1 WESTERN AREA COUNSEL OFFICE ENVIRONMENTAL LAW TRAINING SYMPOSIUM April 2017 Pacific Views Event Center, Camp Pendleton, CA REGISTRATION FORM Name Luis Ledesma Occupation: Head Head, Installation Restoration Employer Title or Command: Environmental Security Address: Bldg Camp Pendleton Address: Phone: Fax: If offered, would you participate in an on-premises social hour following the Thursday class day? Please mark x to indicate your preference: Yes [ ] No[ X ] This form may also be faxed (DSN /(760) ), or ed to andrea.givens@usmc.mil. If you have any questions, please call Andrea Givens at (760) , or Donald Bal at (760) Thank you.

2 MCB CAMP PENDLETON SITE 1115 CONCEPTUAL SITE MODEL & RI/FS UPDATE 5 January th FFA Meeting

3 SITE 1115 CSM AND RI/FS UPDATE Location Site Status Site Background/Site History Previous Investigations/Removal Actions (Prior to RI/FS) RI/FS Update and Conceptual Model Remedial Alternatives 2

4 SITE 1115 CSM AND RI/FS UPDATE Site Location Located in Mainside Base Area Approximately 14.5 acres Relatively steep topography (topography sloping to north) N Site 6/7 Site 1 Site 5/8/9/17 3

5 Overview SITE 1115 CSM AND RI/FS UPDATE RIFS Complete Three pilot studies recently completed (to be discussed in a following presentation) Pilot study reporting is on-going Plans underway to update Conceptual Site Model based on pilot study performance Use pilot study results to optimize remedial approach Preparation of ROD and Proposed Plan pending 4

6 SITE 1115 CSM AND RI/FS UPDATE History/Background Site 1115 was formerly known as the 13 Area, Force Service Support Group (FSSG) Lot Historical Site use for vehicle staging, service, fueling Originally 17 separate UST sites were identified on the property, one of which (Site 17) was a pipeline (connecting Sites 5 and 8) The 17 UST sites were later combined into groups based on proximity: Former UST Site 1, 5/8/9/17, and 6/7. One site (17), was a pipeline connecting Sites 5 and 8 All USTs have been removed or closed in-place and remaining contamination is being addressed as Site

7 SITE 1115 CSM AND RI/FS UPDATE Historical Aerial Photos 6

8 SITE 1115 CSM AND RI/FS UPDATE History/Background (Continued) Multiple investigations of UST sites under Base UST Program since 1986 Transferred to IR (under CERCLA) in 2002 due to the presence of VOCs in groundwater the site. Current site use - vehicle staging area (no fueling or servicing) 7

9 SITE 1115 CSM AND RI/FS UPDATE Recent Aerial Photo with Identified Source Areas N Site 1 Site 6/7 Site 5/8/9/17 8 ~200 feet

10 SITE 1115 CSM AND RI/FS UPDATE Previous Investigations and Interim Actions at Site 1115 (Under IR Program) Previous investigations under IR Program leading up to RI/FS: Final Soil Investigation Report for the OU 5 sites (FWENC, 2002) Action Memorandum For Non-Time Critical Removal Action, Operable Unit 5, Site 1115, 13 Area (2003). Draft Final OU 5 RI prepared for Sites 1A-1, 6A, 21, 1111, and 12 (Appendix M) (2004) Previous interim actions leading up to RI/FS: Pilot scale testing of SVE conducted at Former UST Site 1 in 2000 Soil removal action at Former UST Site 1 in 2002 Pilot scale testing of in situ bioremediation at Site 5/8/19/17 in 2009/2010 9

11 SITE 1115 CSM AND RI/FS UPDATE Conceptual Model and RI/FS Update Shallow and deep groundwater zones exist at the site. Dissolved-phase groundwater COPCs generally limited to the shallow zone except benzene which is present above RGs in both zones at Site 1. Fourteen groundwater VOCs exceed their MCLs, and two VOCs exceed their California Response Levels (RLs). Twelve additional COCs were identified in soil and soil gas. Primary dissolved-phase chlorinated VOCs in groundwater are TCE, cis-1,2- DCE, and 1,2-DCA. LNAPL historically present in portions of the shallow groundwater, and one deep well. Residual COCs also present in the vadose zone soils. Potentially significant levels of VOCs in soil gas roughly correspond to the footprint of the groundwater plumes exceeding MCLs. 10

12 SITE 1115 CSM AND RI/FS UPDATE Conceptual Model and RI/FS Update (continued) Santiago Formation occurs as shallow depths - low-permeability siltstone/sandstone. Groundwater contamination has spread several hundred feet beyond the three initial source areas, however there s no evidence of off-site migration. Historically, surface water has collected and infiltrated north of the unpaved crescent-shaped area, resulting in a groundwater mound. Surface water flow in ephemeral creek north of site. Surface runoff from Site 1115 joins San Luis River, reaching the Pacific Ocean approximately 11 miles downstream. Surface flow within tributaries to the San Luis Rey river is ephemeral. No municipal wells are known to exist within 7 miles downstream of the site. 11

13 SITE 1115 CSM AND RI/FS UPDATE Conceptual Model and RI/FS Update (continued) Groundwater flow in the shallow aquifer is multi-directional due to a mound near former Building Groundwater flows: 1) south and southwest beneath the western and southern portions of the site; 2) west beneath the east-central portion of the site; and 3) north and northeast in the northern portion of the site. Deep groundwater at Site 1115 generally flows to the west-southwest at a gradient of ~0.005 feet/foot. The in-situ thermal remediation pilot study implemented within the shallow groundwater zone, is believed to have affected the occurrence of groundwater in the vicinity of Former UST Site 9 (i.e. formerly saturated soils remain unsaturated). 12

14 SITE 1115 CSM AND RI/FS UPDATE 2012 Shallow Groundwater Elevations from RI/FS 13

15 SITE 1115 CSM AND RI/FS UPDATE 2012 Deep Groundwater Elevations from RI/FS 14

16 SITE 1115 CSM AND RI/FS UPDATE Nature and Extent Based on limited groundwater sampling performed during the 2016 pilot studies, the contour maps presented in the RI/FS (2014) were recently updated. The data included on contour maps in the RI/FS (2014) were a minimum i of 4 years old (data from 2012 and older). The recent data (2016) is limited to the western and southwestern portion of the site. These updates are presented on the following slides, and generally represent only minor changes; any exceptions will be discussed d below. 15

17 SITE 1115 CSM AND RI/FS UPDATE TCE in Shallow Groundwater Zone data set with 2016 updates

18 SITE 1115 CSM AND RI/FS UPDATE Cis-1,2-DCE in Shallow Groundwater Zone data set with 2016 updates

19 SITE 1115 CSM AND RI/FS UPDATE Benzene in Shallow Groundwater Zone data set with 2016 updates

20 SITE 1115 CSM AND RI/FS UPDATE Benzene in Deep Groundwater Zone data set with 2016 updates

21 SITE 1115 CSM AND RI/FS UPDATE 1,2-DCA in Shallow Groundwater Zone data set with 2016 updates

22 SITE 1115 CSM AND RI/FS UPDATE 1,2-DCA in Deep Groundwater Zone data set with 2016 updates

23 SITE 1115 CSM AND RI/FS UPDATE Nature and Extent (Continued) Approximately 4 acres (30% of the site) is underlain by groundwater having COCs exceeding MCLs or RLs. Primarily fuel-related compounds at former UST Site 1. A mixture of fuel-related compounds and solvents are at former UST Sites 6/7 and 5/8/9/17. COC concentrations in shallow groundwater zone are approximately 1 order of magnitude greater than in the deep groundwater. 22

24 SITE 1115 CSM AND RI/FS UPDATE Nature and Extent (Continued) As of the timeframe (RI/FS), LNAPL was present in five wells (four at Former UST Sites 5/8/9/17, one at Former UST Site 1). LNAPL has historically been present at 13 wells. Thickest LNAPL is in vicinity of Sites 5/8/9/17; product recovery reduced LNAPL thickness substantially. Residual soil contamination, VOCs and TPH, at each source area. VOCs in soil did not exceed residential RSLs, except for two samples deeper than 10 feet bgs at Sites 5/8/9/17. VOCs in soil gas are at potentially significant concentrations over groundwater plume area. 23

