1 1
2 TOPICS September 8 & 22, 2011 The Challenge The Solution (Part of it) The Grand Park The Results 2
3 The North Georgia Water Challenge High dependency on Lake Lanier and Chattahoochee River (>70%). 11 th U.S. Circuit Court of Appeals Ruling: Overturn Judge Magnuson Ruling Water supply is an authorized purpose of Lake Lanier Corps of Engineers has 12 months to determine the water availability of Lake Lanier Conservation is not enough/water Stewardship Act is not sufficient by itself optimistic projections of conservation savings of 25 MGD less than 90 MGD over the long term Regardless of the Lake Lanier status, Metro Area Water Supply projects: additional supply needs of approximately 150 MGD by 2035 potential deficits by 2025
4 Projected Supply Deficits in the Region 2025 DEFICIT EVEN WITH LAKE LANIER AND CONSERVATION 2012 DEFICIT ~ 280 MGD 2020 DEFICIT ~ 350 MGD SOURCE: Governor s Water Contingency Planning Task Force Findings and Recommendations Report, December 21, 2009
5 Water Supply Options (solutions addressing water shortage) 1. Conservation 2. Groundwater Development 3. Reservoir Expansion 4. New Reservoir Construction Governor s Task Force 2020 contingency plan includes new reservoir NW of Forsyth County as an option to supply 88 MGD (270 AFD) the proposed Shoal Creek Reservoir 5. Water Transfer 6. Reuse 7. Desalination Combining options (1) and (4) are critical to the water supply deficit
6 Shoal Creek Reservoir : Project Overview Reservoir Location 1 Reservoir Surface Area Reservoir Volume Structure Type Ht. of Dam Water Sources Off-stream Pump Station Capacity Potential Yield Water Treatment Capacity Finished Water Transmission Shoal Creek 0.2 to 0.4 miles upstream of confluence with Etowah River 1,187 acres 1,221 acres 14.7 BG BG 45,112 AF 63,219 AF Gravity, roller compacted concrete 160 ft Shoal Creek on stream impoundment Etowah River off stream pumping Amicalola River offstream pumping 30 MGD MGD 92 AFD 675 AFD Up to 90 MGD on continuous basis Up to 100 MGD Up to 307 AFD 37 miles of 42-inch to 72-inch SOURCE: 1991 HS/BEJ Report and 2009 analysis Disclaimer: Estimates based upon information at this time. Schedule Project Cost 8 to 12 years Approximately $650 million
7 Public/Private Partnership Team: Experienced and Proven Etowah Water & Sewer Authority City of Atlanta American Water Private Equity American Water committed to raising needed equity and invest in the project Local engineering and contractor support
8 American Water Overview o Heritage dates back to 1886 o Largest water services provider in U.S. o Serves approximately 16 million people in more than 1,600 communities o Operations in 35 states and Ontario and Manitoba, Canada o More than 7,000 employees
9 American Water Facts and Figures Owner/Operator of system assets More than 500 individual water systems 48,000 miles of distribution mains 96 surface water treatment plants 750 groundwater treatment plants 1,120 groundwater wells 294 wastewater treatment plants 100 Reservoirs
10 AW s Commitment in Needed Infrastructure Ongoing Capital Expenditure program of $800 million to $1 billion per year Capital Expenditure Framework Capital program focused on Infrastructure replacement Capacity projects Source of supply needs Major projects Lexington, KY Ashtabula, OH Hopewell, VA Short Hills, NJ EXCELLENCE * Coatesville, INTEGRITY PA * STEWARDSHIP * COMMITMENT * EFFICIENCY * VISION (1) Net capex defined as gross capex less advances and contributions in aid of construction. Net Capex (1) by category
11 The Grand Park Preservation of 8,000 acres Central Park, New York 842 acres Recreational use of 2,000 acre reservoir Extension of the Appalachian Trail Interpretive Center for public education Bird watching, hiking, hunting, canoeing, kayaking, fishing, etc. 11
12 The Grand Park The 8,000 acre park will be managed by a Park Authority. The Park Authority will be directed by a 7 person board consisting of the following representatives: 2 persons from EWSA 3 persons from Dawson County 2 persons from DNR, USFW, Nature Conversancy, private contributor to the park or other mutually agreed upon persons The Park Authority will create a 50 year master plan for the use of the park. This master plan must be approved by the Dawson County Commission and the Board of Directors of EWSA, exclusively. All changes to the master plan must be approved by the Dawson County Commission and the Board of Directors of EWSA, exclusively. Additional revenue may be obtained from private sources. 12
