O I L S E A R C H L I M I T E D

Size: px
Start display at page:

Download "O I L S E A R C H L I M I T E D"

Transcription

1 O I L S E A R C H L I M I T E D 1 Oil Search Profile Established in Papua New Guinea (PNG) in 1929 Operates all of PNG s producing oil and gas fields. Current gross production ~33,500 boepd, net share ~18,500 boepd At December 2010, proven reserves were 337 mmboe, proven and probable 559 mmboe plus 318 mmboe 2C resources, taking 2P reserves and 2C resources to 877 mmboe PNG Government is largest shareholder with 15%. In early 2009, Govt issued exchangeable bond over shares to IPIC of Abu Dhabi 29% interest in PNG LNG Project, world scale LNG project operated by ExxonMobil. Project in construction, first LNG sales expected 2014 Exploration interests in PNG and Middle East/North Africa Market capitalisation ~US$8 billion. Listed on ASX (Share Code OSH) and POMSOX, plus ADR programme (Share Code OISHY) 2

2 Oil Search Locations Iraq Tunis Tunisia Sulaymaniyah Dubai Sana a Yemen Papua New Guinea Kutubu Ridge Camp Port Moresby (Head Office) Australia Brisbane Sydney 3 Key Oil and Gas Fields, PNG P nyang PPL260 Madang Hides LEGEND Wabag PRL3 PPL260 Juha 6 S Kiunga Hides Gas Conditioning PlantPRL02 Komo Airstrip Oil Field PDL8 PDL9 PPL239 Trapia PRL11 PDL1 APPL250 PDL6 PDL7 Angore PPL219 Prospect Mendi 233 Mananda 5 Kundiawa APPL249 PDL5 PPL233 Gas Field Mt. Hagan Oil Pipeline Kutubu, Agogo & Moran V. PDL2 Proposed Gas Pipeline PPL SE Mananda APPL386 PRL14 PNG LNG Project Gas Resources 7 S Non PNG LNG Gas Resources Gobe PDL4 338 PDL3 Kimu Barikewa PRL Major Lae Road Elk/Antelope 338 PRL08 PPL240 Kopi Wharf PPL338 Exploration Gas Resources Uramu PPL Gulf Onshore PRL10 PPL312 8 S Kerema 100km PPL276 Kumul Terminal PPL234 APPL385 PPL244 Gulf Offshore 9 S Daru PRL01 Pandora LNG Facility Port Moresby 143 E 144 E 145 E 146 E 147 E 4

3 OSH Strategies to Create Value Optimise current oil and gas production: Through improved efficiencies and pursuit of near field opportunities Maximise value of PNG LNG Project (T1 & T2): By utilising in-country knowledge to assist Operator Develop LNG and other gas expansion opportunities: Build gas resources for both PNG LNG expansion and standalone LNG project/s Measured programme of other growth options: Optimise exploration portfolio Ensure Oil Search s Sustainability: Operate business in transparent and sustainable manner to ensure long term operating stability and enhance social licence to operate 5 Strong Performance in 1H11 Production (mmboe) Oil Price (US$/bbl) US$m % 86% 83% NPAT* Operating cash flow EBITDAX Margin 83% % H H 11 *NPAT before significant items 1H 2011 NPAT increased by 117% to US$114.5 million Result driven by 53% increase in realised average oil price of US$ per barrel, more than offset 10% lower production of 3.56mmboe Cash operating margin stable against back drop of inflationary pressure in PNG coupled with adverse currency movements and declining volumes 6

4 World Class Safety Performance Total Recordable Injury Frequency Rate of 1.47 in 1H11 12 TRI / 1,000,000 Hours International Companies (OGP) Oil Search Australian Companies (APPEA) H Share Price Performance Aug Share price (rebased to OSH) Oil Search WTI oil Santos ASX 100 Woodside Jan 06 Jul 06 Jan 07 Jul 07 Jan 08 Jul 08 Jan 09 Jul 09 Jan 10 Jul 10 Jan 11 Jul 11

5 Treasury Update - 30 June 2011 US$1.23 billion in cash at end June Cash invested and actively managed with highly rated bank counterparties US$275.5 million available from term revolving facility, nil drawn down. Facility doesn t expire until 2013, will refinance prior to expiry No oil hedging undertaken during 1H11 or currently in place - realised earnings uplift from 2011 oil price recovery US$1.32 billion has been drawn down under the PNG LNG project finance facility 2011 interim dividend of two US cents per share to be fully underwritten via DRP 9 Liquidity US$mm Liquidity (cash plus undrawn bank debt) Outlook updated for first half cash generation, investment spend and forward prices Liquidity (including escrowed cash) at the end of 1H 2011 ~ $1.5 billion Company is well placed to meet existing commitments / base business plan with sufficient liquidity to deliver on strategic plan initiatives Key Assumptions: 1. Brent Forward curve pricing as at 1 July PNG LNG Project on schedule and budget 3. Includes T3 pre FEED costs 4. Production, operating costs and investment spend based on strategic review business plan 5. Existing oil facility refinanced 10

6 PNG LNG Project Overview 6 S Juha Facility C1 HGCP Hides Wells Wabag EPC4 Hides Gas Conditioning Plant Mendi Mt. Hagan Kundiawa Goroka EPC5B Komo Airfield Kutubu CPF Gobe PF Lae 7 S C1 South complete EPC5A Onshore pipeline and Infrastructure Kopi Wharf LEGEND Oil Field Gas Field Oil Pipeline 8 S EPC2 Offshore pipeline Kumul Terminal Kerema LNG Gas Pipeline Oil Facility LNG Facility 100km Major Road Daru C2 Complete 9 S 143 E 144 E 145 E 146 E EPC3 LNG Facility Port Moresby 147 E 11 PNG LNG Project Overview 6.6 MTPA, 2 train development, operated by ExxonMobil Over its 30-year life, PNG LNG expected to produce over 9 tcf of gas and 200+ million barrels of associated liquids Initial Equities: ExxonMobil % Oil Search % Kroton2 (PNG Government) -16.8% Santos % Nippon Oil - 4.7% MRDC (PNG Landowners) - 2.8% Fully contracted to Asian buyers, with continuing strong market interest Sinopec (China) ~2.0 MTPA TEPCO (Japan) ~ 1.8 MTPA Osaka Gas (Japan) ~1.5 MTPA CPC (Taiwan) ~ 1.2 MTPA 12

