1 In-Situ Remediation of Brine Impacted Soils and Groundwater Using Hydraulic Fracturing, Desalinization and Recharge Wells Craig Robertson, M.Sc., P.Geol. 1, Ion Ratiu, M.Sc. 2, and Gordon H. Bures, M.Eng., P.Eng. 3 ABSTRACT The remediation of brine impacted fine grained soils present significant technical problems. Traditional recovery methods, including tile drainage and recovery wells are limited due to the low hydraulic conductivities of the soil matrix. Current designs either require very tight spacing, which can be technically and economically restrictive, require enhanced recovery methods such as mole drains or leave areas between the drains or wells that are not effectively leached. Other technical issues include leaching of salts from the vadose zone. This not only includes the zone above the historical water table but also the area above the drain inverts. This can be especially troublesome in semi-arid areas. The low hydraulic conductivities and resulting low flows require lone timeframes to achieve closure. Disposal of effluent is generally via deep well injection. Depending on transportation distances and disposal fees, this can be expensive. In an attempt to provide effective pathways for brine removal, flush salts from the vadose zone and reduce disposal cost; the combined technologies of hydraulic fracturing, desalinization and recharge wells has been employed to remediate brine impacted soils and groundwater. The remediation techniques used at the site include fracing the impacted soil zones at multiple depths and locations using hydraulic fracturing. A frac media is injected into the fractures to increase the permeability. Spacing of the fracing locations is selected to allow for overlap between fracture zones. Drainage is directed toward a gravel sump where the leachate is collected and treated using a flash distillation desalinization unit. This resulted in two streams, one for reapplication to the site and the second, concentrated brine, for disposal. Prior to reapplication the treated water is first blended to ensure chemistry compatibility with the receiving soils. The treated water is then injected at the upgradient end of the formation to enhance salt recovery. INTRODUCTION Remediation of brine impacted soils is a major issue in the western Great Plains area of Canada. As a result of oil and gas operations, highly concentrated brines have been released into the environment. Generally resulting from spills or pipeline breaks the highly concentrated fluids infiltrate into the soil where they leach down and enter the groundwater. For relatively course grained materials the traditional concept of leaching the soils with natural precipitation and recovery by either pumping wells or tile drainage systems has proven to be fairly successful. However, with fine grained soils, generally glacial tills and lacustrine deposits, the removal of 1 Wiebe Environmental Services Inc., Calgary, Alberta 2 GeoGrid Environmental Inc., Calgary, Alberta 3 Frac Rite Environmental Ltd., Calgary, Alberta

2 the impacted fluids becomes difficult and time consuming. Historically remediation of oil and gas facilities has centered on dealing with hydrocarbon issues while leaving the brine impacted soils and groundwater in place. Current regulations require that a site be remediated to the former land use capability. For many sites treatment and accumulated costs over decades has not been feasible. Therefore, alternative remediation options are being explored. The concept of improving the permeability of the soil along with leaching salts with the application of irrigation water was considered for a former battery owned by Canadian Natural Resources Limited (Canadian Natural) in the Calmar area of central Alberta. BACKGROUND Development of the oil and gas reserves in the Calmar and Leduc fields started in the early 1940 s and the Calmar Battery likely began operations in the 1940 s. Development and environmental information about the site and surrounding area is limited since Alberta Energy and Utility Board (EUB) facility files and spill records only date back to Files obtained from the Surface Reclamation Council of Alberta do indicate salt water spills occurring in 1962 and again in 1966 due to operations at the Okalta Oil Ltd. battery and associated salt water pipelines. A surface reclamation certificate was issued on 1972 to Oakwood Petroleum Ltd. by the Department of the Environment under Section 15 of the Surface Reclamation Act. Figure 1: Aerial Photograph 1962

3 An aerial photograph search indicates a facility was present in Aerial photos for subsequent years indicate the site was decommissioned by Figure 1 presents the layout of the facility as it appeared in Through the acquisition of Sceptre Resources in 1996, Canadian Natural has retained responsibility for environmental issues pertaining to the former Calmar Battery. The current land owner had reported to Alberta Environment (AENV) a lack of vegetation and crop growth in the general vicinity of the former battery site. AENV contacted Canadian Natural in mid 1998 specifying the land owner s concerns. In September, 1998 Canadian Natural contracted Wiebe Environmental Services Inc. (WES Inc.) to conduct an environmental inspection of the site. The inspection found stressed vegetation in certain areas and soil probing with a hand-auger indicated hydrocarbon contaminated soil at a depth of approximately 30 to 40 cm below ground surface. A preliminary Environmental Site Assessment (ESA) was conducted in 1999 to determine the likely cause and extent of impacted soil and groundwater. A detailed ESA was completed in Characterization of the subsurface conditions of the Calmar Battery included conducting an electro magnetic (EM) survey, advancing conductivity probes, drilling of 137 boreholes and advancing 100 test-holes. The investigations were conducted to a maximum depth of 7.5 m below grade. In order to identify potential impacts on groundwater quality, and assess the Figure 2: Site Diagram Showing Phase II Site Assessment Program

