BELLMAWR BOROUGH SCHOOL DISTRICT ETHEL M. BURKE ELEMENTARY SCHOOL 112 SOUTH BLACK HORSE PIKE BELLMAWR, NJ FACILITY ENERGY REPORT

Size: px
Start display at page:

Download "BELLMAWR BOROUGH SCHOOL DISTRICT ETHEL M. BURKE ELEMENTARY SCHOOL 112 SOUTH BLACK HORSE PIKE BELLMAWR, NJ FACILITY ENERGY REPORT"

Transcription

1 BELLMAWR BOROUGH SCHOOL DISTRICT ETHEL M. BURKE ELEMENTARY SCHOOL 112 SOUTH BLACK HORSE PIKE BELLMAWR, NJ FACILITY ENERGY REPORT

2

3 TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR EQUIPMENT LIST... 9 IV. ENERGY CONSERVATION MEASURES V. ADDITIONAL RECOMMENDATIONS Appendix A ECM Cost & Savings Breakdown Appendix B New Jersey Smart Start Program Incentives Appendix C Portfolio Manager Statement of Energy Performance Appendix D Major Equipment List Appendix E Investment Grade Lighting Audit Appendix F Renewable / Distributed Energy Measures Calculations June 22, 2011 FINAL Page 1 of 35

4 I. HISTORIC ENERGY CONSUMPTION/COST The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. Electric Utility Provider: Electric Utility Rate Structure: Third Party Supplier: Natural Gas Utility Provider: Utility Rate Structure: Third Party Supplier: Public Service Electric & Gas General Lighting & Power (GLP) South Jersey Energy Company Public Service Electric & Gas Large Volume Service (LVG) Hess Corporation The electric usage profile represents the actual electrical usage for the facility. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. The gas usage profile within each facility report shows the actual natural gas energy usage for the facility. The gas utility measures consumption in cubic feet x 100 (CCF), and converts the quantity into Therms of energy. One Therm is equivalent to 100,000 BTUs of energy. June 22, 2011 FINAL Page 2 of 35

5 ELECTRIC USAGE SUMMARY Utility Provider: Rate: Meter No: Account # Third Party Utility Provider: TPS Meter / Acct No: MONTH OF USE Table 1 Electricity Billing Data CONSUMPTION KWH DEMAND TOTAL BILL Aug-09 15, $2,882 Sep-09 17, $3,377 Oct-09 49, $6,923 Nov-09 41, $6,127 Dec-09 19, $2,883 Jan-10 26, $3,913 Feb-10 22, $3,382 Mar-10 21, $3,177 Apr-10 20, $3,033 May-10 15, $2,457 Jun-10 21, $3,969 Jul-10 16, $3,428 Totals 286, Max $45,550 AVERAGE DEMAND AVERAGE RATE 66.1 KW average $0.159 $/kwh Demand data was not available for this facility. June 22, 2011 FINAL Page 3 of 35

6 Figure 1 Electricity Usage Profile Demand (kw) 60,000 50,000 40,000 30,000 20,000 10,000 0 Electric Usage Profile November-09 through October-10 Month ELECTRIC USAGE KWH DEMAND KW Usage (kwh) June 22, 2011 FINAL Page 4 of 35

7 NATURAL GAS USAGE SUMMARY Utility Provider: Rate: Meter No: Point of Delivery ID: Third Party Utility Provider: TPS Meter No: Table 4 Natural Gas Billing Data MONTH OF USE CONSUMPTION (THERMS) TOTAL BILL Aug $ Sep $ Oct $ Nov-09 1, $2, Dec-09 3, $3, Jan-10 3, $3, Feb-10 3, $4, Mar-10 1, $2, Apr $ May $ Jun $ Jul $96.11 TOTALS 14, $18, AVERAGE RATE: $1.29 $/THERM June 22, 2011 FINAL Page 5 of 35

8 Figure 2 Natural Gas Usage Profile 4,000 3,500 3,000 2,500 2,000 1,500 1, Gas Usage Profile September-09 through August-10 Month Gas Usage Usage (Therms) June 22, 2011 FINAL Page 6 of 35

9 II. FACILITY DESCRIPTION Ethel M. Burke Elementary School is located at 112 South Black Horse Pike in Bellmawr, New Jersey. The 31,617 GSF Public School building was built in 1922 with additions/renovations in 1927, 1955, and The building is a partial two-story facility (basement plus 1 st and 2 nd floors) comprised of classrooms, library, art room, computer room, science rooms, prekindergarten and kindergarten classrooms, nurse s office, teacher work room, faculty room, administrative offices, boiler room, electrical rooms, and a multi-purpose room with a kitchen. Occupancy Profile The typical hours of operation for the Ethel M. Burke Elementary School are Monday through Friday between 8:00 am and 2:30 pm. Building Envelope The original 1922 and 1927 sections of the building are built of 8 CMU and 4 brick with concrete beams. The windows throughout the facility are in poor condition and were installed in Typical windows throughout the facility are double pane, operable, ¼ clear glass with aluminum frames with insulated panels. This year, the School District will be replacing the window systems with 7/8 insulated, low-e units. Blinds are utilized throughout the facility for occupant comfort. The blinds are valuable because they help to reduce heat loss in the winter and reduce solar heat in the summer. The 1994 multi-purpose/kitchen addition is built of 4 split-face blocks, 8 concrete blocks, steel frame, and 2 rigid insulation on a roof deck with a roof membrane. The roof over the older sections of the building is comprised of a built-up roof over T&G wood sheathing with insulated ceiling tile. HVAC Systems The HVAC system consists of hot water boilers, packaged rooftop cooling units, classroom unit ventilators, a split system in the nurse s office, a vertical self-contained unit in one classroom, and window air conditioners in several rooms along with the administration office. The hot water is conveyed to the hot water coils via two (2) 5 HP secondary pumps manufactured by Aurora. The hot water is circulated thru the hot water boilers by two (2) 1/2 HP primary pumps also manufactured by Aurora. The boilers are 1998 vintage Lochinvar Power-Fin, modular, gas-fired hot water boilers with a rated input of 1,000 MBH each and an output of 880 MBH. These boilers serve the hot water coils within the unit ventilators and hot water cabinet heaters at the entrances. The multi-purpose room is heated/cooled by two (2) Carrier packaged rooftop units rated at 15-Tons of DX cooling and 270 MBH of gas-fired heating. The nurse s office has a one-ton Airedale split ceiling cassette unit with the condenser mounted on the roof. Also, there is a 3-Ton Airedale vertical self-contained unit in one of the classrooms. June 22, 2011 FINAL Page 7 of 35

10 Exhaust System Air is exhausted from the toilet rooms through separate roof exhausters. The classrooms have several fans that exhaust air collected in the corridor ceilings. The offices have a separate general exhaust fan and the multi-purpose room has two exhaust fans that are interlocked to the rooftop units. The kitchen hood has a separate roof exhaust fan. HVAC System Controls The controls are pneumatic. Domestic Hot Water Domestic hot water for the restrooms is provided by a Bradford White electric hot water heater with an 80-gallon capacity and two (2) 4.5 kw coils. The kitchen is served by a Bradford White gas-fired hot water heater with a rated input of 76,000 Btuh and a storage capacity of 75 gallons. Lighting Refer to the Investment Grade Lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space. June 22, 2011 FINAL Page 8 of 35

11 III. MAJOR EQUIPMENT LIST The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix. Refer to the Major Equipment List Appendix for this facility. June 22, 2011 FINAL Page 9 of 35

12 IV. ENERGY CONSERVATION MEASURES Energy Conservation Measures are developed specifically for this facility. The energy savings and calculations are highly dependent on the information received from the site survey and interviews with operations personnel. The assumptions and calculations should be reviewed by the owner to ensure accurate representation of this facility. The following ECMs were analyzed: Table 1 ECM Financial Summary ENERGY CONSERVATION MEASURES (ECM's) ECM NO. DESCRIPTION NET INSTALLATION COST A ANNUAL SAVINGS B SIMPLE PAYBACK (Yrs) SIMPLE LIFETIME ROI ECM #1 Lighting Upgrade $400 $ % ECM #2 Lighting Upgrade - Multi- Pupose Rm $3,420 $ % ECM #3 Lighting Controls $2,915 $2, % ECM #4 Domestic Water Heater Upgrade $10,201 $ % ECM #5 AC Unit Upgrade $45,630 $2, % ECM #6 Heating Boiler Upgrade $129,770 $2, % ECM #7 Premium Efficiency Motors $2,918 $ % ECM #8 Programmable Thermostats $600 $1, % RENEWABLE ENERGY MEASURES (REM's) ECM NO. DESCRIPTION NET INSTALLATION COST ANNUAL SAVINGS SIMPLE PAYBACK (Yrs) SIMPLE LIFETIME ROI REM #1 Solar Photovoltaic System $20,700 $1, % Notes: A. Cost takes into consideration applicable NJ Smart StartTM incentives. B. Savings takes into consideration applicable maintenance savings. June 22, 2011 FINAL Page 10 of 35

13 Table 2 ECM Energy Summary ENERGY CONSERVATION MEASURES (ECM's) ECM NO. ECM #1 Lighting Upgrade 1.3 3,479 0 ECM #2 Lighting Upgrade - Multi- Pupose Rm 1 2,855 0 ECM #3 Lighting Controls ,248 0 ECM #4 DESCRIPTION Domestic Water Heater Upgrade ELECTRIC DEMAND (KW) ECM #5 AC Unit Upgrade ,435 0 ECM #6 Heating Boiler Upgrade ,065 ECM #7 Premium Efficiency Motors 0.5 1,041 0 ECM #8 Programmable Thermostats 0.0 7,716 0 RENEWABLE ENERGY MEASURES (REM's) ECM NO. DESCRIPTION ELECTRIC DEMAND (KW) ANNUAL UTILITY REDUCTION ELECTRIC CONSUMPTION (KWH) ANNUAL UTILITY REDUCTION ELECTRIC CONSUMPTION (KWH) NATURAL GAS (THERMS) NATURAL GAS (THERMS) REM #1 Solar Photovoltaic System 2.3 2,995 0 June 22, 2011 FINAL Page 11 of 35

14 Table 3 Facility Project Summary ENERGY SAVINGS IMPROVEMENT PROGRAM - POTENTIAL PROJECT ENERGY CONSERVATION MEASURES ANNUAL ENERGY SAVINGS ($) PROJECT COST ($) SMART START INCENTIVES CUSTOMER COST SIMPLE PAYBACK Lighting Upgrade $679 $1,040 $640 $ Lighting Upgrade - Multi- Pupose Rm $454 $3,870 $450 $3, Lighting Controls $2,424 $3,745 $0 $3, Domestic Water Heater Upgrade $112 $10,441 $240 $10, AC Unit Upgrade $2,597 $48,000 $0 $48, Heating Boiler Upgrade $2,600 $133,270 $0 $133, Premium Efficiency Motors $165 $3,038 $120 $2, Programmable Thermostats $1,227 $600 $0 $ Design / Construction Extras (15%) $204,003 $204,003 Total Project $10,093 $404,969 $1,330 $403, Incentive Values crossed out represent ECMs that conflict with other incentives already accounted for. Highlighted ECMs are not included in total Design / Construction Extras is shown as an additional cost for the facility project summary. This cost is included to estimate the costs associated with construction management fees for a larger combined project. June 22, 2011 FINAL Page 12 of 35