7 PNG LNG Project Overview Main EPC contractors: LNG Plant: Offshore Pipeline Hides Gas Plant Onshore Pipeline Infrastructure Early Works Associated Gas (OSH only) Chiyoda/JGC Saipem CBI/Clough JV Spiecapag McConnell Dowell/CCC JV Clough/Curtain JV Aker Solutions Different labour environment to Australian LNG projects Four-year construction period. First LNG sales expected 2014, capital cost US$15 billion 13 Milestones achieved in 1H 2011 Ground-breaking and pouring of first foundations at the LNG plant site Commencement of welding and burial of onshore pipeline, continued clearing and stringing of pipe along the route Construction of Caution Bay offshore pipeline support site Completion of training facilities at Juni in Highlands Continued early construction activities both in Highlands (incl. earthworks at Hides plant site and Komo airfield, road and bridge upgrades) and at PNG plant site near Port Moresby Ramp-up in PNG workforce and use of PNG suppliers. Total workforce at end June of 9,300, of which 6,600 were PNG nationals (71%) 14

8 Focus items for 2H 2011 Community engagement and downtime management Working with new Government to ensure continued alignment and delivery of obligations Wellpad and Hides spine road development First stage of Associated Gas project at CPF (successfully completed) Commencement of work on Kumul rejuvenation following completion of fabrication of new Single Point Mooring (SPM) for Kumul loading terminal Onshore pipeline installation Commencement of offshore pipelay Continued progress at LNG Plant site Rig mobilisation and arrival and site preparations Strong A$ 15 Timetable Continued early works Detailed design Order long leads and place purchase orders Open supply routes Contractor mobilisation Commence AG construction Complete AG Continue onshore pipe lay Complete offshore pipe lay Start Hides plant installation First Gas from Train 1, then Train Financial Close Ongoing procurement and mobilisation Airfield construction Drilling mobilisation Start offshore pipeline construction Onshore line clearing and laying Start LNG equipment installation Complete pipe lay Ongoing drilling Complete Hides plant Commission LNG plant with Kutubu gas 16

9 PNG LNG Project Onshore Pipeline Construction Kopi Scraper Station Pipeline stringing, onshore pipeline Completed Mubi River crossing PNG LNG Project Onshore Pipeline Construction 17 First weld Pipe Welding Pipe Lowering-in 18

10 PNG LNG Project Hides Conditioning Plant - Pioneer camp construction Drilling Rig Ribbon cutting ceremony, Houston Texas 19 PNG LNG Plant Site July 2011 February

11 PNG LNG Plant Construction Process pipe rack construction Marine jetty piling 21 Gas Growth and Exploration Key strategic priority for Oil Search is to grow gas business in PNG Pursuing two pronged strategy: PNG LNG Expansion Gulf Area LNG PNG near field oil exploration High graded exploration outside PNG 22

12 Drilling Programme Embarking on one of the largest drilling programmes ever undertaken, starting 4Q11 continuing through 2012, into 2013 Multi-TCF risked potential for gas and several hundred millions of barrels of oil potential Appraisal and development drilling Hides P nyang Kutubu, Moran and likely Mananda Exploration Trapia (PRL 11) Near field oil exploration Gulf Area drilling, subject to final seismic results Taza, Kurdistan Potential to underwrite continued gas commercialisation and short-medium term oil production 23 PNG LNG Expansion Integrated exploration and appraisal drilling programme in the Highlands Results by mid/late 2012 Upside in Associated Gas fields: Detailed evaluation ongoing by Oil Search Targeting alignment with PNG LNG Co-Venturers in 2012 Hides Gas Water Contact Well: Hides development drilling scheduled to commence in late 2011, Gas:Water Contact well planned early in drilling sequence Optimisation with logistics and construction (Komo and HGCP) P nyang and Trapia (formerly Huria) wells targeted for 4Q11 and 1Q12 spud respectively 24

13 PNG LNG Expansion P nyang PPL260 Hides Wabag Madang LEGEND 6 S PRL3 Juha PPL260 PDL9 PPL239 Hides Gas PRL02 Conditioning Plant Komo Airstrip Kiunga Mananda 5 PDL1 PDL7 PDL8 PRL11 PDL6 PPL V. PPL219 PDL2 APPL250 PDL5 Trapia Angore APPL249 Mendi Mt. Hagan Kundiawa Kutubu, Agogo & Moran Oil Field Gas Field Prospect Oil Pipeline Proposed Gas Pipeline PNG LNG Project Gas Resources 7 S Non PNG LNG Gas Resources Exploration Gas Resources Kimu SE Mananda 240 PRL08 PPL240 APPL386 PDL4 PDL3 PRL PRL14 Gobe 338 Barikewa 338 Elk/Antelope 338 Kopi Wharf PPL338 PPL Uramu PPL PRL10 Gulf Onshore Major Lae Road PPL312 8 S 100km PPL276 Kumul Terminal Kerema PPL234 APPL385 PPL244 Gulf Offshore 9 S Daru PRL01 Pandora LNG Facility Port Moresby 143 E 144 E 145 E 146 E 147 E PDL 1, PDL 7 and PDL 8 Hides & Angore 25 PDL 1 Hides Field 8 New Wells Drilling GTE PL 1 Hides GTE Plant Hides Nogoli Camp PDL 1 ExxonMobil Oil Search Santos PNG Govt Gas Resources Gigira Ltd.(L/O) PDL 7 ExxonMobil Oil Search PNG Govt Gas Resources Hides No.4 Ltd.(L/O) 36.81% 16.66% 24.03% 20.50% 2.00% 36.81% 40.69% 20.50% 2.00% PDL 8 ExxonMobil Oil Search PNG Govt Gas Resources Angore Ltd. (L/O) % 40.69% 20.50% 2.00% PDL 7 South Hides Hides Gas Conditioning Plant Construction 2012/13 10km PDL 8 Angore Field 2 New Wells 26

14 PNG LNG Expansion P nyang (PRL 3) ExxonMobil 49%, Oil Search 38.5%, JX Holdings 12.5% Appraisal well scheduled for 4Q11 Targeting southern fault block Aim is to move 3C to 2C and increase 1C resource Potential 2C of ~2 tcf P nyang 100km Hides Juha 6 S Angore Moran Agogo Kutubu SE Gobe 7 S 8 S Kumul Terminal 142 E 143 E 144 E 145 E 27 PNG LNG Expansion Juha 6 S Angore 7 S 8 S Hides PRL11 Moran Agogo Kutubu SE Gobe Kumul Terminal 10km Trapia 1 (PRL 11) Oil Search 52.5%, ExxonMobil affiliates 47.5% Exploration well scheduled for 1Q12 Series of prospects in area: Reasonable seismic but structural uncertainty remains Multi-tcf potential in area Partial dependency. Exploration potential remains in event of success or failure at Trapia 142 E 143 E 144 E 145 E 28