4 characteristics of the shallow groundwater table, 15 boreholes were completed as groundwater monitoring wells. The areas under investigation are presented on Figure 2. The conclusions of the investigation were as follows: A volume of approximately 8,000 m 3 of heavy end hydrocarbons, trace elements (metals), and heavily brine impacted materials was identified in the former tankfarm (Area 1), and the buried flare pit (Area 2) areas. Evidence of residual brine constituents was identified within the soil profiles of the northwest (Area 4), and the southwest portions of the lease (Area 6). A volume of approximately 62,000 m 3 of brine impacted materials with potential for in-situ remediation through non-disruptive methods was anticipated for Areas 1, 2, 4, and 6. Figure 3: August 5, 1962 Aerial Photograph

5 Figure 4: EM31 Conductivity Data Figure 5: Direct Push Conductivity Cross Sections

6 A volume of approximately 1,000 m 3 of medium to light end hydrocarbon impacted materials was identified in Area 10. The groundwater flow direction in the unconsolidated clay deposits is predominantly northwest. Groundwater flow direction in the mudstone bedrock appears to be to the southwest. The average linear groundwater flow velocity is estimated to range between 3 and 6 mm/year. Brine impacts on groundwater quality were identified in the former tankfarm and the buried flare pit area at monitoring wells P03-1, P03-3, P03-5, and P Regions of elevated EM31 conductivity values, suggesting the presence of inorganic impacts were identified within the former tankfarm and the buried flare pit areas (Figure 3). Areas of adjacent low and high EM31 values were identified in the west and southwest and were attributed to the presence of buried metal objects (i.e. pipelines) (Figure 4). Vertical conductivity and EM31 data correlate well in delineating the lateral extent of the inorganic impacts. Potential impacts appear to extend to 6.0 m below grade (Figure 5). REMEDIATION PLAN Detailed environmental site assessments conducted at the Calmar Battery characterized the environmental status of the former lease and the adjacent areas. The assessment programs identified the presence of a relatively extensive brine impacted plume within the former tankfarm and the buried flare pit area. A phased remediation and reclamation plan was recommended for the Calmar Battery. The initial stages of the remediation program targeted the removal of the heavy end hydrocarbons, trace elements (metals), and the most heavily brine impacted materials from the former tankfarm and the buried flare pit areas. Residual brine impacts on soil and groundwater quality remaining at the limits of the excavations were addressed through in-situ remediation. Monitoring and remediation activities will continue until satisfactory remediation criteria are achieved. DECOMMISSIONING The decommissioning program included removal and landfill disposal of the hydrocarbons, trace elements (metals), and the most heavily brine impacted materials. The excavated materials were stockpiled on-site for landfill disposal. Confirmatory samples from the limits (base and sidewalls) of the excavations were collected to verify the removal of the impacted materials and to determine a base line for the remediation program. To remediate the residual brine impacted materials remaining in-situ at the limits of the excavations, a leachate recovery sump was installed in the central portions of the former flare pit. To facilitate the recovery of impacted groundwater a volume of approximately 650 m 3 ( tonnes) of? 1½ diameter washed rock was placed in the central portion of the flare pit excavation. For water recovery, a 610 mm (24 ) diameter galvanized steel culvert was installed.

