1 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA 3 PROJECT DESCRIPTION This chapter describes the proposed mining of sand and gravel (pitrun) by Bestcrete Aggregates Limited (BAL) at Pine Road, Matura. It begins with an overview of the project, and then describes: < Mining Reserves, < Mining Operation, < Transport and Processing, < Rehabilitation, < Workforce and Equipment, < Ancillary Facilities, < Utilities, < Waste Management, and < Project Schedule. 3.1 Project Overview In September 2009, Bestcrete Aggregates Limited (BAL) was granted a Quarry License by the Ministry of Energy and Energy Industries (MEEI) {now the Ministry of Energy and Energy Affairs (MEEA)} to conduct quarrying activities on approximately 209 acres of state land within the Melajo Forest Reserve. The proposed quarry site is located within the prolific gravel-bearing Valencia - Matura area. The site is located on Pine Road, which is off the Toco Main Road, Matura, County of St. Andrew/ St. David (see Figure 1-1). It comprises part of the Melajo Forest Reserve, which was planted with pine trees and has been harvested and released for Quarrying by the Forestry Division of the Ministry of Housing and the Environment. The vegetation at present consists of secondary vegetation. The property is surrounded on all sides by State lands of the forest reserve, its northern boundary is defined by the Melajo River, its southern boundary by Pine Road and its eastern boundary by Tractor Road. In view of the depth of the water table estimated at 15 to 20 feet, it is envisaged that the majority of pitrun will be mined dry. The extracted material will be transported by road to an off-site facility where it will be converted to construction materials (sharp sand, 10 mm, 25 mm and 40 mm gravel and ballast) to be used by the company. Ecoengineering 13 of 118 environmentally appropriate development for the Caribbean

2 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA 3.2 Mining Reserves General Sand and gravel occur naturally along the foothills of the Northern Range. The gravel belt encompasses Wallerfield, Valencia and Matura in the north-east. The sand and gravel deposit consists of a heterogeneous mixture of clay, sand and gravel which grade laterally and vertically into one another. The gravel deposits are associated with impurities (clay and silt) which may comprise 0 % to 40% of the deposit. The major associated sediment types associated with the gravel deposits are as follows: < Overburden generally ranges from 6 inches to 15 feet thick and consists of soil (6 inches to 18 feet thick) and clay. This is removed to expose the underlying commercial deposits. < The interburden may range from 1 foot to 20 feet thick and may comprise the interbedded clay bands that separate individual gravel units or the underlying basal rocks. < A fine, well-sorted white to yellow, pure marine sand is located in some areas along Pine Road and in some areas it is in beds in excess of 8 m thick. < Pitrun occurs as thin beds and lenses overlying the basal clay. Bank pitrun of marine origin occurs on the proposed quarry site Initial Survey Seven boreholes were drilled to a depth of 30 metres by Trintoplan Consultants in February 2010 and the locations are shown in Figure 3-1. The reserves of pitrun are estimated at 1.8 million cu yards or 5 30,000 cu. yd. /month. Cross sections of the site are shown in Figures 3-2, 3-3 and 3-4. The Mine Design Plan is provided in Appendix D. 3.3 Mining Operation The operation at Matura will consist of mining only as no processing will be conducted on the site. The various processes involved in the Mining Operation are as follows: (a) Mobilisation and Site Preparation, (b) Clearing of Vegetation and Overburden, (c) Winning of Gravel Deposits, and (d) Transportation to the Processing Plant. Ecoengineering 14 of 118 environmentally appropriate development for the Caribbean

3

4 THIS PAGE LEFT INTENTIONALLY BLANK

5

6 THIS PAGE LEFT INTENTIONALLY BLANK

7

8 THIS PAGE LEFT INTENTIONALLY BLANK

9

10 THIS PAGE LEFT INTENTIONALLY BLANK

11 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Mobilisation and Site Preparation It is expected that the mining operation will last approximately five years. A site office will be constructed with concrete blocks and masonry with dimensions roughly 20 feet long x 20 feet wide close to the entrance of the quarry. The site office will serve the following purposes: < Storage for tools, minor equipment and parts; < Offices for company s staff and government s checker; < Lunch room for staff; and < Watchman s quarters. A 30 feet wide access road will be constructed through the site to access the pitrun deposits ensuring that there is a minimum 15 m setback from the Melajo River. The road will be constructed using the Kolbelco SK335 Excavator or equivalent and New Holland D350 Bulldozer or equivalent. A drain (3 feet wide and 3 feet deep) will be constructed on the shoulder of the road to ensure rapid drainage and maintenance of an acceptable surface. Figure 3-5 shows a sketch of the layout for proposed quarry Clearing of Vegetation and Overburden Land clearing will be kept to a minimum, with just enough being cleared to facilitate an efficient mining operation. Based on the geological map, areas underlain by clay will be left undisturbed in their original state, as far as practical. The extraction of pitrun will be conducted in a progressive, organized manner from west to east. The reserves are mainly concentrated in the middle of the site, so not all 209 acres will be cleared. A buffer zone will be left along the Melajo River (15 m) and along Pine Road (8 m) which will be left under vegetation. Approvals will be obtained from the Forestry Division to clear and remove any remaining pine trees from the area that is to be worked. The remainder of the vegetative cover will then be removed using bulldozers. Ecoengineering 15 of 118 environmentally appropriate development for the Caribbean

