPORT Reference F-IB-031 Page Page 1 of 10 NSI pproved Thermal Modellers Scheme Guidance for applicant to NSI pproved Thermal Modellers Scheme Content Part 1 - ssessment for competency

More information

Sustainable Retrofit A fabric first approach. Mark Elton Technical expert panel member Energy Saving Trust

Sustainable Retrofit A fabric first approach. Mark Elton Technical expert panel member Energy Saving Trust Sustainable Retrofit A fabric first approach Mark Elton Technical expert panel member Energy Saving Trust Improving the building fabric A technical and business opportunity guide covering: Thermal insulation

More information

Energy Training for Professionals. 630 in 3 years. Joseph Little BArch, MRIAI, MSc Archit. AEES

Energy Training for Professionals. 630 in 3 years. Joseph Little BArch, MRIAI, MSc Archit. AEES Energy Training for Professionals 630 in 3 years Joseph Little BArch, MRIAI, MSc Archit. AEES What we do from 2009 from 2006 Who we are from 2010 Fighting climate change nationally - one retrofit at a

More information

Building Regulations and the Future of Energy Efficient Buildings. Chris Hughes Programme Manager Energy Performance of Buildings Directive

Building Regulations and the Future of Energy Efficient Buildings. Chris Hughes Programme Manager Energy Performance of Buildings Directive Building Regulations and the Future of Energy Efficient Buildings Chris Hughes Programme Manager Energy Performance of Buildings Directive Overview SEAI Energy Efficiency Building Regulations Part L Conservation

More information

SERVE Conference, T.I. Insulating safely health, condensation, location

SERVE Conference, T.I. Insulating safely health, condensation, location SERVE Conference, T.I. Insulating safely health, condensation, location Joseph Little MRIAI, B Arch, MSc Arch AEES Doing it well - the need for a Code Preparation of walls for internal insulation Understanding

More information

Low Energy, Low Carbon Buildings: Current and emerging developments for buildings other than dwellings

Low Energy, Low Carbon Buildings: Current and emerging developments for buildings other than dwellings Low Energy, Low Carbon Buildings: Current and emerging developments for buildings other than dwellings CIBSE CPD Series 8 February 2012 Martin Vaughan Assistant Principal, Architecture /Building Standards,

More information

IBCI Conference 2014 Building Regulations Update. By Eamonn Smyth Advisor Building Standards Section

IBCI Conference 2014 Building Regulations Update. By Eamonn Smyth Advisor Building Standards Section IBCI Conference 2014 Building Regulations Update By Eamonn Smyth Advisor Building Standards Section Regulatory Framework Building Control Acts 1990 & 2007 Building Regulations 1997 to 2014 Building Control

More information

Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG

Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG Nearly Zero Energy Buildings (NZEB) Seán Armstrong, Housing/Building Standards Section, DHPCLG Outline Current Part L Requirements Implementing the Energy Performance of Buildings Directive and NZEB Dwellings

More information

V1/0715/AI/TDO1. KORE Loft. Insulated Flooring System Design Guide

V1/0715/AI/TDO1. KORE Loft. Insulated Flooring System Design Guide V1/0715/AI/TDO1 KORE Loft Insulated Flooring System Design Guide KORE Loft Insulated Flooring System Key Features Excellent thermal performance for the lifetime of the building Sheets tongue and grooved

More information

Documentation of the component 11. January 2010 Thermal transmittance (U-value) according to BS EN ISO 6946

Documentation of the component 11. January 2010 Thermal transmittance (U-value) according to BS EN ISO 6946 Thermal transmittance (U-value) according to BS EN ISO 6946 Page 1/5 OUTSIDE INSIDE Assignment: External wall Manufacturer Name Thickness [m], number Lambda [W/(mK)] Q R [m²k/w] Rse 0.04 1 Generic Building

More information

d1c standard construction drawings new build aggregate PART fill 6 digit product code unique to Travis Perkins Group

d1c standard construction drawings new build aggregate PART fill 6 digit product code unique to Travis Perkins Group new build standard construction drawings d1c aggregate PART fill 6 digit product code unique to Travis Perkins Group 1 Welcome to Sustainable Building Solutions (SBS) is a specialist division of the Travis

More information

Application of DEAP to Part L. Sean Armstrong, Technical Adviser, Building Standards, DEHLG

Application of DEAP to Part L. Sean Armstrong, Technical Adviser, Building Standards, DEHLG Application of DEAP to Part L Sean Armstrong, Technical Adviser, Building Standards, DEHLG Outline Part L legislation BER legislation DEAP application for Part L DEAP application for BER How to check DEAP

More information

Building Standards & Regulations

Building Standards & Regulations Building Standards & Regulations Sarah Neary, BE MBA CEng Senior Adviser Building Standards Section Building Standards Section Who we are? What we do? Content of Presentation 1. Objectives/strategies 2.

