INTRODUCTION. Zakum Development Company (ZADCO) 2.11 ZADCO. Company. P r ofile ZADCO OPERATES THREE FIELDS

Size: px
Start display at page:

Download "INTRODUCTION. Zakum Development Company (ZADCO) 2.11 ZADCO. Company. P r ofile ZADCO OPERATES THREE FIELDS"

Transcription

1

2 Oil & Gas Directory Middle East Zakum Development () INTRODUCTION ZAKUM Development () was established as per law No. 9 of 15th November, 1977, issued by the late Sheikh Zayed Bin Sultan Al-Nahyan. mandate was to develop the Upper Zakum field on behalf of ADNOC for the benefit of the partners. today operates for the benefit of three shareholders in the joint venture, 60% to Abu Dhabi National Oil (ADNOC), ExxonMobil with 28% share and 12% to Japan Oil Development Ltd. (JODCO). As a result of a study made by ADNOC on the inter-related operations of the Upper Zakum, Umm Al-Dalkh and Satah fields, it was decided to merge the operations of Umm Al- Dalkh Development (UDECO) with in order to rationalize operations and minimize operating costs. This merger that officially took place on 1st April 1988, was a historical event and the first of its kind in Abu Dhabi oil industry. The exerted efforts that accompanied the launching of for the development of Upper Zakum Field in Nov were fully successful as evidence through the first crude oil shipment exported from Zirku Island on "Al Ain" tanker on 24th May, The above event was a sufficient reason for pride and boasting that the efforts made through the past years yielded its fruits to place as one of the leading oil producers in the world. The success of production from Upper Zakum field and reservoirs bolstered 's position, capabilities and qualifications to handle further tasks within the scope of development and production of oil from Umm Al-Dalkh and Satah fields. OPERATES THREE FIELDS Upper Zakum Field Oil was discovered in Zakum field, extending around 1200 square Kilometers, in 1963 in the deep waters of the Arabian Gulf 84 Kms. north west of Abu Dhabi. Through wellhead platforms, oil is pumped to the main collection platforms (satellites), then to the central complex where it is pumped to Zirku Island at 56 Kms. through 42 inch main pipeline for treatment, storage and export. During the past few years, executed several projects for the development of Upper Zakum field to maximize production rates. The Central Complex is deemed as one of the biggest offshore structures in the world (375 x 46 meters) designed for gas separation, treatment and pressuring of gas, generating power for the complex and the central platforms in addition to providing various living facilities through two accommodation platforms with supporting facilities.. Umm Al-Dalkh field Umm Al-Dalkh field is located 25 Kms. north west of Abu Dhabi and covers an area of 168 square Kilometers. The field is composed of two separated domes where the layers carrying oil are located in the upper formation at the depth of 7700 feet at 235 feet thickness. The process of operations in this field took several years beginning from the oil discovery in 1969, through field development followed by oil production in 1985 and finally the merger of UDECO with in Umm Al-Dalkh central complex is connected with the central complex of Upper Zakum field by 66 Kms. 14 inch main line where both oil are mixed and pumped to Zirku Island through 42 inch main pipe line. Satah Field Satah field with an area of 35 square Kilometers is located 200 Kms. north west of Abu Dhabi. This field, with its dome formation was discovered in 1975 and its production began in July Oil from Satah field is pumped to Zirku Island through 58 Kms. 14 inch pipeline.

