1 Best Management Practices Applied to Dredging Projects for Environmental Protection Doug Clarke Engineer Research and Development Center Environmental Laboratory

2 Management Practice A practice intended to improve the environmental performance of a dredging project, inclusive of excavation, transport, and placement of dredged material. Best Management Practice A management practice, or combination of management practices, that is determined after impact assessment, examination of alternative practices, and appropriate stakeholder participation to be the most effective, practical, and sustainable means of achieving an environmental protection objective.

3 RISK FRAMEWORK RISK ASSESSMENT PARADIGM Exposure Assessment Economic Analysis, Socio-Political, Engineering Feasibility Problem Formulation Risk Characterization Risk Management Effects Assessment Risk = f (Exposure + Effect) Best Management Practices

4 MP Evaluation and Selection FINAL PROJECT DESIGN RECONSIDER PROJECT NO RISK ACCEPTABLE? NO, BUT SELECT MP YES PROJECT REQUIREMENTS PROJECT CONSTRUCTION MONITOR YES MP EFFECTIVE? NO SELECT MP

5 BEST or BAD Management Practice? DEPLOY SILT CURTAIN SLOW HOIST SPEED USE CLOSED BUCKET ENVIRONMENTAL WINDOW

6 EFFECTIVENESS Management Practice Evaluation PREFERRED REQUIRED LEVEL OF PROTECTION LEAST UNDESIRABLE MARGINALLY ACCEPTABLE LAST RESORT UNDESIRABLE MOST UNDESIRABLE REASONABLE/AFFORDABLE EFFORT OR COST UNREASONABLE/UNAFFORDABLE

7 EFFECTIVENESS Management Practice Evaluation PREFERRED Environmental Window Closed Bucket LEAST UNDESIRABLE Open Bucket REQUIRED LEVEL OF PROTECTION REASONABLE/AFFORDABLE Slow Hoist Speed EFFORT OR COST LAST RESORT Silt Curtain MOST UNDESIRABLE UNREASONABLE/UNAFFORDABLE

8 Equipment-Related MPs Select appropriate dredge type and size mechanical or hydraulic Apply appropriate modifications hopper dredge degassing system hopper dredge green valve hopper odor controls turtle deflectors and/or observers aerial noise controls bucket type Equipment maintenance inspections maintenance of seals, winches, etc.

9 OPEN 12 CU YD BUCKET CLOSED 18 CU YD ENVIRONMENTAL BUCKET CLOSED 32 CU YD BUCKET

10 Dredging Process-Related MPs Modify rate of operations bucket ascent or descent speed reduce over-dredging by bed leveling Limit or prevent hopper/barge overflow Limit fill of barges Restrict temporal aspects of operations season, tide, day/night Provide spatial buffer zone

11 Placement-Process MPs Pipeline discharge controls baffle plates, diffusers, tremie tubes, spreaders optimize discharge rate and solids density Optimize CDF operations use additives or flocculants settling basin weir layout Spill controls for off-loading

12 Control-Related MPs Use silt curtains, sheet piling, or bubble curtains Use surface booms Provide emissions controls Control ballast water Provide spill prevention/response plans Provide debris, waste, ordnance, cultural resource management plan

13 SILT CURTAINS REMEDIAL DREDGING APPLICATION NAVIGATION DREDGING APPLICATION

14 ADVISORY TEAMS Scientists Effects Assessment Engineers Exposure Assessment Effects Thresholds Effective Controls RISK CHARACTERIZATION Stakeholders Select BMPs or Set Window RISK MANAGEMENT

15 Inserting Science REFINE WINDOW DREDGE ADAPTIVE MONITORING

16 Recommendations Seek science-based, adaptive alternatives to windows Obtain commitments to resolve major concerns and knowledge gaps Explore ecological risk-based methods to setting windows Increase understanding of the dredging process Increase awareness of conservation needs among dredgers

DOER Dredged Material Management (DMM) Focus Area

DOER Dredged Material Management (DMM) Focus Area DOER Dredged Material Management (DMM) Focus Area Tim Welp Research Hydraulic Engineer Engineering Research and Development Center U.S. Army Corps of Engineers Jacksonville, FL 24-26 May 2011 US Army Corps