15 Gulf Area LNG Opportunity Gobe PPL260 PPL Multi-licence, multi play type, multi well opportunity being developed PPL338 2D Seismic Lines Elk/Antelope PPL 7 S Large, modern 3D seismic dataset acquired to unlock potential of Gulf Processing of data almost all complete and being interpreted. Results of initial interpretation are encouraging PPL276 PRL10 PPL312 Kumul Terminal PPL234 Uramu 8 S 2D onshore in PPL 338 and complete and being processed Rig options and timing being assessed 3D Seismic Regions Flinders PPL244 Long lead item procurement process commencing 9 S PRL01 Pandora 144 E 50km 145 E 146 E 29 Gulf Area LNG Opportunity Prospectivity: Targeting 4Q for initial assessment of prospectivity across all licences Final views by year end Partnering: Discussions initiated and ongoing with potential strategic farm-in partners Drilling: Planning ongoing: Well design commenced Long lead item procurement process commenced Site survey planning Rig selection and sourcing discussions ongoing Timing: Targeting Timing dependent on: Prospectivity Rig selection and availability Strategy selected Status of partnering discussions 30

16 Analogue Comparison Kokomo Prospect - Gulf of Papua vs. Sequoia Field - Nile Delta Channel Sands 6 km Kokomo Prospect Gulf of Papua, PNG Oil Search High Amplitude Anomalies Sediment flow-direction Sequoia Field Nile Delta, Offshore Egypt British Gas 9Tcf Kokomo Prospect Reservoir Lower Channel 31 L Amplitude H 6 km Map view of horizon slice 32

17 Kurdistan - Taza PSC PSC signed after exercising Option Agreement Oil Search entry as Operator in extremely active Kurdistan Region of Iraq Very prospective location adjacent to three fields Large, simple 4-way dip closure identified from 2010 seismic Well scheduled to spud in 1H12 Jambur Oil Field Pulkhana Oil Field Kor Mor Gas Field Taza Prospect 33 Tunisia 2010 seismic evaluation complete Large structures mapped Proven plays present and new deep gas play developed Prime prospect in Tajerouine permit has potential for >100 mmstb oil and >400 bcf gas Fiscal regime favourable Prospect sizes commercially attractive Exploration well in Tajerouine to be drilled in late 2012 ~10km 34

18 Oil Search Production Net Production (mmboe) MENA Hides GTE SE Mananda SE Gobe Gobe Main Moran Kutubu Production Outlook Production in 1H of 3.56 mmboe, solid performance with underlying production from oil fields generally consistent with expectations Gas injection well at Usano, UDT 13, drilled successfully. Providing support to key production well in Usano East IDT 25 development well successfully drilled in Kutubu Main Block Toro: Good indications of hydrocarbons in Toro reservoir Well deepened to exploration target in Koi Iange horizon, with hydrocarbon indications - will be flow tested in 4Q11 2H11 production will be impacted by: Two week shutdown for tie-in of Associated Gas facilities (successfully completed) Natural decline Repairs to HP compressor at APF Workover programme using the Hydraulic Workover Unit (HWU) underway at Gobe Full year estimate remains consistent with guidance ( mmboe) Production out to first LNG broadly flat, subject to success of work programmes 36

19 Near Field Exploration Detailed review of near field exploration potential in and around existing producing fields as part of 2010 strategic review More than 25 opportunities currently identified Potential: 125 mmboe net (approximately half oil, half gas) Higher risk than historical development drilling: Difficulty imaging Untested reservoir properties Complex geology Risk management: Integrating with existing pads and wells to reduce cost Fall back of safer, conventional proven targets Step wise approach, building out from known positions 37 Near Field Exploration Deeper targets e.g. Koi Iange Footwalls Forelimbs Focused on: Deeper Koi-Iange play: Potentially underlies all producing reservoirs Penetrated by IDT 25, due to be tested in 4Q 2011 Forelimb play: ADT 2 look alikes Currently drilling Hedinia 10 forelimb Agogo 6 well in 4Q Play extensions: Based on detailed remapping and 2011 seismic Potentially SE Mananda and Kube Kabe (north of Kutubu) Footwall targets: Hedinia, Moran, Mananda 38

20 2H11 Drilling Activity Hedinia Forelimb ST1 ST2 ST3 Agogo Forelimb Hedinia 10 targeted ADT2 lookalike forelimb structure under producing Hedinia field within Kutubu. Well found thin oil column in Toro reservoir, successfully proving structural model. Well now being sidetracked updip to appraise size of discovery Agogo 6 is follow-up to ADT2 targeting Agogo Toro forelimb and extent of Digimu forelimb 2011/12 Development & Near- Field Appraisal Drilling Activity 39 PRL02 PPL260 Hides 6 S PPL239 Juha PDL1 PRL 12 PRL12 PRL11 PPL233 Angore PDL6 PDL5 APPL350 Moran: 2012 : 1-2 wells Mananda 5 SE Mananda PPL219 PPL233 Kutubu: 2011 : 1 well, 1 workover Agogo: 2011 : 1 well 2012 : ±1 well PDL2 APPL386 Gobe Main: 2011 : 1 workover 7 S Usano: 2011 : 1 well, 1 workover 2012 : 1 well PPL240 SE Gobe: 2011 PPL240: 3-4 workovers PDL 4 PDL 3 PRL09 PDL 4 PRL14 Cobra Iehi Barikewa 50km Kimu PRL E 144 E 40

21 2H11 Focus Areas Maintain OSH s industry-leading safety performance in high activity environment Strong commitment to cost effectiveness PNG LNG Project commitments driving operational developments: Deliver the Associated Gas Project as planned Improved reliability and long term integrity Life extension programmes for facilities Upgrade of key systems and processes Enhanced development of personnel Continued focus on capturing additional in-field and near field reserve opportunities Mananda 5 Discovery 25 mmboe discovery, ~50:50 oil:gas Confirmed oil in Toro A, B & C Ambiguous in Imburu & Digimu Location application lodged with DPE 6 10'S 6 15'S ªk Mananda 2SMananda 3X Mananda 3XST1 µy Mananda 5 PPL 219 Potential Pipeline Route k Mananda 4X PPL ' MORAN PDL 6 PDL 5 SE Mananda 4SE Mananda 5 SE Mananda 2X SE Mananda 3 SE Mananda 1X ADT 'S AHT 1APF Km PPL 287 ADT ' 1 ADD %, 3 AHT 'E SE MANANDA 143 0'E 1 PDL 2 ª'1' APPL 350 NW Moran 1 Moran 14 Moran 13 Moran 12 ª'ª' Moran 14A Moran 12A Moran 6XMoran 9 ª' ' Moran 8 Moran 4X Moran 'E ª 1' ª' ª ' ª' ' AGOGO Subsurface, engineering and incountry issues evaluation ongoing Decision on development or further appraisal by end

22 PNG Operating Environment PNG has built enviable investment record of fiscal stability in resources sector over past 15 years Unprecedented investment now taking place in oil, gas and mining, encouraged by attractive fiscal policy and stability History of constructive dialogue between industry and Government to manage issues and expectations Anticipate that this will continue with new Government, led by Prime Minister Peter O Neill 43 PNG Operating Environment Rapidly changing economic and social landscape Changes in traditional tribal culture Increased expectations and opportunities Education and communications Focus on improving benefits distribution system, transparency and service delivery Strong support from landowner leaders and key institutions 44

