AMERICAN SAMOA POWER AUTHORITY

Size: px
Start display at page:

Download "AMERICAN SAMOA POWER AUTHORITY"

Transcription

1 AMERICAN SAMOA POWER AUTHORITY A Scope of Work for Construction Management Supervision of Directionally Drilled Wells for American Samoa Power Authority. For the Benefit of the Territory of American Samoa This project will benefit the water supply on the Island of Tutuila in the Territory of American Samoa. The project will focus on improvements to the ASPA-owned water supply as stipulated under USEPA Administrative Orders. Submitted by the American Samoa Power Authority December 2016

2 Scope of Work (SOW) Outline Proposed Wells nos. 9, 10, 11, 12 and 153 Drilling Project. 1. Project Background: This project involves the drilling of five (5) new directional wells in the Island of Tutuila in American Samoa. Some of the existing wells on Tutuila Island have chloride levels exceeding EPA minimum standards and some are under the influence of surface water contamination. Groundwater under the influence of surface water contamination (GUDI wells) is a critical issue on Tutuila Island and is the reason for the Boil Water Notice issued for affected areas. The American Samoa Power Authority (ASPA) is in urgent need of more good water sources to remove the BWN and also have better water supply coverage with areas of low pressure and supply shortage. The topography in American Samoa is very steep, some areas are very hard to access and areas easily accessible to drilling are not recommended due to dense residential settlements and Right of Way issues and close proximity to the ocean. Hence directional drilling is recommended to tap into new groundwater sources without need of mass excavation or delays in construction work from land rights issues and also to keep the extraction point far away from the coast. 2. Scope of Services Description This SOW covers the Construction Management supervision for the directional drilling of five (5) new directional wells. The well locations and details are described in Section 3 of this document. The tasks and services required of the Construction Manager for this project is outlined below. A. Construction Manager Responsibilities: 1. Ensure and organize that all standard erosion control measures (e.g. silt fencing, barricades, retaining walls and silt ponds) on project site are in place to control any runoff and sedimentation during construction works. 2. Ensure safety procedures are in place and that employees have and are wearing Personal Protective Equipment (PPE) onsite, as well as conduct safety briefings. All onsite incidents must be reported by CM to the Project Engineer and to ASPA Safety. 3. The CM is expected to have background experience in Directional Drilling and can assist with reviewing and making recommendations on the procurement of tooling and drilling supplies for directional drilling and give feedback and assistance during construction activities. 4. The CM is to provide a QA/QC plan to ASPA and ensure implementation of the QA/QC Plan and that the driller follows standard drilling standards/procedures for directional drilling. 2

3 5. Document all drilling works carried out on site and must produce a daily report for all drilling works and construction work on site. Weekly reports must be submitted to project manager and project engineer at the beginning of the new week and month reports to USEPA must be prepared and submitted to Project Manager for review on the first week of the new month prior to submitting to USEPA. 6. Record and keep track and stock of all materials ordered and materials used on site and expenses. A record of all drilling materials received and materials used during construction must be recorded in the weekly progress reports. All tooling and supplies must be accounted for. A final stock take of materials must be carried out by the CM after construction work and signed off by Project Engineer. 7. Collect and record drill cuttings during drilling and produce a lithology log for new well at the end of drilling. The CM is expected to have background knowledge of the geologic formations in the project area and must have sound hydrogeologic knowledge to contribute to drilling works. 8. Ensure that the neat cement for grouting has a consistent density and that the process and procedures for installing the wells grout seal are correct and efficient and make recommendations if there s any for better procedures for installing. 9. Test and record chloride concentrations for the new well and produce salinity profile for the new well. Also, carry out water quality sampling and arrange with ASPA Water Quality operations for baseline tests and any other necessary tests to ensure a good quality source. 10. Assist and complete any other necessary tasks given by the Project Engineer or Project Manager. 11. Must have input in reverse circulation techniques and assist as required. 12. Submit a Final Well Drilling Construction Management Report no less than 30 working days at the end of directional drilling works to the Project Engineer. A copy of well drilling and construction photographs, reports and other related materials must be handed over to ASPA-ESD with submission of CM s final report. 3. PROJECT LOCATION This project will have five different well site locations, Well 9 will be drilled in the Pago Pago area, Well 10 will be drilled in the Aua area, Well 11 will be drilled in the Lauli i area, Well 12 will be drilled in the Alega area and Well 153 will be at Aoa area. Below are the site description and location maps. A. Proposed New Well Site # 9 Pago Pago Drilling Works This proposed site is at elevation 290 ft. amsl and is 1,203 ft. (0.23 mi) from Vaipito Reservoir, 1,089 ft. (0.20 mi) from south east of Well 183 in Vaipito. The well site is 1,203 ft. (0.23 mi) from the main road and the closest distance to the coast on the Fagasa side is 4,812 ft. (0.91 mi) and 4,630 ft. (0.88 mi) on the Pago Pago harbor side. This Pago Pago well will help provide additional water to the canneries. This well will be angle drilled at an angle of 50 o from ground level towards the easterly direction (refer to Figure 1) down to a depth of 50 ft. below groundwater table and will have casing from ground 3

4 level to 100ft below surface level in the vertical direction, hence will require at least 160 ft. of casing if drilled at the proposed angle. The well is expected to produce 150 gallons per minute (gpm). Figure 1 shows the proposed well location. The existing road to Well # 9 site will need to be widened and graded from the main road leading up to the project area to allow the drilling rig and other vehicles to access the new drilling site. The 100 x 100 ft. drilling project area requested for drilling works will allow for maneuvering the drill rig into/and around the project area, and for casings, equipment, water tank, drilling crew vehicle and any other necessary materials needed on site during drilling works. After, the drilling site has been cleared and prepared, we will then select a suitable drilling spot within the 100 x 100 ft. project area. The design for this well is shown in Appendix B of this document. A Construction Manager (CM) that has been hired via ASPA s competitive bidding process will be supervising the directional drilling of this well to ensure Quality Control and Assurance. When drilling works have been completed, the well must undergo pumping test procedures (see Appendix C) to determine the sustainable yield. Once a sufficient yield has been obtained from this well, the Well Connections Project will then commence to prepare our well heads and fence off the area for the well. Figure 1: Location of Proposed Well 9 in PagoPago B. Proposed New Well Site # 10 Aua Drilling Works This proposed site is at elevation 285 ft. amsl and is 101 ft. (0.02 mi) from the main road and the closest distance to the coast is 2,249 ft. (0.43 mi). This site is 233 ft. (0.044 mi) 4