More information

Hudson River PCBs Superfund Site

Hudson River PCBs Superfund Site PCBs Superfund Site Intermediate Design Report (IDR) Community Advisory Group Meeting August 31, 2005 1 Introduction Prepared by GE pursuant to the Administrative Order on Consent for Design (RD AOC) Design

More information

Dredging and Dredged Material Disposal Overview

Dredging and Dredged Material Disposal Overview Dredging and Dredged Material Disposal Overview Tim Welp Timothy.L.Welp@usace.army.mil 601.634.2083 The process of dredging consists of the following stages: - Excavation (loosening or dislodging) of the

More information

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011

Introduction to Sediment Remediation. Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Introduction to Sediment Remediation Presented to: Lower Passaic River Community Advisory Group July 14, 2011 Overview Feasibility Considerations Conceptual Site Model Dredging / Capping Dredged Material

More information

Dredge Spoils Management for Sustainable Support of U.S. Coast Guard Missions

Dredge Spoils Management for Sustainable Support of U.S. Coast Guard Missions Dredge Spoils Management for Sustainable Support of U.S. Coast Guard Missions Erick Jackson 1, Bethany Gollin 1, Spencer Zwenger 1, Holly Moore 1, Hudson Jackson 2, and Kassim Tarhini 3 1 Ensign, United

More information

Dredging for Climate Change and Transport in the Netherlands

Dredging for Climate Change and Transport in the Netherlands Dredging for Climate Change and Transport in the Netherlands Dredging to survive Polite Laboyrie (Chairman of CEC and Head of Hydr&Env Eng RWS) Organisation Ministry of Transport Dredging for Climate Change

More information

Obstacles to Implementing Working with Nature Concepts

Obstacles to Implementing Working with Nature Concepts Obstacles to Implementing Working with Nature Concepts Douglas Clarke Environmental Laboratory U.S. Army Corps of Engineers Engineer Research and Development Center US Army Corps of Engineers Engineer

More information

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement

U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement Name of Project: Maintenance Dredging AIWW Vicinity Jupiter

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

High Performance. Uniform Distribution

High Performance. Uniform Distribution Water Technologies Peripheral Feed - Peripheral Take-Off Clarifier Middle East Project was able to reduce the number of clarifier units from ten to six, providing a significant savings in capital cost.

More information

CCI107 ONLINE PROGRAM. Stormwater Management. Stormwater Management for Construction Activities Alberta. Market Type: Construction Level: 1

CCI107 ONLINE PROGRAM. Stormwater Management. Stormwater Management for Construction Activities Alberta. Market Type: Construction Level: 1 ONLINE PROGRAM Market Type: Construction Level: 1 Stormwater Management 1-877-25-SWPPP 1-877-25-9777 info@stormwaterone.com + Choose Alberta Enroll Now at StormwaterONE.com StormwaterONE.com 290 Pratt

More information

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico Second LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCEI 2004) Challenges and Opportunities for Engineering Education, Research and Development 2-4 June

More information

Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies

Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies UKTAG Guidance 31st March 2008 Document title UKTAG Guidance on the Classification of

More information

CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD

CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD 24 Terra et Aqua Number 133 December 2013 TAKU SAITOH CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD ABSTRACT Securing disposal fields to receive soft dredged material has become

More information

rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system

rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system Flow distribution of mixed liquor is uniform around the basin circumference, density flow pattern is away from the effluent weir,

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

OLMSTED LOCKS AND DAM

OLMSTED LOCKS AND DAM SITE REPORT OLMSTED LOCKS AND DAM IN-THE-WET 1 AS PART OF ONE OF THE FINAL PHASES OF THE OLMSTED LOCKS AND DAM PROJECT, A PUTZMEISTER CONCRETE PLACING SYSTEM IS PLACING UP TO 140,000 CUBIC YARDS (107,308M³)

More information

Hough, M., Stewart, W.I., Uderstadt, K.F. & Wood, A.