23 Managing Operating Risk Oil Search has increased its focus on managing incountry issues Seen as key way to mitigate operating risk Expanded Sustainability Group is focusing on: Government/regulatory Promoting transparency Sovereign wealth funds Supporting benefits distribution process Providing support to PNG Government bodies, when appropriate Relationship building between Government, Landowners and other businesses Oil Search Health Foundation: Expanding the successful OSH model for health programmes to other areas of PNG Nominated as Principal Recipient for grants from The Global Fund to deliver HIV and malaria programmes 45 Summary Delivery of PNG LNG underway: Robust project Outside crowded Australian LNG space, conventional onshore gas, limited technical risks High quality Operator, making good progress towards first sales in 2014 Largest ever drilling programme Oil fields generating strong cash flows. Production impacted by associated gas construction in 2H, but expect production to remain flat in 2012/13 despite field maturity PNG challenging environment, increased focus on managing risk Balance sheet remains strong, ample liquidity to meet LNG obligations and to mature expansion activities 46

24 Appendix 2011 Full Year Guidance Summary 47 Production: mmboe Similar performance in 2012 and 2013, subject to success in planned work programmes Operating costs US$19-21/boe (incl corporate costs) Impacted by: Lower production volumes Major workover programme to maximise oil recoveries before gas production FOREX PNG inflation Associated Gas activities Sustainability initiatives Depreciation, depletion and amortisation: US$7-9/boe 48

25 2011 Capital Outlook Update US$ m Investing : Exploration inc gas growth PNG LNG Production Corporate (inc rigs) 1H H ,200-1, Financing : Dividends 0 * 0 * 0 * * Dividend fully underwritten 49 Other Key Players in PNG Talisman Equity Participation NGE & Interoil Equity Participation 6 S Juha Hides & Angore 6 S Juha Hides & Angore NGE Interoil Kutubu & Agogo Kutubu & Agogo Gobe Gobe 8 S 8 S 100km 142 E 146 E Port Moresby 100km 142 E 146 E Port Moresby 6 S 8 S Oil Search Equity Participation Juha Hides & Angore Kutubu & Agogo Gobe 100km Petroleum Licences Port Moresby 142 E 146 E Talisman and Sasol have significant acreage in Western Forelands. InterOil has strong position in Eastern Forelands OSH strategy focused on core PNG LNG Foldbelt acreage and Gulf - viewed as offering greatest potential for large gas discoveries 50

26 DISCLAIMER While every effort is made to provide accurate and complete information, Oil Search Limited does not warrant that the information in this presentation is free from errors or omissions or is suitable for its intended use. Subject to any terms implied by law which cannot be excluded, Oil Search Limited accepts no responsibility for any loss, damage, cost or expense (whether direct or indirect) incurred by you as a result of any error, omission or misrepresentation in information in this presentation. All information in this presentation is subject to change without notice. This presentation also contains forward-looking statements which are subject to particular risks associated with the oil and gas industry. Oil Search Limited believes there are reasonable grounds for the expectations on which the statements are based. However actual outcomes could differ materially due to a range of factors including oil and gas prices, demand for oil, currency fluctuations, drilling results, field performance, the timing of well work-overs and field development, reserves depletion, progress on gas commercialisation and fiscal and other government issues and approvals. 51

UBS UK Roadshow September 2014

UBS UK Roadshow September 2014 UBS UK Roadshow September 214 Oil Search Limited ARBN 55 79 868 214 First Half Highlights» PNG LNG Project start-up major milestone for Oil Search and PNG: Condensate production in March, LNG production

More information

O I L S E A R C H L I M I T E D

O I L S E A R C H L I M I T E D O I L S E A R C H L I M I T E D 1 Investor Field Trip 28 30 March 2011 OSH PARTICIPANTS Peter Botten Gerea Aopi Phil Bainbridge Phil Caldwell Richard Robinson Ann Diamant Managing Director EGM, External

More information

O I L S E A R C H L I M I T E D

O I L S E A R C H L I M I T E D 1 O I L S E A R C H L I M I T E D 2008 Full Year Results Agenda Introduction Performance Summary Financial Overview Operations Review Gas Commercialisation Operating at US40/bbl Outlook Brian Horwood Peter

More information

For personal use only

For personal use only O I L S E A R C H L I M I T E D 1 Changing Face of Oil Search PNG LNG Project over 85% complete (end April), material 20+ year cash flow stream approaching LNG expansion opportunities being matured, with

More information

Company Update March 2017

Company Update March 2017 Company Update March 2017 Oil Search Limited ARBN 055 079 868 ASX: OSH POMSoX: OSH US ADR: OISHY www.oilsearch.com DISCLAIMER While every effort is made to provide accurate and complete information, Oil

More information

For personal use only

For personal use only UBS Australasian Conference November 215 Oil Search Limited ARBN 55 79 868 ASX: OSH POMSoX: OSH US ADR: OISHY www.oilsearch.com Overview» Strong production from quality assets: PNG LNG Project capacity

More information

Oil Search Update - Projects & Initiatives

Oil Search Update - Projects & Initiatives Oil Search Update - Projects & Initiatives SEAAOC, August 2017 Oil Search Limited ARBN 055 079 868 Disclaimer While every effort is made to provide accurate and complete information, Oil Search Limited

More information

HORIZON OIL (HZN) PNG PETROLEUM AND ENERGY SUMMIT PRESENTATION

HORIZON OIL (HZN) PNG PETROLEUM AND ENERGY SUMMIT PRESENTATION Horizon Oil Limited ABN 51 009 799 455 Level 6, 134 William Street, Woolloomooloo NSW Australia 2011 Tel +61 2 9332 5000, Fax +61 2 9332 5050 www.horizonoil.com.au The Manager, Company Announcements ASX

More information

Santos lifts half-year net profit by 155% to $504 million. Underlying net profit up 12% to $236 million

Santos lifts half-year net profit by 155% to $504 million. Underlying net profit up 12% to $236 million Media enquiries Investor enquiries Matthew Doman Andrew Nairn +61 8 8116 5260 / +61 (0) 421 888 858 +61 8 8116 5314 / +61 (0) 437 166 497 matthew.doman@santos.com andrew.nairn@santos.com 19 August 2011

More information

LNG Opportunities. An Oil Search Perspective. PNG Chamber of Mines and Petroleum 28 November Oil Search Limited ARBN

LNG Opportunities. An Oil Search Perspective. PNG Chamber of Mines and Petroleum 28 November Oil Search Limited ARBN LNG Opportunities An Oil Search Perspective PNG Chamber of Mines and Petroleum 28 November 2017 Oil Search Limited ARBN 055 079 868 Strong long-term global LNG market fundamentals ASIAN DEMAND (MTPA) 364

More information

Investor Field Trip November 2016

Investor Field Trip November 2016 Investor Field Trip November 2016 Oil Search Limited ARBN 055 079 868 ASX: OSH POMSoX: OSH US ADR: OISHY Presentation Agenda Welcome PNG Production Gas Development Exploration Financial Overview & Strategy

