1 Project Development Programme East Africa Tanzania s Wind Energy Market Target Market Analysis

2

3 Target Market Analysis Tanzania s Wind Energy Market

4 Author Integrated Energy Solutions (IES) Mark Hankins November 2009 Editor Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) GmbH On behalf of the German Federal Ministry of Economics and Technology (BMWi) Contact Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) GmbH Potsdamer Platz 10, Berlin, Germany Fax: +49 (0) Web: Web: This Target Market Analysis is part of the Project Development Programme (PDP) East Africa. PDP East Africa is implemented by the Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) on behalf of the German Federal Ministry of Economics and Technology (BMWi) in context of the Export Initiative Renewable Energies. More information about the PDP and about renewable energy markets in East Africa: This publication, including all its information, is protected by copyright. GTZ cannot be liable for any material or immaterial damages caused directly indirectly by the use or disuse of parts. Any use that is not expressly permitted under copyright legislation requires the prior consent of GTZ. All contents were created with the utmost care and in good faith. GTZ assumes no responsibility for the accuracy, timeliness, completeness or quality of the information provided.

5 Target Market Analysis: Tanzania s Wind Energy Market V Content 1 STATUS QUO OF THE WIND ENERGY SECTOR Brief Wind Energy Sector Overview Major Market Segments Local Capacities (Potential) Grid-Connect Wind Farms Off-Grid Wind Projects WIND ENERGY MARKET POTENTIALS Overall Sector Outlook Grid-Connect Wind Generation Opportunities Off-Grid Wind Generation Opportunities Undeveloped Market Opportunities Stand-Alone Wind Systems for Commercial Battery Charging Stations Stand-Alone Wind Generators for Tourism in Off-Grid Locations Stand-Alone Wind Generators in Hybrid Systems for Telecommunication Wind-Diesel Hybrid Systems for Rural Electrification through Mini-Grids WIND ENERGY-SPECIFIC REGULATION AND FRAMEWORK Policies and Regulations Applicable Public Sector Support/ Financing Mechanisms and Sources Grid-Connected Wind Tariffs Mini-Grid Wind Tariffs BUSINESS PARTNERS AND COMPETITORS IN THE WIND ENERGY SECTOR Overview of Wind Energy Key Market Players Overview Major and/or Most Emblematic Wind Energy Projects ANNEX: STANDARDISED POWER PURCHASE TARIFFS (SPPT)... 15

6 Target Market Analysis: Tanzania s Wind Energy Market VI List of Tables Table 1: Wind Resources in Tanzania... 1 Table 2: Existing Capacity for Studies and Works... 4 Table 3: Summary of Wind Opportunities in Tanzania... 5 Table 4: Grid-Connect Opportunities... 6 Table 5: Off-Grid Stand Alone Wind Generator Opportunities... 7 Table 6: Stand-Alone Wind Systems for Commercial Battery Charging Stations... 8 Table 7: Stand-Alone Wind Generators for Tourism in Off-Grid Locations... 8 Table 8: Stand-Alone Wind Generators in Hybrid Systems for Telecommunication... 9 Table 9: Wind-Diesel Hybrid Systems for Rural Electrification through Mini-Grids... 9 Table 10: Incentives and Support Mechanisms for Wind Project Developers Table 11: Grid-Connected Wind Tariffs Table 12: Mini-Grid Wind Tariffs Table 13: Tanzania's Wind Energy Key Market Players Annex Table 14: Seasonally Adjusted Standardised Tariff Payable for Power Delivered to Buyer in Table 15: Seasonally Adjusted Standardised Tariffs Currency 1 USD = TZS 1,440 (May 2010) 1 = TZS 1,776 (May 2010) Measurement W Watt Wp Watt peak Wh Watt hour kw Kilowatt kwp Kilowatt peak kwh Kilowatt hour MW Megawatt MWp Megawatt peak MWh Megawatt hour GW Gigawatt GWp Gigawatt peak GWh Gigawatt hour

7 Target Market Analysis: Tanzania s Wind Energy Market VII List of Acronyms BBS CDM DANIDA EIA EWURA GEF HFO ICT LRMC MEM MFI m/s NEMA NGO O & M PPA PV REA SHS SIDA SME SPP SPPA SPPT TADEP TANESCO TIC UNDP USAID VDC Battery Based System Clean Development Mechanism Danish International Aid Organisation (Ministry of Foreign Affairs) Environmental Impact Assessment Energy and Water Utility Regulatory Authority Global Environment Facility Heavy Fuel Oil Information and Communication Technology Long Run Marginal Cost Ministry of Energy and Minerals Micro Finance Institutions Meter per Second (Wind Speed Measurement) National Environment Monitoring Agency Non-Governmental Organisation Operation and Maintenance Power Purchase Agreement Photovoltaic Rural Energy Agency Solar Home System Swedish International Development Cooperation Agency Small- and medium-sized enterprise Small Power Project Standardised Power Purchase Agreement Standardised Power Purchase Tariffs Tanzania Access Development Energy Project Tanzania Electric Supply Company Tanzania Investment Centre United Nations Development Programme United States Agency for International Development Volts Direct Current

8 Target Market Analysis: Tanzania s Wind Energy Market VIII Summary Tanzania has encouraging wind resources throughout the Rift Valley, in the highland plains and along the coast, however, thorough exploration has yet to be conducted. To date, only a handful of off-grid wind plants have been installed, including wind pumps and small-scale power generators, and no gridconnected systems. There are undeveloped opportunities to establish stand-alone wind systems for telecom, tourism and mini-grid. There is an estimated short-term potential for MW of grid-connected wind farms. Although Tanzania does not have a programme of feed-in tariffs that provides set payments for specified technologies, it has recently-designed mechanisms to encourage the development of small renewable energy-based power plants, namely hydro, wind and biomass. These mechanisms include a standardised power purchase agreement (SPPA) and associated standardised power purchase tariffs (SPPT). Small power projects are defined for small power plants that use a renewable energy power source (or waste heat) with an installed capacity of between 100 kw and 10 MW. At present, several companies are in development stages of setting up wind farms of around 50 MW and more in the Rift Valley that could be operational in the near future. It is expected that their positive experiences will open up a larger market for wind generation and improve the current poor product supply chains and technical training available.

9 Target Market Analysis: Tanzania s Wind Energy Market 1 1 Status Quo of the Wind Energy Sector 1.1 Brief Wind Energy Sector Overview Before the 1990 s, Tanzania was considered by the global wind power community to be an area of low wind potential. In the coastal areas prevailing South-Eastern (S.E. Trades) and North-Eastern (N.E. Monsoon) winds offered marginal potential as wind farm sites. However, after , a number of inland areas along the edge of the Rift Valley were studied more carefully and seen to offer wind resources greater than coastal areas. A number of these areas are being considered as potential wind farm sites in 2009 by major investors. Tanzania has an estimated multi-gw wind potential that, as yet, has not been quantified. There is a lack of comprehensive data about wind resources in Tanzania, and any developer of projects or seller of wind equipment will need to focus on gathering quality data. Available data is mostly from 10 m masts of Tanzania Meteorological Agency stations, and much of it is not suitable for predicting output of wind farms. Nevertheless, results are promising in a number of sites with average speeds exceeding 8 m/s in certain locations. DANIDA/Risø/ TANESCO (2003) and wind companies themselves have made major efforts to assess wind resources and undertake investment feasibility for harnessing wind energy. Specific locations for which there is detailed information are described in the table below: Table 1: Wind Resources in Tanzania Site Study 10 m Wind 30 m Wind Speed (m/s) Speed (m/s) Makambako Original Wind East Africa Singida Wind East Africa Karatu (Arusha) DANIDA/Risø/ TANESCO Mkumbara (Tanga) DANIDA/Risø/ TANESCO Gomvu (Kigamboni) DANIDA/Risø/ TANESCO Litembe (Mtwara) DANIDA/Risø/ TANESCO The DANIDA/Risø/TANESCO study (2003) also used satellite data to evaluate off-shore coastal wind speeds and found that: the average of annual wind speed is over 6 m/s along the coast there is no significant variation between the North and the South coast of Tanzania and there is a significant seasonal difference in wind speed (speeds range between less than 5 m/s in November/December and over 8 m/s in July). Factors that make Tanzania s wind regime interesting (especially in the Rift Valley) are the low turbulence, high average speeds and unidirectional nature of the flow. From measurements in some sites, net annual capacity factors as high as 40 % would be possible. Also notable is the fact that ample areas of land are available in areas of good wind resources. 1 Following similar inland studies along the Rift Valley in Kenya.

