1 4-1

2 4-2

3 Listed above are the major Learning Outcomes you will have achieved when this lesson is completed. 4-3

4 It is important to understand that there is Variability in constructing transportation projects. Our goal is to minimize Variability. The level of Quality of any material or product is associated with the level of Variability. 4-4

5 Quality Control and Verification sampling and testing are used to measure the quality of the constructed t product. The specific material properties which h are evaluated by QC and Verification sampling and testing are referred to as Quality Characteristics. Quality Characteristics which are specified are normally selected because they: -Relate to initial and long term Performance -Are quantifiable or measurable -Can be measured with good repeatability 4-5

6 Quality Characteristics for QC are selected because they are good indicators to monitor and control production against specification targets and limits. Quality Characteristics selected for QC contribute either directly or indirectly to the long term performance of the product. Shown above are some QC Quality Characteristics for Asphalt and Portland Cement concrete. 4-6

7 Quality Characteristics for Verification are selected because they directly relate to the long-term performance of the product. Shown above are some Verification Quality Characteristics for Asphalt and Portland Cement concrete. Are some quality characteristics more important than others? Typical Quality Characteristics Utilized for Acceptance Hot-Mix Asphalt (HMA) Asphalt Content (25% Pay factor) Air Voids (25% Pay factor) Portland Cement Concrete (PCC) Air Content Compressive Strength In-Place Density (35% Pay factor) % Passing #8 Sieve (5% Pay factor) % Passing #200 Sieve (10% Pay factor) Ride Quality 4-7

8 Variability exists in all construction materials. It is one of the key factors that is integral to Quality Assurance and must be understood. d Variability can be controlled but not eliminated. Construction materials, even under the best controlled production, can be expected to have some amount of variability. It is important to keep in mind, that each material has some inherent variability. 4-8

9 Variability- there are four primary sources of Variability in construction materials, those being: - Material Variability - Sampling Variability - Testing variability - Production and Placement 4-9

10 Materials variability is for the most part due to Mother Nature, in that the variation exists in the materials naturally. It is quite unrealistic to expect perfect homogeneity in any raw or processed source of construction materials. However, this variability is generally small when like materials are compared. 4-10

11 Sampling Variability is caused by variation that is in the sampling methods used. Even if the standard sampling procedures are followed, some amount of sampling variability will occur, because we are human. No two people will perform sampling identically. 4-11

12 Testing Variability is caused by variation that is in the testing methods and equipment. Even if the technician i carefully follows the standard d procedures, and the equipment is properly calibrated, there is some variability. Naturally, for both sampling and testing, should liberties be taken with altering the procedures or methods, regardless of how small, more variability has been introduced. Additionally, equipment that is not properly calibrated or properly functioning just adds to the list of variables. 4-12

13 Construction Variability is a result of the variations that occur in construction and production processes. Additional variables can be introduced through inconsistent production and construction methods. 4-13

14 Typical Quality Measures used in Quality Assurance Specifications are selected because they quantify the average quality, the variability, or both. Quality Measures that we will review are: The Mean The Range The Variance The Deviation The Standard Deviation The Percent Within Limits (PWL) For example, the Mean of all strength test results might be specified as the Quality Measure for a LOT of Portland Cement concrete. Or, the Percent Within Limits (PWL) of all in-place density test results might be used as the Quality Measure for earthwork densities. PWL is the Quality Measure that is most often recommended for use in Quality Assurance Specifications. 4-14

15 Specification Limits Are statistical limits that are applied to test results of multiple samples when evaluating the quality of a LOT using some Quality measure such as PWL. They are usually comprised of an Upper Specification Limit (USL), a Lower Specification Limit (LSL), or both. It is important to recognize that since these are statistical limits, individual sample test results may fall outside of the limits and still be included in the Acceptance determination. Engineering Limits Are sometimes used in conjunction with Specification Limits and sometimes not. As an example, strength test results for Portland Cement Concrete are typically evaluated using the Mean of three consecutive test results, but still requires that no individual test result falls below a specified Engineering Limit. There usually is an Upper Engineering g limit (UEL) andalower Engineering g Limit (LEL). Results falling outside these limits are generally considered below an acceptable level. Acceptance Limits Are limits that are placed on the Quality Measure (e.g. the minimum allowable PWL), not on the test values of samples for an individual Quality characteristic. While test values are evaluated with Specification and Engineering Limits, the actual computed quality level for a specific Quality Measure is evaluated against the Acceptance Limit. 4-15

16 The Mean coincides with the center or midpoint of a Normal Distribution Curve. Ideally, the Mean should be the Target Value for Quality Characteristics with an acceptance range. The mean target value needs to be above the minimum limit for pass/fail specifications. The Mean is denoted by an X with a bar over it (x), and is called x-bar. The Mean of a Statistical Sample is computed by adding all of the individual material sample test values (x i ) in the Statistical Sample and dividing the sum ( ) ofthose test values by the number of samples (n). Therefore: x = = x i X 1 + X 2 + X 3 +. n Where: x = Mean x i = Individual id test t value = Sum of all n = number of samples 4-16

17 In this example, 14 tests were performed on a project. The individual test values were recorded d and the Mean was computed as shown above. 4-17