12 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Once the vegetation has been cleared, the top soil (0.5 m to 0.75 m) and overburden (5 m to 10 m) will be stripped away to expose the useable sand and gravel. Clearing and stripping will be done using a Kolbelco Excavator and New Holland Bulldozer or equivalent units. The top soil will be stored on a section of worked area for later site rehabilitation. Even though most rainfall onto this mine percolates into the sand, channels will be cut to effectively manage overland flow Winning of the Gravel Deposits The gravel deposits will be excavated using the Strip Mining Method which is the safest, most efficient and cost effective manner of winning the gravel and which is the dominant method of excavation practised by the majority of sand and gravel quarry operators. This method allows maximum extraction of the gravel and affords continuous rehabilitation of the land on a phased basis through backfilling. The steps involved are as follows: < Using the bulldozer and the excavator, vegetation and overburden over 2 acres on the eastern boundary will be cleared to the gravel layer and capped. The topsoil will be stored on a levelled section of the worked area for use in later rehabilitation. The overburden will be placed temporarily on a section of the 2 acre parcel and used in progressively restoration. < Gravel will be excavated in a north-south direction in strips 50 feet to 60 feet wide and 200 feet long. Any interbedded clay encountered will be stockpiled on the overburden area. The rate of excavation will be approximately 30,000 cu. yd. /month (1,500 cu. yd/ day). < Successive north-south strips will be excavated until the entire 2 acre parcel is mined. < Test pits will be excavated 17 feet to 20 feet below the previous excavation to evaluate the potential for deeper gravels. If deeper gravels are encountered excavation in this area will be carried out using dragline cranes. < Successive 2 acre parcels will be cleared and all shallow gravel will be extracted to exhaustion or to the limit of the available equipment. < Borehole testing will be conducted and if deeper gravels are encountered areas of commercial gravel and clay or non-commercial gravel will be identified. < If commercial gravel is identified, beginning at the eastern boundary and using the strip mining method, the second level of gravel will be excavated to the limits of the excavator. In the event that additional reserves are encountered at depth, a dragline will be used to recover the remaining reserves below the groundwater table. Ecoengineering 16 of 118 environmentally appropriate development for the Caribbean

13

14 THIS PAGE LEFT INTENTIONALLY BLANK

15 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Exhausted areas will be progressively backfilled. Vegetation and overburden will be placed at the base and a 12 inches layer of top soil will be placed on the surface. < At the end of the quarrying all mined areas will be backfilled and levelled. On average, 20,000 metric tonnes to 30,000 metric tonnes of pitrun will be stockpiled on-site. 3.4 Transport and Processing Bestcrete is negotiating with Readymix (West Indies) Limited to process their pitrun at Readymix facility in Melajo, off Tapana Road. This facility is Source Registered and operates under Source Registration No. WWG 91 from the Environmental Management Authority (see Section B.4.5 of Appendix B). A letter indicating Readymix willingness to process pitrun material from the BAL Matura Quarry is included in Appendix D. The following sub-sections describe the transport of pitrun to the Readymix facility, Readymix processing plant, the water recovery system at Readymix, and the transport of processed sand and gravel to Bestcrete s Block Manufacturing Plant Transport of Pitrun Pitrun material excavated at the Bestcrete Matura Quarry will be transported to the Readymix (West Indies) Limited facility in Melajo, off Tapana Road for processing (see Figure 3-6). Pitrun will be excavated at an average rate of approximately 30,000 yd 3 per month, or approximately 1,500 yd 3 per day. This will be transported in a fleet of eight 20 yd 3 trucks. Therefore, there will be 75 truck trips per day transporting material from the quarry, and 75 trips per day of empty trucks returning to the quarry Processing Plant Readymix processing plant is described in more detail in Appendix D.II, and summarized hereunder. Processing of pitrun material at the Readymix facility is done using four types of equipment: < Primary Separator, < Hydrocyclones, < Vibrating Wash Screens, and < Crusher. These are shown in the Process Flow Block Diagram in Figure 3-7. Ecoengineering 17 of 118 environmentally appropriate development for the Caribbean