3 46 Oil & Gas Directory Middle East OPERATIONS CENTERS Zirku Island Since 24th May 1983, when the first shipment of oil was exported from Zirku Island; operations base, it went through to become to what it stands now as a major center for oil and gas operations for the three offshore fields of. Zirku Island is located approx. 140 Kms. north west of Abu Dhabi and 56 Kms. from Upper Zakum field. The Island contains all subsistence facilities for the staff living. The Island also witnessed continuous plans of landscaping and tree growing reflecting our consistent drive for the protection of environment and people thus fostering sense of safe living among factories, plants and other oil installations. Crude oil is pumped to oil tankers docked at the loading terminals through two 16 Kms. 48 inch lines extended through the sea. Zirku Island witnessed several projects contributing to its industrial infrastructure and upgrading its capacity. In addition, the Island also witnessed several civil projects related to landscaping and other living and recreational facilities. Arzanah Island In 1994, was vested with the task of managing the operations of Arzanah island located 180 Kms. north west of Abu Dhabi. The Island is connected with other 's systems with the availability of water and gas injection plant. It has a modern housing complex provided with all living facilities to cater for about 100 employees. PEOPLE AND FACILITIES IN A SAFE ENVIRONMENT With the gears of operations moving in all directions, was able to achieve its established targets for the safety of personnel, plants and preserving a clean environment. No operation with such a huge size witnessed by 's offshore sites went on with any single accident, thanks to the firm awareness, continuous training and full compliance with the health, safety and measures/standards environment that enabled the to avoid risks. as turtles. A large number of local and migrating birds such as pelicans, cormorents and sea birds also found safe shelter in both Zirku and Arzanah Islands. Perhaps one of the most perspective reflecting the clean environment of at the operations sites is the success of planting (Mangrove) trees which was performed in cooperation with the Environmental and Wildlife Research Agency (ERWDA) (Now Environment Agency - Abu Dhabi) and Japan Oil Development (JODCO) for the best interest of the area due to the various benefits of such trees. Hundreds of palm trees are being planted every year in Zirku Island contributing not to preserve the natural environment on the Island, but to enhance it where it has become a safe shelter for nesting and attracting several kinds of local and migrant birds. The artificial islands concept: In collaboration with ExxonMobil, is developing four artificial islands at Upper Zakum field. These based drilling and production centers were evaluated and found to be an attractive forward development plan. To support this concept, 's own drilling division was established and high-technology extended-reach drilling (ERD) was employed. The use of Maximum Reservoir Contact (MRC) technology, offers the opportunity to reduce the required number of new wells and unlock tighter areas in the reservoir. Advantages of using artificial islands Artificial islands provide a more flexible and robust development base for the redevelopment of the Upper Zakum field. This will significantly reduce life-cycle development costs and enable long term maximum recovery levels to be achieved. The 'green fields' development on islands accelerates oil development rate, is safer and more capital efficient. Gas lift application on the islands will be much easier than from WHPT and will help improve long term reservoir recovery. The current development plan has the potential to extend the production plateau for more than 15 years and significantly delay the need for full field EOR / WAG application and investment. managed to achieve a bright record in the field of safety marked with distinguished performance in all areas of business. In a study for establishing the basis of environment protection as adopted by the, the results concluded by such study indicated that the environment conditions within the 's operations area are far better than expected as reflected by a variety of marine-creatures at the sea bed such COMPANY ADDRESS: ZAKUM DEVELOPMENT COMPANY () Sheikh Khalifa Energy Complex, P.O. Box 46808, Abu Dhabi, U.A.E. Tel: , Fax: publicrelations@zadco.ae Website:

