Kentucky Oil and Gas Regulatory Modernization Act of 2015 Senate Bill 186 Effective June 24, Department for Natural Resources April 20, 2015
|
|
- Dale Dorsey
- 6 years ago
- Views:
Transcription
1 Kentucky Oil and Gas Regulatory Modernization Act of 2015 Senate Bill 186 Effective June 24, 2015 Department for Natural Resources April 20,
2 KRS Chapter 353 Originally enacted as an oil and gas conservation law. Many provisions are outdated. Statute has not kept pace with technological advancements in oil and gas production. 2
3 Oil and Gas Workgroup Established by EEC Secretary Len Peters, May members representing Cabinet, industry, environmental organizations, and citizens. Eleven meetings and one conference call from June 2014 to mid-january
4 Workgroup Members Dave Adkisson William Barr Steve Coleman Kim Collings William Daugherty William Donan Tom FitzGerald Peter Goodmann Mike Haines Monte Hay Steve Hohmann Doug Hyden Andrew McNeill Maurice Royster Reggie Van Stockum Chester Thomas Rudy Vogt Kentucky Chamber of Commerce Blackridge Resource Partners LLC Environmental Quality Commission Division of Oil & Gas Blackridge Resource Partners, LLC Mine Safety Review Commission Kentucky Resources Council Division of Water Office of General Counsel Hay Exploration Department for Natural Resources Clean Gas LLC Kentucky Oil and Gas Association EQT Corporation Attorney- at-law Green River Collieries, LLC Cumberland Valley Resources 4
5 Workgroup Mission Review the current regulations and statutes governing the oil and gas industry in Kentucky; Suggest appropriate revisions to the statutes and regulations; Detail revisions that might be accommodated by regulation; Suggest possible legislative action that may be recommended for the 2015 session of the General Assembly. 5
6 Abandoned Storage Tank Facilities Abandoned Storage Tank Batteries: Creates the Kentucky Abandoned Storage Tank Reclamation Fund for the cleanup of abandoned storage tank facilities. Defines abandoned storage tank facility as a storage tank or interconnected grouping of tanks no longer being actively used and maintained in conjunction with the production and storage of crude oil and produced water. Provides that, if after written notice by the cabinet, the owner or operator fails to respond within 30 days, the tank facility is considered abandoned. Establishes criteria for identification and prioritization of leaking abandoned storage tank facilities, including affected lands. Clarifies that if soil contamination is encountered beyond three feet in depth at the abandoned facility site, DNR shall consult with the Department for Environmental Protection to address possible remediation. 6
7 Abandoned Storage Tanks Cont. Provides authority for the cabinet to recover costs from the last owner or operator of record or any other party legally responsible for causing or contributing to a release from an abandoned facility. Establishes the cabinet s right of entry authority onto a property to determine a facility site s prioritization and/or to perform an on-site investigation. Provides that a person who wishes to remove an abandoned storage tank facility on his own shall do so at his own risk, and shall not be eligible for funds that are established in the Act, and clarifies that by doing so the person does not acquire any additional authority under the law. Does not identify a funding source for the fund. 7
8 Reclamation Reclamation of All Oil and Gas Sites: Expands reclamation requirements for oil and gas wellsite construction operations to severed mineral tracts. Requires operators on severed and non-severed mineral tracts to submit a well-site construction operations and reclamation plan at the time of filing an application for a well permit. Form ED-10. Requires operators to employ best management practices (BMPs) for all construction operations in order to prevent erosion and sedimentation from constructed well sites and access roads. 8
9 Reclamation Common Best Management Practices (BMPs): Rock checks. Water bars. Erosion Control Blanket (ECB). Silt Fence, straw bales, sumps. Rip rap. Quick growing revegetation. 9