5 North East of the Aua 100,000 gallon tank. The new well site is 259 ft. (0.049 mi) from operational Well 99, and 626 ft. (0.19 mi) from operational Well 97. Figure 2: Location of Proposed Well 10 in Aua Wells 99 and 97 are high in chloride and we aim to shut down these two wells if the new Aua well is successful. This well will be angle drilled at an angle of 50 o from ground level towards the north easterly direction (refer to Figure 2) down to a depth of 50 ft. below groundwater table and will have casing from ground level to 100ft below surface level in the vertical direction, hence will require at least 160 ft. of casing if drilled at the proposed angle. The well is expected to produce 100 gallons per minute (gpm). This new well will contribute water to Aua area and eastern side. Figure 2 shows proposed well location. 5

6 The existing road to Well # 10 site will need to be widened and graded from existing road leading to the project area to allow the drilling rig and other vehicles to access the new drilling site. The 100 x 100 ft. drilling project area requested for drilling works will allow for maneuvering the drill rig into/and around the project area, and for casings, equipment, water tank, drilling crew vehicle and any other necessary materials needed on site during drilling works. After, the drilling site has been cleared and prepared, we will then select a suitable drilling spot within the 100 x 100 ft. project area. The design for this well is shown in Appendix B of this document. A Construction Manager (CM) that has been hired via ASPA s competitive bidding process will be supervising the directional drilling of this well to ensure Quality Control and Assurance. When drilling works have been completed, the well must undergo pumping test procedures (see Appendix C) to determine the sustainable yield. Once a sufficient yield has been obtained from this well, the Well Connections Project will then commence to prepare our well heads and fence off the area for the well. C. Proposed New Well Site # 11 Lauli i Drilling Works This proposed site is at elevation 91 ft. amsl and is 2,702 ft. (0.51 mi) from the main road and the closest distance to the coast is 2,317 ft. (0.44 mi). There is a small perennial stream that runs 150 ft. (0.028 mi) from the project boundary area. This well will be angle drilled at an angle of 55 o from ground level towards the north westerly direction (refer to Figure 3) down to a depth of 30 ft. below groundwater table and will have casing from ground level to 100ft below surface level in the vertical direction, hence will require at least 160 ft. of casing if drilled at the proposed angle to prevent any surface infiltration. The well is expected to produce 70 gallons per minute (gpm). Figure 3 shows proposed well location. The existing road to Well # 11 site will need to be widened and graded from existing road leading to the project area to allow the drilling rig and other vehicles to access the new drilling site. The 100 x 100 ft. drilling project area requested for drilling works will allow for maneuvering the drill rig into/and around the project area, and for casings, equipment, water tank, drilling crew vehicle and any other necessary materials needed on site during drilling works. After, the drilling site has been cleared and prepared, we will then select a suitable drilling spot within the 100 x 100 ft. project area. The design for this well is shown in Appendix B of this document. 6

7 Figure 3: Location of Proposed Well 11 in Laulii A Construction Manager (CM) that has been hired via ASPA s competitive bidding process will be supervising the directional drilling of this well to ensure Quality Control and Assurance. When drilling works have been completed, the well must undergo pumping test procedures (see Appendix C) to determine the sustainable yield. Once a sufficient yield has been obtained from this well, the Well Connections Project will then commence to prepare our well heads and fence off the area for the well. D. Proposed New Well Site # 12 Alega Drilling Works This proposed site is at elevation 135 ft. amsl and is 537 ft (0.10 mi) from the main Alega road and the closest distance to the coast is 579 ft (0.11 mi). 7

8 Figure 4: Location of Proposed Well 12 in Alega. This well will be angle drilled at an angle of 55 o from ground level towards the northern direction (refer to Figure 4) down to a depth of 40 ft. below groundwater table and will have casing from ground level to 100ft below surface level in the vertical direction, hence will require at least 160 ft. of casing if drilled at the proposed angle. The well is expected to produce 60 gallons per minute (gpm). This new well site is located on the eastern side of Tutuila Island as shown on Figure 4, and if successful will contribute to alleviating water pressure, water quality and supply issues on the East side. 8

9 The existing road to Well # 12 site will need to be widened and graded from existing road leading to the project area to allow the drilling rig and other vehicles to access the new drilling site. The 100 x 100 ft. drilling project area requested for drilling works will allow for maneuvering the drill rig into/and around the project area, and for casings, equipment, water tank, drilling crew vehicle and any other necessary materials needed on site during drilling works. After, the drilling site has been cleared and prepared, we will then select a suitable drilling spot within the 100 x 100 ft. project area. The design for this well is shown in Appendix B of this document. A Construction Manager (CM) that has been hired via ASPA s competitive bidding process will be supervising the directional drilling of this well to ensure Quality Control and Assurance. When drilling works have been completed, the well must undergo pumping test procedures (see Appendix C) to determine the sustainable yield. Once a sufficient yield has been obtained from this well, the Well Connections Project will then commence to prepare our well heads and fence off the area for the well. E. Proposed New Well Site # 153 Aoa Drilling Works This proposed site is at elevation 185 ft. amsl and is 187 ft. (0.035 mi) from the main road and the closest distance to the Aoa coastline is 1806 ft. (0.34 mi) towards the Aoa coastline and 2665 ft. (0.50 mi) towards the Amouli coastline. This new well will be angle drilled at an angle of 60 o towards the central part of the island to target a more favorable hydrogeological area down to a vertical depth of 235 ft. and install casing from ground level to 100 ft. below surface level in the vertical direction. Angle drilling this well at 60 o will move the extraction point at least another 400 ft. towards the central part of the island. By drilling towards the south eastern side of the island at the proposed angle, ASPA will be able to tap into the thicker part of the freshwater lens further inland and move our extraction area further away from the coast thus reducing the risk of saline up-coning. The existing road to proposed Well 153 will require road works to widen the access path up to the tank site area. The existing security fence around the tank site area will be removed in some parts to allow for more room and space for project construction works. After completion of the project, the fence will be re-installed. 9

10 Fig 5: Location of proposed well in Aoa. After, the drilling site has been cleared and prepared, we will then select a suitable drilling spot within the 100 x 100 ft. project area. The design for this well is shown in Appendix B of this document. A Construction Manager (CM) that has been hired via ASPA s competitive bidding process will be supervising the directional drilling of this well to ensure Quality Control and Assurance. When drilling works have been completed, the well must undergo pumping test procedures (see Appendix C) to determine the sustainable yield. Once a sufficient yield has been obtained from this well, the Well Connections Project will then commence to prepare our well heads and fence off the area for the well. 4. KEY PERSONNEL William Spitzenberg, Chief Water Engineer; Joachim Fong, ESD Manager; Katrina Mariner, Project Engineer; Ioana Uli, Procurement Manager; Taylor Savusa, Water Operations Manager; David Addison, ASPA Archaeology. 5. KEY PARTNERS/AGENCIES AS-EPA and US-EPA are ASPA s key partners in this endeavor. ASPA will also work closely with the AS Department of Marine and Wildlife Resources, the Department of Commerce, the Historic Preservation Office and other government agencies and private interest groups that wish to participate. 10

