1 Company Profile June 2015 PT Multi Harapan Utama 1

2 Table of Content MHU Brief Profile Mining Operations Production History & Life of Mine Plan Coal Specifications Quality Control Processes Facilities Human Resource Service Sustainability 2

3 MHU Brief Profile 3

4 MHU Brief Profile Contract Form PT Multi Harapan Utama First generation Coal Contract of Work (CCoW), signed in 1986, with concession area of 46,062 ha CCoW Expiry April 2022 Locations Kutai Kartanegara and Samarinda, East Kalimantan Shareholders PT Pakarti Putra Sang Fajar (60%) Private Resources Pty Ltd (40%) Coal Resources (as at Dec 2014) Composite Coal Specs Blocks Total million MT Measured million MT, Indicated million MT, Inferred million MT GCV 5,275 kcal/kg (GAR); TS 1.25% (ADB); TM 20% (AR) Teluk Dalam (TDO); Gitan (GTO); Busang Jonggon (BJO) Ports Teluk Dalam Coal Terminal capacity 3 million MT per annum Loa Kulu Coal Terminal capacity 2 million MT per annum Beloro Coal Terminal not in operation Production Capacity 300,000 MT per month (as of April 2015) Production recommenced in October 2013 and MHU has produced approx. 3 million MT until April 2014 PROPER environmental rating BLUE rating 4

5 Who We Are PT ABM Investama Integrated energy company Coal mining Coal resources : 561mn MT Coal reserves : 221mn MT Mining contractor Main mining contractor Coal mining Coal resources : 592mn MT Coal reserves : 106mn MT 5

6 MHU : Vision - Mission - Values To be a reliable and progressive coal producer in Indonesia VISION VALUES MISSION Creating employment opportunities Ensuring sustainable business growth thereby maximizing the shareholder return Providing solutions for customer satisfaction Being actively involved as good corporate citizen 6

7 Mining Operations 7

8 Mine Location Distance from Mine to Port Busang Jonggon 10,910 Ha Busang & Jonggon (Beloro Port) Loa Kulu (Loa Kulu Port) Approx. 25 km from Busang, 35 km from Jonggon Approx km Teluk Dalam 7,640 Ha Teluk Dalam (Teluk Dalam Port) Approx km Gitan 27,660 Ha Samarinda East Kalimantan Capital City Distance from Port to Muara Berau Beloro 142 km Loa Kulu 82 km Teluk Dalam 75 km 8

9 Operating Block: Teluk Dalam Block Teluk Dalam Teluk Dalam 7,640 Ha Reserve Resource Sub-Blocks Port 11mnt MT 237mn MT Tanjung Laong Loa Gagak Jongkang Teluk Dalam Coal Terminal Production 2014 (A) (P) 2.1mn MT 2016 (P) 2.2 mn MT 9

10 Teluk Dalam - Pits & Equipment Profile Tanjung Laong Operations Coal Getting & Cleaning OB Removal OB Dumping Coal Hauling 1 Pit Production Capacity 1.4mn MT / 2015 Hauling Distance from Pit to Port 2 KM 1 x Fleet Coal Cleaning with cutting edge 3 x Fleet Coal Getting 3 x 30 Ton Class 6 x Fleet OB 4 x 100 Ton Class 3 x 30 Ton Class OHT 775 DT 20 Ton Distance max 1200 meter DT 20 Ton Class Covered material aggregate Cap 20 kt/day Loa Gagak Operations Coal Getting & Cleaning OB Removal OB Dumping Coal Hauling 2 Pits Production Capacity 1.0mn MT / 2015 Hauling Distance from Pit to Port 8.5 KM 1 x Fleet Coal Cleaning with cutting edge 1 x Fleet Coal Getting 5 x Fleet OB 1 x 100 Ton Class ADT 470 DT 20 Ton DT 20 Ton Class Covered material aggregate 2 x 30 Ton Class 4 x 45 Ton Class Distance max 1200 meter Cap 15 kt/day 10

11 Operating Block: Gitan Loa Kulu Block Gitan Loa Kulu Reserve Resource Sub-Blocks 9mnt MT 101mn MT Loa Kulu South Loa Kulu North Port Loa Kulu Coal Terminal Production 2014 (A) (P) 0.8mn MT 2016 (P) 1.3mn MT 11

12 Gitan - Pits & Equipment Profile Loa Kulu South Operations Coal Getting & Cleaning OB Removal OB Dumping Coal Hauling 1 Pit Production Capacity 0.6mn MT / 2015 Hauling Distance from Pit to Port 13.5 KM 1 x Fleet Coal Cleaning with cutting edge 1 x Fleet Coal Getting 1 x 30 Ton Class 6 x Fleet OB 2 x 100 Ton Class 4 x 30 Ton Class OHT 775 DT 20 Ton Distance max 1000 meter DT 20 Ton Class Covered material aggregate Cap 3 kt/day Next Pit Development (2 nd Semester 2015) No Block Sub Block Total Pit 1 Gitan Loa Kulu North 3 Pits 2 Gitan Beruaq 1 Pit 3 Gitan Loa Kulu South 1 Pit 12

13 Operating Block: Gitan Sentuk (under development) Block Gitan Sentuk Reserve Resource Sub-Blocks 16mnt MT 100mn MT East Sentuk South Sentuk Port Production 2016 (P) 0.4mn MT 2017 (P) 1.4mn MT 2018 (P) 2.3mn MT 13