More information

Thermablok Aerogel Insulation Blanket Thermablok Aerogel Blanket

Thermablok Aerogel Insulation Blanket Thermablok Aerogel Blanket Uniclass 68152 Thermablok Aerogel Insulation Blanket Thermablok Aerogel Blanket Ultra Thin Internal Solid Wall, Ceiling & Floor Insulation Systems for New Build & Refurbishment Unique insulation with the

More information

Documentation of the component 25. May 2011 Thermal transmittance (U-value) according to BS EN ISO 6946

Documentation of the component 25. May 2011 Thermal transmittance (U-value) according to BS EN ISO 6946 Thermal transmittance (U-value) according to BS EN ISO 6946 Page 1/6 OUTSIDE INSIDE Assignment: External wall Manufacturer Name Thickness [m], number Lambda [W/(mK)] R [m²k/w] Rse 0.0400 1 Generic Building

More information

Documentation of the component 25. May 2011 Thermal transmittance (U-value) according to BS EN ISO 6946

Documentation of the component 25. May 2011 Thermal transmittance (U-value) according to BS EN ISO 6946 Thermal transmittance (U-value) according to BS EN ISO 6946 Page 1/6 OUTSIDE INSIDE Assignment: External wall Manufacturer Name Thickness [m], number Lambda [W/(mK)] R [m²k/w] Rse 0.0400 1 Generic Building

More information

Thermally Broken Lintel Product Selector

Thermally Broken Lintel Product Selector CI/Sfb Uniclass L325:P4142 March 2017 (31.9) Hh2 EPIC F631:X442 Thermally Broken Lintel Product Selector March 2017 Contents 4 Technically Superior Products 5 Thermally Broken Lintel Solution 6 Thermal

More information

Documentation of the component 25. May 2011 Thermal transmittance (U-value) according to BS EN ISO 6946

Documentation of the component 25. May 2011 Thermal transmittance (U-value) according to BS EN ISO 6946 Thermal transmittance (U-value) according to BS EN ISO 6946 Page 1/6 OUTSIDE INSIDE Assignment: External wall Manufacturer Name Thickness [m], number Lambda [W/(mK)] R [m²k/w] Rse 0.0400 1 Generic Building

More information

CIBSE REPUBLIC OF IRELAND. Nearly Zero Energy Buildings and the revised Irish Part L of the Building Regulations 13/9/18 in WIT

CIBSE REPUBLIC OF IRELAND. Nearly Zero Energy Buildings and the revised Irish Part L of the Building Regulations 13/9/18 in WIT CIBSE REPUBLIC OF IRELAND Nearly Zero Energy Buildings and the revised Irish Part L of the Building Regulations 13/9/18 in WIT CIBSE IRELAND Student awards WIT, DIT and ITT BIM CPD SDAR Journal Standards

More information

Building Control (Amendment) Regulations MBCA Guidance Document

Building Control (Amendment) Regulations MBCA Guidance Document Building Control (Amendment) Regulations 2014 Contents 1. Introduction 4 2. Legislative Background 5 3. Definitions 6 4. Process 7 5. Documents at tender stage 8 6. Building Control Management System 9

More information

Thermablok Aerogel Isolation Strips

Thermablok Aerogel Isolation Strips Uniclass 68152 Ultra Thin Internal Solid Wall, Ceiling & Floor Insulation Systems for New Build & Refurbishment Unique insulation with the lowest Thermal Conductivity of any insulation product 0.015W/m²K

More information

A Handbook of thermal bridging details incorporating aircrete blocks

A Handbook of thermal bridging details incorporating aircrete blocks A Handbook of thermal bridging details incorporating aircrete blocks Book 1 Thermal bridging solutions for external wall partial fill cavity details and full fill party wall details Prepared for the Aircrete

More information

Superior Performance PIR Insulation. Roofs. XO/SK (T&G) Insulation for Sarking Warm Roof Construction