Hough, M., Stewart, W.I., Uderstadt, K.F. & Wood, A. DESIGN, CONSTRUCTION, OPERATION AND EFFECTIVENESS OF A PILOT ARTIFICIAL WETLAND SYSTEM TO REMOVE STORMWATER AND SEWAGE POLLUTANTS ENTERING THE SWARTKOPS RIVER ESTUARY VIA THE MOTHERWELL CANAL, NELSON MANDELA

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

Voith s StreamDiver solution for decentralized low head hydropower plant operations

Voith s StreamDiver solution for decentralized low head hydropower plant operations Voith s StreamDiver solution for decentralized low head hydropower plant operations Stefan Reich Joerg Lochschmidt, Mandar Pachegaokar Voith Hydro Holding GmbH & Co. KG Voith Hydro Holding GmbH & Co. Voith

More information

On Site Detention System.

On Site Detention System. On Site Detention System. Setting new standards. NOTE: This OSD (On site detention system) brief should be read in conjunction with the Landscape Tanks brochure, which outlines all the features and benefits

More information

Fort Leonard Wood, Missouri. September 2013

Fort Leonard Wood, Missouri. September 2013 Fort Leonard Wood, Missouri September 2013 1 Presenters Shannon Kelly, Physical Scientist Clean Water Act Program Manager Directorate of Public Works Environmental Division Environmental Compliance Branch

More information

Dredging Mining Industry. Sand and Gravel Dredging equipments and Industrial Pumps

Dredging Mining Industry. Sand and Gravel Dredging equipments and Industrial Pumps Dredging Mining Industry Sand and Gravel Dredging equipments and Industrial Pumps Dredging Mining - Industry About Nearly two-thirds of the non-fuel minerals mined each year are aggregates. Dragflow has

More information

The World of. Work safely and effectively in shallow waters. Innovative urban dredging. Keeping an urban waterway operational

The World of. Work safely and effectively in shallow waters. Innovative urban dredging. Keeping an urban waterway operational The World of N E W S L E T T E R 2 0 1 7 smart solution for hard work Work safely and effectively in shallow waters Innovative urban dredging Keeping an urban waterway operational www.watermaster.fi Operating

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

CONFINED DISPOSAL FACILITIES (CDFS): GREAT LAKES EXPERIENCE. J. Miller

CONFINED DISPOSAL FACILITIES (CDFS): GREAT LAKES EXPERIENCE. J. Miller CONFINED DISPOSAL FACILITIES (CDFS): GREAT LAKES EXPERIENCE J. Miller U.S. Army Corps of Engineers, Great Lakes & Ohio River Division, Chicago, Illinois USA Confined disposal facilities, or CDFs have been

More information

FIELD PERSONNEL 24 HOUR SUPPORT SPECIALIZED DREDGING, EXCAVATION & RECOVERY

FIELD PERSONNEL 24 HOUR SUPPORT SPECIALIZED DREDGING, EXCAVATION & RECOVERY 24 HOUR SUPPORT FIELD PERSONNEL Javeler is committed to providing exceptional customer service. Our experienced and knowledgeable team gladly accepts the opportunity to assist you 24 hours a day. Our operations

More information

CITY OF SACO DEPARTMENT OF PUBLIC WORKS TRANSFER STATION OPERATIONS MANUAL. Revised January 2001

CITY OF SACO DEPARTMENT OF PUBLIC WORKS TRANSFER STATION OPERATIONS MANUAL. Revised January 2001 CITY OF SACO DEPARTMENT OF PUBLIC WORKS TRANSFER STATION OPERATIONS MANUAL Revised January 2001 INDEX SECTION DESCRIPTION PAGE # 1.0 GENERAL 1 2.0 ACCESS TO FACILITIES 1 3.0 TYPES OF WASTE ACCEPTED 2 4.0

More information

THE BENEFITS OF MECHANICAL DEWATERING: CASE STUDY OF MACHADO LAKE ECOSYSTEM REHABILTATION PROJECT IN LOS ANGELES, CALIFORNIA

THE BENEFITS OF MECHANICAL DEWATERING: CASE STUDY OF MACHADO LAKE ECOSYSTEM REHABILTATION PROJECT IN LOS ANGELES, CALIFORNIA THE BENEFITS OF MECHANICAL DEWATERING: CASE STUDY OF MACHADO LAKE ECOSYSTEM REHABILTATION PROJECT IN LOS ANGELES, CALIFORNIA Presented by: Thomas B. Amaro, VP/GM, Tim Azevedo, Chief Estimator Machado Lake

More information

195LiquidsCatalog.