18 The simplest measure of dispersion (i.e. Variability) which can be determined for asetof measurements or test values is the Range. The Range for a Statistical Sample (i.e. multiple samples) is computed as shown above; by subtracting the lowest sample value from the highest. Although it is a single, easy to determine measurement, its primary drawback is that it does not utilize all of the information (sample values) available in the statistical sample. Since the Range only accounts for the two extreme values, it provides no measure of the dispersion of the other values. It is often used in Control Chart applications. 4-18

19 Using the same 14 tests, the table above shows how the Range was determined. d 4-19

20 One simple measure used to express how much an individual id sample value varies from the Mean of a set of measurements or test values is referred to as a Deviation. This is simply calculated by subtracting the mean from the single sample value: Deviation = (x i x) Where: x = Mean x i = Individual test value = Sum of all n = number of samples 4-20

21 The variance is another mathematical measure of the spread or dispersion of sample values. Where the Range provides an indicator of the spread of test values from the highest to lowest, the Variance looks at the overall Deviation of values from the Mean. The Variance is denoted by the term s 2. The variance (s 2 ) of a distribution of sample test values is computed by squaring each Deviation from the Mean (x i - x) 2, adding these squares, and dividing their sum ( ) by the number of samples (n) minus one. Thus, the Variance provides an idea of how the results are scattered about the Mean. It can be used for comparing Contractor QC and Verification sample test results. Where: x = Mean x i = Individual test value = Sum of all n = number of samples s 2 = Variance 4-21

22 Using the same 14 tests, the table above shows how the Variance (s 2 )was determined. d 4-22

23 The Standard Deviation is another measure of spread or variation, and is derived from the Variance. It provides a measure of the average Deviation i of the individual id sample values from the Mean. The Standard Deviation of a Population is denoted by the symbol and the Standard Deviation of a Statistical Sample is denoted with by s. The Standard deviation(s) is computed by taking the square root of the Variance (s 2 ) of a distribution of sample test values. If the number (n) of samples that comprise the Statistical Sample is greater than 200, the Population Standard Deviation ( ) should be used. Please note that that the n denominator is different in the two calculations. Where: x = Mean x i = Individual test value = Sum of all n = number of samples s 2 = Variance s = Standard Deviation of Statistical Sample = Standard Deviation for Populations 4-23

24 Using the same 14 tests, the table above shows how the Standard Deviation (s) was determined. d 4-24

25 Quality Assurance type Specifications have pay adjustment procedures that are linked to the computed quality levell for each Quality Characteristics. i To compute the quality level, the Quality Level Analysis (QLA)- Standard Deviation method, is used. This mathematical procedure estimates the percentage of a LOT that is within the Specification Limits or PWL. Typically, the PWL for each Quality Characteristics is calculated using the Mean and Standard Deviation of the Acceptance sample test results for a given LOT of material. A specific Pay Factor is assigned for each PWL and this is subsequently applied to the LOT quantity and corresponding contract unit price to compute a pay adjustment. 4-25

26 A is more variable. Even though A s average would be on target, each data point varies greatly from the target. Why aren t the average values a good enough measure? 4-26

27 If these two data sets are for the same material, we would say that something is out of control. The two graphs have the same mean (average), but have different variability. We are interested in the cause of the variability. If it is inherent variability, then we cannot control it; it is a property of the material. WE NEED TO KNOW: WHAT IS ACCEPTABLE VARIABILITY FOR THIS PARTICULAR MATERIAL? 4-27

28 Target Values are based upon the Mean for a particular material. The upper and lower limits are established based upon a desired engineering value related to material performance. The mean needs to be above the lower Limit. Establishing Limits for QA Specs expect to achieve the desired result if measured data falls within the established limits of our target value 95% of the time. Establishing Limits for QA Specs expect to achieve the desired result if measured data falls within the established limits of our target value 95% of the time. 95% of Data 4-28

29 One of the key terms used in quantifying or measuring quality is Population. 4-29

30 In Quality Assurance Specification, the term LOT is used to represent a Population of material (e.g. HMA, PCC, Soils, etc.) which h is incorporated into the product. SSRBC sets forth the size of a LOT, by construction type and material. The LOT size is intended to represent material which is indeed from the same source and which has been produced and placed essentially under the same controlled conditions. For Example- Section 120- Excavation & Embankment- a LOT is a single lift of finished material not to exceed 500 feet in length, or a single run of pipe connecting two structures, whichever is less. On some very small projects, the Plans may define the LOT as the entire quantity of material produced and placed on that project. This is often referred to as Job- Mix Formula (JMF). Some drawbacks to the JMF approach are: -Material may be placed over an extended period (1-2 years) -The entire material may truly have not been produced and placed under the same conditions (changes in equipment, changes in weather, material source, etc.) LOT 500 feet 4-30

31 LOTs may be divided into smaller quantity amounts of uniform size, which are called sublots. 4,000 tons 1,000 tons 1,000 tons 1,000 tons 1,000 tons LOT 5 sublot 1 sublot 2 sublot 3 sublot

32 Shown above are the SSRBC LOT sizes for Asphalt, Concrete and Earthwork. 4-32

33 To measure a particular Quality Characteristic of a LOT or sublot, we could obtain a sample from every part of the LOT. For example- we want to test the compressive strength of 500 CY of PCC. We could test every yard, but then we wouldn t have much concrete left. This is called complete enumeration. Obviously, this is not practical or cost-effective, therefore we obtain a Statistical Sample. Statistical Samples are those samples obtained from a LOT which can provide information that may be used to quantity the quality of the entire LOT. 4-33