10 Target Market Analysis: Tanzania s Wind Energy Market 2 Use of off-grid wind energy in Tanzania has been established for decades. At least 150 wind-pumping systems have been installed by missionary projects, communities and private individuals, but not all are currently operational. There are as many as several hundred installed small wind turbine units in off-grid parts of the country (totalling > 400 kw). However, neither the off-grid wind pump market nor the wind generator market has developed to warrant an organised supply chain for products outside of occasional purchases. Suppliers of off-grid wind systems are only beginning to get established, wind generators are available on demand from the major solar suppliers. As of June 2009, there was no grid connecting wind systems in Tanzania and two known projects of over 50 MW in planning stages. There is recently growing interest data-gathering throughout the country, following a 2002-DANIDA/Risø study that assessed four sites for large-scale wind projects (included in Table 1). The first generation of pioneer grid-connected wind farms are testing the waters and are negotiating with the government, power companies and regulatory bodies to put in place processes that will make wind projects and power purchase agreements (PPAs) much simpler in the future. 1.2 Major Market Segments The current shortfall in electricity supply in Tanzania presents ample opportunities for wind electricity, both on- and off-grid. Nevertheless, it is taking time for the power sector to appreciate the major role that wind can play. The novel nature of wind technologies means that government players (the Ministry, the regulator EWURA, the power company TANESCO and the Rural Energy Agency (REA)) are only now coming to terms with the processes of assessing resources, attracting developers, and negotiating agreements with wind suppliers and projects as wind farms are increasingly seen as a viable method of closing the shortfall. Grid-based electricity There is no operating wind power generation on-grid. Installed generation capacity on TANESCO s interconnected transmission system amounts to 888 MW primarily from hydro and thermal generation as follows: Hydro: 561 MW. Note that most hydro sites are in the South of the country while demand is primarily in the North (Arusha, Mwanza) and East (Dar es Salaam). Hydro resources fluctuate considerably during extended dry periods. Thermal: 304 MW (from natural gas and HFO generators). Isolated thermal stations in about 12 sites contribute an additional total of 32 MW (Diesel based). Demand for power from 602,500 consumers, stands at just under 800 MW and has been growing at eight to 15 % per year, closely following the strong trends in economic growth over the past decade. It is recognised that demand for grid is out-stripping supply and that wind power is an option, particularly since wind tends to be available in increased amounts during dry periods when hydro availability is constrained. Off-grid electricity There are many small off-grid wind pumps and wind generators in operation. 75 % of Tanzania s estimated population of 41 million is located in rural areas. At the same time, less than 5 % of this population is served by the grid and large areas of the country are completely un-served by grid power. Many of these off-grid areas have excellent wind resources.

11 Target Market Analysis: Tanzania s Wind Energy Market 3 The key constraint of off-grid populations is ability-to-pay for electricity. In general, those located further from the grid have proportionally lower levels of economic activity, but there are a number of economically active sectors in areas poorly served by the grid, including mining, tourism, and telecom which would be willing to invest in power systems. 1.3 Local Capacities Beyond the assessment of wind resources for wind energy projects, local skills regarding project design and implementation need specific capacity building measures in Tanzania both for off-grid and grid-connect projects. The challenges of each market are different, and the capacity needs of the sectors are distinct. The two categories are considered separately in the discussions below. There is no wind power industry association in the country. The current wind measurement, project development, negotiation and installation and capacities reside with a few agencies, including: TANESCO - Tanzania Electricity Supply Company Ltd Tanzania Meteorological Agency Ministry of Energy and Minerals (MEM) Wind East Africa (wind company) (Potential) Grid-Connect Wind Farms Wind farms rely extensively on imported expertise and technology. The current active projects in the country are rapidly building skills that previously were not available and will result in a network of agencies that can be utilised by future projects. The process, however, for the pioneer companies is time consuming and therefore result in relatively high up-front investment costs. For developers interested in importing 1 MW systems into the country, it would be expected that capacity issues would be a major problem. Wind studies: There has been a rapid build-up in capacity to gather data and this is not seen as a problem area. Companies that put up masts for telecom base stations are capable of readily setting up wind measurement stations. Power purchase agreements (PPA): There is little capacity in place to complete the complex legal arrangements involved in setting up PPAs. Civil works is not seen to be a major problem area as there are companies that have the capacity to install the wind generator bases and complete the interconnection work. Cranes for the erection of the wind towers are not available in the country currently. Transport of large wind towers and/or blade components on the limited road network is expensive and disruptive due to limited traffic flows from the port city of Dar es Salaam. There are regulations that make the process of moving equipment expensive and difficult to complete. Load flow study: Current projects have had to bring in their own consultants to complete these studies on behalf of the power company Off-Grid Wind Projects Execution of small off-grid wind projects relies largely on existing networks of PV and generation installers/designers. Since retailers often lack capacity to design and market off-grid wind systems the support to develop these skills often comes from supplier companies or projects. Companies that install and design systems generally train their own staff or send their staff abroad for this training.

12 Target Market Analysis: Tanzania s Wind Energy Market 4 The demand for small wind generators in Tanzania has not developed and consequently neither have supply chains. Unlike the case for PV equipment, dealers do not usually stock wind turbines and they are supplied on order and/or purchased opportunistically by dealers. Dealers have not rolled out marketing campaigns for wind turbines, thus rural consumers are largely unaware of the technology and prices are extremely high. Those that purchase get their information along different channels or import units directly from outside the country. There is no accepted accreditation system or hand-over procedure to ensure that systems are properly done (as there is with grid systems). Consumer agencies are often at the mercy of suppliers when systems are installed. Development of the mini-grid or large off-grid system market is constrained by a lack of capacity to design and install large systems, and a lack of faith among potential customers, in company capacity to complete and execute large systems. Table 2: Existing Capacity for Studies and Works Tanzania private firms or individuals International firms present in Tanzania Government institutions Wind resource study -/+ ++ -/+ Site survey and rough + + -/+ system design PPA Negotiation - + -/+ Technical plant design -/+ + - Feasibility study Construction work N/A Engineering work + + -/+ Electrical work Business development advice + + N/A - not available; -/+ limited; + can be found; ++ there is choice

13 Target Market Analysis: Tanzania s Wind Energy Market 5 2 Wind Energy Market Potentials 2.1 Overall Sector Outlook Table 3 below summarises the main opportunities in the Tanzanian wind sector. These include gridconnected wind farms, off-grid isolated wind generators for a variety of applications and wind pumping. Table 3: Summary of Wind Opportunities in Tanzania Wind sector opportunities Stand-alone off-grid wind opportunities Grid-connect or minigrid wind opportunities Water pumping Current demand Total installed capacity less than 500 kw No active grid connect farms Several 50 MW+ projects in planning stages ±150 installed units in the country Sporadic installations Basic description of opportunity Domestic market: High end market Social institutions and community (schools, clinics, NGOs) Commercial: small business applications Tourism: Systems for small camps and for larger off-grid lodges and camps (in combination with gensets as hybrid) Telecom: medium-sized systems for off-grid base stations, consumer side systems Wind farm opportunities. Most of the wind resources are along the Rift Valley Market for large-sized systems Hybrid mini-grids (in tourism, rural electrification, commercial developments) Isolated generation/hybrid: Mtwara, Lindi, Mafia Island Potential market for second hand used generators Agricultural: Focus on pumping and market ready applications Livestock Community water supply Grid-Connect Wind Generation Opportunities The largest wind sector opportunity by far is grid-connected wind power, given the rising demand for grid electricity in Tanzania, ample wind resources and the virgin nature of the sector. The DANIDA/Risø/TANESCO study (2003) modelled 50 MW wind electricity project cost at USD 0,07-0,09 per kwh (at the Mkumbara site). This compares favourably with TANESCO LRMC of electricity (> USD 0,066). Tanzania is quickly developing interest in wind farms, since 2002 there has been a number of potential investors evaluating the country for wind projects. However, because (East) Africa is still seen as risky by large wind companies/developers, since the process of establishing a wind farm is not fully defined and Tanzania has not developed feed-in tariffs or specific targets for wind, this is still not an especially active area. Nevertheless, once there is an established method for developing and approving wind projects, it is likely that the sector will expand at a steady and promising pace.

14 Target Market Analysis: Tanzania s Wind Energy Market 6 Wind farms could be established anywhere along the national grid. The necessary sub-station and transmission lines for grid connection should be considered as part of the wind farm project. The feasibility of wind farms depends on the cost of energy from such a wind farm, which in turn will depend on the wind conditions. There is no reason to believe that costs of construction and operation of a wind farm in any of the areas visited along the Pangani River or between Mbulu and Karatu should be significantly higher than elsewhere in the world, provided that the wind farm has a sufficiently large size and uses commercially proven technology and internationally experienced suppliers. 2 The short-term upper limit of wind farm activities is likely to be MW. This is a technical limitation based on grid size (it does not necessarily mean wind potential would be exhausted or that more wind could be added as the grid increases in size). Larger wind farms would present technical difficulties in system integration, esp. regarding grid power balancing. Table 4: Grid-Connect Opportunities Applied technology Expected financial volume Competitiveness Planning Predominate operator models Constraints/obstacles Recommendations for German enterprises Wind farms utilising state-of-the-art large wind generators (i.e. 1-3 MW) Wind farms utilising second hand wind generators from European markets Wind farms feeding into isolated grids Hundreds of millions of USD Where wind resources are above 7-8 m/s, wind appears to be competitive with the cost of grid electricity. Two or more year time horizon Developer consortium including technology provider Engineering firms Financier Carbon traders Local partners Lack of defined feed-in tariff and risks of completing deal Difficulty of attracting major wind suppliers Financing arrangements PPAs Ability of TANESCO to pay Construction of towers (cranes), delivery of wind machines to site from coast A strong partner with government linkages is necessary to complete local negotiations. Understand the PPA-development process as a first step. TANESCO operates twelve isolated networks - all based on small diesel engines: Kigoma, Mtwara, Lindi, Njombe, Mafia, Mpanda, Tunduru, Songea, Liwale, Ikwiriri, Masasi and Kilwa Masoko. These have a combined installed capacity of 31 MW but they effectively contribute about 15 MW due to aged machinery and lack of spare parts. These isolated networks may present an opportunity for mini-grid wind power, especially given the higher tariffs offered to isolated networks Off-Grid Wind Generation Opportunities Opportunities in off-grid wind can generate a high return on investment. However, the potential clients are more dispersed, harder to educate and reach and expensive to serve. An off-grid wind business venture would make more sense if piggybacked upon a business that provides a similar product or service to off-grid customers (PV, generators, hardware, etc.). 2 Risø/Danida, 2003.