10 805 KAR 1:170 Reclamation 805 KAR 1:170 Pending Regulation Changes: Requires pre-construction planning to design/locate site features for sediment control and placement of BMPs. Stable cut slopes, pits in solid where practical, erosion and sediment control on all disturbance. Salvage topsoil where present to reuse for reclamation. Temporary sediment control during road construction. Definition for site closure. Requires written notice to and approval by DOG. Identifies procedures for well permit transfers. 10
11 805 KAR 1:170 Reclamation 805 KAR 1:170 Pending Regulation Changes: Defines well site to include access road. Changes to map requirements: Drawing not sufficient-requires map. Allows for electronic map Requires all features listed on ED-10, water bodies, and utilities within 500 of the well head and 100 of the access road to be identified on the map Show drainage patterns 11
12 Map Feature Requirements Form ED-10 12
13 Public Disclosure of Fluids and Additives Public Disclosure of High Volume Hydraulic Fracturing Fluids and Additives via FracFocus: Requires oilfield vendors or well service contractors to provide oil and gas well operators with information concerning chemicals used in high volume hydraulic fracturing treatments for entry into the fracfocus.org chemical disclosure registry web site. Defines high volume hydraulic fracturing as any treatment or stimulation technique using 320,000 gallons of water and chemicals in aggregate stages or more than 80,000 gallons per treatment stage. Allows operators to claim limited trade secret status for certain chemical combinations. The chemical name and CAS number cannot be claimed as trade secret. Outlines a method for persons disputing the claims of trade secret to appeal the claim, and sets requirements for disclosure for medical emergency. 13
14 Public Notification Prior Public Notice of High Volume Hydraulic Fracturing Treatments: Requires operators employing a high volume hydraulic fracturing treatment to provide prior notice of the treatment to surface property owners within 1,000 feet of the surface location of the well. Requires notice to be given at least 20 days prior to the commencement of the fracturing treatment. 14
15 Deep Wells Deep Wells: Establishes statutory authority for permitting and creating drilling units for deep horizontal wells. The proposal allows deep horizontal well units to be established by the Oil and Gas Conservation Commission. Clarifies the definition of correlative rights. Changes the definition of deep well. Currently, the definition of a deep well is any well that is drilled to a depth of over 4,000 feet or below the base of the lowest member of the Devonian Shale Formation, whichever is deeper. New definition moves the depth of a deep well to 6,000 feet or below the base of the lowest member of the Devonian Shale Formation. Includes bonding amounts for wells between 4,000-6,000 feet deep that will be designated as shallow wells due to deep well definition changes. 15
16 Deep Wells Cont. Includes a water testing provision requiring operators conducting deep well, high volume hydraulic fracturing for horizontal wells to sample water supplies within 1,000 feet of the well head before and after conducting fracturing treatments. Increases permit fees for deep vertical and horizontal wells. 16
17 Deep Wells Cont. Increases bond amounts for both vertical and horizontal deep wells. Requires bonds for deep wells to cover plugging and reclamation. Allows blanket bonding for deep wells. Sets a minimum prevailing royalty payment at 1/8 or 12.5% for deep well tracts. 17
18 Permit Fee Amounts for Deep Wells Vertical deep wells: Less than 7,000 feet deep = $500. More that 7,000 feet deep = $600. Horizontal deep wells: Less than 10,000 feet deep = $5,000. More than 10,000 feet deep = $6,000. Additional horizontal deep well fees: Additional well on same pad, less than 10,000 ft. = $3,000. Additional well on same pad, more than 10,000 ft. = $4,000. Additional laterals = $