25 SITE 1115 CSM AND RI/FS UPDATE Former UST Site 1 LNAPL (through Jan 2013) 24

26 SITE 1115 CSM AND RI/FS UPDATE Former Sites 5/8/9/17 and 6/7 LNAPL (through Jan 2013) 25

27 SITE 1115 CSM AND RI/FS UPDATE Fate and Transport Based on RI/FS data plumes are generally not expanding beyond their current extent. LNAPL is a continuing source of COCs to the underlying groundwater, and is a much more significant source of contaminant than leaching of residual COPCs from soils. Geochemical conditions within the source areas are generally anaerobic. Geochemical conditions at the outer edges of the plume are predominantly aerobic. Concentration trends of key VOCs (TCE, benzene, and cis- 1,2-DCE) decreasing or stable at leading edge of shallow groundwater plume. 26

28 SITE 1115 CSM AND RI/FS UPDATE Risk Assessment 2012 FS No current complete exposure pathways for human receptors were identified in the RI/FS; groundwater is not used, no buildings, and no plans for development or construction. ti Risk from the hypothetical potable use of groundwater > than 1 x 10-4 and the hazard index is > 1.0. Aquifer has low yield and TDS, but groundwater at the site is classified as having beneficial uses for municipal, agricultural, and industrial supply. VOCs in groundwater and soil gas could pose a significant VI risk (i.e., > 1x10-6 and up to a max of 2 x 10-3 for a hypothetical resident over S1-MW25). Soils not considered to pose a threat to human health via direct contact (i.e., incidental ingestion and dermal contact) based on the soil data to date. The threat to ecological receptors from COPCs at Site 1115 is negligible. 27

29 SITE 1115 CSM AND RI/FS UPDATE Target Treatment t Zones Contaminated areas of Site 1115 are presented in the FS as Target Treatment Zones (TTZs). The designation of the TTZs is based upon 1) distinctive mixtures of contaminants present; 2) the relative concentrations of contaminants present; and, 3) distinct aquifer zones. TTZs were designated in the FS to facilitate t the identification of appropriate technologies, processes, and remedial alternatives in select portions of the larger Site

30 SITE 1115 CSM AND RI/FS UPDATE Target Treatment t Zones (continued) TTZ-1S: Defined as shallow aquifer groundwater in the vicinity of the former UST Site 1 gas station. TTZ-1SP: Shallow, dilute groundwater contaminant plume adjacent to TTZ-1S, and excluding areas adjacent to the east with non-fuel related contamination (TCE, 1,2-DCE) exceeding respective MCLs. TTZ-1D: Deep aquifer groundwater near former UST Site 1. TTZ- 1D is addressed as a near-source area with the highest benzene and 1,2-DCA, and a relatively small downgradient dilute plume area. TTZ-2L: Groundwater near former UST Site 9 impacted by LNAPL; Also includes additional smaller areas of historical LNAPL identified near UST Sites 5/8/17 and 6/7. 29

31 SITE 1115 CSM AND RI/FS UPDATE Target Treatment t Zones (continued) TTZ-2S: Shallow groundwater underlying LNAPL areas defined by TTZ-2L. The CSM assumes LNAPL is a source of dissolved phase contaminants, including benzene and TCE, among other COCs; therefore, in close proximity to LNAPL is considered a source area. TTZ-2SP: Shallow aquifer groundwater downgradient/crossgradient from TTZ-2L and TTZ-2S, extending to the edges of the dilute groundwater plume with contaminant concentrations above MCLs. TTZ-2D: Represents deep aquifer groundwater, excluding TTZ- 1D. Historical sampling in TTZ-2D shows exceedances of MCLs; but sampling during the RI//FS did not show continued impacts above MCLs in TTZ-2D. As such, potential remedial technologies, processes and alternatives for TTZ-2D were not developed. 30

32 SITE 1115 CSM AND RI/FS UPDATE Shallow Groundwater Target Treatment Zones 31

33 SITE 1115 CSM AND RI/FS UPDATE Deep Groundwater Target Treatment Zones 32

34 SITE 1115 CSM AND RI/FS UPDATE Target Treatment Zones on Cross Section A-A 33

35 SITE 1115 CSM AND RI/FS UPDATE Remedial Alternatives Applied to TTZs Alternative 1: No Action Alternative 2: Land Use Controls and Long-Term Monitoring, with Monitored Natural Attenuation Remedial alternatives for the various TTZs include one or more combinations of the following technologies (note that all alternatives listed below [or combinations of alternatives] also include Alternative 2) Excavation and extraction of groundwater and/or LNAPL In situ chemical oxidation (ISCO) Biosparge Biosparge Barrier Dual phase extraction (DPE) Automated LNAPL recovery Enhanced in situ bioremediation and air sparging/soil vapor extraction (AS/SVE) (sequentially) 34

36 SITE 1115 CSM AND RI/FS UPDATE Remedial Alternatives Applied to TTZs 35

37 SITE 1115 CSM AND RI/FS UPDATE TTZ-1S Shallow Groundwater, Former UST Site 1 Area Alternatives 36

38 SITE 1115 CSM AND RI/FS UPDATE TTZ-1D Deep Groundwater, Former UST Site 1 Area Alternatives 37

39 SITE 1115 CSM AND RI/FS UPDATE TTZ-2L LNAPL Source Zone Alternatives 38

40 MCB CAMP PENDLETON SITE 1115 PILOT STUDIES UPDATE 5 January th FFA Meeting

41 Overview Site 1115 Pilot Study Update Site 1115 pilot studies overview and preliminary results In Situ Thermal Remediation (ISTR) at Former UST Site 9 ISCO Applied into open excavation and by Injection at Former UST Site 1 Hydraulic Fracturing at Former UST Site 1 Path Forward 2

42 Site 1115 Pilot Study Update Pilot Studies conducted in two of the sources areas: Near Former UST Site 9 and Former UST Site 1 In Situ Thermal Remediation (ISTR) Pilot Study at Former UST Site 9 (TTZ-2L and TTZ-2S), which is part of Site 5/8/9/17. Excavation to address shallow impacts at Former UST Site 1 (TTZ-1S), followed by introduction of chemical oxidant in excavation. The excavation was implemented as a Removal Action. ISCO injection into the deep aquifer at Former UST Site 1 (TTZ-1D). Fracking Pilot Study at Former UST Site 1 (TTZ-1D) Permeability Enhancement Technology using hydraulic fracturing technique). 3

43 Site 1115 Pilot Study Update 4

44 Site 1115 Pilot Study Update ISTR Pilot Study Area 80 ft x 80 ft area near Former UST Site 9 5

45 Site 1115 Pilot Study Update In Situ Thermal Remediation Pilot Study Assess the effectiveness of thermal conductive heating (TCH) at mobilizing and removing LNAPL and reducing shallow groundwater COCs to below MCLs. Obtain sufficient data to evaluate and optimize the design for full scale implementation of TCH technology to other source/treatment areas. The TCH system consisted of natural gas powered heaters installed in steel TCH wells. The heaters transferred heat to the TCH well casing and then into surrounding soils. NAPL and COCs were mobilized through steam stripping and volatilization and captured through multiphase extraction (MPE) wells. System consisted of: 80 TCH wells 32 MPE Wells Horizontal extraction wells on top of the ground surface (beneath insulating layer) to contain any escaping vapors. 4 temperature monitoring points. 6

46 Site 1115 Pilot Study Update ISTR Pilot Study Area System Layout. 7

47 Site 1115 Pilot Study Update ISTR - Pilot Study Final 111 Days Day BGS Day BGS Day BGS Day BGS 8

48 Site 1115 Pilot Study Update In Situ Thermal Remediation Pilot Study Pre-Treatment Max Soil Concentrations: TPH Diesel 18,000 mg/kg TPH Motor Oil 1,300 mg/kg TPH Gasoline 3,700 mg/kg 1,2,4-TMB 25,000 µg/kg Naphthalene 29,000 µg/kg TCE 820 µg/kg BTEX Not detectable Post-Treatment Max Soil Concentrations TPH Diesel 2,600 mg/kg TPH Motor Oil 720 mg/kg TPH Gasoline < PSLs (6.5 mg/kg) All VOCs/BTEX < PSLs Pre-Treatment LNAPL Max Thickness Pre-treatment Max LNAPL thickness = 11.2 feet in MPE-11 Post-Treatment LNAPL Max Thickness Unknown (groundwater and/or LNAPL has not recovered/rebounded following thermal treatment) 9

49 Site 1115 Pilot Study Update In Situ Thermal Remediation Pilot Study Pre-Treatment Max Groundwater Concentrations 1,2,3-Trichloropropane (0.64 J μg/l),2-dibromoethane (0.52 J μg/l) 1,2-Dichloroethane (38 μg/l) Benzene (120 μg/l) cis-1,2-dce (26 μg/l) Methylene Chloride (10 μg/l) Naphthalene (78 μg/l) Tetrachloroethene (0.47 (J) μg/l) TCE (18 μg/l) TPH-d (6,200 μg/l) TPH-g (1,600 μg/l) TPH-mo (590 μg/l) Post-Treatment Max Groundwater Concentrations Groundwater was absent within the treatment area so no post treatment sampling performed 10

