AN OPTIMAL DESIGN OF HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT

Size: px
Start display at page:

Download "AN OPTIMAL DESIGN OF HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT"

Transcription

1 International Journal of Industrial Engineering & Technology (IJIET) ISSN Vol. 3, Issue 1, Mar 2013, TJPRC Pvt. Ltd. AN OPTIMAL DESIGN OF HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT S. S. WAHID Mechanical Power Engineering & Energy Department, Faculty of Engineering, Minia University, Egypt ABSTRACT This research investigates an efficient and optimal Egyptian design of hazardous waste incineration plant for hospitals with a capacity of 100kg/h. This incinerator was designed according to the standard specifications guidelines, and rules of "Egyptian Environmental Affairs Agency (EEAA)" according to Law No. 94/1994 & Executed Regulations No. 338/1995". These incineration plants were built as a prototype in ten hospitals of Minia Governorate cities, Egypt". These incinerators are inline twin combustion chamber, fixed hearth, pyrolytic and controlled air (starved-air) incinerators. From this investigation it is worth to note that this hazardous waste incineration plant for hospitals operates efficiently at the designed parameters levels and has a full compliance with standard specification and rules of (EEAA), and their laws. So, this efficient design of this controlled-air incineration plant is the most accepted proper disposal method for the hazard (biomedical) wastes. KEYWORDS: Design Criteria, Starved-Air Incineration Plant, Air-Pollution Control System INTRODUCTION Based on the principal stated that the better understanding of the composition of hospital waste is fundamental in order to choose the best disposition alternative, Altin [2] made a research study to evaluate the physical and elemental composition of waste in four hospitals in Sivas, Turkey. The results of their investigation indicated that combustible waste constituted 92% of total mass of hospital waste. On the basis of their results, they decided that, the proper disposal method is incineration. However, individual incineration for each hospital does not seem to be economic. Therefore, one common incinerator should be designed for the four hospitals in Sivas. Also, Surjit Katoch [3] studied the classification, management, treatment, and disposal methods of biomedical waste, and health care waste generated from some hospitals in India. He stated that, incineration used to be the method of choice for most hazardous health care wastes and is still widely used. As well as, the use of proper air pollution control device (APCDs) during incineration would significantly reduce the carcinogenic potencies. Shaaban [4] investigated the development of the process engineering design of an integrated unit, which is technically and economically capable for incinerating medical wastes and treatment of combustion gases. Such unit consists of an incineration unit having an operating temperature of 1100 C at 300% excess air, combustion-gases cooler generating 35 m 3 /h & hot water at 75 C, dust filter capable of reducing particulates to mg/nm 3, gas scrubbers for removing acidic gases, a multi-tube fixed bed catalytic converter to maintain the level of dioxins and furans below 0.1 ng/nm 3, and an induced-draft suction fan system that can handle 6500 Nm 3 /h at 250 C. The residence time of combustion gases in the ignition, mixing and combustion chambers was found to be 2s, 0.25s and 0.75s, respectively. This will ensure both thorough homogenization of combustion gases and complete destruction of harmful constituents of the refuse. The adequate engineering design of individual process equipment results in competitive fixed and operating investments. His

2 52 S. S. Wahid incineration unit has proved its high operating efficiency through the measurements of different pollutant-levels vented to the open atmosphere, which was found to be in conformity with the maximum allowable limits as specified in the law number 4/1994 issued by the Egyptian Environmental Affairs Agency (EEAA) and the European standards. Reis [5] made study interested with the hazardous clinical solid waste incinerator. His solid waste incinerators were industrial facilities, based on sustained high-temperature combustion processes and intended to treat these wastes, so as to reduce its volume and hazardousness, capture, concentrate, and destroy potentially harmful substances, and, as of more recently, recover energy from the combustion of the waste for disposal. He stated that, incineration is increasingly used in waste management, in an effort to counter the problem of growing waste production, consequentially increasing human exposure to the most critical pollutants potentially emitted by these facilities. However, emissions of pollutants under standard operating conditions have been substantially reduced by technological advances and increasingly stringent regulations. The term incinerate, means to burn something until nothing is left but ashes. An incinerator is a unit or facility used to burn trash and other types of waste until it is reduced to ash. Incineration of wastes has many advantages, such as: incinerators require relatively small plots of land as compared to sanitary landfills; it can usually be located in residential and collection areas. Also, incineration's operation is not interrupted by inclement weather, and it can operate for a range up to 24 hours a day to accommodate the variations in refuse generation. The waste is completely destroyed, the waste is not recognizable, waste volume and weight are significantly reduced (>95%), as well as the ash residues from an incinerator is generally stable nearly inorganic, and its volume not exceed than 4 5% from its capacity. Large quantities of waste can be treated, toxic emissions are reduced, suitable for all types of waste, micro-organisms are completely destroyed, so it has high disinfection efficiency, all types of organic waste (liquid and solid) are destroyed. Moreover, no shredding of waste is necessary prior to charging it into incinerator, low fly ash carry over, and low operational costs. It is worth noting that, the incinerator can be less expensive than sanitary landfill, and it can burn practically any kind of refuse. The incineration process is represented a controlled high efficiency combustion process, which leads to high thermal efficiency. But, there are some disadvantages of using the incinerators, such as: the high initial cost of an incinerator facility. Even though long-term landfill cost has been reported to be as much or more expensive than incineration cost. Operation, maintenance and repair costs may be high, because of the high temperatures necessary for the burning and damaging nature of the refuse and residue. Although the number of employees required to run an incineration plant may be smaller than other methods of disposal, the salary for the skilled employees who operate, maintain, and repair an incinerator are higher, for instance, than for men who work on a landfill. [6,7 and 8]. So, the most common treatment method of the hazard (biomedical) waste is incineration. In general, the using of incinerator is more safety, than the using of landfill, because the incineration destroyed the wastes completely and change it into ash. The high temperature of incinerator has a capability of destroying all kinds and types of viruses and diseases, that present in medical wastes and crematory, while, the landfill has a dangerous effect on the pollution of underground water. The present research is one of a series of researches interested with the studies leads to get an advanced, modified, and efficient Egyptian design for hazardous (biomedical) waste incineration plant for hospitals, a case study in general hospitals of Minia Governorate cities, Egypt. These groups of researches were supported by private company in Minia, Egypt which is interested in the field of incineration process as safe, proper and suitable disposal method for hazardous (biomedical) wastes. The hazardous (biomedical) wastes produced from the hospitals are used as the working medium for incinerators. So, the average quantities and physicochemical compositions of the hazardous (biomedical) wastes are the basis on which the design of incinerator is built. Therefore, the average quantities, compositions, and properties of the

3 An Optimal Desin of Hazardous (Biomedical) Waste Incineration Plant 53 mixture of hazardous waste categories generated from hospitals of Minia Governorate cities were determined in the first paper of these series. The design criteria for incinerators which would be got an advanced and modified efficient Egyptian design for hazardous (biomedical) waste incineration plant for hospitals, as a second study. The design of this incineration plant is based on some concepts, such as: the system must be simple in construction, easy to operate and low cost, and where most of the maintenance work can be done by local workers using local available material. The design criteria can be summarized as follows:-- Design criteria for the hazardous waste incinerator for hospitals Incineration plant DESIGN CRITERIA FOR THE HAZARDOUS WASTE INCINERATION PLANT FOR HOSPITALS The estimated properties for the mixture of the hazardous waste categories generated in "Minia General Hospitaly, Egypt", is illustrated in Table (1&2) [1&9]. Table 1: The Average Physical Properties of the Mixture of the Hazardous Waste Categories Produced from "General Hospital of Minia City, Egypt" [9] Table (1-A): Physical Characteristics Item % Sum% tissues 10.50% Combustible textile 17.00% matter, (%) plastics 52.00% 79.50% Moisture (body fluid, salt solution, glucose) 20.50% Total 100% 100% Table (1-B): Physical Composition Item % Sum% Combustible matter, (%) Volatile Matter, % % Fixed Carbon, % 3.41 Non-Combustible matter, % Moisture from waste 5.9 Total Moisture, % composition, % Moisture from body fluid salt 20.50% 26.40% solution, glucose Total 100% 100% Table (1-C): Physical Properties Property Item Molecular weight of the mixture kg/mole of hazardous waste categories Average density 872.4kg/m 3 Volume of 100kg waste m 3 Heating value of the mixture of 28, kj/kg hazardous waste categories Table(1-A) shows the physical characteristics of this mixture of the hazardous waste categories are; 79.5% combustible matter (10.5% tissues, 17.0% textile, 52.0% plastics), and (20.5%) moisture (body fluid, salt solution,