4 Oil & Gas Directory Middle East SIGNIFICANT DATES 1963 Oil discovered in Upper Zakum field 1969 Oil discovered in Umm Al-Dalkh field 1975 Oil discovered in Satah field 1977 established as per Law No. 9 of UDECO established as per Law No. 15 of first crude oil shipment exported from Zirku Island 1985 Oil production started from Umm Al-Dalkh field 1987 Oil production started in Satah field 1988 Amalgamation of UDECO operations with 1994 Assignment of Arzanah Island operations to 1994 Completion of Tank No. 6 in Zirku Island raising the storage capacity to six million barrels 1998 Headquarters moved to Sheikh Khalifa Energy Complex on Abu Dhabi Corniche 2000 reorganization in Business Units 2001 Launching of Health, Safety and Environment Management Systems (HSEMS) th crude oil shipment exported from Zirku Island 2005 achieved the ISO Certification 2006 ExxonMobil joined ADNOC and JODCO as shareholder in the Upper Zakum Field Development 2006 achieved the OHSAS Certification th crude oil shipment exported fom Zirku Island 2007 achieved ADNOC HSE Award - Environment th Anniversary of 2008 achieved two of ADNOC 2007 HSE Awards - Categories: Safety and Special Recognition 2008 achieved the ISO Certification 2008 Launching of UZWO - Organisation 2009 Completion of 4 billion barrels export 2009 achieved the ADNOC 2008 HSE Award - Categories: Safety & Performance 2010 Launching of UZ750 Project to elevate Upper Zakum production to 750 MBOPD by 2015 using the Artificial Islands Solution 2011 achieved two ADNOC HSE Award - Safety Category Achieved the following No LTI records ( * ongoing): UZ750 Project : 699 days* (>1 million hours) including no recordable incident Zirku Island : 2,002 days UAD Field : 2,223 days 2012 Successfully completed planned total S/D works for UZ-750 & 42 New MOL tie-ins as well as Zirku Satah Plant & Umm Lulu tie-ins at UAD CPC 2012 Laboratory was awarded with ISO 17025:2005 accreditation by the Emirates Authority for Standardization and Metrology (EASM) - 1st occasion in the region 2012 Awarded the Accommodation & Utilities Project (AUP) contract 2012 Awarded the Early Civil Works (ECW) contract 2012 Awarded the UZ750 Engineering, Procurement & Construction (EPC-1) contract

5 OIL COMPANIES - OFFSHORE - PRODUCER UAE +971 ZAKUM DEVELOPMENT COMPANY P.O. Box ABU DHABI Tel: Fax: publicrelations@zadco.ae Website: Location: Sheikh Khalifa Energy Complex, Abu Dhabi. U.A.E. Profile: Oil Producing.

Dodsal E&C Pte. Limited

Dodsal E&C Pte. Limited Business Profile Brief description of the company: Dodsal Engineering & Construction is the flagship business of the Dodsal Group. As part of EPC business, Dodsal undertakes Engineering, Procurement and

More information

Sustainable Development through Partnership and Clean Technologies. Sustainability Report 2013 Executive Summary

Sustainable Development through Partnership and Clean Technologies. Sustainability Report 2013 Executive Summary Sustainable Development through Partnership and Clean Technologies Abu Dhabi National Oil Company (ADNOC) Sustainability Report 213 Executive Summary Message from the Director General The United Arab Emirates

More information

COMPANY PROFILE. Version: 1.0 ORIGINAL. Page 1 of 17

COMPANY PROFILE. Version: 1.0 ORIGINAL. Page 1 of 17 COMPANY PROFILE Version: 1.0 ORIGINAL Page 1 of 17 Contents 1. About ATS... 4 1.1. Mission... 4 1.2. Vision... 4 1.3. General Information... 4 1.4. Main Activities... 4 2. Capabilities... 5 2.1. ATS Model...

More information

Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel)

Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel) Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel) Dipak Sakaria (BDM - Abu Dhabi Carbon Capture Company - Al Reyadah), United Arab Emirates 30 th April

More information

ASMEF Monthly Newsletter February 2016 Issue

ASMEF Monthly Newsletter February 2016 Issue 1 ASMEF wins a contract for ADCO-Mender Project With its continuing efforts to win projects while enhancing its prequalification to work with the major oil & gas industry players, Ali & Sons Marine Engineering

More information

Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel)

Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel) Review of Project Proposed for CSLF Recognition: Al Reyadah CCUS Project (Phase I: Emirates Steel) Dipak Sakaria (BDM - Abu Dhabi Carbon Capture Company - Al Reyadah), United Arab Emirates 30 th April

More information

GALAXY ENERGY GENERAL CONTRACTING LLC COMPANY PROFILE

GALAXY ENERGY GENERAL CONTRACTING LLC COMPANY PROFILE GALAXY ENERGY GENERAL CONTRACTING LLC COMPANY PROFILE OVERVIEW Galaxy Energy is an ISO OHSAS certified Contractor based in Abu Dhabi, UAE and caters to client within the Middle East Oil and Gas Industry.