11 6. ADMINISTRATION The procurement of materials will be the responsibility of the ASPA Procurement Manager. All purchases will be approved by EPA, the Executive Director and the ASPA Board of Directors. Construction of wells will be overseen by Project Manager and Engineer. Administrative tasks will be overseen by ASPA s Grants Manager. Administrative tasks will include, but not limited to tracking financial expenditures, financial reporting and project status appraisal for US-EPA. 7. ATTACHMENTS Appendix A: Directional Well Design. Appendix B: Pumping Test Procedures. 8. PROJECT MANAGEMENT As stipulated by EPA, the project will be managed by William Spitzenberg, P.E., ASPA s Sr. Water Engineer. 10/14/14 02/27/15 Signed: William E. Spitzenberg, Arizona P.E

12 AMERICAN SAMOA POWER AUTHORITY Appendix A: Directional Well Design. 12

13 Ground Elevation 12" hole to 160' 12" casing as needed Neat cement seal 10" casing if needed 8" hole to required depth 8" casing as needed 6" casing to required depth as needed perforated Note: This well will be drilled down to 50 ft. or less (depending on formations) below water table. The construction of the well and the size of the casings used will depend on the formations and information obtained from drilling. Final trajectory and direction of angled well will be surveyed after construction. Well ID 9 Pago Pago (50 Angle Well) Scale: Scale To Fit

14 Ground Elevation 12" Hole to 140'. 12" casing will be pulled out after pumping in cement. Neat cement seal 10" casing if needed 8" casing as needed 6" casing as needed Perforated Note: This well will be drilled down to 50 ft. or less (depending on formation) below the water table. The construction of the well and the size of the casings used will depend on the subsurface formations and information obtained from drilling. Final trajectory and direction of angled well will be surveyed after construction. Well ID 10 Aua (40 Angle Well) Scale: Scale To Fit

15 Ground Elevation 8" Hole to 160'. 8" casing will be pulled out after pumping in cement. Neat cement seal Note: This well will be drilled down to 30 ft. or less (depending on formations) below water table. The construction of the well and the size of the casings used will depend on the formations and information obtained from drilling. Final trajectory and direction of angled well will be surveyed after construction. Well ID 11 Laulii (40 Angle Well) Scale: Scale To Fit 6" casing as needed Perforated

16 Ground Elevation 12" Hole to 160'. 12" casing will be pulled out after pumping in cement. Neat cement seal 10" casing if needed Note: This well will be drilled down to 50 ft. or less (depending on formations) below water table. The construction of the well and the size of the casings used will depend on the formations and information obtained from drilling. Final trajectory and direction of angled well will be surveyed after construction. 8" casing as needed 6" casing as needed Perforated Well ID 12 Alega (55 Angle Well) Scale: Scale To Fit

17 Ground Elevation 12" Hole to 200'. 12" casing will be pulled out after pumping in cement. Neat cement seal Note: This well will be drilled down to 30 ft. or less (depending on formations) below water table. The construction of the well and the size of the casings used will depend on the formations and information obtained from drilling. Final trajectory and direction of angled well will be surveyed after construction. 10" casing if needed 8" casing as needed 6" casing if needed Perforated Well ID 153 Aoa (60 Angle Well) Scale: Scale To Fit

18 AMERICAN SAMOA POWER AUTHORITY A. Purpose and Scope Appendix B: Pumping Test Procedures. The purpose of this procedure is to describe the process for performing pumping tests to determine the hydraulic properties of water-bearing geologic materials for the American Samoa Power Authority (ASPA). B. Background and Precautions 1. Background A pumping test is a controlled field procedure to determine the hydraulic properties of water bearing geologic units. Aquifer characteristics that may be obtained from pumping tests include hydraulic conductivity (K), transmissivity (T), specific yield (Sy) for unconfined aquifers, the storage coefficient (S) for confined aquifers, and the vertical hydraulic conductivity of confining layers. Also, the occurrence and position of recharge or impermeable boundaries can be identified. These parameters can be determined by graphical solutions and calculations as well as computerized programs. Pumping tests consist of three main phases: 1) an initial phase before pumping whereby water levels in the well are measured to determine any fluctuations that are natural (tidal) or induced by other wells 2) a pumping phase resulting in water level drawdown; and 3) a recovery phase after the pump has been turned off. Water level monitoring is conducted throughout all three phases. The pumping test regime may include the following: 1) Pre-tidal water level monitoring 2) Multiple Flow Test 3) Recovery 4) Constant Rate Test 5) Post-tidal water level monitoring During pumping, water drawdown measurements during each step may be taken at the following intervals or as specified by the onsite engineer: 1) 0 to 10 minutes: every minute 2) 10 to 20 minutes: every 2 minutes 3) 20 to 60 minutes: every 5 minutes During the recovery period, water level measurements may be recorded as follows: 13

19 AMERICAN SAMOA POWER AUTHORITY 1) 0 to 10 minutes: every minute 2) 10 to 20 minutes: every 2 minutes 3) 20 to 60 minutes: every 5 minutes 4) 60 to 120 minutes: every 10 minutes 5) 120 to 360 minutes: every 15 minutes 2. Precautions Pumping tests are generally carried out by monitoring the water level over time in the pumping well and in each observation well (if available) while the pumping well is being discharged at a constant rate. All water from the pumping well must be discharged downstream at a distance determined by the onsite engineer to prevent recharge into the well that is being pump tested. Such tests provide results that are more representative of aquifer characteristics than those obtained by other methods. They can also be used to determine the hydraulics of secondary aquifer flow. However, pumping tests require a greater degree of labor activity and expense than other methods and may not always be justified for all levels of investigation. Refer to the site-specific work plan for the duration of the pumping test, the location of the observation well (if available), and the data to be collected. Collection of measurements and documentation of data will be performed C. Equipment and Tools 1) Water pressure transducers; 2) Discharge flow meter; 3) Electronic data logger; 4) Electric water level indicator (if transducer method is not used); 5) Manufacturer s operating manuals for equipment selected above; 6) Weighted tapes with plopper (plumb bob); 7) Steel tape (graduated in hundredths of a foot); 8) Stopwatch or watch with a second hand; 9) Tape measure (graduated in tenths of a foot); 10) Semi log graph paper (if required); 11) Laptop computer; 12) Waterproof ink pen; 13) Thermometer; 14) Appropriate references; 15) Calculator; 14