14 Production History & Life of Mine Plan 14

15 Production History & Life of Mine Plan 14 Coal Sales (in million tons) New Shareholders, April 2013

16 Coal Specifications 16

17 Coal Specifications Tanjung Laong Coal TJL - 1 GCV TM TS ASH UNIT ARB kcal/kg ARB % ADB % ADB % VALUE Typical Reject 5,000 < 4, > > TJL - 2 GCV TM TS ASH UNIT ARB kcal/kg ARB % ADB % ADB % VALUE Typical Reject 5,200 < 5, > > P O R T E : N: Teluk Dalam Coal Terminal Coal Availability Lat 0 33' 46.54" LS Long '25.21" BT TJL Loading Rate: 5,000 mtpd Barge Capacity: Max 300ft TJL - 1 UoM Jun Jul Aug Sep Oct Nov Dec Approx. distance to anchorage: 60 NM to Muara Berau 30 NM to Muara Jawa Approx. Sailing Time to anchorage: 36 hours to Muara Berau 16 hours to Muara Jawa 17

18 Coal Specifications Loa Kulu Coal GCV TM TS ASH LKS UNIT ARB kcal/kg ARB % ADB % ADB % VALUE Typical Reject 5,500 < 5, > > GCV TM TS ASH LKN UNIT ARB kcal/kg ARB % ADB % ADB % VALUE Typical Reject 5,800 < 5, > > P O R T E : N: Loa Kulu Coal Terminal Coal Availability Lat 0 33' 46.54" LS Long '25.21" BT LKS Loading Rate: 5,000 mtpd Barge Capacity: Max 300ft LKN UoM Jun Jul Aug Sep Oct Nov Dec Approx. distance to anchorage: 63 NM to Muara Berau 33 NM to Muara Jawa Approx. Sailing Time to anchorage: 40 hours to Muara Berau 20 hours to Muara Jawa 18

19 Quality Control Processes 19

20 Coal Sampling Pont & Processes 20

21 Quality Control Processes Location Exploration Drilling / Infill Drilling Basis Drill hole Coring Direct Monitoring + Seam Exposed / Channel Sampling / Pit Sampling Rom Stockpile sampling Exposed / Space date Mass Basis Quality Sampling & Analysis By Sucofindo Crushed Coal Sampling Coal Barging Sampling Mass Basis and Time Basis Lot by Lot Typical Mass Basis and Time Basis Lot by Lot Blending 21

22 Facilities 22

23 Stockpile & Crushing Coal Preparation Plant Teluk Dalam Coal Terminal Loa Kulu Coal Terminal ROM Stockpile Capacity 500 Tph Single Stage Crusher Screening Process Tripper Car Installation (Quality separation) Magnetic Separator Capacity 500 Tph Double Stage Crusher Screening Process Radial Stacker for stacking Magnetic Separator Chemical dust suppressant Teluk Dalam Coal Terminal Loa Kulu Coal Terminal Teluk Dalam Coal Terminal Loa Kulu Coal Terminal Capacity 100 Kt Loader Stacking Capacity 100 Kt Loader Stacking Dust Netting Capacity 60 kt Preparation for Geotextile base Stockpile control by survey monitoring Capacity 20 kt Material Aggregate bases Stockpile control by survey monitoring Crushed Coal Stockpile 23

24 Port & Barge Loading Facilities Capacity 1000 TPH Operation using 2 x On Ground Feeder chain Load by Dozer and Loader Can be support 300 ft barge Teluk Dalam Coal Terminal Loa Kulu Coal Terminal Capacity 1000 TPH Operation using 1 x Hopper Bin Load by loader and Truck Can be support 300 ft barge 24

25 Human Resource Service 25

26 Human Resource Service MHU s Employee 30 MHU s Employee 327 Contractor s Employee Male Female Total: Total Employee in MHU Operation 26

27 Sustainability 27

28 Corporate Social Responsibility (CSR) MHU is committed not only in complying with the rules and regulations with regards to CSR, but also in obtaining the social license to operate. To fulfill its mission to be a good corporate citizen, MHU strives to work together with its stakeholders. It is MHU s goal to live in harmony with surrounding communities. MHU CSR commitment is manifested through the establishment of structure and resources, as well as creation of programs based on community s needs. Programs are carried out through community relations (focusing on maintaining relationship) and community development (focusing on strengthening local capacity). 28

29 Community Development EDUCATION CULTURE HEALTH 29 ENVIRONMENT ECONOMIC EMPOWERMENT

30 Environment MHU is committed to apply good mining practices. In environment area, MHU strives to continuously improve its performance in environmental protection. MHU has started the certification process of ISO 14001:2004 since In 2014 MHU managed to sustain its Blue PROPER for its environmental management performance. This was due to the Company s effort in Busang Jonggon post-mine reclamation, which exceeded the plan (152 ha reclamation area, or 102% from plan). nursery water sampling reclamation water quality monitoring 30

31 PT Multi Harapan Utama Head Office Sovereign Plaza 9th Floor Jl TB Simatupang Kav 36 Jakarta Indonesia Phone: Fax: Samarinda Office Ruko Mahakam Square Jl Untung Suropati Blok C23 No 75 Samarinda, Kalimantan Timur Indonesia Phone: Fax:

1. Focus: Bharinto and Tandung Mayang

1. Focus: Bharinto and Tandung Mayang 1. Focus: Bharinto and Tandung Mayang 4 New integrated operations groups ITM operations in Kalimantan 1 2 Palangkaraya Kitadin Td.Mayang Bunyut Port Trubaindo 1 Bharinto 2 Samarinda Balikpapan Indominco