13 Benefits of the Reservoir & Park Largest individual project identified to offset loss from Lake Lanier and/or meet future supply deficits Built with NO tax dollars NO additional debt burden for the Authority, County, or State 8,000 acres of open space preserved A GRAND Park for the use of Dawson County and the Region The largest job creator in the State during construction Compatible projects and uses Transparent process ensuring all issues are addressed openly Economic benefits to the County
14 The Basics This project must have customers This project is not a pork barrel. You have to be able to defend the price of the water openly, honestly, and in the full sunshine. There can be no earmarks or pork. Greed will kill this project before it ever gets started. There is a price range at which water can be sold. The yield of the project has not been established. Therefore, the business model is variable. Concerns: T&E Interbasin Transfer Trees Longevity
15 We are not asking you to make a choice. The choice has been made, join the team you know. One community, one voice, one future, and one direction.
Glades Reservoir Environmental Impact Statement (EIS)
Glades Reservoir Environmental Impact Statement (EIS) Permit Application #SAS-2007-00388 Public Scoping Meeting Proposed Operational Plan/Scenarios March 2012 Glades Reservoir Environmental Impact Statement
More informationW A T E R S U P P L Y A N D W A T E R C O N S E R V AT I O N M A N A G E M E N T P L A N M A Y
This Section identifies surface water supply sources for the Metro Water District to meet future water demands. The first part of this Section discusses the water supply sources intended to meet water
More informationA resource assessment of the Etowah Watershed
A resource assessment of the Etowah Watershed The Upper Etowah watershed drains a region dominated by rolling Piedmont topography with interspersed forest cover, agricultural and urban land uses. With
More informationWater Users & Southern Arizona
Water Users & Southern Arizona March 6, 2015 SOUTHERN ARIZONA WATER USERS Southern Arizona Water Users Association Water Experts & Professionals serving Southern Arizona Discuss & Analyze Issues One Voice
More informationThe Evolution of the City of Asheville Water System. Presented by Leslie Carreiro and Bill Hart
The Evolution of the City of Asheville Water System Presented by Leslie Carreiro and Bill Hart First City of Asheville Water System Asheville Water System Prior to 1883 Beaucatcher Reservoir -5 Million
More informationThe Catawba-Wateree River: Conflict and Collaboration in the Carolinas
The Catawba-Wateree River: Conflict and Collaboration in the Carolinas Jeff Lineberger, PE Director, Water Strategy and Hydro Licensing Duke Energy NC At-Large Director Catawba-Wateree Water Management
More informationCUMULATIVE IMPACT ANALYSIS: A SIMPLE MODEL FOR LOCAL GOVERNMENT RESERVOIRS AND WITHDRAWALS IN GEORGIA
CUMULATIVE IMPACT ANALYSIS: A SIMPLE MODEL FOR LOCAL GOVERNMENT RESERVOIRS AND WITHDRAWALS IN GEORGIA Nolton G. Johnson AUTHOR: Chief, Water Resources Branch, Georgia Environmental Protection Division,
More informationSuccessful Procurement and Finance Methods: The Southwest Florida Experience
Successful Procurement and Finance Methods: The Southwest Florida Experience Eugene A. Schiller 1 The focus of this paper is to share a few thoughts based on my 30 years of participating in various public-private
More informationAn Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker
An Investigation into the 2012 drought on Apalachicola River Steve Leitman, Bill Pine and Greg Kiker Apalachicola-Chattahoochee-Flint (ACF) River basin 20,400 sq. mi. One of the most actively disputed
More informationCOUNTY-BY-COUNTY WATER FACILITY CAPACITY AND EXPANSION SCHEDULE
COUNTY-BY-COUNTY WATER FACILITY CAPACITY AND EXPANSION SCHEDULE This Appendix outlines the schedule for expanding water facility treatment capacities in the Metro Water District. Appendix B details the
More informationPublic Scoping Meetings
Public Scoping Meetings GRASS VALLEY Wednesday, March 9, 2016 6:00 8:00 p.m. Holiday Inn Express 121 Bank Street Grass Valley, CA 95945 AUBURN Thursday, March 10, 2016 6:00 8:00 p.m. Forest Lake Christian
More informationModel Riparian Buffer Ordinance.
Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor
More informationNovember 15 th, 2012 WMAO 2012 Fall Conference 100 Years of Watershed Events. Amy Mackey Raccoon Creek Watershed Coordinator
November 15 th, 2012 WMAO 2012 Fall Conference 100 Years of Watershed Events Amy Mackey Raccoon Creek Watershed Coordinator Surface Mining Control & Reclamation Act of 1977 (SMCRA) watershed event most
More informationThe Boardman: A River Reborn Project Fact Sheet
The Boardman: A River Reborn Project Fact Sheet What is The Boardman: A River Reborn Project? In 2005, Traverse City Light and Power determined that is was not economically feasible to produce hydropower
More informationRaw water sources, facilities, and infrastructure
WATER AND WASTEWATER SERVICES IN STEAMBOAT SPRINGS Prepared by Jay Gallagher, General Manager Mt. Werner Water and Sanitation District (February, 2015) Raw water sources, facilities, and infrastructure
More informationSupplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project. August 24, 2016
Supplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project August 24, 2016 What is a Supplemental Environmental Impact Statement? What is a Supplemental Environmental
More informationCity of Port Orford Water Supply Expansion. Phase I Distribution System Phase II Hubbard Creek Impoundment
City of Port Orford Water Supply Expansion Phase I Distribution System Phase II Hubbard Creek Impoundment City of Port Orford Water Supply Expansion Presented by: City of Port Orford SHN Consulting Engineers
More informationUpdate to Facility Capacity Charges Methodology and Schedule. A study for El Dorado Irrigation District. prepared by. Bartle Wells Associates
APPENDIX A Update to Facility Capacity Charges Methodology and Schedule A study for El Dorado Irrigation District prepared by Bartle Wells Associates Principal Consultants Doug Dove, President Catherine
More informationThe U.S. Army Corps of Engineers Regulatory Program in Georgia
The U.S. Army Corps of Engineers Regulatory Program in Georgia David Lekson, PWS Kelly Finch, PWS Richard Morgan Savannah District August, 2013 US Army Corps of Engineers Topics Savannah District Regulatory
More informationRE: Plan Amendment Process Documentation and Staff Recommendation
TO: FROM: Executive Committee Metro Water District Staff DATE: November 12, 2018 RE: Plan Amendment Process Documentation and Staff Recommendation (City of Auburn) The Metropolitan North Georgia Water
More informationProposed Performance Indicators for Thrive MSP 2040 For discussion at the December 19, 2012 Committee of the Whole meeting
Proposed Performance Indicators for Thrive MSP 2040 For discussion at the December 19, 2012 Committee of the Whole meeting Why develop indicators for Thrive MSP 2040? Why measure performance? Broadly defined,
More informationWater Supply and Water Conservation Management Plan
Water Supply and Water Conservation Management Plan May 2009 Prepared By: AECOM Metropolitan North Georgia Water Planning District [This page intentionally left blank] Water Supply and Water Conservation
More informationOverview of Local Facilities. Integrated Resource Planning Advisory Committee
Overview of Local Facilities Integrated Resource Planning Advisory Committee City of Henderson Utility Services System Overview 2 CITY OF HENDERSON Department of Utility Services The Department of Utility
More informationWhat are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals?
What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals? What are WSSC customers expectations about water conservation?