20 AMERICAN SAMOA POWER AUTHORITY 16) Barometer or recording barograph (for tests conducted in confined aquifers); 17) Pumping/recovery test data forms; 18) Groundwater elevation forms; 19) Daily activity logs; 20) Any PPE listed or required in the site-specific health and safety plan (SSHASP); and 21) Any additional supplies listed in associated procedures, as needed. D. Step-by-Step Process Description 1. Pre-Operation Activities 1) Field Team 2) Drilling Crew 3) Field Team: i. Ensure permission to discharge is obtained (Permit may be required) or that a containment system is available for collecting the water that will be pumped during the test. [NOTE: This is especially important for wells that may produce contaminated water.] ii. Confirm from the site drilling crew that well installation is complete and that the equipment necessary to conduct the pumping test is deployed. [NOTE: All wells should be properly developed before testing.] iii. Obtain the pumping test equipment, appropriate operating manuals, and information on equipment modifications necessary to conduct a pumping test. iv. Check the equipment for proper functioning. v. Install a submersible or turbine pump. vi. Install a flow meter in the discharge line of the pumping well to accurately measure and monitor the volume of discharge. vii. Install sufficient pipe to transport the discharge from the pumping well away from the area to prevent infiltration of extracted water into the pumped zone. viii. Install a gate valve along with a pressure regulator on the discharge pipe to control the pumping rate. ix. Place an outlet near the well head, but past the totalizer and flow meters, for water quality monitoring and sampling. x. Ensure all gauges, transducers, flow meters, and other equipment used in conducting pumping tests are properly calibrated before use. xi. Perform any on-site zero adjustment or calibration and document those procedures. xii. Monitor and record water levels at the test site for about one (1) week before performing the test using a continuous recording device. [NOTE: 15

21 AMERICAN SAMOA POWER AUTHORITY These records establish the barometric efficiency of the aquifer. The records also help determine if the aquifer is experiencing an increase or decrease in head over time that may be caused by recharge or pumping in the nearby area or by diurnal variations.] 2. Pumping and Recovery Test Options 1) Field Team: i. Manually measure static water levels in the test well and any observation well(s) using a water level meter when all equipment has been deployed ii. Read and record the totalizer value from the in-line flow meter prior to turning on the pump. iii. Initiate pumping at a specified discharge rate and immediately begin time series water level measurements in the test and observation wells at a predetermined time zero. iv. Measure all depths to water from a designated reference marker point (measuring point). v. Continue to monitor water levels during recovery phase of the test. vi. Connect the pressure transducer to a lap top computer to monitor drawdown and recovery changes in real time. vii. Record barometric pressure during the test. [NOTE: The barometric data, as well as projected pre-test water level trends, may be applied as corrections to water level readings so that the reduced data are representative of the hydraulic response in the aquifer to pumping from the test well.] 16

Performance and Analysis of Aquifer Slug Tests and Pumping Tests Policy

Performance and Analysis of Aquifer Slug Tests and Pumping Tests Policy Performance and Analysis of Aquifer Slug Tests and Pumping Tests Policy May 31, 2007 Table of Contents page Introduction... 2 (1) Purpose of policy...2 (2) Basis for technical approach...2 (3) The purpose

More information

To construct or alter a bore

To construct or alter a bore Resource Consent Application Form 9A To construct or alter a bore For office use only Consent o Job o Important notes for the applicant You must complete this application form 9A and Resource Consent Application

More information

Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California

Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California Executive Summary Aquifer test results demonstrated that the

More information

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14

NGWA s Water Well Construction Standard: ANSI/NGWA 01-14 NGWA s Water Well Construction Standard: ANSI/NGWA 01-14 NGWA Standard Development Process as Approved by ANSI What is ANSI? The American National Standards Institute (ANSI), founded in 1918, promotes

More information

KINGWOOD TOWNSHIP THREE PART PUMP TEST CHECKLIST. APPLICANT: Road Name: TAX MAP Sheet/Block/Lot Date Submitted: Name of Project (If Any):

KINGWOOD TOWNSHIP THREE PART PUMP TEST CHECKLIST. APPLICANT: Road Name: TAX MAP Sheet/Block/Lot Date Submitted: Name of Project (If Any): APPLICANT: Road Name: TAX MAP Sheet/Block/Lot Date Submitted: Name of Project (If Any): Signature of Applicant: 1 2 Supervision. All well tests shall be conducted under the supervision of a Certified Well

More information

NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT. Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES

NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT. Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES Department of Environment and Local Government January 2012 Table

More information

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii Preface to the Third Edition xiii About the Authors xv Acknowledgements xvii Contents PART ONE: THEORY...1 1. Groundwater in Construction...3 1.1 Groundwater in the Hydrologic Cycle 3 1.2 Origins of Dewatering

More information

Ground Water and Wells. Basic (Geo)Science for Sustainable a Future. Dr. David Boutt. UMass Amherst, Geosciences Department

Ground Water and Wells. Basic (Geo)Science for Sustainable a Future. Dr. David Boutt. UMass Amherst, Geosciences Department Ground Water and Wells Basic (Geo)Science for Sustainable a Future Dr. David Boutt UMass Amherst, Geosciences Department Your tasked with locating properties/land to purchase for a high yield (1000 gpm)

More information

SPECIFICATION FOR JET GROUTING

SPECIFICATION FOR JET GROUTING SPECIFICATION FOR JET GROUTING 1.0 GENERAL The Specialist Contractor shall construct jet grout columns of nominal diameter and spacing as specified in the drawing(s) to the requirements of the Contract.

More information

WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002

WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002 WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002 Prepared by: Gosling Czubak Engineering Sciences, Inc. 1280 Business Park Drive Traverse City, Michigan 48686 Telephone:

More information

THE DAVIS BASIN DO NOT DELAY IN GETTING STARTED RIGHT AWAY!