4 54 S. S. Wahid glucose). The physical composition of the hazardous waste mixture is shown in Table (1-B). While the average values of molecular weight, density and heating value of the mixture of the hazardous waste categories are kg/mol, 872.4kg/m 3, and 28, kJ/kg respectively are shown in Table (1-C). Table (2) illustrates the chemical composition of the hazardous waste mixture. The main design parameters for the hazardous (biomedical) waste incinerator for hospitals, of a capacity of (100kg/h) are shown in Table (1&2). The calculation of the design of this incinerator based on the actual percentage of the constituents of hazardous waste mixture estimated from the hospital, as illustrated in this Table (1&2). The design of the incinerator was based on total mass of hazardous waste mixture, i.e. Capacity of Incinerator = m ) Waste = 100kg/h. It is worth noting to state that our incinerators are designed to burn many types of wastes, including Type IV pathological waste and infectious and contaminated "red bag," surgical dressings, plastic test devices and other wastes. Table 2: The Average Chemical Composition of the Mixture of the Hazardous Waste Categories Produced from "General Hospital of Minia City, Egypt" [9] Item % Sum% Carbon Combustible matter, % Hydrogen % (Tissues, Textile, and Plastics) Sulphur Chlorine Oxygen 9.35 Non-Combustible matter, % Nitrogen % Ash Moisture (body fluid, salt solution, glucose) 20.50% 20.50% 20.50% Total 100% 100% 100% INCINERATION PLANT There are three main types of incinerators are used; controlled air (starved-air), excess air, and rotary kiln. The majority of the hazard waste incinerators (>95 percent) are controlled air units, a small percentage (<2 percent) are excess air, and less than one percent were identified as rotary kiln. The rotary kiln units tend to be larger. It is recommended that all the incinerators typically are equipped with air pollution control devices [9]. Of the three types of incinerators, the controlled-air (starved-air) unit is currently the most widely accepted system for the incineration of biomedical waste [8]. The design of this incinerator is based on "controlled-air" incineration principle (i.e. starved air incinerator), as particulate matter emission is low in such incinerator. Incinerator means furnaces or combustion chambers, each incinerator must be associated with an air pollution control system (exhaust treatment unit), and electric control panel, and the assembly of these three parts assembly is called incineration plant. Figure 1, illustrates the block diagram for the incineration plant, including all its components and the air pollution control process. The incineration plant under investigation consists of three main parts: Incinerator (Combustion Chamber) Air Pollution Control System Electrical Control Panel

5 An Optimal Desin of Hazardous (Biomedical) Waste Incineration Plant 55 Controlled Air (Starved-Air) Incinerator (Combustion Chamber) The incinerator consists of double incineration furnaces, (double combustion chambers). The first combustion chamber is the primary combustion chamber (PCC), which is the main combustion chamber. It is preferred to call it, incineration chamber (IC). It has a volume 3.16m 3, with hearth area of 1.74m 2, includes charging door of (600 x 600mm) and ash removal door of (200 x 300 mm). The second combustion chamber is the secondary combustion chamber (SCC), which represented a thermal oxidation chamber or after burner chamber. The secondary combustion chamber (SCC) includes one door with a dimension of (500 X 500mm.), for maintenance operation. These two combustion chambers are inline and adjacent to each other. Both the two combustion chambers are separated from each other by a refractory (fire brick) wall. Both of the two combustion chambers are made of heavy welded steel sheet (6mm thickness), and painted externally with heat resistant paint. They are lined with special refractory material (fire bricks of 42% Al 2 O 3,). Also, they have a layer of insulating material (Asbestos), which keeps the outer surface of the incinerator body at a temperature not exceeds than (15-20 C) above room temperature, to protect the incinerator's operators. Air Caustic soda solution Exhaust Incinerator (Combustion chambers) Air Pollution Control System (APCS) Barometric Damper Waste +Fuel +Air Primary Combustion Chamber 800±50 C Secondary Burner Secondary Combustion Chamber at 1150±50 C Air Box Venturi Wet Scrubber Lower Liquid Separation Chamber Higher Liquid Separation Chamber Absorption Caustic Soda Tray Tower Scrubber Chimney Clean Air Caustic Soda Solution Tank Primary Burner Additional Combustion Air Blower Pumps Figure 1: Block Diagram for Incineration Plant The incinerator furnaces designed with stationary hearth, which is usually a refractory floor to the furnace. The additional primary combustion air does not admitted through openings beneath the stationary hearth, but it admitted under slight pressure through ports along the sides of the furnace, and combustion proceeds in the same, surface-burning manner as in a bonfire, but with improved conditions due to the re-radiation of heat from the surrounding furnace walls and roof. The refractory surface of the secondary chamber should be heated over a minimum period of 15 minutes, prior to turn-on

6 56 S. S. Wahid the primary oil-burner, to ensure optimum conditions for the destruction of micro-organisms [9]. To prevent leakage of gaseous emissions from the doors of combustion chambers, all of these doors are sealed; also, the incinerator is designed to operate continuously under minimum draft negative pressure in primary combustion chamber [12]. Each combustion chamber is equipped with a separated auxiliary oil-burner, the heat input capacity of each burner is sufficient to raise the temperature in the primary and secondary combustion chambers to the required temperature as 800±50 C and 1150±50 C respectively. The two auxiliary oil-burners operated by a two separated shield thermocouples (type-k). These two thermocouples are connected to two digital controllable thermostats, used in continuous monitoring and, controlling the operating temperature for both the two combustion chambers. The function of the secondary combustion chamber (SCC) is to oxidize the continuously generated pyrolysis off-gases coming from the incineration process in primary combustion chamber (PCC) with the additional secondary combustion excess air (rich oxygen i.e. more than stoichiometric). This is to ensure complete combustion of these pyrolysis off-gases before, allowing the product combustion gas to exit through the air pollution control system. So, the thermal oxidation in (SCC) is the most efficient, as well as the most flexible combustion technique for controlling high concentration of flammable emission and odours. Also, the high temperature of the (SCC) burns completely the toxic and carcinogenic substances (i.e. decompose the dioxin, and furan to its chlorine halogen.). Table (3), shows the specification of this incinerator. Table 3: Specifications of Incinerator (Capacity of 100kg/h) Incinerator outer Dimensions L = 3000, W =1800, H = 2800 mm Volume of primary combustion chamber V (PCC) V (PCC) = 3.16 m 3 Volume of secondary combustion chamber V (SCC) V (SCC) = 1.55m 3 Hearth area of primary combustion chamber A (PCC) = 1.74 m 2 Capacity of auxiliary primary oil-burner kW Capacity of auxiliary secondary oil-burner kW Charging Door dimensions 600 X 600 mm Ash Door dimensions 200 X 300 mm Oxidation Room Door dimensions 500 X 500 mm The incineration plant has a chimney of diameter (D=700 mm.) which is large enough to prevent the restriction of the flow of flue gases. Also, according to the rules of the "Egyptian Environmental Affairs Agency"(EEAA), the height of the chimney is taller with 3.5meter than any buildings in a circle of 50 meter diameter around the chimney. Air Pollution Control System (APCS) The air pollution control system (APCS) that installed in this incineration plant is wet-scrubbers type (wet scrubber exhaust treatment unit). This wet scrubber air pollution control system (Wet-APCS), consists of a sequential separated unites to ensure the removal of environmental pollutants It comprises; caustic soda solution tank, two stainless steel pumps, venturi wet-scrubber, caustic soda absorption tray tower-scrubber, two liquid separation chambers, tall chimney (stack), and blower (ID fan). This unite is used to clean the contaminated gases emitted from both combustion chambers (furnaces), [10,14, and 15]. Electrical Control Panel (ECP) The incineration plant is supplied with an electrical control panel (ECP) contains, indictors, switches protector, and controllers for all the components of the incinerator and air pollution control system (exhaust treatment unit). The automatic control system is divided in two parts: temperature control and timing control.