19 Bond Amounts for Deep Wells Vertical Deep Wells = $25,000. Horizontal Deep Wells = $40,000 minimum. Oil and Gas Conservation Commission may set higher bond for any individual well based on anticipated costs to plug the well and reclaim the wellsite. 19
20 Summary SB 186 is a collaborative effort. Considered as significant progress toward modernizing Chapter 353 and updating Kentucky statutes. Provides expanded reclamation measures for well sites and abandoned storage tank facilities. Outlines controls for high volume hydraulic fracturing treatments. Provides regulatory certainty for industry. 20
21 Future Work Workgroup has developed recommendations for regulatory changes. Workgroup plans to continue its work in May 2015 to address additional areas of statutory and regulatory change. 21
22 Questions Contact Division of Oil and Gas Director: Kim Collings Assistant Director: Marvin Combs
Kentucky Oil & Gas Modernization Act of 2015
Kentucky Oil & Gas Modernization Act of 2015 Follow Steptoe & Johnson on Twitter: Follow @Steptoe_Johnson ALSO FIND US ON http://www.linkedin.com/companies/216795 http://www.facebook.com/steptoe.johnson
More informationKENTUCKY DIVISION OF OIL & GAS KIM COLLINGS, DIRECTOR STATE-BID PLUGGING AND ABATEMENT PROGRAM
KENTUCKY DIVISION OF OIL & GAS KIM COLLINGS, DIRECTOR STATE-BID PLUGGING AND ABATEMENT PROGRAM Ky Division of Oil &Gas Plugging Fund Oil and Gas Plugging Fund established in 1990 as a interestbearing "special
More informationHinckley Seniors Group January 2, 2012
Hinckley Seniors Group January 2, 2012 What Is Shale Gas and Why Is It Important? Shale gas refers to natural gas that is trapped within shale formations. Shale is a fine-grained sedimentary rocks that
More informationRick Henderson, Field Operations Supervisor DEQ Office of Oil, Gas, and Minerals
Rick Henderson, Field Operations Supervisor DEQ Office of Oil, Gas, and Minerals 1 Contamination Conservation Uses Remediation Protection Groundwater Protection DEQ Supervisor of Wells Part 615 Oil and
More informationMichigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals
Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals DEQ Mission Statement The Michigan Department of Environmental Quality promotes wise management
More informationEPA s Underground Injection Control Program Overview. Solid Waste Advisory Committee Meeting June 5, 2014
EPA s Underground Injection Control Program Overview Solid Waste Advisory Committee Meeting June 5, 2014 Presentation Outline Underground Injection Control (UIC) Program Background 1974 Safe Drinking Water
More informationDepartment of the Environment
Department of the Environment The Marcellus Shale Briefing to Advisory Commission Robert M. Summers, Ph.D. Secretary, Maryland Department of the Environment August 4, 2011 Drilling Activity in Maryland
More informationNEVADA EXPLORATION PROJECT
Energizing the World, Bettering People s Lives NEVADA EXPLORATION PROJECT Legislative Committee on Public Lands June 12, 2014 Kevin Vorhaben, Rockies/Frontier Business Unit Manager Forward-looking Statements
More informationRECLAMATION PLAN FOR. (name of Mine) MINING OPERATION
RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally
More informationMarcellus Shale Gas Well Development in New York State
Marcellus Shale Gas Well Development in New York State 5/27/2008 New York State Department of Environmental Conservation Division of Mineral Resources Today s s Key Points Gas and oil wells are not new
More informationOil and Gas Study. March 2 2, 2012
Oil and Gas Study March 2 2, 2012 Overview of Presentation 1. Limitations 2. Findings 3. Areas for further study 4. Recommendations 5. Questions 2 Study Limitations Lack of detailed information on extent
More informationThe State of Hydraulic Fracturing in CA: Where Are We, and Where Are We Going?
The State of Hydraulic Fracturing in CA: Where Are We, and Where Are We Going? Butte County Board of Supervisors February 10, 2015 Steve Bohlen, State Oil and Gas Supervisor, California Division of Oil,
More informationDivision Mandates. Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources.