34 There are a variety of sample types that can be obtained when sampling LOTs. Biased Sampling- A sampling procedure whereby samples obtained from a LOT do not have an equal probability of being chosen. Representative Sample- a non-random sample which, in the opinion of the sampler, represents an average condition of a material or an item of construction. Uniform Interval Sampling- a non-random procedure in which samples are obtained at fixed intervals of material production or material quantity. Quota Sampling- a non-random procedure in which samples are obtained at the discretion and convenience of the sampler to satisfy the required number of samples for a LOT. Selective Sampling- a non-random procedure in which a sample is obtained only for informational purposes to guide Quality Control or Verification actions. Random Sampling- a sampling procedure where each sample is obtained from the LOT has an equal probability of being selected. For Asphalt, LOTs are divided into smaller quantity amounts of uniform size, which are called sublots. There are no sublots in FDOT earthwork construction and concrete. 4-34

35 Department Verification: The Engineer will conduct a Verification The Engineer will select test locations, including Station, Offset, and Lift, using a Random Number generator based on the Lots under consideration. Each Verification test evaluates all work represented by the Quality Control testing completedinthoselots. (All other specifications have similar language) To eliminate biased samples (both QC and Verification), Random Sampling is to be performed. Random sampling protects against known defects, unknown defects, cycles and patterns. It has a low inherent risk, low risk in unknown situations, and high reliability. Furthermore, it does not required a knowledgeable sampler (one who understands patterns, etc.) 4-35

36 Random sampling is just that, random. Every truck, lift, station has an equal chance of being selected. When you choose the location, truck, LOT, etc. based on what or where you want to sample or test, it is biased. For instance, if Verification always choose the 4 th LOT of 4 consecutive LOTs of earthwork for density testing, it would be considered biased. 4-36

37 LOTs are divided into sublots (for asphalt) to ensure that samples are not concentrated by the random numbers in one particular location. sublots allow for samples to be taken from within equal segments of the LOT. This is referred to as Stratified Random Sampling. This method is used to ensure that samples are obtained from throughout the LOT. 4-37

38 There are a variety of methods for determining Random sampling locations. It is important to determine which method the Engineer will be using, as the specifications require the Engineer to provide the Random Number generator. The QC Manager and their staff should be made aware of the system to be used in advance of construction and all parties agree. Example Random Number Generators: -ASTM D Standard Practice for Random Sampling of Construction Materials -Computer/calculator capable of generating random numbers -Throwing dice -Random Number Table created through software, such as MS Excel or proprietary software available for purchase. 4-38

39 This is the Random Number Chart FDOT. The following Random Number Chart and instructions can be obtained from the SMO website. The following pages have a full size of the chart and detailed instructions on its use. 4-39

40 er Chart FDOT om Numbe Rando 4-40

41 Random Number Sampling Plans A random number generator is to be used to help select random frequencies and locations for materials. Random number charts are published in a variety of publications and available on scientific calculators and computers. Other published random number charts and electronic generators are approved to use in order to generate a random sampling plan. Random Number Chart FDOT is published and available at the State Materials Office Web page. Asphalt plant and roadway quality control and verification sample random number locations are generated by the Composite Pay Factor worksheet. Suggestions for using Random Number Chart FDOT Determine the number of samples you plan on obtaining using the project documents. 1. Pick a number between 1 and 100. This is the row number you selected. 2. Pick another number between 1 and 7. This is the column number. 3. Enter the chart using the row and column numbers you selected. 4. Assign a unique random number from the chart for each sample you plan to obtain. You may go right to left, up or down, or left to right from the row and column you entered in step 3. If you come to a random number that does not generate a valid location for sampling, skip that number and move on to the next number in the sequence. 5. The random numbers can be used as a percentage or individual digits to select sample frequencies or locations. EXAMPLES Concrete Plan for a 230 cy placement with a sample frequency of 1 per lot, 50 cy lot size. Expect5 lots, 1 sample for each 50 cy lot. Pick 63 and 4 as row and column numbers to enter chart. Pick five numbers reading left to right. (0.1224, , , , ) Using the percentage method: Lot 1 : 50 cy x =6.12, select the truck at the 6 cy point Lot 2 : 50 cy x =6.57, select truck at the 57 cy point ( for Lot 1 = 57) Lot 3: 50 cy x =38.34, select truck at 138 cy point. ( for lots 1&2=138) Lot 4: 50 cy x =30.70, select truck at 181 cy point. ( for lots 1,2&3=181) Lot 5: 30 cy x =29.07, select truck at 229 cy point. ( for lots 1 thru 4 = 229) 4-41

42 Earthwork Stabilized Subgrade Contractor completes stabilization and compaction operations for a subgrade section of 1400 lineal feet with a width of 24 feet. Three Lots of stabilized subgrade. You plan for 3 density tests (1 location per Lot) and 9 stabilizing mixing depth (3 locations per Lot). Density locations: Pick 18 and 2 as row and column numbers to enter random number chart. Reading left to right: , , , , and Note 6 random numbers are selected as you need random distance locations from the beginning of the lot station and random width locations from the edge of the stabilized area. Lot 1: Length, 500 x = 320 Width, 24 x = 0.34 Select location 320 from beginning station of Lot 1 and 0.34 from the right side of the stabilized area. Lot 2: Length, 500 x Width, 24 x = 17.8 Select location 485 from beginning station of Lot 2 and 17.8 from the right side of the stabilized area Lot 3: Length, 400 x = 33 Width, 24 x = 13.5 Select location 33 from beginning station of Lot 3 and 13.5 from the right side of the stabilized area Mixing depth check locations can be selected in a similar manner using 3 locations per Lot. Tips : Enter the chart at a unique location each time it is used. Avoid starting at the top, (row 1, and column 1). And reading to the right like a book each for successive chart uses. Keep it simple! Close your eyes and point to a spot on the page to start if you can t decide which numbers between 1 and 100 or 1 and 7 are good starting points. Avoid the temptation to pick new random numbers just because you don t agree with the random selection. You can always use Independent verification ( IV) testing if the random selection is obviously missing an area of particular concern. Record all the test data for every test conducted. 4-42