More information

COMPANY PRESENTATION. Analyst Meeting Full Year 2011 Jakarta, 3 April 2012

COMPANY PRESENTATION. Analyst Meeting Full Year 2011 Jakarta, 3 April 2012 COMPANY PRESENTATION Analyst Meeting Full Year 2011 Jakarta, 3 April 2012 Table of Contents Introduction & FY 2011 Highlight p.3 Financial Overview p.8 Operational Overview SBU: PT Reswara Minergi Hartama(Reswara)

More information

COMPANY PRESENTATION. Analyst Meeting Full Year 2011 Jakarta, 3 April 2012

COMPANY PRESENTATION. Analyst Meeting Full Year 2011 Jakarta, 3 April 2012 COMPANY PRESENTATION Analyst Meeting Full Year 2011 Jakarta, 3 April 2012 Table of Contents Introduction & FY 2011 Highlight p.3 Financial Overview p.8 Operational Overview p.17 SBU: PT Reswara Minergi

More information

A single trial order value has USD$5.00 per MT added to the price which is discounted on the(if) second plus order prevails.

A single trial order value has USD$5.00 per MT added to the price which is discounted on the(if) second plus order prevails. PLEASE NOTE SOME ARE GCV which pertains to actual thermal qualities some as GAD Gross Air Dried values which pertains to calorific value once such coal has been taken form the mine and dried naturally.the

More information

Analyst Briefing 2Q16 Performance Results

Analyst Briefing 2Q16 Performance Results Analyst Briefing 2Q16 Performance Results Jakarta, 16 August 2016 DISCLAIMER: The views expressed here contain information derived from publicly available sources that have not been independently verified.

More information

Qualified Persons Report April 2014

Qualified Persons Report April 2014 Qualified Persons Report April 2014 Prepared For : F-1 Qualified Persons Report CONTENTS Page No. DISCLAIMER... 5 ABBREVIATIONS... 7 RELEVANT REPORTS AND DOCUMENTS... 8 EXECUTIVE SUMMARY... 9 QUALIFIED

More information

Analysis of the Current Environmental Pollution Problem Caused by the Coal Mines in the Mahakam River Basin

Analysis of the Current Environmental Pollution Problem Caused by the Coal Mines in the Mahakam River Basin Chapter 4 Analysis of the Current Environmental Pollution Problem Caused by the Coal Mines in the Mahakam River Basin 1. The current situation of coal mines 1.1 General description of coal mines The number

More information

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

For personal use only

For personal use only COAL FE RESOURCES LIMITED QUARTERLY REPORT For the period ended 31 March 2012 Highlights Abadi Project: Deployment of machinery according to plan with the aim of increasing the targeted monthly production

More information

Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements

Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 1 Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 2 COAL RESOURCE Indonesia has large resources of lower heating value subbituminous coal the resources are

More information

Site Visit to Sishen Mine. 14 April 2010

Site Visit to Sishen Mine. 14 April 2010 Site Visit to Sishen Mine 14 April 20 Summary: Kumba Iron Ore Large hematite ore body: ±14km x 3.2km x 400m: 2.4bt resource 1.6bt reserve Hard ore: 60:40 lump to fine ratio Mining started in 1953; First

More information

Public Exposé 3Q17 Performance Results

Public Exposé 3Q17 Performance Results PT Indo Tambangraya Megah Tbk Public Exposé 3Q17 Performance Results Jakarta, 14 November 2017 1 Agenda 1 INTRODUCTION 2 OPERATIONAL REVIEW 3 COMMERCIAL REVIEW 4 FINANCIAL REVIEW 5 QUESTION & ANSWERS 2

More information

Analyst Briefing. 1Q14 performance results. 13 May 2014

Analyst Briefing. 1Q14 performance results. 13 May 2014 Analyst Briefing 1Q14 performance results 13 May 2014 The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or

More information

NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh

NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh NTPC, Simhadri, 4X500MW, Visakhapatnam, Andhra Pradesh Unit Capacity Year of Comml Power Share AP TN Kar Ker Pud Unit-1 500 MW Sep 2002 100% X X X X Unit-2 500 MW Mar 2003 100% X X X X Unit-3 500 MW Sep

More information

ANALYST BRIEFING 3Q18 PERFORMANCE RESULTS. Jakarta, 14 November 2018

ANALYST BRIEFING 3Q18 PERFORMANCE RESULTS. Jakarta, 14 November 2018 ANALYST BRIEFING 3Q18 PERFORMANCE RESULTS Jakarta, 14 November 2018 Agenda 1 INTRODUCTION 2 OPERATIONAL REVIEW 3 COMMERCIAL REVIEW 4 FINANCIAL REVIEW 5 QUESTION & ANSWERS 2 Highlights of 3Q18 and 9M18

More information

BHPBilliton Iron Ore Port Sweating the assets. September 2003

BHPBilliton Iron Ore Port Sweating the assets. September 2003 BHPBilliton Iron Ore Port Sweating the assets September 2003 Port Hedland Ports Operations Nelson Point 240 hectares Approx 400 employees 3 car dumpers 4 reclaimers 6 stackers 2 berths Finucane Island