15 ECM #1: Lighting Upgrade Description: The majority of the interior lighting throughout the Ethel M. Burke Elementary School building is provided with fluorescent fixtures with older generation, 700 series 32W T8 lamps and electronic ballasts. These fixtures were surveyed to find that a replacement lamp could not be retrofitted without the replacement of the existing electronic ballast. The cost to replace the electronic ballast makes it cost prohibitive for the savings from 32W lamps to 28W lamps therefore these fixtures were not included in the calculation. In some areas, incandescent lights were found which could be replaced with new compact fluorescent lamps. The ECM includes replacement of any incandescent lamps with compact fluorescent lamps. Compact fluorescent lamps (CFL s) were designed to be direct replacements for the standard incandescent lamps which are common to table lamps, spot lights, hi-hats, bathroom vanity lighting, etc. The light output of the CFL has been designed to resemble the incandescent lamp. The color rendering index (CRI) of the CFL is much higher than standard fluorescent lighting, and therefore provides a much truer light. The CFL is available in a myriad of shapes and sizes depending on the specific application. Typical replacements are: a 13-Watt CFL for a 60-Watt incandescent lamp, an 18-Watt CFL for a 75-Watt incandescent lamp, and a 26-Watt CFL for a 100-Watt incandescent lamp. The CFL is also available for a number of brightness colors that is indicated by the Kelvin rating. A 2700K CFL is the warmest color available and is closest in color to the incandescent lamp. CFL s are also available in 3000K, 3500K, and 4100K. The 4100K would be the brightest or coolest output. A CFL can be chosen to screw right into your existing fixtures, or hardwired into your existing fixtures. Where the existing fixture is controlled by a dimmer switch, the CFL bulb must be compatible with a dimmer switch. In some locations the bulb replacement will need to be tested to make sure the larger base of the CFL will fit into the existing fixture. The energy usage of an incandescent compared to a compact fluorescent approximately 3 to 4 times greater. In addition to the energy savings, compact fluorescent fixtures burn-hours are 8 to 15 times longer than incandescent fixtures ranging from 6,000 to 15,000 burn-hours compared to incandescent fixtures ranging from 750 to 1000 burnhours. However, the maintenance savings due to reduced lamp replacement is offset by the higher cost of the CFL s compared to the incandescent lamps. The exit signs in the facility were converted from incandescent to compact fluorescents during the T8 lighting upgrade of the facility. Only the internal components of the fixtures were retrofitted. This application would be an excellent opportunity for LED technology. LED is an acronym for light-emitting-diode. LED s are small light sources that are readily associated with electronic equipment. LED exit signs have been manufactured in a variety of shapes and sizes. There are also retrofit kits that allow for simply modification of existing exit signs to accommodate LED technology. The benefits of LED technology are substantial. LED exit signs will last for years without maintenance. This results in tremendous maintenance savings considering that incandescent or fluorescent lamps need to be replaced at a rate of 1-5 times per year. Lamp costs ($2-$7 each) and labor costs ($4-$10 per lamp) add up rapidly. Additionally, LED exit lights only uses 4 Watts. In comparison, conventional exit signs use Watts. This ECM replaces all exit signs with compact fluorescent lamps in their entirety with new exit signs June 22, 2011 FINAL Page 13 of 35

16 containing LED technology. It is recommended that samples of the products be installed to confirm that they are compatible with the existing electrical system. Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed retrofits, costs, savings, and payback periods for each set of fixtures in the each building. Rebates and Incentives: There are incentives available from NJ Smart Start Program for a portion of the retrofits in this ECM. Incentives are calculated as follows: From the Smart Start Incentive appendix, the retrofit of an incandescent with a compact fluorescent fixture warrants the following incentive: $25 per 1 lamp fixture $30 per 2 lamp fixture SmartStart Incentive = # of 1 Lamp Fixtures $25 = 22 $25 = $550 From the Smart Start Incentive appendix, the retrofit of a compact fluorescent exit sign with a LED exit sign warrants the following incentive: $10 per LED Exit sign ( 75kW facility connected load) $20 per LED Exit sign ( 75kW facility connected load) SmartStart Incentive = # of Exit Signs $10 = 9 $10 = $90 Replacement and Maintenance Savings: There are no Replacement and Maintenance Savings for compact fluorescent light fixtures. LED Exit Signs Maintenance savings = 9 fixtures x 2 bulbs/fixture x ($3/bulb + $4/bulb installation) = $126/yr June 22, 2011 FINAL Page 14 of 35

17 Energy Savings Summary: ECM #1 - ENERGY SAVINGS SUMMARY Installation Cost ($): $1,040 NJ Smart Start Equipment Incentive ($): $640 Net Installation Cost ($): $400 Maintenance Savings ($/Yr): $126 Energy Savings ($/Yr): $553 Total Yearly Savings ($/Yr): $679 Estimated ECM Lifetime (Yr): 15 Simple Payback 0.6 Simple Lifetime ROI % Simple Lifetime Maintenance Savings $1,890 Simple Lifetime Savings $10,185 Internal Rate of Return (IRR) 170% Net Present Value (NPV) $7, June 22, 2011 FINAL Page 15 of 35

18 ECM #2: Lighting Upgrade Multi-Purpose Room Description: The all-purpose room at Ethel M. Burke Elementary School utilizes 250W low bay probe start metal halide fixtures for its lighting. Utilizing pulse start metal halide lamps in low and high bay spaces is a superior option over probe start metal halide fixtures. This ECM includes replacement of each of the existing multi-purpose room probe start metal halide ballast and lamp with pulse start metal halide ballast and lamp retrofit kits. The retrofit for the probe start metal halide fixtures includes a one for one fixture replacement. The lamp selected will provide equivalent light compared to the average light output of the existing probe start metal halide fixtures. The bulb replacement cost for the pulse start metal halide lamps compared to the existing probe start metal halide lamps were found to be approximately equal and therefore not included in the savings calculations. Hours of Operation Multi-Purpose Room: 2,600 Hours/Yr Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the proposed retrofits, costs, savings, and payback periods. NJ Smart Start Program Incentives are calculated as follows: From the Smart Start Incentive Appendix, the following incentives are warranted: Pulse Start metal Halide fixtures (for fixtures 150 watts) = $25 per Fixture Smart Start Incentive = (# of Fixtures Replaced $25) Smart Start Incentive = (18 $25) = $450 There is no significant replacement or maintenance savings generated with this ECM. Energy Savings Summary: June 22, 2011 FINAL Page 16 of 35

19 ECM #2 - ENERGY SAVINGS SUMMARY Installation Cost ($): $3,870 NJ Smart Start Equipment Incentive ($): $450 Net Installation Cost ($): $3,420 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $454 Total Yearly Savings ($/Yr): $454 Estimated ECM Lifetime (Yr): 15 Simple Payback 7.5 Simple Lifetime ROI 99.1% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $6,810 Internal Rate of Return (IRR) 10% Net Present Value (NPV) $1, June 22, 2011 FINAL Page 17 of 35

20 ECM #3: Lighting Controls Upgrade Occupancy Sensors Description: Some of the lights in the school building are left on unnecessarily. In many cases the lights are left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. This is common in rooms that are occupied for only short periods and only a few times per day. In some instances lights are left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off. Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways, document posted for public use April The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report: Occupancy Sensors for Lighting Control 20% - 28% energy savings. Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors and daylight sensors (The majority of the savings is expected to be after school hours when rooms are left with lights on) This ECM includes installation of ceiling or switch mount sensors for individual offices, classrooms, large bathrooms, and libraries. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls implemented in this ECM and outlines the proposed controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls. Energy Savings Calculations: Energy Savings = (% Savings Controlled Light Energy ( kwh/yr) ) June 22, 2011 FINAL Page 18 of 35

21 Savings. = Energy Savings $ kwh ( kwh) Ave ElecCost Cost and Incentives: Installation cost per dual-technology sensors (Basis: Sensor switch or equivalent) are as follows: Dual Technology Occupancy Sensor - Remote Mount Dual Technology Occupancy Sensor - Switch Mount Dual Technology Occupancy Sensor with 2 Pole Powerpack Remote mount $250 per installation $150 per installation $300 per installation Cost includes material and labor. From the NJ Smart Start Program Incentives Appendix, the installation of a lighting control device warrants the following incentive: Occupancy Sensor Fixture Mounted (existing facility only) = $20 per sensor Occupancy Sensor Remote Mounted (existing facility only) = $35 per sensor (# of wall mount $ 20) + (#of ceilingmount $35) ( 3 wall mount $ 20) + (22ceiling mount $35) $830 Smart Start Incentive = Smart Start Incentive = = Energy Savings Summary: ECM #3 - ENERGY SAVINGS SUMMARY Installation Cost ($): $3,745 NJ Smart Start Equipment Incentive ($): $830 Net Installation Cost ($): $2,915 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $2,424 Total Yearly Savings ($/Yr): $2,424 Estimated ECM Lifetime (Yr): 15 Simple Payback 1.2 Simple Lifetime ROI % Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $36,360 Internal Rate of Return (IRR) 83% Net Present Value (NPV) $26, June 22, 2011 FINAL Page 19 of 35

22 ECM #4: Condensing Domestic Hot Water Heater Description: The original source for domestic hot water for the kitchen is provided by one 75 gallon dedicated water heater made by Bradford White. The efficiency of the gas hot water heaters is approximately 80%. Newer technology available for this type of equipment would provide more efficient operation. Condensing hot water heaters provide substantially improved efficiency over standard hot water heaters (up to 97% thermal efficiency.) The thermal efficiency gain is a result of condensing the flue gases allowing for maximum extraction of heat from the combustion process. This ECM includes installation of new central tank type condensing hot water heater to replace the existing standard efficiency hot water heater. The efficiency of the proposed hot water heater represents an increase of 20% for all hot water use in the building. The basis for this ECM is the AO Smith condensing hot water heater model number BTH 120 to replace the existing water heaters. Energy Savings Calculations: Non-Heating Gas Consumption: 46 Therms/month (Based on average June through September Utility Bills) 46 Therms/month x 12 months = 552 Therms Estimated Existing HWH Gas Consumption (100%): 552 Therms X 100% = 552 Therms Dom. HW Gas Usage = Heating Eff. Cons. ( Btu) BTU (%) Fuel Heat Value Dom HW Heat Therm Gas Energy Cost = Heating Gas Usage $ Therm ( Therms) Ave Fuel Cost June 22, 2011 FINAL Page 20 of 35

23 CONDENSING DOM. HWH CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS Existing Nat Gas New Condensing HWHs HWHs Total Dom. Hot Water Nat. Gas Usage per Utility Bills (Therms) Water Lbs per Gallon Dom. HWH Efficiency (%) 80% 95% 15% Gas Heat Value (BTU/Therm) Central HW Heat Required (MMBTUs) 100, , Gas Cost ($/Therm) ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Proposed Central Dom. HW Natural Gas Usage (Therms) Gas Energy Cost ($) $712 $600 $112 COMMENTS: Installation cost AO Smith condensing hot water heaters (Basis: BTH 120 or equivalent) is estimated at $10,441 for both units including material and labor. From the NJ Smart Start Appendix, the installation of a condensing hot water heater warrants the following incentive: >50 gallons, <300 MBH, 85% AFUE = $2.00 per MBH Smart Start Incentive = ( Total MBH $ 2.00/ MBH ) = ( 120 $2.00) = $ 240 June 22, 2011 FINAL Page 21 of 35

24 Energy Savings Summary: ECM #4 - ENERGY SAVINGS SUMMARY Installation Cost ($): $10,441 NJ Smart Start Equipment Incentive ($): $240 Net Installation Cost ($): $10,201 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $112 Total Yearly Savings ($/Yr): $112 Estimated ECM Lifetime (Yr): 15 Simple Payback 90.7 Simple Lifetime ROI -83.5% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $1,686 Internal Rate of Return (IRR) -17% Net Present Value (NPV) ($8,858.75) June 22, 2011 FINAL Page 22 of 35

25 ECM #5: Air Conditioning Unit Upgrades Description: The all-purpose room at Ethel M. Burke Elementary School is air conditioned by packaged rooftop AC units. The units currently installed are inefficient compared to modern equipment and can be replaced with new high efficiency units. New air conditioners provide higher full load and part load efficiencies due to advances in inverter motor technologies, heat exchangers and refrigerants. This ECM includes one-for-one replacement of the older air conditioning units with new higher efficiency systems. It is recommended to fully evaluate the capacity needed for all new systems prior to moving forward with this ECM. A summary of the unit replacements for this ECM can be found in the table below: ECM INPUTS SERVICE / LOCATION RTU-1A Multi-Purpose Room 1 180, Carrier 48PM RTU-1B Multi-Purpose Room 1 180, Carrier 48PM Total 2 360, The manufacturer used as the basis for design is Carrier. This ECM includes replacement of the unit in its entirety. All units are one for one style replacements with matching capacity of the new units to the old units. Operating efficiency of the existing equipment is estimated due to lack of data from the existing units. Energy Savings Calculations: Cooling Energy Savings: Seasonal energy consumption of the air conditioners at the cooling mode is calculated with the equation below: Energy Savings, kwh = Cooling Capacity, BTU Hr 1 1 Operation Hours SEER Old SEER New 1000 W kwh Demand Savings, kw = IMPLEMENTATION SUMMARY COOLING TOTAL NUMBER CAPACITY, CAPACITY, OF UNITS BTU/HR TONS Energy Savings (kwh) Hours of Cooling Cooling Cost Savings = Energy Savings, kwh Cost of Electricity $ kwh REPLACE UNIT WITH June 22, 2011 FINAL Page 23 of 35