16 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Primary Separator The primary separator consists of a dry vibrating screen onto which pitrun material is placed. This separates the pitrun into a coarse fraction and a fine fraction. The fine fraction consists of sand and silt, and this is directed to the hydrocyclones. The coarse fraction consists largely of gravel-sized particles with some sand and silt adhering, and this is directed to the vibrating wash screens Hydrocyclones The fine fraction from the Primary Separator is mixed with water and pumped up to one of two Hydrocyclone units, which discharge sand particles through one port, and mixed water and silt through another. Sand is transported to stockpiles by conveyor belts, while silty water flows into the water recovery system (see Section 3.4.3, below) Vibrating Wash Screens The coarse fraction from the Primary Separator is washed over Vibrating Wash Screens to remove adhering silt and sand, and to separate the gravel into different sizes. The 3/8-inch gravel is held in hoppers from which they are discharged to trucks. The ¾-inch gravel is moved via conveyor belts to stockpiles, and the oversize is moved by conveyor belt to the Crusher Crusher Gravel and cobbles larger than ¾-inch size are moved to the Crusher via conveyor belt, to be broken up into smaller pieces and returned to the intake of the Vibrating Wash Screen for processing Water Recovery Silty water from the Hydrocyclones and the Vibrating Wash Screen is recovered for re-use as wash water, using one of two processes: Clarifiers or Settling Ponds (see Process Flow Block Diagram in Figure 3-8). Ecoengineering 18 of 118 environmentally appropriate development for the Caribbean

17

18 THIS PAGE LEFT INTENTIONALLY BLANK

19

20 THIS PAGE LEFT INTENTIONALLY BLANK

21

22 THIS PAGE LEFT INTENTIONALLY BLANK

23 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Clarifiers The Readymix facility includes three Jadair Water Settler / Clarifiers. Wastewater from one of the Hydrocyclones and from the Vibrating Wash Screen is pumped into a mixer tank where polymer is added. This mixture is then fed into in the main tank of the Settler / Clarifier, where the polymer enhances the formation of large flocs. The flocs (coalesced suspended solids) sink to the floor of the main tank, and clarified water overflows from the main tank and is piped back for reuse. A moving paddle system scrapes the settled flocs out of the tank, down a chute. They are piled up to allow continued de-watering, and then placed within the compound to fill in low areas Settling Ponds The alternative water recovery system is a series of settling ponds, the layout of which is shown in Figure 3-9. The topography of the land is used to allow flow by along most of the system. The water recovery system centers on a reservoir from which relatively silt-free water is pumped to the Hydrocyclones and the Vibrating Wash Screens. Outflow from the Clarifiers (see Section , above) also flows into this reservoir. From the Hydrocyclones and the Vibrating Wash Screens, silty water flows via a drain to the Primary Settling Pond where much of the silt settles out of the water. Water then flows from the Primary Settling Pond via a drain to the Secondary Settling Pond, where the settling of sediment continues. From the Secondary Settling Pond, water flows into the Tertiary Settling Pond via a pipe, and settling of sediment continues. Water is discharged from the Tertiary Settling Pond via a drain which discharges into the upper reaches of the reservoir. Over time the ponds will become silted up, and they are then dredged using an excavator. The settled silt which is removed from the ponds is placed within the compound to fill in low areas. Ecoengineering 19 of 118 environmentally appropriate development for the Caribbean

24 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Transport of Product When pitrun material is processed, the product streams consists of sand and gravel suitable for use in construction works, and silt which is carried away in the wastewater. Processing of pitrun from the Matura Quarry is expected to yield 75 percent of useable product. Based on an intake of 1,500 yd 3 per working day, product is expected to be produced at a rate of 1,125 yd 3 per working day. This will be transported from the Readymix facility to Bestcrete s Block Manufacturing Plant on the Churchill Roosevelt Highway in Mausica (see Figure 3-10) in a fleet of twelve 20 yd 3 trucks. Therefore, there will be 57 truck trips per day transporting processed sand and gravel from the Readymix facility. 3.5 Rehabilitation Rehabilitation of the worked out areas will be progressive. That is, rehabilitation will be carried out at each completed portion of the quarry, rather than after the entire deposit has been excavated. A Rehabilitation Plan has been developed for the site and is presented in Appendix E. When the quarrying is completed it is expected that approximately 50% of the site will be under approximately 5 feet to 10 feet of water while the remainder will be dry. The preferred after-use for this site is forestry since this was the original land use. 3.6 Workforce and Equipment The workforce at the quarry will be as follows: < Quarry Supervisor, < 4 Heavy Equipment Operator, < 20 Truck Drivers, < 2 Quarry Checkers, and < 2 Security Officers. It is envisaged that the majority of the pitrun will be mined dry, given the depth of the water table (15 ft to 20 ft). The following equipment will therefore be utilized: < 2 D350 New Holland Bulldozers or equivalent, < 2 SK335 Kolbelco Excavators or equivalent, < 1 Water Truck, and < 8 Ten Wheeler Dump Trucks. Ecoengineering 20 of 118 environmentally appropriate development for the Caribbean