More information

GLOUCESTER COAL QUARTERLY REPORT PERIOD ENDED 31 DECEMBER 2011 HIGHLIGHTS

GLOUCESTER COAL QUARTERLY REPORT PERIOD ENDED 31 DECEMBER 2011 HIGHLIGHTS GLOUCESTER COAL QUARTERLY REPORT HIGHLIGHTS 5 years LTI free at Stratford CHPP Record coal mining at Gloucester Basin s Duralie mine Middlemount rail project commissioned ahead of expectations Mining activities

More information

Analyst Briefing 4Q17 & FY17 Performance Results

Analyst Briefing 4Q17 & FY17 Performance Results PT Indo Tambangraya Megah Tbk Analyst Briefing 4Q17 & FY17 Performance Results Jakarta, 26 February 2018 1 Agenda 1 INTRODUCTION 2 OPERATIONAL REVIEW 3 COMMERCIAL REVIEW 4 FINANCIAL REVIEW 5 QUESTION &

More information

Adaro Energy Quarterly Activities Report Second Quarter of 2014

Adaro Energy Quarterly Activities Report Second Quarter of 2014 We are pleased with the commercial operations of Balangan Coal. The close proximity to our existing infrastructure, good quality of coal and low capex allow us to develop this asset within one year. This

More information

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA 16 December 2009 The Manager Company Announcements Platform Australian Securities Exchange Exchange Plaza, 2 The Esplanade PERTH WA 6000 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8

More information

MINING & QUARRY PROJECT EXPERIENCE

MINING & QUARRY PROJECT EXPERIENCE Page 1 of 12 MINING & QUARRY PROJECT EXPERIENCE CORTEX ENGINEERING RESOURCES PTY LTD Suite 102, 254 Bay Road, Sandringham, Vic. 3191 ichamberlain@cortex.com.au fax +61 3 9543 5223 ph +61 3 9543 5225 www.cortex.com.au

More information

23 September 2010 CHL: AIM. Churchill Mining PLC

23 September 2010 CHL: AIM. Churchill Mining PLC 23 September 2010 CHL: AIM Churchill Mining PLC 30 Million Tonnes per Annum East Kutai Coal Project Feasibility Study Returns Pre-Tax NPV of US$1.8 Billion Highlights: Study confirms the technical and

More information

ANALYST BRIEFING 2Q18 PERFORMANCE RESULT

ANALYST BRIEFING 2Q18 PERFORMANCE RESULT PT Indo Tambangraya Megah Tbk ANALYST BRIEFING 2Q18 PERFORMANCE RESULT Jakarta, 16 August 2018 1 Agenda 1 INTRODUCTION 2 OPERATIONAL REVIEW 3 COMMERCIAL REVIEW 4 FINANCIAL REVIEW 5 QUESTION & ANSWERS 2

More information

SUNRISE CHIPANGA COKING COAL BLOCK: MINING, TRANSPORTATION OF COAL

SUNRISE CHIPANGA COKING COAL BLOCK: MINING, TRANSPORTATION OF COAL 3152, Av, EduaradoMondlane, Maputo, Mozambique. +258 823096780 +258 840337700 SUNRISE MINING LIMITADA NOTICE INVITING EXPRESSION OF INTEREST SUNRISE CHIPANGA COKING COAL BLOCK: MINING, TRANSPORTATION OF

More information

designengineeringinnovation

designengineeringinnovation EDGE MATERIAL HANDLING designengineeringinnovation WHEN IT COMES TO CONVEYORS ONE SIZE DOES NOT FIT ALL... EDGE Innovate s range of material handling equipment offers operators an efficient, reliable

More information

Continuous Improvement at KPC: Enabling sustainable performance improvement amidst cost & market pressures

Continuous Improvement at KPC: Enabling sustainable performance improvement amidst cost & market pressures Continuous Improvement at KPC: Enabling sustainable performance improvement amidst cost & market pressures (By Dasril Jailani, General Manager Business and Performance Improvement, PT Kaltim Prima Coal)

More information

PrimaTrade. PT Prima Quarta Avia. Coal and Mineral Mining and Trading. CEPOT Group

PrimaTrade. PT Prima Quarta Avia. Coal and Mineral Mining and Trading. CEPOT Group CEPOT Group PT Prima Quarta Avia Coal and Mineral Mining and Trading COMPANY ESTABLISHMENT & LICENSES Company Name PT Prima Quarta Avia Company Type Limited Liability Company Establishment Deed Established

More information

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends

More information

Analyst Briefing FY16 Performance Results

Analyst Briefing FY16 Performance Results Analyst Briefing FY16 Performance Results Jakarta, 27 February 2017 DISCLAIMER: The views expressed here contain information derived from publicly available sources that have not been independently verified.

More information

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

Introduction of the JOGMEC survey and brief overview on the laws and regulations of coal mining in Indonesia. Eiichiro Nakama

Introduction of the JOGMEC survey and brief overview on the laws and regulations of coal mining in Indonesia. Eiichiro Nakama JOGMEC Survey on Environmental Protection, Forest Conservation, Land Reclamation and Forest Rehabilitation in Coal Mining in Indonesia Introduction of the JOGMEC survey and brief overview on the laws and

More information

Binaartha Summit 2017 PT Elnusa Tbk 11 December

Binaartha Summit 2017 PT Elnusa Tbk 11 December Binaartha Summit 2017 PT Elnusa Tbk 11 December 2017 www.elnusa.co.id Company Structure 41.1% Upstream Services Drilling & Oilfield Services Seismic Services 14.9% Downstream Services Transportation Distribution

More information

For personal use only

For personal use only ASX / MEDIA ANNOUNCEMENT 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 5 September 2012 INVESTOR PRESENTATION SEPTEMBER 2012 Pan Asia Corporation Ltd (the