Division Mandates Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources. Supervise and permit the owners/operators to utilize all
More informationNorth Dakota s AWPSRF Program
North Dakota s AWPSRF Program https://www.dmr.nd.gov/oilgas (701) 328-8020 Cody VanderBusch Reclamation Specialist Abandoned Well Plugging and Site Restoration Fund AWPSRF Established 1983 Pay plugging
More informationTENORM ISSUES FROM AN OIL AND GAS OPERATIONAL PROSPECTIVE. Kentucky Mineral Law Conference October 20, 2016 William G. Barr III
TENORM ISSUES FROM AN OIL AND GAS OPERATIONAL PROSPECTIVE Kentucky Mineral Law Conference October 20, 2016 William G. Barr III A discussion of the regulation of TENORM must begin with a establishing a
More informationSLIDES: Collaborative Planning and Lessons Learned
University of Colorado Law School Colorado Law Scholarly Commons Best Management Practices (BMPs): What? How? And Why? (May 26) Getches-Wilkinson Center Conferences, Workshops, and Hot Topics 5-26-2011
More informationNew Activities at EMNRD Related to the Oil and Gas Industry in New Mexico
New Activities at EMNRD Related to the Oil and Gas Industry in New Mexico David Martin, Cabinet Secretary NM Energy, Minerals, and Natural Resources Department (EMNRD) IPANM Annual Meeting Albuquerque,
More informationNatural Gas Horizontal Well Control Act
Natural Gas Horizontal Well Control Act Law Update Summer of 2011, Governor Tomblin issued an Executive Order calling for Emergency Rules Environmental issues only Targeted certified plans for sites 3
More informationApplication for Gas Exploration and Production
1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for
More informationBriefing to House Environmental Matters Committee February 9, Robert M. Summers, Ph.D. Acting Secretary Maryland Department of the Environment
Briefing to House Environmental Matters Committee February 9, 2011 Robert M. Summers, Ph.D. Acting Secretary Maryland Department of the Environment John R. Griffin Secretary Maryland Department of Natural
More informationRECLAMATION REGULATIONS
RECLAMATION REGULATIONS 1001. INTRODUCTION a. General. The rules and regulations of this series establish the proper reclamation of the land and soil affected by oil and gas operations and ensure the protection
More informationDAVID SPEARS STATE GEOLOGIST
Hydraulic Fracturing for Natural Gas in Virginia DAVID SPEARS STATE GEOLOGIST What is hydraulic fracturing? An industrial process in which reservoir rocks are fractured using high-pressure fluid Used to
More informationBill Richardson Governor. Highlights of the Pit Rule NMAC
Bill Richardson Governor Joanna Prukop Cabinet Secretary Reese Fullerton Deputy Cabinet Secretary Mark Fesmire Division Director Oil Conservation Division Highlights of the Pit Rule 19.15.17 NMAC 19.15.17.8
More informationBoard on Earth Sciences and Resources
Committee on Earth Resources Board on Earth Sciences and Resources National Research Council of the National Academies Keck Center Washington, D.C. October 30, 2012 1 2 1 3 Energy Independence Really,
More informationSection 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012
Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012 Site Restoration Regulations Act 13-3216(a) The Oil and Gas Act 25 Pa. Code 78.65 Oil
More informationSection 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012
Site Restoration Regulations Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012 Act 13-3216(a) The Oil and Gas Act 25 Pa. Code 78.65 Oil
More informationOil and Gas Monitoring. November 2, 2016 GRA Meeting John Borkovich, P.G. Groundwater Monitoring Section Chief
Oil and Gas Monitoring November 2, 2016 GRA Meeting John Borkovich, P.G. Groundwater Monitoring Section Chief Presentation Overview Background Well Stimulation Groundwater Monitoring (Model Criteria) Produced
More informationAll nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.
ARTICLE B: STANDARDS Sec. 16-1-11 Standards All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below. (a) General Standards. 1. REFUSE AND
More informationSection 9 Recommendations and limitations
Section 9 Recommendations and limitations A. Recommendations After reviewing other studies and experiences in oil and gas producing states, DENR has concluded that information available to date suggests
More informationDavid Blackmon Managing Director for Public Policy and Strategic Communications FTI Consulting
Water and Energy in Texas October 4, 2012 David Blackmon Managing Director for Public Policy and Strategic Communications FTI Consulting Lower 48 Shale Plays * Not all natural gas that is consumed is combusted.