25

26 THIS PAGE LEFT INTENTIONALLY BLANK

27

28 THIS PAGE LEFT INTENTIONALLY BLANK

29 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA 3.7 Ancillary Facilities Proposed ancillary facilities include: < 1 Site office; < 1 Diesel Storage Tank (1000 gallons); and < 3 Water Storage Tanks (1000 gallons, each). It should be noted that diesel fuel is the only hazardous substance used in this project. A digital copy of the Material Safety Data Sheet (MSDS) is provided in Appendix Z to this EIA Report. 3.8 Utilities Utilities will be provided to the proposed quarry as follows: < Water will be trucked to the site for drinking and wash down purposes, including wetting of the road. < Since this will be a daylight operation no electricity will be required from T&TEC; however a generator will be utilized where necessary. < All telecommunications will be by mobile phones. 3.9 Waste Management The types of waste that will be generated from the quarry include: < Solid waste, < Sewage, and < Domestic wastewater. Approximately 2 to 4 million cubic meters per annum of overburden will be generated. However neither overburden nor topsoil are considered waste materials and will be stored and reused on the site for rehabilitation of worked out areas. Effluent from settling ponds will be pumped to the Melajo River after sediment has settled. Used oils and lubricants will be disposed off-site. Ecoengineering 21 of 118 environmentally appropriate development for the Caribbean

30 BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA Solid waste will be collected in large bins placed at strategic locations and removed to the Heights of Guanapo landfill for disposal. This will comprise: < Packaging material. < Old tyres. < Discarded containers, barrels, pieces of wood, old tools, hoses and miscellaneous items. < Domestic waste (soft drink cans, food containers, paper cups, wrapping material, etc). Chemical toilets will be utilized on the site when operations commence and 2 toilets and 2 urinals will be constructed with a septic tank and soakaway system in accordance with standards outlined by the Water and Sewerage Authority (WASA). Used oils and lubricants as well as chemicals will be stored in barrels and collected by the Solid Waste Management Company for recycling. The mining will be conducted in such a way to create a system of retention ponds for all stormwater discharge. Water will only be discharged to the river after sediment has settled Project Schedule Mining of pitrun will continue until recoverable reserves have been excavated. Given the size of the reserve it is estimated that the quarry will continue to operate for approximately 5 years. Clearing and grubbing of the area will commence 2 weeks after the awarding of a mining license starting from Tractor Road and proceeding westward using a bulldozer, excavator and trucks. Approximately 5 acres will be cleared at a time. The phased rehabilitation will commence in the dry season and will continue throughout the project; but rehabilitation efforts will be concentrated in the dry season. Ecoengineering 22 of 118 environmentally appropriate development for the Caribbean

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

Jeremy s Construction Ltd.

Jeremy s Construction Ltd. Jeremy s Construction Ltd. Environmental Assessment Registration Document Proposed Doyles Quarry Extension Submitted by: Jeremy s Construction Limited P.O. Box 137 Doyles, NL A0N 1J0 March 2017 Table of

More information

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group Best Practices for Building High-Performance Resource Roads Road Drainage Developed by: The Roads and Infrastructure Group THIS GUIDE IS INTENDED FOR EQUIPMENT OPERATORS CONSTRUCTION CONTRACTORS FIELD

More information

Construction Materials Industry Overview

Construction Materials Industry Overview Construction Materials Industry Overview August 23, 2016 Agenda Welcome Safety Brief Aggregates in our Life Presentation Economic contribution Aggregate uses and demand Industry Issues Aggregate production

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235 Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235 Ministry of Transportation and Infrastructure 213, 1011-4 th Avenue, Prince George, BC, V2L 3H9 McElhanney

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2

1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2 Table of Contents 1. Introduction... 1 1.1 Site Information... 1 1.2 Site Characteristics... 1 1.3 Hydrogeologic Setting... 2 2. Closure Plan... 5 2.1 Closure Description... 5 2.2 Closure Timeframe...

More information

San Joaquin County. Residential Onsite Systems Bulletin

San Joaquin County. Residential Onsite Systems Bulletin San Joaquin County Residential Onsite Systems Bulletin Environmental Health Department 1868 East Hazelton Avenue Stockton, CA 95205-6232 (209) 468-3420 September 2008 Table of Contents I. Permits... 2

More information

Grading & Excavation Information Application & Checklist

Grading & Excavation Information Application & Checklist Grading & Excavation Information Application & Checklist Yakima County Public Services ~ Building & Fire Safety Division 128 North 2 nd Street, Yakima, WA 98901 ~ Office (509) 574-2300 Building & Fire

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

Water Resources. Using Our Water Resources Efficiently

Water Resources. Using Our Water Resources Efficiently & PERFORMANCE FOOD ENVIRONMENT PEOPLE COMPANY Water Resources Using Our Water Resources Efficiently Responsible use of water is a fundamental component of sustainability at Mosaic. Our water management