More information

Proposed Environmental Pollution Control Measures

Proposed Environmental Pollution Control Measures Chapter 5 Proposed Environmental Pollution Control Measures 1. Environmental monitoring To determine the actual degree of environmental pollution in the Mahakam River is the first step to restore and preserve

More information

Company Overview. August 2011

Company Overview. August 2011 Company Overview August 2011 Capital Structure Market Capitalisation approx $130 million Undervalued against peers ASX Code: IDO 229.8m shares on issue 30.5m unlisted options Up to 35m performance shares

More information

PT ABM INVESTAMA TBK. 3Q 2013 Result Company Presentation

PT ABM INVESTAMA TBK. 3Q 2013 Result Company Presentation PT ABM INVESTAMA TBK 3Q 2013 Result Company Presentation Jakarta, November 2013 Cautionary Statements DISCLAIMER: This presentation has been prepared by PT ABM Investama Tbk ( ABMM or the "Company") solely

More information

BLENDING OF IMPORTED/ HIGH GRADE AND DOMESTIC COALS. I.K. Rajdeva, GM (Operation Services) NTPC Ltd.

BLENDING OF IMPORTED/ HIGH GRADE AND DOMESTIC COALS. I.K. Rajdeva, GM (Operation Services) NTPC Ltd. BLENDING OF IMPORTED/ HIGH GRADE AND DOMESTIC COALS I.K. Rajdeva, GM (Operation Services) NC Ltd. BLENDING Uniform mixing of different grades of coal in predetermined proportion to achieve desired GCV/

More information

For personal use only

For personal use only For personal use only Iron Ore Holdings Ltd Investor Presentation March 2013 Corporate Overview A stable corporate structure with a proven track record of completing transactions Background Capital Structure

More information

PT. Indonesia Arang Emas Internasional. Indonesia Palm Kernel Shell (PKS) Supplier Jambi Sumatra. Company Profile 2017

PT. Indonesia Arang Emas Internasional. Indonesia Palm Kernel Shell (PKS) Supplier Jambi Sumatra. Company Profile 2017 PT. Indonesia Arang Emas Internasional Indonesia Palm Kernel Shell (PKS) Supplier Jambi Sumatra Company Profile 2017 Message from our director PT. Indonesia Arang Emas Internasional has expertise in range

More information

For personal use only. Company Overview. 30 May 2011

For personal use only. Company Overview. 30 May 2011 Company Overview 30 May 2011 Capital Structure Market Capitalisation approx $145 million Undervalued against peers ASX Code: IDO 211.1m shares on issue (100% tradeable) 29.6m unlisted options (incl 28.6m

More information

OTJIKOTO GOLD MINE INTRODUCTION AND PROGRESS UPDATE MAY 2014

OTJIKOTO GOLD MINE INTRODUCTION AND PROGRESS UPDATE MAY 2014 OTJIKOTO GOLD MINE INTRODUCTION AND PROGRESS UPDATE MAY 2014 Who is B2Gold? 2 Who is B2Gold Namibia? B2Gold Namibia: 90% owned by B2Gold 10% owned by EVI Mining Company Ownership is a broad-based economic

More information

ESSAR VIZAG TERMINALS LIMITED

ESSAR VIZAG TERMINALS LIMITED ESSAR VIZAG TERMINALS LIMITED Phase-I - Up-gradation and Modernization of Existing Iron-Ore Mechanized Facility of Outer Harbour at Visakhapatnam Port Contents Introduction EPL Overview EVTL - Brief Over-view

More information

KCH GROUP. Spreading Our Wings to the World. #4004 Trade Tower, 511 Yeongdong-daero, Gangnam-gu, Seoul, Korea (Postal Code: )

KCH GROUP. Spreading Our Wings to the World. #4004 Trade Tower, 511 Yeongdong-daero, Gangnam-gu, Seoul, Korea (Postal Code: ) #4004 Trade Tower, 511 Yeongdong-daero, Gangnam-gu, Seoul, Korea (Postal Code: 135-729) GROUP Tel. 82-2-6000-6200 Fax. 82-2-6000-6201 www.kchglobal.com KCH Spreading Our Wings to the World 1 1 KCH Spreading

More information

Adaro Energy Quarterly Activities Report Third Quarter of 2014

Adaro Energy Quarterly Activities Report Third Quarter of 2014 Adaro Energy Quarterly Activities Report Third Quarter of 2014 For the Three Months Ending September 30, 2014 For further information please contact: Cameron Tough, Head of Investor Relations & Corporate

More information

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST For electronic distribution 12 th May 2014 Highlights PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST A Prefeasibility Study for an underground coal mine based on a 200Mt portion of the A Seam within

More information

ANALYST BRIEFING 1Q12 Performance Result. 11 May 2012

ANALYST BRIEFING 1Q12 Performance Result. 11 May 2012 ANALYST BRIEFING 1Q12 Performance Result 11 May 2012 Disclaimer The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation

More information

Custom Processing Plant Construction

Custom Processing Plant Construction Custom Processing Plant Construction Steel Systems Installation, Inc. (SSI) is a full-service, aggregate processing system engineering and consulting firm, recognized as a leader in the aggregate industry.