195LiquidsCatalog. 195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403

More information

2014 WEDA ENVIRONMENTAL EXCELLENCE AWARD NOMINATION FOR CONSIDERATION

2014 WEDA ENVIRONMENTAL EXCELLENCE AWARD NOMINATION FOR CONSIDERATION 2014 WEDA ENVIRONMENTAL EXCELLENCE AWARD NOMINATION FOR CONSIDERATION Environmental Dredging of Sheboygan River, Wisconsin A multi-stakeholder collaboration, simultaneous execution of multiple projects

More information

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA)

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) Siegmund Schlie*, Bernd Opfermann** and Torsten Retzlaff*** * Heinrich Hirdes GmbH, Rostock ** b & o - Ingenieure, Hamburg ***

More information

Sediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Basins and Skimmers Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Dewatering Risers in Basins: Single orifice Perforated and wrapped riser And now

More information

SANDALS ROYAL CARIBBBEAN PROJECT BRIEF FOR 12 ADDITIONAL OVER WATER ROOMS

SANDALS ROYAL CARIBBBEAN PROJECT BRIEF FOR 12 ADDITIONAL OVER WATER ROOMS SANDALS ROYAL CARIBBBEAN PROJECT BRIEF FOR 12 ADDITIONAL OVER WATER ROOMS SANDALS ROYAL CARIBBEAN MAHOE DRIVE MONTEGO BAY ST. JAMES JAMAICA Table of Contents 1.0 INTRODUCTION... 1 2.0 PROJECT LOCATION...

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Sediment Basin. Fe= (Depends on soil type)

Sediment Basin. Fe= (Depends on soil type) 3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment

More information

Liquid Stream Fundamentals: Grit Removal

Liquid Stream Fundamentals: Grit Removal FACT SHEET Liquid Stream Fundamentals: Grit Removal Grit removal is an essential component of the wastewater treatment process. Not only does the removal of grit help protect downstream equipment from

More information

Immersed Tunnels in the Natural Environment

Immersed Tunnels in the Natural Environment Immersed Tunnels in the Natural Environment An information paper produced by the International Tunnelling and Underground Space Association Working Group 11 for Immersed and Floating Tunnels 00000-ITA-DOC-8P.indd

More information

Chapter 4 Watershed Goals and Objectives

Chapter 4 Watershed Goals and Objectives Chapter 4 Watershed Goals and Objectives Eight (8) long-term watershed goals have been developed by the NEW Watershed Advisory Group (WAG) after consideration of discussions held during monthly watershed

More information

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

U.S. ARMY CORPS OF ENGINEERS. Little Rock District U.S. ARMY CORPS OF ENGINEERS Little Rock District SEDIMENT AND EROSION CONTROL GUIDELINES FOR PIPELINE PROJECTS Table of Contents 1.0 INTRODUCTION... - 1-2.0 PROJECTS IN WATERS OF THE UNITED STATES...

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring.

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Ad Stolk and Chris Dijkshoorn Ministry of Transport, Public Works and Water Management Rijkswaterstaat North

More information

LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET. February 2004 Draft Version 1.4

LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET. February 2004 Draft Version 1.4 LTMS Environmental Work Windows INFORMAL CONSULTATION PREPARATION PACKET February 2004 Draft Version 1.4 Table of Contents Section Page Introduction 3 How Consultation Works 3 Herring Waiver Program 5

More information

APPENDIX A ALTERNATIVES COST ANALYSIS

APPENDIX A ALTERNATIVES COST ANALYSIS APPENDIX A ALTERNATIVES COST ANALYSIS 1.0 INTRODUCTION This appendix provides the cost detail for the remedial alternatives. The limits of the alternatives are based on the sediment PRG of 13.7 mg/kg TPAHs.