Superior Performance PIR Insulation. Roofs. XO/SK (T&G) Insulation for Sarking Warm Roof Construction Superior Performance PIR Insulation Roofs XO/SK (T&G) Insulation for Sarking Warm Roof Construction 021 Data Sheet XO/SK (T&G) Insulation for Sarking Warm Roof Construction XtroLiner Sarking XO/SK is an

More information

Passive House. Briefing. Thurs Cork Institute of Technology Welcomes the Passive House Association of Ireland

Passive House. Briefing. Thurs Cork Institute of Technology Welcomes the Passive House Association of Ireland Passive House Briefing Cork Institute of Technology Welcomes the Passive House Association of Ireland Thurs 19.02.15 Passivhaus is an evidence-based performance standard for buildings that delivers radically

More information

PurAcell Isolation Wärmedämmung

PurAcell Isolation Wärmedämmung CI/SfB (29) IRISH AGRÉMENT BOARD CERTIFICATE NO. 16/0389 EKO-Vision Building Products Ltd. Syngefield Business Park Birr, Co. Offaly T: +353 579122827 W: www.ekovisionltd.com E: Info@ekovisionltd.com PurAcell

More information

d1b standard construction drawings new build aerated PART fill 6 digit product code unique to Travis Perkins Group

d1b standard construction drawings new build aerated PART fill 6 digit product code unique to Travis Perkins Group new build standard construction drawings d1b aerated PART fill 6 digit product code unique to Travis Perkins Group 1 Welcome to Sustainable Building Solutions (SBS) is a specialist division of the Travis

More information

Avoidance of Thermal Bridging in Steel Construction

Avoidance of Thermal Bridging in Steel Construction SCI PUBLICATION P380 Avoidance of Thermal Bridging in Steel Construction A G J Way MEng CEng MICE C Kendrick MSc Published by: The Steel Construction Institute Silwood Park Ascot Berkshire SL5 7QN Tel:

More information

Optima Dry Lining System

Optima Dry Lining System Optima Dry Lining System High Performing, Easy & Quick 1ST NSAI CERTIFIED Dry Lining System in Ireland SpecHub ISOVER SpecHub REGISTER TODAY! The home of free residential and commercial insulation, airtightness

More information

Superior Performance PIR Insulation. XO/PR Insulation for Pitched Roof. Roofs 12/4956

Superior Performance PIR Insulation. XO/PR Insulation for Pitched Roof. Roofs 12/4956 Superior Performance PIR Insulation Roofs XO/PR Insulation for Pitched Roof 021 12/4956 Data Sheet XtroLiner Pitched Roof XO/PR on sloped roofs (ventilated, hybrid or warm) provides the most efficient

More information

Interstitial Condensation Risk Report. MASONRY WALL WITH POLASTIC Queanbeyan

Interstitial Condensation Risk Report. MASONRY WALL WITH POLASTIC Queanbeyan Interstitial Condensation Risk Report Prepared by: Gradwell Consulting ABN 68 872 791 784 Sustainability Consultants PO Box 4 Pymble NSW 2073 t: 1800 11 24 25 e: info@gradwellconsulting.com w: www.gradwellconsulting.com

More information

URSA TF Roll URSA GLASSWOOL.

URSA TF Roll URSA GLASSWOOL. URSA GLASSWOOL E-mail : ursauk@uralita.com URSA UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web : www.ursa-uk.co.uk E-mail

More information

Investing in Local Authority Housing and NZEB

Investing in Local Authority Housing and NZEB Investing in Local Authority Housing and NZEB Seán Armstrong, Advisor, Architecture/Building Standards Section, Department of Environment, Community and Local Government, Policy-Drivers for Energy Efficiency

More information

KORE Lock Roof Insulation

KORE Lock Roof Insulation CI/SfB (29) IRISH AGRÉMENT BOARD CERTIFICATE NO. 05/0235 KORE Insulation, Kilnaleck, Co. Cavan, Ireland. T: +353 (0)49 4336998 F: +353 (0)49 4336823 E: info@kore-icf.com W: www.kore-system.com KORE Lock

More information

A Comparative Study of the effect of Thermal Bridging and Moisture on the Thermal Performance of Straw Bale and Cavity Wall Construction Final Year

A Comparative Study of the effect of Thermal Bridging and Moisture on the Thermal Performance of Straw Bale and Cavity Wall Construction Final Year A Comparative Study of the effect of Thermal Bridging and Moisture on the Thermal Performance of Straw Bale and Cavity Wall Construction Final Year Dissertation Abstract This research dissertation analyses