More information

Company Overview. We pride ourselves on our ability to provide our customers with a fully integrated and comprehensive service.

Company Overview. We pride ourselves on our ability to provide our customers with a fully integrated and comprehensive service. Company Overview Al Emarat E.P.C L.L.C, established in July 2017 was created as a solid Engineering Procurement Construction (EPC) contracting company in the Oil and Gas, water, power, roads and pipeline

More information

Project Management Consultancy Services. Ensuring safe and successful execution of your projects

Project Management Consultancy Services. Ensuring safe and successful execution of your projects Project Management Consultancy Services Ensuring safe and successful execution of your projects Deep expertise in Project Managem TechnipFMC s Project Management Consultancy business unit supports contract

More information

FROM THE CEO. Sameh Masry

FROM THE CEO. Sameh Masry An infrastructure utility Group of Companies specializing in the construction and operation & maintenance of water, power and transport systems. FROM THE CEO Sameh Masry Looking at the development and

More information

WE ARE CONTINUOUSLY IMPROVING. WE DON T BELIEVE IN STANDING STILL. WE HAVE GROWN FROM A FABRICATOR TO AN INTERNATIONAL EPC COMPANY. WE ARE NPCC.

WE ARE CONTINUOUSLY IMPROVING. WE DON T BELIEVE IN STANDING STILL. WE HAVE GROWN FROM A FABRICATOR TO AN INTERNATIONAL EPC COMPANY. WE ARE NPCC. WE ARE CONTINUOUSLY IMPROVING. WE DON T BELIEVE IN STANDING STILL. WE HAVE GROWN FROM A FABRICATOR TO AN INTERNATIONAL EPC COMPANY. WE ARE NPCC. 01 02 CONTENTS OUR COMPANY Overview History of NPCC Concept

More information

Etihad Rail s First Batch of Rail Wagons Arrive at Mina Zayed

Etihad Rail s First Batch of Rail Wagons Arrive at Mina Zayed Etihad Rail s First Batch of Rail Wagons Arrive at Mina Zayed -- A milestone in the development of Stage One of infrastructure project vital to the UAE-- Abu Dhabi, UAE, 26 December, 2012: Etihad Rail

More information

"The Future of Gas : A Global Challenge" Session (1) Middle East Gas Supply

The Future of Gas : A Global Challenge Session (1) Middle East Gas Supply FIRST DOHA CONFERENCE ^jujaji ji*ij J^ - ON NATURAL GAS ^ ^ ^ V " H

More information

WE PROVIDE QUICK RELIABLE AFTERSALES SERVICE AND SUPPORT FOR OUR CUSTOMERS

WE PROVIDE QUICK RELIABLE AFTERSALES SERVICE AND SUPPORT FOR OUR CUSTOMERS INTRODUCTION SINCE ITS INCEPTION IN 2013,OVERSEAS ENERGY SOLUTIONS PROVIDES SUPERIOR PRODUCTS AND SERVICE SOLUTIONS TO THE DIVERSE STREAMS SUCH AS UPSTREAM, MIDSTREAM, DOWNSTREAM, CHEMICALS, PETROCHEMICALS,

More information

Safe and clean sour gas

Safe and clean sour gas Safe and clean sour gas BASF and Wintershall are able to team up as strong partners with their respective sour gas expertise: in the Middle East, for example, where the production of sulfurous sour gas