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/BLR/FE/12/BNG (ii) Designation : (iii) Accompaning mine : Official

More information

Rp. 8,500,000.- (Indonesian Edition) / Rp. 9,000,000.- (English Edition) US$ 750 Overseas Price

Rp. 8,500,000.- (Indonesian Edition) / Rp. 9,000,000.- (English Edition) US$ 750 Overseas Price Contact us (021) 3193 0108 (021) 3193 0109 (021) 3193 0070 (021) 3193 0102 marketing@cdmione.com www.cdmione.com C argo transportation holds an essential role to support successful development of a country,

More information

Singapore November 2011

Singapore November 2011 On Track to Build a Bigger and Better Adaro Energy ------------------------------------------------------------Morgan Stanley Annual Asia Pacific Summit Singapore 15-17 November 2011 Disclaimer These materials

More information

Wambo Coal. Site Specific Particulate Matter Control. Best Practice Assessment. Report Number R1. 30 August 2012

Wambo Coal. Site Specific Particulate Matter Control. Best Practice Assessment. Report Number R1. 30 August 2012 Pty Ltd Jerry's Plain Road Warkworth via Singleton NSW 2330 Version: Pty Ltd Page 2 PREPARED BY: ABN 29 001 584 612 2 Lincoln Street Lane Cove NSW 2066 Australia (PO Box 176 Lane Cove NSW 1595 Australia)

More information

Appendix Gs. Codrilla Air Quality & Greenhouse Gas Assessment Addendum Report

Appendix Gs. Codrilla Air Quality & Greenhouse Gas Assessment Addendum Report Appendix Gs Codrilla Air Quality & Greenhouse Gas Assessment Addendum Report Codrilla Coal Mine Project Valkyrie Air Quality & Greenhouse Gas Assessment - Addendum Report 5843R02V01_draft2.docx 05/05/2011

More information

PETROSEA RESULTS FOR THE YEAR ENDED DECEMBER 31, 2016

PETROSEA RESULTS FOR THE YEAR ENDED DECEMBER 31, 2016 PETROSEA RESULTS FOR THE YEAR ENDED DECEMBER 31, 2016 PT Petrosea Tbk. (IDX: PTRO) a multi-disciplinary mining, infrastructure and oil & gas services company reported its audited consolidated financial

More information

ENVIRONMENTAL REPORT 2018

ENVIRONMENTAL REPORT 2018 R ENVIRONMENTAL REPORT 2018 INTEGRITY & SOUNDNESS COMMUNICATION DEDICATION TO LONG TERM GOAL PERSONAL DEVELOPMENT Integrity & Soundness (Compliance) (Safety First) (Environment Awareness ) Inter-personal

More information

CONTENTS EXCELLING SINCE ABOUT US OUR VISION OUR STRATEGIES SUBSIDIARIES OUR SERVICES HABCO 1

CONTENTS EXCELLING SINCE ABOUT US OUR VISION OUR STRATEGIES SUBSIDIARIES OUR SERVICES HABCO 1 COMPANY PROFILE CONTENTS 2-5 6-7 ABOUT US OUR VISION 8-9 OUR STRATEGIES 10-11 12 SUBSIDIARIES OUR SERVICES EXCELLING SINCE 1991 HABCO 1 ABOUT US THE NAME HABCO IS DERIVED UPON THE NAMES OF ITS FOUNDERS

More information

For personal use only

For personal use only GROSVENOR WEST CONCEPT STUDY COMPLETED HIGHLIGHTS Study concludes strong development potential for either open cut or underground operations at Grosvenor West: Production of 5Mtpa (ROM) and 3.5Mtpa saleable

More information

Environmental Policy

Environmental Policy Mission Statement Our mission in industry is to produce high quality products at competitive prices while delivering extremely high levels of customer service to complete an all encompassing package. Environmental

More information

ENERGY FOR CHANGE September

ENERGY FOR CHANGE September ENERGY FOR CHANGE September 2017 1 Key questions: What is the outlook of the coal industry? How was Adaro Energy s performance in 1H17 and what is the view for FY17? What is the progress of Adaro Energy

More information

Social Responsibility > About DSR Management > Principles of Dai-ichi Life Group Principles of Dai-ichi Life Group The Dai-ichi Life Group will contri

Social Responsibility > About DSR Management > Principles of Dai-ichi Life Group Principles of Dai-ichi Life Group The Dai-ichi Life Group will contri Social Responsibility > About DSR Management > From Management Quality to DSR Management From Management Quality to DSR Management The basis for our management framework has been to aspire to reach a higher

More information

Asphalt Cold Feed Systems

Asphalt Cold Feed Systems Asphalt Cold Feed Systems Custom Engineered Cold Feed Systems Multiple or Single Bin Configurations Belt Feeders or Vibrating Feeders Variable and Proportionate Controls Optional Grizzly Bars Field Installation

More information

SURFACE MINING FOR WATER QUALITY SYMPOSIUM

SURFACE MINING FOR WATER QUALITY SYMPOSIUM SURFACE MINING FOR WATER QUALITY SYMPOSIUM BY CHARLES J. MILLER March 14, 1980 I would like to use a small job which I have just completed as a basis for determining special overburden handling considerations

More information

INDONESIAN MINING POLICY UPDATE

INDONESIAN MINING POLICY UPDATE INDONESIAN MINING POLICY UPDATE bauma FORUM bauma 2013 30th International Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment

More information

Analyst Meeting PT Elnusa Tbk November

Analyst Meeting PT Elnusa Tbk November Analyst Meeting PT Elnusa Tbk November 2017 www.elnusa.co.id 9M 17 Financial Highlight INCOME STATEMENT 9M16 9M17 % Change Revenue 2.524 100% 3.321 100% 31,6% Cost of Revenue 2.094 83% 2.987 90% 42,6%