7 Figure 6: Leachate Recovery Sump Installation Detail Figure 7: Leachate Recovery Sump

8 The leachate recovery system was backfilled with clean imported subsoil. On-site originating topsoil was replaced over the disturbed area and recontoured. Refer to Figure 6 and Figure 7. Lease cleanup operations included removal and disposal/recycling of the abandoned buried lines. All steel piping was removed from the lease and transported to an appropriate recycling facility. At the landowner request, the cobbles, larger aggregates, and the industrial debris scattered over the lease were periodically removed and landfill disposed during the 2005 summer season. Weed control completed the lease cleanup activities. HYDRAULIC SOIL FRACTURING Hydraulic fracturing is a process whereby a fluid is pumped into a well at a rate and pressure high enough to overcome the in-situ confining stress and the material strength of a formation (i.e. soil or rock) resulting in the formation of a fracture. This process has been used for decades in the petroleum industry to enhance production rates from low-yielding oil and gas wells. When a hydraulically fractured well is produced, the induced fractures serve as pathways to promote fluid flow at greater rates than would otherwise be possible. The fractures also increase the effective drainage area of wells, such that fewer wells are required for extraction from a petroleum reservoir. Hydraulic soil fracturing technology was adapted for environmental applications in contaminated soils and groundwater in the early 1990s. In practice, a slurry mixture containing a proppant (sand) and a viscous fluid (guar gum and potable water) is pumped under pressure into subsurface soils to create a fracture. Fracturing is facilitated by the use of specialized down hole fracturing equipment designed for various soil types, drilling configurations, and operating pressures. After the slurry has been placed in the subsoil, sand proppant holds the fracture open while an enzyme or chemical additive breaks down the viscous fluid. The fluid subsequently drains from the fracture pathways, leaving only permeable sand inside the induced fractures. Multiple fractures emplaced by soil fracturing intersect the system of natural, vertical microfractures that often exist in clays, thereby creating a network of drainage pathways. The fracture network increases the bulk permeability of subsoil, thereby increasing contaminant recovery or treatment rates. Hydraulic soil fracturing has been successfully applied to accelerate site cleanups with conventional remediation technologies and enhance geotechnical dewatering rates for slope stability and foundation applications. Knowing the configuration and geometry of individual fractures initiated and propagated in subsoil is extremely useful for assessing the subsequent performance of remediation technologies at fracture-enhanced sites. This is especially true in cases where the soil fracturing process includes delivering chemical or biological amendments for expediting in-situ remediation. Fractures placed in the subsurface can be mapped remotely using surface mounted tiltmeters. Tiltmeters are highly sensitive instruments (to microradian resolution) used in the hydraulic fracturing industry to measure the minute ground surface deformations created during the

9 fracturing process. The direction and magnitude of ground surface deformation or tilt measured by tiltmeters is used to determine the shape, thickness, extent and orientation of fractures in the subsurface. This information is useful in confirming the extent and coverage of fractures placed in the subsurface, as few fractures ever propagate in a perfectly radial or horizontal manner. Typically, an array of 12 to 25 surface-mounted tiltmeters is set up in a grid or concentric configuration around each fracture borehole location. The tiltmeter spacing and configuration is determined by the number of fractures placed per borehole and the depth of fracture placement. During fracturing, ground surface tilt is measured at each tiltmeter station and the information is stored in on-site dataloggers. Tiltmeter data is downloaded onto laptop computers in the field and subsequently analyzed and interpreted using principals of tiltmeter geophysics. The output is generated into three dimensional graphical representations of individual fractures using advanced computer modelling software. These images can be user-manipulated via computer output files to view individual fractures, or the entire fracture network, from any perspective in space (Figure 8). Figure 8: Conceptual Model of Hydraulic Fracturing The project involved the creation of a hydraulically connected subsurface drainage network in clay soils within the 1.5 ha area salt plume. This involved fracturing salt-impacted soils at vertical increments of 0.5 m to 1.0 m to the bedrock surface located at approximately 4.5 metres below the ground surface. A total of 221 horizontal fractures each containing almost one tonne of sand were emplaced between 2 to 4.5 metres depth at 64 borehole locations in clays. The network of horizontal sand drains emplaced in this manner was hydraulically connected to a gravel filled sump in the former flare pit area. Fracture mapping was conducted on 47 fractures at 13 fracture borehole locations to confirm the extent of fracture placement and connectivity.