More information

INTRODUCTION. Al Laith International Al Laith Scaffolding

INTRODUCTION. Al Laith International Al Laith Scaffolding Oil & Gas Directory Middle East - 2013 71 Al Laith International INTRODUCTION Al Laith has been an established organisation in the United Arab Emirates since 1995. From its inception as a contract scaffolding

More information

Project Management Consultancy Services. Ensuring safe and successful execution of your projects

Project Management Consultancy Services. Ensuring safe and successful execution of your projects Project Management Consultancy Services Ensuring safe and successful execution of your projects Deep expertise in Project Management Consultancy TechnipFMC s Project Management Consultancy business unit

More information

2. In what year was the first horizontal well drilled in Abu Dhabi?

2. In what year was the first horizontal well drilled in Abu Dhabi? Name Section www.adnoc.com An EFL lesson based on the authentic web site Semester 3 Reading and writing 3 class periods 2003 by Scott South (The Petroleum Institute) First created June 21, 2003 The latest

More information

COMPANY INTRODUCTION

COMPANY INTRODUCTION Numero Uno Training and Consulting LLC COMPANY INTRODUCTION Numero Uno Training & Consulting Services (NUTC) 1 COMPANY INTRODUCTION Headquartered in Industrial City of Abu Dhabi ICAD1; Numero Uno has dedicated,

More information

ARKOIL Technologies Nederland OIL SLUDGE TREATMENT AND OIL-CONTAMINATED SOILS RECULTIVATION TECHNOLOGY

ARKOIL Technologies Nederland OIL SLUDGE TREATMENT AND OIL-CONTAMINATED SOILS RECULTIVATION TECHNOLOGY ARKOIL Technologies Nederland OIL SLUDGE TREATMENT AND OIL-CONTAMINATED SOILS RECULTIVATION TECHNOLOGY 1 ABOUT US ARKOIL Technologies Nederland B.V. developed and implemented worldwide the exclusive system

More information

ENVIRONMENT AGENCY ABU DHABI

ENVIRONMENT AGENCY ABU DHABI Marawah Marine Biosphere Reserve (MMBR), Abu Dhabi, UAE and the Extractive Industry: An Exemplary Model The 4th World Congress of Biosphere Reserves 14-17 March 2016 Lima, Peru CONTENT Why Presenting Marawah

More information

Sustainable Design and Construction: Codes, Standards and Best Practice

Sustainable Design and Construction: Codes, Standards and Best Practice Sustainable Design and Construction: Codes, Standards and Best Practice Page 1 of 7 Why Attend Climate change impacts related to human activity have rapidly become one of the key global issues facing modern

More information

INTECNA srl REFERENCES LIST AND APPROVALS HYDRO-TESTING PROCEDURES

INTECNA srl REFERENCES LIST AND APPROVALS HYDRO-TESTING PROCEDURES INTECNA srl Via Stella del Sud, 4 20060 Mediglia (MI) I Tel +39 02 90601175 Fax +39 02 90601191 E mail intecna@libero.it HYDRO-TESTING PROCEDURES REFERENCES LIST AND APPROVALS Case History n 1 Year : 1996

More information

Since its inception in 2011, YUCO ALLIANCE DMCC provides superior products and service solutions to the diverse streams such as upstream, midstream,

Since its inception in 2011, YUCO ALLIANCE DMCC provides superior products and service solutions to the diverse streams such as upstream, midstream, Since its inception in 2011, YUCO ALLIANCE DMCC provides superior products and service solutions to the diverse streams such as upstream, midstream, downstream, chemicals, petrochemicals, power, mining

More information

BAUER Environment Group installs PURE-Reed Bed Sewage Plant in midst of the desert

BAUER Environment Group installs PURE-Reed Bed Sewage Plant in midst of the desert BAUER Environment Group installs PURE-Reed Bed Sewage Plant in midst of the desert The Gulf States and specially the UAE are in the head lines of the international press mainly because of their bold construction

More information

Figure 1; Storage capacity for emergency water in GCC countries.