More information

2014 Strategic Review

2014 Strategic Review 2014 Strategic Review Investor Seminar Oil Search Limited ARBN 055 079 868 Disclaimer While every effort is made to provide accurate and complete information, Oil Search Limited does not warrant that the

More information

The Sole Gas Project Project update: 8 September 2016

The Sole Gas Project Project update: 8 September 2016 The Sole Gas Project Project update: 8 September 2016 Important Notice Disclaimer and other information The information in this presentation: Is not an offer or recommendation to purchase or subscribe

More information

For personal use only

For personal use only PNG Company Number 1-63551 Corporate Update November, 2014 Slide 1 Disclaimer and Competent Person Disclaimer The information contained in this Company Update Presentation has been prepared in good faith

More information

Pryme Oil and Gas Building a World-Class Independent Oil & Gas Company. Australian Securities Exchange (ASX):PYM Presentation: March 2008

Pryme Oil and Gas Building a World-Class Independent Oil & Gas Company. Australian Securities Exchange (ASX):PYM Presentation: March 2008 Pryme Oil and Gas Building a World-Class Independent Oil & Gas Company Australian Securities Exchange (ASX):PYM Presentation: March 2008 1 What we do Explore, develop and produce oil and natural gas resources

More information

Cuba Block 9 Production Sharing Contract (Melbana Energy 100% # )

Cuba Block 9 Production Sharing Contract (Melbana Energy 100% # ) (Melbana Energy 100% # ) Overview of Block 9 PSC, Onshore Cuba Proven hydrocarbon system, on trend with the giant Varadero oil field The Cuba Block 9 Production Sharing Contract ( Block 9 PSC ), covers

More information

Large Scale Gas Projects Northern Territory, Queensland & PNG. Moyes & Co.

Large Scale Gas Projects Northern Territory, Queensland & PNG. Moyes & Co. Large Scale Gas Projects Northern Territory, Queensland & PNG! Large Scale Gas Projects - Australasia " Regional Activity SE East Asia, Australia Existing & Possible Northern Territory Gas Pipelines #

More information

ASX Small Mid Caps Conference Hong Kong

ASX Small Mid Caps Conference Hong Kong David Dix Executive Chairman 21 October 2010 ASX Small Mid Caps Conference Hong Kong ASX Small Mid caps Conference October, 2010 DISCLAIMER 2 Although appropriate care has been taken in the preparation

More information

The information in this presentation: Qualified petroleum reserves and resources evaluator. Rounding. Reserves and resources calculation

The information in this presentation: Qualified petroleum reserves and resources evaluator. Rounding. Reserves and resources calculation Orbost gas plant The information in this presentation: Is not an offer or recommendation to purchase or subscribe for shares in Cooper Energy Limited or to retain or sell any shares that are currently

More information

COMPANY PROFILE FOR. Workforce Group of Companies. Prepared by

COMPANY PROFILE FOR. Workforce Group of Companies. Prepared by COMPANY PROFILE FOR Prepared by Workforce Group of Companies Western International Oil & Gas Limited is 100% nationally owned company. The company Comprises of three (3) nationally owned companies that

More information

First appraisal wells brought online on the Western Surat Gas Project ahead of schedule, on budget and using local contractors

First appraisal wells brought online on the Western Surat Gas Project ahead of schedule, on budget and using local contractors ly Report Q2 FY17 2016 HIGHLIGHTS During the second quarter of FY17, Senex Energy (Senex, the Company, ASX:SXY) benefited from higher oil prices and met a major milestone on its flagship gas project (WSGP).

More information

ADX ASSETS & STRATEGY A PIVOTAL PERIOD AHEAD

ADX ASSETS & STRATEGY A PIVOTAL PERIOD AHEAD 121 OIL & GAS CONFERENCE 30 OCTOBER 2017, LONDON ADX ASSETS & STRATEGY A PIVOTAL PERIOD AHEAD A European focused appraisal and development company By Ian Tchacos www.adxenergy.com 1 DISCLAIMER This document

More information

For personal use only

For personal use only AWE Limited GOOD OIL CONFERENCE 14 September 2017 Perth, Western Australia DAVID BIGGS CEO and Managing Director Disclaimer Disclaimer This presentation may contain forward looking statements that are

More information

For personal use only. GLNG investor visit May 2013

For personal use only. GLNG investor visit May 2013 1 1 GLNG investor visit 22-23 May 2013 Disclaimer & important notice This presentation contains forward looking statements that are subject to risk factors associated with the oil and gas industry. It

More information

For personal use only

For personal use only Mermaid Marine Supply Base Mermaid Logistics Supply Base UBS Emerging Companies Conference 3 April 2012 Disclaimer This document contains general background information about the activities of Mermaid

More information

SECOND QUARTER REPORT FOR PERIOD ENDED 30 JUNE 2014

SECOND QUARTER REPORT FOR PERIOD ENDED 30 JUNE 2014 ASX Announcement Thursday, 17 July 2014 ASX: WPL OTC: WOPEY Woodside Petroleum Ltd. ACN 004 898 962 Woodside Plaza 240 St Georges Terrace Perth WA 6000 Australia www.woodside.com.au SECOND QUARTER REPORT

More information

Dana Gas Presentation to ADX Brokers. 26 June

Dana Gas Presentation to ADX Brokers. 26 June Dana Gas Presentation to ADX Brokers 26 June 2013 www.danagas.com 1 Disclaimer This presentation contains forward-looking statements which may be identified by their use of words like plans, expects, will,

More information

Flax Field Flax Field Major Growth Potential June 2012

Flax Field Flax Field Major Growth Potential June 2012 For personal use only Flax Field Flax Field Major Growth Potential June 2012 1 Flax Field Major Growth Potential Multiple large proven oil discoveries (Flax and Juniper) 100% owned and operated by Acer

More information

Yours faithfully SUN RESOURCES NL

Yours faithfully SUN RESOURCES NL ABN 69 009 196 810 (Incorporated in Western Australia) Unit 16 Subiaco Village 531 Hay Street, Subiaco WA 6008 PO Box 1786, West Perth WA 6872 T +61 8 9388 6501 F +61 8 9388 7991 28 January 2011 ASX Limited

More information

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information

Pryme Energy Limited ASX Code: PYM Turner Bayou Project Update and Investor Presentation

Pryme Energy Limited ASX Code: PYM Turner Bayou Project Update and Investor Presentation Pryme Energy Limited ASX Code: PYM Turner Bayou Project Update and Investor Presentation April 2012 Disclaimer, Forward Looking Statements and Competent Person Statement This presentation has been prepared