43 Remember- Random sampling ensures that each specimen in a LOT has the same chance of being selected for the sample. Stratified random sampling additionally involves the selection of two or more defined sublots of a given LOT. Stratified random sampling is used to ensure that the specimens for the sample are obtained from throughout the LOT, and are not concentrated in one portion or sublot of the LOT. It is possible, but not likely, that in a LOT all of the random numbers could have us sampling in the morning: we avoid this through the use of sublots. 4-43

44 Chance Causes of variability are inherent to any method or process and must be expected. These were discussedd earlier in this chapter (i.e. sampling variability, testing variability, etc.). Assignable Causes are those that can be shown directly to cause a variation in the process (during this operation it was pouring rain, it was extremely cold during this phase, the equipment used in the placement process was changed, etc.). 4-44

45 Control Charts are useful tools for monitoring and ensuring the quality of a product or process. These can be used by the QC Manager as an aid in the Quality Control process and some of their uses include: -Early detection of trouble -Establishment Etblih tof process capability -Identify variability of production or process -Permanent record of quality Some of the benefits from their use include: -Decrease in overall product variability -Assist in achievement of higher pay adjustments - Instill a quality awareness 4-45

46 8 RUN CHART Test Number Individual Air Content 8 STATISTICAL CHART Test Number Mean Air Content 4-46

47 Run Charts plot individual material sample values (n=1) and check the measurements or test results against the Specification i Limits. i Targets for Run Charts are typically established by the Contractor for their process for a particular Quality Characteristic within the Specification Limits. The Target should coincide with either a know or assumed Mean process capability. For example, based upon the development of a specific mix design (Hot Mix Asphalt, Concrete, etc.) a Contractor or Producer would typically utilize the target value from the mix design as the target for the run chart. The limits are usually either the Specification limits and/or the Engineering Limits. (Engineering Limits are established based upon a desired engineering value related to material performance, such as 4% Air Voids in HMA) Shown above is a Run Chart illustrating the tracking of the percent passing the 300 µm Sieve. Notice the Percent Passing, the Quality characteristic being measure, is on the vertical axis and the sample number on the horizontal axis. Note this chart has both Upper and Lower Specification and Engineering Limits. 4-47

48 The case study presented here is a Run Chart used by Luck Stone Corporation at their Leesburg Plant. The chart is setup for individual tests for a No. 88 stone. The chart uses a combination of Specification Limits (5 to 30% passing) and plant process limits. For controlling the No. 88 stone, the No. 4 sieve is identified as the key sieve for measuring the effect of the change in the setup. Setups are the documentation required to measure every every change in stone control process. The setups contain data on the crusher settings required, the locations of the various screen sizes, the screen size and wire cloth screen size. In this case study, evidence is presented to show the impact of setup change on gradation by the shift in trends from one setup (#1-9) to another (#10-20).The setup change was necessitated by the material being coarser than desired, brought on by crusher liner wear. This was noticed by a plant technician who noticed a run of tests (#1-9) being on the Coarse side of the Target Mean. To compensate for this liner wear, the wire clothscreensizewas changed from ¼ cloth to 3/16 cloth, making the product finer. The change was effective as shown by Test #10 being slightly above the Target Mean. 4-48

49 Statistical Control Charts always use Subgroups of data rather than individual sample results. The minimum i Subgroup size is n=2 and typically is in the range of n=3 to 5. (A Subgroup is a predetermined number of samples whose Mean or Range are plotted on a Statistical Control Chart). There are three primary types of Statistical Charts that are typically used for transportation construction material Quality Control. X Chart (X Bar)- plots the Grand Mean of Subgroup Means based on the number of subgroups. R Chart- plots the Mean Range for the Subgroup Ranges based upon the number of subgroups. Moving Average Chart- plots a moving average for a predefined number of samples or subgroups. The X Bar and R Charts are the most widely used for the process control of construction materials and both must be used to estimate whether a process is in control. The X Bar chart is used to determine when the center (process Mean) changes and the R Chart is used to determine when the spread (process Variability) changes. 4-49

50 The key element of these charts is the proper designation of the Control Chart Limits, which may not be the same as those used for Acceptance. They are defined as: Action Limits; statistically derived boundaries applied to a Control Chart in controlling material production or placement. As shown above, these are expressed as Upper Control Limit (UCL) and the Lower Control Limit (LCL). When values of the material characteristics fall within these limits, the process is under control. When values fall outside the limits, there is an indication that some Assignable Cause is present causing the process to be out of control, such as the vibrator for the compactor broke. This chart relies on the fact that we may assume that the distribution of measurements surrounding the Mean value occurs within a ±3 Standard Deviations of the Mean. Therefore, think of it as a bell-shaped curve turned on its side, as shown above. 4-50