Figure 1; Storage capacity for emergency water in GCC countries. Strategic Water Reserve: New Approach for Old Concept in GCC Countries Dr. Mohamed A. Dawoud Manager, Water Resources Department, Environment Agency - Abu Dhabi, P.O. Box 45553, Email: mdawoud@ead.ae 1.

More information

vmonitor Technology The world s largest wellhead wireless monitoring system installation base

vmonitor Technology The world s largest wellhead wireless monitoring system installation base vmonitor Technology The world s largest wellhead wireless monitoring system installation base vmonitor Overview vmonitor is the worldwide technology leader in wireless systems for remote operations in

More information

WE ARE CONTINUOUSLY IMPROVING. WE DON T BELIEVE IN STANDING STILL. WE HAVE GROWN FROM A FABRICATOR TO AN INTERNATIONAL EPC COMPANY. WE ARE NPCC.

WE ARE CONTINUOUSLY IMPROVING. WE DON T BELIEVE IN STANDING STILL. WE HAVE GROWN FROM A FABRICATOR TO AN INTERNATIONAL EPC COMPANY. WE ARE NPCC. WE ARE CONTINUOUSLY IMPROVING. WE DON T BELIEVE IN STANDING STILL. WE HAVE GROWN FROM A FABRICATOR TO AN INTERNATIONAL EPC COMPANY. WE ARE NPCC. 01 02 CONTENTS OUR COMPANY Overview History of NPCC Concept

More information

AL SIDRAH. Dec 2016 Vol.2 Issue 21

AL SIDRAH. Dec 2016 Vol.2 Issue 21 AL SIDRAH Dec 2016 Vol.2 Issue 21 "Environment & pollution lecture EPDA organized a lecture about "Environment & pollution" in Al Rahma and Al Bashaer Kindergarten. EPDA had also distributing 100 trees

More information

CO 2 FloodING. Most CO Billion. Floods. Increased Recovery. occidental petroleum corporation 2014

CO 2 FloodING. Most CO Billion. Floods. Increased Recovery. occidental petroleum corporation 2014 FloodING Technology occidental petroleum corporation 2014 Oxy s CO 2 operations in Hobbs, New Mexico, United States 650 Billion Oxy injected more than 650 billion cubic feet of carbon dioxide ( ) into

More information

Security Situation. Basra Province. Thi-Qar Province. Koerk telecom company attacked. Source: iraqi news. Date: 06 April 2014

Security Situation. Basra Province. Thi-Qar Province. Koerk telecom company attacked. Source: iraqi news. Date: 06 April 2014 Security Situation Basra Province Koerk telecom company attacked Source: iraqi news. Date: 08 April 2014 A sound bomb targeted the headquarter of Koerk telecom company at 14 th street, Al-Jaza'aer area

More information

Energy related projects in the north-east Asia

Energy related projects in the north-east Asia Energy related projects in the north-east Asia Outline There are various Energy related projects in the northeast Asia. In today s my presentation, The projects which purport to develop the oil & gas in

More information

Oil & Gas - Project List.

Oil & Gas - Project List. 1 New Power Upgrade System at All ADCO Fields 2 Borouge Petrochemicals Project 3 4 5 6 7 8 Shahd LB-EPF Expansion Project Shah Accommodation Liwa, Abu Dhabi EPCIC for BNCPP-B Topsides, Jacket Substructure

More information

The Hibernia Development Project

The Hibernia Development Project PT-2013: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. john s, NL, Canada March, 2013 Paper Code. (PT-2013 - Zhang)

More information

THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI

THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI CONTENTS 04 04 The Capital Emirate 08 Connecting You to the World 06 The Pulse of Trade 12 Ready for Business CONTENTS 16 Tailored Solutions 22 Master

More information

Financial Results for the six months ended September 30, 2018

Financial Results for the six months ended September 30, 2018 INPEX CORPORATION Financial Results for the six months ended September 30, 2018 November 8, 2018 Agenda Corporate Overview Consolidated Financial Results for the six months ended September 30, 2018 1 Cautionary