10 Fracturing break pressures (i.e. pressure at which soil parts or breaks and fracture propagation begins) typically ranged from 1,000 kpa to 1,500 kpa for the majority of fractures. Break pressure is a function of the depth of fracture initiation, soil cohesion, slurry viscosity, and sand loading. The results appear to be consistent with shallow overburden pressures and cohesive strength values typical of clay soils. The overall placement efficiency of sand fractures (i.e. ratio of sand emplaced to sand pumped) was 96 %. Some sand slurry emerged through the ground surface in the latter stages of pumping in shallow fractures initiated at 2.0 metres depth. This pattern appeared to be consistent until the starting fracture depth was increased to 2.5 metres, whereupon all sand slurry stayed emplaced in the subsoil. The results of fracture mapping to determine fracture orientation and geometry are presented based on analysis of tiltmeter geophysical data. Tilt vectors measured at each tiltmeter station were used to model each fracture as a discrete planar feature. Pressure-time plots and slurry flow rate data were likewise considered in the interpretation of the tiltmeter data. The tiltmeter data was processed to produce a three-dimensional depiction of fractures placed at each fracture borehole location. The results of fracture mapping on 47 fractures indicated a preferred trend in fracture orientation along a southwest-northeast axis. Approximately 80 % of fractures exhibited this orientation while 20 % of fractures followed a southeast-northwest trend. Fractures generally tended to propagate preferentially northwards (63 % of fractures) than southwards. Tiltmeter data analysis indicated that two-thirds of fractures mapped were near-horizontal or slightly ascending to the ground surface (Figure 8). Approximately one-quarter of the fractures mapped were classified as moderately ascending, while less than 10 % of fractures were classified as strongly ascending to the ground surface. The steepest ascending fracture was 52 which occurred at 4.4 m depth in FB16-4. INJECTION WELLS Injection wells were selected as the means of inducing recharge and return flow for the flushing system. Two factors were decisive in the selection. The upper 1.5 metres of soil was not impacted and the fracture pattern was installed in a series of progressively deeper horizontal layers. In order to by pass the upper soil zone and to maximize the exposure of the infiltrating water to the fractured medium vertical injection wells were installed around the perimeter of the contaminated area. The injection well locations are shown on Figure 9. With the pumping of the culvert installed in the leachate recovery sump near the centre of the impacted area and injection of treated water around the perimeter the hydraulic gradient would result in radial flow from the injection wells to the leachate sump. This would result in the flushing of salts from the area around the fractures. The water treatment system was located on the edge of the field near the access road adjacent to a secondary highway. This allowed access to electrical and natural gas utilities and allowed for

11 Figure 9: Injection Well Location Map Figure 10: Injection Well Installation Profile

12 trucking of waste water. The location also reduced restrictions on the farming operations. A sump pump was placed in the recovery culvert with electrical and discharge lines buried below grade. Once the water was treated it was returned to the injection wells by gravity feed through buries return lines attached to each well through a manifold. To allow maximum use of the arable land, the recovery culvert was completed below grade (Figure 10). WATER TREATMENT The selected water treatment method consisted of a flash distillation unit. The process works on the principle that liquids boil at a lower temperature when placed in a vacuum. The collected saline leachate is placed in a concentrate container (Figure 11). The leachate is then pumped through a heat exchanger where the temperature is raised to approximately 60 o C. The water stream in then sprayed into a vacuum chamber where distillation takes place. The evaporated water is passed though a condenser and the recovered distilled water is stored in a clean water tank. Water that does not volatilize in the chamber is returned to the concentrate tank and pumped back through the system. The process continues until the concentrate reached a desired level of salinity when it is discharged into a waste water disposal tank and a fresh batch of leachate is introduced to the system. Flash distillation has been used extensively for the recovery of metals in the plating industry. The construction materials are very resistant to corrosive liquids. The major advantage of flash distillation over most other available systems is that it can handle brine concentrations significantly above reverse osmosis capabilities and uses less energy than traditional distillation units. Identified concerns to date include controlling discharge concentrations and scaling. Figure 11: Flash Distillation Process

13 The configuration of the treatment pad consists of a corrugated metal berm constructed to contain three storage tanks. The tank configuration consisted of a leachate tank, a treated water tank and a waste water tank. The flash distillation unit is mounted adjacent to the tanks and is connected to electrical and natural gas utilities, the leachate inflow and pump power lines and the injection well outflow lines. CONCLUSIONS To date the infrastructure and equipment have been installed at the site. The distillation unit has being test operated to maximize operating efficiencies. Full scale operation is expected to commence in the spring of 2007 with remediation expected to take several years.

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

Potential effects evaluation of dewatering an underground mine on surface water and groundwater located in a rural area

Potential effects evaluation of dewatering an underground mine on surface water and groundwater located in a rural area Potential effects evaluation of dewatering an underground mine on surface water and groundwater located in a rural area ITRODUCTIO Michel Mailloux* Eng. M.Sc, Vincent Boisvert, M.Sc, Denis Millette, Eng.,

More information

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0 PROTOCOL 15 FOR CONTAMINATED SITES Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil Version 1.0 Prepared pursuant to Section 64 of the Environmental Management

More information

In-Situ Containment and Treatment of a Free Phase Hydrocarbon Plume beneath Plant Infrastructure

In-Situ Containment and Treatment of a Free Phase Hydrocarbon Plume beneath Plant Infrastructure In-Situ Containment and Treatment of a Free Phase Hydrocarbon Plume beneath Plant Infrastructure M. Brewster 1, S. Penny 1, B. Odell 1 and T. Jorgensen-Nelson 2 Abstract A very shallow (1 2 m deep) hydrocarbon

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled

More information

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult INTRODUCTION What is groundwater? Water contained in saturated soil and rock materials below the surface of the earth. It is not NEW water, but is recycled water through the hydraulic cycle. The source