7 An Optimal Desin of Hazardous (Biomedical) Waste Incineration Plant 57 EXPERIMENTAL WORK The new designed hazardous (biomedical) wastes incineration plant for hospital (with a capacity of 100kg/h) was built in "General Hospital of Minia City, Egypt". The specifications, design details, manufacturing, installation and operation of this hazardous (biomedical) wastes incineration plant had been reviewed, inspected, and checked by the engineering receipt committee of the hospital. The incinerator was charged with about 105kg (red bags) of hazardous waste, which composed from a mixture of pathological tissues, textile and plastics. Hence the incineration plant had been started the incineration process. All the components of incineration plant were investigated and observed, before operation, during operation (incineration process), and during its cooling period. The hazardous (biomedical) wastes, and ash produced at the end of runs were weighed Also, the operating parameters, effectiveness of destroying the wastes, volume reduction, concentration of emission from the chimney,for this incineration plant was observed and recorded. RESULTS AND DISCUSSIONS This investigated hazardous (biomedical) waste incineration plant was operated successfully, and the operation conditions of it was observed and recorded in the following tables and figures. Table (4) shows the operating parameters of the incineration plant, while Table (5) shows the concentration of the exhaust gases emitted from the chimney of the incineration plant. Table 4: Operating Parameter of Incineration Plant Incinerator Capacity ( kg/h) 100kg Charge weight. 105kg Ash weight. 4.3kg Ash percentage. 4% Destruction efficiency 96% Standard range of Temp of Primary Combustion Chamber = 800±50 C Temperature of Primary Comb. Chamber. 830 C Standard range of Temp of Secondary Combustion Chamber = 1150±50 C Temperature of Secondary Comb. Chamber C Standard range of Temp of outer surface of incinerator body < Room Temp + 20 C Temperature of outer surface of Comb. Chambers body 39 C Room Temperature. 25 C Temp of Exhaust gases rising from chimney 120 C From Table (4) the average measured values of the temperature of both primary and secondary combustion chambers were (830 C and 1120 C respectively), so it is met the designed level (800±50 C and 1150±50 C) respectively, as shown in Fig.2. Also, the average measured value of the temperature of the outer surface of the incinerator body was (39 C), which is met the design level (20 C above room temperature), at ambient temperature of 25 C. As well as, it operates safety with rapid, complete destruction, and clean disposal of hazard (biomedical) wastes. There are no odours or smokes leakage from incinerator's doors to the incinerating plant's room, also, no appearance of black smoke from chimney.

8 58 S. S. Wahid Temperature, C Tp Figure 2: The Higher, Lower and Average Measured Temperatures of Primary and Secondary Combustion Chamber Ts The ash represents 4% of the capacity of the incinerator which gives destruction efficiency of 96%. It is observed that the ash is composed mainly of a fine grain, which is proved that the completeness of the incineration process and the combustion. Moreover, rapid cooling of the flue gases in wet scrubber air pollution control system, minimise the risk of reformation of dioxins. Also, the fully automatic control system (electric control panel), reducing the need for operating personnel and securing 100% controlled incineration process complying with any applied emission requirements. As shown in Table (5) and Fig.3, the measured values of the species concentration of carbon monoxide, sulphuric dioxide, and nitrogen oxides rising from the chimney of our incineration plant, were less than the standard levels of "Egyptian Environment Rules". Table 5: Concentration of Emissions from Incineration Plant No. Description Standard Law 4/1994 Measured Values (mg/m 3 ) 1- Carbon Monoxide Sulphuric Dioxide Nitrogen Oxides Egyptian Environmental Affairs Agency, "Law No.4/1994 & Executed Regulations No. 338/1995". Emission Concentration, mg/m (S)=Standard (M)=Measured 100 CO(S) 87 CO(M) 50 SO2(S) 26.5 SO2(M) Figure 3: Comparison between Standard and Measured Values of the Gaseous Emissions from the Hazardous Waste Incinerator for Hospital 200 NOx (S) 91 NOx (M)

9 An Optimal Desin of Hazardous (Biomedical) Waste Incineration Plant 59 Figure 4 shows the variation of the temperature of both primary and secondary combustion chambers with the time, and the higher and lower limits of their temperatures. This figure represents one run of operation, including three periods; preheating-period, incineration-period and cooling-period. It can be expanded the incineration period to several hours to overcome several numbers of operating runs. From Fig.4 at the beginning of the incineration (burning) process the operation of primary auxiliary oil-burner has been delayed for about minutes even all the components of the incineration plant have been reached to their stabilized state (i.e. the temperature of the secondary combustion chamber reaches to 1150±50 C, to ensure the oxidation of the pyrolysis off-gases, also the air pollution control system (APCS) is filled with the circulated treatment caustic soda solution). The incineration processes in the primary combustion chamber are achieved on "controlled-air" incineration principle (starved air incinerator), i.e. with additional air less than the stoichiometric. In starved air incinerator, the waste in primary combustion chamber will be gasified and partially burnt using a support heat (from the primary auxiliary oilburner). So, the thermal reactions occurring in the primary combustion chamber (PCC) are a combination of combustion and pyrolysis. As primary (incineration) auxiliary oil-burner began to operate the combustible materials are ignited, after some minutes. At temperature between C, the drying and degassing processes were occurred (evolution of volatile contents e.g. hydrocarbons and water). The drying and degassing process do not require any oxidizing agent and are only dependent on the supplied heat from the primary auxiliary oil-burner. While at temperature between C the pyrolysis process began Preheating period Incineration (burning) period Cooling period Temperature, C ) ) ) ) ) 750 ) ) T PCC T SCC ) ) ) ) ) ) ) ) ) ) ) ) Time, minutes Figure4: The Higher, Lower Values and Variation of Temperatures of Primary and Secondary Combustion Chambers with Time The additional primary air supply was sufficient to incinerate the carbon-rich (organic) residues by the pyrolysis process. Thereby, the necessary heat for the decomposition of organic substances in the absence of an oxidizing agent was

10 60 S. S. Wahid generated. Also, at the same time of pyrolysis process, gasification of the carbonaceous residues was achieved by the reaction of the residues with water vapour and CO2 at temperatures around 500 C. Hot exhaust gases seep upwards through the combustible material, heating it and causing it to decompose into small volatile molecules. Depending on the type of waste, the interval is varied from minutes. The heat stored in the refractory material speeds up the pyrolysis process. Thus, solid organic matter is transferred to the gaseous phase. In addition to the temperature, water, steam and oxygen support this reaction. Keeping the temperature of the incineration chamber (PCC) at 800±50 C confirms and ensures the continuity of pyrolysis process. The products of the pyrolysis reaction, in primary combustion chamber, are typically hydrocarbon gases (mainly methane), carbon monoxide and water vapour off-gases, and unburned carbon. These product gases from the pyrolysis and incineration process in the incineration chamber (at around 800±50 C) are taken off to the secondary combustion chamber (SCC) (thermal oxidation chamber) through a refractory lined smoke gas flue, in which the secondary auxiliary oil-burner with the additional secondary combustion excess air supply is built, to complete their combustion (oxidation), and ensure optimum conditions for the destruction of micro-organisms, and the oxidation of the pyrolysis off-gases [16]. After the end of the incineration period, the primary and secondary auxiliary oil-burners were turn off. The air blowers were remained in working to cool the components of incineration plant specially the combustion chambers, even the temperature of the secondary combustion chamber was reached to about 50 C. The cooling period was taken about 2 hours. This cooling period may be exceeded to more than 2 hours, whenever the incineration period increased. Finally, this incineration plant under investigation has a high carefully disposal effect of highly infectious hazard (biomedical) waste, composed of many types of wastes, including Type 4 (pathological waste). From these experimental results that have been got from this incineration plant under investigation, it has been confirmed that the incineration process is the most accepted proper disposal method of hazard (biomedical) wastes. So, this represented an optimal and efficient design for a controlled-air (starved-air) incineration plant which is complied to the rules of EEAA Moreover, it is worth to note that, there were another nine incineration plants for hospitals (with a capacity of 100kg/h), which had been built in nine hospitals of nine cities of Minia governorate. All of these incineration plants were subjected to the same receipt protocol and strategy that mentioned previously. CONCLUSIONS This investigated hazardous waste incineration plant for hospitals operates efficiently at the designed parameters levels and has a full compliance with standard specification and rules of "Egyptian Environmental Affairs Agency (EEAA)", according to Law No. 94/1994 & Executed Regulations No. 338/1995". The operating parameters of temperatures of combustion chambers, and outer surface body of incinerator are within the standard levels. Also, the measured values of the gaseous emission from chimney are less than the standard values. As well as, it operates safety with rapid complete destruction, and clean disposal of hazard (biomedical) wastes. There are no odours or smokes leakage from incinerator's doors, also, no appearance of black smoke from chimney. Moreover, the residues ash is 4-5% of the incinerator capacity. This ash is composed mainly of a fine grains, which is proved that the completeness of the incineration process and the combustion. This incineration plant is simple in construction, easy to operate and low cost compared with the imported incinerators, and most of the maintenance work can be done by local workers using local available material.