More informationFracture Stimulation Just the Facts, Ma am
Fracture Stimulation Just the Facts, Ma am 1 Picture of a frac treatment in a coalbed methane well that was mined out in a NM coal mine at 600 depth. Fluid containing sand pumped at high pressures to crack
More informationDESIGN AND CONSTRUCTION STANDARDS. Section 3: Standards by CSI Divisions. Storm Water Permit and Monitoring
Storm Water Permit and Monitoring GENERAL It is the Contractor s responsibility to obtain a National Pollutant Discharge Elimination System (NPDES) permit coverage under ADEM Administrative Code Chapter
More informationCurrent Regulatory Issues Impacting the Appalachian Basin. Gary E. Slagel Steptoe & Johnson PLLC October, 2014
Current Regulatory Issues Impacting the Appalachian Basin Gary E. Slagel Steptoe & Johnson PLLC October, 2014 Regulatory Issues PA Chapter 78a, Subchapter C comprehensive environmental performances standards
More informationTennessee Underground Injection Control Program Overview
Tennessee Underground Injection Control Program Overview Mission of the UIC Program The UIC program s mission is to protect underground sources of drinking water from contamination by regulating the construction
More informationOAR Table 240-1
OAR 690-240-0005 Table 240-1 WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 240 CONSTRUCTION, MAINTENANCE, ALTERATION, CONVERSION AND ABANDONMENT OF MONITORING WELLS, GEOTECHNICAL HOLES AND OTHER HOLES
More informationKPDES FORM SDAA Kentucky Pollutant Discharge Elimination System (KPDES)
KPDES FORM SDAA Kentucky Pollutant Discharge Elimination System (KPDES) Socioeconomic Demonstration and Alternatives Analysis The Antidegradation Implementation Procedure found in 401 KAR 10:030, Section
More information(NOTE: Unless specifically identified, the changes outlined below apply to BOTH Chapter 78 and Chapter 78a.)
DRAFT FINAL RULEMAKING 25 PA.CODE CHAPTER 78 (RELATING TO CONVENTIONAL OIL AND GAS WELLS) AND CHAPTER 78a (RELATING TO UNCONVENTIONAL WELLS) SUMMARY OF CHANGES FROM ANFR PUBLISHED ON APRIL 4, 2015 (NOTE:
More informationSURFACE MINING INSPECTION REPORT
State of California DEPARTMENT OF CONSERVATION OFFICE OF MINE RECLAMATION MRRC-1 (4/97) Page 1 of 5 (Rev. 07/13) SURFACE MINING INSPECTION REPORT (See reverse side of each form page for completion instructions)
More informationTexas Railroad Commission
Texas Railroad Commission Chairman Christi Craddick Commissioner Ryan Sitton Commissioner Wayne Christian November, 2017 Railroad Commission of Texas by Peter Fisher, P.G., District Director, Houston and
More informationPapua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV
Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE
Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS
More informationAppendix K: Soil Erosion and Sedimentation Control Plan Check List
Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted
More informationChapter MINERAL EXTRACTION AND MINING OPERATIONS
Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all
More informationRULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DEFINITIONS TABLE OF CONTENTS
RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-51-01 DEFINITIONS TABLE OF CONTENTS 0400-51-01-.01 Definitions of Terms 0400-51-01-.01 DEFINITIONS OF TERMS. For the purpose of
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationPROJECT DESCRIPTION CHAD EXPORT PROJECT SUPPORTING DOCUMENTS - VOLUME DECOMMISSIONING
CHAD EXPORT PROJECT SUPPORTING DOCUMENTS - VOLUME 1 8.0 DECOMMISSIONING This section provides an overview of the decommissioning activities that will be undertaken after construction and after each facility
More informationSection 208. SOIL EROSION AND SEDIMENTATION CONTROL
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW HOUSE BILL 609
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW 2011-374 HOUSE BILL 609 AN ACT TO PROMOTE THE DEVELOPMENT OF WATER SUPPLY RESERVOIRS AND OTHER WATER SUPPLY RESOURCES, TO PROVIDE THAT FUNDS
More informationOKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL
API NUMBER: 087 Horizontal Hole 22123 Oil & Gas OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX 52000 OKLAHOMA CITY, OK 73152-2000 (Rule 165:10-3-1) Approval Date: 03/29/2018 Expiration
More informationWATER RESOURCES ISSUES RELATED TO SHALE GAS DEVELOPMENT
WATER RESOURCES ISSUES RELATED TO SHALE GAS DEVELOPMENT Photo courtesy Paul Hart, Hart Resource Technologies, Inc Protection of drinking water Fracking chemicals Adequate wastewater treatment Impact of
More informationOil and Gas Development and Ballot Initiatives
Oil and Gas Development and Ballot Initiatives Bob Randall, Deputy Director Council on State Governments September 26, 2014 1) Background on Oil and Gas in Colorado 2) Colorado s Legal and Regulatory Structure
More informationSECTION D FEDERAL OIL AND GAS LEASING AVAILABILITY
SECTION D FEDERAL OIL AND GAS LEASING AVAILABILITY INTRODUCTION This section of the Final EIS identifies George Washington National Forest lands that could be made available for oil and gas leasing, in
More informationNonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT
Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box
More informationStaff will monitor Bills as the move through the legislative process
May 2, 2013 There are a number of legislative proposals concerning Hydraulic Fracturing: AB 288 (Levine) AB 7 (Wieckowski) AB 982 (Williams) AB 669 (Stone) SB 4 (Pavley) SB 395 (Jackson) SB 665 (Wolk)
More informationDECISION MEMO. Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106
DECISION MEMO Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106 USDA FOREST SERVICE REGION 8 NATIONAL FORESTS AND GRASSLANDS IN TEXAS SABINE NATIONAL FOREST ANGELINA/SABINE
More informationCHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS
IAC 5/12/93, 4/8/98 Environmental Protection[567] Ch 39, p.1 IAC 5/12/93, 4/8/98 CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS 567 39.1(455B) Purpose. The purpose of this chapter is to
More informationCELEBRATING 80 YEARS MEMORANDUM. We have been asked to review SB 411, which proposes to amend the Environmental
CELEBRATING 80 YEARS MEMORANDUM From: Jordan B. Yeager and Lauren M. Williams Curtin & Heefner LLP Date: Re: Preliminary Review of SB 411 We have been asked to review SB 411, which proposes to amend the
More informationAppendix 14-I Description of Stream Crossing for Electrical Interconnect
Appendix 14-I Description of Stream Crossing for Electrical Interconnect 14.0 Ecology Appendix 14-I CPV Valley Energy Project Description of Stream Crossing for Electrical Interconnect The CPV Valley Energy
More informationLAND DISTURBANCE PERMIT
SPRINGVILLE CITY Application Date: 110 South Main Springville, UT 84663 Permit Number: (801) 491-2780 Caselle #2208 Project Name: Project Address: LAND DISTURBANCE PERMIT Priority Site Owner s Name Phone
More informationWhat s Fracking in SoCal
SSMPA Community Meeting Monday, April 21, 2014 Photo: National Geographic ex - tract get, take, draw out, withdraw, pull out, suck Extraction Extraction: Breathing, or sucking the oxygen out of the air
More informationGENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER
More informationOutline. Senate Bill 4 Overview
Senate Bill 4 Overview Outline Types of Well Stimulation Treatments Why Well Stimulation Treatments are Necessary Overview of Hydraulic Fracturing in Ventura County History of Sespe Oil Field Operations
More informationOKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL
API NUMBER: 051 Horizontal Hole 24312 Oil & Gas OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX 52000 OKLAHOMA CITY, OK 73152-2000 (Rule 165:10-3-1) Approval Date: 03/29/2018 Expiration
More informationTable of Contents See also Summary of Contents on the previous page.
Table of Contents See also Summary of Contents on the previous page. Chapter One: PowerPoint: Environmental Impacts of Hydraulic Fracturing: Dispelling the Myths... 1 Kevin J. Garber, Esquire and Jean
More informationHydraulic Fracturing 101
Hydraulic Fracturing 101 Presentation to the Air & Waste Management Association Georgia Chapter May 24, 2012 Co-sponsored by the Environmental Law Section of the State Bar of Georgia Fred McManus, U.S.