More information

Warm climate - Passivhaus system

Warm climate - Passivhaus system Warm climate - Passivhaus system Contents ISOBIO system 3 ISOBIO standard panel 4 Panel assembly 5 Functions 7 Construction details 8 TB 01. Slab on grade - External wall 11 TB 02. Suspended floor over

More information

SOUND INSULATION DESIGN OF MODULAR CONSTRUCTION HOUSING

SOUND INSULATION DESIGN OF MODULAR CONSTRUCTION HOUSING SOUND INSULATION DESIGN OF MODULAR CONSTRUCTION HOUSING D Yates L Hughes A Campbell Buro Happold Ltd, London, UK Buro Happold Ltd, Newcastle, UK WSP, Bristol, UK 1 INTRODUCTION This paper provides an insight

More information

Cool temperate climate - Passivhaus system

Cool temperate climate - Passivhaus system Cool temperate climate - Passivhaus system Contents ISOBIO system 3 ISOBIO standard panel 4 Panel assembly 5 Functions 7 Construction details 8 TB 01. Slab on grade - External wall 11 TB 02. Suspended

More information

2 in 1 Breathable Multi-layer Insulation Blanket. Thermal insulation in a 40mm thin, flexible, multi-layer breathable membrane

2 in 1 Breathable Multi-layer Insulation Blanket. Thermal insulation in a 40mm thin, flexible, multi-layer breathable membrane 2 in 1 Breathable Multi-layer Insulation Blanket Thermal insulation in a 40mm thin, flexible, multi-layer breathable membrane 2 in 1 insulating breather membrane Non degradable maintaining thermal performance

More information

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork Insulation CI/SfB (21.9) Rn7 M2 First Issue May 2017 e with retaining clip TW50 STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY 25 mm / 50 mm residual cavity Kingspan Thermawall TW50 Outer

More information

Certified Passive House Components: Spacers in Low-e Glazing Version 0.32, kk

Certified Passive House Components: Spacers in Low-e Glazing Version 0.32, kk Criteria and Algorithms for Certified Passive House Components: Spacers in Low-e Glazing Version 0.32, 14.08.2014 kk This document is provisional and is therefore subject to specific changes. Content 1

More information

Basement Board High Performance (HP) 70 and 100

Basement Board High Performance (HP) 70 and 100 Basement Board High Performance (HP) 70 and 100 Floor and Wall Insulation - Basements Basement Board HP is a closed cell expanded polystyrene (EPS) insulation board which makes it suitable for use below

More information

Building Sustainability & Compliance

Building Sustainability & Compliance November 2011 WELCOME TO THE STROMA OCDEA TECHNICAL BULLETIN! This bulletin has been produced as a response to the latest full SAP conventions release, to ensure that our assessors are fully informed and

More information

PIR Insulation. XT/Walk-R. Insulated Loft Decking. Roofs

PIR Insulation. XT/Walk-R. Insulated Loft Decking. Roofs PIR Insulation Roofs XT/Walk-R Insulated Loft Decking Data Sheet XT/Walk-R Insulated Loft decking Thin-R Loft Decking XT/Walk-R is a composite of high performance PIR insulation with tough OSB board that

More information

URSA MINERAL WOOL URSA Timber Frame Roll & URSA Timber Frame Slab

URSA MINERAL WOOL URSA Timber Frame Roll & URSA Timber Frame Slab URSA TF Roll (Tim & Met) - 073_Layout 1 02/10/2017 10:21 Page 1 URSA UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web :

More information

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY Insulation CI/SfB (21.9) Rn7 M2 First Issue May 2017 oltherm Board rick outer leaf d retaining clip amp proof course om K106 Cavity Board y fill K106 Cavity Board STANDARD DETAILS FOR 115 MM INSULATION

More information

PRODUCT SUSPENDED. Concrete Soffit Liner Specification Guide

PRODUCT SUSPENDED. Concrete Soffit Liner Specification Guide CI/SfB (2-) Rn7 (M2) IMPORTANT: On 1 September 2017, this product (among others) was temporarily suspended while we investigate the results of recent tests (Parts 6 and 7 of British Standard 476). In addition,

More information

Condensation and dampness

Condensation and dampness BRE Expert Collection 7 Condensation and dampness A collection of BRE expert guidance on assessing and treating dampness in buildings To view the full range of IHS BRE Press publications visit www.brebookshop.com