11 An Optimal Desin of Hazardous (Biomedical) Waste Incineration Plant 61 Therefore, it is worth noting to state that, the design of this investigated incineration plant is considered to be an efficient design for hazardous waste incinerator for hospitals. So, this efficient design of this controlled-air incineration plant is the most accepted proper disposal method for the incineration of hazard (biomedical) wastes. Future Recommendation For saving operational costs, it is recommended that, this incineration plant may be combined with energy recovery systems for various purposes (e.g. heating, steam production, etc.). NOMENCLATURE [Q ] APS Air pollution control system A (PCC) Area of hearth of primary combustion chamber EEAA Egyptian Environmental Affair Agency ECP Electrical control panel IC Incineration chamber mg/nm 3 Milligram per normal cubic meter ng/nm 3 Nano gram per normal cubic meter m ) Waste Mass of waste PCC Primary combustion chamber Heat release rate per unite area of hearth of the primary combustion chamber A(Hearth) [Q ] V(PCC) Heat release rate per unite volume of primary combustion chamber SCC Secondary combustion chamber Tpcc Temperature of primary comb. chamber Tscc Temperature of secondary combustion chamber TOX Thermal oxidizer V (PCC) Volume of primary combustion chamber Volume of secondary combustion chamber V (SCC) REFERENCES 1. S.S.Wahid, "Design Criteria for the Hazardous (Biomedical) Waste Incinerator for Hospitals", (submitted to publication), bulletin of faculty of engineering, Minia University. 2. S. Altin, A. Altin, B. Elevli, O. Cerit " Determination of Hospital Waste Composition and Disposal Methods: a Case Study", Polish Journal of Environmental Studies Vol. 12, No. 2 (2003), Surjit S. Katoch, "Biomedical Waste Classification, and Prevailing Management Strategies", Proceedings of the "Proceedings of International Conference on Sustainable Solid Waste Management", 5-7, September, Chennai, India. pp A.F. Shaaban, " Process engineering design of pathological waste incinerator with an integrated combustion gases treatment unit", Journal of Hazardous Materials, Volume 145, Issues 1 2, 25 June 2007, Pages M.F. Reis," Solid Waste Incinerators: Health Impacts", Encyclopaedia of Environmental Health, 23 February 2011, Pages International Committee of the Red Cross (ICRC) "Medical Waste Management", 19 avenue de la Paix, 1202, Geneva, Switzerland, November Catalogue of Envikraft A/S Topstykket 18 DK-3460 Birkerød Denmark 8. Catalogue of Nika, Engineers Private Limited, India, 2010

12 62 S. S. Wahid 9. S.S.Wahid, "Assessment of Physiochemical Properties of Hazardous (Biomedical) Waste Categories, As a Working Medium for the Incinerators, A Case Study in (General Hospitals of Minia Governorate Cities, Egypt)", (submitted to publication ), bulletin of faculty of engineering, Minia University. 10. "Guidance For Incinerator Design and Operation", Volume 1, General, December 1988, Ontario, Ministry of Environment and Energy. 11. Walter R. Niessen, "Combustion and Incineration Processes", Third Edition, 2002, Revised and Expanded, Marcel Dekker, Inc. New York, Basel 12. "AP42, Fifth Edition, Volume I", "Section 2.3, Medical Waste Incineration", 1June Edward M. Voelker, " Incinerator Standards", Journal of the Air Pollution Control Association, Technical Committee, Incinerator Institute of America (IIA), New York, USA, October 1962 / Volume 12, No. 10, page Howard S. Peavy, Donald R. Rowe, and George Tchobanoglous "Enviromental Engineering", McGraw-Hill, Robert M Bethea, P.E., Ph.D, " Air Pollution Control Technology, An Engineering Analysis Point of View", Van Nostrand Reinhold Environmental Engineering Series, Van Nostrand Reinhold Company, NewYork, European Commission, "Integrated Pollution Prevention and Control, Reference Document on the Best Available Techniques for Waste Incineration", August 2006 :ىبرعصخلم تايفشتسمللةرطخلاتايافنلا ) ديمرت ( قرحةطحمللثمأميمصت ديحوميهاربإدعسقيدص دقو (100kg/h). ةعسب تايفشتسمللةرطخلاتايافنلا (ديمرت) قرحةطحمللضفأولاعفىرصمميمصتققحيثحبلااذه نوناقللاقبطو (EEAA) يرصملاةئيبلانوئشزاهجلةيسايقلادعاوقلاو تاهيجوتلاوتافصاوملل اقفوةقرحملاهذهتممص تايفشتسمةرشعيف ( prototype )يلوأجذومنك قراحملاهذهتينبدقو.(338/1995) مقرهلةذفنملاحئاوللاو ) (94/1994 مقر (hearth) دقومتاذودحاوطخ ىلعنيتيلاتتمقارتحإللنيتجودزمنيتفرغنمضتتقراحملاهذهو.رصم اينملاةظفاحمندمب تايافنلا (ديمرت) قرحةطحمنأىلإةراشإلاردجت ثحبلااذهنم.ءاوهلاىف (ةردن) مكحتلاعمىرارحلاللحتلابلمعتوتباث دعاوقلا و تافصاوملا عمامامت ةقباطتم اهنأ و ميمصتلا تاريغتم تايوتسم ىلع ةءافكب لمعتهذه تايفشتسملل ةرطخلا لمعت ىتلا (ديمرتلا) قرحلا ةطحمل لاعفلا ميمصتلا اذه نإف كلذل.هنيناوقو ىرصملا ةئيبلا نوئش زاهجل ةيسايقلا تايافنلا (ديمرت) قرحل ميلسلا نما لا صلختلل ةقيرطك الوبق رثكألا وه ءاوهلا ىف (ةردن) مكحتلا و ىرارحلا للحتلاب.ةرطخلا (ةيويحلاةيبطلا)

APPROVAL FOR HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS

APPROVAL FOR HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS International Journal of Industrial Engineering and Technology (IJIET) ISSN 2277-4769 Vol. 3, Issue 1, Mar 2013, 81-92 TJPRC Pvt. Ltd. APPROVAL FOR HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS

More information

OPERATION AND PERFORMANCE TESTING OF THE HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS

OPERATION AND PERFORMANCE TESTING OF THE HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS International Journal of Applied Engineering Research and Development (IJAERD) ISSN 2250-1584 Vol. 3, Issue 1, Mar 2013, 11-24 TJPRC Pvt. Ltd. OPERATION AND PERFORMANCE TESTING OF THE HAZARDOUS (BIOMEDICAL)

More information

An Experimental Approached to Investigate Keys Operating Parameters for Thermal Destruction of Major Components of Simulated Infectious Waste

An Experimental Approached to Investigate Keys Operating Parameters for Thermal Destruction of Major Components of Simulated Infectious Waste An Experimental Approached to Investigate Keys Operating Parameters for Thermal Destruction of Major Components of Simulated Infectious Waste Paisan Letsalaluk 1, Woranuch Jangsawang 1 and Somrat Kerdsuwan,*

More information

1) ABSORPTION The removal of one or more selected components from a gas mixture by absorption is probably the most important operation in the control

1) ABSORPTION The removal of one or more selected components from a gas mixture by absorption is probably the most important operation in the control 1) ABSORPTION The removal of one or more selected components from a gas mixture by absorption is probably the most important operation in the control of gaseous pollutant emissions. Absorption is a process

More information

HOW PYROLYSIS WASTE TO ENERGY WORKS

HOW PYROLYSIS WASTE TO ENERGY WORKS HOW PYROLYSIS WASTE TO ENERGY WORKS The use of pyrolysis in the thermal processing of municipal solid waste is becoming more widespread in application due to the overall flexibility of the pyrolysis process.