More information

22 Tubewell Drainage Systems

22 Tubewell Drainage Systems 22 Tubewell Drainage Systems WK Boehmer' and J Boonstra2 221 Introduction ' Tubewell drainage is a technique of controlling the watertable and salinity in agricultural areas It consists of pumping, from

More information

February 23, 2010 Version 0.0

February 23, 2010 Version 0.0 February 23, 2010 Version 0.0 New Jersey Department of Environmental Protection Site Remediation Program Guidance for Light Non-aqueous Phase Liquid (LNAPL) Free Product Initial Recovery and Interim Remedial

More information

APPENDIX E HORIZONTAL DIRECTIONAL DRILL EXECUTION PLAN

APPENDIX E HORIZONTAL DIRECTIONAL DRILL EXECUTION PLAN APPENDIX E HORIZONTAL DIRECTIONAL DRILL EXECUTION PLAN 35 Horizontal Directional Drilling - Execution Plan Note: This form shall be used on all HDD watercourse crossings (including rivers, sloughs, public

More information

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology Detailed site assessment work at a manufacturing facility in South Carolina indicated that a former French drain

More information

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria Terry Eldridge Golder Associates S.A., Chile Ben Wickland Golder Associates Ltd., Canada Adrian Goldstone Dundee Precious Metals

More information

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals DEQ Mission Statement The Michigan Department of Environmental Quality promotes wise management

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

Design of a passive hydraulic containment system using FEFLOW modelling

Design of a passive hydraulic containment system using FEFLOW modelling Design of a passive hydraulic containment system using FEFLOW modelling Rémi Vigouroux remi.vigouroux@arteliagroup.com Florence Lenhardt florence.lenhardt@arteliagroup.com Noëlle Doucet noelle.doucet@arteliagroup.com

More information

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES Albert L. Lamarre Lawrence Livermore National Laboratory Kathy Angleberger U.S. Dept. of Energy Michael

More information

Remediation of Sodium Contaminated Sites

Remediation of Sodium Contaminated Sites Remediation of Sodium Contaminated Sites..\..\3918b1ca23763e9e9a12ffd67acb0ceb.jpg 21 st International Petroleum Environmental Conference, Houston, Texas Mark Landress P.G. Project Navigator, Ltd. 10497

More information

Electrokinetics - Insitu Remediation of Salt Impacted Fine-Grained Soil and Groundwater at a Former Battery Site

Electrokinetics - Insitu Remediation of Salt Impacted Fine-Grained Soil and Groundwater at a Former Battery Site Electrokinetics - Insitu Remediation of Salt Impacted Fine-Grained Soil and Groundwater at a Former Battery Site Presenters: Bonnie Swift, MBA, CCEP, P.Eng Tanya Michailuck, M.Eng., P.Eng. Project Collaborators

More information

Water Well Decommissioning Guidelines

Water Well Decommissioning Guidelines Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well

More information

Drilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics

Drilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics January 2014 Introduction This fact sheet provides a basic overview of natural gas drilling in the Marcellus and Utica Shale regions of Ohio and the potential environmental issues associated with these

More information

Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence. Josephine Molin, PeroxyChem October

Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence. Josephine Molin, PeroxyChem October Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence Josephine Molin, PeroxyChem October 2 2014 Presentation Objective / Outline To empirically summarize our experience from a range

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Prepared for: City of Bellingham Public Works Department Environmental Resource Division 210 Lottie St.

More information

Engineered Water Solutions. Aquifer Storage and Recovery

Engineered Water Solutions. Aquifer Storage and Recovery Engineered Water Solutions Aquifer Storage and Recovery We Make Sustainable Water Real with technologies and expertise to make the most of your water resources TO MAKE ASR VIABLE, YOU NEED: high-resolution

More information

Jackfish 2 Project. Public Disclosure Document. August 2005

Jackfish 2 Project. Public Disclosure Document. August 2005 Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical

More information

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E.

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E. LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS Mike Bradford, P.E. 2 Today s Agenda SOLUTIONS YOU CAN COUNT ON. PEOPLE YOU CAN TRUST. What are we controlling? FOCUS: How do we control

More information

5.14 CONTAMINATED MATERIALS

5.14 CONTAMINATED MATERIALS 5.14 CONTAMINATED MATERIALS 5.14.1 Introduction Contaminated materials are toxic or potentially harmful substances that may be present in soil, groundwater, and building materials. Contaminated materials

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.4 PERMEATION GROUTING 7.4.1 Definitions 7.4.1.1 Geotechnical Data Report (GDR)

More information

Thermal Remediation Services, Inc.