50 Site 1115 Pilot Study Update ISTR Pilot Study Treatment System, Former UST Sites 5/8/17 11

51 Site 1115 Pilot Study Update ISTR Pilot Study Treatment System, Former UST Sites 5/8/17 12

52 Excavation with ISCO, Former UST Site 1 Site 1115 Pilot Study Update Excavation occurred between August and November 2014 to remove vadose zone impacts and deliver chemical oxidants to shallow groundwater. Excavation was 106 feet by 89 feet by 26 feet deep. Excavation extended the 2002 excavation limits by 7 feet towards the east, south, and west, and by 9 feet to the north, and was 6 feet deeper (20 ft bgs in 2002, and 26 ft bgs in 2016). No groundwater or LNAPL encountered during excavation. Wet soils were located from 20 to 26 feet (native soils) and in some areas within the sidewalls outside the previous investigation (most notable at approximately 14 ft bgs). 41 confirmation samples collected, with maximum concentrations found in soil sample 1115-SW (14 ft bgs): 10,000 mg/kg benzene 61,000 mg/kg ethylbenzene 2,800 J mg/kg TPH gasoline 1,600 J mg/kg TPH diesel 13

53 Site 1115 Pilot Study Update Excavation with ISCO, Former UST Site 1 14

54 Site 1115 Pilot Study Update Excavation with ISCO, at Former UST Site 1 11,380 tons of soil excavated. 7,275 tons of vadose zone overburden used as backfill following analytical testing, 4,105 tons were disposed of as contaminated soil. 4,628 lbs of ORC was applied to excavation floor (at ~26 feet bgs) prior to backfill. The entire footprint of excavation from zero to 8 feet bgs was backfilled with imported, clean fill material. 15

55 Site 1115 Pilot Study Update Deep ISCO Injection, Former UST Site 1 ISCO Pilot Study occurred between December 2014 and March Well abandonment activities (S1-MW25 and S1-MW26 located within excavation footprint). Eleven groundwater monitoring wells were installed (1115 -MW-25R, 1115-MW-26R, 1115-MW-29 through 1115-MW-31, and 1115-MW-33 through 1115-MW-38). Nineteen injection wells were installed (1115 -IW-01 through IW-18, and 1115-IW-32 (formerly 1115-MW-32). Two injection events (sodium persulfate and sodium hydroxide), performed in April and September

56 Site 1115 Pilot Study Update Deep ISCO Injection, Former UST Site 1 First Injection Event - 7,920 pounds of sodium persulfate and 11,186 gallons of sodium hydroxide. Second Injection Event - 3,080 pounds of sodium persulfate and 1,645 gallons of sodium hydroxide. Sodium persulfate solution was mixed at a ratio of 24, 55 lb bags per 400 gallons of water. A total of 3,330 gallons of sodium persulfate solution was injected over both events. Four performance monitoring events performed (December 2015, March 2016, and June 2016, September 2016). Groundwater results in key monitoring wells (MW-30, MW-31, MW- 33, and MW-34) show a decrease in benzene concentrations ranging from 88% to 99% and 1,2-DCA ranging from 19% to 98%. Reporting on ISCO Pilot Studies at Site 1 on-going. 17

57 Site 1115 Pilot Study Update Hydraulic Fracturing, Former UST Site 1 Technique can deliver a uniform and effective distribution of treatment amendments in low permeability and fractured media. Goal of pilot study is to demonstrate the effectiveness of the technology using the hydraulic approach in delivering remediation amendments into low permeability zones. In this case, a high-viscosity fluid (guar) was injected into one borehole at multiple depth intervals to overcome in situ confining stress, resulting in soil fracturing. Sand was injected simultaneously to keep the fractures from collapsing. Fracturing was performed in one borehole at multiple depth intervals, followed by conversion of the borehole into an injection well for injection of an NaOH-activated persulfate amendment. Three performance monitoring wells were installed within the 25 foot injection ROI. 18

58 Site 1115 Pilot Study Update Hydraulic Fracturing Results, Permeability Enhancement Unit 19

59 Site 1115 Pilot Study Update Well Layout Used for Hydraulic Fracturing with 25 ft ROI ROI = HMW#3 Enhancement point 1115-HMW# HMW#2 20

60 Site 1115 Pilot Study Update Preliminary Monitoring Data One month following the hydraulic fracturing and subsequent persulfate injection, significant decreases in BTEX compounds were observed at all three new monitoring wells (1115-HWM-01, -02, and -03). 21

61 Site 1115 Pilot Study Update Hydraulic Fracturing Results Successfully created high-k sand lenses and allowed for distribution of a treatment amendment. 1-month post-fracturing results show significant contaminant reduction at monitoring wells located within the anticipated ROI of the fracturing. Decreases in contaminant concentrations were also seen at existing monitoring wells located cross-gradient and downgradient of the demo area and such decreases are expected to continue as groundwater travels downgradient from demonstration area. 22

62 Site 1115 Pilot Study Update Proposed Path Forward Pilot studies are being completed with final data rounds to be collected and results reports to be prepared in Parsons to prepare a technical memorandum to summarize / consolidate pilot study findings and present an updated site conceptual model. Based on final pilot study results remedial alternatives will be selected in consultation with the FFA team and presented in the proposed plan. 23

63 5 January th FFA Meeting

64 Site Locations Sites 1116 and

65 Sites 1116 and

66 Sites 1116 and Status Site 1116 encompasses both former Subsites 1491 and The 1491 and subsite designations are no longer needed. Subsite is still referred to separately since it is geographically separated (1,600 feet northwest). Site 1116 originally consisted of nine former UST sites. Further action recommended at 14112, 1491, and in 2011; No further action determined for remaining sites in

67 Sites 1116 and Three Recent Documents Final Site 1116 Non-Time Critical Removal Action Completion Report (ECM, March 2015). Objective of RA was to address VOCs and fuels in soil and groundwater to reduce potential risks to human health and the environment. The NTCRA included soil excavations, DPE system, and an EISB pilot test. Draft Site 1116 Investigation Summary Report (TetraTech, November 2015). Objective of investigation was to delineate extent of VOCs in groundwater and develop TCE concentration trends. Draft Post NTCRA Performance Groundwater Monitoring Report (ECM, December 2015). Includes groundwater monitoring between January 2014 (Baseline) and March 2015 (5 events total). 5

68 Sites 1116 and Site Setting/Hydrogeology Mission Hydrologic Subarea of the Lower San Luis Hydrologic Area, within the San Luis Rey Hydrologic Unit. Groundwater has designated beneficial uses including domestic supply, but nearest supply wells are ~1 mile from the site. Groundwater is within alluvium, Santiago Formation or weathered granodiorite. Groundwater depth is 5 to 15 ft bgs. Groundwater flow at the site is northeast/east. Up to 7.5 ft of fill or alluvium is overlying sedimentary Santiago Formation or granodiorite it bedrock (Site 1116). 6

69 Sites 1116 and Groundwater Flow, Former Subsite

70 Sites 1116 and Groundwater Flow, Former Subsite

71 Sites 1116 and Groundwater Flow, Site

72 Sites 1116 and Site 1116 Plume Extent (Tri-Eco, 2014) 10

73 Site 1116 Status Sites 1116 and Former UST Subsites 1491 and are now referred to as Site 1116 (subsite designations are no longer needed). Site 1116 COCs are VOCs and fuel-related compounds, specifically: Benzene, cis-1 1,2-DCE, TCE, and TPH-d (1491), 1,1,2-TCA, TCE, and TPH-d (140008), and 1,2-DCA, benzene, naphthalene, TCE, and TPH-d (14112) Cleanup goals for VOCs were established during previous investigations as MCLs; for TPH-d the cleanup goal was established as 100 µg/l (SF Board ESL). 11

74 Former Subsite 1491 Sites 1116 and Former administrative offices and parking. Two 1,000 gallon USTs removed in cubic yards removed in Building 1491 demolished in Two phases of investigation completed in 2012 (17 CPTs, 9 hydropunches, and sampling 8 new wells in addition to 9 existing wells). 2nd Phase of NTCRA in excavation of 665 cubic yards (45 x25 x18 ) and excavation dewatering. Followed by EISB pilot study injection in July - August 2014 reduced d TCE in MW-21 from 140 µg/l to 10 µg/l, but limited area of influence (<80 feet downgradient). 12