THE DAVIS BASIN DO NOT DELAY IN GETTING STARTED RIGHT AWAY! THE DAVIS BASIN This is not a lab. It is a project where you are representing your own consulting firm. Make up a catchy name if you like and have fun with it. However, you are expected to perform at a

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

SECTION IRRIGATION WATER WELL

SECTION IRRIGATION WATER WELL PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 33 21 16 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment, and services necessary for the drilling of irrigation

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS C-44 Reservoir/STA System Discharge Project RFB: 6000000620 Addendum No. 1 March 2014 CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS HDR Engineering, Inc. SECTION 02401 DEWATERING, COFFERDAM AND BYPASS

More information

Aquifer Science Staff, January 2007

Aquifer Science Staff, January 2007 Guidelines for Hydrogeologic Reports and Aquifer Tests Conducted Within the Jurisdictional Boundaries of the Barton Springs / Edwards Aquifer Conservation District I. Introduction Aquifer Science Staff,

More information

NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT. Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES

NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT. Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES NEW BRUNSWICK DEPARTMENT OF ENVIRONMENT AND LOCAL GOVERNMENT Environmental Impact Assessment WATER SUPPLY SOURCE ASSESSMENT GUIDELINES Department of Environment and Local Government April 2017 Table of

More information

5.0 - WATER SUPPLY WELLS

5.0 - WATER SUPPLY WELLS 5.0 - WATER SUPPLY WELLS 5.1. GENERAL This section covers the requirements for public, potable water supply wells. All design, construction, development and testing of any well to be offered for dedication

More information

MITIGATION PLAN SEAWATER INTRUSION

MITIGATION PLAN SEAWATER INTRUSION MITIGATION PLAN SEAWATER INTRUSION A. OVERVIEW The Island County Health Department has identified the western area of Sections 8 and 17, Township 31 North, Range 2 East, W. M. (east of Race Road) as being

More information

P Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer

P Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer 2. Field Program 2.1 Health and Safety Plan Prior to beginning the field program, CH2M HILL developed a health and safety plan (H&SP). The H&SP provided a summary of potential physical hazards that could

More information

SECTION IRRIGATION WATER WELL

SECTION IRRIGATION WATER WELL PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02670 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment and services necessary for the drilling of irrigation water

More information

The Contract Documents may be examined at the following locations:

The Contract Documents may be examined at the following locations: ADVERTISMENT FOR BIDS Separate sealed Bids for the replacement of Municipal Production Well will be received by the Department of Public Services at 301 W. Main Street, Owosso, MI 48867 until 2:00 p.m.

More information

WATER LEVEL MEASUREMENT

WATER LEVEL MEASUREMENT WATER LEVEL MEASUREMENT SOP#: 2043 DATE: 10/03/94 REV. #: 0.0 1.0 SOPE AND APPLIATION The purpose of this Standard Operating Procedure (SOP) is to set guidelines for the determination of the depth to water

More information

Report on Effects of Groundwater Withdrawal from the Doghouse Meadow, Yosemite National Park

Report on Effects of Groundwater Withdrawal from the Doghouse Meadow, Yosemite National Park Report on Effects of Groundwater Withdrawal from the Doghouse Meadow, Yosemite National Park William E. Sanford Department of Geosciences Colorado State University 03 March 2006 1 Purpose The purpose of

More information

Design Checklist for EWB-USA Chapters Working on Drilled Well

Design Checklist for EWB-USA Chapters Working on Drilled Well Design Checklist for EWB-USA Chapters Working on Drilled Well TAC Review for Phase 2 Borehole development and aquifer evaluation The following checklist provides a list of specific information that must

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.4 PERMEATION GROUTING 7.4.1 Definitions 7.4.1.1 Geotechnical Data Report (GDR)

More information

Conducting Well Pumping Tests

Conducting Well Pumping Tests Conducting Well Pumping Tests Water Stewardship Information Series Photos by Sylvia Kenny and Jim Fyfe 3. Extend the well casing to at least 12 inches (0.30 meters) above the finished ground level (see

More information

(this page left intentionally blank)

(this page left intentionally blank) 10. Yield Test (this page left intentionally blank) 10. Yield Test Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Yield Test... 4 Relevant Sections

More information

ASSESSMENT OF UTILIZABLE GROUNDWATER RESOURCES IN A COASTAL SHALLOW AQUIFER

ASSESSMENT OF UTILIZABLE GROUNDWATER RESOURCES IN A COASTAL SHALLOW AQUIFER ASSESSMENT OF UTILIZABLE GROUNDWATER RESOURCES IN A COASTAL SHALLOW AQUIFER V. S. SINGH AND V. K. SAXENA National Geophysical Research Institute, Uppal Rd, Hyderabad, 500 007, India In the recent years

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL Mail To: WDEQ/WQD ATTN: UIC Program 122 W. 25 th St. 4W Cheyenne, WY

More information

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as

More information

California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA

California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA 95811 cga@groundh2o.org 916-231-2134 CGA STANDARD PRACTICE SERIES ARTICLE 550 MANAGEMENT OF SURFACE ARTESIAN

More information

PUBLIC HEALTH OBJECTIVE

PUBLIC HEALTH OBJECTIVE INTERIM SEAWATER INTRUSION POLICY GENERAL DISCUSSION THE PROBLEM Seawater intrusion is found in public and individual water wells at many coastal areas of Skagit County. Fresh water, being less dense than

More information

Livingston County Department of Public Health Environmental Health Division. Hydrogeologic Investigation Requirements for Land Division Developments

Livingston County Department of Public Health Environmental Health Division. Hydrogeologic Investigation Requirements for Land Division Developments Livingston County Department of Public Health Environmental Health Division Hydrogeologic Investigation Requirements for Land Division Developments Reviewed March 1, 2013 Table of Contents Scope/Authority..1

More information

COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY APPLICATION FOR A GROUNDWATER WITHDRAWAL PERMIT (FOR USE IN GROUNDWATER MANAGEMENT AREAS)

COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY APPLICATION FOR A GROUNDWATER WITHDRAWAL PERMIT (FOR USE IN GROUNDWATER MANAGEMENT AREAS) COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY APPLICATION FOR A GROUNDWATER WITHDRAWAL PERMIT (FOR USE IN GROUNDWATER MANAGEMENT AREAS) PREAPPLICATION CONFERENCE DATE: 1. APPLICANT INFORMATION:

More information

Groundwater Monitoring Requirements of the CCR Rule What s Next?