Thermal Remediation Services, Inc. Thermal Remediation Services, Inc. Electrical Resistance Heating for Rapid Remediation of DNAPL April 2003 David Fleming 425-396-4266 dfleming@thermalrs.com www.thermalrs.com What is Electrical Resistance

More information

Petroleum Production Optimization

Petroleum Production Optimization Petroleum Production Optimization Petroleum Production Optimization Fundamentals Production Optimization refers to the various activities of measuring, analyzing, modelling, prioritizing and implementing

More information

SepticDesign.ca Gunnell Engineering Ltd.

SepticDesign.ca Gunnell Engineering Ltd. SepticDesign.ca Gunnell Engineering Ltd. Presentation Summary Best Practices Code Context Prior to Attending the Site When on Site Site Assessment Assessing Existing Sewage Systems The Septic Test Pit

More information

Geoenvironmental impact assessment of a landfill for solid chemical wastes

Geoenvironmental impact assessment of a landfill for solid chemical wastes ALOJZY SZYMAŃSKI, ZBIGNIEW LECHOWICZ, KAZIMIERZ GARBULEWSKI Department of Geotechnical Engineering, Warsaw Agricultural University SGGW, Poland Geoenvironmental impact assessment of a landfill for solid

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

SAGD Water Disposal Options, Associated Impacts, and Strategies to Improve Environmental Footprint. Basil Perdicakis, January 27, 2011

SAGD Water Disposal Options, Associated Impacts, and Strategies to Improve Environmental Footprint. Basil Perdicakis, January 27, 2011 SAGD Water Disposal Options, Associated Impacts, and Strategies to Improve Environmental Footprint Basil Perdicakis, January 27, 2011 Statoil Canada Kai Kos Dehseh (KKD) Lease Leismer site currently producing

More information

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project ABSTRACT In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project R. Juhlin, M. Butherus S.M. Stoller Corporation 2597 B ¾ Road, Grand Junction, C0 81506 USA The

More information

Salt may be easy to clean up on a table top, but it s not so easy at an oil and gas site 9/14/2015. Marcellus Shale Water Group, LLC

Salt may be easy to clean up on a table top, but it s not so easy at an oil and gas site 9/14/2015. Marcellus Shale Water Group, LLC Marcellus Shale Water Group, LLC In-Situ Remediation of Salinity-Impacted Soils Salt may be easy to clean up on a table top, but it s not so easy at an oil and gas site 1 Salt Facts All sites can be remediated

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Code of Practice for Land Treatment of Soil Containing Hydrocarbons

Code of Practice for Land Treatment of Soil Containing Hydrocarbons Code of Practice for Land Treatment of Soil Containing Hydrocarbons September 2008 Made under the Environmental Protection and Enhancement Act RSA 2000, ce-12 Published by Alberta Queen s Printer Alberta

More information

Environmental Management Division. David Amidei NASA HQ

Environmental Management Division. David Amidei NASA HQ NASA s Remediation Challenges David Amidei NASA HQ Environmental Management Division i i NASA Facilities Environmental Management Division Previous Practices Environmental Management Division and more

More information

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements Introduction Cross Borehole Electrical Resistivity Tomography (ERT) Measurements Resistivity imaging at the surface may be used for applications such as cavity detection, geotechnical investigation, site

More information

Common Oil & Gas Environmental Issues

Common Oil & Gas Environmental Issues Common Oil & Gas Environmental Issues Environment July 2, 2013 Drilling Operations Drilling operations involve creating access to hydrocarbon-bearing zones. Environment 2 1 Upstream (Production) Operations

More information

Water Issues Relating to Unconventional Oil and Gas Production

Water Issues Relating to Unconventional Oil and Gas Production Water Issues Relating to Unconventional Oil and Gas Production John Veil 410 212 0950 john@veilenvironmental.com www.veilenvironmental.com National Research Council Workshop on the Development of Unconventional

More information

Trenchless Pipeline Crossings

Trenchless Pipeline Crossings Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going

More information

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates Ltd., Canada I. Bin Ahmed Golder Associates Ltd., Canada

More information

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and

More information

Leachate Management Leachate Control and Collection

Leachate Management Leachate Control and Collection Leachate Management Leachate Control and Collection Leachate Collection Sanitary landfills have leachate collection and removal system above liner At un-lined landfills and dump sites Perimeter Ditch -

More information

SHALE FACTS. Production cycle. Ensuring safe and responsible operations

SHALE FACTS. Production cycle. Ensuring safe and responsible operations SHALE FACTS Production cycle Ensuring safe and responsible operations Statoil is committed to developing our shale projects in a safe, responsible and open manner. Statoil takes a long term perspective