15 Target Market Analysis: Tanzania s Wind Energy Market 7 Off-grid wind generation opportunities are similar to opportunities in the off-grid PV sector 3 and, if it was better developed, an off-grid wind supply chain could follow the same model. However, suppliers questioned about wind generators said that there is little demand and it is sporadic. Little study has been made of existing demand for stand-alone wind generation units. The technical and geographical potential for off-grid wind is relatively high. Known wind resources are ample and 75 % of the population is off-grid. However, the economic potential for wind in off-grid areas is limited because incomes in off-grid areas tend to be relatively low. Unlike PV systems, wind power systems have a lower size limit (i.e. 200 W) meaning that they cannot be scaled down to sizes and unit prices small enough to be attractive to the majority of rural households or small- and mediumsized enterprises (SMEs). Therefore, estimating reliable market potentials for off-grid wind systems is considerably more difficult than for the PV market because any demand would depend greatly on wind resources (which yet has to be completely scoped out), trade-offs against other technologies, consumers ability to pay and assumed consumer demand. Two main areas of potential interest include: Domestic and small commercial. Only high-end consumers with relatively sophisticated knowledge of energy systems would buy wind generators. If it were assumed that 5 % of the large solar home system (SHS) market (i.e. over 100 Wp) instead bought a wind generator, this would reflect a total market potential market of about 2000 units. Missions, NGOs and governmental institutions. This is the area where there has been the most activity in the market place. The Rural Energy Agency (REA) has set aside funds for purchase of wind generators for rural institutions. As well, there is constant demand for small energy systems from missions and NGOs. Table 5: Off-Grid Stand Alone Wind Generator Opportunities Applied technology Wind generators for stand-alone applications including household power, community institutions, small commercial sites, tourism and telecommunications. Components include generators, invertors, charge regulators, batteries, associated electrical spares. Expected financial volume Competitiveness Planning Predominate operator models Constraints/obstacles Total potential market size is unlikely to be above USD 15 million. A well-developed market might sell several hundred thousand USD worth of equipment per year. There is little competition in this sector. An aggressive marketer of wind generators could conceivably do well selling wind generators in addition to other products (gensets, PV) to the off-grid market. Wind generators are expensive items to keep in inventory. Any agent would have to ensure that his ability to stock and deliver units is on part with demand. Would use PV or diesel gen-set supply networks Wholesaler-retailer-technician Possible use of agents in windy target areas Sales and system design for NGO/mission, tourism and telecommunication would require tailored approach High cost of inventory Lack of consumer awareness and demand Need for marketing and education of consumers Need for information about wind regimes in wide areas Lack of installation and design capacity 3 See related report on Tanzania s solar energy sector: Target Market Analysis: Tanzania s Solar Energy Market.

16 Target Market Analysis: Tanzania s Wind Energy Market 8 Recommendations for German enterprises Utilise the same supply chains that deliver PV systems Target approaches to the various market groups Work closely with the REA to develop procurement projects Train skilled installers to market product in target areas Avoid box-shifter dealers, focus on specialist that provide good customer service 2.2 Undeveloped Market Opportunities Stand-Alone Wind Systems for Commercial Battery Charging Stations A considerable number of off-grid small businesses and households utilise centrally-recharged leadacid batteries for 12 VDC electricity needs. In areas remote from the grid, charging 12 VDC batteries with wind power presents an interesting business opportunity. This business opportunity could be franchised by local organisations. Table 6: Stand-Alone Wind Systems for Commercial Battery Charging Stations Technology to be applied Anticipated total potential Applicable support/financing mechanisms Constraints/obstacles Recommendations for German enterprises kw wind generators charge consumer batteries and sell related products and services. Economic potential is in the hundreds of units. Because of the potential for employment and income generation, this type of business would be eligible for support from Micro Finance Institutions and possibly the REA. Development of an appropriate business model is a concern with this concept. Financing of the units for entrepreneurs is also a key obstacle. Business model and technical solution would have to be pushed out to the rural entrepreneurs, possibly in conjunction with financing Stand-Alone Wind Generators for Tourism in Off-Grid Locations There are several hundred off-grid tented camps and lodges in Tanzania. Table 7: Stand-Alone Wind Generators for Tourism in Off-Grid Locations Technology to be applied Anticipated total potential Applicable support/financing mechanisms Constraints/obstacles Recommendations for German enterprises Hybrid wind-generator systems and/or mini-grids. System sizes would vary greatly depending upon the size of the lodge or camp (3 kw to 100 kw+). Total market size is relatively small (15-30 systems) each of which would perhaps be as large as 50 kw on average. Tourism players would identify their own finance. Operation of wind systems would have to be integrated into normal operation of camp/lodge. High up-front investment costs would be difficult for many companies. Pursue wind power for camps at senior levels of tourism industry. Complete one demonstration and use it as a sales point for other camps/lodges.

17 Target Market Analysis: Tanzania s Wind Energy Market Stand-Alone Wind Generators in Hybrid Systems for Telecommunication Most base stations in East Africa are powered by diesel gen-sets, thus fuel is a huge cost factor for their operation. In Kenya, Safaricom has already installed at least 20 hybrid wind-generator systems for their off-grid base stations. In Tanzania, there are 600 off-grid base stations, perhaps 20 % of which are in presumably high-wind areas. Table 8: Stand-Alone Wind Generators in Hybrid Systems for Telecommunication Technology to be applied Anticipated total potential Applicable support/financing mechanisms Pilot Constraints/obstacles Recommendations for German enterprises Hybrid wind-generator-battery units powering base station for cell phone companies. Wind provides > 70 % of total energy for system. Total potential market of > 100 sites where ±3 kw units would be installed. Telecommunication companies (or base station operators) buy units or pay for energy service. Safaricom in Kenya is piloting units successfully. Base stations require power 100 % of the time and do not allow down time - this means that wind resources would have to be completely evaluated. Approach telecommunication providers at a high level Wind-Diesel Hybrid Systems for Rural Electrification through Mini-Grids Many remote out-posts in rural areas utilise diesel mini-grids for office, pumping, clinic and school power. Wind electricity fed into such grids can greatly reduce costs of fuel, which is the main operational cost of such systems. Table 9: Wind-Diesel Hybrid Systems for Rural Electrification through Mini-Grids Technology to be applied Anticipated total potential Applicable support/financing mechanisms Hybrid wind-diesel generator set (50 kw to 1 MW) possibly with battery back-ups and inverters. Size would depend on demand and available funding. Scores of potential sites identified in Rural Electrification Master Plan. This type of system would be funded by donors, REA, missions. See section 3.2 to off-grid tariff structures for SPPTs. Pilot Constraints/obstacles Recommendations for German enterprises Technology is relatively new. Management of systems in remote areas is a significant risk. Many operators of off-grid generators (who make a rent income from sales of diesel) would be reluctant to utilise wind and reduce fuel usage. Development of this business will require close collaboration with REA or funding donor. Consult the Energy and Water Utility Regulatory Authority (EWURA) on projects that might qualify for special Standardised Power Purchase Tariffs (SPPT) payments.