More information

Chevron Australasia Overview

Chevron Australasia Overview Chevron Australasia Overview Roy Krzywosinski, Managing Director June 2011 Cautionary Statement CAUTIONARY STATEMENTS RELEVANT TO FORWARD-LOOKING INFORMATION FOR THE PURPOSE OF SAFE HARBOR PROVISIONS OF

More information

ENGINEERING, PROCUREMENT & CONSTRUCTION MANAGEMENT

ENGINEERING, PROCUREMENT & CONSTRUCTION MANAGEMENT ENGINEERING, PROCUREMENT & CONSTRUCTION MANAGEMENT Petrofac Engineering & Production Services Petrofac at a glance Services for every stage of your project life cycle International oilfield services provider

More information

For personal use only

For personal use only ASX Announcement 21 August 2015 AWE upsizes onshore Perth Basin gross recoverable gas to over 700 Bcf Total gross 2P Reserves plus 2C Contingent Resources for Waitsia, Senecio, Irwin and Synaphea now 721

More information

Large Uncontracted Gas Reserves Excellent Market. Excellence in Oil and Gas

Large Uncontracted Gas Reserves Excellent Market. Excellence in Oil and Gas Large Uncontracted Gas Reserves Excellent Market Excellence in Oil and Gas March 2012 Disclaimer This presentation is being provided for the sole purpose of providing the recipients with background information

More information

June Quarter Q4 FY17. March Quarter Q3 FY17. Senex also released its Annual Reserves Statement to the ASX today, reporting:

June Quarter Q4 FY17. March Quarter Q3 FY17. Senex also released its Annual Reserves Statement to the ASX today, reporting: ly Report HIGHLIGHTS Senex Energy (Senex, the Company, ASX:SXY) made material progress on existing gas projects during the final quarter of FY17, and recently announced an oil discovery on the western

More information

ROYAL DUTCH SHELL PLC LEADER IN GLOBAL GAS

ROYAL DUTCH SHELL PLC LEADER IN GLOBAL GAS ROYAL DUTCH SHELL PLC LEADER IN GLOBAL GAS DEFINITIONS AND CAUTIONARY NOTE Resources: Our use of the term resources in this announcement includes quantities of oil and gas not yet classified as Securities

More information

Lakes Oil NL Annual General Meeting

Lakes Oil NL Annual General Meeting Lakes Oil NL Annual General Meeting 13 November 2017 Disclaimer This document is not a recommendation, offer or invitation by any person to any person to sell or apply for securities in the Company and

More information

Appendix A: Project Characteristics

Appendix A: Project Characteristics Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project

More information

LIQUEFIED NATURAL GAS LIMITED

LIQUEFIED NATURAL GAS LIMITED LIQUEFIED NATURAL GAS LIMITED ASX: LNG CNPC HQCEC: Company Making Transaction Liquefied Natural Gas Limited 5 Ord Street West Perth WA 6005 +61 8 9366 3700 www.lnglimited.com.au LNG Limited An Overview

More information

GLADSTONE TO JAPAN: EXPORT LNG PROJECT. December 2007

GLADSTONE TO JAPAN: EXPORT LNG PROJECT. December 2007 GLADSTONE TO JAPAN: EXPORT LNG PROJECT December 2007 Project Summary Sunshine Gas (SHG) and Sojitz Corporation (SOJITZ) formed relationship to combine upstream and downstream resource expertise to identify

More information

7 April Prospective resources in Indonesia

7 April Prospective resources in Indonesia 7 April 2016 Prospective resources in Indonesia New Zealand Oil & Gas are presenting at international farm-out conferences and will disclose prospective resources in its directly-held Indonesia interests.

More information

INVESTOR PRESENTATION UPDATE JUNE 2008

INVESTOR PRESENTATION UPDATE JUNE 2008 LEVEL 1, 47 COLIN STREET WEST PERTH WA 6005 AUSTRALIA PO BOX 1783 WEST PERTH WA 6872 TEL +61 8 9485 1000 FAX +61 8 9485 1060 Email info@tapoil.com.au www.tapoil.com.au 19 June 2008 The Company Announcements

More information

New Zealand Energy Corp.

New Zealand Energy Corp. New Zealand Energy Corp. Investor Business Update November 2016 CAUTIONARY NOTES FORWARD-LOOKING INFORMATION This document contains certain forward-looking information and forward-looking statements within

More information

The Unconventional Oil and Gas Market Outlook

The Unconventional Oil and Gas Market Outlook The Unconventional Oil and Gas Market Outlook The future of oil sands, shale gas, oil shale and coalbed methane Report Price: $2875 Publication Date: July 2010 E N E R G Y The Unconventional Oil and Gas

More information

PERFORMANCE SUMMARY SENEX ENERGY LIMITED ABN

PERFORMANCE SUMMARY SENEX ENERGY LIMITED ABN SENEX ENERGY LIMITED ABN 50 008 942 827 Registered Office Level 14, 144 Edward Street Brisbane Qld 4000 Postal Address GPO Box 2233 Brisbane Qld 4001 T +61 7 3837 9900 F +61 7 3837 9999 E info@senexenergy.com.au

More information

Eastern Australia Business Unit

Eastern Australia Business Unit Insert picture Eastern Australia Business Unit Cooper Basin Unconventional Gas Opportunities & Commercialisation November 2012 Disclaimer & important notice This presentation contains forward looking statements

More information

DTE Energy Barnett Shale Overview. April 6, 2006

DTE Energy Barnett Shale Overview. April 6, 2006 DTE Energy Barnett Shale Overview April 6, 2006 Safe Harbor Statement The information contained herein is as of the date of this presentation. DTE Energy expressly disclaims any current intention to update

More information

ASX / MEDIA ANNOUNCEMENT 5 March 2018

ASX / MEDIA ANNOUNCEMENT 5 March 2018 ASX / MEDIA ANNOUNCEMENT ASX: NCZ 5 March 2018 NEW CENTURY EXECUTES A$40M EPC CONTRACT WITH SEDGMAN FOR RESTART OF MINE & PORT AND SELECTS AUSENCO AS PREFERRED BIDDER FOR A$1.7M PIPELINE REFURBISHMENT

More information

Arrow Energy. Surat operational update. July 2016

Arrow Energy. Surat operational update. July 2016 Surat operational July 2016 Why we are here today Provide an to the community on Arrow s operational activities over the past 24 months Approval stages for the Surat Gas Project Upcoming survey activities

More information

Origin Energy 2011 Annual Reserves Report

Origin Energy 2011 Annual Reserves Report 28 July 2011 Origin Energy 2011 Annual Report This Annual Report provides an update on the hydrocarbon reserves of Origin Energy Limited ( Origin ) and its subsidiaries as at 30 June 2011. It provides

More information

Eastern Mediterranean

Eastern Mediterranean Eastern Mediterranean Rodney Cook SVP International Susan Cunningham SVP Exploration Eastern Mediterranean World-class potential Best-in-class Operating Reliability Leading Operated Position in the Levantine