Groundwater Monitoring Requirements of the CCR Rule What s Next? 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Groundwater Monitoring Requirements of the CCR Rule What s Next? Thomas A. Mann, PE SynTerra Corporation,

More information

Movement and Storage of Groundwater The Hydrosphere

Movement and Storage of Groundwater The Hydrosphere Movement and Storage of Groundwater The Hydrosphere The water on and in Earth s crust makes up the hydrosphere. About 97 percent of the hydrosphere is contained in the oceans. The water contained by landmasses

More information

Westbay System. Multilevel Technology for Subsurface Characterization and Monitoring

Westbay System. Multilevel Technology for Subsurface Characterization and Monitoring Westbay System Multilevel Technology for Subsurface Characterization and Monitoring Is Groundwater Monitoring Important? WHY GROUNDWATER MONITORING? Groundwater is an essential resource of great social,

More information

RESPONSIBLE PLANNING FOR FUTURE GROUND WATER USE FROM THE GREAT FLATS AQUIFER : TWO CASE STUDIES: THE GEP ENERGY

RESPONSIBLE PLANNING FOR FUTURE GROUND WATER USE FROM THE GREAT FLATS AQUIFER : TWO CASE STUDIES: THE GEP ENERGY RESPONSIBLE PLANNING FOR FUTURE GROUND WATER USE FROM THE GREAT FLATS AQUIFER : TWO CASE STUDIES: THE GEP ENERGY Introduction PROJECT AND THE SI GREEN FUELS BOILER PROJECT Thomas M. Johnson Hydrogeologist,

More information

Lab 6 - Pumping Test. Pumping Test. Laboratory 6 HWR 431/

Lab 6 - Pumping Test. Pumping Test. Laboratory 6 HWR 431/ Pumping Test Laboratory 6 HWR 431/531 7-1 Introduction: Aquifer tests are performed to evaluate the capacity of an aquifer to meet municipal or industrial water requirements. Hydraulic characteristics

More information

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or Groundwater Recharge and Extraction Techniques D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB What is Groundwater Recharge Groundwater recharge or deep drainage or deep percolation

More information

Division: Number: Category: Status: Issued: DDAGW WQ Water Quality Guidance Final December 2, 2010

Division: Number: Category: Status: Issued: DDAGW WQ Water Quality Guidance Final December 2, 2010 Guidance for Ground Water Rule Triggered Source Water Monitoring (TSWM) Plans and Options for Reducing Samples Division: Number: Category: Status: Issued: DDAGW WQ-17-001 Water Quality Guidance Final December

More information

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -

More information

Synopsis. Geoffrey R. Tick Dorina Murgulet Hydrogeology Group The University of Alabama UA Project Number Grant # 09-EI UAT-2

Synopsis. Geoffrey R. Tick Dorina Murgulet Hydrogeology Group The University of Alabama UA Project Number Grant # 09-EI UAT-2 Assessment of Groundwater Flow Paths and Discharge to the Coastal Region of Baldwin County, Alabama to Understand Contaminant Transport using a Cross- Sectional Groundwater Flow and Transport Synopsis

More information

General Groundwater Concepts

General Groundwater Concepts General Groundwater Concepts Hydrologic Cycle All water on the surface of the earth and underground are part of the hydrologic cycle (Figure 1), driven by natural processes that constantly transform water

More information

MEMORANDUM. RAI Responses Related to East Lake Road Wellfield Drawdown Analysis, WUP No SDI Project No. PCF-180.

MEMORANDUM. RAI Responses Related to East Lake Road Wellfield Drawdown Analysis, WUP No SDI Project No. PCF-180. SDI Environmental Services, Inc. 13911 N. Dale Mabry Hwy. Suite 201, Tampa, FL 33618; (813) 961-1935 MEMORANDUM TO: FROM: SUBJECT: Dave Slonena, P.G., Pinellas County Cathleen Beaudoin Jonas RAI Responses

More information

Assisting Energy Savings While Protecting 2009 REVISIONS TO GUIDELINES FOR THE CONSTRUCTION OF VERTICAL BOREHOLES

Assisting Energy Savings While Protecting 2009 REVISIONS TO GUIDELINES FOR THE CONSTRUCTION OF VERTICAL BOREHOLES Ground Source Heat Pump Systems Assisting Energy Savings While Protecting Groundwater 2009 REVISIONS TO GUIDELINES FOR THE CONSTRUCTION OF VERTICAL BOREHOLES FOR CLOSED LOOP HEAT PUMP SYSTEMS Kevin McCray,

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

OUTLINE OF PRESENTATION

OUTLINE OF PRESENTATION GROUNDWATER?? OUTLINE OF PRESENTATION What is groundwater? Geologic investigation Definitions: aquifer and aquitard, unconfined and semi-confined Water level and interpretation of water level data Well

More information

Contents Page. Foreword... xi. 9.8 Pump intake design Introduction Purpose Scope...1

Contents Page. Foreword... xi. 9.8 Pump intake design Introduction Purpose Scope...1 Contents Page Foreword... xi 9.8 Pump intake design...1 9.8.1 Introduction...1 9.8.1.1 Purpose...1 9.8.1.2 Scope...1 9.8.1.3 Nomenclature, primary symbols, and units...1 9.8.2 Design objectives...8 9.8.3

More information

Modeling the Contamination of an Aquifer from a Highway Salt Storage Facility

Modeling the Contamination of an Aquifer from a Highway Salt Storage Facility First International Conference on Saltwater Intrusion and Coastal Aquifers Monitoring, Modeling, and Management. Essaouira, Morocco, April 23 25, 01 Modeling the Contamination of an Aquifer from a Highway

More information

WASTE TREATMENT LAGOON

WASTE TREATMENT LAGOON 359-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE STANDARD WASTE TREATMENT LAGOON (No.) CODE 359 DEFINITION A waste treatment impoundment made by constructing an embankment and/or excavating

More information

Implementing the California Ocean Plan - Desalination Amendments - Analysis of Subsurface Intake Feasibility

Implementing the California Ocean Plan - Desalination Amendments - Analysis of Subsurface Intake Feasibility Implementing the California Ocean Plan - Desalination Amendments - Analysis of Subsurface Intake Feasibility 7 th Annual Conference, February 6-8 Cathedral City, California Scott Seyfried, PG, CHG Groundwater

More information

Reference Guideline #1. Hydrogeological Impact Assessment

Reference Guideline #1. Hydrogeological Impact Assessment Reference Guideline #1 Hydrogeological Impact Assessment Reference Guideline #1 Hydrogeological Impact Assessment Hydrogeological assessments are required for some subdivision applications when triggered

More information

Alto Tunnel Study. Weekly Progress Report February 10, 2017

Alto Tunnel Study. Weekly Progress Report February 10, 2017 Alto Tunnel Study Weekly Progress Report February 10, 2017 Report 1/Rev. No. 1 February 13, 2017 Table of Contents 1.0 Project Activities... 2 1.1 Underhill Site Drilling Progress... 3 1.2 Underhill Site

More information

AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) EAST SIDE WELLS-BOOSTERS SECURITY FENCE REPLACEMENT

AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) EAST SIDE WELLS-BOOSTERS SECURITY FENCE REPLACEMENT AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) EAST SIDE WELLS-BOOSTERS SECURITY FENCE REPLACEMENT Issuance Date: March 24, 2016 Closing Date: March 31, 2016 APPROVED