51 Examples: HMA LOT - 4,000 tons sublot - 1,000 tons Earthwork LOT - single lift of finished embankment not to exceed 500 linear feet PCC Class II Bridge Deck LOT is 50 CY or one day s production whichever is less 4-51

52 4-52

53 4-53

54 Now, lets look at some examples on how random sampling is used for each of the materials previously discussed. 4-54

55 Suppose a contractor s technician is to sample a bituminous mixture to obtain material for determination of AC content. The LOT size is 4,000 Tons and the sample consists of 3 split samples per 1,000 Ton sublot. If we assume that the LOT begins at the 12,000 th Ton, then we can use a random number table to select the Tons from which the samples will be taken and; therefore, we can determine from which truck to take our sample. 4-55

56 These random numbers are generated by an Excel spreadsheet. The spreadsheet dh tthen takes these numbers and performs the computations ti thatt determines which ton is sampled for each sublot. 4-56

57 Remember, the beginning tonnage of the LOT (sublot 1) was 12,000 tons and each sublot size was 1,000 tons. Therefore, the end of sublot 1 (beginning of sublot 2) would be tons, the end of sublot 2 (beginning of sublot 3) would be tons, the end of sublot 3 (beginning of sublot 4) would be tons, and the end of sublot 4 (end of the LOT) would be tons. 4-57

58 sublot tons x = tons Sample the th ton in the sublot Therefore, sample the ton overall sublot tons x = tons Sample the th toninthe sublot Therefore, sample the ton overall sublot tons x = tons Sample the th toninthe sublot Therefore, sample the ton overall sublot tons x = tons Sample the th toninthe sublot Therefore, sample the ton overall 4-58

59 Truck #?? contains the 740 th ton for sublot 1 Truck #?? contains the 600 th ton for sublot 2 Truck #?? contains the 10 th ton for sublot 3 Truck #?? contains the 270 th ton for sublot

60 Contractor takes random samples from each sublot that is each split into QC, VT, & RT samples. Then, the Department randomly selects one of the sublots for Verification (VT) testing. 4-60

61 4-61

62 4-62

63 4-63

64 4-64

65 4-65

66 4-66

67 These random numbers are generated by an Excel spreadsheet, random number table, or any other approved random number generator. 4-67

68 Remember, the beginning cubic yards of LOT 13 was 600 cy and each LOT size was 50 cy. Therefore, the end of LOT 13 (beginning of LOT 14) would be cy, the end of LOT 14 (beginning of LOT 15) would be cy, the end of LOT 15 (beginning of LOT 16) would be cy, and the end of LOT 16 would be cy. 4-68

69 LOT cy x = cy Sample the cy in the LOT Therefore, sample the CY overall LOT cy x = cy Sample the cy in the LOT Therefore, sample the CY overall LOT cy x = cy Sample the cy in the LOT Therefore, sample the CY overall LOT cy x = cy Sample the cy in the LOT Therefore, sample the CY overall 4-69

70 Truck #?? contains the 621 st CY for LOT 13 Truck #?? contains the 657 th CY for LOT 14 Truck #?? contains the 730 th CY for LOT 15 Truck #?? contains the 791 st CY for LOT 16 If Verification is going to test the same load then, QC technician casts one additional cylinder from the same sample, the QC hold cylinder 4-70

71 Verification randomly selects one of the 4 LOTs where QC obtained a sample and will independently perform plastic properties test and cast a set of cylinders from a separate sample from the same load of concrete as the Contractor s QC sample. Verification casts one additional hold cylinder from each sample. 4-71

72 Suppose a contractor s technician is to collect material to take to the lab for maximum density determination ti (Proctor). The maximum the LOT size can be is 500 ft, which is what we have here. The frequency of sampling is one per two consecutive LOTs (QC) and one per 8 consecutive LOTs (VT). If we assume that the LOTs in question begins at station and 13 RT of C/L Construction. Then the QC technician can use a random number table to select the stations and offsets from which the samples will be taken. 4-72

73 These random numbers are generated by an Excel spreadsheet, random number table, or any other approved random number generator. For this exercise in class, write in the Station and first Offset Random Numbers only. 4-73

74 Remember, the beginning station of the LOT 1 was and each LOT size was 500 feet. Therefore: LOT Beginning Station Ending Station

75 LOTs 1 & 2 Y 1000 feet x = feet (124+78) + = (Station) X 20 feet x = feet = C/L Const. LOTs 3 & 4 Y 1000 feet x = feet (134+78) + = (Station) X 20 feet x = feet = C/L Const. LOTs 5& 6 Y 1000 feet x = feet (144+78) + = (Station) X 20 feet x = feet = C/L Const. LOTs 7 & 8 Y 1000 feet x = feet (154+78) + = (Station) X 20 feet x = feet = C/L Const. Y 20 ft. X 1,000 ft. (2 LOTs) 4-75

76 QC obtains enough material to split into QC, VT, &RTsamples (3-way split). Then, the Verification technician randomly selects one of the 4 split samples for Verification (VT) testing. 4-76

77 4-77

78 4-78

79 NOTES 4-79

Mix Design Statistical Analysis Program Guidelines

Mix Design Statistical Analysis Program Guidelines Mix Design Statistical Analysis Program Guidelines INTRODUCTION The Concrete Ontario Technical Committee recently developed a mix design statistical analysis program to be implemented as a Standard Practice