More information

TEMPO AUSTRALIA INVESTOR PRESENTATION

TEMPO AUSTRALIA INVESTOR PRESENTATION TEMPO AUSTRALIA INVESTOR PRESENTATION ASX: TPP MAY 2016 DISCLAIMER AND FORWARD LOOKING STATEMENTS This Presentation is provided by Tempo Australia Ltd (the Company). You should not rely upon anything in

More information

Short Term Energy Outlook March 2011 March 8, 2011 Release

Short Term Energy Outlook March 2011 March 8, 2011 Release Short Term Energy Outlook March 2011 March 8, 2011 Release Highlights West Texas Intermediate (WTI) and other crude oil spot prices have risen about $15 per barrel since mid February partly in response

More information

9. STAKEHOLDER ENGAGEMENT

9. STAKEHOLDER ENGAGEMENT 9. STAKEHOLDER ENGAGEMENT This chapter describes the program of stakeholder engagement for the. It includes an overview of the consultation approach (Section 9.1, Overview), an outline of the regulatory

More information

STRATEGY UPDATE. Scott Cummins 28 September 2017

STRATEGY UPDATE. Scott Cummins 28 September 2017 Scott Cummins 28 September 2017 STRATEGIC HIGHLIGHTS Transformational Growth Strategy Reset, Stabilise, Consolidate, Grow New operating model and turnaround in performance Pursuit of operational excellence

More information

Alaska South Central LNG (SCLNG) Project

Alaska South Central LNG (SCLNG) Project Alaska South Central LNG (SCLNG) Project Overview for Alaska Legislators February, 2013 - Overview BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an Alaska LNG project:

More information

For personal use only Operations Update

For personal use only Operations Update 2016 Operations Update 1 Highlights 2016 is set to be an exciting year of delivery for Range Most active onshore work programme in Trinidad amongst independents Largest scale waterflood projects in recent

More information

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX November 2017 AGM Presentation DISCLAIMER General Disclaimer This presentation has been prepared by Metals X Limited ( Metals X or the Company ) for the

More information

Graphite India Limited

Graphite India Limited Earnings Release Earnings Release Earnings Release Earnings Release Earnings Release Graphite India Limited (NSE: GRAPHITE, BSE: 509488) Unaudited Standalone First Quarter Results for FY2013 August 03,

More information

For personal use only

For personal use only Sydney, Australia 7 March, 2011 Eastern Star Gas Limited (ASX:ESG & OTCQX:ESGLY) as CSG Operator of Joint Ventures in PELs 6, 427 & 428, located in northern NSW with Orion Petroleum Limited (ASX: OIP)

More information

PETROLEUM SECTOR DEVELOPMENT. Industrialization of the Sector in the country and its impact on long term national economy

PETROLEUM SECTOR DEVELOPMENT. Industrialization of the Sector in the country and its impact on long term national economy PETROLEUM SECTOR DEVELOPMENT Industrialization of the Sector in the country and its impact on long term national economy Presentation at KKFP Conference Dili, 27 October 2016 1 OUTLINE 1. Development of

More information

Armour Energy Limited 2 September 2015 Armour to Become a Significant Gas, LPG, Condensate and Oil Producer

Armour Energy Limited 2 September 2015 Armour to Become a Significant Gas, LPG, Condensate and Oil Producer Armour Energy Limited 2 September 2015 Armour to Become a Significant Gas, LPG, Condensate and Oil Producer on the Roma Shelf, Surat Basin, Queensland. Highlights: Armour executes agreements to acquire

More information

assets, growth and development strategies

assets, growth and development strategies assets, growth and development strategies leveraging first mover advantage Ebbie Haan, managing director, Sasol Petroleum International forward-looking statements Forward-looking statements: Sasol may,

More information

Trends, Issues and Market Changes for Crude Oil and Natural Gas

Trends, Issues and Market Changes for Crude Oil and Natural Gas Trends, Issues and Market Changes for Crude Oil and Natural Gas East Iberville Community Advisory Panel Meeting Syngenta September 26, 2012 Center for Energy Studies David E. Dismukes, Ph.D. Center for

More information

Our refining and chemicals facilities in Saudi Arabia some wholly owned, some ventures with global companies increase opportunities for domestic

Our refining and chemicals facilities in Saudi Arabia some wholly owned, some ventures with global companies increase opportunities for domestic Our refining and chemicals facilities in Saudi Arabia some wholly owned, some ventures with global companies increase opportunities for domestic conversion industries, manufacturers, and service providers,

More information

The Maari Growth Projects

The Maari Growth Projects The Maari Growth Projects Auckland, March 31, 2015 OMV New Zealand Ltd Presentation Structure Maari Location Development history Producing reservoirs Installed facilities Maari Growth Project Components

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

For personal use only

For personal use only Disclaimer This summary was prepared with due care and attention and is current at the date of the presentation. The proposed programs are generic and may differ from project to project. Actual programs

More information

For personal use only

For personal use only ASX / MEDIA RELEASE ASX Code: MEL 31 October 2011 QUARTERLY ACTIVITIES REPORT FIRST QUARTER ENDED 30 SEPTEMBER 2011 Highlights In August, Metgasco raised $21.55 million in new capital to progress the Company

More information

AGM Presentation and Strategy Update

AGM Presentation and Strategy Update AGM Presentation and Strategy Update RBR Group Limited () 29 November 2016 Business Snapshot Diversified labour services and training provider complementary businesses with retained exposure to resources

More information

LNG Impact on U.S. Domestic Natural Gas Markets

LNG Impact on U.S. Domestic Natural Gas Markets LNG Impact on U.S. Domestic Natural Gas Markets Disclaimer This presentation contains statements about future events and expectations that can be characterized as forward-looking statements, including,

More information

Gas in India Now Available. Sector Overview and Outlook: E&P, LNG, Pipelines and CGD. India Infrastructure Research.

Gas in India Now Available. Sector Overview and Outlook: E&P, LNG, Pipelines and CGD. India Infrastructure Research. Now Available Gas in India 2017 Sector Overview and Outlook: E&P, LNG, Pipelines and CGD Report (PDF) Data-set (Excel) India Infrastructure Research Gas in India 2017 Table of Contents 1. Executive Summary

More information

EXCO S PROJECT PIPELINE. Unlocking the Value

EXCO S PROJECT PIPELINE. Unlocking the Value EXCO S PROJECT PIPELINE Unlocking the Value EXCO RESOURCES N.L. 20 AUGUST 2010 Wholesale Investors Forum Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking

More information

Shell EP Americas. IPAA 75 th Annual Meeting. Raoul Restucci CEO, EP Americas

Shell EP Americas. IPAA 75 th Annual Meeting. Raoul Restucci CEO, EP Americas Shell EP Americas IPAA 75 th Annual Meeting Raoul Restucci CEO, EP Americas 26 October 2004 Disclaimer Disclaimer statement The following presentation contains forward-looking statements as defined in

More information

For personal use only. Cummins Range Rare Earths Project

For personal use only. Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

Anadarko LNG and China

Anadarko LNG and China Anadarko LNG and China Scott Moore Vice President Worldwide Marketing US-China Oil and Gas Industry Forum September 26, 2014 Regarding Forward-Looking Statements and Other Matters This presentation contains

More information

Streamlining. forecasting, planning and Reserves management for. oil and gas. corporations

Streamlining. forecasting, planning and Reserves management for. oil and gas. corporations Streamlining forecasting, planning and management for oil and gas corporations Optimise PRODUCTION MANAGEMENT process With demand for natural resources increasing worldwide, oil and gas companies must

More information

Liquefied Natural Gas.