More information

A Burning Experiment Study of an Integral Medical Waste Incinerator

A Burning Experiment Study of an Integral Medical Waste Incinerator Energy and Power Engineering, 2010, 2, 175-181 doi:10.4236/epe.2010.23026 Published Online August 2010 (http://www.scirp.org/journal/epe) A Burning Experiment Study of an Integral Medical Waste Incinerator

More information

Chapter 13. Thermal Conversion Technologies. Fundamentals of Thermal Processing

Chapter 13. Thermal Conversion Technologies. Fundamentals of Thermal Processing Chapter 13 Thermal Conversion Technologies Fundamentals of Thermal Processing Thermal processing is the conversion of solid wastes into gaseous, liquid and solid conversion products with the concurrent

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

FREQUENTLY ASKED QUESTIONS (FAQS)

FREQUENTLY ASKED QUESTIONS (FAQS) FREQUENTLY ASKED QUESTIONS (FAQS) Q: Why is this different from every other incinerator out there? A: Incinerators are usually multi-chamber, or have a moveable grate where the waste sits while burning.

More information

Bio-medical Wastes Disposal Incinerator Systems - Understanding, Criteria and Analysis For Comparative Selection, By Homi R. Mullan.

Bio-medical Wastes Disposal Incinerator Systems - Understanding, Criteria and Analysis For Comparative Selection, By Homi R. Mullan. .Page 1 of 9 BIO-MEDICAL WASTES DISPOSAL INCINERATOR SYSTEMS - UNDERSTANDING, CRITERIA AND ANALYSIS FOR COMPARATIVE SELECTION. Preamble The Bio-medical waste (Handling and Management) Rules, 1998, promulgated

More information

MP-300. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better!

MP-300. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better! The most thermally efficient, robust and reliable medical incinerators on the market Simply Built Better! Specifically designed for medical waste. MP-300 The MP medical hot hearth Incinerators The Addfield

More information

Application of CFB (Circulating Fluidized Bed) to Sewage Sludge Incinerator

Application of CFB (Circulating Fluidized Bed) to Sewage Sludge Incinerator Application of CFB (Circulating Fluidized Bed) to Sewage Sludge Incinerator Akira Nakamura*, Toshihiko Iwasaki**, Takashi Noto*, Hisanao Hashimoto***, Nobuyuki Sugiyama**** and Masahiro Hattori***** *

More information

Technical Description Package Micro Auto Gasification System (MAGS )

Technical Description Package Micro Auto Gasification System (MAGS ) 1 Technical Description Package Micro Auto Gasification System (MAGS ) written consent of Terragon Environmental Technologies Inc. is forbidden. Date 2 1. TECHNOLOGY DESCRIPTION 1.1. Process Overview Terragon

More information

Borregaard Case Study. Sarpsborg I & II

Borregaard Case Study. Sarpsborg I & II Borregaard Case Study Sarpsborg I & II Borregaard Case Study Sarpsborg I & II Situation Borregaard Industries is a major supplier of wood-based chemicals. The company owns and operates one of the world

More information

MP-500. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better!

MP-500. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better! The most thermally efficient, robust and reliable medical incinerators on the market Simply Built Better! Specifically designed for medical waste. MP-500 The MP medical hot hearth Incinerators designed

More information

MP-400. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better!

MP-400. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better! The most thermally efficient, robust and reliable medical incinerators on the market Simply Built Better! Specifically designed for medical waste. MP-400 The MP medical hot hearth Incinerators designed

More information

The types of industrial exhaust streams that present particular pollution-control challenges include:

The types of industrial exhaust streams that present particular pollution-control challenges include: Choosing the Right Emissions Control Option Steve Blocki, P.E, Durr Systems, Inc. Determining the most economical option to control airborne emissions during chemical process operations presents several

More information

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management WESTINGHOUSE PLASMA GASIFICATION Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human

More information

Environmental Performance Test of Hazardous Waste Incinerator in Indonesia

Environmental Performance Test of Hazardous Waste Incinerator in Indonesia Environmental Performance Test of Hazardous Waste Incinerator in Indonesia Prof. Kardono, Ph.D. Environmental Technology Center Agency for the Assessment and Application of Technology (BPPT) Jakarta, INDONESIA

More information

INDUCED-DRAFT RICE HUSK GASIFIER WITH WET SCRUBBER AND JET-TYPE BURNER: DESIGN AND PERFORMANCE

INDUCED-DRAFT RICE HUSK GASIFIER WITH WET SCRUBBER AND JET-TYPE BURNER: DESIGN AND PERFORMANCE Technical Bulletin No. 41 INDUCED-DRAFT RICE HUSK GASIFIER WITH WET SCRUBBER AND JET-TYPE BURNER: DESIGN AND PERFORMANCE by Alexis T. Belonio and Ted Redelmeier Gasification of biomass is becoming of interest

More information

INCINERATION. Combustion Efficiency. NACT Incinerators NACT 270. Incinerators. 3 T's Time (of residence) Temperature Turbulence

INCINERATION. Combustion Efficiency. NACT Incinerators NACT 270. Incinerators. 3 T's Time (of residence) Temperature Turbulence NACT 270 Incinerators INCINERATION A combustion process, in which the primary purpose is to destroy combustible material. Biomedical Incinerators: Hospital, Pathological and Crematory Incinerators. Heat

More information

Green Incinerators Brand. Scan & Surf

Green Incinerators Brand. Scan & Surf Environment Partners Green Incinerators Brand. Scan & Surf N.C Medical Technology Co., Ltd. M.7411, No.58 - Post Code: 210019 Nanjing - P.R.China E-mail: info@incineratorwaste.com Website: http://www.incineratorwaste.com

More information

EQUIPMENT ENGINEERING

EQUIPMENT ENGINEERING EQUIPMENT ENGINEERING Anlagenbau GmbH & Co. KG Complete Solutions from one Supplier Flue Gas Purification for Process Waste and Special Waste Incineration Applications Flexibled solutions through modular

More information

Technical Session on Healthcare Waste Management - Treatment of infectious and sharp waste -

Technical Session on Healthcare Waste Management - Treatment of infectious and sharp waste - Technical Session on Healthcare Waste Management - Treatment of infectious and sharp waste - Global Learning Event WASH in hcf in Kathmandu - March 2017 - Presented by: Dr. Ute Pieper (PhD) WHO Consultant

More information

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco Paykan Safe and Matt Russell WorleyParsons Gas Cleaning, Irving, Texas USA ABSTRACT PT Inco is a ferronickel smelter in Soroako, Sulawesi,

More information

Biomass Gasification

Biomass Gasification Biomass Gasification Efficient use of Energy Turning waste to energy, liabilities to assets and visions into reality. Table of Contents THE HTI ADVANTAGE...................... 1 FEED SYSTEMS..........................

More information

TheDesignandConstructionofaStepGrateIncinerator

TheDesignandConstructionofaStepGrateIncinerator Global Journal of Researches in Engineering: A Mechanical and Mechanics Engineering Volume 16 Issue 3 Version 1.0 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global Journals

More information

Incinerator Options. Surefire TS Fixed Hearth Incinerators. todaysurematthews.com +44 (0) Application. Throughput Capacities

Incinerator Options. Surefire TS Fixed Hearth Incinerators. todaysurematthews.com +44 (0) Application. Throughput Capacities Our Surefire range of incinerators are engineered to provide a safe efficient solution for the disposal of a wide range of wastes, such as hazardous, medical, animal, general and liquid waste streams.