More information

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS JP Morgan Melbourne Mining Day Terry Burgess, Managing Director and CEO Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS: CURRENT STATUS 2 Prominent Hill ramping-up to name-plate capacity

More information

Percent Passing by Weight. 105% Payment #200

Percent Passing by Weight. 105% Payment #200 2018 GUIDE SPEC FOR CRUSHING GRAVEL ROAD SURFACING AGGREGATE (10-17-2018) Please delete the first two pages of this document (the user note) prior to putting the spec into a contract Specification User

More information

Indonesian Coal Production and Exploration. Investor Presentation March 2012

Indonesian Coal Production and Exploration. Investor Presentation March 2012 Indonesian Coal Production and Exploration Investor Presentation March 2012 Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance

More information

Redeau Lake Pit No. 1947

Redeau Lake Pit No. 1947 Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops, BC, V2C-2T3 Telephone: (250) 371-3965 Fax: (250) 828-4083

More information

Market Update Southdown Magnetite Project

Market Update Southdown Magnetite Project MEDIA RELEASE 23 February 2018 Market Update Southdown Magnetite Project Grange Resources Limited (ASX:GRR) (Grange) is pleased to announce that, in conjunction with its joint venture participant, SRT

More information

Bauxite Mine & Metals Facility Manjimup BMMF - Project COMMUNICATION RELEASE DRAFT. Minerals & Energy 1

Bauxite Mine & Metals Facility Manjimup BMMF - Project COMMUNICATION RELEASE DRAFT. Minerals & Energy 1 Bauxite Mine & Metals Facility Manjimup BMMF - Project COMMUNICATION RELEASE DRAFT 1 Overview Table of Contents 1. Prima Resources Business Profile 2. Project Proposal Executive Summary Opportunities for

More information

Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold/Moly (Silver) Project Pacific Booker Minerals Inc. Morrison Copper/Gold/Moly (Silver) Project Mr. ERIK TORNQUIST, Executive VP & COO November 2008 Forward Looking Statement This presentation may include forward-looking statements

More information

Developing mining options at the Sese coal project in Botswana

Developing mining options at the Sese coal project in Botswana Developing mining options at the Sese coal project in Botswana Results from the Concept Study, September 2011 Disclaimer This presentation has been prepared by and issued by African Energy Resources Limited

More information

Mt Carlton. May Arlene Rofe General Manager

Mt Carlton. May Arlene Rofe General Manager Mt Carlton May 2014 Arlene Rofe General Manager Disclaimer This presentation has been prepared by Evolution Mining Limited ( Evolution Mining ) and consists of slides for a presentation concerning the

More information

Indonesia: Heavy Equipment Market Brief

Indonesia: Heavy Equipment Market Brief Indonesia: Heavy Equipment Market Brief Indonesian Heavy Equipment Market Brief Page 1 of 7 Kalung Riang 8/28 Summary After years of being in the doldrums in the wake of the 1997/1998 monetary crisis,

More information

ROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT

ROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT MARCH 2016 ROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT THE SOURCE Located near Iquique, Chile s first region is one of the worlds most abundant sources of high grade salt. The deposit

More information

Indonesian Coal Production and Exploration

Indonesian Coal Production and Exploration Indonesian Coal Production and Exploration Investor Presentation May 2012 Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance

More information

100% Payment. 105% Payment #

100% Payment. 105% Payment # CRUSHED AND STOCKPILED GRAVEL ROAD SURFACING AGGREGATE (3-17-2017) Please delete the first two pages of this document (the user note) prior to putting the spec into a contract Specification User Note:

More information

KATINGAN RIA COAL PROJECT FOB CASH COST AND VALUATION REVISION. FOB cash cost forecasts reduced by $8/t or 20% to US$31/t before royalties

KATINGAN RIA COAL PROJECT FOB CASH COST AND VALUATION REVISION. FOB cash cost forecasts reduced by $8/t or 20% to US$31/t before royalties Company Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 By Electronic Lodgement 11 December 2014 Dear Sir/Madam KATINGAN RIA COAL PROJECT FOB CASH COST AND VALUATION REVISION FOB cash cost forecasts

More information

ENGINEERING SERVICES

ENGINEERING SERVICES ENGINEERING SERVICES www.elb.co.za Bulk Materials Handling ABOUT ELB ENGINEERING SERVICES ELB Engineering Services (ELB) is an internationally recognised technology driven holistic solutions provider to

More information

Area-Wide IPM for Commercial Grain Storage. Paul Flinn, Carl Reed, Thomas Phillips, and David Hagstrum

Area-Wide IPM for Commercial Grain Storage. Paul Flinn, Carl Reed, Thomas Phillips, and David Hagstrum Area-Wide IPM for Commercial Grain Storage Paul Flinn, Carl Reed, Thomas Phillips, and David Hagstrum Area-Wide IPM for Commercial Wheat Storage USDA-ARS ARS Demonstration Project for Area- wide IPM for

More information

Energy and Mineral Resources for the People s Welfare

Energy and Mineral Resources for the People s Welfare REPUBLIK INDONESIA The 11 th international Conference on Mining, Materials and Petroleum Engineering 11-13 November 2013, Centara Duangtawan Hotel, Chiang Mai, THAILAND MINISTRY OF ENERGY AND MINERAL RESOURCES