75 Sites 1116 and Site 1116 Pilot Study Area (red oval) 13

76 Sites 1116 and Site 1116, Former Subsite Former 12,000 gal diesel tank was removed in Removal action in cubic yards were excavated south of building and excavation was dewatered. Sewer line connection near MW09 (15th and E St) may be a contributing factor for the multi-site plume. Potential source near MW07A/B (in the vicinity of Bldg ) may have contributed to the Building portion of the plume, which is unbounded to the north and east. Movement of combined plume is likely controlled by geologic factors; i.e., contact between Santiago Formation and granodiorite. 14

77 Site 1116, Subsite Sites 1116 and Two diesel USTs removed in Several investigations between 1999 and NTCRAs Source area excavation (270 yards) and dewatering in 2013, DPE system installed in 2014 to address PSH, and System operated in Feb 2015 and was discontinued after generating large amounts of water requiring treatment to concentrations below system capabilities. 15

78 Sites 1116 and Site Jan 2014 Groundwater Results 16

79 Sites 1116 and Subsite March 2015 Groundwater Results 17

80 Sites 1116 and Plans Going Forward per Final Tech Memo (2016) Site 1116 (Former Subsites 1491 and ) Sampling to refine extent of plume, including addressing data gaps near upgradient source areas and downgradient edge. Determine best EISB locations and configuration based on geology and updated CSM. Collect soil gas data and perform risk assessment. Site Further define extent of plume extending off site, including TCE and TPH in groundwater. Remove LNAPL via periodic placement of absorbent socks, track thickness and removal rates. Determine optimized remedial strategy based on additional groundwater monitoring data. 18

81 Sites 1116 and Proposed Well and Soil Gas Locations at Site

82 Sites 1116 and Proposed Well and Soil Gas Locations at Site MW07 relocated 100 feet southwest due to an on-going construction project that prevented access MW07 relocated approximately 15 feet to the west due to encountering non-water bearing granite at shallow depths in original location. 20

83 Sites 1116 and Proposed Well Locations at Subsite

84 Sites 1116 and Proposed Well Locations at Site (continued) Due to CPEN safety concerns about installing MW-16 in the baseball field, it was moved ~190 east-northeast to a location behind the outfield fence. This well will confirm groundwater hydraulics and extent of contamination northeast of Site Drainage swale (view to east), between the swimming pool and the baseball field, along with irrigation of the ball field may be influencing groundwater flow northeast of Site

85 Completed Field ldactivities iti Sites 1116 and Field reconnaissance of all drilling locations for accessibility and logistical constraints. Utility Clearance work by Base FMD, USA, and Geophysical Survey completed at Site 1116 and Site Drilling began on Dec 12th, 2016 at Site All nine groundwater monitoring wells and six soil gas points installed at Site 1116 as of Dec 20th. Installation of 4 wells to be completed at Site by Dec 23rd, As of Dec 20th, only MW-17 installed. Indications are that all wells will produce groundwater. 23

86 Sites 1116 and Schedule Going Forward Dec 2016 Groundwater Well Development at Sites 1116 and Jan 3 through Jan 20, 2017 Groundwater sampling at Sites 1116 and 14112, and soil gas sampling at Site Jan 23, 2017 Replace/install ll absorbent b socks at Site March 2017 IDW removal. April 2017 Validated Analytical Results Available. June 2017 Reporting of results from field investigation. Tetratech is under contract to prepare p the PP and ROD and are currently preparing the remedial design to include EISB, MNA, and LUCs. PP currently under Navy review. 24

87 MCB CAMP PENDLETON SITE 1119 PILOT STUDY DESIGN MEMORANDUM PROJECT UPDATE 5 January th FFA Meeting

88 Presentation Overview Document Submittals Site Conceptual Model SITE 1119 Selected Remedy from ROD Source Area EAB Pilot and EAB Permeable Reactive Barrier Implementation Path Forward 2

89 SITE 1119 Document Submittals (needs to be updated) Final RI/FS - May 15, 2014 Final Proposed Plan January 2015 Final Record of Decision Being Circulated for Signatures Final Design Study Work Plan for Enhanced In-Situ Bioremediation January 2016 Final Design Study Technical Memorandum (for EISB) December

90 4

91 Site Discovery SITE 1119 Originally defined as groundwater in the vicinity of Base supply wells and In well 26016, TCE was previously detected at 11 µg/l during a pumping test by the FMD in In well 26018, TCE was detected on multiple occasions, including a maximum detection of 2.6 µg/l collected by the FMD in The TCE contamination in this area was designed as IR Site 1119 and a Remedial Investigation/Feasibility Study was initiated in

92 SITE 1119 RI/FS Results and 2013 TCE Detections 6

93 SITE 1119 Conceptual Site Model from RI/FS Upper Ysidora Subbasin (UYS) is an alluvium-filled valley. Groundwater flow is toward the southwest. Depth to bedrock in the UYS up to 150. Depth to bedrock in potential source area is feet bgs. Bedrock consists of Santiago Formation and granite, depending on location. 7

94 SITE 1119 CSM Updated with Results of EISB Design Study 8

95 SITE 1119 CSM Updated d with Results of ESIB Design Study 9

96 SITE 1119 Summary of Nature and Extent TCE is the only contaminant that exceeds MCLs with a max concentration is 440 µg/l detected in well 1119-MW-20 located 450 feet downgradient of Building Verbal accounts of site operations during the 1960s-1970s indicate that drums of solvent may have been emptied in the low area near well 1119-MW-20. The current treatment area measures approximately 420 feet long by 160 wide. Source area is identified with the 200 µg/l TCE contour line, which is defined by detections > 200 µg/l in wells 1119-MW-18, 1119-MW-20, and 1119-MW-9. 10

97 SITE 1119 Selected Remedial Alternatives ti from ROD Land Use Controls and Long Term Monitoring (FS Alternative 2) Source Area Treatment via In Situ Enhanced Bioremediation (EISB) (FS Alternative 5) Reactive Barrier Installed via Injection Wells Downgradient of the Source Area (Alternative 8) A Design Study was included in Alternative 5 to provide additional source area characterization prior to the implementation of EISB 11

98 SITE 1119 Alternative 5 from RI/FS - Source Area Treatment via EISB Installation of EISB system to destroy contaminant mass in groundwater at the source area. Mixture of organic substrate(s) and ph buffer to induce geochemical and microbial conditions that will support biodegradation. Multiple injection events needed to achieve required mass reduction in the source area within 10 years. Need to drive the aquifer from moderately aerobic to anaerobic conditions. This alternative included a design study to provide additional source area characterization prior to the implementation of EISB. The results of this design study are incorporated into the slides below. 12

99 SITE 1119 TTZ-1 Proposed Injection Well Locations 13

100 SITE 1119 TTZ-2 Proposed Injection Well Locations 14

101 SITE 1119 Alternative 8 Details: Reactive Barrier (PRB) Installed via Injection Wells Downgradient of the Source Area Installation of an EISB system in a linear configuration perpendicular to groundwater flow and downgradient of the source area (i.e., Permeable reactive barrier). Injection to occur at multiple well locations (spaced ~25 feet apart). The Draft RD increased the number of injection locations from the nine (stated in the ROD) to 12 to enhance system performance. Designed to destroy TCE mass in groundwater as it passes through the reactive zone. Requires injection of a mixture of organic substrates and ph buffer to induce conditions conducive to biodegradation. Would need to be maintained indefinitely due to the expected persistence of the TCE source area. FS includes eight reinjection events over 30 years. 15

102 SITE 1119 Updated PRB Layout Reflecting Design Study Results 16

103 SITE 1119 Installation of Permeable Reactive Barrier (PBR) Pre-field activities to include coordination with Base and NAVFAC, permitting and notifications, utility clearance, mobilization and staging of equipment. 12 PRB well injection locations with four injection wells at each location and screened intervals configured to maximize the coverage of the targeted strata to a maximum depth of 80 feet. Wells will be installed in separate boreholes. The deepest well at each location will be drilled and logged first using rotosonic methods. Six of the 12 deepest wells will be installed as 4-inch diameter wells to allow extraction of make up water. The three shallower wells at each the 12 injection locations will be installed to a maximum depth of 58 feet using Direct Push. Lithology obtained from soil boring logs during the rotosonic drilling will be used to optimize locations of well screen intervals. 17

104 SITE 1119 PRB Well Installation Diagram 18

105 SITE 1119 Installation of Permeable Reactive Barrier (PBR) Baseline groundwater sampling will be conducted before injection to define pre-treatment t t water conditions. Performance monitoring program design currently under consideration. Approximately 106,000 gallons of water will be extracted from the six 4-inch diameter PRB wells prior to injection for use as makeup water. Injectants to include 8,890 gals (10,252 lbs) of 60% sodium lactate solution 8,977 gallons of EVO 750 lbs of soda ash 204 liters of the microbial culture (SDC-9 TM ) 19

106 Path Forward SITE 1119 Source Area EISB Pilot Preliminary field activities: January 2017 Well installation: February March 2017 Baseline groundwater sampling: Late March 2017 Substrate injection: March April 2017 Performance monitoring: July 2017 July 2018 EAB Permeable Reactive Barrier Draft Remedial Design Revision: February 2017 Regulatory comments receipt: April 2017 Final Revised Remedial Design: May June 2017 MCBCP field kickoff: k June 2017 Mobilization to the field: July 2017 Well installation / injection: July September

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination.