More information

Thermal Oxidation plants February 2016

Thermal Oxidation plants February 2016 Thermal Oxidation plants February 2016 Thermal Oxidation of gaseous waste Typical Processed Stream: Contaminated Air by Hydrocarbons Contaminated Air by Solvents Contaminated Air by Stripping/Scrubbing

More information

TRIAL BURN TECHNOLOGY FOR WASTE THERMAL PLANT

TRIAL BURN TECHNOLOGY FOR WASTE THERMAL PLANT 유동층공학환경응용기술연구회 TRIAL BURN TECHNOLOGY FOR WASTE THERMAL PLANT 1999. 12. 16 한국원자력연구소 / 핵화공연구팀 양희철 Content Trial Burn Concept Trial Burn Technologies Trial Burns of PAM system Recommendations Glossary APCE

More information

GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR

GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR INCINERATORS (MUNICIPAL WASTE INCINERATION) BPM 12/1 (08) Environmental Protection Department Air Policy Group February 2008 1. INTRODUCTION 1.1 This Note

More information

Incinerators for hazardous materials Safety and reliability with newest technology

Incinerators for hazardous materials Safety and reliability with newest technology TRANSPORTABLE / MOBILE INCINERATOR UNITS TIU-8G+ 2017 made in Germany Retrofittable modular system TIU-8G+: 0 250 kg/hr 850/1100 C Incinerators for hazardous materials Safety and reliability with newest

More information

Catalytic Abatement Plant

Catalytic Abatement Plant Industrial Air Purification Catalytic Abatement Plant Ethylene Oxide Abatement for Medical Devices Ethylene Oxide (EtO) Sterilization Process Advancement in medical procedures has resulted in the increased

More information

Robust flue gas probes for industrial emissions measurements.

Robust flue gas probes for industrial emissions measurements. Robust flue gas probes for industrial emissions measurements. For reliable measurements using testo 340 and testo 350, even in the harshest of conditions. Robust flue gas probes for industrial emissions

More information

Pyrolysis of Spent Ion Exchange Resins 12210

Pyrolysis of Spent Ion Exchange Resins 12210 Pyrolysis of Spent Ion Exchange Resins 12210 Dr. Georg Brähler, Rainer Slametschka, NUKEM Technologies GmbH ABSTRACT Organic ion exchangers (IEX) play a major and increasing role in the reactor coolant

More information

Effect of Fuel Particle Size on Emissions and Performance of Fluidized Bed Combustor

Effect of Fuel Particle Size on Emissions and Performance of Fluidized Bed Combustor 2011 International Conference on Biology, Environment and Chemistry IPCBEE vol.24 (2011) (2011)IACSIT Press, Singapoore Effect of Fuel Particle Size on Emissions and Performance of Fluidized Bed Combustor

More information

COMPREHENSIVE MSW PROCESSING STEPS BIO COKE METHOD

COMPREHENSIVE MSW PROCESSING STEPS BIO COKE METHOD COMPREHENSIVE MSW PROCESSING STEPS BIO COKE METHOD STEPS BIOCOKE METHOD FOR CONVERSION OF MSW TO COAL AND FUEL OIL STEPS BIOCOKE processing system is designed for converting the MSW which is received on

More information

RECENT CHANGES TO REGULATORY REQUIREMENTS FOR LOW LEVEL RADIOACTIVE WASTES INCINERATION AT FUEL FACILITIES IN CANADA

RECENT CHANGES TO REGULATORY REQUIREMENTS FOR LOW LEVEL RADIOACTIVE WASTES INCINERATION AT FUEL FACILITIES IN CANADA Canadian Nuclear Commission canadienne Safety Commission de sûreté nucléaire RECENT CHANGES TO REGULATORY REQUIREMENTS FOR LOW LEVEL RADIOACTIVE WASTES INCINERATION AT FUEL FACILITIES IN CANADA A Technical

More information

Transportable disease control units

Transportable disease control units DISEASE CONTROL UNIT DCU 8G+ 2016 Retrofittable modular system 0-250 kg/hour Capacity > 4 m³ 1300 C made in Germany Transportable disease control units Incinerators for infected hazardous materials Safety

More information

State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes

State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes State Of The Art (SOTA) Manual For Non-Hazardous Onsite Remediation Processes July 1997 State of New Jersey Department of Environmental Protection Air Quality Permitting Program State of the Art (SOTA)

More information

Incineration (energy recovery through complete oxidation) Mass Burn Refuse Derived Fuel Pyrolysis Gasification

Incineration (energy recovery through complete oxidation) Mass Burn Refuse Derived Fuel Pyrolysis Gasification Incineration (energy recovery through complete oxidation) Mass Burn Refuse Derived Fuel Pyrolysis Gasification WPC Plasma Gasification Reactor Cross Section Technology proven in 1989 at General Motors,

More information

S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES

S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES UOP Callidus Oxidizers for Waste Destruction TODAY S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES Thermal oxidizer systems Catalytic oxidizer systems Callidus, experts in Thermal Oxidizers

More information

UNIT IV OFF-SITE PROCESSING PART A (2 MARKS) 1. Differentiate between aerobic and anaerobic composting of MSW Aerobic composting process is a single stage process in which aerobic microorganisms oxidize

More information

TheDesignandConstructionofaStepGrateIncinerator

TheDesignandConstructionofaStepGrateIncinerator Global Journal of HUMANSOCIAL SCIENCE: H Interdisciplinary Volume 16 Issue 3 Version 1.0 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global Journals Inc. (USA) Online ISSN:

More information

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems Callidus Oxidizer Systems Thermal and Catalytic Oxidizer Systems Meet the Thermal Oxidizer Experts Wide Range of Applications Honeywell UOP Callidus is an industry leader in environmental combustion technology.

More information

ECO2 LINCS LTD SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY

ECO2 LINCS LTD SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY ISSUE NUMBER 1 DATE 16/11/07 AUTHOR CHECKED SMO TME Title Page ISSUE NUMBER 1 DATE 16/11/07 AUTHOR CHECKED SMO TME Title Page TABLE

More information

Development and optimization of a two-stage gasifier for heat and power production

Development and optimization of a two-stage gasifier for heat and power production Journal of Physics: Conference Series PAPER OPEN ACCESS Development and optimization of a two-stage gasifier for heat and power production Related content - Design and implementation of a laserbased absorption

More information

An Innovative Volatile Organic Compound Incinerator

An Innovative Volatile Organic Compound Incinerator 10 th U. S. National Combustion Meeting Organized by the Eastern States Section of the Combustion Institute April 23-26, 2017 College Park, Maryland An Innovative Volatile Organic Compound Incinerator

More information

Field trip to Arnoldstein WTE facility Arnoldstein, Austria, December 19, by Werner Sunk

Field trip to Arnoldstein WTE facility Arnoldstein, Austria, December 19, by Werner Sunk Field trip to Arnoldstein WTE facility Arnoldstein, Austria, December 19, 2005 by Werner Sunk On December 19 th, 2005, Werner Sunk of Columbia University/WTERT/EEC visited the WTE facility Arnoldstein

More information

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

Biomass Boiler Emission Abatement Technologies. Simon Wakefield Biomass Boiler Emission Abatement Technologies Simon Wakefield simon.wakefield@hwenergy.co.uk About Us Established in 2003 Specialise only in biomass heating Team of 50 staff Design & engineering led company

More information

Chapter 2.1: Fuels and Combustion

Chapter 2.1: Fuels and Combustion Chapter 2.1: Fuels and Combustion Part I: Objective type Questions and Answers 1. The unit of Density in SI system is. a) kg/m 2 b) kgf/m 3 c) kg/m 2 d) kg/m 3 2. Name the instrument used for the measurement

More information

A Presentation Prepared For: PROCESS COMBUSTION CORPORATION

A Presentation Prepared For: PROCESS COMBUSTION CORPORATION A Presentation Prepared For: PROCESS COMBUSTION CORPORATION Introductions Mike Foggia - Business Development / Marketing Manager Son Nguyen Business Development Manger Gulf Coast 2 Program Objectives Technology

More information

GASIFICATION THE WASTE-TO-ENERGY SOLUTION SYNGAS WASTE STEAM CONSUMER PRODUCTS TRANSPORTATION FUELS HYDROGEN FOR OIL REFINING FERTILIZERS CHEMICALS

GASIFICATION THE WASTE-TO-ENERGY SOLUTION SYNGAS WASTE STEAM CONSUMER PRODUCTS TRANSPORTATION FUELS HYDROGEN FOR OIL REFINING FERTILIZERS CHEMICALS GASIFICATION THE WASTE-TO-ENERGY SOLUTION WASTE SYNGAS STEAM CONSUMER PRODUCTS HYDROGEN FOR OIL REFINING TRANSPORTATION FUELS CHEMICALS FERTILIZERS POWER SUBSTITUTE NATURAL GAS W W W. G A S I F I C A T