More informationOrange County Water District. SCAP May 4, 2015
Orange County Water District SCAP May 4, 2015 Orange County Water District Created in 1933 Manage and protect the groundwater basin Serve approximately 2.4 million residents 19 Groundwater Producers 10
More informationRaw Water Supply Master Plan Development
Raw Water Supply Master Plan Development Stakeholder Outreach Meeting - II 31 August 2016 Welcome Introductions Master Plan Goals and Objectives Refine our standard approach to long-term plan for securing
More informationCommunity Strategies for Water Supply in the Bakken Region
Community Strategies for Water Supply in the Bakken Region Robert R Hearne Associate Professor Department of Agribusiness and Applied Economics North Dakota State University Phone 701 231 6494 email robert.hearne@ndsu.edu
More informationFEDERAL OPERATION OF LAKE LANIER AND ALLATOONA LAKE
As water systems in the Metro Water District continue to collaborate on regional water resources planning, water resources issues are identified. This Section outlines the regional water resource issues
More informationLos Angeles 3 rd Regional
Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan
More informationSouth Florida Water Management District Future Directions. Melissa Meeker, Executive Director
South Florida Water Management District Future Directions Melissa Meeker, Executive Director September 15, 2011 District Overview Oldest and largest of five water management districts Covers 18,000 square
More informationU.S. Army Corps of Engineers Role in the Great Lakes Restoration Initiative (GLRI)
U.S. Army Corps of Engineers Role in the Great Lakes Restoration Initiative (GLRI) Michael Greer GLRI Program Manager and Regional Technical Specialist, Ecosystem Restoration Buffalo District August 5,
More informationCity of Valdosta Land Development Regulations
Chapter 324 Section 324-1 Environmental Planning Criteria Protection of Groundwater Recharge Areas (A) Purpose and Intent. Pursuant to O.C.G.A. 12-2-8 and the Georgia Department of Natural Resources (DNR),
More informationNorth Fulton Wastewater Capacity Analysis and Economic Assessment
North Fulton Wastewater Capacity Analysis and Economic Assessment Fulton County Department of Water Resources Project No. 84426 07/27/2015 North Fulton Wastewater Capacity Analysis and Economic Assessment
More informationStrategic Plan. Grand River Conservation Authority
Grand River Conservation Authority Strategic Plan The Grand River Conservation Authority is a partnership of 39 municipalities created to manage water and natural resources for the benefit of the 960,000
More informationFigure 1 Demands on Lake Athens
Table 1 Projected Demands for Athens MWA and Lake Athens Water User Group Demand on Lake Athens 2010 2020 2030 2040 2050 2060 Comments City of Athens 2,326 2,832 3,431 4,111 5,003 6,108 Henderson Co. Irrigation
More informationSeptember 7, JOINT PUBLIC NOTICE Savannah District/State of Georgia
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 Regulatory Branch SAS-2001-04600 Formerly SAS-2003-00306 September 7, 2018
More informationECONOMIC IMPACT OF THE GRAND RIVER DAM AUTHORITY
ECONOMIC IMPACT OF THE GRAND RIVER DAM AUTHORITY MARCH 2015 E XECUTIVE E SUMMARY In 2012, the Oklahoma Department of Commerce completed an economic impact study of the Grand River Dam Authority (GRDA),
More information2016 // RETURN ON ENVIRONMENT Dauphin County
2016 RETURN ON ENVIRONMENT Dauphin County 01 WHY A RETURN ON ENVIRONMENT? Nature is serious business. WHAT IS THE VALUE OF OUR CLEAN AIR, WATER, AND OPEN SPACE? WHAT HAPPENS TO OUR QUALITY OF LIFE IF WE
More informationRIVER BRIDGE MOUNTAIN ACREAGE
RIVER BRIDGE MOUNTAIN ACREAGE Acreage: Location: Elevation: Amenities: 205 +/- Acres surrounded by Martha Sundquist State Forest and Cherokee National Forest. An estimated seven miles east of Hartford,
More informationInterlake Tunnel Project
Interlake Tunnel Project February 26,2015 Updated 3/19/15 Presentation at the Heritage Ranch Rec Barn 1 Agenda Introductions Project description and background Feasibility and hydraulic modeling San Antonio