More information

IMPACTS OF DETAILING ON ANNUAL HEATING DEMAND IN A PASSIVE HOUSE BUILDING

IMPACTS OF DETAILING ON ANNUAL HEATING DEMAND IN A PASSIVE HOUSE BUILDING ANKARA - TURKIYE IMPACTS OF DETAILING ON ANNUAL HEATING DEMAND IN A PASSIVE HOUSE BUILDING Architect Derya Yılmaz a and Assoc. Prof. Dr.Ali Murat Tanyer b a Gökhan Aksoy Architecture, Ankara, Turkey d.yilmaz@gokhanaksoyarchitects.com

More information

Building Control. A Guide to Compliance When Designing Domestic Extensions

Building Control. A Guide to Compliance When Designing Domestic Extensions Building Control Technical Guidance Leaflet No. 18 Approved Document L1B 2010 Conservation of Fuel and Power This leaflet is one of a series produced by the Hertfordshire Building Control Technical Forum

More information

Available online at ScienceDirect. Energy Procedia 78 (2015 ) th International Building Physics Conference, IBPC 2015

Available online at   ScienceDirect. Energy Procedia 78 (2015 ) th International Building Physics Conference, IBPC 2015 Available online at www.sciencedirect.com ScienceDirect Energy Procedia 78 (2015 ) 889 894 6th International Building Physics Conference, IBPC 2015 Parametric study on the impact of thermal bridges on

More information

A handbook of thermal bridging details incorporating Porotherm blocks

A handbook of thermal bridging details incorporating Porotherm blocks A handbook of thermal bridging details incorporating Porotherm blocks Book 7 Thermal bridging solutions for external wall cavity details using Porotherm Prepared for Wienerberger Ltd by the BBA Constructive

More information

Limiting Thermal Bridging and Air Infiltration Acceptable Construction Details

Limiting Thermal Bridging and Air Infiltration Acceptable Construction Details Limiting Thermal Bridging and Air Infiltration Acceptable Construction Details Government of Ireland 2008 July 2008 INTRODUCTION This guide to Acceptable Construction Details (ACDs) is intended to help

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015 for Inspecting and Certifying Buildings and Works Building Control Regulations 1997 to 2015 September, 2016 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1

More information

Thermablok Aerogel Isolation Strips Thermablok Aerogel Isolation Strips

Thermablok Aerogel Isolation Strips Thermablok Aerogel Isolation Strips Uniclass 68152 Ultra Thin Internal Solid Wall, Ceiling & Floor Insulation Systems for New Build & Refurbishment Unique insulation with the lowest Thermal Conductivity of any insulation product 0.014W/m²K.

More information

The Nottingham Ecohome. Part L1 (2002) in existing dwellings

The Nottingham Ecohome. Part L1 (2002) in existing dwellings The Nottingham Ecohome Part L1 (2002) in existing dwellings The Nottingham Ecohome is a refurbished Victorian house situated in West Bridgford, Nottingham, which incorporates a variety of eco-friendly

More information

Interim NZEB Performance Specification Calculation Methodology

Interim NZEB Performance Specification Calculation Methodology Interim NZEB Performance Specification Calculation Methodology Q1 2018 Contents: 1 Introduction... 2 2 Reference Building... 4 2.1 Project Database... 4 2.2 Geometry... 4 2.3 HVAC Systems... 6 2.4 HWS

More information

BBA Information Bulletin No 3

BBA Information Bulletin No 3 BBA Information Bulletin No 3 APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL APPROVALS FOR CONSTRUCTION Reflective foil insulation Conventions for U value calculations Introduction Reflective foil

More information

Resistance to the passage of sound

Resistance to the passage of sound The Building Regulations 2000 The Building (Approved Inspectors etc) Regulations 2000 E APPROVED DOCUMENT E1 Protection against sound from other parts of the building and E2 E3 E4 adjoining buildings Protection

More information

Resistance to the passage of sound

Resistance to the passage of sound The Building Regulations 2000 The Building (Approved Inspectors etc) Regulations 2000 E APPROVED DOCUMENT E1 Protection against sound from other parts of the building and E2 E3 E4 adjoining buildings Protection