More information

High Density Polyethylene (HDPE) Lined Evaporation Ponds

High Density Polyethylene (HDPE) Lined Evaporation Ponds High Density Polyethylene (HDPE) Lined Evaporation Ponds Presented by: Neil Nowak, PE Phone: 303-221-1719 Email: nnowak@scsengineers.com Website: scsengineers.com TOPIC OF PRESENTATION: Use of High Density

More information

Simulating the Performance of a Dry Stack Tailings Design for Water Control Permitting

Simulating the Performance of a Dry Stack Tailings Design for Water Control Permitting Simulating the Performance of a Dry Stack Tailings Design for Water Control Permitting Amy Hudson 1, April Hussey 1, Andrew Harley 1 and Timothy M. Dyhr 2 1. Tetra Tech, USA 2. Nevada Copper Corp., USA

More information

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING Dale RUCKER and Jim FINK hydrogeophysics, Inc., USA ABSTRACT Electrical resistivity geophysics has been

More information

RECLAMATION REGULATIONS

RECLAMATION REGULATIONS RECLAMATION REGULATIONS 1001. INTRODUCTION a. General. The rules and regulations of this series establish the proper reclamation of the land and soil affected by oil and gas operations and ensure the protection

More information

Using Fractran Fracture Flow Modeling in Tandem with Modflow to Assist in the Development of Wellfield Protection Zones for Municipal Wells in Bedrock

Using Fractran Fracture Flow Modeling in Tandem with Modflow to Assist in the Development of Wellfield Protection Zones for Municipal Wells in Bedrock Using Fractran Fracture Flow Modeling in Tandem with Modflow to Assist in the Development of Wellfield Protection Zones for Municipal Wells in Bedrock T.K. Wiezel 1, G.G. Violette 1 and S.T. Hamilton 2

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

ONSITE SEWAGE SYSTEMS*

ONSITE SEWAGE SYSTEMS* GENERAL DESCRIPTIONS OF COMMON TYPES OF ONSITE SEWAGE SYSTEMS* *Some of the systems described are not permitted for new construction under the current code in Wisconsin. See individual descriptions for

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

Handbook of Ground Water Development

Handbook of Ground Water Development Handbook of Ground Water Development PREFACE There has been a long-standing need for a comprehensive book on ground water development. The lack of sufficient texts may be because the industry is highly

More information

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE

EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE EXPERIENCE WITH BACKFILLING UNDERGROUND VOIDS AND SHAFTS DURING MINE CLOSURE ABSTRACT YURIY N. SPYCHAK Donbas Special Grouting Co., Ltd., Antratsit, Lugansk region, Ukraine; E-mail: watercon@an.lg.ua This

More information

Canadian Solar Developers Ltd.

Canadian Solar Developers Ltd. Canadian Solar Developers Ltd. Type of Document Draft Report Project Name Proposed Ground Mount Solar Facility L.P #5 8338 Scotchmere Drive, Strathroy, ON OPA FIT Program: FIT-FL67GB5 Project Number V00002250-00

More information

Closure Plan Brame Fly Ash Pond

Closure Plan Brame Fly Ash Pond Brame Fly Ash Pond CLECO Corporation Rodemacher Unit 2 Project No. 90965 Revision 0 10/14/2016 Brame Fly Ash Pond prepared for CLECO Corporation Rodemacher Unit 2 Rapides Parish, Louisiana Project No.

More information

SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES

SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES SOIL REMEDIATION OF A FORMER POWER PLANT SITE IN TULITA, NORTHWEST TERRITORIES Yvan Pouliot 1, Nicolas Moreau 2 and Eric Thomassin-Lacroix 1 1 Biogenie S.R.D.C. Inc., Northern Office 2 Biogenie S.R.D.C.

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe PHASE I ERNEST MINE COMPLEX Project Objectives The objective of the project was to develop an economically feasible, safe method of diverting all flows from the Ernest Mine Complex to a central discharge

More information

Murphy Oil Company LTD.