More informationGlades Reservoir Draft Environmental Impact Statement
Glades Reservoir Draft Environmental Impact Statement Chapter 4 Environmental Consequences October 2015 4 ENVIRONMENTAL CONSEQUENCES 4.1 INTRODUCTION 4-1 4.1.1 Types and Definitions of Impacts 4-1 4.1.2
More informationPARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013
PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR
More informationMONONGAHELA RIVER, WV
Hydropower Project License Summary MONONGAHELA RIVER, WV MORGANTOWN LOCK AND DAM HYDROELECTRIC PROJECT (P-13762) POINT MARION LOCK AND DAM HYDROELECTRIC PROJECT (P-13771) Photo Credit: U.S. Army Corps
More informationA Down-Streamers Perspective. Steve Davis August 26, 2011
A Down-Streamers Perspective Steve Davis August 26, 2011 Agenda Historical Perspective Georgia State Water Planning Council 11 th Circuit Court of Appeals Ruling Perspective Endangered Species Act Perspective
More informationCity of Columbia South Carolina. Discussion of Public Private Partnership. April 24, 2012
City of Columbia South Carolina Discussion of Public Private Partnership April 24, 2012 1 KEY HISTORICAL DATES Rich 142 Year History 1869-Founded as Hackensack Water Company 1890-Listed on the New York
More informationC I R P A C P R E S E N T A T I O N B Y R O N T H O M P S O N J U N E 1 6,
WATER UPDATE C I R P A C P R E S E N T A T I O N B Y R O N T H O M P S O N J U N E 1 6, 2 0 1 6 W A T E R S U P P L Y, C O N S E R V A T I O N A N D D E V E L O P M E N T CURRENT WATER CONDITIONS 102%*
More informationAugust 19, Subject: IBT Report for Dear Ms. Nimmer:
August 19, 2016 Ms. Kim Nimmer Water Supply Planning Branch N.C. Division of Water Resources 1611 Mail Service Center Raleigh, North Carolina 27699-1611 Subject: IBT Report for 2015 Dear Ms. Nimmer: We
More informationNovember 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project
November 15, 2017 The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project OVERVIEW Team Introduction About the NJWSA About Round Valley About the Project Project Components
More informationState of the City. Chamber of Commerce November 1, The city that makes a difference
State of the City Chamber of Commerce November 1, 2007 Overview Snapshot of the city Council s first year: an update Key themes & opportunities for the future Snapshot of the city Population growth Household
More information8.3 Somervell County Water Supply Project
8.3 Somervell County Water Supply Project 8.3.1 Description of Option The Somervell County Water District (SCWD) completed the first part of their surface water supply system in October 2011. Previously,
More informationImplementing the Second Stage Short-Term Drought Response Strategy GMP No. 3 Garney Companies and Pepper Lawson. June 25, 2015
Implementing the Second Stage Short-Term Drought Response Strategy GMP No. 3 Garney Companies and Pepper Lawson June 25, 2015 DROUGHT IS REAL Lake Fort Phantom Hill Was 47% capacity in May, 2013 Now 43%
More informationExecutive Summary. ES-1 Water Resources Infrastructure for Apex, Cary, Morrisville, and RTP South
Executive Summary Since the mid-1990s the Towns of Apex, Cary, and Morrisville, and Wake County have worked to develop and manage a flexible portfolio of water resources options. This approach is preferable
More informationProviding local politically supported water access opportunities to the waterways of Virginia s Middle Peninsula
Contact: Lewis Lawrence Title: Director of Regional Planning Affiliation: Middle Peninsula Planning District Commission Address: P.O. Box 286 Saluda, Virginia 23149 Email address: LLawrence@mppdc.com Phone:
More informationOconee County Utility Department. Water Resources Mid-Year Update January 18, 2017
Water Resources Mid-Year Update January 18, 2017 Water & Wastewater Planning Carter & Sloope, Inc. Marty Boyd, P.E. Engineered Horizons, LLC Paula Feldman, P.E. Planning Presentation Outline Water demand
More informationENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA
ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA Nolton G. Johnson, Steven R. Layman, and Cristin C. Krachon AUTHORS: Geosyntec Consultants, 1255 Roberts Blvd NW, Suite