More information

Mining Update - Mongolia

Mining Update - Mongolia Suite C1, 1 Honeysuckle Drive, The Boardwalk Newcastle NSW 2300 PO Box 509, Newcastle NSW 2300 Telephone: 02 4914 5910 Facsimile: 02 4925 3505 www.guildfordcoal.com.au 15 October 2012 Company Announcements

More information

NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit

NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit Air Quality Permit Program Instructions on Page 3 1a) AQ Facility ID (permit) No.: 1b) AQD File No.: 2) Facility

More information

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate

More information

OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA

OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA 1 Presentation Sturcture Coal Sector Overview Demand

More information

Interim Meeting of the Project on Low-Carbon City Planning in Surabaya, Indonesia. November 20, 2013 AMITA CORPORATION

Interim Meeting of the Project on Low-Carbon City Planning in Surabaya, Indonesia. November 20, 2013 AMITA CORPORATION Interim Meeting of the Project on Low-Carbon City Planning in Surabaya, Indonesia November 20, 2013 AMITA CORPORATION 1 Business Concept ~Waste Reuse in Cement Plant~ Virgin raw material CaO SiO 2 Al 2

More information

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES ASX Release: 9 September 2010 MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES Definitive Mining Studies confirm continuity, quality and quantum of Ore body at MARILLANA Detrital Ore Reserves

More information

Traffic Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results. Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.

More information

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Thermal Coal: Indonesia - Kalimantan In Major Coal Provinces South and East Kalimantan Close to Asian Markets # 1 thermal coal

More information

Content. Chapter 1: An Overview of the Energy Situation in Indonesia Chapter 2: A Profile of the East Kalimantan Province...

Content. Chapter 1: An Overview of the Energy Situation in Indonesia Chapter 2: A Profile of the East Kalimantan Province... Content The outline of the study... 1 1. Background of the study... 1 2. Purpose of this study... 1 3. Area of the Study... 2 4. Scope of the Study... 3 5. Counterparts of the Study... 3 6. Team Members

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/GLB/LST/7/BNG (i) Name of the Inspecting : Officer and ID No. (ii)

More information

Introduction. Letseng-la-Terae Diamond-Mine

Introduction. Letseng-la-Terae Diamond-Mine Introduction Brief about MGC-RST Mining Limitada: MGC-RST Mining Limitada was incorporated in Mozambique on 30 Mar 2012. It is a partnership entity between Matekane Group of Companies from Lesotho and

More information

ENERGY FOR CHANGE October

ENERGY FOR CHANGE October ENERGY FOR CHANGE October 2018 1 Key questions: Why has coal price remain high and will it stay high for longer? What is Adaro s rationale for venturing overseas? Should investors expect more M&A activities?

More information

Mining Update - Mongolia

Mining Update - Mongolia Suite C1, 1 Honeysuckle Drive, The Boardwalk Newcastle NSW 2300 PO Box 509, Newcastle NSW 2300 Telephone: 02 4914 5910 Facsimile: 02 4925 3505 www.guildfordcoal.com.au 11 September 2012 Company Announcements

More information

LAS BAMBAS. December 2016

LAS BAMBAS. December 2016 LAS BAMBAS December 2016 1 Important Information The information contained in this presentation is intended solely for your personal reference and may not be reproduced, redistributed or passed on, directly

More information

For cleaner coal at lower cost. Modular Coal Preparation Plant. Modular Coal Preparation Plant. Classification, cleaning and dewatering

For cleaner coal at lower cost. Modular Coal Preparation Plant. Modular Coal Preparation Plant. Classification, cleaning and dewatering For cleaner coal at lower cost Modular Coal Preparation Plant Modular Coal Preparation Plant Classification, cleaning and dewatering World class coal preparation Proven at the world s most demanding plants

More information

INDONESIAN COAL - A BRIGHT FUTURE

INDONESIAN COAL - A BRIGHT FUTURE INDONESIAN COAL - A BRIGHT FUTURE By : Bob Kamandanu Chairman ICMA President Director PT. Berau Coal Symposium - Clean Coal Day in Japan 2009 September 7, 2009, ANA InterContinental Hotel, Tokyo, Japan

More information

TRANSNET PORT TERMINALS PRESENTATION. Transport Forum Visit Port Elizabeth

TRANSNET PORT TERMINALS PRESENTATION. Transport Forum Visit Port Elizabeth TRANSNET PORT TERMINALS PRESENTATION Transport Forum Visit Port Elizabeth 7 th July 2011 TABLE OF CONTENTS Overview of Transnet Port Terminals Overview of Eastern Cape Terminals Features & Characteristics

More information

AAPA. Port Operations/Safety and Information Technology Seminar

AAPA. Port Operations/Safety and Information Technology Seminar AAPA Port Operations/Safety and Information Technology Seminar 4/24/-27, 2007 Jacksonville, FL Innovation in Port Efficiency: Processes, Simulations and Modeling for better Terminal Operations, Planning

More information

Advanced Solutions for Aluminum Smelters

Advanced Solutions for Aluminum Smelters Advanced Solutions for Aluminum Smelters 2 3 Material Handling in Port Areas Petcoke Storage & Handling Harbour Equipment With a proven range of loading and unloading equipment for ships and barges, FLSmidth

More information

Materials 206: Handling RAP (Advanced) Contractor QC and Specifications

Materials 206: Handling RAP (Advanced) Contractor QC and Specifications Materials 206: Handling RAP (Advanced) Contractor QC and Specifications 38 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 25, 2011 Denver, Colorado By Tom Blair Director of Product

More information