More information

Effectiveness of briquetting bio mass materials with different ratios in 10 kw down draft gasifier

Effectiveness of briquetting bio mass materials with different ratios in 10 kw down draft gasifier Effectiveness of briquetting bio mass materials with different ratios in 10 kw down draft gasifier K.Sivakumar 1* B. Sivaraman 2 and N.Krishna Mohan 3 1*, Assistant Professor, Department of Mechanical

More information

Waste-To-Energy New Technologies

Waste-To-Energy New Technologies Glorin Group First Viglas Forum 21 Conference Sustainability, Social and Environmental Responsibility - New Approaches and Technologies. Waste-To-Energy New Technologies VIGLAS FORUM 21 FOR SUSTAINABLE

More information

Appendix VIII: Determination of chimney heights

Appendix VIII: Determination of chimney heights Appendix VIII: Determination of chimney heights 181 Regional Air Quality Plan for Taranaki 182 Regional Air Quality Plan for Taranaki Appendix VIII: Determination of stack heights and boiler operation

More information

CEMENT PLANT ENVIRONMENTAL TECHNOLOGY FOR ACHIEVING HIGH SO 2 REMOVAL

CEMENT PLANT ENVIRONMENTAL TECHNOLOGY FOR ACHIEVING HIGH SO 2 REMOVAL CEMENT PLANT ENVIRONMENTAL TECHNOLOGY FOR ACHIEVING HIGH SO 2 REMOVAL Sara Safariyeganeh sara.safariyeganeh@mecsglobal.com Cary Joe Lovett, PE joe.lovett@holcim.com Abstract - The EPA has adopted revised

More information

State of the Art (SOTA) Manual for Stationary Gas Turbines

State of the Art (SOTA) Manual for Stationary Gas Turbines State of the Art (SOTA) Manual for Stationary Gas Turbines Original Date: July 1997 Revision Date: November 1999 State of New Jersey Department of Environmental Protection Air Quality Permitting Program

More information

1.01 Development of the Air cross flow gasification-process

1.01 Development of the Air cross flow gasification-process PROCESS- AND TECHNOLOGY- DESCRIPTION AIR CROSS FLOW- GASIFICATION Seite2 1 Description of the technology: 1.01 Development of the -process The VER Ltd. began in 1993 with the development of a new gasification

More information

CECEBE Technologies Inc.

CECEBE Technologies Inc. 98.2.8 Improving Furnace-Boiler System in Sulfuric Acid Plants Dr. Gordon M. Cameron and Dr. Dahya Bhaga CECEBE Technologies Inc. 4 Wellesbourne Crescent Toronto, Ontario Canada, M2H 1Y7 Tel: (416) 490-9840

More information

Batch waste gasification technology: characteristics and perspectives

Batch waste gasification technology: characteristics and perspectives Waste to Energy 125 Batch waste gasification technology: characteristics and perspectives P. De Filippis 1, M. Scarsella 1, N. Verdone 1 & G. B. Carnevale 2 1 Chemical Engineering Department, Sapienza

More information

Module 4: Gaseous Fuel. Lecture 28: Water Gas

Module 4: Gaseous Fuel. Lecture 28: Water Gas 1 P age Module 4: Gaseous Fuel Lecture 28: Water Gas 2 P age Keywords: Coal gasification, steam blast, blast saturation temperature, gas generator 4.3 Water gas Water gas is a gaseous fuel generated in

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation

More information

GM2000. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better! GM2000. Touch Screen.

GM2000. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better! GM2000. Touch Screen. The most thermally efficient, robust and reliable medical incinerators on the market Simply Built Better! Our largest low capacity medical incinerators on the market, extremely robust with a pre-cast block

More information

POZP 8 EN Incineration. Combustion Flares Combustion units Catalytic VOC oxidation Incineration of Hazard materials Vent gas cleaning Summary

POZP 8 EN Incineration. Combustion Flares Combustion units Catalytic VOC oxidation Incineration of Hazard materials Vent gas cleaning Summary POZP 8 EN Incineration Combustion Flares Combustion units Catalytic VOC oxidation Incineration of Hazard materials Vent gas cleaning Summary Thermal Oxidation Description Thermal oxidation is the oxidation

More information

New Generation Mobile Unit for PCBs Contaminated Oil and POPs Destruction with High Temperature

New Generation Mobile Unit for PCBs Contaminated Oil and POPs Destruction with High Temperature New Generation Mobile Unit for PCBs Contaminated Oil and POPs Destruction with High Temperature 10 th Annual Pesticide and AG Plastics Stewardship Conference Savannah, Georgia February 21-23, 2010 1 Introduction

More information

Industrial Air Purification. The Promise of Clean Air

Industrial Air Purification. The Promise of Clean Air Industrial Air Purification LESNI - The Air Purification People The Promise of Clean Air We solve your exhaust air problems as effectively and economically as possible LESNI A/S specialises in providing

More information

R A S C H K A. Compact -Fluidized Bed Incinerator

R A S C H K A. Compact -Fluidized Bed Incinerator R A S C H K A Compact -Fluidized Bed Incinerator Lonza Engineering Ltd Muenchensteinerstrasse 38,CH-4002 Basel, Switzerland phone: +41 61 316 8606 fax:+41 61 316 9606 e-mail: info.engineering@lonza.com

More information

CHAPTER 6 BOILER EFFICIENCY

CHAPTER 6 BOILER EFFICIENCY CHAPTER 6 BOILER EFFICIENCY 6.1 Introduction Boiler operation is very complex and plays very important role in sugar mill. Sugar mill requires steam for the process and electric power for auxiliary consumption.

More information

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Air Division INSTRUCTIONS FOR COMPLETION OF DATA SHEET FOR WASTE DISPOSAL

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Air Division INSTRUCTIONS FOR COMPLETION OF DATA SHEET FOR WASTE DISPOSAL ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Air Division INSTRUCTIONS FOR COMPLETION OF DATA SHEET FOR WASTE DISPOSAL ADEM 106 All applicable portions of this form should be completed by printing or

More information

Gasification of Municipal Solid Waste

Gasification of Municipal Solid Waste Gasification of Municipal Solid Waste Salman Zafar Renewable Energy Advisor INTRODUCTION The enormous increase in the quantum and diversity of waste materials and their potentially harmful effects on the

More information

Biomass gasification plant and syngas clean-up system

Biomass gasification plant and syngas clean-up system Available online at www.sciencedirect.com ScienceDirect Energy Procedia 75 (2015 ) 240 245 The 7 th International Conference on Applied Energy ICAE2015 Biomass gasification plant and syngas clean-up system

More information

Combined Cycle Gasification Plant

Combined Cycle Gasification Plant Combined Cycle Gasification Plant Kenneth Jørgensen and Robert Heeb Babcock & Wilcox Vølund A/S Abstract: The gasification technology promises many technological advantages compared to traditional steam

More information

Hazardous Waste Management

Hazardous Waste Management Westinghouse Plasma Corporation Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human

More information

Chapter Five Waste Processing, Treatment and Recycling Joe Green Dr Chris Wooldridge Cardiff University

Chapter Five Waste Processing, Treatment and Recycling Joe Green Dr Chris Wooldridge Cardiff University Chapter Five Waste Processing, Treatment and Recycling Joe Green Dr Chris Wooldridge Cardiff University Learning Outcomes: By completing this section you should: Be aware of the options for waste separation

More information

Atmospheric Emissions from Stationary Combustion Turbines

Atmospheric Emissions from Stationary Combustion Turbines GUIDELINE A-5 Atmospheric Emissions from Stationary Combustion Turbines Legislative Authority: Environmental Protection Act, Sections 6, 9, and 14 Ontario Regulation 346 Responsible Director: Director,

More information

WOOD PELLETS- A GROWING MARKETPLACE

WOOD PELLETS- A GROWING MARKETPLACE WOOD PELLETS- A GROWING MARKETPLACE The present drive for carbon neutral energy sources has given rise to increasing focus on biomass for energy. A big component of the world s biomass energy resource