26 ECM INPUTS COOLING CAPACITY, BTU/Hr Project Cost, Incentives and Maintenance Savings From the NJ Smart Start Program appendix, the replacement of split system AC units and unitary systems with high efficiency AC systems falls under the category Unitary HVAC Split System and warrants an incentive based on efficiency (EER/SEER). The program incentives are calculated as follows: Smart Start Incentive = ENERGY SAVINGS CALCULATIONS ANNUAL COOLING HOURS EXISTING UNITS (S)EER NEW UNITS (S)EER ( CoolingTons $/Ton Incentive) Summary of cost, savings and payback for this ECM is below. # OF UNITS ENERGY SAVINGS kwh There is no significant maintenance savings due to implementation of this ECM. DEMAND SAVINGS kw RTU-1A 180,000 1, EER 11.5 EER 1 8, RTU-1B 180,000 1, EER 11.5 EER 1 8, Total 2 16, UNIT DESCRIPTION AC UNITS REBATE SUMMARY UNIT EFFICIENCY REBATE $/TON PROPOSED CAPACITY TONS TOTAL REBATE $ 20 to 30 tons 10.5 EER 79 0 $ to < 20 tons 11.5 EER $2, to < tons 11.5 EER 73 0 $0 5.4 tons or less Unitary AC and 14 SEER $ $0 Split System TOTAL 30 $2,370 ECM INPUTS INSTALLED COST COST & SAVINGS SUMMARY # OF UNITS TOTAL COST REBATES NET COST ENERGY SAVING PAY BACK YEARS RTU-1A $24,000 1 $24,000 $1,185 $22,815 $1, RTU-1B $24,000 1 $24,000 $1,185 $22,815 $1, Total $48,000 2 $48,000 $2,370 $45,630 $2, June 22, 2011 FINAL Page 24 of 35

27 Energy Savings Summary: ECM #5 - ENERGY SAVINGS SUMMARY Installation Cost ($): $48,000 NJ Smart Start Equipment Incentive ($): $2,370 Net Installation Cost ($): $45,630 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $2,597 Total Yearly Savings ($/Yr): $2,597 Estimated ECM Lifetime (Yr): 15 Simple Payback 17.6 Simple Lifetime ROI -14.6% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $38,950 Internal Rate of Return (IRR) -2% Net Present Value (NPV) ($14,630.82) June 22, 2011 FINAL Page 25 of 35

28 ECM #6: Heating HW Condensing Boiler Installation Description: The existing Lochinvar boilers are used as the primary source of heat for the building. The existing boilers are over 18 years old and within the typical life expectancy of a cast iron boiler, which is 25 years. The equipment appears to be maintained in fair operating condition. It is difficult to predict the point at which the boiler becomes inoperable. With the increased efficiency of the condensing boilers, the savings can be substantial. New condensing boilers could substantially improve the operating efficiency of the heating system of the building. Condensing boiler s peak efficiency tops out at 99% depending on return water temperature. Due to the operating conditions of the building, the annual average operating efficiency of the proposed condensing boiler is expected to be 88%. The existing boiler s efficiency is approximately 75%, which makes the condensing boilers an 13% increase in efficiency. This ECM is based on variable supply water temperature adjusted based on outdoor temperature. This ECM includes installation of two condensing gas fired boilers to replace the existing two boilers. The remaining Patterson-Kelley boiler would remain as a back-up. The basis for this ECM is Aerco model number KC1000. The boiler installation is based on a one for one replacement based on capacity of the existing boiler. Energy Savings Calculations: Existing Non-Heating Natural Gas Use: Existing Heating Natural Gas Use: 46 Therms (Avg from May to September Gas Use) (Total Therms) (Non-Heating Therms) 14,532 Therms 552 Therms = 13,980 Therms Bldg Heat Re quired = Existing Nat Gas BTU Therm ( Therms) Heating Eff.(%) Fuel HeatValue Pr oposed Heating Gas Usage = Bldg Heating Eff. Heat Re quired ( BTU ) BTU (%) Fuel Heat Value Therm Energy Cost = Heating Gas Usage $ Therm ( Therms) Ave Fuel Cost June 22, 2011 FINAL Page 26 of 35

29 HEATING HW BOILER CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS Existing Boilers New Condensing Boilers Existing Nat Gas (Therms) 13,980 0 Boiler Efficiency (%) 75% 88% 13% Nat Gas Heat Value (BTU/Therm) 100, ,000 Equivalent Building Heat Usage (MMBTUs) 1,048 1,048 Ave. Gas Cost ($/Therm) (Heating season only) ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Natural Gas Usage (Therms) 13,980 11,914 2,065 Energy Cost ($) $17,603 $15,002 $2,600 COMMENTS: Installation cost of the two new condensing boilers, demolition, flue piping, boiler water piping modifications, gas piping modifications, electric, etc. is estimated to be $133,270. From the NJ Smart Start Appendix, the installation of new condensing boilers warrants the following incentive: $1.75 per MBH. Smart Start Incentive = ( Boiler MBH $ 1.75) = ( 2,000 $1.75) = $3, 500 June 22, 2011 FINAL Page 27 of 35

30 Energy Savings Summary: ECM #6 - ENERGY SAVINGS SUMMARY Installation Cost ($): $133,270 NJ Smart Start Equipment Incentive ($): $3,500 Net Installation Cost ($): $129,770 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $2,600 Total Yearly Savings ($/Yr): $2,600 Estimated ECM Lifetime (Yr): 25 Simple Payback 49.9 Simple Lifetime ROI -49.9% Simple Lifetime Maintenance Savings 0 Simple Lifetime Savings $65,009 Internal Rate of Return (IRR) -5% Net Present Value (NPV) ($84,488.77) June 22, 2011 FINAL Page 28 of 35

31 ECM #7: Install NEMA Premium Efficiency Motors Description: The improved efficiency of the NEMA Premium efficient motors is primarily due to better designs with use of better materials to reduce losses. Surprisingly, the electricity used to power a motor represents 95 % of its total lifetime operating cost. Because many motors operate continuously 24 hours a day, even small increases in efficiency can yield substantial energy and dollar savings. The electric motors driving the hot water pumps are candidates for replacing with premium efficiency motors. These standard efficiency motors run considerable amount of time over a year. This energy conservation measure replaces existing inefficient electric motors with NEMA Premium efficiency motors. NEMA Premium is the most efficient motor designation in the marketplace today. IMPLEMENTATION SUMMARY EQMT ID FUNCTION MOTOR HP HOURS OF OPERATION EXISTING EFFICIENCY NEMA PREMIUM EFFICIENCY HWP-1 Hot Water Pump 5 2, % 90.2% HWP-2 Hot Water Pump 5 2, % 90.2% Energy Savings Calculations: Electric usage, kwh = HP LF Hours of Operation Motor Ef iciency where, HP = Motor Nameplate Horsepower Rating LF = Load Factor Motor Ef iciency = Motor Nameplate Ef iciency ElectricUsageSavings,kWh = ElectricUsage Electric Existing Usage Proposed Electric Usage Savings, kwh = Electric Usage Existing Electric Usage Proposed Electric cost savings = Electric Usage Savings Electric Rate $ kwh June 22, 2011 FINAL Page 29 of 35

32 The calculations were carried out and the results are tabulated in the table below: PREMIUM EFFICIENCY MOTOR CALCULATIONS NEMA PREMIUM POWER SAVINGS ENERGY SAVINGS EQMT MOTOR LOAD EXISTING COST ID HP FACTOR EFFICIENCY EFFICIENCY kw kwh SAVINGS HWP % 84.0% 90.2% $95 HWP % 85.5% 90.2% $71 TOTAL 0.5 1,041 $165 Equipment Cost and Incentives Below is a summary of SmartStart Building incentives for premium efficiency motors: INCENTIVES NJ SMART HORSE START POWER INCENTIVE 5 $ $90 10 $ $ $ $130 The following table outlines the summary of motor replacement costs and incentives: EQMT ID MOTOR REPLACEMENT SUMMARY MOTOR POWER HP INSTALLED COST SMART START INCENTIVE NET COST TOTAL SAVINGS SIMPLE PAYBACK HWP-1 5 $1,519 $60 $1,459 $ HWP-2 5 $1,519 $60 $1,459 $ TOTAL Totals: $3,038 $120 $2,918 $ June 22, 2011 FINAL Page 30 of 35

33 Energy Savings Summary: ECM #7 - ENERGY SAVINGS SUMMARY Installation Cost ($): $3,038 NJ Smart Start Equipment Incentive ($): $120 Net Installation Cost ($): $2,918 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $165 Total Yearly Savings ($/Yr): $165 Estimated ECM Lifetime (Yr): 15 Simple Payback 17.6 Simple Lifetime ROI -14.9% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $2,482 Internal Rate of Return (IRR) -2% Net Present Value (NPV) ($942.41) June 22, 2011 FINAL Page 31 of 35

34 ECM #8: Programmable Thermostats for Central A/C System Description: The air conditioning for the Multi-Purpose Room is provided by direct expansion cooling. The system is controlled with a mechanical thermostat. Currently, there is no night setback for this system. Energy consumption of the air conditioning system can be reduced by installing a programmable thermostat. Programmable thermostats for air conditioning units are available to utilize time-ofday schedules for occupied and unoccupied times and set-backs. This energy conservation measure will install programmable thermostats to control the central air conditioning systems. The recommended thermostat set points for air conditioning in the facility are as follows: Occupied Cooling = Unoccupied Cooling = 74 F 78 F Energy Savings Calculations: Energy savings calculations are derived from the annual energy consumption of the unit based on total cooling capacity and seasonal integrated energy efficiency of the system. The calculation uses the number of annual cooling degree days (CDDs) and the estimated hours of setback during the unoccupied period on each day. First total energy consumption of the unit in occupied and unoccupied modes are calculated using the total cooling capacity and the CDDs. Energy Consp., kwh (Occupied) = BTU Cooling Capacity, Hr Operation Hours (CDDs 65 F) IEER 1000 W kwh Energy Consp., kwh (Unoccupied) = BTU Cooling Capacity, Hr Operation Hours (CDDs 70 F) IEER 1000 W kwh Total Annual Energy Consumption of the unit in partly occupied and unoccupied settings are calculated simply by proportioning the hours of day in occupied mode and unoccupied modes using equation below: June 22, 2011 FINAL Page 32 of 35

35 Total Energy Consp., kwh (Partly Occupied & Unoccupied Modes) BTU Cooling Capacity, = Hr IEER 1000 W kwh (24 HoursSetback) CDDs 65 F 24 HrsSetback CDDs 70 F 24 Energy savings is the difference between the energy consumption of the unit at always occupied mode and partly occupied mode. Cooling Cost Savings = Energy Savings, kwh Cost of Electricity $ kwh Demand savings cannot be achieved in this facility via installing programmable thermostats. Energy savings calculations are summarized in the table below. PROGRAMMABLE THERMOSTAT for AIR CONDITIONING ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS Mechanical Programmable Thermostat Thermostat Total Cooling Capacity, Tons Annual Cooling Degree Days, Base 65 F 1,811 1,811 - Annual Cooling Degree Days, Base 70 F 1,168 1,168 - Unit Efficiency (Estimated, IEER) Hours Set-back 0 8 Elec Cost ($/kwh) $0.159 $ ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Electric Cons. (Non Set-back) 65,196 43,464 21,732 Electric Cons. (Set-back) 0 14,016 (14,016) Electric Cons. (Total) 65,196 57,480 7,716 Electric Energy Cost ($) $10,366 $9,139 $1,227 COMMENTS: HDDs estimated based on Newark,NJ. Cost Installed cost of programmable thermostats is $300/Unit. June 22, 2011 FINAL Page 33 of 35

36 Energy Savings Summary: ECM #8 - ENERGY SAVINGS SUMMARY Installation Cost ($): $600 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $600 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $1,227 Total Yearly Savings ($/Yr): $1,227 Estimated ECM Lifetime (Yr): 15 Simple Payback 0.5 Simple Lifetime ROI % Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $18,403 Internal Rate of Return (IRR) 204% Net Present Value (NPV) $14, June 22, 2011 FINAL Page 34 of 35

37 V. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less. A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%. B. Maintain all weather stripping on windows and doors. C. Clean all light fixtures to maximize light output. D. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ. E. Turn off computers when not in use. Ensure computers are not running in screen saver mode which saves the monitor screen not energy. F. Ensure outside air dampers are functioning properly and only open during occupied mode. June 22, 2011 FINAL Page 35 of 35

38 APPENDIX A 1 of 1 ECM COST & SAVINGS BREAKDOWN CONCORD ENGINEERING GROUP Bellmawr School District Ethel M. Burke Elementary School ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY ECM NO. DESCRIPTION MATERIAL INSTALLATION COST LABOR REBATES, INCENTIVES NET INSTALLATION COST YEARLY SAVINGS ECM LIFETIME LIFETIME ENERGY SAVINGS ENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime) LIFETIME MAINTENANCE SAVINGS (Yearly Maint Svaing * ECM Lifetime) LIFETIME ROI (Lifetime Savings - Net Cost) / (Net Cost) SIMPLE PAYBACK (Net cost / Yearly Savings) INTERNAL RATE OF RETURN (IRR) NET PRESENT VALUE (NPV) ($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($) ECM #1 Lighting Upgrade $520 $520 $640 $400 $553 $126 $ $10,185 $1, % % $7, ECM #2 Lighting Upgrade - Multi-Pupose Rm $1,935 $1,935 $450 $3,420 $454 $0 $ $6,810 $0 99.1% % $1, ECM #3 Lighting Controls $1,873 $1,873 $830 $2,915 $2,424 $0 $2, $36,360 $ % % $26, ECM #4 Domestic Water Heater Upgrade $6,322 $4,119 $240 $10,201 $112 $0 $ $2,811 $0-72.4% % ($8,243.21) ECM #5 AC Unit Upgrade $36,000 $12,000 $2,370 $45,630 $2,597 $0 $2, $38,950 $0-14.6% % ($14,630.82) ECM #6 Heating Boiler Upgrade $61,920 $71,350 $3,500 $129,770 $2,600 $0 $2, $65,009 $0-49.9% % ($84,488.77) ECM #7 Premium Efficiency Motors $1,898 $1,140 $120 $2,918 $165 $0 $ $2,482 $0-14.9% % ($942.41) ECM #8 Programmable Thermostats $540 $60 $0 $600 $1,227 $0 $1, $18,403 $ % % $14, REM RENEWABLE ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY REM #1 Solar Photovoltaic System $10,350 $10,350 $0 $20,700 $476 $1,048 $1, $22,867 $15, % % ($2,501.16) Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period. 2) The variable DR in the NPV equation stands for Discount Rate 3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period.