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination. Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Contaminants: Contaminants: Contaminants present and the highest amount

More information

MEMORANDUM. Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc.

MEMORANDUM. Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc. MEMORANDUM To: From: Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc. (GSI) Doug Sutton, GeoTrans, Inc. Rob Greenwald, GeoTrans,

More information

Large-Scale Implementation of Recirculation Systems for In-Situ Treatment of Hexavalent Chromium in Groundwater in Hinkley CA 17338

Large-Scale Implementation of Recirculation Systems for In-Situ Treatment of Hexavalent Chromium in Groundwater in Hinkley CA 17338 WM217 Conference, March 5 9, 217, Phoenix, Arizona, USA Large-Scale Implementation of Recirculation Systems for In-Situ Treatment of Hexavalent Chromium in Groundwater in Hinkley CA 17338 Margy Gentile

More information

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION IPEC 13 November 2013 CLIQUEZ ET MODIFIEZ LE TITRE PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS 1. IN-SITU THERMAL REMEDIATION

More information

Enhanced Anaerobic Bioremediation Using CAP18 as a Polishing Application for CVOC Impacted Groundwater

Enhanced Anaerobic Bioremediation Using CAP18 as a Polishing Application for CVOC Impacted Groundwater www.burnsmcd.com Author: Presented Date: Walter McClendon, Martha Hildebrandt and John Hesemann, Burns & McDonnell John Shimp, Directorate of Public Works, Fort Riley, Kan. Bradden Bigelow, Environmental

More information

In Situ Chemical Oxidation (ISCO) Delivery Mechanisms & Injection Strategies

In Situ Chemical Oxidation (ISCO) Delivery Mechanisms & Injection Strategies In Situ Chemical Oxidation (ISCO) Delivery Mechanisms & Injection Strategies presentation for TEMADAG VINTERMØDE 2010 Vingstedcentret, Vejle, Denmark by: Prasad Kakarla In-Situ Oxidative Technologies,

More information

INTRODUCTION. Camp Pendleton s Professional Military Education.

INTRODUCTION. Camp Pendleton s Professional Military Education. INTRODUCTION Marine Corps Installations West-Marine Corps Base Camp Pendleton serves as the Marine Corps premier amphibious training base offering comprehensive air, sea, and ground assault training to

More information

MDEQ PROJECT UPDATE (2015 4Q PROGRESS REPORT)

MDEQ PROJECT UPDATE (2015 4Q PROGRESS REPORT) MDEQ PROJECT UPDATE (215 4Q PROGRESS REPORT) RACER Lansing, Plants 2, 3 & 6 January 26, 216 Agenda Tracer Study / ISCO Pilot Test Results Lower 1,4-Dioxane Toe Investigation Fourth Quarter Groundwater

More information

May 5, Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118

May 5, Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118 May 5, 2015 Mr. Mostafa Mehran Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118 Re: Response to ADEQ Correspondence Dated March 30, 2015 Whirlpool Corporation

More information

CORRECTIVE ACTION COMPLETION REPORT

CORRECTIVE ACTION COMPLETION REPORT REVISED FINAL CORRECTIVE ACTION COMPLETION REPORT IMA for the Corrective Actions at the Old Property Disposal (PDO) Yard Hunter Army Airfield, Georgia Prepared for U.S. ARMY CORPS OF ENGINEERS SAVANNAH

More information

Lessons Learned from the Installation and Monitoring of a Permeable Reactive Barrier at the Lake City Army Ammunition Plant, Independence, MO

Lessons Learned from the Installation and Monitoring of a Permeable Reactive Barrier at the Lake City Army Ammunition Plant, Independence, MO Lessons Learned from the Installation and Monitoring of a Permeable Reactive Barrier at the Lake City Army Ammunition Plant, Independence, MO Presented by Kevin Keller, PG, CGWP - Shaw E&I, Inc. Thomas

More information

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISCO Treatment Program: O&G Superfund Site Site O&G Superfund Drum Reconditioning Site;

More information

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology Detailed site assessment work at a manufacturing facility in South Carolina indicated that a former French drain

More information

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project ABSTRACT In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project R. Juhlin, M. Butherus S.M. Stoller Corporation 2597 B ¾ Road, Grand Junction, C0 81506 USA The

More information

Delivery Tools for Combined Remedies

Delivery Tools for Combined Remedies Delivery Tools for Combined Remedies John Haselow Redox Tech, LLC 1 BEFORE 2 Redox Tech LLC 1 AFTER 3 Why Injection Isn t for Amateurs 4 Redox Tech LLC 2 If you can set up your next shot, you are more

More information

Presenters' Contact Information

Presenters' Contact Information Presenters' Contact Information Paul Ranieri Conestoga-Rovers & Associates 2055 Niagara Falls Blvd. Suite Three, Niagara Falls, New York 14304 Phone: 716-297-2160 Email: pranieri@craworld.com CHEMICAL

More information

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination.

Site Profiles - View. General Information. Contaminants: Site Name and Location: Description: Historical activity that resulted in contamination. Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Rummel Creek Shopping Center Houston, Texas, United States The facility

More information

In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds

In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds RemTech 2017, Banff Springs Hotel and Conference Centre October 11, 2017 Presented by - Jay Dablow,

More information

Soil Vapor Extraction O&M Report Camp Stanley Storage Activity, Texas

Soil Vapor Extraction O&M Report Camp Stanley Storage Activity, Texas Appendix C Soil Vapor Extraction O&M Report Camp Stanley Storage Activity, Texas APPENDIX C TECHNOLOGY EVALUATION MEMORANDUM, VEG/OIL BARK MULCH ENHANCEMENT (ORIGINALLY PRESENTED DURING THE SWMU B-3 REMOVAL

More information

In Situ Chemical Oxidation of VOCs and BTEX Plume in Low-Permeability Soils. Amit Haryani, PE, LSRP

In Situ Chemical Oxidation of VOCs and BTEX Plume in Low-Permeability Soils. Amit Haryani, PE, LSRP In Situ Chemical Oxidation of VOCs and BTEX Plume in Low-Permeability Soils Amit Haryani, PE, LSRP Process Map Maintenance Yard Diesel, gasoline, solvents Client Goals Attain NJ GWQS - Rapidly Challenges

More information

Wickes Manufacturing TCE Plume Site Mancelona, Michigan

Wickes Manufacturing TCE Plume Site Mancelona, Michigan Wickes Manufacturing TCE Plume Site Mancelona, Michigan December 2017 What is TCE? Trichloroethylene (TCE) Common Industrial Solvent Known Human Carcinogen Federal and State Safe Drinking Water of 5 µg/l

More information

Site Profiles - View. General Information. Contaminants: Site Hydrology:

Site Profiles - View. General Information. Contaminants: Site Hydrology: Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Tiger Cleaners Memphis, Tennessee, United States Tiger Cleaners is located

More information

LNAPL REMEDIATION USING ELECTRICAL RESISTANCE HEATING

LNAPL REMEDIATION USING ELECTRICAL RESISTANCE HEATING LNAPL REMEDIATION USING ELECTRICAL RESISTANCE HEATING TRS Group, Inc. ABSTRACT An Electrical Resistance Heating (ERH) pilot test was conducted in the fall of 1998 to determine the effectiveness of using

More information

Thermal Remediation Technology Overview and Practical Applications

Thermal Remediation Technology Overview and Practical Applications Thermal Remediation Technology Overview and Practical Applications Rhode Island Society of Environmental Professionals Tuesday December 5, 2017 Steffen Griepke Nielsen and John Haas TerraTherm, Inc. Goals

More information

PROPOSED PLAN for Amendment to Record of Decision

PROPOSED PLAN for Amendment to Record of Decision PROPOSED PLAN for Amendment to Record of Decision Operable Unit 1, Area 6 Naval Air Station Whidbey Island Oak Harbor, Washington November 2018 INTRODUCTION TABLE OF CONTENTS The United States Navy (Navy)

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES Albert L. Lamarre Lawrence Livermore National Laboratory Kathy Angleberger U.S. Dept. of Energy Michael

More information

Thermal Remediation Services, Inc.