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

Regional Engineers. Jack A. Elston

Regional Engineers. Jack A. Elston Regional Engineers Jack A. Elston Special Provision for Hot-Mix Asphalt Pay for Performance Using Percent Within Limits Jobsite Sampling April 20, 2018 This special provision was developed by the Bureau

More information

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure SECTION 100 General Conditions Add the following: 2016 ACHD Supplemental Specifications to the ISPWC Ada County Highway District Quality Control and Quality Assurance Procedure Definitions Quality Assurance

More information

CHAPTER 5 BLENDING AGGREGATES

CHAPTER 5 BLENDING AGGREGATES CHAPTER 5 BLENDING AGGREGATES A good asphalt concrete pavement requires more than asphalt, aggregates and equipment. It also requires knowledge, skill, and workmanship. Part of this knowledge and skill

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS March 2, 2015 806.01 Description 806.02 JMF Field Adjustments 806.03

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS ENGINEERING

MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS ENGINEERING Mn/DOT SD-15 (Rev. 2-2001) MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS ENGINEERING Federal Aid, State Funds, County and Municipal Federal Aid Projects This schedule outlines the minimum

More information

T-145 batch vs. Continuous. Technical Paper T-145. batch vs. continuous. by E. Gail Mize and Greg Renegar

T-145 batch vs. Continuous. Technical Paper T-145. batch vs. continuous. by E. Gail Mize and Greg Renegar T-145 batch vs. Continuous Technical Paper T-145 batch vs. continuous by E. Gail Mize and Greg Renegar ASTEC encourages its engineers and executives to author articles that will be of value to members

More information

4-07 Asphalt Treated Permeable Base (ATPB)

4-07 Asphalt Treated Permeable Base (ATPB) 1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course

More information

SPECIAL CONTROL CHARTS

SPECIAL CONTROL CHARTS INDUSTIAL ENGINEEING APPLICATIONS AND PACTICES: USES ENCYCLOPEDIA SPECIAL CONTOL CHATS A. Sermet Anagun, PhD STATEMENT OF THE POBLEM Statistical Process Control (SPC) is a powerful collection of problem-solving

More information

Asphalt Plant Level 1. Module 3 - Sampling Bituminous Paving Mixtures. Release 10 4/19/

Asphalt Plant Level 1. Module 3 - Sampling Bituminous Paving Mixtures. Release 10 4/19/ Release 10 4/19/2016 3-1 This module covers FM 1-T 168 Sampling Bituminous Paving Mixtures. Loose mix samples are obtained from the haul truck at the asphalt plant. These samples are used to prepare gyratory

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

OHD L-52. Aggregate Proportioning Guide for Optimized Gradation Concrete Mix Designs

OHD L-52. Aggregate Proportioning Guide for Optimized Gradation Concrete Mix Designs Aggregate Proportioning Guide for Optimized Gradation Concrete Mix Designs Oklahoma D.O.T. Page 1 of 7 General This guide covers procedures for developing a well-graded aggregate combination for use in

More information

HOT MIX ASPHALT PAVEMENT

HOT MIX ASPHALT PAVEMENT Section 700 - Hot Mix Asphalt Pavement HOT MIX ASPHALT PAVEMENT PART - GENERAL.0 SECTION INCLUDES A. Hot Mix Asphalt (HMA) Pavement B. Base Widening.0 DESCRIPTION OF WORK A. Includes the requirements for

More information

Minimum Sample and Test Requirements (MSTR)

Minimum Sample and Test Requirements (MSTR) Minimum Sample and Test Requirements (MSTR) 1. Asphalt Construction: General Notes: The Area Engineer must furnish representative samples of component mineral aggregate materials to the Bituminous Engineer

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PRE-QUALIFIED AGGREGATE SUPPLIER PROGRAM. April 18, 2008

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PRE-QUALIFIED AGGREGATE SUPPLIER PROGRAM. April 18, 2008 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PRE-QUALIFIED AGGREGATE SUPPLIER PROGRAM April 18, 2008 1069.01 Description 1069.02 Definitions 1069.03 General Pre-qualification Requirements

More information

Online Student Guide Types of Control Charts

Online Student Guide Types of Control Charts Online Student Guide Types of Control Charts OpusWorks 2016, All Rights Reserved 1 Table of Contents LEARNING OBJECTIVES... 4 INTRODUCTION... 4 DETECTION VS. PREVENTION... 5 CONTROL CHART UTILIZATION...

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION During the early 1960s, the Virginia Department of Transportation undertook a program to upgrade aggregate materials. The Department felt this was necessary since the highway construction

More information

OPTIMIZED 3/4" GRADATION LIGHTWEIGHT AGGREGATE REPORT

OPTIMIZED 3/4 GRADATION LIGHTWEIGHT AGGREGATE REPORT OPTIMIZED 3/4" GRADATION LIGHTWEIGHT AGGREGATE REPORT PREPARED BY: JODY WALL, P.E. DIRECTOR OF RESEARCH AND DEVELOPMENT CAROLINA STALITE COMPANY RESEARCH LAB GOLD HILL, NORTH CAROLINA Optimized 3/4" Gradation

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE CFS:JFS 1 of 28 APPR:TES:DBP:07-11-17 FHWA:APPR:07-13-17 a. Description. The Contractor

More information

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.