39 Appendix B Page 1 of BURNT MILL ROAD VOORHEES, NEW JERSEY PHONE: (856) FAX: (856) SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives as of February, 2010: Electric Chillers Water-Cooled Chillers $12 - $170 per ton Air-Cooled Chillers $8 - $52 per ton Energy Efficiency must comply with ASHRAE Gas Absorption Chillers Gas Engine-Driven Chillers Gas Cooling $185 - $400 per ton Calculated through custom measure path) Desiccant Systems $1.00 per cfm gas or electric Electric Unitary HVAC Unitary AC and Split Systems $73 - $93 per ton Air-to-Air Heat Pumps $73 - $92 per ton Water-Source Heat Pumps $81 per ton Packaged Terminal AC & HP $65 per ton Central DX AC Systems $40- $72 per ton Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat (Hospitality & Institutional Facility) $75 per thermostat Energy Efficiency must comply with ASHRAE Ground Source Heat Pumps $450 per ton, EER 16 Closed Loop & Open Loop $600 per ton, EER 18 $750 per ton, EER 20 Energy Efficiency must comply with ASHRAE

40 Appendix B Page 2 of 3 Gas Fired Boilers < 300 MBH Gas Fired Boilers MBH Gas Heating $300 per unit $1.75 per MBH Gas Fired Boilers MBH $1.00 per MBH Gas Fired Boilers > 4000 MBH (Calculated through Custom Measure Path) Gas Furnaces $300 - $400 per unit, AFUE 92% Variable Air Volume Chilled-Water Pumps Compressors Gas Water Heaters 50 gallons Gas-Fired Water Heaters > 50 gallons Gas-Fired Booster Water Heaters Gas Fired Tankless Water Heaters Variable Frequency Drives Natural Gas Water Heating $65 - $155 per hp $60 per hp $5,250 to $12,500 per drive $50 per unit $ $2.00 per MBH $17 - $35 per MBH $300 per unit Prescriptive Lighting Retro fit of T12 to T-5 or T-8 Lamps $10 per fixture w/electronic Ballast in Existing (1-4 lamps) Facilities Replacement of T12 with new T-5 or T- 8 Lamps w/electronic Ballast in Existing Facilities Replacement of incandescent with screw-in PAR 38 or PAR 30 (CFL) bulb T-8 reduced Wattage (28w/25w 4, 1-4 lamps) Lamp & ballast replacement Hard-Wired Compact Fluorescent Metal Halide w/pulse Start LED Exit Signs $25 per fixture (1-2 lamps) $30 per fixture (3-4 lamps) $7 per bulb $10 per fixture $25 - $30 per fixture $25 per fixture $10 - $20 per fixture T-5 and T-8 High Bay Fixtures $16 - $284 per fixture HID 100w Retrofit with induction lamp, power coupler and generator (must be 30% less watts/fixture than HID system) HID 100w Replacement with new HID 100w LED Refrigerator/Freezer case lighting replacement of fluorescent in medium and low temperature display case $50 per fixture $70 per fixture $42 per 5 foot $65 per 6 foot

41 Appendix B Page 3 of 3 Lighting Controls Occupancy Sensors Wall Mounted Remote Mounted Daylight Dimmers Occupancy Controlled hi-low Fluorescent Controls $20 per control $35 per control $25 per fixture $25 per fixture controlled Lighting Controls HID or Fluorescent Hi-Bay Controls Occupancy hi-low $75 per fixture controlled Daylight Dimming $75 per fixture controlled Daylight Dimming - office $50 per fixture controlled Premium Motors Three-Phase Motors $45 - $700 per motor Fractional HP Motors Electronic Communicated Motors (replacing shaded pole motors in refrigerator/freezer cases) $40 per electronic communicated motor Other Equipment Incentives $1.00 per watt per SF below program incentive threshold, currently 5% more Performance Lighting energy efficient than ASHRAE for New Construction and Complete Renovation Custom Electric and Gas Equipment not prescriptive Incentives $0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year payback on estimated savings. Custom Measures Minimum required savings of 75,000 KWh or 1,500 Therms and a IRR of at least 10%. Multi Measures Bonus 15%

42 OMB No STATEMENT OF ENERGY PERFORMANCE Ethel M. Burke ES Appendix C Page 1 of 2 Building ID: For 12-month Period Ending: July 31, Date SEP becomes ineligible: N/A Date SEP Generated: May 19, 2011 Facility Ethel M. Burke ES 112 South Black Horse Pike Bellmawr, NJ Year Built: 1922 Gross Floor Area (ft 2 ): 31,617 Facility Owner Bellmawr School District 256 Anderson Avenue Bellmawr, NJ Primary Contact for this Facility John Amato 256 Anderson Avenue Bellmawr, NJ Energy Performance Rating 2 (1-100) 38 Site Energy Use Summary 3 Electricity - Grid Purchase(kBtu) 978,050 Natural Gas (kbtu) 4 1,453,156 Total Energy (kbtu) 2,431,206 Energy Intensity 5 Site (kbtu/ft 2 /yr) 77 Source (kbtu/ft 2 /yr) 151 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO 2 e/year) 216 Electric Distribution Utility Public Service Electric & Gas Co National Average Comparison National Average Site EUI 69 National Average Source EUI 136 % Difference from National Average Source EUI 11% Building Type K-12 School Stamp of Certifying Professional Based on the conditions observed at the time of my visit to this building, I certify that the information contained within this statement is accurate. Meets Industry Standards 6 for Indoor Environmental Conditions: Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A Certifying Professional Mike Fischette 520 S Burnt Mill Road Voorhees, NJ Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA. 2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR. 3. Values represent energy consumption, annualized to a 12-month period. 4. Values represent energy intensity, annualized to a 12-month period. 5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality. The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) and welcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C EPA Form

43 Statement of Energy Performance 2010 Ethel M. Burke ES 112 South Black Horse Pike Bellmawr, NJ Portfolio Manager Building ID: Appendix C Page 2 of 2 The energy use of this building has been measured and compared to other similar buildings using the Environmental Protection Agency s (EPA s) Energy Performance Scale of 1 100, with 1 being the least energy efficient and 100 the most energy efficient. For more information, visit energystar.gov/benchmark. This building s score Least Efficient Average Most Efficient This building uses 151 kbtu per square foot per year.* *Based on source energy intensity for the 12 month period ending July 2010 Buildings with a score of 75 or higher may qualify for EPA s ENERGY STAR. I certify that the information contained within this statement is accurate and in accordance with U.S. Environmental Protection Agency s measurement standards, found at energystar.gov Date of certification Date Generated: 05/19/2011

44 Appendix D Page 1 of 6 MAJOR EQUIPMENT LIST Concord Engineering Group Ethel M. Burke Elementary School Rooftop / AC Units Tag RTU-1A RTU-1B CU-1 Unit Type Packaged Rooftop Packaged Rooftop Air-Cooled Condenser Qty Location Roof Roof Roof Area Served Multi-Purpose Room Multi-Purpose Room Nurse's Office Manufacturer Carrier Carrier Airedale Model # 48TJE016 48TJE016 SHC12DAA0 Serial # 1595F F Cooling Type DX Coil DX Coil DX Coil Cooling Capacity (Tons) 15-Tons 15-Tons 12,000 BTUH Cooling Efficiency (SEER/EER) EER = 8.0 (Existing) EER = 8.0 (Existing) SEER=11.8 Heating Type Gas-Fired Heater Gas-Fired Heater N/A Heating Input (MBH) 270 MBH 270 MBH N/A Efficiency 80% 80% N/A Fuel Natural Gas Natural Gas N/A Approx Age ASHRAE Service Life Remaining Life Comments

45 Appendix D Page 2 of 6 Rooftop / AC Units Tag Unit Type Vertical Classroom Unit Qty 1 Location Area Served Manufacturer Model # Serial # Cooling Type Cooling Capacity (Tons) Cooling Efficiency (SEER/EER) Heating Type Heating Input (MBH) Efficiency Fuel Classroom Classroom Airedale CMX-2 PA U25763 DX Coil 2-Tons SEER = 10.3 HW Coil 74 MBH N/A Natural Gas Approx Age 5 ASHRAE Service Life 15 Remaining Life 10 Comments

46 Appendix D Page 3 of 6 MAJOR EQUIPMENT LIST Concord Engineering Group Ethel M. Burke Elementary School Boilers Tag Boiler-1 & 2 Unit Type Modular Gas-Fired Qty 2 Location Area Served Manufacturer Model # Basement Boiler Room Entire Facility Lochinvar Power-Fin PBN1000 Serial # D & 68 Input Capacity (MBH) Rated Output Capacity (MBH) Approx. Efficiency % Fuel 1,000 MBH 880 MBH 80% (existing) Natural Gas Approx Age 18 ASHRAE Service Life 20 Remaining Life 2 Comments

47 Appendix D Page 4 of 6 MAJOR EQUIPMENT LIST Concord Engineering Group Ethel M. Burke Elementary School Domestic Water Heaters Tag HWH-1 HWH-2 Unit Type Electric DHW Heater Gas-Fired DHW Heater Qty 1 1 Location Boiler RM (Basement) Mechanical Room Area Served Entire Facility Except Kitchen Kitchen Manufacturer Bradford White Bradford White Model # M-1-80R6DS13 75T80B3N Serial # YM EA Size (Gallons) 80 gal 75 gal Input Capacity (MBH/KW) 4.5 kw per Element 76,000 BTUH Recovery (Gal/Hr) F Rise F Rise Efficiency % N/A 80% Fuel Electric Natural Gas Approx Age 8 2 ASHRAE Service Life Remaining Life 4 10 Comments

48 Appendix D Page 5 of 6 Pumps MAJOR EQUIPMENT LIST Concord Engineering Group Ethel M. Burke Elementary School Tag Primary HW Pumps Secondary HW pump Unit Type In-Line Centrifugal Base-Mounted Centrifugal Qty 2 1 Location Basement Boiler Room Basement Boiler Room Area Served Entire Facility Entire Facility Manufacturer Aurora Aurora Model # 1.5 x 1.5 x 6 N/A Serial # N/A N/A Horse Power 1/2 HP 5 HP Flow FT HD FT HD Motor Info Aurora Emerson Electrical Power 208V/3 Phase 208V/3 Phase RPM Motor Efficiency % N/A 84.0% Approx Age ASHRAE Service Life Remaining Life 8 8 Comments

49 Pumps Tag Unit Type Secondary HW pump Base-Mounted Centrifugal Appendix D Page 6 of 6 Qty 1 Location Area Served Manufacturer Model # Serial # Horse Power Flow Motor Info Electrical Power Basement Boiler Room Entire Facility Aurora N/A N/A 5 HP FT HD U S Electric 208V/3 Phase RPM 1755 Motor Efficiency % 85.5% Approx Age 12 ASHRAE Service Life 20 Remaining Life 8 Comments