More information

Stormwater Pollution Prevention Plan for:

Stormwater Pollution Prevention Plan for: Stormwater Pollution Prevention Plan for: Lemon Creek Valley Juneau, Alaska Under the NPDES 2008 Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activities: Permit No.

More information

USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY

USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY USE OF POLYMERS IN HIGH SPEED DEWATERING OF FINE GRAINED SEDIMENTS TO REPLACE CONFINED DISPOSAL FACILITIES - A CASE STUDY Karen C. Kabbes, PE, D.WRE. 1 and Michael Hodges 2 ABSTRACT Hydraulically dredging

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

Great Lakes Perspective Sediment Choreography

Great Lakes Perspective Sediment Choreography Global Reach. Local Benefit. Great Lakes Perspective Sediment Choreography Jim White Director, Sustainable Infrastructure Program AAPA H&N 15 SEPTEMBER 2015 The Port is a partner in community development

More information

The Technical Challenges of Dissolved Oxygen Enhancement

The Technical Challenges of Dissolved Oxygen Enhancement The Technical Challenges of Dissolved Oxygen Enhancement B.Papillon EPRI-DOE Conference on Environmentally-Enhanced Hydro Turbines Washington DC May 19, 2011 Agenda 1st topic 2nd topic 3nd topic 4nd topic

More information

LAKESIDE Water Purification Since Bulletin #1218 Revised June Spiravac Clarifier. Peripheral Feed Center Takeoff Suction Sludge Removal

LAKESIDE Water Purification Since Bulletin #1218 Revised June Spiravac Clarifier. Peripheral Feed Center Takeoff Suction Sludge Removal LAKESIDE Water Purification Since 98 Bulletin #8 Revised June 999 Peripheral Feed Center Takeoff Suction Sludge Removal Copyright Lakeside Equipment Corporation 999 The Spiraflo principle has been successfully

More information

Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California

Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California Parcel F Carbon Amendment Placement Pilot Study, Hunters Point Naval Shipyard, San Francisco, California Presented By George L. Hicks Global Practice Director / CH2M Objective Present an overview of the

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

City of Vancouver WATER RESOURCES PROTECTION - CATCH BASIN FILTER PROGRAM

City of Vancouver WATER RESOURCES PROTECTION - CATCH BASIN FILTER PROGRAM City of Vancouver WATER RESOURCES PROTECTION - CATCH BASIN FILTER PROGRAM Introduction The City of Vancouver initiated a catch basin filter program in 2004 based on a program called Grate Mate which was

More information

Innovations in Dredging Technology: Equipment, Operations, and Management

Innovations in Dredging Technology: Equipment, Operations, and Management Innovations in Dredging Technology: Equipment, Operations, and Management PURPOSE: This technical note describes the management approach used to identify currently existing innovative dredging technologies

More information

Sanitary and Environmental Engineering I (4 th Year Civil)

Sanitary and Environmental Engineering I (4 th Year Civil) Sanitary and Environmental Engineering I (4 th Year Civil) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

OFFSHORE SEAWATER INTAKES FOR DESALINATION PLANTS: AN OPERATING EXPERIENCE MINIMIZING ENVIROMENTAL IMPACTS

OFFSHORE SEAWATER INTAKES FOR DESALINATION PLANTS: AN OPERATING EXPERIENCE MINIMIZING ENVIROMENTAL IMPACTS OFFSHORE SEAWATER INTAKES FOR DESALINATION PLANTS: AN OPERATING EXPERIENCE MINIMIZING ENVIROMENTAL IMPACTS Authors: Adriano Ameglio, Marco Brioschi, Marco Garzoglio Presenter: Marco Brioschi, Senior Civil

More information

Conceptual Engineering Report Collier County Beaches, Florida

Conceptual Engineering Report Collier County Beaches, Florida Conceptual Engineering Report Collier County Beaches, Florida Presented to Collier County Coastal Advisory Committee October 13, 2011 Steve Keehn, PE, CPE Topics Goals Monitoring & Performance Summary