More information

Operating and Reclamation Plan

Operating and Reclamation Plan Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of

More information

MINING AND RECLAMATION PLAN BLACK MESA AND KAYENTA MINES INDEX. Chapter Title Volume

MINING AND RECLAMATION PLAN BLACK MESA AND KAYENTA MINES INDEX. Chapter Title Volume INDEX Chapter Title Volume 15 (Cont.) Attachment 11 - Alluvial Well Lithologic Logs Attachment 12 - Alluvial Well Hydrograph Analyses Attachment 13 - Alluvial Cross Sections Using Seismic Refraction Technique

More information

***NO SEPTIC SYSTEM EXCAVATION WITHOUT AN APPROVED PERMIT IN POSSESSION****

***NO SEPTIC SYSTEM EXCAVATION WITHOUT AN APPROVED PERMIT IN POSSESSION**** SMALL WASTEWATER FACILITY APPLICATION PACKET A PERCOLATION TEST WITH A 10 SITE HOLE AND/OR AN APPLICATION ALONG WITH AN ADDRESS MUST BE COMPLETED AND SUBMITTED TO THE DIVISION OF ENVIRONMENTAL HEALTH BEFORE

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

GUIDELINES FOR SEPTIC SYSTEM DESIGN

GUIDELINES FOR SEPTIC SYSTEM DESIGN GUIDELINES FOR SEPTIC SYSTEM DESIGN Single Family Residential For multi family or commercial buildings, Or If in the Oakdale area, contact the Department of Environmental Resources Regarding septic system

More information

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT WORK PROGRAMME FORM QUARRY RESOURCE CONSENT Please submit this work programme for approval to the West Coast Regional Council, Tainui Street, P.O. Box 66, Greymouth. A site inspection may be required prior

More information

CERTIFICATE OF APPROVED REGISTRATION J. T. BAKER CHEMICAL COMPANY. Sanitary Landfill. Harmony Township. Warren 2110B

CERTIFICATE OF APPROVED REGISTRATION J. T. BAKER CHEMICAL COMPANY. Sanitary Landfill. Harmony Township. Warren 2110B State of New Jersey SOLID WASTE ADMINISTRATION BEATRICE S. TYLUTKI CERTIFICATE OF APPROVED REGISTRATION Under the provisions of N.J.S.A. 13:lE n as the Solid Waste Management Act, this registration is

More information

Percent Passing by Weight. 105% Payment #200

Percent Passing by Weight. 105% Payment #200 2018 GUIDE SPEC FOR CRUSHING GRAVEL ROAD SURFACING AGGREGATE (10-17-2018) Please delete the first two pages of this document (the user note) prior to putting the spec into a contract Specification User

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

Wetland Permit Application

Wetland Permit Application DAVID J. KLOTZLE WETLAND INSPECTOR, PHILIPSTOWN, NY 238 Main Street Cold Spring, NY 10516 (914) 736-7132 Wetland Permit Application MEMO TO APPLICANT 1. Use this form to apply for a Wetlands Permit as

More information

Closed Water Loop Dewatering. System Possible Coagulant Feed Points

Closed Water Loop Dewatering. System Possible Coagulant Feed Points Closed Water Loop Dewatering Sand Screw Feed (from sizing screens) - 400 mesh (38 micron) solids System Possible Coagulant Feed Points Water for Reuse Thickener Dilution Water Product Hydrocyclones Belt

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE 2.0 MATERIALS

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE 2.0 MATERIALS 1/8 1.0 PURPOSE This specification describes the minimum gradation and physical property requirements and describes acceptable material qualities, handling, storage and delivery of earthfill materials.

More information

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,

More information

The applicant has estimated a total of vehicle movements per day.

The applicant has estimated a total of vehicle movements per day. INSPECTORS REPORT WASTE LICENCE REGISTER NUMBER 147-1 Ashgrove Plant Limited (trading as Ashgrove Recycling) Churchfield Industrial Estate, Cork Recommendation: That a Licence subject to condition be granted

More information

Klickitat County. On-Site Sewage System. Construction Manual

Klickitat County. On-Site Sewage System. Construction Manual Homeowner OSS Design and Construction Guide Klickitat County On-Site Sewage System Construction Manual Minimum standards and recommendations expected for the construction of on-site wastewater treatment

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment Appendix 8: Best Practicable Environmental Option (BPEO) Assessment ABERDEEN HARBOUR EXPANSION PROJECT BEST PRACTICABLE ENVIRONMENTAL OPTION (BPEO) ASSESSMENT October 2015 Updated April 2016 TABLE OF CONTENTS