50 Investment Grade Lighting Audit APPENDIX E 1 of 8 CEG Job #: Project: Bellmawr School District Ethel M. Burke Elementary School KWH COST: $ South Black Horse Bellmawr, NJ Bldg. Sq. Ft. 31,617 ECM #1: Lighting Upgrade - General EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost INSTALLED Cost Savings Savings $ Savings Payback 744 Multi-Purpose Gym Teachers Office Storage Room Boy's Room Girl's Room Kitchen w MH "Shoe Box" Area Light 2x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt., No Lens 1x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt., No Lens 2x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens ,806.0 $2, Retrofit; 200w MH Pulse Start Lamp and Ballast; Venture Lighting $1, $ $3, $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ ,081.6 $ No Change $0.00 $0.00 $ $ Exit Signs (2) 7w CFL Exit Sign $ Exit Sign - LED $11.14 $65.00 $ $ Gym Corridor Corridor Corridor Principal's Office RM Women's Restroom Boy's Room RM Nurse x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x2, 2 Lamp, 17w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x4, 1 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Acrylic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x1 Surface Mount, Prismatic Lens, (2) 13w CFL Lamp 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens ,372.8 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ ,940.0 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ ,341.6 $ No Change $0.00 $0.00 $ $ ,341.6 $ No Change $0.00 $0.00 $ $

51 Investment Grade Lighting Audit APPENDIX E 2 of 8 ECM #1: Lighting Upgrade - General EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost INSTALLED Cost Savings Savings $ Savings Payback Restroom RM Custodian Closet RM Girl's Room Boiler Room RM Supply Room RM RM RM RM Faculty Room ESL Room Restroom Elect Room Faculty Room x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens Wall Mnt. Globe w/cage, (1) 60w A19 Lamps 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Wall Mnt. Globe w/cage, (1) 60w A19 Lamps 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 4 Lamp, 32w T8, Elect. Ballast, Surface Mnt., Prismatic Lens Wall Mnt. Globe w/cage, (1) 60w A19 Lamps Wall Mnt. Globe w/cage, (1) 60w A19 Lamps 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Wall Mnt. Globe w/cage, (1) 60w A19 Lamps 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant $ No Change $0.00 $0.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ $ Energy Star Rated, Dimmable 13w CFL Lamp $2.48 $20.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ Energy Star Rated, Dimmable 13w CFL Lamp $7.44 $20.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ ,683.2 $ No Change $0.00 $0.00 $ $ ,450.8 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ $ Energy Star Rated, Dimmable 13w CFL Lamp Energy Star Rated, Dimmable 13w CFL Lamp $21.50 $20.00 $ $ $5.37 $20.00 $ $ $ No Change $0.00 $0.00 $ $ $ Energy Star Rated, Dimmable 13w CFL Lamp $4.96 $20.00 $ $ ,934.4 $ No Change $0.00 $0.00 $ $ Exit Signs Incandescent Exit Sign $ Exit Sign - LED $11.14 $65.00 $ $

52 Investment Grade Lighting Audit APPENDIX E 3 of 8 ECM #1: Lighting Upgrade - General EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost INSTALLED Cost Savings Savings $ Savings Payback Incandescent Exit Sign $ Exit Sign - LED $2.79 $65.00 $ $ Faculty Room Exit Water Meter Room Basement Storage Maintenance Office Exit # Storage Room RM RM Girl's Room Boy's Room RM RM RM RM RM behind RM RM Wall Mnt. Globe w/cage, (1) 60w A19 Lamps Wall Mnt. Globe w/cage, (1) 60w A19 Lamps Wall Mnt. Globe w/cage, (1) 60w A19 Lamps 1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt., No Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed 1x1 Surface Mount, Prismatic Lens, (2) 60w A Lamp 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x1 Surface Mount, Prismatic Lens, (2) 60w A Lamp 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant $ $ $ Energy Star Rated, Dimmable 13w CFL Lamp Energy Star Rated, Dimmable 13w CFL Lamp Energy Star Rated, Dimmable 13w CFL Lamp $16.12 $20.00 $ $ $2.48 $20.00 $ $ $9.92 $20.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ w CFL Lamps $4.96 $25.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ w CFL Lamps $21.50 $25.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $ ,901.6 $ No Change $0.00 $0.00 $ $

53 Investment Grade Lighting Audit APPENDIX E 4 of 8 ECM #1: Lighting Upgrade - General EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost INSTALLED Cost Savings Savings $ Savings Payback Hallway Guidance Office Stairwell Stairwell x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ $ No Change $0.00 $0.00 $ $ Attic Storage w CFL Lamp $ No Change $0.00 $0.00 $ $ Entrance Lobby Exterior Lighting 2x2, 4 Lamp, 17w T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 70w HPS, 1x1 Surface Mnt., Prismatic Lens $ No Change $0.00 $0.00 $ $ ,048.0 $ No Change $0.00 $0.00 $ $ w HPS Wallpack ,963.2 $ No Change $0.00 $0.00 $ $ Totals ,389 $14, ,717 $1,863 $4, ,333 $1,

54 APPENDIX E 5 of 8 CEG Job #: Project: Bellmawr School District Ethel M. Burke Elementary School KWH COST: $0.159 Address: 112 South Black Horse Bellmawr, NJ Building SF: 31,617 FALSE ECM #2: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 744 Multi-Purpose w MH "Shoe Box" Area Light $2, No Change % $2, $ $ $ Gym Teachers Office x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Switch Mnt % $68.79 $75.00 $ $ Storage Room x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt., No Lens 1x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt., No Lens $ No Change % $44.27 $ $ $ $ No Change % $44.27 $ $ $ Boy's Room x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $68.79 $ $ $ Girl's Room x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $68.79 $ $ $ Kitchen x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed $ No Change % $ $ $ $ Exit Signs (2) 7w CFL Exit Sign $ No Change % $89.14 $ $ $ Gym Corridor x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed $ No Change % $ $ $ $ Corridor x2, 2 Lamp, 17w T8, Elect. Ballast, Recessed $ No Change % $23.79 $ $ $ Corridor x4, 1 Lamp, 32w T8, Elect. Ballast, Recessed Mnt., Acrylic Lens $ No Change % 5940 $ $ $ $ Principal's Office x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ Dual Technology Occupancy Sensor - Remote Mnt % $82.02 $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Women's Restroom Boy's Room x1 Surface Mount, Prismatic Lens, (2) 13w CFL Lamp 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ No Change % 67.6 $10.75 $ $ $ $ No Change % $51.26 $ $ $

55 APPENDIX E 6 of 8 ECM #2: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Nurse x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Switch Mnt % $ $75.00 $ $ Restroom x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ No Change % $35.55 $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Custodian Closet Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ No Change % 72 $11.45 $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Girl's Room x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ No Change % $51.26 $ $ $ Boiler Room Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ No Change % 216 $34.34 $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Supply Room x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ No Change % $23.66 $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ RM x4, 3 Lamp, 32w T8, Elect. Ballast, Recessed $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ RM x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Faculty Room x4, 4 Lamp, 32w T8, Elect. Ballast, Surface Mnt., $ No Change % $42.99 $ $ $ Prismatic Lens 611 ESL Room Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ Dual Technology Occupancy Sensor - Switch Mnt % $79.37 $75.00 $ $

56 APPENDIX E 7 of 8 ECM #2: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 611 Restroom Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ No Change % 156 $24.80 $ $ $ Elect Room x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ No Change % 74.4 $11.83 $ $ $ $ No Change % 144 $22.90 $ $ $ Faculty Room x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ Exit Signs Incandescent Exit Sign $ No Change % $ $ $ $ Incandescent Exit Sign $ No Change % $27.86 $ $ $ Faculty Room Exit Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ No Change % 468 $74.41 $ $ $ Water Meter Room Wall Mnt. Globe w/cage, (1) 60w A19 Lamps $ No Change % 72 $11.45 $ $ $ Basement Storage Wall Mnt. Globe w/cage, (1) 60w A19 Lamps 1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt., No Lens $ No Change % 288 $45.79 $ $ $ $ No Change % $22.13 $ $ $ Maintenance Office Exit # x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., Prismatic Lens $ No Change % $25.63 $ $ $ $ No Change % $51.26 $ $ $ Storage Room x1 Surface Mount, Prismatic Lens, (2) 60w A Lamp $ No Change % 144 $22.90 $ $ $ RM RM Girl's Room x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ $ Dual Technology Occupancy Sensor - Remote Mnt. Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ % $ $ $ $ $ No Change % $51.26 $ $ $

57 APPENDIX E 8 of 8 ECM #2: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Cont. Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 610 Boy's Room x1 Surface Mount, Prismatic Lens, (2) 60w A Lamp $ Dual Technology Occupancy Sensor - Remote Mnt % $79.37 $ $ $ RM RM RM RM RM RM Hallway Guidance Office Stairwell Stairwell x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 2x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Recessed Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens 1x4, 2 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Prismatic Lens $ $ $ $ $ $ Dual Technology Occupancy Sensor - Remote Mnt. Dual Technology Occupancy Sensor - Remote Mnt. Dual Technology Occupancy Sensor - Remote Mnt. Dual Technology Occupancy Sensor - Remote Mnt. Dual Technology Occupancy Sensor - Remote Mnt. Dual Technology Occupancy Sensor - Remote Mnt % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ % $ $ $ $ $ No Change % $86.75 $ $ $ $ No Change % $51.26 $ $ $ $ No Change % $86.75 $ $ $ $ No Change % 0 $0.00 $ $ $ Attic Storage w CFL Lamp $ No Change % 0 $0.00 $ $ $ Entrance Lobby x2, 4 Lamp, 17w T8, Elect. Ballast, Recessed $ No Change % 0 $0.00 $ $ $ Exterior Lighting 70w HPS, 1x1 Surface $ No Change % 0 $0.00 $ $ $ w HPS Wallpack $ No Change % $ $ $ $ Totals ,165.8 $14, ,918.1 $12, $3, ,248 $2,

58 Appendix F Page 1 of 2 Project Name: LGEA Solar PV Project - Ethel M. Burke ES Location: Bellmawr, NJ Description: Photovoltaic System - Direct Purchase Simple Payback Analysis Photovoltaic System - Direct Purchase Total Construction Cost $20,700 Annual kwh Production 2,995 Annual Energy Cost Reduction $476 Annual SREC Revenue $1,048 First Cost Premium Simple Payback: $20, Years Life Cycle Cost Analysis Analysis Period (years): 25 Financing %: 0% Financing Term (mths): 0 Maintenance Escalation Rate: 3.0% Average Energy Cost ($/kwh) $0.159 Energy Cost Escalation Rate: 3.0% Financing Rate: 0.00% SREC Value ($/kwh) $0.350 Period Additional Energy kwh Energy Cost Additional SREC Net Cash Cumulative Cash Outlay Production Savings Maint Costs Revenue Flow Cash Flow 0 $20, $0 (20,700) 0 1 $0 2,995 $476 $0 $1,048 $1,524 ($19,176) 2 $0 2,980 $490 $0 $1,043 $1,533 ($17,642) 3 $0 2,965 $505 $0 $1,038 $1,543 ($16,099) 4 $0 2,950 $520 $0 $1,033 $1,553 ($14,546) 5 $0 2,936 $536 $30 $1,027 $1,533 ($13,013) 6 $0 2,921 $552 $30 $1,022 $1,544 ($11,469) 7 $0 2,906 $569 $30 $1,017 $1,556 ($9,913) 8 $0 2,892 $586 $30 $1,012 $1,568 ($8,345) 9 $0 2,877 $603 $30 $1,007 $1,581 ($6,764) 10 $0 2,863 $621 $29 $1,002 $1,594 ($5,170) 11 $0 2,849 $640 $29 $997 $1,608 ($3,563) 12 $0 2,834 $659 $29 $992 $1,622 ($1,941) 13 $0 2,820 $679 $29 $987 $1,637 ($304) 14 $0 2,806 $699 $29 $982 $1,653 $1, $0 2,792 $720 $29 $977 $1,669 $3, $0 2,778 $742 $29 $972 $1,686 $4, $0 2,764 $764 $28 $967 $1,703 $6, $0 2,750 $787 $28 $963 $1,721 $8, $0 2,737 $811 $28 $958 $1,740 $9, $0 2,723 $835 $28 $953 $1,760 $11, $1 2,709 $860 $28 $948 $1,780 $13, $2 2,696 $886 $28 $944 $1,802 $15, $3 2,682 $912 $28 $939 $1,824 $17, $4 2,669 $940 $27 $934 $1,846 $18, $5 2,656 $968 $27 $929 $1,870 $20,750 Totals: 70,550 $17,362 $604 $24,693 $41,450 $2,441 Net Present Value (NPV) Internal Rate of Return (IRR) $20, %

59 Appendix F Page 2 of 2 Building Roof Area (sq ft) Ethel M. Burke 2060 Panel Qty Sunpower SPR230 Panel Sq Ft Panel Total Sq Ft Total KW DC Total Annual kwh Panel Weight (33 lbs) W/SQFT , = Proposed PV Layout Notes: 1. Estimated kwh based on the National Renewable Energy Laboratory PVWatts Version 1 Calculator Program.