More information

BASF Polyurethane - Walltite Isolation Wärmedämmung

BASF Polyurethane - Walltite Isolation Wärmedämmung IRISH AGRÉMENT BOARD CERTIFICATE NO. 13/0377 BASF Polyurethanes UK Ltd Wimsey Way, Somercotes Alfreton, Derbyshire, DE55 4NL, UK Tel: +44 (0) 1773 601166 Fax: +44 (0) 1773 602089 Web site: www.walltite.basf.co.uk

More information

URSA MINERAL WOOL URSA Cavity Batts

URSA MINERAL WOOL URSA Cavity Batts s 073_Layout 1 02/10/2017 10:18 Page 1 UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web : www.ursa-uk.co.uk E-mail : ursauk@ursa.com

More information

E:Zero TM E500 Foam Isolation Wärmedämmung

E:Zero TM E500 Foam Isolation Wärmedämmung E:Zero TM E500 Foam Isolation Wärmedämmung CI/SfB (29) IRISH AGRÉMENT BOARD CERTIFICATE NO. 11/0365 CPI Foam Ltd Unit 2, Charvey Lane Rathnew, Co. Wicklow Phone: +353 (0) 404 66111 Fax: +353 (0) 404 66088

More information

E:Zero TM E500 Foam Isolation Wärmedämmung

E:Zero TM E500 Foam Isolation Wärmedämmung E:Zero TM E500 Foam Isolation Wärmedämmung CI/SfB (29) IRISH AGRÉMENT BOARD CERTIFICATE NO. 11/0365 CPI Foam Ltd Unit 2, Charvey Lane Rathnew, Co. Wicklow Phone: +353 (0) 404 66111 Fax: +353 (0) 404 66088

More information

KOREFILL Cavity Wall Insulation System Isolent de murs à double parol Kerndämmung

KOREFILL Cavity Wall Insulation System Isolent de murs à double parol Kerndämmung CI/SfB 41 IRISH AGRÉMENT BOARD CERTIFICATE NO. 07/0293 Airpacks Ltd., Kilnaleck, Co. Cavan. Tel: +353 494336998 Fax: + 353 494336823 Email: sales@airpacks.ie Website: www.airpacks.ie Rq2 KOREFILL Cavity

More information

KOREFILL Cavity Wall Insulation System Isolent de murs à double parol Kerndämmung

KOREFILL Cavity Wall Insulation System Isolent de murs à double parol Kerndämmung CI/SfB 41 IRISH AGRÉMENT BOARD CERTIICATE NO. 07/0293 Airpacks Ltd., Kilnaleck, Co. Cavan. Tel: +353 494336998 ax: + 353 494336823 Email: sales@airpacks.ie Website: www.airpacks.ie Rq2 KOREILL Cavity Wall

More information

PIR Insulation. XT/PR Insulation for Pitched Roofs. Roofs 08/ /0183

PIR Insulation. XT/PR Insulation for Pitched Roofs. Roofs 08/ /0183 PIR Insulation Roofs XT/PR Insulation for Pitched Roofs 08/4613 03/0183 Data Sheet XT/PR Insulation for Pitched Roofs Thin-R Pitched Roof XT/PR on sloped roofs (ventilated, hybrid or warm) provides the

More information

PlyLok. Product Guide PIR and Plywood Laminate Insulation for Warm Flat Roofs.

PlyLok. Product Guide PIR and Plywood Laminate Insulation for Warm Flat Roofs. PlyLok Product Guide PIR and Plywood Laminate Insulation for Warm Flat Roofs. Introduction The Company. Driven by a culture of innovation, technical competence and flair, Recticel Insulation Products is

More information

Superior Performance Phenolic Insulation SR/PR. Insulation for Pitched Roofs. Roofs AS LOW AS 10/4803

Superior Performance Phenolic Insulation SR/PR. Insulation for Pitched Roofs. Roofs AS LOW AS 10/4803 Superior Performance Phenolic Insulation Roofs SR/PR Insulation for Pitched Roofs AS LOW AS 020 10/4803 Data Sheet SR/PR Insulation for Pitched Roofs Safe-R is a superior performance phenolic insulation

More information

Insitu Concrete Floors

Insitu Concrete Floors Thermal Ground Floor insulation approved document Part l 2013 solutions Technical handbook section 6 2015 solutions approved document Part l 2014 solutions BBa certified thermal insulation and floor systems

More information

BSc (Hons) Architectural Technology 2010/2011. Predictive Modelling of Heat Transfer and Thermal Bridging within the Building Envelope