More information

Hydropower and Water Resources

Hydropower and Water Resources Hydropower and Water Resources Hydropower and Water Resources The development, planning, design, and construction of hydropower as well as large-scale irrigation schemes and special hydraulic structures

More information

Private Sector WWF Forum Vienna, November 2006 Jan van de Meene Boskalis International Consortium Grensmaas

Private Sector WWF Forum Vienna, November 2006 Jan van de Meene Boskalis International Consortium Grensmaas Private Sector WWF Forum Vienna, 13 14 November 2006 Jan van de Meene Boskalis International Consortium Grensmaas A business example A business example Programme public and private parties developing the

More information

THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I.

THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I. THE CARIBBEAN S MOST BEAUTIFUL WASTEWATER TREATMENT SYSTEM: CONSTRUCTED WETLAND AT ANTIGUA, W. I. Gregory L. Morris * Laura Carbó Gregory L. Morris Engineering P.O. Box 9024157, San Juan, PR 00902 Tel.

More information

John Hart Generating Station Replacement Project. May 2017 Community Construction Update Report #47

John Hart Generating Station Replacement Project. May 2017 Community Construction Update Report #47 John Hart Generating Station Replacement Project May 2017 Community Construction Update Report #47 Prepared by: Stephen Watson, BC Hydro (O) 250-755-4795 or (C) 250-616-9888 Twitter: @Puntledge Email:

More information

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri ODOR MANAGEMENT PLAN Bridgeton Landfill 13570 St. Charles Rock Road Bridgeton, Missouri Date: 6-20-2014 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Background 1.2 Purpose of the 2.0 ODOR MONITORING 2.1 Identifying

More information

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...

More information

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates LA Transportation Conference: 10 Jan 2011 Drilled Shaft Foundations For Two Mississippi River Bridges in Louisiana Dan Brown and Associates Projects John James Audubon Bridge, St. Francisville New Construction

More information

Action 2.8: Report about appropriate dredging techniques Envisan

Action 2.8: Report about appropriate dredging techniques Envisan Progetto LIFE 08 ENV/IT 00426 COAST-BEST Action 2.8: Report about appropriate dredging techniques Envisan 7.2.7 Action 2.8 (Report about appropriate dredging techniques) LIFE Project Number LIFE08 ENV/IT

More information

VOTR Site Assessment Victoria on the River

VOTR Site Assessment Victoria on the River i Executive Summary A. Introduction AECOM New Zealand Limited (AECOM) was engaged by Hamilton City Council (HCC) to undertake a geotechnical assessment of the (VOTR) site in Hamilton s central business

More information

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment

Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation. Subject: Task 3 Existing Grit Removal System Assessment A Technical Memorandum Date: Project: Norwalk, CT Water Pollution Control Facility (WPCF) CSO Capacity and Treatment Evaluation Subject: Task 3 Existing Grit Removal System Assessment This memorandum presents

More information

CENTRIFUGE DECANTER AND HOW IT WORKS

CENTRIFUGE DECANTER AND HOW IT WORKS CENTRIFUGE DECANTER AND HOW IT WORKS DECANTER CENTRIFUGE In a decanter there s a continuous mechanical separation of suspended solids from a liquid or liquids You could see a centrifuge decanter like a

More information

SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL. SIEMEX (M) Sdn Bhd

SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL. SIEMEX (M) Sdn Bhd SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL SIEMEX (M) Sdn Bhd LOCATION 23, JALAN PJU 3/45 SUNWAY DAMANSARA 47810 PETALING JAYA SELANGOR CONTACT info@siemex.com.my WEBSITE www.siemex.com.my GENERAL SIEMEX

More information

Marine Fueling Facility Program Update Advisory

Marine Fueling Facility Program Update Advisory Marine Fueling Facility Program Update Advisory Bruce Marshall Harbor Director Bill Helbig Interim Engineering Director Jeff Smith Finance Director August 13, 2012 Program Update History Marine Fuel Market

More information

Appendix D. Stormwater Pollution Prevention Plan

Appendix D. Stormwater Pollution Prevention Plan Appendix D Memorandum AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com To Joan Liu, Metro Vancouver Page 1 CC Subject Conveyance for the NSWWTP