BELLMAWR BOROUGH SCHOOL DISTRICT BELL OAKS MIDDLE SCHOOL 256 ANDERSON AVENUE BELLMAWR, NJ FACILITY ENERGY REPORT

BELLMAWR BOROUGH SCHOOL DISTRICT BELL OAKS MIDDLE SCHOOL 256 ANDERSON AVENUE BELLMAWR, NJ FACILITY ENERGY REPORT BELLMAWR BOROUGH SCHOOL DISTRICT BELL OAKS MIDDLE SCHOOL 256 ANDERSON AVENUE BELLMAWR, NJ 08031 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ 08723 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS GEORGE BAKER ELEMENTARY SCHOOL FACILITY ENERGY REPORT 139 WEST MAPLE AVENUE MOORESTOWN, NJ 08057

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS GEORGE BAKER ELEMENTARY SCHOOL FACILITY ENERGY REPORT 139 WEST MAPLE AVENUE MOORESTOWN, NJ 08057 MOORESTOWN TOWNSHIP PUBLIC SCHOOLS GEORGE BAKER ELEMENTARY SCHOOL 139 WEST MAPLE AVENUE MOORESTOWN, NJ 08057 FACILITY ENERGY REPORT Moorestown Township Public Schools George Baker TABLE OF CONTENTS I.

More information

HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 4 TAUNTON DR HOWELL, NJ 07731

HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 4 TAUNTON DR HOWELL, NJ 07731 HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL 4 TAUNTON DR HOWELL, NJ 07731 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR

More information

VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, FACILITY ENERGY REPORT

VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, FACILITY ENERGY REPORT VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, 08043 FACILITY ENERGY REPORT Voorhees Township Public Schools Osage Elementary School TABLE OF CONTENTS

More information

WEST DEPTFORD TOWNSHIP PUBLIC SCHOOL DISTRICT OAKVIEW ELEMENTARY SCHOOL FACILITY ENERGY REPORT 350 DUBOIS AVENUE WOODBURY, NJ 08096

WEST DEPTFORD TOWNSHIP PUBLIC SCHOOL DISTRICT OAKVIEW ELEMENTARY SCHOOL FACILITY ENERGY REPORT 350 DUBOIS AVENUE WOODBURY, NJ 08096 WEST DEPTFORD TOWNSHIP PUBLIC SCHOOL DISTRICT OAKVIEW ELEMENTARY SCHOOL 350 DUBOIS AVENUE WOODBURY, NJ 08096 FACILITY ENERGY REPORT West Deptford Twp. Public Schools Oakview Elementary School TABLE OF

More information

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS MOORESTOWN HIGH SCHOOL FACILITY ENERGY REPORT 350 BRIDGEBORO ROAD MOORESTOWN, NJ 08057

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS MOORESTOWN HIGH SCHOOL FACILITY ENERGY REPORT 350 BRIDGEBORO ROAD MOORESTOWN, NJ 08057 MOORESTOWN TOWNSHIP PUBLIC SCHOOLS MOORESTOWN HIGH SCHOOL 350 BRIDGEBORO ROAD MOORESTOWN, NJ 08057 FACILITY ENERGY REPORT Moorestown Township Public Schools High School Energy Audit TABLE OF CONTENTS I.

More information

CHERRY HILL TOWNSHIP SCHOOLS THOMAS PAINE ELEMENTARY 4001 CHURCH ROAD CHERRY HILL, NJ FACILITY ENERGY REPORT

CHERRY HILL TOWNSHIP SCHOOLS THOMAS PAINE ELEMENTARY 4001 CHURCH ROAD CHERRY HILL, NJ FACILITY ENERGY REPORT CHERRY HILL TOWNSHIP SCHOOLS THOMAS PAINE ELEMENTARY 4001 CHURCH ROAD CHERRY HILL, NJ 08034 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

HADDON TOWNSHIP WATER TREATMENT PLANT BEECHWOOD AVENUE, NEAR RHOADS AVENUE WESTMONT, NJ FACILITY ENERGY REPORT

HADDON TOWNSHIP WATER TREATMENT PLANT BEECHWOOD AVENUE, NEAR RHOADS AVENUE WESTMONT, NJ FACILITY ENERGY REPORT HADDON TOWNSHIP WATER TREATMENT PLANT BEECHWOOD AVENUE, NEAR RHOADS AVENUE WESTMONT, NJ 08108 FACILITY ENERGY REPORT Haddon Township Water Treatment Plant TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

CLIFTON PUBLIC SCHOOLS CHRISTOPHER COLUMBUS MIDDLE SCHOOL 350 PIAGET AVENUE CLIFTON, NEW JERSEY FACILITY ENERGY REPORT

CLIFTON PUBLIC SCHOOLS CHRISTOPHER COLUMBUS MIDDLE SCHOOL 350 PIAGET AVENUE CLIFTON, NEW JERSEY FACILITY ENERGY REPORT CLIFTON PUBLIC SCHOOLS CHRISTOPHER COLUMBUS MIDDLE SCHOOL 350 PIAGET AVENUE CLIFTON, NEW JERSEY 07011 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

LONG HILL TOWNSHIP SCHOOL DISTRICT CENTRAL SCHOOL FACILITY ENERGY REPORT 90 CENTRAL AVENUE STIRLING, NJ 07980

LONG HILL TOWNSHIP SCHOOL DISTRICT CENTRAL SCHOOL FACILITY ENERGY REPORT 90 CENTRAL AVENUE STIRLING, NJ 07980 LONG HILL TOWNSHIP SCHOOL DISTRICT CENTRAL SCHOOL 90 CENTRAL AVENUE STIRLING, NJ 07980 FACILITY ENERGY REPORT Long Hill Twp. School District Central School TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017 EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017 FACILITY ENERGY REPORT East Orange School District Gordon Parks Academy TABLE OF CONTENTS I. HISTORIC

More information

WALDWICK BOARD OF EDUCATION WALDWICK MIDDLE & HIGH SCHOOL FACILITY ENERGY REPORT 155 WYCOFF AVENUE WALDWICK, NJ 07463

WALDWICK BOARD OF EDUCATION WALDWICK MIDDLE & HIGH SCHOOL FACILITY ENERGY REPORT 155 WYCOFF AVENUE WALDWICK, NJ 07463 WALDWICK BOARD OF EDUCATION WALDWICK MIDDLE & HIGH SCHOOL 155 WYCOFF AVENUE WALDWICK, NJ 07463 FACILITY ENERGY REPORT Waldwick BOE Waldwick Middle & High School TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017 EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017 FACILITY ENERGY REPORT East Orange School District Dionne Warwick Institute TABLE OF CONTENTS I. HISTORIC

More information

BERGEN COUNTY WILLIAMS CENTER FOR THE ARTS 15 SYLVAN ST RUTHERFORD, NJ, FACILITY ENERGY REPORT

BERGEN COUNTY WILLIAMS CENTER FOR THE ARTS 15 SYLVAN ST RUTHERFORD, NJ, FACILITY ENERGY REPORT BERGEN COUNTY WILLIAMS CENTER FOR THE ARTS 15 SYLVAN ST RUTHERFORD, NJ, 07070 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR

More information

GLOUCESTER TOWNSHIP BOARD OF EDUCATION C.W. LEWIS MIDDLE SCHOOL / DEPARTMENT OF INSTRUCTION FACILITY ENERGY REPORT 875 ERIAL ROAD BLACKWOOD, NJ 08012

GLOUCESTER TOWNSHIP BOARD OF EDUCATION C.W. LEWIS MIDDLE SCHOOL / DEPARTMENT OF INSTRUCTION FACILITY ENERGY REPORT 875 ERIAL ROAD BLACKWOOD, NJ 08012 GLOUCESTER TOWNSHIP BOARD OF EDUCATION C.W. LEWIS MIDDLE SCHOOL / DEPARTMENT OF INSTRUCTION 875 ERIAL ROAD BLACKWOOD, NJ 08012 FACILITY ENERGY REPORT Gloucester Township BOE C.W. Lewis Audit TABLE OF CONTENTS

More information

BRICK TOWNSHIP BOARD OF EDUCATION TRANSPORTATION BUILDING B 346 CHAMBERS BRIDGE ROAD BRICK, NJ FACILITY ENERGY REPORT

BRICK TOWNSHIP BOARD OF EDUCATION TRANSPORTATION BUILDING B 346 CHAMBERS BRIDGE ROAD BRICK, NJ FACILITY ENERGY REPORT BRICK TOWNSHIP BOARD OF EDUCATION TRANSPORTATION BUILDING B 346 CHAMBERS BRIDGE ROAD BRICK, NJ 08723 FACILITY ENERGY REPORT Brick Township BOE Transportation Garage TABLE OF CONTENTS I. HISTORIC ENERGY

More information

HADDON TOWNSHIP CRYSTAL LAKE POOL COMPLEX WEST PARK DRIVE & CRYSTAL LAKE AVENUE WESTMONT, NJ FACILITY ENERGY REPORT

HADDON TOWNSHIP CRYSTAL LAKE POOL COMPLEX WEST PARK DRIVE & CRYSTAL LAKE AVENUE WESTMONT, NJ FACILITY ENERGY REPORT HADDON TOWNSHIP CRYSTAL LAKE POOL COMPLEX WEST PARK DRIVE & CRYSTAL LAKE AVENUE WESTMONT, NJ 08108 FACILITY ENERGY REPORT Haddon Township Crystal Lake Pool Concession Stand TABLE OF CONTENTS I. HISTORIC

More information

NEW BRUNSWICK BOARD OF EDUCATION PAUL ROBESON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 199 COMMERCIAL AVENUE NEW BRUNSWICK, NJ 08901

NEW BRUNSWICK BOARD OF EDUCATION PAUL ROBESON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 199 COMMERCIAL AVENUE NEW BRUNSWICK, NJ 08901 NEW BRUNSWICK BOARD OF EDUCATION PAUL ROBESON ELEMENTARY SCHOOL 199 COMMERCIAL AVENUE NEW BRUNSWICK, NJ 08901 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY

More information

CHERRY HILL TOWNSHIP SCHOOLS CHERRY HILL HIGH SCHOOL EAST 1750 KRESSON ROAD CHERRY HILL, NJ FACILITY ENERGY REPORT

CHERRY HILL TOWNSHIP SCHOOLS CHERRY HILL HIGH SCHOOL EAST 1750 KRESSON ROAD CHERRY HILL, NJ FACILITY ENERGY REPORT CHERRY HILL TOWNSHIP SCHOOLS CHERRY HILL HIGH SCHOOL EAST 1750 KRESSON ROAD CHERRY HILL, NJ 08003 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

MIDDLESEX BOARD OF EDUCATION HAZELWOOD ELEMENTARY SCHOOL FACILITY ENERGY REPORT 800 HAZELWOOD AVENUE MIDDLESEX, NJ 08846

MIDDLESEX BOARD OF EDUCATION HAZELWOOD ELEMENTARY SCHOOL FACILITY ENERGY REPORT 800 HAZELWOOD AVENUE MIDDLESEX, NJ 08846 MIDDLESEX BOARD OF EDUCATION HAZELWOOD ELEMENTARY SCHOOL 800 HAZELWOOD AVENUE MIDDLESEX, NJ 08846 FACILITY ENERGY REPORT Middlesex Board of Education Hazelwood Elementary School TABLE OF CONTENTS I. HISTORIC

More information

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS SOUTH VALLEY ELEMENTARY SCHOOL FACILITY ENERGY REPORT 210 SOUTH STANWICK ROAD MOORESTOWN, NJ 08057

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS SOUTH VALLEY ELEMENTARY SCHOOL FACILITY ENERGY REPORT 210 SOUTH STANWICK ROAD MOORESTOWN, NJ 08057 MOORESTOWN TOWNSHIP PUBLIC SCHOOLS SOUTH VALLEY ELEMENTARY SCHOOL 210 SOUTH STANWICK ROAD MOORESTOWN, NJ 08057 FACILITY ENERGY REPORT Moorestown Township Public Schools South Valley TABLE OF CONTENTS I.