Thermal Remediation Services, Inc. Thermal Remediation Services, Inc. Electrical Resistance Heating for Rapid Remediation of DNAPL April 2003 David Fleming 425-396-4266 dfleming@thermalrs.com www.thermalrs.com What is Electrical Resistance

More information

In-Situ Chemical Oxidation from Pilot Study to Full-Scale Implementation

In-Situ Chemical Oxidation from Pilot Study to Full-Scale Implementation 21 st International Petroleum Environmental Conference In-Situ Chemical Oxidation from Pilot Study to Full-Scale Implementation October 15, 2014 Joann Lin, E.I.T. Co-authors: Jim Leu, Ph.D., P.E. Michelle

More information

Establishing Contact

Establishing Contact ENHANCED IN-SITU BIOREMEDIATION Implementation Design & System Operation CONTACT!!! Impacts of Geology / Contaminant Distribution Delivery system Design / Selection Mike Marley : ~ 1:45 to 3:00pm Establishing

More information

Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016

Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016 Welcome Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016 1 Welcome and Program Introduction Mr. Lex Stokes EAB Installation Co-chair 2 Acronyms and Abbreviations AS/SVE Air Sparge/Soil

More information

IXPER 70C Calcium Peroxide CASE STUDY

IXPER 70C Calcium Peroxide CASE STUDY IXPER 70C INTRODUCTION TO ENHANCED AEROBIC BIOREMEDIATION Enhanced aerobic bioremediation is a well-established and viable remediation technology for in situ degradation of a variety of petroleum hydrocarbon

More information

Fort George G. Meade. Restoration Advisory Board Meeting March 25, 2010

Fort George G. Meade. Restoration Advisory Board Meeting March 25, 2010 Fort George G. Meade PERFORMANCE BASED ACQUISITION II SITE STATUS OVERVIEW Restoration Advisory Board Meeting March 25, 2010 John Cherry ARCADIS APM Tim Llewellyn ARCADIS PM 1 PBA II Site Locations Manor

More information

CASE STUDY COMPARISON OF MULTIPLE ACTIVATION METHODS FOR SODIUM PERSULFATE ISCO TREATMENT

CASE STUDY COMPARISON OF MULTIPLE ACTIVATION METHODS FOR SODIUM PERSULFATE ISCO TREATMENT CASE STUDY COMPARISON OF MULTIPLE ACTIVATION METHODS FOR SODIUM PERSULFATE ISCO TREATMENT Gary Cronk, P.E. (JAG Consulting Group) Presentation at the Battelle 6 th International Conference on Remediation

More information

In Situ Treatment of Contaminated Soil and Groundwater: Lessons Learned from the Field

In Situ Treatment of Contaminated Soil and Groundwater: Lessons Learned from the Field In Situ Treatment of Contaminated Soil and Groundwater: Lessons Learned from the Field Presented by Alan Weston, Ph.D. Conestoga-Rovers & Associates Niagara Falls, NY, USA Agenda 1. Introduction to In

More information

Evaluation of VI Data Relative to Separation Distance Screening Criteria A Michigan Case Study

Evaluation of VI Data Relative to Separation Distance Screening Criteria A Michigan Case Study GROUNDWATER & ENVIRONMENTAL SERVICES,INC. Evaluation of VI Data Relative to Separation Distance Screening Criteria A Michigan Case Study Chris Mulry, GES, Inc. March 19, 2014 Presentation Outline Study

More information

THERMAL REMEDIATION: TWO ERH CASE STUDIES

THERMAL REMEDIATION: TWO ERH CASE STUDIES THERMAL REMEDIATION: TWO ERH CASE STUDIES NEWMOA In Situ Thermal Remediation Workshop June14 14, 2012 Westford, MA Presentation by Janet Waldron, MassDEP Groveland Wells No.s 1 & 2 Groveland, MA 850 acre

More information

Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights

Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights Brian D. Symons, P.E. FOTH Infrastruture & Environment, LLC Overland Park, Kansas What We Want to Learn? Complexities of Nature Treatment

More information

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By:

CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, Prepared By: CLEANUP ACTION PLAN COOK INLET HOUSING AUTHORITY 3607 & 3609 SPENARD ROAD ANCHORAGE, ALASKA OCTOBER 7, 2016 Prepared By: SHANNON & WILSON, INC. 5430 Fairbanks Street, Suite 3 Anchorage, Alaska 99507 (907)

More information

Phytoremediation Technology Evaluation and Preliminary Design

Phytoremediation Technology Evaluation and Preliminary Design Phytoremediation Technology Evaluation and Preliminary Design Chlorinated and Petroleum Hydrocarbon Groundwater Plume at Former Gas Liquids Extraction Facility, Colorado November 13, 2012 Dustin Krajewski

More information

GROUNDWATER MODELING OF A PERMEABLE REACTIVE BARRIER TO ENHANCE SYSTEM PERFORMANCE

GROUNDWATER MODELING OF A PERMEABLE REACTIVE BARRIER TO ENHANCE SYSTEM PERFORMANCE GROUNDWATER MODELING OF A PERMEABLE REACTIVE BARRIER TO ENHANCE SYSTEM PERFORMANCE K.C. Scott, P.G., and D. J. Folkes, P.E. EnviroGroup Limited, 7208 South Tucson Way, Suite 125, Englewood, CO 80112; Phone:

More information

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B SITE: CHAMPAIGN FORMER MGP SITE CHAMPAIGN, ILLINOIS JULY 24, 2013 PREPARED FOR: PSC INDUSTRIAL OUTSOURCING, LP 210 WEST SAND BANK

More information

RemTech 2011 IN-SITU BIOREMEDIATION OF CHLORINATED SOLVENTS - A CASE STUDY - Presented by: René Filion, Eng.

RemTech 2011 IN-SITU BIOREMEDIATION OF CHLORINATED SOLVENTS - A CASE STUDY - Presented by: René Filion, Eng. RemTech 2011 IN-SITU BIOREMEDIATION OF CHLORINATED SOLVENTS - A CASE STUDY - Presented by: René Filion, Eng. PRESENTATION OVERVIEW Site history Environmental Site Assessment process Soil and groundwater

More information

Surfactant Enhanced Remediation Technologies and Case Studies. Dan Socci EthicalChem. SMART Remediation Ottawa, ON February 4, 2016

Surfactant Enhanced Remediation Technologies and Case Studies. Dan Socci EthicalChem. SMART Remediation Ottawa, ON February 4, 2016 Surfactant Enhanced Remediation Technologies and Case Studies Dan Socci EthicalChem SMART Remediation Ottawa, ON February 4, 2016 SMART is Powered by: www.vertexenvironmental.ca A division of Ethical Solutions

More information

Christopher Gaule 1, Kenneth J. Goldstein 2,and Curtis A. Heckelman 3. Abstract

Christopher Gaule 1, Kenneth J. Goldstein 2,and Curtis A. Heckelman 3. Abstract Dual Reactive Barrier Walls for the Remediation of CHC Contamination, Watervliet Arsenal, New York: Design and Installation of an Innovative Technology Abstract Christopher Gaule 1, Kenneth J. Goldstein

More information

Assessing Technical Impracticability in a Karst Setting at Anniston Army Depot

Assessing Technical Impracticability in a Karst Setting at Anniston Army Depot Assessing Technical Impracticability in a Karst Setting at Anniston Army Depot Robert O Laskey, Elisabeth Hawley, Rula Deeb, Michael Kavanaugh (Malcolm Pirnie, Inc.) Bridget Lyons (US Army Environmental

More information

PROJECT NOTE NO. 59. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 109)

PROJECT NOTE NO. 59. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 109) PARSONS Contract No. N62473-11-C-0411 Document Control No. NRS-0411-0000-0011 Parsons Project No. 746181 PROJECT NOTE NO. 59 SUBJECT: Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement

More information

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California October 2 nd, 2014 Insert then choose Picture select your picture. Right click your picture and

More information

Results of HRC Injection at Dixie Cleaners, Jacksonville Florida

Results of HRC Injection at Dixie Cleaners, Jacksonville Florida Results of HRC Injection at Dixie Cleaners, Jacksonville Florida Hydrogen Release Compound (HRC TM ) Used to enhance in situ biodegradation by supporting anaerobic reductive dechlorination process. HRC

More information

S-ISCO REMEDIATION OF COAL TAR

S-ISCO REMEDIATION OF COAL TAR Case Study Site Former Roofing Products Manufacturer, Queens, New York Contaminants of Concern VOCs (BTEX) & SVOCs (PAHs and naphthalene) related to MGP coal tar in soil & groundwater East River S-ISCO