Murphy Oil Company LTD. Murphy Oil Company LTD. Seal Polymer Pilot Scheme Approval No. 11320B Annual ERCB Progress Presentation June 3, 2013 1 Agenda Subsurface Surface Conclusions 2 Subsurface Background Geology Drilling & Completions

More information

Mitigation of the Contaminated Groundwater Plume at the West Valley Demonstration Project, New York, USA 10409

Mitigation of the Contaminated Groundwater Plume at the West Valley Demonstration Project, New York, USA 10409 Mitigation of the Contaminated Groundwater Plume at the West Valley Demonstration Project, New York, USA 10409 Mark S. Bellis, U. S. Department of Energy; John D. Chamberlain, Linda M. Michalczak and Cynthia

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information

SECTION2 Drainage Control for Surface Mines. Some Technical Aspects of Open Pit Mine Dewatering

SECTION2 Drainage Control for Surface Mines. Some Technical Aspects of Open Pit Mine Dewatering SECTION2 Drainage Control for Surface Mines 22 Some Technical Aspects of Open Pit Mine Dewatering by V. Straskraba, Senior Mining Hydrogeologist, Dames & Moore, Denver, Colorado, USA INTRODUCTION In recent

More information

Implementation of Electrokinetic Based Soil Desalinization

Implementation of Electrokinetic Based Soil Desalinization Implementation of Electrokinetic Based Soil Desalinization Christopher J. Athmer, P.E., Brent E. Huntsman, CPG Terran Corporation Dustin Andersen Oasis Petroleum Current Remediation Technologies for Brine

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

Design Guideline for Gravity Systems in Soil Type 1. January 2009

Design Guideline for Gravity Systems in Soil Type 1. January 2009 Design Guideline for Gravity Systems in Soil Type 1 January 2009 This page is intentionally blank. Design Guideline for Gravity Systems in Soil Type 1 January 2009 For information or additional copies

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow

More information

Overview of Offshore Well Completions

Overview of Offshore Well Completions Overview of Offshore Well Completions Dennis McDaniel Offshore Operators Committee NASEM Workshop: Offshore Well Completion and Stimulation using Hydraulic Fracturing and Other Technologies October 2,

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors Leachate Recirculation and Biogas Collection Methodologies in Bioreactors E. McBean, Ph.D., P.Eng., P.E. School of Engineering University of Guelph 1 INPUT OUTPUT Municipal Solid Waste Moisture Decomposed

More information

Water Dependency of Geothermal Power Generation Systems

Water Dependency of Geothermal Power Generation Systems Proceedings 5 th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 Water Dependency of Geothermal Power Generation Systems (Esther Sironka. ) Kenya Electricity Generating Company

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

is a possibility of the existence of permafrost as a result

is a possibility of the existence of permafrost as a result 111.2 CERTAIN ASPECTS OF ALASKA DISTRICT ENGINEERS EXPERIENCE IN AREAS OF MARGINAL PERMAFROST E. L. Long In nearly twenty years of engineering and construction experience in Alaska, the Alaska District

More information

Natural Gas A Game Changer

Natural Gas A Game Changer Natural Gas A Game Changer Water Resources Old Issues Environment Industry Citizens A Balance is Needed - Lithuania New Issues Presented by: Mr. Brian Oram, Professional Geologist (PG), Soil Scientist,

More information

Students will know how to analyze and interpret samples.

Students will know how to analyze and interpret samples. Environmental Service Systems AG1 Essential Questions: 1. How do policies and regulations impact systems? 2. How do scientific principles apply to systems? 3. How are tools, equipment, machinery and technology

More information

TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: FINAL REPORT

TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: FINAL REPORT 2011 Groundwater and Surface Water Monitoring Program FINAL REPORT TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: 09-511 Submitted:

More information

George E. King SPE GCS 27 October 2011

George E. King SPE GCS 27 October 2011 Treating Produced Water For Shale Fracs A U S T R A L I A A R G E N T I N A C A N A D A E G Y P T N O R T H S E A U. S. C E N T R A L U. S. G U L F George E. King SPE GCS 27 October 2011 Horn River 5000

More information

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY IN-SITU REMEDIATION OF HYDROCARBON IMPACTED GROUNDWATER IN PERMAFROST TERRAIN AT A REMOTE SITE. TIBBITT TO CONTWOYTO WINTER ROAD, NORTHWEST TERRITORIES Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER

More information

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY

CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY CONTAMINATED MEDIA MANAGEMENT PLAN MIDLAND MARKET RAIL YARD KLAMATH FALLS, OREGON DEQ ECSI SITE #1732 MAY 4, 2009 FOR BNSF RAILWAY COMPANY File No. 0506-013-07 Contaminated Media Management Plan Midland

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living organisms that inhabit a geographic area and depend on it

More information

Design and development of a decline shaft through poorly consolidated Kalahari deposits at Ghaghoo Diamond Mine.

Design and development of a decline shaft through poorly consolidated Kalahari deposits at Ghaghoo Diamond Mine. Design and development of a decline shaft through poorly consolidated Kalahari deposits at Ghaghoo Diamond Mine. Alan Naismith 1, Dr Graham Howell 2, Howard Marsden 3. 1 SRK; 2 SRK; 3 Petra Diamonds (previously,

More information