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

DREDGING TECHNIQUES USED TO DEVELOP A MAN-MADE IJXE ON A DEEP ORGANIC PROFILE ABSTRACT

DREDGING TECHNIQUES USED TO DEVELOP A MAN-MADE IJXE ON A DEEP ORGANIC PROFILE ABSTRACT DREDGING TECHNIQUES USED TO DEVELOP A MAN-MADE IJXE ON A DEEP ORGANIC PROFILE by Thomas D. Swantko, Geotechnical Consultant, Los Angeles, California, and Stephen W. Berry, Vice President, Michael D. Sims

More information

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care B M B.M PTY.LTD. A.B.N 36 473 826 551 8 Midstar Crescent, Shepparton, 3631 P.O. Box 6577, Shepparton, 3632 David Earl B. Eng. (Civil), M.I.E. (Aus.) EC30953 Peter Willmott B. Eng. (Civil), M.I.E. (Aus.)

More information

Mono County Health Department Construction Guide for Residential and Commercial On-Site Sewage Treatment & Disposal System I.

Mono County Health Department Construction Guide for Residential and Commercial On-Site Sewage Treatment & Disposal System I. Mono County Health Department Construction Guide for Residential and Commercial On-Site Sewage Treatment & Disposal System I. Scope: This construction guide and permit application procedure has been prepared

More information

DRIP EMITTER SYSTEM STUDY GUIDE

DRIP EMITTER SYSTEM STUDY GUIDE DRIP EMITTER SYSTEM STUDY GUIDE Minimum Criteria for Pressurized Subsurface Absorption Fields Utilizing Emitters. Subsurface systems utilizing emitters may be used in lieu of conventional or other alternative

More information

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

HOLDING TANK PLANNING & INSTALLATION GUIDELINES HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS

More information

If you have any questions during the review of the enclosed materials, please call me at (207) or me at

If you have any questions during the review of the enclosed materials, please call me at (207) or  me at October 21, 2016 Ms. Amanda Lessard Town Planner Town of Windham 8 School Road 04062 RE: Response to Comments - Minor Site Plan Application Dear Ms. Lessard: St.Germain Collins has prepared responses to

More information

Conditions Annexed to and Forming Part of Land Use Permit # MV2013C0021

Conditions Annexed to and Forming Part of Land Use Permit # MV2013C0021 Conditions Annexed to and Forming Part of Land Use Permit # MV2013C0021 Part A: Scope of Permit 1. This Permit entitles New Discovery Mines Ltd. to conduct the following land-use operation: a) Use, construction

More information

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co.

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co. Lignite Mining and Reclamation Process Kayla Torgerson The Coteau Properties Co. 1 Presentation Overview History of Regulation The Process of Mining and Reclamation Harmony Lake 2 1 2 3 4 5 6 7 8 Which

More information

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming PRIOR TO SUBMITTING APPLICATION 1) Ground water test pit This pit is required to be inspected by a representative of Sheridan

More information

ACTIVITY: Dewatering Operations AM 12

ACTIVITY: Dewatering Operations AM 12 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes. 1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

BioGenesis Enterprises, Inc Alban Station Blvd. Suite B-208 Springfield, Virginia USA TEL (703) FAX (703)

BioGenesis Enterprises, Inc Alban Station Blvd. Suite B-208 Springfield, Virginia USA TEL (703) FAX (703) BENCH-SCALE TREATABILITY STUDY REPORT BIOGENESIS SM SEDIMENT WASHING TECHNOLOGY NamDong Retardation Basin Incheon City, South Korea October 15, 2008 BioGenesis Enterprises, Inc. Abstract BioGenesis Enterprises,

More information

1 Exam Prep Chapter 64E -6 Questions and Answers

1 Exam Prep Chapter 64E -6 Questions and Answers 1 Exam Prep Chapter 64E -6 Questions and Answers Part One 1. According to Florida Rules: Chapter 64E-6, if building construction has commenced, for how many additional days past the eighteen month expiration

More information

100% Payment. 105% Payment #

100% Payment. 105% Payment # CRUSHED AND STOCKPILED GRAVEL ROAD SURFACING AGGREGATE (3-17-2017) Please delete the first two pages of this document (the user note) prior to putting the spec into a contract Specification User Note:

More information

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43 COLORADO PROFESSIONALS IN ONSITE WASTEWATER (CPOW) GUIDELINES FOR THE DESIGN AND INSTALLATION OF NON-PRESSURIZED DRIP DISPERSAL SYSTEMS (NDDS) REVISED DECEMBER 11, 2014 1.0 BACKGROUND Non-Pressurized Drip

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R3 AFIN:

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R3 AFIN: LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT

More information

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.] 28-1 GENERAL SECTION 28 AGGREGATE BASE COURSE (FAA P-208) The Contractor shall perform all work required by the plans and specifications for construction of aggregate base course for, use under runway

More information

Private Sewage Systems Standard of Practice Proposed Revisions

Private Sewage Systems Standard of Practice Proposed Revisions Private Sewage Systems Standard of Practice Proposed Revisions The Government of Alberta is currently reviewing the Standard of Practice (SOP) for Private Sewage Systems. To this end, the Alberta government

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

INSPECTORS REPORT DRAFT PD REGISTER NUMBER

INSPECTORS REPORT DRAFT PD REGISTER NUMBER INSPECTORS REPORT DRAFT PD REGISTER NUMBER 156-1 Applicant: KTK Sand and Gravel Ltd. Facility: Kimmeens, Ballymore Eustace, Co. Kildare Inspector s Recommendation: The licence be granted subject to conditions.