Liquefied Natural Gas. Liquefied Natural Gas www.clough.com.au At a glance Clough is an engineering and project services contractor servicing the Energy & Chemical and Mining & Mineral markets in Australia and Papua New Guinea.

More information

The North American shale gas revolution of the past 10 years has. Natural Gas Briefs: Bradley Ritts is the managing

The North American shale gas revolution of the past 10 years has. Natural Gas Briefs: Bradley Ritts is the managing JANUARY 2017 As Japan moves toward a second pilot test of natural gas production from offshore methane hydrates during 2017, the Stanford Natural Gas Initiative examines the potential for this future natural

More information

Queensland LNG: Past, Present and Future

Queensland LNG: Past, Present and Future Queensland LNG: Past, Present and Future Dr Graeme Bethune Rick Wilkinson 15 November 2016 EnergyQuest Founded 2005 Energy strategy and analysis Graeme Bethune: CEO Susan Bethune: data collection and analysis

More information

8 th Annual Wyoming CO 2 Conference

8 th Annual Wyoming CO 2 Conference 8 th Annual Wyoming CO 2 Conference July 2014 Click About to Forward-Looking edit Master title style Statements The data contained in this presentation that are not historical facts are forward-looking

More information

GRADUATE AND VACATION EMPLOYMENT PROGRAM

GRADUATE AND VACATION EMPLOYMENT PROGRAM GRADUATE AND VACATION EMPLOYMENT PROGRAM CONTENTS Introducing Santos...1 Vision, strategy & values...2 Graduate program...3 Graduate development program...4 Employment benefits...6 Geoscience disciplines...7

More information

RESPONSE TO SHAREHOLDER RESOLUTION ON CLIMATE CHANGE 2015 AGM 19 MAY 2015 ROYAL DUTCH SHELL PLC

RESPONSE TO SHAREHOLDER RESOLUTION ON CLIMATE CHANGE 2015 AGM 19 MAY 2015 ROYAL DUTCH SHELL PLC RESPONSE TO SHAREHOLDER RESOLUTION ON CLIMATE CHANGE 2015 AGM 19 MAY 2015 ROYAL DUTCH SHELL PLC 1 DEFINITIONS & CAUTIONARY NOTE Reserves: Our use of the term reserves in this presentation means SEC proved

More information

ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016

ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016 ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016 Key Physical and Financial Parameters Iluka issued guidance on a range of parameters in its Key Physical and Financial Parameters of 19 February 2016).

More information

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011 Windimurra Vanadium Plant Project Update Investor Presentation August 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation

More information

Low-cost, rich, DRC copper

Low-cost, rich, DRC copper Low-cost, rich, DRC copper May 20, 2014 Brad Marwood, Managing Director Disclaimer Forward-Looking Statements This presentation contains forward-looking information, which is based on assumptions and judgments

More information

Medco Investment Strategy during Downturn Oil Era

Medco Investment Strategy during Downturn Oil Era Delivering Energy Medco Investment Strategy during Downturn Oil Era www.medcoenergi.com Hilmi Panigoro President Director of Medco Energi International SIEP Conference- Houston Texas, 19 November 2016

More information

RCR Investor Presentation. Managing Director & CEO: Dr Paul Dalgleish

RCR Investor Presentation. Managing Director & CEO: Dr Paul Dalgleish RCR Investor Presentation ASX Conference: New York & London Managing Director & CEO: Dr Paul Dalgleish 27 February 2014 1 Agenda Company Overview Highlights Delivering Returns to Shareholders RCR Business

More information

Floating LNG What are the key business development risks and mitigation strategies in a FLNG project?

Floating LNG What are the key business development risks and mitigation strategies in a FLNG project? Floating LNG 2013 What are the key business development risks and mitigation strategies in a FLNG project? What are the key challenges? What are some of the risk mitigation strategies? What are some of

More information

For personal use only

For personal use only Level 9, Marine Board Building 1 Franklin Wharf Hobart, Tasmania 7000 Attention: ASX Company Announcements Platform Lodgement of Market Briefing 20 August 2015 Tassal MD on FY15 results and evolution to

More information

The Transformation Continues

The Transformation Continues The Transformation Continues Jean-François Poupeau EVP Corporate Development and Communication UBS Global Oil & Gas Conference Austin, May 25, 2016 Safe Harbor This presentation contains forward-looking

More information

121 MINING INVESTMENT CONFERENCE HONG KONG

121 MINING INVESTMENT CONFERENCE HONG KONG ASX / MEDIA RELEASE 23 April 2018 121 MINING INVESTMENT CONFERENCE HONG KONG St George Mining Limited (ASX: SGQ) ( St George or the Company ) is participating at the 121 Mining Investment Conference in

More information

Woodside Energy: A Brief Overview

Woodside Energy: A Brief Overview Woodside Energy: A Brief Overview COQG Fall Meeting Crowne Plaza Riverwalk, San Antonio Bob Davis Principal Petroleum Systems Analyst 23 rd October 2008 Woodside s HQ Woodside Energy Ltd. Woodside Energy

More information

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Note to Investors This presentation contains certain forward-looking statements, including projected future

More information

AGM PRESENTATION NOV 2017 ASX: GLL

AGM PRESENTATION NOV 2017 ASX: GLL AGM PRESENTATION NOV 2017 ASX: GLL Company overview Brisbane based gas explorer (ASX:GLL). 100% owner of the 2 nd largest Contingent Gas Resource in Queensland (excluding the big 3 LNG exporters). Location

More information

CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014

CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014 FOUR NEW REPORTS LNG IN INDIA 2014 CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014 E&P IN OIL AND GAS 2014 Each report package will have three elements: Research Report (PDF) Presentation

More information

INTRODUCTION. Zakum Development Company (ZADCO) 2.11 ZADCO. Company. P r ofile ZADCO OPERATES THREE FIELDS

INTRODUCTION. Zakum Development Company (ZADCO) 2.11 ZADCO. Company. P r ofile ZADCO OPERATES THREE FIELDS Oil & Gas Directory Middle East - 2013 45 Zakum Development () INTRODUCTION ZAKUM Development () was established as per law No. 9 of 15th November, 1977, issued by the late Sheikh Zayed Bin Sultan Al-Nahyan.

More information