18 Target Market Analysis: Tanzania s Wind Energy Market 10 3 Wind Energy-Specific Regulation and Framework Although Tanzania does not have a programme of feed-in tariffs that provides set payments for specified technologies, it has recently-designed mechanisms to encourage the development of small renewable energy-based power plants, namely hydro, wind and biomass. These mechanisms include a standardised power purchase agreement (SPPA) and associated standardised power purchase tariffs (SPPT). Small power projects (SPP) are defined for small power plants that use a renewable energy power source (or waste heat) with an installed capacity of between 100 kw and 10 MW 4. Essentially, the purpose of the SPPAs is to speed up development and simplify the process of putting small power systems in place for standard 20-years-periods. The SPPAs encourage embedded generation on a system that is extremely susceptible to hydro power fluctuations, and which has large distances separating power supply and demand centres. Projects are only now being developed through the SPPA structures and the process is far from perfect. Some private sector players interviewed complain quietly that EWURA may be exceeding its mandate by not allowing developers and private investors to set their own rates of return or benchmarks, making the overall process risky from the point of view of investors who are already wary of Tanzania. 3.1 Policies and Regulations Government policy in Tanzania is increasingly favourable to all renewable energy and wind energy in particular. Indeed, wind companies maintain that the overall tone of the government is extremely positive toward their projects. However, practical implementation of favourable policy has some ways to go to be fully facilitative of wind projects. The government agencies primarily concerned with development of wind projects include: Energy and Water Utilities Regulatory Authority (EWURA). The regulator is responsible for negotiation and approval of any PPA. It was empowered by the Energy and Water Utilities Regulatory Authority Act of 2001 to approve wholesale power sale terms and tariffs. Tanzania Electricity Supply Company Ltd (TANESCO). State-owned TANESCO is virtually a monopoly electricity utility in Tanzania. Proposals for grid-connected power projects must be made to TANESCO (and approved by EWURA). TANESCO pays project developers for power supplied on-grid. Ministry of Energy and Minerals (MEM). This is the government s policy-making body which is tasked with the job of administering law and facilitating the development of the SPP development and power sale. Rural Energy Agency (REA). This body is concerned with the development of off-grid projects and the administration and awarding of rural electrification subsidies and grants. Projects seeking support to supply power in remote or off-grid areas would deal with REA. REA was set up to address the special requirements of rural consumers through programmatic grant and subsidy support. The government, the World Bank, the Swedish International Development Cooperation Agency (SIDA) and numerous other donors provide funding for REA s activities. 4 Larger wind or biomass plants may be able to negotiate to fit under these agreements. However, if the size is significantly larger, the IPP may have to negotiate a new agreement.

19 Target Market Analysis: Tanzania s Wind Energy Market 11 Grid connection procedures TANESCO outlines on equipment, transmission and distribution requirements and standards, including the Interconnection Guidelines, that apply to the installation and to the operation of all equipment and interconnections. However, local project developers complain that TANESCO does not keep to defined standards for wind projects. Key permits required include the following: The National Environment Monitoring Agency (NEMA) approves environmental impact assessment (EIA). Registration at the Tanzania Investment Centre (TIC). This organisation supports investors and is extremely helpful in providing assistance to investing companies. Generating license or preliminary licence. Land acquisition. The land ownership process is complex as it involves agreements with municipalities and villages. Land surveys must be completed as well as evaluation compensation paid to local groups. Title deed for the land is necessary (all land in Tanzania is owned by the government and a midterm lease or 99 year lease would have to be obtained). Standards and technical requirements So far, there are no accepted standards or grid codes for wind farms. Local developers are following Europeans standards. Public acceptance issues At present there are few Not-in-my-backyard issues with regard to wind in Tanzania. Land is widely available, and, in general, the locations where wind resources are high are sparsely populated. Issues may arise where wind generators are located next to areas important to bird life or game reserves.

20 Target Market Analysis: Tanzania s Wind Energy Market Applicable Public Sector Support/ Financing Mechanisms and Sources Government support for wind projects has only been recently developed and those projects currently in the pipeline are testing the waters. None of the projects interviewed is moving as quickly as originally planned, but there is considerable optimism about the future of wind in the country. Incentives and support mechanisms available for developers of wind projects are briefly summarised in the table below: Table 10: Incentives and Support Mechanisms for Wind Project Developers Support Mechanism Standardised power purchase tariffs (SPPT) Tax relief Rural Energy Agency (REA) Special loan options Duties Carbon credits Comments and Description Simplified standard 20 year tariff agreements for renewable energy projects between 100 kw and 10 MW. SPPA specifies tariff rates for Grid-connected and mini-grid power, Types of power (wind, biomass, hydro), and Power delivery season (dry/rainy). Projects with a status of strategic national importance can negotiate tax incentives from the government. Under the Ministry of Energy and Minerals (MEM)/Rural Electrification Agency (REA) and Tanzania Access Development Energy Project (TADEP) programme (supported with government and World Bank funds), special dispensations are available for renewable energy projects. Though wind projects are not specifically mentioned, it is likely that they would be considered. REA makes support available for innovative off-grid renewable energy projects. Nothing locally available No import duties because of registration with Tanzania Investment Centre (TIC). Tanzania is a party to the Kyoto Protocol and has a standard government process for approval of Clean Development Mechanism (CDM) projects. The following sections summarise the SPPT payment schemes as of 2008 in both grid-connected systems and off-grid systems Grid-Connected Wind Tariffs As noted above, a Standardised Power Purchase Agreement (SPPA) was developed for small (100 kw- 10 MW) projects by the Tanzanian Government. However, this agreement was not found to meet the needs of existing wind developers (whose projects are above the 10 MW maximum anyway) and they have had to develop more comprehensive agreements. Tariffs for wind farms are based on calculated long run marginal costs of electricity calculated each year, with two fixed price boundaries. A lower Floor Price provides for returns on investment for investors while a Price Cap sets a maximum price per kwh to be paid to the SPP.

21 Target Market Analysis: Tanzania s Wind Energy Market 13 These levels are set out in the table below. The seasonal adjustments are designed to lower prices paid during wet periods, when hydro power is more available. Table 11: Grid-Connected Wind Tariffs Floor Price TZS USD Long-run marginal financial costs adjusted for avoided losses 80.0 TZS/kWh 0.064/kWh Seasonally adjusted Dry season Aug-Nov 96.0 TZS/kWh /kWh standardised Wet season Jan-Jul and 72.0 TZS/kWh /kWh Dec Price Cap Seasonally adjusted Dry season Aug-Nov TZS/kWh 0.224/kWh standardised Wet season Jan-Jul and Dec TZS/kWh 0.168/kWh (Exemplary period of validity: 1st January to 31st December, 2008) Mini-Grid Wind Tariffs For off-grid projects, rates are much higher 5, and reflect the higher costs of running diesel gen-sets in remote areas. Renewable projects connected to mini-grids of TANESCO (and other companies) will receive payments that are technology-specific, cost-based, and based on three tiers. The tariff will consist of a fixed rate, an operation and maintenance (O&M) rate (and a fuel rate for biomass). The table below summarises the proposed rates (from the 2007 draft SPPT report which has been adopted). Table 12: Mini-Grid Wind Tariffs Tariff component Off-grid wind SPP payment (TZS/kWh) Off-grid wind SPP payment (USD/kWh) Escalable base O&M rate (year 1) Escalable base fuel rate (year 1) Tier 1 non-escalable (Year 1-8) Tier 2 non-escalable (Year 9-15) Escalable year For wind-based power generation in mini-grids, the payment process would be more complex, as there will be need for firm power from diesel generators to cover fluctuations in wind availability. Special tariffs paid for wind would have to be balanced against the costs of this spinning reserve. Therefore, wind in off-grid sites will not be as attractive as micro-hydro in mini-grids where it is available, and the incremental costs of setting up a wind-based mini-grid will necessarily be much higher than grid-connect. 5 Based on final recommendations of Standardised SPPTs for Tanzania, Final Draft June 2007.

22 Target Market Analysis: Tanzania s Wind Energy Market 14 4 Business Partners and Competitors in the Wind Energy Sector 4.1 Overview of Wind Energy Key Market Players Table 13: Tanzania's Wind Energy Key Market Players Importing company Wind East Africa Company description Tanzanian owned wind project developer Company strategy Involved in developing two 50 MW wind farms in Singida Major activities Wind projects Contact details Michael Case Principle Project Manager 5th Floor Barclays House P.O. Box Tel: (+255) (0) Fax: (+255) (0) mike.case@winde.co.tz Ashton Energy Wind project developer Start-up company Wind equipment and projects Abbas Hirji, Director P.O. Box st Floor Raha Towers Tel: (+255) (0) Mob: (+255) (0) abbas@ashtonenergy.com Internet: Rural Energy Agency TANESCO Address the special requirements of rural consumers State-owned electricity company Programmatic grant and subsidy support Electricity sales & purchases. Pays for wind electricity Rural energy support agency Electricity sales Mwakehesya Lutengano lmwakahesya@rea.go.tz 4.2 Overview Major and/or Most Emblematic Wind Energy Projects There are two active wind projects in Tanzania: Wind East Africa project. Started by local investors in 2007, this project aims to install two 50 MW farms in Singida, in two phases. A UK investor is partner within the consortium. Land acquisition has been completed in Singida, the PPA is under negotiation. Financial close is expected in 2009/2010, and commissioning is expected to start directly thereafter. Good P.M Group (Korean), 210 MW project, Singida. The project was originally related to the Wind East Africa project. 6 The group has signed a Memorandum of Understanding to acquire the 500-hectare property in Singida from Tanzania s Power Pool East Africa Ltd. Danida/Risø/TANESCO demonstration. The 2001/02 Danida study has originally planned to work with TANESCO to implement a wind farm. The project is not active at present. 6 Project information from:

23 Target Market Analysis: Tanzania s Wind Energy Market 15 Annex: Standardised Power Purchase Tariffs (SPPT) 7 Rates for Delivery of TANESCO's Entitlement The tariff payable shall be based on the avoided long-run marginal costs of buyer, as revised and announced by the regulator applicable to each calendar year of the agreement. The tariff is seasonally differentiated and is adjusted annually within the limits of a minimum and maximum price. Year of execution of SPPA: 2008 Table 14: Seasonally Adjusted Standardised Tariff Payable for Power Delivered to Buyer in 2008 Season Months applicable to season TZS/kWh Dry season August through November 96.0 Wet season January through July and December 72.0 Minimum Price: The annually applicable tariff during the term of the agreement shall not be less than the price for the initial year, as set forth above. Maximum Price: The annually applicable tariff during the term of the agreement shall not exceed the prices, by type of SPP technology, set forth in the table below. Table 15: Seasonally Adjusted Standardised Tariffs Season Months applicable to season Small hydro (TZS/kWh) Wind (TZS/kWh) Biomass (waste) (TZS/kWh) Dry season August through November Biomass (grown) (TZS/kWh) Wet season January through July and December From: Standardised Power Purchase Agreement for purchase of grid-connected capacity and associated electric energy between TANESCO and a small power project (revised draft). June 2007.