More information

Lesson W9 Wastewater and CSOs

Lesson W9 Wastewater and CSOs Lesson W9 Wastewater and CSOs Where Does our Water Go When We Flush it Down the Drain? When you flush your toilet or wash your dishes, where does the water go? We learned that only 2-3% of the water used

More information

SMALL WASTEWATER FACILITY APPLICATION PACKET

SMALL WASTEWATER FACILITY APPLICATION PACKET SMALL WASTEWATER FACILITY APPLICATION PACKET A PERCOLATION TEST AND/OR AN APPLICATION ALONG WITH AN ADDRESS MUST BE COMPLETED AND SUBMITTED TO THE DIVISION OF ENVIRONMENTAL HEALTH BEFORE A PERMIT TO INSTALL

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION APPENDIX I BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION South Bay Salt Pond Restoration Project Phase 2 July 2015 Draft Environmental Impact Statement/Report 2185 N. California Blvd., Suite

More information

Table of Contents. Appendices

Table of Contents. Appendices Table of Contents 1.0 Introduction... 1 1.1 Site Description... 1 2.0 Waste Management Plan... 1 2.1 Waste Generation... 1 2.2 Pit Design and Storage... 2 2.3 Transportation and Disposal of Waste... 3

More information

CHAPTER 2 SIEVE ANALYSIS AND FINENESS MODULUS

CHAPTER 2 SIEVE ANALYSIS AND FINENESS MODULUS CHAPTER 2 SIEVE ANALYSIS AND FINENESS MODULUS Sampling Since the reason for sampling aggregates is to determine the gradation (particle size) of the aggregate, it is necessary that they be sampled correctly.

More information

Maine s Land Use Regulations and Erosion Control Techniques

Maine s Land Use Regulations and Erosion Control Techniques Maine s Land Use Regulations and Erosion Control Techniques Protecting Maine s Air, Land and Water Colin Clark 441-7419 colin.a.clark@maine.gov Tom Gilbert 441-8031 thomas.gilbert@maine.gov Jim Rodrigue

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

GUIDELINES to the MINING ACT

GUIDELINES to the MINING ACT GUIDELINES to the MINING ACT PART I Format Requirements Reports 1. All reports required to be submitted to the minister by the Mining Act or regulations shall (a) be bound in a folder; (b) be a typewritten

More information

Q. CONSTRUCTION IMPACTS

Q. CONSTRUCTION IMPACTS Q. CONSTRUCTION IMPACTS 1. Construction Plan As noted on Exhibit 3Q-1, Overall Phasing Plan and SWPPP Notes, construction of the Proposed Project is anticipated to include five phases. The entire construction

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

Holding tank Interceptor Leaching Leaching bed Leaching bed fill Loading rate Pail privy Percolation time Portable privy Potable Pressurized

Holding tank Interceptor Leaching Leaching bed Leaching bed fill Loading rate Pail privy Percolation time Portable privy Potable Pressurized Glossary of Terms Absorption trench Artesian groundwater As constructed plans Basement Bathroom group Building area Building sewer Clean water Clear water waste Distribution box Distribution pipe Drainage

More information

POLLUTION PREVENTION AFTER CONSTRUCTION

POLLUTION PREVENTION AFTER CONSTRUCTION POLLUTION PREVENTION AFTER CONSTRUCTION..CHAPTER.. 10 This chapter describes the pollution prevention measures to be taken once the site has been permanently and finally stabilized and no additional construction

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2 CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted September 5, 1989 Table of Contents Page Part 1 Introduction...2 32-1 Purpose...2 32-2 Applicability...2 32-3 Definitions...2 32-4

More information

Septic Systems. A Complete Guide To Understanding How They Work and How To Keep Them Healthy

Septic Systems. A Complete Guide To Understanding How They Work and How To Keep Them Healthy Septic Systems A Complete Guide To Understanding How They Work and How To Keep Them Healthy What Is A Septic System? Wastewater from a home, which includes the water from toilets, laundry, showers, sinks