More information

ALLISTON SAND AND GRAVEL PIT

ALLISTON SAND AND GRAVEL PIT ALLISTON SAND AND GRAVEL PIT Township of Adjala - Tosorontio, Simcoe County Monitoring Protocol, Investigative Triggers and Mitigation Measures Summary prepared by: C.C. Tatham & Associates Ltd. 115 Sandford

More information

Appendix C Data Collection Protocols

Appendix C Data Collection Protocols INTEGRATED REGIONAL GROUNDWATER MANAGEMENT PLAN Appendix C Data Collection Protocols STANISLAUS & TUOLUMNE RIVERS GROUNDWATER BASIN ASSOCIATION GROUNDWATER MONITORING PROTOCOL FOR MEASURING STATIC GROUNDWATER

More information

RIDDICK ASSOCIATES, P.C.

RIDDICK ASSOCIATES, P.C. RIDDICK ASSOCIATES, P.C. CIVIL & ENVIRONMENTAL ENGINEERS 139 LAFAYETTE AVENUE SUFFERN, NEW YORK 10901 845 357-7238 FAX 845 357-7267 NORMAN L. LINDSAY DENNIS G. LINDSAY ---------------------------- SEAN

More information

Water Resource Management for Shale Energy Development

Water Resource Management for Shale Energy Development Water Resource Management for Shale Energy Development Presented by Dave Yoxtheimer, P.G. February 19, 2014 Bakken Shale Energy: A Global Play Well Site in Operation U.S. Natural Gas Production is Increasing

More information

Water Well Screens and Well Efficiencies Designing an Efficient Well

Water Well Screens and Well Efficiencies Designing an Efficient Well A brand of Aqseptence Group Water Well Screens and Well Efficiencies Designing an Efficient Well Efficiency in any system is defined as the ratio of the effective output to the total input. In machines,

More information

STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS

STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS STANDARDS AND GUIDELINES FOR MUNICIPAL WATERWORKS, WASTEWATER AND STORM DRAINAGE SYSTEMS January 2006 Drinking Water Branch Environmental Policy Branch Environmental Assurance Division Pub. No.: T/840

More information

Surface Water and Seawater Interactions in the Coastal Environment of Biscayne Bay, Southeast Florida

Surface Water and Seawater Interactions in the Coastal Environment of Biscayne Bay, Southeast Florida Surface Water and Seawater Interactions in the Coastal Environment of Biscayne Bay, Southeast Florida William C. Hutchings, MS, PG Nicholas Albergo, PE, DEE Paper No. 191-8 2005 Salt Lake City Annual Meeting

More information

GROUNDWATER General Facts and Concepts

GROUNDWATER General Facts and Concepts GROUNDWATER General Facts and Concepts General schematic of hydrologic cycle. As the term implies, water moves within the cycle and groundwater (aquifer) is just one zone of the cycle. Aquifers and Wells

More information

SPECIAL SPECIFICATION 5989 Settlement Gauge

SPECIAL SPECIFICATION 5989 Settlement Gauge 2004 Specifications CSJ 0047-14-067 SPECIAL SPECIFICATION 5989 Settlement Gauge Description. Install, maintain, and subsequently abandon settlement gauges as indicated for the purpose of obtaining foundation

More information

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43 COLORADO PROFESSIONALS IN ONSITE WASTEWATER (CPOW) GUIDELINES FOR THE DESIGN AND INSTALLATION OF NON-PRESSURIZED DRIP DISPERSAL SYSTEMS (NDDS) REVISED DECEMBER 11, 2014 1.0 BACKGROUND Non-Pressurized Drip

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

Glossary Irrigation Terminology

Glossary Irrigation Terminology Glossary Irrigation Terminology ANGLE VALVE A valve configured so its outlet is oriented 90 from its inlet. In irrigation, these valves are generally installed with the inlet at the bottom of the valve.

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

WATER QUALITY ASSESSMENT AND MICROSCOPIC PARTICULATE ANALYSIS (MPA) DATA REPORT

WATER QUALITY ASSESSMENT AND MICROSCOPIC PARTICULATE ANALYSIS (MPA) DATA REPORT Big Sky County Water & Sewer District No. 363 WATER QUALITY ASSESSMENT AND MICROSCOPIC PARTICULATE ANALYSIS (MPA) DATA REPORT LLC November 2008 , LLC 6595 Bear Claw Lane Bozeman, MT 59715 Tel (406) 585-5947

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

15A NCAC 02C.0219 AQUIFER STORAGE AND RECOVERY WELLS (a) Aquifer Storage and Recovery Wells are used to inject potable water for the purposes of

15A NCAC 02C.0219 AQUIFER STORAGE AND RECOVERY WELLS (a) Aquifer Storage and Recovery Wells are used to inject potable water for the purposes of 15A NCAC 02C.0219 AQUIFER STORAGE AND RECOVERY WELLS (a) Aquifer Storage and Recovery Wells are used to inject potable water for the purposes of subsurface storage and for later recovery of the injected

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on

DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS. Filed with the Secretary of State on DEPARTMENT OF ENVIRONMENTAL QUALITY OIL, GAS, AND MINERALS DIVISION OIL AND GAS OPERATIONS Filed with the Secretary of State on These rules become effective immediately upon filing with the Secretary of

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

ALABAMA GROUNDWATER SUSTAINABILITY: A STRONG SCIENTIFIC FOUNDATION FOR WATER RESOURCE MANAGEMENT AND POLICY TO SECURE ALABAMA S WATER FUTURE

ALABAMA GROUNDWATER SUSTAINABILITY: A STRONG SCIENTIFIC FOUNDATION FOR WATER RESOURCE MANAGEMENT AND POLICY TO SECURE ALABAMA S WATER FUTURE ALABAMA GROUNDWATER SUSTAINABILITY: A STRONG SCIENTIFIC FOUNDATION FOR WATER RESOURCE MANAGEMENT AND POLICY TO SECURE ALABAMA S WATER FUTURE Marlon Cook Geological Survey of Alabama Groundwater Assessment

More information

MEMORANDUM. Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc.