BSc (Hons) Architectural Technology 2010/2011. Predictive Modelling of Heat Transfer and Thermal Bridging within the Building Envelope BSc (Hons) Architectural Technology 2010/2011 Predictive Modelling of Heat Transfer and Thermal Bridging within the Building Envelope Steven Paul Richardson Student No: C07816723 Submitted: 20 th May 2011

More information

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money. Adding insulation

EASY$ TIP SHEETS. Energy Advice Saving Yukoners Money. Adding insulation EASY$ TIP SHEETS Energy Advice Saving Yukoners Money Quick Links Adding insulation What are insulation values? How much insulation? Where to install insulation Frame wall new construction Frame wall existing

More information

PIR Insulation XT/TF. Insulation for Timber Framed Walls. Walls 08/ /0183

PIR Insulation XT/TF. Insulation for Timber Framed Walls. Walls 08/ /0183 PIR Insulation Walls XT/TF Insulation for Timber Framed Walls 08/4613 03/0183 Data Sheet XT/TF Insulation for Timber Framed Walls Timber Frame construction is a fast, systematic method that results in

More information

Primary School Retrofit Project

Primary School Retrofit Project Primary School Retrofit Project Final Design Proposal Ian Black DIT D12124703 Passiv Haus Design Criteria PHI ENERPHIT CRITERIA EnerPHit Certification based on the requirement for heating demand Heating

More information

Refusal to issue a building consent for a house with insulated concrete walls at 11 York Road, Riversdale, Southland

Refusal to issue a building consent for a house with insulated concrete walls at 11 York Road, Riversdale, Southland Determination 2009/104 Refusal to issue a building consent for a house with insulated concrete walls at 11 York Road, Riversdale, Southland 1. The matters to be determined 1.1 This is a determination under

More information

Achieving CfSH Levels 4, 5 and 6

Achieving CfSH Levels 4, 5 and 6 Achieving CfSH Levels 4, 5 and 6 Background The Code for Sustainable Homes was developed to encourage continuous improvement in sustainable home building. The implementation of the code is managed by BRE

More information

Construction Studies Theory - Higher Level

Construction Studies Theory - Higher Level 2014. M76 Coimisiún na Scrúduithe Stáit State Examinations Commission Leaving Certificate Examination, 2014 Construction Studies Theory - Higher Level (300 marks) Friday, 13 June Afternoon, 2:00 to 5:00

More information

BRE Global Test Report

BRE Global Test Report BRE Global Test Report Classification of fire performance in accordance with BR 135: 2013 Annex B. Prepared for: Date: 02 July 2014 Report Number: 287129 Iso Systems and Aquarian Cladding Systems BRE Global

More information

URSA Cavity Batts URSA GLASSWOOL.

URSA Cavity Batts URSA GLASSWOOL. URSA GLASSWOOL E-mail : ursauk@uralita.com URSA UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web : www.ursa-uk.co.uk E-mail

More information

Walls. Superior Performance PIR Insulation. XtroWall Plus 110 CAVITY. Insulation for Partial Fill Cavity Walls

Walls. Superior Performance PIR Insulation. XtroWall Plus 110 CAVITY. Insulation for Partial Fill Cavity Walls PRODUCT Superior Performance PIR Insulation Walls 110 Insulation for Partial Fill Cavity Walls W/M 2 K IN A 150MM CAVITY IMPROVED PERFORMANCE FOR NZEB NEW PRODUCT 2018 Data Sheet is a superior performance

More information

URSA GLASSWOOL URSA 10 Loft Roll

URSA GLASSWOOL URSA 10 Loft Roll URSA GLASSWOOL Insulation for Cold Pitched Roofs 02 Company Information The Company URSA is Europe s third largest manufacturer of insulation materials and, in terms of sales, the largest business unit

More information

Retrofit of existing housing in the United Kingdom: the carbon reduction possibilities

Retrofit of existing housing in the United Kingdom: the carbon reduction possibilities ARCHITECTURE AND SUSTAINABLE DEVELOPMENT, Proceedings of PLEA 2011, Louvain-la-Neuve, Belgium (July 2011) ISBN xxx-x-xxxx-xxxx-x - ISBN (USB stick) xxx-x-xxxx-xxxx-x @ Presses universitaires de Louvain

More information

URSA MINERAL WOOL URSA 10 & URSA 20 DIVERSO Loft Roll

URSA MINERAL WOOL URSA 10 & URSA 20 DIVERSO Loft Roll URSA 10 Loft Roll - 073_Layout 1 02/10/2017 10:26 Page 1 URSA UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web : www.ursa-uk.co.uk