More information2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1
2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment
More informationEsquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges
Esquimalt Graving Dock Waterlot Remediation Mega-Site (Phase 1B): Design, Contracting, and Construction Challenges Presented by Dan Berlin and Tom Wang, Anchor QEA, LLC Andrew Mylly and Rae-Ann Sharp,
More informationCEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E
Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationHydraulic Fracturing for Shale Gas Production: Practices & Progress
Hydraulic Fracturing for Shale Gas Production: Practices & Progress David P. Regalbuto, CPG MWEA Annual Conference Boyne Mountain Resort June 27, 2012 Objectives Dispel misconceptions Clarify potential
More informationASSEMBLY, No STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION
ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 0 SESSION Sponsored by: Assemblywoman ELIANA PINTOR MARIN District (Essex) SYNOPSIS Port Support Zone Act of 0. CURRENT
More informationWellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014
Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014 Terry Bovee Source Water Protection Unit Minnesota Department of Health Purpose Response to requests
More informationEMBARGOED UNTIL 2:00 PM TUESDAY, JULY 12, 2011
EMBARGOED UNTIL 2:00 PM TUESDAY, JULY 12, 2011 STATE OF WEST VIRGINIA EXECUTIVE DEPARTMENT CHARLESTON EXECUTIVE ORDER NO. 4-11 By the Governor WHEREAS, our great State has been blessed with many forms
More informationCore Value. Unconventional Gas Production and Water Resources: Lessons from the U.S. Brisbane, Sydney & Canberra, Australia February 27 March 1, 2012
Core Value Unconventional Gas Production and Water Resources: Lessons from the U.S. Brisbane, Sydney & Canberra, Australia February 27 March 1, 2012 Mark K. Boling Executive Vice President & General Counsel
More information1951 Clarence Iverson #1
THE BAKKEN Where It All Began... On April 4, 95, the first successful well in North Dakota was drilled outside the community of Tioga. Since the success of the first well, named Clarence Iverson #, the
More informationJanuary 2, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.
January 2, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP18-332-000;
More informationNATIONAL CONFERENCE of STATE LEGISLATURES. The Forum for America s Idea HYDRAULIC FRACTURING: STATES TAKE ACTION
a HYDRAULIC FRACTURING: STATES TAKE ACTION JACQUELYN PLESS, ENERGY POLICY SPECIALIST, NCSL NCSL & NCEP WEBINAR ON HYDRAULIC FRACTURING STATE POLICIES DECEMBER 19, 2012 OVERVIEW Why now? Economic impacts
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT
More informationNo. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads
No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs
More informationCOMPARATIVE ANALYSIS & COMMENTARY ON ACT 13 OF 2012
COMPARATIVE ANALYSIS & COMMENTARY ON ACT 13 OF 2012 MARCH 2012 INTRODUCTION On February 14, 2012, Governor Corbett signed what is now known as into law. Act 13 represents the conclusion of the first comprehensive
More informationDRAINAGE REPAIR POLICY FOR COUNTY DRAINAGE SYSTEMS. Drainage System No.