More informationHICKORY LOG CREEK RESERVOIR: A NEW APPROACH TO SUSTAINABLE WATER MANAGEMENT
HICKORY LOG CREEK RESERVOIR: A NEW APPROACH TO SUSTAINABLE WATER MANAGEMENT George F. McMahon, Ph.D. 1/ and A. Roy Fowler 2/ AUTHORS: 1/ Vice President, Technical Practice Director for Water Resources,
More informationCHARLES RIVER NATURAL VALLEY STORAGE AREA DRAFT MASTER PLAN PUBLIC MEETING MILLIS PUBLIC LIBRARY 19 APRIL 2017
CHARLES RIVER NATURAL VALLEY STORAGE AREA DRAFT MASTER PLAN PUBLIC MEETING MILLIS PUBLIC LIBRARY 19 APRIL 2017 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131
More informationMeeting Emerging Challenges: The Case for Transformation at Interior. Bob Lamb, Senior Advisor Department of Interior
Meeting Emerging Challenges: The Case for Transformation at Interior Bob Lamb, Senior Advisor Department of Interior Our Goal The great wild places and unspoiled landscapes of this country are the common
More informationColorado River Challenges Impacts to Southern Arizona
Colorado River Challenges Impacts to Southern Arizona 2 3 4 5 Colorado River Basics 7 States, 2 Nations Annual Flow 15.0 MAF 40 Million People All of the Major Cities in Southwest 5.5m Irrigated Acres
More informationOverview and Background Information. Tualatin Valley Water District
Overview and Background Information Introduction The ( TVWD or the District ) is in the process of conducting a comprehensive rate study. As a part of the process, TVWD has formed a Rate Advisory Committee
More informationWATER TREATMENT PLANT TOUR
Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow WATER TREATMENT PLANT TOUR Tom Kula, Executive Director Billy George, Assistant Deputy Director Water August 11, 2017 Member
More informationSpringfield Supplemental Water Supply Project Supplemental Environmental Impact Statement
The purpose of this Supplemental Environmental Impact Statement is to evaluate new and significant information within the project area, evaluate all appropriate and reasonable alternatives, assess the
More informationThe Water Resources Utility of the Future: Emergence of an Innovation Ecosystem
The Water Resources Utility of the Future: Emergence of an Innovation Ecosystem Kenneth Rubin, PhD Managing Partner American Infrastructure Holdings 1050 30 th St NW Washington DC 20007 202-652-2650 (o)
More informationWater Finance Conference. Carlsbad Desalination Project August 30, 2016
Water Finance Conference Carlsbad Desalination Project August 30, 2016 Agenda I. Introduction II. Market For Seawater Desalination III. Carlsbad Desalination Plant I. Development II. III. Financing Construction
More informationWholesale water agency created by State Legislature in Mission is to provide safe and reliable water supply to member agencies Service area
Wholesale water agency created by State Legislature in 1944 24 member agencies 36-member board of directors 3 million people $188 billion economy Mission is to provide safe and reliable water supply to
More informationCalendar Year capital improvement. Program
Calendar Year 2010 capital improvement Program Important Notice: The information found in this file concerning the 2010 Capital Improvements Program, has been extracted from the San Antonio Water System
More informationCity of San Diego Pure Water Project October 2014
City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,
More information4C.11 Off-Channel Reservoir near Lake Corpus Christi (N-11)
4C.11 Off-Channel Reservoir near Lake Corpus Christi (N-11) 4C.11.1 Description of Strategy Choke Canyon Reservoir (CCR) has a storage capacity of approximately 695,000 acft and a contributing drainage
More informationFulton County Water Supply and Demand Analysis. Final Report. Fulton County Commissioners 152 South Fulton Street Wauseon, Ohio 43567
Fulton County Water Supply and Demand Analysis Final Report Fulton County Commissioners 152 South Fulton Street Wauseon, Ohio 43567 July 2012 Presented 10/03/2012 Background Current Fulton County Service
More informationThe Corporation of the City of London Proposed Risk Assessment and 2013 Risk-Based Audit Plan. January 31, 2013