24 Target Market Analysis: Tanzania s Wind Energy Market 16 References Nzali, A & Mushi, S. Wind Energy Utilization in Tanzania, PREA Workshop DFIC - Dr. Fromme International Consulting, The Potential of Renewable Energies in East Africa Wind Energy. East African Business Council GTZ (2009): Business Guide Tansania, Eschborn. Risø National Laboratory/Danida: "Wind Measurements and Wind Power, Feasibility at Selected Sites in Tanzania, Draft Final Report, May Standardised Small Power Purchase Tariffs for Tanzania. Final Draft Report June Ferrey, Steven, Standardised Power Purchase Agreement for purchase of grid-connected capacity and associated electric energy between TANESCO and a small power project (revised draft). June 2007.

25

26 This publication is available free of charge as part of the public relations work of the Federal Ministry of Economics and Technology, and may not be sold. It may not be used by political parties or campaigners or electoral assistants during an election for the purposes of campaigning. In particular, it is forbidden to distribute this publication at campaign events or at information stands run by political parties or to insert, overprint, or affix partisan information or advertising. It is also forbidden to pass it on to third parties for the purposes of electoral campaigning. lrrespective of when, in what way, and in what quantity this publication reached the recipient, it may not be used even when an election is not approaching in a way that might be understood as suggesting a bias in the federal government in favour of individual political groupings.

Brief Overview of Renewable Energy Regulation in Tanzania

Brief Overview of Renewable Energy Regulation in Tanzania THE ENERGY AND WATER UTILITIES REGULATORY AUTHORITY (EWURA) Brief Overview of Renewable Energy Regulation in Tanzania Presentation by Anastas P. Mbawala Director of Electricity At the NARUC EWURA Mission

More information

Over-View of Electricity Regulation in Tanzania

Over-View of Electricity Regulation in Tanzania THE ENERGY AND WATER UTILITIES REGULATORY AUTHORITY (EWURA) Over-View of Electricity Regulation in Tanzania Presentation to the 1 st Partnership Exchange USAID/NARUC/East Africa Regional Regulatory Partnership

More information

Storage Solutions in Developing Countries A Case Study on the Market Potential for Battery Storage in Tanzania

Storage Solutions in Developing Countries A Case Study on the Market Potential for Battery Storage in Tanzania Storage Solutions in Developing Countries A Case Study on the Market Potential for Battery Storage in Tanzania Agenda 1 Energy supply in Tanzania 2 Battery storage technologies 3 Fields of application

More information

Costs of Renewables in Pacific Island Countries (PICs)

Costs of Renewables in Pacific Island Countries (PICs) IRENA Workshop Accelerated Renewable Energy Deployment in Islands with Emphasis on the Pacific Islands Costs of Renewables in Pacific Island Countries (PICs) Katerina Syngellakis Senior Engineer IT Power

More information

Success Factors for the Implementation of Mini Grids. Michael Franz, Project Manager, GIZ

Success Factors for the Implementation of Mini Grids. Michael Franz, Project Manager, GIZ Success Factors for the Implementation of Mini Grids Michael Franz, Project Manager, GIZ Berlin, 26 February 2013 Page 1 giz Service Portfolio for the Energy Sector Capacity development Technical and management

More information

NATIONAL ENERGY POLICY, 2015

NATIONAL ENERGY POLICY, 2015 UNITED REPUBLIC OF TANZANIA MINISTRY OF ENERGY AND MINERALS NATIONAL ENERGY POLICY, 2015 'ENERGY AND WATER UTILITIES REGUL-ATTI RY AUTHORITY (EWURA) 18 JUL 2016 L PUBLIC ACCESS REGISTRY Dar es Salaam December,

More information

ELECTRICITY PRICING IN TANZANIA

ELECTRICITY PRICING IN TANZANIA ELECTRICITY PRICING IN TANZANIA Felix Ngamlagosi Director of Regulatory Economics EWURA 10 13 SEPT. 2012 ELECTRICITY PRICING IN TANZANIA BACKGROUND TARIFF APPLICATION GUIDELINES 2009 CURRENT TARIFF SETTING

More information

Financing Renewable Energy Projects. Part I: Government Subsidies

Financing Renewable Energy Projects. Part I: Government Subsidies Financing Renewable Energy Projects Part I: Government Subsidies Part I: Government Subsidies Goals of Government Subsidies Renewable Portfolio Standards and Renewable Energy Certificates Illinois Renewable

More information

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA Rules on Initiation of Power Procurement and Review of Power Purchase Agreements Eng. Anastas Mbawala, EWURA 1 Overview of this Presentation Background on statutory powers and purpose of the Rules Description

More information

MONGOLIA COUNTRY PROFILE 88

MONGOLIA COUNTRY PROFILE 88 MONGOLIA COUNTRY PROFILE 88 Overview Mongolia has a GDP of USD 5,259 million lxvi and a population of approximately 2.61 million. lxvii The total primary energy supply in 2007 was 3.09 Mtoe (million tons

More information

Chapter 4. Introduction to the Toolkit

Chapter 4. Introduction to the Toolkit Chapter 1 Introduction to the Toolkit This table explains which sections of the Plan are completed in each chapter of the toolkit: Toolkit Chapters: Chapter 1 Chapter 2 Chapter 3 Chapter 4 Plan Section

More information

Policies and Initiatives For Renewable Energy Development and Investment in Ghana

Policies and Initiatives For Renewable Energy Development and Investment in Ghana AFRICAN RENEWABLE ENERGY FORUM CASABLANCA, 2017 Policies and Initiatives For Renewable Energy Development and Investment in Ghana By Dr. Robert Sogbadji Deputy Director, Clean Energy Ministry of Energy,

More information

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY Presentation to the Promoters of Renewable Energy Technologies Energy Regulation Board November 2015 CONTENTS 1. BACKGROUND 2. REFiT POLICY

More information

Independent Power Production Policy

Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy October 2015 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy

More information

Renewable energy: Investing in Africa

Renewable energy: Investing in Africa 1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission

More information

Bringing electricity to the rural areas: Designing Laws and Policies that work

Bringing electricity to the rural areas: Designing Laws and Policies that work Bringing electricity to the rural areas: Designing Laws and Policies that work By Hon.Umaru Lule Member of Parliament / Chairman Committee on Natural Resources Parliament of Uganda Contents Introduction

More information

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji Ministry of Economy Republic of Fiji Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji Pre-feasibility Study Results December 2017 Context of National Policy and Nationally

More information

Renewable Portfolio Standards

Renewable Portfolio Standards Renewable Portfolio Standards Lisa Schwartz Presentation to Oregon State University Energy Economics Class Feb. 22, 2010 The Regulatory Assistance Project China EU India United States About the Regulatory

More information

Renewable Energy and Poverty Reduction, Tanzania Case

Renewable Energy and Poverty Reduction, Tanzania Case Renewable Energy and Poverty Reduction, Tanzania Case Kick-Off Workshop on Low Carbon Development, 100% Renewable Energy and Poverty Reduction 25 th February 2016, Kunduchi Beach Hotel & Resort. Mary Swai,

More information

Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT

Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT 1 Introduction The demand for electricity in Vietnam is rising rapidly to power the growing economy and forecasts predict an annual growth rate for electricity

More information

IDCOL Renewable Energy Initiatives

IDCOL Renewable Energy Initiatives IDCOL Renewable Energy Initiatives Nazmul Haque Director & Head of Investment, IDCOL Nairobi, Kenya March 05, 2012 Contents Overview of IDCOL IDCOL Solar Home System Program IDCOL Biogas Program Other

More information

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Suite 2B, 08 Arnold Road, Rosebank, 2196, Johannesburg, South Africa Tel: +27 11 447 9852; Website: http://www.espcg.com Transaction advisory