More information

CHAPTER 10 PRELIMINARY TREATMENT

CHAPTER 10 PRELIMINARY TREATMENT CHAPTER 10 PRELIMINARY TREATMENT TM 5-814-3/AFM 88-11, Volume III 10-1. General considerations. Preliminary treatment of wastewater includes screening, grinding, grit removal, flotation, equilization,

More information

Bio-Filter TM Stormwater Biofiltration System

Bio-Filter TM Stormwater Biofiltration System Bio-Filter TM Stormwater Biofiltration System Inspection and Maintenance Manual March 2017 AquaShield, TM Inc. 2733 Kanasita Drive, Suite 111 Chattanooga, TN 37343 Phone: (423) 870-8888 Fax: (423) 826-2112

More information

F. Impact on the Receiving Environment

F. Impact on the Receiving Environment F. Impact on the Receiving Environment Dredging is a necessity for the port to remain commercially active. However, over the past two decades the Port of Waterford has acquired numerous reports and investigations

More information

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) This guide specification for U.S. applications describes construction of bio-infiltration bump outs (or bioretention ) systems. From the surface down to the

More information

Water Quality Aspects of Dredged Sediment Management

Water Quality Aspects of Dredged Sediment Management Water Quality Aspects of Dredged Sediment Management Anne Jones-Lee, PhD and G. Fred Lee PhD, PE, DEE G. Fred Lee & Associates 27298 East El Macero Drive El Macero, CA 95618 www.gfredlee.com email: gfredlee33@gmail.com

More information

Stormwater Pollution Treatment BMP Discharge Structures

Stormwater Pollution Treatment BMP Discharge Structures University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Theses, Dissertations, and Student Research Civil Engineering 5-2013 Stormwater Pollution Treatment BMP

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

Evaluation Of Aeration Control

Evaluation Of Aeration Control Evaluation Of Aeration Control Randal Samstag - Carollo Engineers Carol Nelson and Curtis Steinke King County DNRP PNCWA ANNUAL CONFERENCE 24 Outline Introduction Aeration control Why is it important?

More information

PERMITTING AND CONSTRUCTING THE INTRACOASTAL WATERWAY DEEPENING PROJECT IN BROWARD COUNTY, FLORIDA

PERMITTING AND CONSTRUCTING THE INTRACOASTAL WATERWAY DEEPENING PROJECT IN BROWARD COUNTY, FLORIDA PERMITTING AND CONSTRUCTING THE INTRACOASTAL WATERWAY DEEPENING PROJECT IN BROWARD COUNTY, FLORIDA Lori S. Brownell, P.E. 1 and Yehya Siddiqui, E.I. 2 ABSTRACT Existing depths in the Intracoastal Waterway

More information

Richland County Department of Public Works Engineering (Land Development) Division

Richland County Department of Public Works Engineering (Land Development) Division Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or

More information

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan

Admiralty Inlet Pilot Tidal Project FERC No Appendix D. Water Quality Monitoring Plan Appendix D Water Quality Monitoring Plan ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 WATER QUALITY MONITORING PLAN (submitted with the Final Application for a New Pilot Project License)

More information

Aqua-Swirl Stormwater Treatment System

Aqua-Swirl Stormwater Treatment System Aqua-Swirl Stormwater Treatment System Inspection and Maintenance Manual AquaShield TM, Inc. 2705 Kanasita Drive Chattanooga, TN 37343 Toll free (888) 344-9044 Phone: (423) 870-8888 Fax: (423) 826-2112

More information

Diversions Update. committed to our coast. Bren Haase, CPRA. Presentation to Diversions Advisory Panel, Meeting #4 February 12, 2015

Diversions Update. committed to our coast. Bren Haase, CPRA. Presentation to Diversions Advisory Panel, Meeting #4 February 12, 2015 Diversions Update Bren Haase, CPRA Presentation to Diversions Advisory Panel, Meeting #4 February 12, 2015 committed to our coast committed to our coast DIVERSIONS ADVISORY PANEL, DIVERSIONS SUB-COMMITTEE

More information

The planned conversion of part of the Port of

The planned conversion of part of the Port of South Port of Copenhagen: Clean-up of Contaminated Sediments NIELS LYKKEBERG & HELGE GRAVESEN, Carl Bro a/s, Glostrup, Denmark KAJ HOLM JØRGENSEN, Port of Copenhagen, Denmark A BSTRACT The planned conversion

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Agricultural Pumping Efficiency Program. Flow Meters. Helping California Agriculture...