More information

Surfactant Enhanced Remediation Technologies

Surfactant Enhanced Remediation Technologies A division of Ethical Solutions LLC Surfactant Enhanced Remediation Technologies Dan Socci, CEO 2014 Green Chemical Solution for Remediation and Oil Industries ETHICALCHEM BACKGROUND EthicalChem Background

More information

Conceptual Site Models for Environmental Investigations and Remediation

Conceptual Site Models for Environmental Investigations and Remediation Remediation Technology Symposium (RemTech) 2012 Conceptual Site Models for Environmental Investigations and Remediation October 18, 2012 Tai T. Wong, P.Eng. Authors and Presenter Authors: James Carss,

More information

ETHICALCHEM BACKGROUND

ETHICALCHEM BACKGROUND A division of Ethical Solutions LLC Successfully Integrating Surfactants Into Chemox Technologies Dan Socci, CEO, EthicalChem Green Chemical Solutions for Environmental Remediation ETHICALCHEM BACKGROUND

More information

Department of Toxic Substances Control

Department of Toxic Substances Control Matthew Rodriguez Secretary for Environmental Protection Department of Toxic Substances Control Deborah O. Raphael, Director 9211 Oakdale Avenue Chatsworth, CA 91311 Edmund G. Brown Jr. Governor STATEMENT

More information

Alternative Cleanup Methods for Chlorinated VOCs

Alternative Cleanup Methods for Chlorinated VOCs Slide 1 Alternative Cleanup Methods for Chlorinated VOCs Getting beyond pump and treat Slide 2 Soil Vapor Extraction Vacuum is applied through extraction wells Creates a pressure gradient that induces

More information

Introduction. IR Site 1111 Overview. IR Site 1111

Introduction. IR Site 1111 Overview. IR Site 1111 Department of the Navy Announces the Proposed Plan for No Further Action at IR Site 1111 within the 26 Area at Marine Corps Base Camp Pendleton July 2011 Introduction The Department of the Navy (DON),

More information

Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation.

Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation. Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation. Abstract William F. Simons, P.G., M.S. and Paul D. Steinberg, P.E.,

More information

COKE OVEN AREA SPECIAL STUDY AREA INTERIM MEASURES WORK PLAN PHASE 1

COKE OVEN AREA SPECIAL STUDY AREA INTERIM MEASURES WORK PLAN PHASE 1 COKE OVEN AREA SPECIAL STUDY AREA INTERIM MEASURES WORK PLAN PHASE 1 SEVERSTAL SPARROWS POINT, LLC SPARROWS POINT, MARYLAND Prepared for: Severstal Sparrows Point, LLC Sparrows Point, Maryland In accordance

More information

Bioremediation System Integration to Contain/Treat a Known Perchlorate Source Area

Bioremediation System Integration to Contain/Treat a Known Perchlorate Source Area Paper L-11, in: Bruce M. Sass (Conference Chair), Remediation of Chlorinated and Recalcitrant Compounds 2006. Proceedings of the Fifth International Conference on Remediation of Chlorinated and Recalcitrant

More information

2013 IPEC Conference San Antonio

2013 IPEC Conference San Antonio 2013 IPEC Conference San Antonio CLIQUEZ ET MODIFIEZ LE TITRE IN-SITU THERMAL REMEDIATION BENEATH A HISTORIC HOME AUTHORS: GRANT GECKELER, WALTER MULICA (GLOBAL TECHNOLOGIES), HATEM SAADAOUI, PHILIPPE

More information

IN SITU ANAEROBIC REDUCTIVE DECHLORINATION AT A FORMER AS/SVE SITE

IN SITU ANAEROBIC REDUCTIVE DECHLORINATION AT A FORMER AS/SVE SITE IN SITU ANAEROBIC REDUCTIVE DECHLORINATION AT A FORMER AS/SVE SITE William Smith, P.G. Principal Hydrogeologist (bsmith@envalliance.com) Kevin A. Morris, Bioremediation Specialist (Environmental Alliance,

More information

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland

2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland 2012 Additional Block E Soil Investigation Report Lockheed Martin Middle River Complex 2323 Eastern Boulevard Middle River, Maryland Prepared for: Lockheed Martin Corporation Prepared by: Tetra Tech, Inc.

More information

EPA Seeks Public Comments on Proposed Plan to Amend 1991 Cleanup Plan. vapor intrusion, and identifies and provides the rationale for EPA s

EPA Seeks Public Comments on Proposed Plan to Amend 1991 Cleanup Plan. vapor intrusion, and identifies and provides the rationale for EPA s EPA CTS Printex, Inc. Superfund Site U.S. Environmental Protection Agency $ Region 9 $ San Francisco, CA $ June 2011 EPA Seeks Public Comments on Proposed Plan to Amend 1991 Cleanup Plan 1.0 Introduction

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Feasibility Study Addendum: Executive Summary

Feasibility Study Addendum: Executive Summary Feasibility Study Addendum: Executive Summary The North Indian Bend Wash (NIBW) Superfund Site (Site) is one of the more extensively studied Superfund sites in the United States. Since 1981, when volatile

More information

Risk-Based Cleanup Actions for Closure of a Brownfield Site

Risk-Based Cleanup Actions for Closure of a Brownfield Site Risk-Based Cleanup Actions for Closure of a Brownfield Site H.W. Rice, J.F. Feild, L.C. Farr Jr. AMEC Earth and Environmental, Inc. 7376 SW Durham Road, Portland, Oregon 97224 USA ABSTRACT Operating as

More information

AIR-BASED REMEDIATION TECHNOLOGY SELECTION LOGIC. Air-Based Remediation Technologies

AIR-BASED REMEDIATION TECHNOLOGY SELECTION LOGIC. Air-Based Remediation Technologies AIR-BASED REMEDIATION TECHNOLOGY SELECTION LOGIC Overview Identify important site/project parameters Present general decision logic to select potentially applicable air-based remediation technologies Apply

More information

Executive Summary. ES.1 Objectives and Scope

Executive Summary. ES.1 Objectives and Scope Executive Summary This Remedial Investigation and Focused Feasibility Study (RI/FFS) report was prepared on behalf of Northern States Power Co. (NSP) to document the findings of the multi-media environmental

More information

Comparison of EHC, EOS, and Solid Potassium Permanganate Pilot Studies for Reducing Residual TCE Contaminant Mass

Comparison of EHC, EOS, and Solid Potassium Permanganate Pilot Studies for Reducing Residual TCE Contaminant Mass Comparison of EHC, EOS, and Solid Potassium Permanganate Pilot Studies for Reducing Residual TCE Contaminant Mass Defense Distribution Depot San Joaquin-Sharpe Site Lathrop, California Corinne Marks, PE

More information

LNAPL Recovery Using Vacuum Enhanced Technology. Theresa Ferguson, R.G. June 2014

LNAPL Recovery Using Vacuum Enhanced Technology. Theresa Ferguson, R.G. June 2014 LNAPL Recovery Using Vacuum Enhanced Technology Theresa Ferguson, R.G. June 2014 Presentation Overview v LNAPL in the Subsurface v What is Vacuum Enhanced Technology? v Technology Description and Application

More information

Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range

Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range Environmental Remediation Services Draft Focused FS FGGM 83/OU-1 Former Skeet Range 1 Presentation Agenda OU-1/FGGM-83, Former Trap & Skeet Range Focused Feasibility Study (FFS) OU-3/FGGM-87, Former Nike

More information

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program www.pca.state.mn.us Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program This document describes the requirements for excavating petroleum-contaminated soil

More information

Adaptive DNAPL Treatment in Groundwater Using an ISCO Recirculation System

Adaptive DNAPL Treatment in Groundwater Using an ISCO Recirculation System WASHINGTON Adaptive DNAPL Treatment in Groundwater Using an ISCO Recirculation System Gunarti Coghlan, P.E. NAVFAC Headquarters, Washington, D.C., USA Ninth International Conference on Remediation of Chlorinated

More information

Site Background December 2005

Site Background December 2005 Site Background December 2005 The South of Runway 18-36 Area consists of the lowland area surrounding the southern portion of runway 18-36. It extends from the East Canal of the airport ditch system on

More information

STRATEGIES FOR CHARACTERIZING SUBSURFACE RELEASES OF GASOLINE CONTAINING MTBE

STRATEGIES FOR CHARACTERIZING SUBSURFACE RELEASES OF GASOLINE CONTAINING MTBE AUGUST 2000 NO. 11 STRATEGIES FOR CHARACTERIZING SUBSURFACE RELEASES OF GASOLINE CONTAINING MTBE ERIC M. NICHOLS, LFR LEVINE!FRICKE; MURRAY D. EINARSON, CONOR PACIFIC/EFW; STEVEN C. BEADLE, LFR LEVINE!FRICKE