MEMORANDUM. Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc. MEMORANDUM To: From: Kathy Yager USEPA OSRTI Dick Goehlert USEPA Region 1 Darryl Luce USEPA Region 1 Mindy Vanderford, GSI Environmental, Inc. (GSI) Doug Sutton, GeoTrans, Inc. Rob Greenwald, GeoTrans,

More information

Healthy Drinking Waters

Healthy Drinking Waters Healthy Drinking Waters for M A S S A C H U S E T T S S a f e a n d h e a l t h y l i v e s i n s a f e a n d h e a l t h y c o m m u n i t i e s Drinking Water Wells When you turn on the faucet to get

More information

Task 4.2 Technical Memorandum on Pumping Impacts on Squaw Creek

Task 4.2 Technical Memorandum on Pumping Impacts on Squaw Creek Task 4.2 Technical Memorandum on Pumping Impacts on Squaw Creek Aquifer Test 1 Aquifer Test 2 Prepared for: Squaw Valley Public Service District April 2013 Prepared by: This page left intentionally blank

More information

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology 910-103 Level 6 Graduate Diploma in Engineering Hydraulics and hydrology Sample Paper You should have the following for this examination one answer book ordinary graph paper pen, pencil, ruler Work sheet

More information

CE 331: Water Supply Engineering. Lecture 5

CE 331: Water Supply Engineering. Lecture 5 CE 331: Water Supply Engineering Lecture 5 Overview Water Well Design Important terms Design Considerations Steps of Water well design Important terms Annular seal Screen or perforations Aquifer Borehole

More information

Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System. Tiffanie Hawley, CFPUA Randy Plummer, HDR

Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System. Tiffanie Hawley, CFPUA Randy Plummer, HDR Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System Tiffanie Hawley, CFPUA Randy Plummer, HDR NC AWWA Spring Conference 2014 Background Data CFPUA Water System Fear Public

More information

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS IAC 5/12/93, 4/8/98 Environmental Protection[567] Ch 39, p.1 IAC 5/12/93, 4/8/98 CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS 567 39.1(455B) Purpose. The purpose of this chapter is to

More information

A five-day course for engineers and WASH professionals in Sierra Leone. Practical work in Gerihun, Bo District 3 rd February - 7 th February 2014

A five-day course for engineers and WASH professionals in Sierra Leone. Practical work in Gerihun, Bo District 3 rd February - 7 th February 2014 Cost-effective Boreholes Training Short Course 3 Drilling Supervision A five-day course for engineers and WASH professionals in Sierra Leone. Practical work in Gerihun, Bo District 3 rd February - 7 th

More information

Recharge Lake/Wetland: Generalized Monitoring Strategy

Recharge Lake/Wetland: Generalized Monitoring Strategy General Hydrologic Characteristics of Recharge Lakes & Wetlands The primary sources of water for recharge lakes and wetlands are direct precipitation and surface runoff. The lake stage of a recharge lake

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:

More information

Module 3 Design and Construction of Water Wells. For more information refer to the Water Wells That Last video (Part I Planning and Construction).

Module 3 Design and Construction of Water Wells. For more information refer to the Water Wells That Last video (Part I Planning and Construction). For more information refer to the Water Wells That Last video (Part I Planning and Construction). For more information see Module 1 "Understanding Groundwater" and Module 2 "Planning Your Water System".

More information

Well Requirements for Public Water Systems. Suitability of Well Construction. Well Location Considerations. WTRG06 Well Requirements for PWS 1/15/15

Well Requirements for Public Water Systems. Suitability of Well Construction. Well Location Considerations. WTRG06 Well Requirements for PWS 1/15/15 Well Requirements for Public Water Systems Static Water Level Drawdown Surrounding Aquifer Zone 1 Suitability of Well Construction Bored ~100 2-30 dia. Soils or Small Boulders, Fractured Formations Jetted

More information

Identification. Module 4 Water Well Drilling Agreements

Identification. Module 4 Water Well Drilling Agreements For more information refer to the Water Wells That Last video series Part I Planning and Construction. + Water Well Drilling Agreements This module outlines a checklist of items that you and your drilling

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

Water Resources Management: Vulnerability of Coastal Aquifers to Climate Change & Human Effects.

Water Resources Management: Vulnerability of Coastal Aquifers to Climate Change & Human Effects. Water Resources Management: Vulnerability of Coastal Aquifers to Climate Change & Human Effects. Water Resources of The Bahamas College of the Bahamas Lecture (Oct-2011) John A. Bowleg Engineer / Hydrologist

More information

Managed Aquifer Recharge (MAR) Practical Techniques for the Caribbean

Managed Aquifer Recharge (MAR) Practical Techniques for the Caribbean Managed Aquifer Recharge (MAR) Practical Techniques for the Caribbean Scope of Presentation What is MAR? Antigua and Barbuda water resources issues Why promote MAR? MAR: Techniques MAR: Design criteria

More information

CMYK. Pantone. Westbay System. Greyscale. Black on White. White on Black. Multi-level Technology for Subsurface Characterization and Monitoring

CMYK. Pantone. Westbay System. Greyscale. Black on White. White on Black. Multi-level Technology for Subsurface Characterization and Monitoring CMYK Pantone Westbay System Greyscale Black on White White on Black Multi-level Technology for Subsurface Characterization and Monitoring Is Groundwater Monitoring Important? WHY GROUNDWATER MONITORING?

More information

Amount of Water Available Annually: 21,000 acre-feet per year (af/yr) upon project completion

Amount of Water Available Annually: 21,000 acre-feet per year (af/yr) upon project completion DRAFT Name of Project: Expanded Carrizo Project Duration of Project: 50 years. Construction completed by 2026. Amount of Water Available Annually: 21,000 acre-feet per year (af/yr) upon project completion

More information

2016 ANNUAL ICR AND TRR WELL FIELD REPORT ICR WATER USERS ASSOCIATION

2016 ANNUAL ICR AND TRR WELL FIELD REPORT ICR WATER USERS ASSOCIATION 2016 ANNUAL ICR AND TRR WELL FIELD REPORT Prepared for ICR WATER USERS ASSOCIATION Prepared By William Meyer 1 2016 ANNUAL ICR AND TRR WELL FIELD REPORT PURPOSE OF THE REPORT This report is one of an annual

More information

Mapping of the Basseterre Valley Aquifer

Mapping of the Basseterre Valley Aquifer Mapping of the Basseterre Valley Aquifer Coastal Aquifer Management in Caribbean SIDS Workshop, St. Kitts-Nevis Halla Sahely, Ph.D., P.Eng St. Kitts Water Services Department October 11, 2010 Participating

More information

Groundwater Sources, Well Design, and Permitting

Groundwater Sources, Well Design, and Permitting Groundwater Sources, Well Design, and Permitting March 6, 2018 All About Irrigation Workshop Tidewater Agricultural Research and Extension Center Suffolk, VA Presented by: Curtis Consolvo, P.G. GeoResources,

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information