Agricultural Pumping Efficiency Program. Flow Meters. Helping California Agriculture... Agricultural Pumping Efficiency Program Flow Meters Helping California Agriculture... Flow Meters The Agricultural Pumping Efficiency Program is providing this information regarding the importance of measuring

More information

Attic Floor Installation Instructions for Contractors

Attic Floor Installation Instructions for Contractors Attic Floor Installation Instructions for Contractors Attic Installation Instructions for Contractors The following are the manufacturer s recommendations for installation of GreenFiber Insulation in attic

More information

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements: TNC Fisher Slough Final Design and Permitting Subject: Inverted Siphon Construction Feasibility To: From: Jenny Baker (TNC) Dave Olson (DD3) Brian Olson (DD17) Bob Boudinot Skagit County David Cline (Tetra

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Project Planning and Control Using Oracle Primavera P6 : P8.3, 8.4, 15.2

Project Planning and Control Using Oracle Primavera P6 : P8.3, 8.4, 15.2 Primavera Essential Course Contents: 1. Overview Describe the Primavera modules Explain the difference between global and project-specific data Project Portfolio Management Defining the Enterprise Project

More information

Sediment Management Alternatives Analysis

Sediment Management Alternatives Analysis Conservancy District April 19, 2017 Sediment Management Alternatives Analysis Report prepared for the Conservancy District -Unionville, IN Report By: KCI Technologies, Inc. 6983 Corporate Circle Indianapolis,

More information

Ecoengineering 3 PROJECT DESCRIPTION

Ecoengineering 3 PROJECT DESCRIPTION BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA 3 PROJECT DESCRIPTION This chapter describes the proposed mining of sand and gravel (pitrun) by Bestcrete Aggregates

More information

Design and Operation of Landfills

Design and Operation of Landfills Design and Operation of Landfills Soils and hydrogeology Site selection criteria Site layout and landfill operations Liner design Water balance Biological reactions in landfills Leachate quality Gas production

More information

Pipe Jacking. Japan Sewage Works Association

Pipe Jacking. Japan Sewage Works Association Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,

More information

Education on Common Household Sewage Treatment Systems Found In Allen County, OH

Education on Common Household Sewage Treatment Systems Found In Allen County, OH Education on Common Household Sewage Treatment Systems Found In Allen County, OH The Allen County Public Health Environmental Health Division would like to provide you with diagrams of some common, discontinued

More information

THE USE OF SELF-CONSOLIDATING CONCRETE FOR DRILLED SHAFT CONSTRUCTION: PRELIMINARY OBSERVATIONS FROM THE LUMBER RIVER BRIDGE FIELD TRIALS

THE USE OF SELF-CONSOLIDATING CONCRETE FOR DRILLED SHAFT CONSTRUCTION: PRELIMINARY OBSERVATIONS FROM THE LUMBER RIVER BRIDGE FIELD TRIALS 1 THE USE OF SELF-CONSOLIDATING CONCRETE FOR DRILLED SHAFT CONSTRUCTION: PRELIMINARY OBSERVATIONS FROM THE LUMBER RIVER BRIDGE FIELD TRIALS Dan Brown 1, Joe Bailey 2, Anton Schindler 3 ABSTRACT: Several

More information

Overview of the Walkover Assessments conducted on the Pont and Blyth catchments

Overview of the Walkover Assessments conducted on the Pont and Blyth catchments Overview of the Walkover Assessments conducted on the Pont and Blyth catchments Pont upstream of the Matfen Transfer (08/03/12) Pont, as supplied from the Matfen Transfer. Also an impassable barrier to

More information