More information

PROJECT NOTE NO. 55. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 105)

PROJECT NOTE NO. 55. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 105) PARSONS Contract No. N62473-09-D-1212 Document Control No. SDV-1212-0014-0034 Parsons Project No. 747324 PROJECT NOTE NO. 55 SUBJECT: Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement

More information

Site Profiles - View. General Information. Contaminants: Site Hydrology:

Site Profiles - View. General Information. Contaminants: Site Hydrology: Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Denver Colorado Dry Cleaner Denver, Colorado, United States The site is

More information

New York State Department of Environmental Conservation August Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation August Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation August 2013 FACT SHEET Environmental Restoration Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: 1201

More information

PROJECT NOTE NO. 65. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 115)

PROJECT NOTE NO. 65. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 115) PARSONS Contract No. N62473-09-D-1212, Delivery Order No. No. 37 Document Control No. SDV-1212-0037-0003 Parsons Project No. 640129.00006.749055 PROJECT NOTE NO. 65 SUBJECT: Marine Corps Base (MCB) Camp

More information

Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups

Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups Colorado's Conditional Closure Policy and Guidance: Risk-Based Approach to Ground Water Cleanups Walter Avramenko Colorado Department of Public Health and Environment May 3, 2012 In the beginning Evolution

More information

ARCADIS/Malcolm Pirnie May 24, 2012

ARCADIS/Malcolm Pirnie May 24, 2012 Innovative Remedial Approaches to Accelerated Site Closure Karen Hohe Suchomel, PG Rula A. Deeb, PhD, BCEEM Scott T. Potter, PhD, PE Suthan S. Suthersan, PhD, PE ARCADIS/Malcolm Pirnie May 24, 2012 Performance

More information

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases:

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases: 2646 Palma Drive, #450 Ventura, CA 93003 P 805-654-9611 F 805-654-9613 October 17, 2014 UCSB Environmental Health & Safety Attn: Ms. Jodi Woods 565 Mesa Road Santa Barbara, California 93106-5132 RE: Public

More information

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer Paul D. Rohde, CH2M HILL and Cynthia R. Butler, P.E., CH2M HILL Abstract Site Background A pilot-scale study of in

More information

Site Profiles - View. General Information. Contaminants: Site Hydrology:

Site Profiles - View. General Information. Contaminants: Site Hydrology: Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Former Sun State Supply, Inc. Orlando, Florida, United States Sun State

More information

ACHIEVING RESIDENTIAL CLOSURE AT A CHLORINATED SOLVENT SITE

ACHIEVING RESIDENTIAL CLOSURE AT A CHLORINATED SOLVENT SITE ACHIEVING RESIDENTIAL CLOSURE AT A CHLORINATED SOLVENT SITE Chlorinated hydrocarbons are among the most persistent and difficult groundwater contaminants to remediate, particularly to residential standards.

More information

Large Scale Bioremediation Using Multiple Electron Donors

Large Scale Bioremediation Using Multiple Electron Donors Large Scale Bioremediation Using Multiple Electron Donors Don Hanson, Oregon Department of Environmental Quality State Coalition for Remediation of Dry Cleaners (SCRD) Fall Meeting 2009 San Antonio, Texas

More information

Combination of Multiple Reductive Technologies for TCE Containment and Removal

Combination of Multiple Reductive Technologies for TCE Containment and Removal Combination of Multiple Reductive Technologies for TCE Containment and Removal Karen Brungard URS Corporation JSEM March 23,2006 Denver, Colorado Site Background FE Warren AFB in Cheyenne, Wyoming Spill

More information

The power of EQuIS in environmental management and decision analysis: case studies in Colorado

The power of EQuIS in environmental management and decision analysis: case studies in Colorado The power of EQuIS in environmental management and decision analysis: case studies in Colorado A. Putnam', S. Weaver^, C. Thompson', & M. Beard^ 'Colorado Department of Public Health & Environment, U.S.A.

More information

FINAL ACTION MEMORANDUM NON TIME-CRITICAL REMOVAL ACTION SITE 33 MARINE CORPS BASE CAMP PENDLETON CALIFORNIA

FINAL ACTION MEMORANDUM NON TIME-CRITICAL REMOVAL ACTION SITE 33 MARINE CORPS BASE CAMP PENDLETON CALIFORNIA FINAL ACTION MEMORANDUM NON TIME-CRITICAL REMOVAL ACTION SITE 33 MARINE CORPS BASE CAMP PENDLETON CALIFORNIA Contract No. N62473-07-D-4013 Task Order 0030 DCN BATL-4013-0030-0020 Prepared for: NAVFAC Southwest

More information

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE PROPOSED PLAN OF REMEDIAL ACTION 560 Terminal Avenue New Castle, DE DNREC Project No. DE 1123 October 2002 Delaware Department of Natural Resources and Environmental Control Division of Air and Waste Management

More information

Area B Groundwater Investigation Fort Detrick

Area B Groundwater Investigation Fort Detrick Area B Groundwater Investigation Fort Detrick Progress Report to the RAB November 6, 2013 John Cherry ARCADIS Imagine 1 the result Overview of Topics Groundwater Tracer Study Overview Shallow Off-Post

More information

Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base

Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base Ellsworth Air Force Base is a Federal "Superfund" site under

More information

PROJECT NOTE NO. 57. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 107)

PROJECT NOTE NO. 57. Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement (FFA) Meeting (No. 107) PARSONS Contract No. N62473-11-C-0411 Document Control No. NRS-0411-0000-0009 Parsons Project No. 746181 PROJECT NOTE NO. 57 SUBJECT: Marine Corps Base (MCB) Camp Pendleton Federal Facilities Agreement

More information

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin Introduction DLA Distribution Depot San Joaquin is an active distribution center operated by the Defense Logistics Agency (DLA) to supply military services with the equipment needed to fulfill their missions.

More information

Treating 1,2 Dichloroethane in a Mixed Plume Kent, UK A Remediation Case Study on the Power of ISCO and ENA

Treating 1,2 Dichloroethane in a Mixed Plume Kent, UK A Remediation Case Study on the Power of ISCO and ENA Chemical Oxidation Enhanced Aerobic Biodegradation Treating 1,2 Dichloroethane in a Mixed Plume Kent, UK A Remediation Case Study on the Power of ISCO and ENA with Royal HaskoningDHV Geology Contaminant

More information

LETTER AND COMMENTS REGARDING DRAFT REMEDY OPTIMIZATION TEAM REPORT FOR GROUNDWATER PLUME REMEDY OU 3 NWIRP BETHPAGE NY 05/16/2011 NORTHROP GRUMMAN

LETTER AND COMMENTS REGARDING DRAFT REMEDY OPTIMIZATION TEAM REPORT FOR GROUNDWATER PLUME REMEDY OU 3 NWIRP BETHPAGE NY 05/16/2011 NORTHROP GRUMMAN N90845.AR.001143 NWIRP BETHPAGE 5090.3a LETTER AND COMMENTS REGARDING DRAFT REMEDY OPTIMIZATION TEAM REPORT FOR GROUNDWATER PLUME REMEDY OU 3 NWIRP BETHPAGE NY 05/16/2011 NORTHROP GRUMMAN NORTHROP GRUMMAN

More information

Former Waste Oil Pit Feasibility Study Former Lordstown Ordnance Depot, Lordstown, Ohio

Former Waste Oil Pit Feasibility Study Former Lordstown Ordnance Depot, Lordstown, Ohio Draft Final Former Waste Oil Pit Feasibility Study Former Lordstown Ordnance Depot, Lordstown, Ohio FUDS Property Number: G05OH0149-03 Prepared for United States Army Corps of Engineers Louisville District

More information

Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014

Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014 Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014 Welcome Col. Tony Haught Commander U.S. Air Force 377 th Mission Support Group 2 Revised Public Meeting Format Greater opportunities for public

More information

FACTS ABOUT: Kop-Flex. Site Location. Site History. Environmental Investigations

FACTS ABOUT: Kop-Flex. Site Location. Site History. Environmental Investigations FACTS ABOUT: Kop-Flex Maryland Department of the Environment Site Location The 25-acre property is located at 7565 Harmans Road in Hanover, Anne Arundel County, Maryland. The property is owned by Emerson

More information

Eden Remediation Services Kenneth Summerour, P.G.

Eden Remediation Services Kenneth Summerour, P.G. Prepared by: Eden Remediation Services Kenneth Summerour, P.G. ken@edenremediation.com 601 S. Madison Avenue, Suite 60 Monroe, GA 30655 Office: 678-635-7360/Cell: 770-241-6176 www.edenremediation.com Overview

More information