The Corporation of the City of London Proposed Risk Assessment and 2013 Risk-Based Audit Plan January 31, 2013 Agenda Risk Assessment Summary 3 Page Proposed 2013 Risk-Based Audit Plan 10 Audit Plan Coverage
More informationNorth Texas Municipal Water District Regional Service Through Unity Meeting Our Region s Needs Today and Tomorrow
North Texas Municipal Water District Regional Service Through Unity Meeting Our Region s Needs Today and Tomorrow Lower Bois d Arc Creek Reservoir Update Tom Kula, Executive Director Mike Rickman, Deputy
More informationEXISTING EID WATER SUPPLY SOURCES
EXISTING EID WATER SUPPLY SOURCES FOLSOM RESERVOIR Folsom Reservoir is located at the west end of El Dorado County, at the confluence of the North and South Forks of the American River. EID treats water
More informationLARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012
LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 01 STONY MOUNTAIN PIPELINE Laricina will develop and follow an environmental protection plan that meets or exceeds
More informationCREATIVE WAYS TO FUND ECONOMIC DEVELOPMENT THROUGH PUBLIC WORKS PROJECTS. Presented by: M. Craig Davis Partner, Spencer Fane Britt & Browne LLP
CREATIVE WAYS TO FUND ECONOMIC DEVELOPMENT THROUGH PUBLIC WORKS PROJECTS Presented by: M. Craig Davis Partner, Spencer Fane Britt & Browne LLP Keys To Success Identify Minimum Project Goals Uses Identify
More informationSanta Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives
Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives The purpose of the Water Supply Master Plan (Water Master Plan) is to present the District s strategy for ensuring a
More informationREPORT RECLAIMED WATER DEFICIT & AUGMENTATION OF RECLAIMED WATER SYSTEM PROJECTION STUDY ON LONG TERM WATER SUPPLY. December 2014
RECLAIMED WATER DEFICIT & AUGMENTATION OF RECLAIMED WATER SYSTEM PROJECTION STUDY ON LONG TERM WATER SUPPLY REPORT December 2014 Prepared by: Ray O. Avery, Utility Consultant for The Clay County Utility
More informationLake County Success. support through synergistic local partnerships that not only mitigate, but also produce
Lake County Success Generating Environmental Gains With Geothermal Power By Mark Dellinger, Administrator, Lake County (CA) Sanitation District, and Eliot Allen, Principal, Criterion/Planners Engineers
More informationWater Availability Study Safe Yield Analysis. Lori A. Burkert, P.G
Water Availability Study Safe Yield Analysis Lori A. Burkert, P.G. lburkert@entecheng.com 610-373-6667 Inflow vs Outflow What is Safe Yield? Maintainable yield of water from a surface or groundwater source
More informationCONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation
M a r y l a n d P a r k L a k e D i s t r i c t Advisory Committee Meeting CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation City of Maryland Heights, Missouri November 07, 2018
More informationMichigan s Water Heritage
Michigan s Water Heritage A Strategy for the Next Generation Jon W. Allan Director, Office of the Great Lakes 7 November 2014 Midwest Born From Great Lakes The Great Lakes and their tributaries made the
More informationGROUNDWATER 101. Milan J. Michalec, Cow Creek Groundwater Conservation District
GROUNDWATER 101 Milan J. Michalec, Cow Creek Groundwater Conservation District Bottom Line Up Front "The primary message of the 2012 State Water Plan is a simple one: In serious drought conditions, Texas
More informationSoutheastern Colorado Water Conservancy District. Leadership Pueblo, May 11, 2017 Jim Broderick Executive Director, SECWCD
Southeastern Colorado Water Conservancy District Leadership Pueblo, Jim Broderick Executive Director, SECWCD Fryingpan-Arkansas Project The Southeastern Colorado Water Conservancy District was formed in
More informationPumped Storage Profile
Pumped Storage Profile Table of Contents Brookfield Asset Management Introduction Brookfield Renewable Power Introduction Pumped Storage Profile Brookfield Pumped Storage Projects Conclusion 2 Brookfield
More informationPublic Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director
Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Utility Fast Facts Average household uses 107,000 gallons of water each year. 1,851 gallons of water to refine
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation
More informationWATER AND WASTEWATER RATE STUDY
WATER AND WASTEWATER RATE STUDY B&V PROJECT NO. 176244.0100 PREPARED FOR Camrosa Water District MARCH 20, 2013 Black & Veatch Holding Company 2011. All rights reserved. Camrosa Water District WATER AND
More informationThe Highlands Region:! Partnerships to Conserve Forests & Watersheds. Ramapo Mountains, NJ
The Highlands Region:! Partnerships to Conserve Forests & Watersheds Ramapo Mountains, NJ The region supplies clean drinking water for nearly 15 million people. French Creek, Berks County, PA Wanaque
More informationManagement of Florida s State-Owned Lands October 23, 2012
Management of Florida s State-Owned Lands October 23, 2012 10/22/2012 1 Land Acquisition Update 2 2 Division of State Lands Role Acquire land on behalf of the Board of Trustees Identify appropriate land
More informationChattahoochee River Dam Removal and Ecosystem Restoration Project: Meeting Ecosystem Restoration and Recreation Goals
Chattahoochee River Dam Removal and Ecosystem Restoration Project: Meeting Ecosystem Restoration and Recreation Goals Doug Baughman and Ryan Mitchell CH2M HILL Rick McLaughlin McLaughlin Whitewater Design
More informationFinancing Canadian Municipalities
Financing Canadian Municipalities Enid Slack Institute on Municipal Finance and Governance Munk School of Global Affairs University of Toronto South African Study Tour, Toronto June 8, 2010 Outline of
More informationLAND & WATER CONSERVATION FUND Preserving the Best of the American Outdoors
LAND & WATER CONSERVATION FUND Preserving the Best of the American Outdoors FY 2010 Land Acquisition Requests U.S.D.A. Forest Service, Southern Region Chattahoochee & Oconee National Forests State of Georgia
More informationPotable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL
Potable Reuse as an Alternative Water Supply AWRA Conference Orlando, FL Who We Are New Port Richey Tampa St. Petersburg 100 percent groundwater pumped from 13 wellfields Tampa Bay Water History Integrated,
More informationWater Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director
Water Reuse: Orlando s Experiences & Perspectives Rick Howard, PE Public Works Director Water Reuse The process of using wastewater that has been thoroughly treated and disinfected to remove harmful organisms
More informationSovereign Lands and Great Salt Lake
Sovereign Lands and Great Salt Lake The Living Lake - Charles Uibel Laura Ault Sovereign Lands Program Manager Division of Forestry, Fire and State Lands What are Sovereign Lands? Lakebeds and riverbeds
More informationSustainability of a potable water supply for a
FWRJ Reservoirs: Florida s Future Sustainable Water Supply Randall Bushey and D. Edward Davis Randall Bushey, P.E., is senior water resources engineer with CH2M in Gainesville, and D. Edward Davis, P.E.,
More informationWater Supply Master Plan Update
Water Supply Master Plan Update January 2018 Page 1 Meeting objective Get stakeholder input on water supply projects and strategies Are we including the right mix of projects? Are there factors that we
More informationManhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas
Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1
More informationBRADEN RIVER UTILITIES BRU
BRADEN RIVER UTILITIES BRU WHO OWNS BRU & WHY BRU IS OWNED AND OPERATED BY SMR AS A NON-PUBLIC MEMBER UTILITY, STARTED IN 1994 SMR IS THE HOLDER OF ALL WATER USE PERMITS (WUP) FOR THE ENTIRE RANCH INCLUDING
More informationDecision Notice Finding Of No Significant Impact
Decision Notice Finding Of No Significant Impact U. S. Forest Service Southern Region Land Between The Lakes National Recreation Area Golden Pond, Kentucky Environmental Assessment for Prior Creek Project
More informationDEKALB COUNTY DEPARTMENT OF WATERSHED
DEKALB COUNTY DEPARTMENT OF WATERSHED DAM SAFETY THE MISSED RISK IN PLAIN SIGHT 11/9/2017 Sandra L. Glenn, P.E. Sandy A. Smith 1 AGENDA 1 7 INTRODUCTION 2 3 4 5 6 BASIC TERMINOLOGY DWM DAMS WHAT WE LEARNED
More information