More information

GLOUCESTER TOWNSHIP BOARD OF EDUCATION ANNA A. MULLEN MIDDLE SCHOOL FACILITY ENERGY REPORT 1400 SICKLERVILLE ROAD SICKLERVILLE, NJ 08081

GLOUCESTER TOWNSHIP BOARD OF EDUCATION ANNA A. MULLEN MIDDLE SCHOOL FACILITY ENERGY REPORT 1400 SICKLERVILLE ROAD SICKLERVILLE, NJ 08081 GLOUCESTER TOWNSHIP BOARD OF EDUCATION ANNA A. MULLEN MIDDLE SCHOOL 1400 SICKLERVILLE ROAD SICKLERVILLE, NJ 08081 FACILITY ENERGY REPORT Gloucester Township BOE Ann A. Mullen Middle School Audit TABLE

More information

BERGEN COUNTY VOTING MACHINE WAREHOUSE 660 GOTHAM PKWY CARLSTADT, NJ FACILITY ENERGY REPORT

BERGEN COUNTY VOTING MACHINE WAREHOUSE 660 GOTHAM PKWY CARLSTADT, NJ FACILITY ENERGY REPORT BERGEN COUNTY VOTING MACHINE WAREHOUSE 660 GOTHAM PKWY CARLSTADT, NJ 07072 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR EQUIPMENT

More information

NEW BRUNSWICK BOARD OF EDUCATION WOODROW WILSON SCHOOL FACILITY ENERGY REPORT 133 TUNISON ROAD NEW BRUNSWICK, NJ 08901

NEW BRUNSWICK BOARD OF EDUCATION WOODROW WILSON SCHOOL FACILITY ENERGY REPORT 133 TUNISON ROAD NEW BRUNSWICK, NJ 08901 NEW BRUNSWICK BOARD OF EDUCATION WOODROW WILSON SCHOOL 133 TUNISON ROAD NEW BRUNSWICK, NJ 08901 FACILITY ENERGY REPORT New Brunswick Board of Education Woodrow Wilson Elementary School TABLE OF CONTENTS

More information

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #14 99 ST. ANDREWS BOULEVARD CLIFTON, NEW JERSEY FACILITY ENERGY REPORT

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #14 99 ST. ANDREWS BOULEVARD CLIFTON, NEW JERSEY FACILITY ENERGY REPORT CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #14 99 ST. ANDREWS BOULEVARD CLIFTON, NEW JERSEY 07012 FACILITY ENERGY REPORT Clifton Public Schools School #14 TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #4 194 WEST SECOND STREET CLIFTON, NEW JERSEY FACILITY ENERGY REPORT

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #4 194 WEST SECOND STREET CLIFTON, NEW JERSEY FACILITY ENERGY REPORT CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #4 194 WEST SECOND STREET CLIFTON, NEW JERSEY 07011 FACILITY ENERGY REPORT Clifton Public Schools School #4 TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

GLOUCESTER TOWNSHIP BOARD OF EDUCATION UNION VALLEY ELEMENTARY SCHOOL FACILITY ENERGY REPORT 1300 JARVIS ROAD SICKLERVILLE, NJ 08081

GLOUCESTER TOWNSHIP BOARD OF EDUCATION UNION VALLEY ELEMENTARY SCHOOL FACILITY ENERGY REPORT 1300 JARVIS ROAD SICKLERVILLE, NJ 08081 GLOUCESTER TOWNSHIP BOARD OF EDUCATION UNION VALLEY ELEMENTARY SCHOOL 1300 JARVIS ROAD SICKLERVILLE, NJ 08081 FACILITY ENERGY REPORT Gloucester Township BOE Union Valley Elementary TABLE OF CONTENTS I.

More information

BERGEN COUNTY PROBATION OFFICE 133 RIVER ST. HACKENSACK, NJ FACILITY ENERGY REPORT

BERGEN COUNTY PROBATION OFFICE 133 RIVER ST. HACKENSACK, NJ FACILITY ENERGY REPORT BERGEN COUNTY PROBATION OFFICE 133 RIVER ST. HACKENSACK, NJ 07601 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR EQUIPMENT LIST...

More information

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #3 365 WASHINGTON AVENUE CLIFTON, NEW JERSEY FACILITY ENERGY REPORT

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #3 365 WASHINGTON AVENUE CLIFTON, NEW JERSEY FACILITY ENERGY REPORT CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #3 365 WASHINGTON AVENUE CLIFTON, NEW JERSEY 07011 FACILITY ENERGY REPORT Clifton Public Schools School #3 TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

BERGEN COUNTY VALLEY BROOK GOLF CLUBHOUSE 15 RIVERVALE ROAD RIVER VALE, NJ FACILITY ENERGY REPORT

BERGEN COUNTY VALLEY BROOK GOLF CLUBHOUSE 15 RIVERVALE ROAD RIVER VALE, NJ FACILITY ENERGY REPORT BERGEN COUNTY VALLEY BROOK GOLF CLUBHOUSE 15 RIVERVALE ROAD RIVER VALE, NJ 07675 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7 III. MAJOR

More information

EVESHAM TOWNSHIP SCHOOL DISTRICT RICHARD L. RICE ELEMENTARY FACILITY ENERGY REPORT 50 CROWN ROYAL PARKWAY MARLTON, NJ 08053

EVESHAM TOWNSHIP SCHOOL DISTRICT RICHARD L. RICE ELEMENTARY FACILITY ENERGY REPORT 50 CROWN ROYAL PARKWAY MARLTON, NJ 08053 EVESHAM TOWNSHIP SCHOOL DISTRICT RICHARD L. RICE ELEMENTARY 50 CROWN ROYAL PARKWAY MARLTON, NJ 08053 FACILITY ENERGY REPORT Evesham Twp. Richard L. Rice School Audit TABLE OF CONTENTS I. HISTORIC ENERGY

More information

WOODBURY CITY PUBLIC SCHOOLS WEST END MEMORIAL ELEMENTARY FACILITY ENERGY REPORT 215 QUEEN STREET WOODBURY, NJ 08096

WOODBURY CITY PUBLIC SCHOOLS WEST END MEMORIAL ELEMENTARY FACILITY ENERGY REPORT 215 QUEEN STREET WOODBURY, NJ 08096 WOODBURY CITY PUBLIC SCHOOLS WEST END MEMORIAL ELEMENTARY 215 QUEEN STREET WOODBURY, NJ 08096 FACILITY ENERGY REPORT Woodbury School District - West End Memorial Elementary Energy Audit TABLE OF CONTENTS

More information

CITY OF PLEASANTVILLE POLICE DEPARTMENT 17 NORTH FIRST STREET PLEASANTVILLE, NJ FACILITY ENERGY REPORT

CITY OF PLEASANTVILLE POLICE DEPARTMENT 17 NORTH FIRST STREET PLEASANTVILLE, NJ FACILITY ENERGY REPORT CITY OF PLEASANTVILLE POLICE DEPARTMENT 17 NORTH FIRST STREET PLEASANTVILLE, NJ 08232 FACILITY ENERGY REPORT City of Pleasantville Police Department TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

PATERSON CHARTER SCHOOL K-6 CAMPUS FACILITY ENERGY REPORT 276 WABASH AVENUE PATERSON, NEW JERSEY 07502

PATERSON CHARTER SCHOOL K-6 CAMPUS FACILITY ENERGY REPORT 276 WABASH AVENUE PATERSON, NEW JERSEY 07502 PATERSON CHARTER SCHOOL K-6 CAMPUS 276 WABASH AVENUE PATERSON, NEW JERSEY 07502 FACILITY ENERGY REPORT Paterson Charter School Grades K-6 Campus Energy Audit TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

EVESHAM TOWNSHIP SCHOOL DISTRICT MARLTON ELEMENTARY FACILITY ENERGY REPORT 190 TOMLINSON MILL ROAD MARLTON, NJ 08053

EVESHAM TOWNSHIP SCHOOL DISTRICT MARLTON ELEMENTARY FACILITY ENERGY REPORT 190 TOMLINSON MILL ROAD MARLTON, NJ 08053 EVESHAM TOWNSHIP SCHOOL DISTRICT MARLTON ELEMENTARY 190 TOMLINSON MILL ROAD MARLTON, NJ 08053 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

WOODBURY CITY SCHOOL DISTRICT WALNUT STREET ELEMENTARY FACILITY ENERGY REPORT 60 WALNUT STREET WOODBURY, NJ 08096

WOODBURY CITY SCHOOL DISTRICT WALNUT STREET ELEMENTARY FACILITY ENERGY REPORT 60 WALNUT STREET WOODBURY, NJ 08096 WOODBURY CITY SCHOOL DISTRICT WALNUT STREET ELEMENTARY 60 WALNUT STREET WOODBURY, NJ 08096 FACILITY ENERGY REPORT Woodbury School District Walnut Street Elementary TABLE OF CONTENTS I. HISTORIC ENERGY

More information

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS UPPER ELEMENTARY SCHOOL FACILITY ENERGY REPORT 325 BORTON LANDING ROAD MOORESTOWN, NJ 08057

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS UPPER ELEMENTARY SCHOOL FACILITY ENERGY REPORT 325 BORTON LANDING ROAD MOORESTOWN, NJ 08057 MOORESTOWN TOWNSHIP PUBLIC SCHOOLS UPPER ELEMENTARY SCHOOL 325 BORTON LANDING ROAD MOORESTOWN, NJ 08057 FACILITY ENERGY REPORT Moorestown Township Public Schools Upper Elementary School Audit TABLE OF

More information

MEDFORD TOWNSHIP SCHOOL DISTRICT MEMORIAL MIDDLE SCHOOL 55 MILL STREET MEDFORD, NJ FACILITY ENERGY REPORT

MEDFORD TOWNSHIP SCHOOL DISTRICT MEMORIAL MIDDLE SCHOOL 55 MILL STREET MEDFORD, NJ FACILITY ENERGY REPORT MEDFORD TOWNSHIP SCHOOL DISTRICT MEMORIAL MIDDLE SCHOOL 55 MILL STREET MEDFORD, NJ 08055 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION... 7

More information

WILLIAM PATERSON UNIVERSITY STUDENT CENTER FACILITY ENERGY REPORT 300 POMPTON ROAD WAYNE, NJ 07470

WILLIAM PATERSON UNIVERSITY STUDENT CENTER FACILITY ENERGY REPORT 300 POMPTON ROAD WAYNE, NJ 07470 WILLIAM PATERSON UNIVERSITY STUDENT CENTER 300 POMPTON ROAD WAYNE, NJ 07470 FACILITY ENERGY REPORT William Paterson University Student Center TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2

More information

MONMOUTH COUNTY MOSQUITO EXTERMINATION ANNEX BUILDING FACILITY ENERGY REPORT SILOAM ROAD FREEHOLD, NJ 07724

MONMOUTH COUNTY MOSQUITO EXTERMINATION ANNEX BUILDING FACILITY ENERGY REPORT SILOAM ROAD FREEHOLD, NJ 07724 MONMOUTH COUNTY MOSQUITO EXTERMINATION ANNEX BUILDING SILOAM ROAD FREEHOLD, NJ 07724 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY ENERGY USE INDEX (EUI)...

More information

OLD BRIDGE TOWNSHIP ICE RINK FACILITY ENERGY REPORT ONE OLD BRIDGE PLAZA OLD BRIDGE, NJ 08857

OLD BRIDGE TOWNSHIP ICE RINK FACILITY ENERGY REPORT ONE OLD BRIDGE PLAZA OLD BRIDGE, NJ 08857 OLD BRIDGE TOWNSHIP ICE RINK ONE OLD BRIDGE PLAZA OLD BRIDGE, NJ 08857 FACILITY ENERGY REPORT Old Bridge Township Ice Rink TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY DESCRIPTION...

More information

MONROE TOWNSHIP MUNICIPAL BUILDING FACILITY ENERGY REPORT 1 MUNICIPAL PLAZA MONROE TOWNSHIP, NEW JERSEY 08831

MONROE TOWNSHIP MUNICIPAL BUILDING FACILITY ENERGY REPORT 1 MUNICIPAL PLAZA MONROE TOWNSHIP, NEW JERSEY 08831 MONROE TOWNSHIP MUNICIPAL BUILDING 1 MUNICIPAL PLAZA MONROE TOWNSHIP, NEW JERSEY 08831 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY ENERGY USE INDEX (EUI)...