More information

THE NEW LAW FOR RENEWABLE ENERGY SOURCES IN GREECE AND MEASURES FOR THE DEVELOPMENT OF PHOTOVOLTAIC APPLICATIONS IN THE COUNTRY

THE NEW LAW FOR RENEWABLE ENERGY SOURCES IN GREECE AND MEASURES FOR THE DEVELOPMENT OF PHOTOVOLTAIC APPLICATIONS IN THE COUNTRY THE NEW LAW FOR RENEWABLE ENERGY SOURCES IN GREECE AND MEASURES FOR THE DEVELOPMENT OF PHOTOVOLTAIC APPLICATIONS IN THE COUNTRY C Protogeropoulos CRES Centre for Renewable Energy Sources Department of

More information

Rural Electrification by Renewable Energy in Cambodia

Rural Electrification by Renewable Energy in Cambodia Capacity and Institutional Strengthening for Rural Electrification and Development-Decentralized Energy Options Rural Electrification by Renewable Energy in Cambodia Heng Kunleang Deputy Director Energy

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities Interim Country Partnership Strategy: Mongolia, 2014 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 1. Sector Performance, Problems, and Opportunities 1. Low energy efficiency and urban air pollution. Presently,

More information

STATUS OF CLEAN ENERGY DEVELOPMENT PROGRAMS IN GHANA

STATUS OF CLEAN ENERGY DEVELOPMENT PROGRAMS IN GHANA STATUS OF CLEAN ENERGY DEVELOPMENT PROGRAMS IN GHANA Presented by: NAME JULIUS K. KPEKPENA COUNTRY GHANA COUNTRY OVERVIEW RENEWABLE ENERGY EFFORTS KEY TECHNOLOGIES ENERGY EFFICIENCY COMPONENTS INCENTIVES

More information

THE GERMAN ENERGY TRANSITION BUSINESS OPPORTUNITIES FOR THE POWER AND ENERGY INDUSTRIES

THE GERMAN ENERGY TRANSITION BUSINESS OPPORTUNITIES FOR THE POWER AND ENERGY INDUSTRIES THE GERMAN ENERGY TRANSITION BUSINESS OPPORTUNITIES FOR THE POWER AND ENERGY INDUSTRIES FEBRUARY 2018 Claus Habermeier Germany Trade & Invest Who we are Foreign trade and inward investment agency of the

More information

Renewable Energy Research Laboratory

Renewable Energy Research Laboratory Policy Options for Renewable Energy Incentives: the View from Europe or What s with Feed-in Tariffs? Massachusetts Wind Working Group November 9, 2006 J. F. Manwell Overview Renewable energy in Europe

More information

Incentives to Increase Renewable Energy. Linda M. Wagner Senior Legal and Policy Advisor Illinois Commerce Commission

Incentives to Increase Renewable Energy. Linda M. Wagner Senior Legal and Policy Advisor Illinois Commerce Commission Incentives to Increase Renewable Energy Linda M. Wagner Senior Legal and Policy Advisor Illinois Commerce Commission August 13, 2013 Overview Generally, how to encourage renewable energy Specifically,

More information

Renewable Energy - A technology overview and the new Feed in Tariffs. Jos Mister Energy Saving Trust

Renewable Energy - A technology overview and the new Feed in Tariffs. Jos Mister Energy Saving Trust Renewable Energy - A technology overview and the new Feed in Tariffs Jos Mister Energy Saving Trust Overview Renewable Technology Overview Generating electricity Generating heat Feed in Tariffs Clean Energy

More information

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India WEST BENGAL ELECTRICITY REGULATORY COMMISSION Cogeneration and Generation of Electricity

More information

Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report

Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators Kenyan Country Report Bernard Osawa, Director Renewable Energy Energy Regulatory Commission, Kenya March 16 18, 2011

More information

Workshop on photovoltaics, grid Integration and funding of the next wave of PV expansion in Cyprus, 13 December 2016.

Workshop on photovoltaics, grid Integration and funding of the next wave of PV expansion in Cyprus, 13 December 2016. Workshop on photovoltaics, grid Integration and funding of the next wave of PV expansion in Cyprus, 13 December 2016 Cyprus PV Market Anthi Charalambous Head of Energy & Environment Division Cyprus Federation

More information

Indonesia update: Tariff framework for renewable energy

Indonesia update: Tariff framework for renewable energy September 2017 Indonesia update: Tariff framework for renewable energy In brief On 7 August 2017, the Ministry of Energy and Mineral Resources of the Republic of Indonesia ( MEMR ) enacted Regulation No.

More information

World Small Hydropower Development Report 2013

World Small Hydropower Development Report 2013 World Small Hydropower Development Report 2013 www.smallhydroworld.org KENYA Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small

More information

Status, Challenges and Forecast of the Philippines Wind Industry

Status, Challenges and Forecast of the Philippines Wind Industry Status, Challenges and Forecast of the Philippines Wind Industry MARIO C. MARASIGAN OIC Assistant Secretary Asian Clean Energy Forum 2016 June 6, 2016 ADB Headquarter, Mandaluyong City Department of Energy

More information

Country Action Plan-Proposed Outline

Country Action Plan-Proposed Outline e8-gef-undesa Financing Sustainable Electrification Africa Dialogues Nairobi, Kenya, April 13-15, 2010 Country Action Plan-Proposed Outline [Kenya] OVERVIEW Liberalization of the energy sector in 1996

More information

With the support of the PV Market Alliance. APVIA Q Market Report

With the support of the PV Market Alliance. APVIA Q Market Report With the support of the PV Market Alliance APVIA Q3 2017 Market Report Introduction Launched in 2017, this 3 rd edition of APVIA s quarterly PV market report focus on Brazil, anticipated to witness solid

More information

Community-Based Renewable Energy

Community-Based Renewable Energy Community-Based Renewable Energy This Act directs the state public utilities commission to set up a pilot program to encourage developing community-based renewable energy facilities. The Act permits the

More information

Green+ ELECTRICITY AUTHORITY OF CYPRUS. NER 300 European Program 2 nd call of proposals Zero Energy Mountains of Cyprus. Green

Green+ ELECTRICITY AUTHORITY OF CYPRUS. NER 300 European Program 2 nd call of proposals Zero Energy Mountains of Cyprus. Green ELECTRICITY AUTHORITY OF CYPRUS NER 300 European Program 2 nd call of proposals Zero Energy Mountains of Cyprus Green 1 About NER300 program About Green Project: Outline Green Project - General Overview

More information

POWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY

POWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY 20 POWER SYSTEMS RENEWABLE ENERGY SUSTAINABLE ENERGY The energy professionals The company intec in the world Power systems Power transmission & distribution Power network key competencies Thermal power

More information

Case Study: Lokoho Project, Madagascar

Case Study: Lokoho Project, Madagascar Session 2.1 RE Identification Case Study: Lokoho Project, Madagascar Pascale Bonzom (UNDP) / Sascha Thielmann (GTZ) Rural Electrification Workshop March 1-3, 2006 Nairobi Case Study: Lokoho Project, Madagascar

More information

Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States

Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States Regulation or Legislation Geographic Eligibility Reporting Period Banking Credit Multipliers Technology - Specific (set asides) NJ MD DC PA DE HB 1308 / SB 869 (2004) Bill 15-747 (4/12/2005) SB 1030/Act

More information

108+ MW Wind Energy Farm in NE Colorado In Logan County, Colorado

108+ MW Wind Energy Farm in NE Colorado In Logan County, Colorado 108+ MW Wind Energy Farm in NE Colorado In Logan County, Colorado Phase 1: $200,000,000 wind farm venture to produce 40 to 46 MW per year of clean renewable energy at roughly 6 cents per KW. Projection

More information

The Challenges and Opportunities of Sustainable Energy Finance. Eric Usher Energy Programme Officer UN Environment Programme

The Challenges and Opportunities of Sustainable Energy Finance. Eric Usher Energy Programme Officer UN Environment Programme The Challenges and Opportunities of Sustainable Energy Finance Eric Usher Energy Programme Officer UN Environment Programme 1 Energy investment presents both a challenge and an opportunity to financial

More information

TasNetworks Transformation Roadmap 2025

TasNetworks Transformation Roadmap 2025 DRAFT TasNetworks Transformation Roadmap 2025 JUNE 2017 Trusted by our customers to deliver today and create a better tomorrow 2 TasNetworks Transformation Roadmap 2025 June 2017 Purpose We deliver electricity

More information

IEA-DSM Task XVII: Country Report Austria

IEA-DSM Task XVII: Country Report Austria IEA-DSM Task XVII: Country Report Austria Matthias Stifter, arsenal research 30. April 2008 AUSTRIA Facts and Figures (2005) 1 Energy consumption in Austria Figure 1 depicts the evolution of gross domestic

More information

Renewable Power and Energy Efficiency: Policies in Iowa and Other States

Renewable Power and Energy Efficiency: Policies in Iowa and Other States Executive Summary Renewable Power and Energy Efficiency: Policies in Iowa and Other States Matthew D. Ritsema Mark A. Edelman Daniel M. Otto April 2003 A report for The Iowa Policy Project 318 2nd Avenue

More information

Renewable Energy Plan in Thailand Karnnalin Theerarattananoon

Renewable Energy Plan in Thailand Karnnalin Theerarattananoon Renewable Energy Plan in Thailand Karnnalin Theerarattananoon November 12, 2014 1 Content 1. Thailand s Energy Situation 2. Thailand s Energy Policy 3. Renewable Energy Development 2 Thailand s Energy

More information

The Brightness and Township Electrification Program in China. Prof. Ma Shenghong Beijing Jikedian Renewable Energy Development Center June.