More information

Pilot Asphalt Specification Review Technician Duties. November 20 th, 2015 Chris Abadie Materials Engineer Administrator District 61 Conference Room

Pilot Asphalt Specification Review Technician Duties. November 20 th, 2015 Chris Abadie Materials Engineer Administrator District 61 Conference Room Pilot Asphalt Specification Review Technician Duties November 20 th, 2015 Chris Abadie Materials Engineer Administrator District 61 Conference Room Roadway Sampling Specification Mainline Roadway lot is

More information

Introduction to Asphalt Pavement Design and Specifications

Introduction to Asphalt Pavement Design and Specifications Introduction to Asphalt Pavement Design and Specifications Ensuring Good Performance in Flexible Pavement Design and Construction: accomplished through: 1. Proper structural (thickness) design for the

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Uwall UNIVERSAL CONSTRUCTION MANUAL

Uwall UNIVERSAL CONSTRUCTION MANUAL Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing

More information

APPENDIX D ANSWERS TO STUDY QUESTIONS/PROBLEMS

APPENDIX D ANSWERS TO STUDY QUESTIONS/PROBLEMS APPENDIX D ANSWERS TO STUDY QUESTIONS/PROBLEMS Chapter 2 Quality Assurance Program Questions 1. What determines the lot size for a specified material accepted under the Statistical QA Program? B. The discretion

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Measurement Systems Analysis

Measurement Systems Analysis Measurement Systems Analysis Components and Acceptance Criteria Rev: 11/06/2012 Purpose To understand key concepts of measurement systems analysis To understand potential sources of measurement error and

More information

MIDLAND COUNTY ROAD COMMISSION

MIDLAND COUNTY ROAD COMMISSION MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

The Cardiac Arrest of Hot Mix Asphalt Pavements

The Cardiac Arrest of Hot Mix Asphalt Pavements The Cardiac Arrest of Hot Mix Asphalt Pavements Timothy R. Murphy, P.E. President What Are You Really Going To Remember from this Convention? What will you really remember most about today? 70% of what

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Mix Design & Construction -1-

Mix Design & Construction -1- Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Performance Specifications What are they?

Performance Specifications What are they? Performance Specifications What are they? ALDOT Bureau of Materials and Tests Montgomery, Alabama Victor (Lee) Gallivan, P.E. Asphalt Pavement Engineer November 6, 2015 Performance Specifications for Rapid

More information

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc. 1 How to Select the Appropriate Pavement Rehabilitation Option David Rettner, PE American Engineering Testing, Inc. 2 Pavement Rehabilitation Selection Understanding the Problem 3 Pavement Assessment Pavement

More information

Aggregate Specifications

Aggregate Specifications Qualified Aggregate Technician Kentucky Specifications Aggregate Specifications State, FHWA, FAA, Contractor Kentucky Transportation Cabinet 107 Aggregate Size Designations Nominal Maximum Size The largest

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB 1.1 TESTING AND EVALUATION OF FINISHED PAVEMENT SURFACE SMOOTHNESS USING INTERNATIONAL ROUGHNESS INDEX (IRI) CRITERIA 1.1.1 General Contrary to the requirements of Specification 3.50, Asphalt Concrete

More information

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique

More information

Estimating Concrete Strength by the Maturity Method

Estimating Concrete Strength by the Maturity Method Estimating Concrete Strength by the Maturity Method The maturity method utilizes the principle that directly relates the strength of concrete to the cumulative temperature history of the concrete. Using

More information

Tolerances- Section

Tolerances- Section Tolerances- Section 346-6.4 Do not add water to delivered concrete when it is within the target Range for slump 1 346-6.4 Tolerances: Meet the following tolerances from target values for plastic concrete

More information

GETTING READY FOR DATA COLLECTION

GETTING READY FOR DATA COLLECTION 3 Chapter 7 Data Collection and Descriptive Statistics CHAPTER OBJECTIVES - STUDENTS SHOULD BE ABLE TO: Explain the steps in the data collection process. Construct a data collection form and code data

More information

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9 Proposed Special Provision for Description Section -0.1 is supplemented with the following: This Work shall consist of providing and placing one or more layers of plant-mixed porous hot mix asphalt (PHMA)

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

2.3. KT-3; Material Passing No. 200 (75µm) Sieve by the Wash Method

2.3. KT-3; Material Passing No. 200 (75µm) Sieve by the Wash Method 5.9.02 SIEVE ANALYSIS OF AGGREGATES (Kansas Test Method KT-2) 1. SCOPE This method of test covers procedures for the determination of the particle size distribution of aggregates using standard sieves.

More information

Statistics Quality: Control - Statistical Process Control and Using Control Charts

Statistics Quality: Control - Statistical Process Control and Using Control Charts Statistics Quality: Control - Statistical Process Control and Using Control Charts Processes Processing an application for admission to a university and deciding whether or not to admit the student. Reviewing

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

Construction Procedures

Construction Procedures Construction Procedures 2014 Rev. 1.6 1 Introduction This manual presents the methods and procedures necessary for the proper erection of a LOCK+LOAD retaining wall. problems later during the service life

More information

DESIGN OF BITUMINOUS MIXTURES

DESIGN OF BITUMINOUS MIXTURES Test Procedure for DESIGN OF BITUMINOUS MIXTURES TxDOT Designation: Tex-204-F Effective Date: August 2016 1. SCOPE 1.1 Use the methods in this procedure to determine the proper proportions of approved

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 Sheet 1 of 6 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 Delete SECTION 2501 and replace with the following: SECTION 2501 PART V 2501.1 GENERAL In

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

Recommended Specifications For Portland Cement Pervious Pavement

Recommended Specifications For Portland Cement Pervious Pavement Recommended Specifications For Portland Cement Pervious Pavement Foreword Portland Cement Pervious Concrete Pavements have become increasingly popular as a method to meet water quality water run off regulations

More information

Section 504. MICRO-SURFACING

Section 504. MICRO-SURFACING 504.01 Section 504. MICRO-SURFACING 504.01. Description. This work consists of preparing existing pavement and providing and placing a micro-surfacing mixture. 504.02. Materials. Provide materials in accordance

More information

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. SECTION 20.22 LEVELING COURSE Article 22.1 General The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. Article

More information

IN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc.