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: i Energy Audit Report Lift Station #1, 3, 5, 6, 7, 8, and 9 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT PREPARED FOR: MT. OLIVE TWP. SCHOOL DISTRICT CHESTER M. STEPHENS ELEMENTARY SCHOOL 99 SUNSET DRIVE BUDD LAKE, NJ, 07828 ATTN: MR. THOMAS SCERBO

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report West Cape May Elementary School West Cape May Board of Education Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution

More information

SUMMARY OF SERVICES & INCENTIVES

SUMMARY OF SERVICES & INCENTIVES SMALL BUSINESS PROGRAM 2017 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2017 Last updated February 1, 2017 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Small Business Program offers

More information

LEAP ACADEMY UNIVERSITY CHARTER SCHOOL UPPER SCHOOL FACILITY ENERGY REPORT 549 COOPER STREET CAMDEN, NEW JERSEY 08102

LEAP ACADEMY UNIVERSITY CHARTER SCHOOL UPPER SCHOOL FACILITY ENERGY REPORT 549 COOPER STREET CAMDEN, NEW JERSEY 08102 LEAP ACADEMY UNIVERSITY CHARTER SCHOOL UPPER SCHOOL 549 COOPER STREET CAMDEN, NEW JERSEY 08102 FACILITY ENERGY REPORT LEAP Academy University Charter School Upper School TABLE OF CONTENTS I. HISTORIC ENERGY

More information

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24473 September 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973)

More information

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity Energy Accounting & Education Energy Managers Kermit King School District of La Crosse John Daily School District of Holmen 1 Topics (Electricity) Creating electricity Defining degree days Customer charges

More information

WILLIAM PATERSON UNIVERSITY BEN SHAHN CENTER FACILITY ENERGY REPORT 300 POMPTON ROAD WAYNE, NJ 07470

WILLIAM PATERSON UNIVERSITY BEN SHAHN CENTER FACILITY ENERGY REPORT 300 POMPTON ROAD WAYNE, NJ 07470 WILLIAM PATERSON UNIVERSITY BEN SHAHN CENTER 300 POMPTON ROAD WAYNE, NJ 07470 FACILITY ENERGY REPORT William Paterson University Ben Shahn Center TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

MEDFORD TOWNSHIP SCHOOL DISTRICT TAUNTON FORGE ELEMENTARY 32 EVERGREEN TRAIL MEDFORD, NEW JERSEY FACILITY ENERGY REPORT

MEDFORD TOWNSHIP SCHOOL DISTRICT TAUNTON FORGE ELEMENTARY 32 EVERGREEN TRAIL MEDFORD, NEW JERSEY FACILITY ENERGY REPORT MEDFORD TOWNSHIP SCHOOL DISTRICT TAUNTON FORGE ELEMENTARY 32 EVERGREEN TRAIL MEDFORD, NEW JERSEY 08055 FACILITY ENERGY REPORT Medford School District Taunton Forge Elementary TABLE OF CONTENTS I. HISTORIC

More information

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Energy Auditing for Schools Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Schools Consumption breakdown 19% 6% 9% Space Heating 46% Water Heating Lighting Cooling 20%

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013 Deep Energy Retrofit Modeling and Effectiveness Study: A Technical Policy Brief January 2013 Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 BUILDING 1... 7 BUILDING 2... 9 BUILDING 3... 11

More information

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC LIBRARY ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Hamilton Bus Garage Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of

More information

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company. Report To: Mr. John Smith Smith Printing Company ENERGY AUDIT 123 Main Street Mississauga, Ontario January 1, 2009 120 Carlton Street, Suite 212 Toronto, Ontario M5A 4K2 Tel 416-964-3246 Toll Free 1-866-964-3246

More information

CLIFTON PUBLIC SCHOOLS TRANSPORTATION BUILDING 94 SYLVAN AVENUE CLIFTON, NEW JERSEY FACILITY ENERGY REPORT

CLIFTON PUBLIC SCHOOLS TRANSPORTATION BUILDING 94 SYLVAN AVENUE CLIFTON, NEW JERSEY FACILITY ENERGY REPORT CLIFTON PUBLIC SCHOOLS TRANSPORTATION BUILDING 94 SYLVAN AVENUE CLIFTON, NEW JERSEY 07013 FACILITY ENERGY REPORT Clifton Public Schools Transportation Building TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST...

More information

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT Report Clayville Elementary School October 2016 3 George Washington Highway, Clayville, RI 02815 Clayville Elementary School Summary of Findings On behalf of the School Building Authority at Rhode Island

More information

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345 ENERGY MANAGEMENT PLAN - HEADQUARTERS ABC Winery 123 1st Street Franklin, NJ 12345 TABLE OF CONTENTS Executive Summary 3 Background and Site Information 3 Summary 3 Energy Conservation Opportunities 4

More information

LOGO. Trivium Level II Energy Audit

LOGO. Trivium Level II Energy Audit LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description

More information

FACILITY ENERGY REPORT

FACILITY ENERGY REPORT LOWER TOWNSHIP BOARD OF EDUCATION CHARLES W. SANDMAN CONSOLIDATED ELEMENTARY SCHOOL 838 Seashore Road Cape May, New Jersey 08204 FACILITY ENERGY REPORT Lower Township B.O.E. Charles W. Sandman Consolidated

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Abbott and Costello Center Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

WATCHUNG BOARD OF EDUCATION VALLEY VIEW SCHOOL FACILITY ENERGY REPORT 50 VALLEY VIEW ROAD WATCHUNG, NEW JERSEY 07069

WATCHUNG BOARD OF EDUCATION VALLEY VIEW SCHOOL FACILITY ENERGY REPORT 50 VALLEY VIEW ROAD WATCHUNG, NEW JERSEY 07069 WATCHUNG BOARD OF EDUCATION VALLEY VIEW SCHOOL 50 VALLEY VIEW ROAD WATCHUNG, NEW JERSEY 07069 FACILITY ENERGY REPORT Watchung Board of Education Valley View School Energy Audit TABLE OF CONTENTS I. HISTORIC

More information

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager Glenn Barnes Environmental Finance Center University of North Carolina at Chapel Hill 919-962-2789 glennbarnes@sog.unc.edu Energy

More information

ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES

ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC UTILITIES ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT for NEW JERSEY BUREAU OF PUBLIC UTILITIES CHA PROJECT NO. 20556

More information

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856)

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856) ENERGY AUDIT FINAL REPORT JANUARY 6, 2010 UNION COUNTY COLLEGE ELIZABETH CAMPUS LESSNER BUILDING 12 W. JERSEY STREET ELIZABETH, NJ 07201 ATTN: MR. HENRY KEY, DIRECTOR OF FACILITIES CEG PROJECT NO. CONCORD

More information

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available?

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available? Why an Energy Efficiency Program? Business Solutions Energy Efficiency Incentive Program MPSC 21st Century Electric Energy Plan More electricity is needed as soon as practicable. One way of achieving this

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Montclair High School Montclair Board of Education 100 Chestnut Street Montclair, New Jersey 07402 Copyright 2019 TRC Energy Services. All rights reserved.

More information

ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016

ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016 BURLINGTON CITY PUBLIC SCHOOLS ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES September 2014

More information

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview Mike Meyers, Xcel Energy Commitment from Leadership Our energy conservation programs are especially valuable because they give

More information

TOWN OF DOVER DEPT. OF PUBLIC WORKS & RECREATION FACILITY ENERGY REPORT 211 N. SUSSEX STREET DOVER, NJ 07801

TOWN OF DOVER DEPT. OF PUBLIC WORKS & RECREATION FACILITY ENERGY REPORT 211 N. SUSSEX STREET DOVER, NJ 07801 TOWN OF DOVER DEPT. OF PUBLIC WORKS & RECREATION 211 N. SUSSEX STREET DOVER, NJ 07801 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY ENERGY USE INDEX (EUI)...

More information

ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318

ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318 PITTSGROVE TOWNSHIP SCHOOL DISTRICT ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES June 2014 Prepared by: 6 Campus

More information

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response Energy Efficient Equipment and Building Upgrades February 2013 Program Goals Save energy

More information

EAST ORANGE SCHOOL DISTRICT CICELY TYSON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 45 N. ARLINGTON AVENUE EAST ORANGE, NEW JERSEY

EAST ORANGE SCHOOL DISTRICT CICELY TYSON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 45 N. ARLINGTON AVENUE EAST ORANGE, NEW JERSEY EAST ORANGE SCHOOL DISTRICT CICELY TYSON ELEMENTARY SCHOOL 45 N. ARLINGTON AVENUE EAST ORANGE, NEW JERSEY FACILITY ENERGY REPORT East Orange School District Cicely Tyson Elementary Energy Audit TABLE OF

More information

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES CITY OF LINDEN J T GREGORIO CENTER 330 Helen Street Linden, NJ, 07036 LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES March 2015 Prepared by: 6 Campus Drive Parsippany, NJ

More information

BB&E GREENHOUSE GAS EMISSIONS INVENTORY. Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland.

BB&E GREENHOUSE GAS EMISSIONS INVENTORY. Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland. BB&E GREENHOUSE GAS EMISSIONS INVENTORY Prepared For: General Services Administration (GSA) Joint Base Andrews, Maryland Prepared By: BB&E, Inc. July 2014 This Greenhouse Gas (GHG) Emissions Inventory

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Mystic Island Volunteer Fire Company Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Abraham Clark High School Roselle Borough Board of Education Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report BOE Warehouse Brick Township Board of Education Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or

More information

MONMOUTH COUNTY AGRICULTURAL BUILDING FACILITY ENERGY REPORT 4000 KOZLOSKI ROAD FREEHOLD, NJ 07728

MONMOUTH COUNTY AGRICULTURAL BUILDING FACILITY ENERGY REPORT 4000 KOZLOSKI ROAD FREEHOLD, NJ 07728 MONMOUTH COUNTY AGRICULTURAL BUILDING 4000 KOZLOSKI ROAD FREEHOLD, NJ 07728 FACILITY ENERGY REPORT TABLE OF CONTENTS I. HISTORIC ENERGY CONSUMPTION/COST... 2 II. FACILITY ENERGY USE INDEX (EUI)... 5 III.

More information

Minnesota Conservation

Minnesota Conservation Program Information MN Minnesota Conservation Programs Summary We offer solutions for business customers in a suite of energy conservation and energy management products that will help you increase your

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Bohn Hall Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document

More information

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected) (Responsible Individual) (Company Name) I,, from verify that the information provided below is accurate, to the best of my knowledge. CREDIT COMPLIANCE (Please complete the color coded criteria(s) based

More information

Geoff Howland. Value Development Manager

Geoff Howland. Value Development Manager Geoff Howland Value Development Manager Chevron Energy Solutions MacArthur Plaza 5525 N. MacArthur Blvd Suite 290 Irving, TX 7 75038 Tel 972.550.3045 Cel 972.757.9154 Fax 972.550.3049 ghowland@chevron.com

More information

ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24385 November 2012 Prepared by: 6 Campus Drive Parsippany, NJ

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Veterans Memorial Middle School Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the

More information

Whitemarsh Township Municipal Building

Whitemarsh Township Municipal Building Whitemarsh Township Municipal Building 616 Germantown Pike, Lafayette Hill, PA 19444 Prepared For: Whitemarsh Township practical energy solutions 101 e. evans street, suite 2, west chester, pa 19380 t.610.430.1382

More information

CITY OF NEWARK CITY HALL COMPLEX City Hall Building Police Building Courthouse ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES

CITY OF NEWARK CITY HALL COMPLEX City Hall Building Police Building Courthouse ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CITY OF NEWARK CITY HALL COMPLEX City Hall Building Police Building Courthouse ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 21823 February 2011 Prepared by: 6 Campus Drive

More information

South Carolina Society for Hospital Engineers

South Carolina Society for Hospital Engineers South Carolina Society for Hospital Engineers Selecting Energy Partners: Criteria & Pitfalls and the Top 10 Ways to Reduce Energy in a Hospital Presented by Jon Dierking, PE, CEM, LEED AP Director of Energy

More information

National Indian Gaming Association 2005 Certification: Energy Management for Cost Savings Larry Kinney Synertech Systems Corporation On behalf of

National Indian Gaming Association 2005 Certification: Energy Management for Cost Savings Larry Kinney Synertech Systems Corporation On behalf of National Indian Gaming Association 2005 Certification: Energy Management for Cost Savings Larry Kinney Synertech Systems Corporation On behalf of CERT Wild Horse Casino in Umatilla Country, Oregon Dancing

More information

ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134

ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134 , NJ ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134 SOUTH BRUNSWICK BOARD OF EDUCATION PO BOX 181 MONMOUTH JUNCTION, NJ 08852 ATTN: MR. ANTHONY TONZINI BUSINESS ADMINISTRATOR CONCORD ENGINEERING GROUP

More information

CAMDEN COUNTY COLLEGE HELENE FULD BUILDING ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

CAMDEN COUNTY COLLEGE HELENE FULD BUILDING ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO CAMDEN COUNTY COLLEGE HELENE FULD BUILDING ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24364 November 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054 (973) 538-2120

More information

BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES

BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES BOROUGH OF OCEANPORT BOROUGH HALL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

More information

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856)

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856) ENERGY AUDIT FINAL REPORT BRICK TOWNSHIP M.U.A. WASTEWATER PUMPING STATIONS BRICK, NJ 08724 ATTN: MR. JAY DELANEY PROJECT MANAGER CEG PROJECT NO. CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES,

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Lake Riviera Middle School Brick Township Board of Education Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of

More information

UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO. 24145 June 2012 Prepared by: 6 Campus Drive Parsippany, NJ 07054

More information

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856)

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856) ENERGY AUDIT FINAL REPORT JANUARY 6, 2010 UNION COUNTY COLLEGE CRANFORD CAMPUS SPERRY OBSERVATORY 1033 SPRINGFIELD AVENUE CRANFORD, NJ 07016 ATTN: MR. HENRY KEY, DIRECTOR OF FACILITIES CEG PROJECT NO.

More information