The Brightness and Township Electrification Program in China. Prof. Ma Shenghong Beijing Jikedian Renewable Energy Development Center June. The Brightness and Township Electrification Program in China Prof. Ma Shenghong Beijing Jikedian Renewable Energy Development Center June. 2004 Background China is a developing country with about 70% rural

More information

BRAZIL - GENERAL DATA

BRAZIL - GENERAL DATA BRAZIL - GENERAL DATA - 2000 Area (km2): 8.5 million Population: 167 million GDP(US$): 594 billion Per capita Income (US$): 3 576 Brazil Electric Power Production: 343 TWh / year National Installed Capacity:

More information

German Energy Turnaround and KfW Promotion

German Energy Turnaround and KfW Promotion German Energy Turnaround and KfW Promotion India Germany Roundtable on Solar Rooftops New Delhi, February 18, 2016 Dr. Jürgen Welschof (juergen.welschof@kfw.de) Head of Division Energy South Asia, KfW

More information

100 Percent Renewable Electricity in Sri Lanka by 2050

100 Percent Renewable Electricity in Sri Lanka by 2050 100 Percent Renewable Electricity in Sri Lanka by 2050 A UNDP/ADB study Manila, 5 June 2017 Dr. Milou Beerepoot, Regional Technical Advisor, UNDP Outline Background to the study A scenario for 100% RE

More information

Germany: Energy Briefing

Germany: Energy Briefing Germany: Energy Briefing February 2014 Contents Introduction 01 1. Amended Remuneration 02 2. Compulsory Direct Marketing 03 3. Tender Procedures 04 4. Self Consumption, Support for 04 Energy Intensive

More information

Page 1. Pty Ltd. provides. Key points. The SRES. 30 June 2012; The price of just over $ which is. The STP. year the.

Page 1. Pty Ltd. provides. Key points. The SRES. 30 June 2012; The price of just over $ which is. The STP. year the. RESEARCH NOTE 2 Understanding the Small-scale Renewable Energy Scheme This Research Note has been prepared for r the REC Agents Association by Green Energy Markets Pty Ltd. This research note analyses

More information

Renewables: The True Costs. Michael Taylor and Eun Young So IRENA, Bonn, Germany 7 May 2015

Renewables: The True Costs. Michael Taylor and Eun Young So IRENA, Bonn, Germany 7 May 2015 Renewables: The True Costs Michael Taylor and Eun Young So IRENA, Bonn, Germany 7 May 2015 IRENA introduction Renewa ble energy c a n: Meet our goa ls for secure, reliable a nd sustainable energy Provid

More information

The Potential for Renewable Energy in India

The Potential for Renewable Energy in India The Potential for Renewable Energy in India - 2012 Disclaimer: All information contained in this report has been obtained from sources believed to be accurate by Gyan Research and Analytics (Gyan). While

More information

Evaluation of an Ongoing Projects 2007 Small Hydropower Promotion Project, Nepal

Evaluation of an Ongoing Projects 2007 Small Hydropower Promotion Project, Nepal Evaluation of an Ongoing Projects 2007 Small Hydropower Promotion Project, Nepal Short report Produced by: CEval Center for Evaluation, Saarbrücken This report was produced by independent external experts.

More information

P.C.Pant Ministry of New and Renewable Energy Trade Union Workshop on Climate Change

P.C.Pant Ministry of New and Renewable Energy Trade Union Workshop on Climate Change RENEWABLE ENERGY SECTOR IN INDIA P.C.Pant Ministry of New and Renewable Energy pcpant@nic.in 3/9/2012 1 Relevance of Renewable Energy Energy Resources availability Increasing world population and increased

More information

Exploring waste to energy opportunities. Thembakazi Mali Senior Manager: Clean Energy Solutions

Exploring waste to energy opportunities. Thembakazi Mali Senior Manager: Clean Energy Solutions Exploring waste to energy opportunities Thembakazi Mali Senior Manager: Clean Energy Solutions About SANEDI The National Energy Act, No. 34 of 2008 established the South African National Energy Development

More information

Design of feed-in tariffs in emerging economies and developing countries

Design of feed-in tariffs in emerging economies and developing countries Environmental Policy Research Centre Forschungsstelle für Umweltpolitik Design of feed-in tariffs in emerging economies and developing countries David Jacobs Baku, Azerbaijan, December 2009 Feed-in tariff

More information

VIETNAM GUIDE ON RENEWABLE ENERGY

VIETNAM GUIDE ON RENEWABLE ENERGY VIETNAM GUIDE ON RENEWABLE ENERGY 2017 FOREWORD Vietnam s power sector has been developing rapidly over the years with opportunities opening for renewable energy (i.e. Solar Energy and Wind Energy, although

More information

Tackling Tariff Design. Making distribution network costs work for consumers

Tackling Tariff Design. Making distribution network costs work for consumers Tackling Tariff Design Making distribution network costs work for consumers Contents Introduction 02 What s driving change? 05 Alternative tariff designs 07 Impacts on consumers bills 11 Reflections and

More information

Ing. Andrew T Barfour, FGhIE,FID Director/Project Coordinator GEDAP Ministry of Energy & Petroleum GHANA

Ing. Andrew T Barfour, FGhIE,FID Director/Project Coordinator GEDAP Ministry of Energy & Petroleum GHANA UNIVERSAL ACCESS TO ENERGY: Ghana s Rural Electrification A Case Study Ing. Andrew T Barfour, FGhIE,FID Director/Project Coordinator GEDAP Ministry of Energy & Petroleum GHANA PRESENTATION OUTLINE Overview

More information

Member State Perspectives

Member State Perspectives Member State Perspectives ENERGY SITUATION IN NEPAL Presenter : Sameer Ratna Shakya, Ministry of Energy (NEPAL) Energy Resources Hydropower Renewable (Alternative) Energy Mini & Micro Biomass Solar Wind

More information

Accelerating access to electricity in Africa with off-grid solar

Accelerating access to electricity in Africa with off-grid solar January 2016 Country Study Accelerating access to electricity in Africa with off-grid solar Off-grid solar country briefing: Ethiopia This country briefing is one of 13 prepared as part of a background

More information

Wind Power in Denmark. Steffen Nielsen Head of Section Danish Energy Authority Ministry of Climate and Energy

Wind Power in Denmark. Steffen Nielsen Head of Section Danish Energy Authority Ministry of Climate and Energy Wind Power in Denmark Steffen Nielsen Head of Section Danish Energy Authority Ministry of Climate and Energy Outline Status on wind power deployment and large scale integration Support system and consent

More information

Methodology for calculating subsidies to renewables

Methodology for calculating subsidies to renewables 1 Introduction Each of the World Energy Outlook scenarios envisages growth in the use of renewable energy sources over the Outlook period. World Energy Outlook 2012 includes estimates of the subsidies

More information

Published 2Q Meg Hendricks Industry Analyst. Clint Wheelock Managing Director. Renewable Energy Credit

Published 2Q Meg Hendricks Industry Analyst. Clint Wheelock Managing Director. Renewable Energy Credit Renewable Energy Credit EXECUTIVE SUMMARY: Renewable Energy Certificates Supply and Demand Dynamics, Policy Factors, Industry Issues and Challenges, and Key Players: Market Analysis and Forecasts Published

More information

Slide 1. The market for Public-Private Partnerships in Germany

Slide 1. The market for Public-Private Partnerships in Germany Slide 1 The market for Public-Private Partnerships in Germany Slide 2 What is PPP? Agreement on Planning + Building + Financing + Operation (+ Post-contract life) between public and private partners PPP

More information

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response Renewable Heat Incentive: proposals for a domestic scheme Community Housing Cymru Group response 1. About Us The Community Housing Cymru Group (CHC Group) is the representative body for housing associations

More information

CERTIFICATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS September 29, 2001

CERTIFICATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS September 29, 2001 CERTIFICATION OF OFF-GRID RENEWABLE ENERGY SYSTEMS September 29, 2001 Written by JP Ross, Consultant to Center for Resource Solutions Introduction The rate of dissemination of off-grid renewable energy

More information

Topic: Renewable Energy projects in Kazakhstan Opportunities and Challenges Speaker: Bagdat Oral

Topic: Renewable Energy projects in Kazakhstan Opportunities and Challenges Speaker: Bagdat Oral Topic: Renewable Energy projects in Kazakhstan Opportunities and Challenges Speaker: Bagdat Oral ЦАТЭК Green Energy LLP September 2016 info@cge.kz Introduction BEng in Thermal Engineering Almaty University

More information

Development of Renewable Energies in Tunisia

Development of Renewable Energies in Tunisia Development of Renewable Energies in Tunisia Mr. Mustapha EL HADDAD Introduction This article aims at highlighting development opportunities for renewable energies (RE) in Tunisia. It covers five RE sectors

More information

Oregon Renewable Energy Resources

Oregon Renewable Energy Resources Background Brief on September 2012 Inside this Brief Overview of Renewable Energy Renewable Portfolio Standard Energy Facility Siting Renewable Energy Legislation Staff and Agency Contacts State Capitol

More information

Solar PV Capacity Additions Forecast for PJM States:

Solar PV Capacity Additions Forecast for PJM States: IHS ENERGY: POWER, GAS, COAL, AND RENEWABLES Presentation Solar PV Capacity Additions Forecast for PJM States: 2017 32 27 October 2016 ihs.com Andy Lubershane, Associate Director Thomas Maslin, Associate

More information

YUKON S ENERGY CONTEXT

YUKON S ENERGY CONTEXT YUKON S ENERGY CONTEXT An overview of the territory s energy supply and demand, both renewable and non-renewable, for electricity, heating and transportation in the residential and commercial sectors.