IN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc. 1 IN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc. Introduction The rising operating costs and declining commodity

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM T. C. NEEL and K.BOZKURT ABSTRACT This work shall consist of the design, manufacture

More information

Section 505. CHIP SEALS

Section 505. CHIP SEALS Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.

More information

SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION

SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01450 - QUALITY CONTROL - CONSTRUCTION MANAGER EDITION PART 1 - GENERAL 1.1 Summary: A Independent testing, inspection

More information

Prepaving Conferences

Prepaving Conferences Prepaving Conferences Presenters ODOT: Bob Townsend Assistant Project Manager The Dalles Construction Office Knife River: Tyrone Belgarde Project Superintendent Knife River Corporation-Northwest Prepaving

More information

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL SECTION 321200 - PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The Contractor for this work shall be held to have read all of the Bidding Requirements, the Proposal Forms, the General Conditions of

More information

GUIDE SCHEDULE OF SAMPLING & TESTING FOR DESIGN-BID-BUILD (DBB) PROJECTS MAY 2016

GUIDE SCHEDULE OF SAMPLING & TESTING FOR DESIGN-BID-BUILD (DBB) PROJECTS MAY 2016 GUIDE SCHEDULE OF SAMPLING & TESTING FOR DESIGN-BID-BUILD (DBB) PROJECTS MAY 2016 Using the Guide Schedule Research of sampling and testing rates listed for project tests in the following Guide Schedule

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

SUPERPAVE ASPHALT CONCRETE END PRODUCT SPECIFICATION (EPS)

SUPERPAVE ASPHALT CONCRETE END PRODUCT SPECIFICATION (EPS) SUPERPAVE ASPHALT CONCRETE END PRODUCT SPECIFICATION (EPS) 1.0 DESCRIPTION This item consists of supplying crushed aggregates, blending materials, anti-stripping agent, asphalt binder, production, loading,

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD)

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) 340.1. Description. Construct a pavement layer composed of a compacted, dense-graded mixture of aggregate and asphalt binder mixed hot in a mixing plant.

More information

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic

More information

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE Quality Assurance is not Quality Control Quality control is Contractors responsibility during construction. Quality Assurance

More information

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS The following list of Standard Documents defines the methods, materials, and testing to be utilized when designing and

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

Cold In-Place Recycling

Cold In-Place Recycling Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,

More information

CE 115 Introduction to Civil Engineering Graphics and Data Presentation Application in CE Materials

CE 115 Introduction to Civil Engineering Graphics and Data Presentation Application in CE Materials CE 115 Introduction to Civil Engineering Graphics and Data Presentation Application in CE Materials Dr. Fouad M. Bayomy, PE Professor of Civil Engineering University of Idaho Moscow, ID 83844-1022 Graphics

More information

Would You Like Concrete With Little or No Shrinkage, Cracking, and Curling??? We Will Focus on:

Would You Like Concrete With Little or No Shrinkage, Cracking, and Curling??? We Will Focus on: Would You Like Concrete With Little or No Shrinkage, Cracking, and Curling??? We Will Focus on: Coarse Aggregates Admixtures Including Shrinkage Reducing and Shrinkage Compensating Admixtures Evaporation

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

INDUSTRIAL ENGINEERING

INDUSTRIAL ENGINEERING 1 P a g e AND OPERATION RESEARCH 1 BREAK EVEN ANALYSIS Introduction 5 Costs involved in production 5 Assumptions 5 Break- Even Point 6 Plotting Break even chart 7 Margin of safety 9 Effect of parameters

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction (Section 02780) PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete

More information

Tex-121-E, Soil-Lime Testing

Tex-121-E, Soil-Lime Testing Overview Effective dates: August 1999 - July 2002. This method consists of two parts. 'Part I, Compressive Strength Test Methods (Laboratory Mixed)' determines the unconfined compressive strength as an

More information

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying AMVIC GEOFOAM products and execution. The specifier needs to edit the guide specifications to

More information

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH Presentation Outline General Introduction Part II Site Preparation & Earthwork Part III Base Courses

More information

MODULAR CONCRETE RETAINING WALL

MODULAR CONCRETE RETAINING WALL MODULAR CONCRETE RETAINING WALL PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing and construction of a KEYSTONE Retaining Wall System or equal in accordance with these specifications

More information

INSTALLATION GUIDELINES FOR MIRAFI FG & FGC

INSTALLATION GUIDELINES FOR MIRAFI FG & FGC INSTALLATION GUIDELINES FOR MIRAFI FG & FGC GENERAL This document is prepared to help ensure that Mirafi FG & FGC paving grids, once installed, will perform their intended design function. To function

More information