More information

#KT2QNNWVKQP6GEJPQNQI[(CEV5JGGV

#KT2QNNWVKQP6GEJPQNQI[(CEV5JGGV #KT2QNNWVKQP6GEJPQNQI[(CEV5JGGV 1. Name of Technology: Regenerative Incinerator This type of incinerator is also referred to as a regenerative thermal oxidizer (RTO), or a regenerative catalytic oxidizer

More information

Chapter page 1

Chapter page 1 Chapter 04-04 page 1 04-04: Odd biomass fractions Properties and processes Introduction There are mainly five different processes to choose from to produce useful energy from any type of biomass. Three

More information

Experimental Investigation of Combustible Gases from Primary Combustion Chamber of a High Temperature Air Combustion Incinerator

Experimental Investigation of Combustible Gases from Primary Combustion Chamber of a High Temperature Air Combustion Incinerator 18 th National Conference of Mechanical Engineering Network of Thailand October 18-, 4, KHON KAN, THAILAND Experimental Investigation of Combustible Gases from Primary Combustion Chamber of a High Temperature

More information

Sheffield s Energy Recovery Facility

Sheffield s Energy Recovery Facility Sheffield s Energy Recovery Facility TRANSFORMING OUR RUBBISH INTO ENERGY Veolia Environmental Services Lumley Street Service Centre Lumley Street, Sheffield S4 7ZJ Tel: 0114 228 3660 Fax: 0114 228 3661

More information

Study Results in Demonstration Operation of Oxyfuel Combustion Boiler for CO 2 Capture

Study Results in Demonstration Operation of Oxyfuel Combustion Boiler for CO 2 Capture Vol. 43 No. 2 21 Study Results in Demonstration Operation of Oxyfuel Combustion Boiler for CO 2 Capture YAMADA Toshihiko : Manager, Research & Development Department, Power Plant Division, Energy Systems

More information

Boiler and. steadily increases while the supply decreases energy

Boiler and. steadily increases while the supply decreases energy FEATURE ARTICLE by William G. Acker ENERGY SURVEYS FOR Stewart Cohen/Stone The efficient use of energy is fast becoming a top concern for industry. As business managers become more conscientious about

More information

Development of EAF Dust Recycling and Melting Technology Using the Coal-based FASTMELT Process

Development of EAF Dust Recycling and Melting Technology Using the Coal-based FASTMELT Process Development of Recycling and Melting Technology Using the -based FASTMELT Process By M. Tateishi, H. Fujimoto, T. Harada, H. Sugitatsu Kobe Steel, Ltd. Editor s note: this article was adapted from a paper

More information

ADECOS II. Advanced Development of the Coal-Fired Oxyfuel Process with CO 2 Separation

ADECOS II. Advanced Development of the Coal-Fired Oxyfuel Process with CO 2 Separation Fakultät Maschinenwesen Institut für Energietechnik, Professur für Verbrennung, Wärme- & Stoffübertragung ADECOS II Advanced Development of the Coal-Fired Oxyfuel Process with CO 2 S. Grahl, A. Hiller,

More information

Pre-treatment plant. Plant BIOROT 200 CC. General description

Pre-treatment plant. Plant BIOROT 200 CC. General description Pre-treatment plant The pre-treatment plant consists of 2 automatic parallel lines able to process and ensures the continuity of waste processing, without interruption even during the routine maintenance

More information

GCE Environmental Technology. Energy from Biomass. For first teaching from September 2013 For first award in Summer 2014

GCE Environmental Technology. Energy from Biomass. For first teaching from September 2013 For first award in Summer 2014 GCE Environmental Technology Energy from Biomass For first teaching from September 2013 For first award in Summer 2014 Energy from Biomass Specification Content should be able to: Students should be able

More information

Correctly Modeling and Calculating Combustion Efficiencies In Fired Equipment

Correctly Modeling and Calculating Combustion Efficiencies In Fired Equipment Correctly Modeling and Calculating Combustion Efficiencies In Fired Equipment David Schmitt, President Increase Performance, Inc. Tulsa, Oklahoma Fired equipment includes furnaces, fired heaters, fired

More information

T-125 EVOLUTION OF THERMAL REMEDIATION. Technical Paper T-125. EVOLUTION OF THERMAL REMEDIATION by Wendell R. Feltman P.E.

T-125 EVOLUTION OF THERMAL REMEDIATION. Technical Paper T-125. EVOLUTION OF THERMAL REMEDIATION by Wendell R. Feltman P.E. T-125 EVOLUTION OF THERMAL REMEDIATION Technical Paper T-125 EVOLUTION OF THERMAL REMEDIATION by Wendell R. Feltman P.E. ASTEC encourages its engineers and executives to author articles that will be of

More information

Environment Protection Engineering. POLLUTANT CONCENTRATIONS FROM A 15 kw HEATING BOILER SUPPLIED WITH SUNFLOWER HUSK PELLETS

Environment Protection Engineering. POLLUTANT CONCENTRATIONS FROM A 15 kw HEATING BOILER SUPPLIED WITH SUNFLOWER HUSK PELLETS Environment Protection Engineering Vol. 38 2012 No. 1 MAREK JUSZCZAK* POLLUTANT CONCENTRATIONS FROM A 15 kw HEATING BOILER SUPPLIED WITH SUNFLOWER HUSK PELLETS Sunflower husk pellets were fired in a channel

More information

Energy Performance Assessment of CFBC Boiler

Energy Performance Assessment of CFBC Boiler Energy Performance Assessment of CFBC Boiler Rakesh Kumar Sahu G.Ishwar Rao Kirti Maurya Abstract Steam power plant generates electricity by using fuel as input. In steam power plant boiler is a crucial

More information

Boiler Efficiency Testing. To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler

Boiler Efficiency Testing. To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler Boiler Efficiency Testing Objectives: To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler Theory Most industrial processes require heating. This is usually

More information

Development of Technology for Advanced Utilization of Hydrogen from By-product Gas of Steelmaking Process

Development of Technology for Advanced Utilization of Hydrogen from By-product Gas of Steelmaking Process Technical Review UDC 669. 1. 054. 8 Development of Technology for Advanced Utilization of Hydrogen from By-product Gas of Steelmaking Process Ken-ichiro FUJIMOTO* Kimihito SUZUKI 1. Introduction Huge volumes

More information

TECHNOLOGY. E-COMPANY Holding, s.e., Europe

TECHNOLOGY. E-COMPANY Holding, s.e., Europe TECHNOLOGY E-COMPANY Holding, s.e., Europe With ZERO-EMISSION WASTE TREATMENT RECYCLING is guaranteed and total ENVIRONMENT is safeguarded COMBUSTIBLE is green and free BAT - Best Available Techniques

More information

CHAPTER 3 BENEFITS OF BETTER BURNING

CHAPTER 3 BENEFITS OF BETTER BURNING Combustion Fundamentals CHAPTER 3 BENEFITS OF BETTER BURNING As every stationary engineer knows, conventional fuels are made up of two elements: carbon and hydrogen, which combine with oxygen, in a process

More information

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION UDK 621.311.22:502.174 Dip.el.eng. Igor SEKOVSKI NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION Abstract Today people make a lot of analysis, of work of

More information

Improved solutions for solid waste to energy conversion

Improved solutions for solid waste to energy conversion Improved solutions for solid waste to energy conversion C. Marculescu * Polytechnic University Bucharest, Romania * Corresponding author. Tel: +40745133713, Fax: +40214029675, E-mail: cosminmarcul@yahoo.co.uk

More information

Introduction: Thermal treatment

Introduction: Thermal treatment Thermal Treatment 2 Introduction: Thermal treatment Technologies using high temperatures to treat waste (or RDF) Commonly involves thermal combustion (oxidation) Reduces waste to ash (MSW c. 30% of input)

More information

AN INDIRECT-FIRED ROTARY SUGARCANE BAGASSE TORREFYER: DESIGN AND PERFORMANCE

AN INDIRECT-FIRED ROTARY SUGARCANE BAGASSE TORREFYER: DESIGN AND PERFORMANCE Technical Bulletin No. 40 AN INDIRECT-FIRED ROTARY SUGARCANE BAGASSE TORREFYER: DESIGN AND PERFORMANCE by Alexis Belonio, Isidore Alcantara and Daniel Belonio Sugar mills basically require a lot of power

More information