More information

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target. http://lowenergybuildings.org.uk Project name Larch House, Ebbw Vale, Wales Project summary The Larch House, designed by bere:architects, is the UKs first zero carbon (code 6), low cost, Certified Passivhaus,

More information

K17 Insulated Plasterboard

K17 Insulated Plasterboard Insulation A4/6 K17 AW2032 Issue 10 Nov 2015 K17 Insulated Plasterboard INSULATED DRY-LINING PLASTERBOARD FOR PLASTER DAuB / ADHESIVE BONDING Super high performance rigid thermoset phenolic insulation

More information

CIBSE REPUBLIC OF IRELAND

CIBSE REPUBLIC OF IRELAND CIBSE REPUBLIC OF IRELAND Why join CIBSE CIBSE Societies CIBSE Journal + App & Electronic Newsletter Networking Opportunities Special Interest Groups 2 CIBSE IRELAND CPDs all around Ireland Social events:

More information

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers 1 Exam Prep Prov Module: 27203-13 Thermal and Moisture Protection Questions and Answers 1. The R-value is a measure of the ability of a material to. A. Resist the passage of moisture B. Resist heat conduction

More information

Presentation to Irish Building Control Institute

Presentation to Irish Building Control Institute Presentation to Irish Building Control Institute Liam Smyth FIEI Head of Marketing & Technical Irish Concrete Federation 26 th March 2009 Irish Concrete Federation National Representative Organisation

More information

Superior Performance Phenolic Insulation. SR/RS Insulation for Ventilated Rainscreen Cladding. Walls 10/4803

Superior Performance Phenolic Insulation. SR/RS Insulation for Ventilated Rainscreen Cladding. Walls 10/4803 Superior Performance Phenolic Insulation Walls SR/RS Insulation for Ventilated Rainscreen Cladding 10/4803 Data Sheet SR/RS Insulation for Ventilated Rainscreen Cladding SR/RS Rainscreen Board provides

More information

REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES

REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES CI/SfB (47) Ln6 Uniclass Pr_25_57_10_68 January 2018 REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES................................ ........................................................ REFLECTIVE TECHNOLOGY

More information

PIR Insulation XT/TL-MF. Insulation for Drylining Walls (Mechanically Fixed) Walls 04/ /0183

PIR Insulation XT/TL-MF. Insulation for Drylining Walls (Mechanically Fixed) Walls 04/ /0183 PIR Insulation Walls XT/TL-MF Insulation for Drylining Walls (Mechanically Fixed) 04/4130 03/0183 Data Sheet Thin-R Thermal Liner Mechanically Fixed XT/TL-MF is a composite insulated panel of Xtratherm

More information

IATGN-10 Educational Developments

IATGN-10 Educational Developments 27 March 2015 IATGN-10 Educational Developments DUBLIN INSTITUTE OF TECHNOLOGY College of Engineering + Built Environment School of Architecture + Construction Context: A new technical language DIT CEBE

More information

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803 Superior Performance Phenolic Insulation Walls Insulation for Steel and Timber Frame AS LOW AS 020 10/4803 Data Sheet Insulation for Steel and Timber Frame Safe-R Framing Board is designed for use with

More information

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803 Superior Performance Phenolic Insulation Walls Insulation for Steel and Timber Frame AS LOW AS 020 10/4803 Data Sheet Insulation for Steel and Timber Frame Safe-R Framing Board is designed for use with

More information

MULTIFOIL INSULATION TLX SILVER AND TLX SILVER FB FOR PITCHED ROOFS

MULTIFOIL INSULATION TLX SILVER AND TLX SILVER FB FOR PITCHED ROOFS Web Dynamics Ltd Moss Lane Blackrod Bolton Lancashire BL6 5JB Tel: 01204 695666 Fax: 01204 695333 e-mail: tlx@webdynamics.co.uk website: www.webdynamics.co.uk APPROVAL INSPECTION TESTING CERTIFICATION

More information

How to build compliant SPANDREL PANELS. Guidance on building and installing spandrel panels for party walls above masonry

How to build compliant SPANDREL PANELS. Guidance on building and installing spandrel panels for party walls above masonry How to build compliant SPANDREL PANELS Guidance on building and installing spandrel panels for party walls above masonry Version 3 April 2018 Foreword Today many builders are exploring the efficiencies

More information