DRAINAGE REPAIR POLICY FOR COUNTY DRAINAGE SYSTEMS Drainage System No. The following policy is intended to supplement Minnesota Statutes Chapter 103E in the Maintenance and Operation of Drainage Systems
More informationTexas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1
Texas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1 Below are the 401 water quality certification conditions the Texas Commission on
More informationBest Practices for Safely and Economically Disposing Radioactive Materials
Best Practices for Safely and Economically Disposing Radioactive Materials Case Study of NORM and TENORM Issues in Kentucky March 29, 2017 Larry Taylor Kentucky Department for Environmental Protection
More informationCHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS
CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS 20.8.10 PURPOSE AND INTENT... 8-2 20.8.20 INCORPORATION OF SMARA AND STATE REGULATIONS... 8-2 20.8.30 APPLICABILITY...8-2 20.8.40 CONTENTS OF
More information*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements
APPLICATION FOR RAZE PERMIT COVER SHEET Page 1 of 2 Project Address The following items must be completed and submitted as a packet: Razing permit application (this item is all that is needed for residential
More informationNatural Gas Reform Campaign
Natural Gas Reform Campaign The Big Picture: Here s where we are today. U.S. Energy Consumption (by fuel) 2009 EIA Figures Renewables 6% Nuclear 9% Oil 39% Coal 21% Natural Gas 25% US Shale Gas Regions
More informationLifecycle Water Management Considerations & Challenges for Marcellus Shale Gas Development
Lifecycle Water Management Considerations & Challenges for Marcellus Shale Gas Development Author: J. Daniel Arthur, P.E., ALL Consulting Presented at: The Independent Oil & Gas Association of New York
More informationDetails of the Proposed Action
Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the
More informationFracking legislation Jennifer Walling Illinois Environmental Council
Fracking legislation 2013 Jennifer Walling Illinois Environmental Council Just some of the environmental issues related to fracking! Toxicity of compounds used in fracking process.! Volume of water used
More informationChapter 9. Water Sourcing and Wastewater Disposal for Marcellus Shale Development in Pennsylvania
CITE AS 32 Energy & Min. L. Inst. 9 (2011) Chapter 9 Water Sourcing and Wastewater Disposal for Marcellus Shale Development in Pennsylvania Kevin J. Garber 1 Jean M. Mosites Babst Calland Clements& Zomnir,
More informationMCLEOD COUNTY JOINT DRAINAGE SYSTEM POLICY AND GUEIDELINES FOR REPAIR
MCLEOD COUNTY JOINT DRAINAGE SYSTEM POLICY AND GUEIDELINES FOR REPAIR MEEKER, DISTRICTS 3, 4 and 5 OF MCLEOD, RENVILLE AND SIBLEY COUNTIES The following policy is intended to supplement Minnesota Statutes
More informationColorado Oil and Gas Conservation Commission
Colorado Oil and Gas Conservation Commission AQUIFER PROTECTION, WELLBORE INTEGRITY & SETBACK MITIGATION August 2013 COGCC MISSION FOSTER THE RESPONSIBLE DEVELOPMENT OF COLORADO S OIL AND GAS NATURAL RESOURCES.
More informationOrdinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:
Ordinance No. 2424 ORDINANCE PROVIDING FOR PREVENTION OF EROSION AND CONTROL OF SEDIMENT; DEFINING TERMS USED IN THE ORDINANCE; ESTABLISHING THE SCOPE OF COVERAGE OF THE ORDINANCE AND EXCEPTING THEREFROM
More informationSPECIFICATIONS FOR STRUCTURAL EXCAVATION
SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition
More informationNo An act relating to hydraulic fracturing wells for natural gas and oil production. (H.464)
No. 152. An act relating to hydraulic fracturing wells for natural gas and oil production. (H.464) It is hereby enacted by the General Assembly of the State of Vermont: Sec. 1. FINDINGS The general assembly
More informationMining. What is it? Why do we do it? What does it do to the Earth? How can we be more sustainable?
Mining What is it? Why do we do it? What does it do to the Earth? How can we be more sustainable? Naturally occurring in earth s crust Must be extracted, processed Examples Energy (oil, coal, natural gas,
More informationE&S BMP DESIGN. Working Toward a Better Conclusion
E&S BMP DESIGN Working Toward a Better Conclusion Are Compost Socks Enough? Compost socks are excellent BMPs when properly used and maintained However, they do have limitations Compost Socks The right
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationSHALE FACTS. Production cycle. Ensuring safe and responsible operations
SHALE FACTS Production cycle Ensuring safe and responsible operations Statoil is committed to developing our shale projects in a safe, responsible and open manner. Statoil takes a long term perspective
More information