More information

Bordei Verde. 8 MW Wind Park Romania.

Bordei Verde. 8 MW Wind Park Romania. Bordei Verde 8 MW Wind Park Romania www.globalwindpower.com Project introduction Project ownership: Global Wind Power Europe ApS Global Wind Power is proud to offer the wind turbine project Bordei Verde

More information

Exploring waste to energy opportunities. Thembakazi Mali Senior Manager: Clean Energy Solutions

Exploring waste to energy opportunities. Thembakazi Mali Senior Manager: Clean Energy Solutions Exploring waste to energy opportunities Thembakazi Mali Senior Manager: Clean Energy Solutions About SANEDI The National Energy Act, No. 34 of 2008 established the South African National Energy Development

More information

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( )

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( ) Thailand s Solar Energy Policy and New Alternative Energy Development Plan (2015-2036) Ms. Thidarat Sawai Bureau of solar energy development Department of Alternative Energy Development and Efficiency

More information

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1 Renewable Energy Development in Sri Lanka Opportunities and Challenges Ministry of Power and Energy Sri Lanka 01/12/2014 1 Overview Power Sector of Sri Lanka at a glance Renewable Energy Potential and

More information

Wind Energy Development for rural communities of color.

Wind Energy Development for rural communities of color. Wind Energy Development for rural communities of color. ENERGY DEMOCRACY USING Wind ENERGY Development Upepo Energy Group Paul Reeves Upepo Energy Group Agenda Introduction UPEPO What is Energy Democracy?

More information

Private Sector Participation in the Off-grid Market

Private Sector Participation in the Off-grid Market Private Sector Participation in the Off-grid Market Is the Mozambican Renewable Energy Sector Bankable? Emmett Costel Epsilon Energia Solar Director of Operations Epsilon Energia Solar (EES), is a company

More information

ENERGY AND WATER STATISTICS 2016

ENERGY AND WATER STATISTICS 2016 ENERGY AND WATER STATISTICS 216 Introduction This issue of Economic and Social Indicators presents Statistics on Energy and Water for the years 215 and 216. The statistics have been compiled in close collaboration

More information

Abstract. The renewable energy revolution

Abstract. The renewable energy revolution Pumped Hydro Energy Storage and the Renewable Energy Revolution Professor Andrew Blakers Australian National University Andrew.blakers@anu.edu.au Ph 02 6125 5905 September 2015 Abstract In Australia and

More information

Michael Sampson - June 21, Regulatory Challenges of Technical Innovation POWER SYSTEM TRANSFORMATION

Michael Sampson - June 21, Regulatory Challenges of Technical Innovation POWER SYSTEM TRANSFORMATION Michael Sampson - June 21, 2017 Regulatory Challenges of Technical Innovation POWER SYSTEM TRANSFORMATION Overview The Regulatory Challenges of Technical Innovation as seen on the Electric Power System

More information

Northumbria Research Link

Northumbria Research Link Northumbria Research Link Walker, S. L. et al. (2005) 'Potential for microgeneration : study and analysis'. London: DTI, with Energy Saving Trust, Element Energy and E- Connect This report is available

More information

Review of Solar PV Market Development in East Africa

Review of Solar PV Market Development in East Africa Downloaded from orbit.dtu.dk on: Jan 07, 2018 Review of Solar PV Market Development in East Africa Hansen, Ulrich Elmer; Pedersen, Mathilde Brix; Nygaard, Ivan Publication date: 2014 Document Version Publisher's

More information

Standardisation and Certification of Renewable Energy Projects

Standardisation and Certification of Renewable Energy Projects Standardisation and Certification of Renewable Energy Projects Dr. Klaus Rave Managing Director Investitionsbank Schleswig-Holstein Vice-President European Wind Energy Associaton Overview Investitionsbank

More information

UNDP/GEF Project Decentralized Renewable Energy Power Generation in Lebanon. UNDP/GEF Renewable Energy Portfolio Overview

UNDP/GEF Project Decentralized Renewable Energy Power Generation in Lebanon. UNDP/GEF Renewable Energy Portfolio Overview UNDP/GEF Project Decentralized Renewable Energy Power Generation in Lebanon UNDP/GEF Renewable Energy Portfolio Overview Lucas Black Regional Technical Advisor Energy, Infrastructure, Transport and Technology

More information

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5 CONTENTS 2. PROJECT DESCRIPTION 2-2 2.1 NEED FOR THE PROJECT 2 2 2.2 ABOUT THE PROPONENT 2 4 2.3 SITE SELECTION 2 4 2.4 OVERVIEW OF THE PROJECT 2 5 Figure 2.1: Provisional wind profile for the Jeffrey

More information

The White Certificate Scheme in New South Wales, Australia

The White Certificate Scheme in New South Wales, Australia The White Certificate Scheme in New South Wales, Australia Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA Demand Side Management Programme Task 14 Workshop on White Certificates

More information

Mini Grids. Opportunities for Rural Development in Africa

Mini Grids. Opportunities for Rural Development in Africa WORKSHOP ANNOUNCEMENT Mini Grids Opportunities for Rural Development in Africa 5 September 2013, Arusha, Tanzania On the occasion of the Africa Electrification Initiative (AEI) Workshop Low cost on-grid

More information

3.1. Spain Solar PV On-Grid and Off-Grid Cumulative Installed Capacity,

3.1. Spain Solar PV On-Grid and Off-Grid Cumulative Installed Capacity, TABLE OF CONTENTS 1. Spain Solar Photovoltaic (PV) Market Introduction 2. Spain Solar Feed-in Tariffs Present Status and Impact 3. Spain Solar PV Market Size, 2006-2010 3.1. Spain Solar PV On-Grid and

More information

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia Solar PV in ASEAN Challenges and Opportunities Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia ESI Workshop on the value of PV in Singapore 18 February 2016

More information

Renewable energy - the future is now

Renewable energy - the future is now University of Nevada, Las Vegas Digital Scholarship@UNLV UNLV Renewable Energy Symposium 2007 UNLV Energy Symposium Aug 15th, 9:00 AM - Jul 15th, 10:00 AM Renewable energy - the future is now Thomas Fair

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY The 2016 SD Electricity Supply Resource Procurement Plan The 2016 South Dakota Electricity Supply Resource Procurement Plan ( Plan ) evaluates NorthWestern Energy s ( NorthWestern

More information

RATE 665 RENEWABLE FEED-IN TARIFF

RATE 665 RENEWABLE FEED-IN TARIFF NORTHERN INDIANA PUBLIC SERVICE COMPANY Third Revised Sheet No. 104 Superseding Second Revised Sheet No. 104 TO WHOM AVAILABLE No. 1 of 11 Sheets This is a rate that is a voluntary offer available to any

More information

Medium voltage products. Technical Application Papers No. 17 Smart grids 1. Introduction

Medium voltage products. Technical Application Papers No. 17 Smart grids 1. Introduction Medium voltage products Technical Application Papers No. 17 Smart grids 1. Introduction Contents 2 1. Introduction 8 2 The different components and functions of a smart grid 8 2.1 Integration of distributed

More information

AFRICAN RENEWABLE ENERGY DIALOGUE THEME: RENEWABLE ENERGY FOR SUSTAINABLE DEVELOPMENT IN AFRICA

AFRICAN RENEWABLE ENERGY DIALOGUE THEME: RENEWABLE ENERGY FOR SUSTAINABLE DEVELOPMENT IN AFRICA AFRICAN RENEWABLE ENERGY DIALOGUE THEME: RENEWABLE ENERGY FOR SUSTAINABLE DEVELOPMENT IN AFRICA PROPOSALS FOR A RENEWABLE ENERGY- DRIVEN SOCIETY IN SIERRA LEONE: BY HON. PARAMOUNT CHIEF BAI KURR KANAGBARO

More information