More information

New South Wales Concrete by-product Recycling and Disposal Industry Guidelines

New South Wales Concrete by-product Recycling and Disposal Industry Guidelines New South Wales Concrete by-product Recycling and Disposal Industry Guidelines Cement Concrete & Aggregates Australia (CCAA) is the peak industry body for the heavy construction materials industry in Australia,

More information

Timber Sale Appraisal More Cow Bell Sale FG W

Timber Sale Appraisal More Cow Bell Sale FG W Timber Sale Appraisal Sale FG-341-2019-W00542-01 District: Forest Grove Date: January 24, 2019 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,048,273.85 $10,164.42 $2,058,438.27 Project

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:

More information

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket10-13-2015part3-1Nsm 10.19. SMALL SCALE SAND AND GRAVEL EXTRACTION. 10.19.1. Applicability. This section applies to any mineral

More information

Wyoming Water Quality Application Form Permit to Construct Small Wastewater System. Complete attached package and submit to appropriate office:

Wyoming Water Quality Application Form Permit to Construct Small Wastewater System. Complete attached package and submit to appropriate office: Wyoming Water Quality Application Form Permit to Construct Small Wastewater System Conventional Septic System with Leachfield less than 2,000 gallons per day only. Not to be used for mound, evaporation

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

1.2 REGULATORY REQUIREMENTS

1.2 REGULATORY REQUIREMENTS Table 1.1. Soil textural classes and general terminology used in soil descriptions (Source: US Environmental Protection Agency 1977). Name Texture Basic soil textural common class names Sandy soils Coarse

More information

PROJECT NARRATIVE CONDITIONAL USE REQUEST FOR C ROAD GRAVEL PIT PARKERSON CONSTRUCTION, INC.

PROJECT NARRATIVE CONDITIONAL USE REQUEST FOR C ROAD GRAVEL PIT PARKERSON CONSTRUCTION, INC. PROJECT NARRATIVE CONDITIONAL USE REQUEST FOR C ROAD GRAVEL PIT PARKERSON CONSTRUCTION, INC. I. INTRODUCTION- The accompanying narrative statements, maps and other attached information is provided in support

More information

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11 Appendix 11 Erosion and Sediment Control Management Plan Appendix 11 OTAIKA QUARRY - PROPOSED OVERBURDEN DISPOSAL AREA Application for Land Use Consent and Assessment of Environmental Effects Otaika Quarry

More information

ON Grade Construction Inc.

ON Grade Construction Inc. ON Grade Construction Inc. P.O. Box 389 St. George s, Newfoundland A0N 1Z0 Tel: (709) 649-8000 P.O. Box 389, St. George s NL A0N 1Z0 Phone: (709) 649-8000 August 15, 2016 Government of Newfoundland and

More information

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water Storm Water Permitting Requirements for Construction Activities John Mathews Storm Water Program Manager Division of Surface Water Why Permit Storm Water? Impacts During Construction Not an issue until

More information

BALLAST PRODUCTION CURRY QUARRY

BALLAST PRODUCTION CURRY QUARRY BALLAST PRODUCTION CURRY QUARRY 2019-2020 INVITATION TO SITE VISIT OCOTBER 2018 SEPTEMBER 27, 2018 ALASKA RAILROAD CORPORATION 327 WEST SHIP CREEK AVENUE ANCHORAGE, ALASKA 99501 PROJECT DESCRIPTION & SCOPE

More information

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT GREY BRUCE HEALTH UNIT Owen Sound (Head Office) 920 1st Ave. W. N4K 4K5 (519) 376-9420 (800)-263-3456 Durham P.O. Box 417 N0G 1R0 (519) 369-3318 (800) 394-6643 Southampton P.O. Box 213 N0H 2L0 (519) 797-2010

More information

Septic Tank Guidelines

Septic Tank Guidelines Septic Tank Guidelines Septic tanks are suitable for conditions where the wastewater can drain away and be absorbed into the soil without contaminating ground water where it is extracted. Sealed solid

More information

Permeable Pavement Facilities and Surfaces

Permeable Pavement Facilities and Surfaces Permeable Pavement Facilities and Surfaces This checklist is intended to highlight items critical to the performance of permeable pavement facilities and surfaces that need to be addressed in the design

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

Crushing. Comminution

Crushing. Comminution Comminution In order to separate the minerals from gangue (the waste minerals), it is necessary to crush and grind the rock to unlock, or liberate, valuable minerals so that they are partially or fully

More information

Section 2: Mineral Exploration and Mining

Section 2: Mineral Exploration and Mining Section 2: Mineral Exploration and Mining Preview Classroom Catalyst Objectives Mineral Exploration Subsurface mining Longwall Mining Solution Mining Surface Mining Surface Coal Mining Section 2: Mineral

More information

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS I. Site Information A. Location (Include site map of harvest area)

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING GENERAL GRADING REQUIREMENTS GRADING STANDARDS Unless otherwise recommended in a soils engineering or engineering geology report, approved by the County,

More information