More information

The Maari Growth Projects

The Maari Growth Projects The Maari Growth Projects Auckland, March 31, 2015 OMV New Zealand Ltd Presentation Structure Maari Location Development history Producing reservoirs Installed facilities Maari Growth Project Components

More information

Founding Visionary Inspiration We must not rely on oil alone as the main source of our national income. We have to diversify the sources of our revenu

Founding Visionary Inspiration We must not rely on oil alone as the main source of our national income. We have to diversify the sources of our revenu We Are Masdar 1 Founding Visionary Inspiration We must not rely on oil alone as the main source of our national income. We have to diversify the sources of our revenue and construct economic projects that

More information

Chapter-2. Abu Dhabi's Oil Industry and Abu Dhabi Marine Operating Company (ADMA - OPCO)

Chapter-2. Abu Dhabi's Oil Industry and Abu Dhabi Marine Operating Company (ADMA - OPCO) Chapter-2 Abu Dhabi's Oil Industry and Abu Dhabi Marine Operating Company (ADMA - OPCO) 2.1 Introduction Oil and Gas meet major part of the energy needs of the world. Middle East region possesses a sizeable

More information

Decommissioning of Offshore Installations

Decommissioning of Offshore Installations An Intensive 5 Day Training Course Decommissioning of Offshore Installations An In-Depth Project Management Course Covering all Aspects of Decommissioning 09-13 Dec 2018, Dubai 01-05 Jul 2019, Houston

More information

NOT FOR PRINT DISTRIBUTION

NOT FOR PRINT DISTRIBUTION Image courtesy of Freeport LNG Development, L.P. A World of Solutions Visit www.cbi.com LNG Liquefaction Diversified Services Across Energy Infrastructure Comprehensive Liquefaction Capabilities For more

More information

ADNOC GROUP SUSTAINABILITY REPORT 2015

ADNOC GROUP SUSTAINABILITY REPORT 2015 ADNOC GROUP SUSTAINABILITY REPORT 2015 TAKING INNOVATION TO NEW HEIGHTS Late Sheikh Zayed Bin Sultan Al Nahyan (May Almighty Allah rest his soul in peace) Founder of the United Arab Emirates Cover photo

More information

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground The oil and gas cycle Life cycle of oil and gas (time) 1) 2) 3) 4) 5) 6) Activity Desk study and get licens: Find areas with favorable geological conditions Seismic survey: Provide detailed information

More information

Tank Farm Operations and Performance Nov May Nov 2017 Dubai, United Arab Emirates

Tank Farm Operations and Performance Nov May Nov 2017 Dubai, United Arab Emirates 20-24 Nov 2016 21-25 May 2017 19-23 Nov 2017 Dubai, United Arab Emirates Topics discussed include: 09-AUG-16 This course is Designed, Developed, and will be Delivered under ISO 29990:2010 & ISO 9001:2015

More information

TCO Future Growth Project Wellhead Pressure Management Project

TCO Future Growth Project Wellhead Pressure Management Project TCO Future Growth Project Wellhead Pressure Management Project Project Overview, Status & Kazakhstani Content Strategy Paul Benoit 10 April 2014 Astana, Kazakhstan FGP-WPMP Tengiz expansion consists of

More information

Certificate in Global Oil and Gas Management. Upstream through Downstream Sep 2018, Houston Nov 2018, London Dec 2018, Dubai

Certificate in Global Oil and Gas Management. Upstream through Downstream Sep 2018, Houston Nov 2018, London Dec 2018, Dubai 17-28 Sep 2018, Houston 12-23 Nov 2018, London 09-20 Dec 2018, Dubai Introduction Oil & gas are vital sources of energy for the world because of its availability, versatility and reliability and will likely

More information

Sakhalin Energy utilizes Thermo Fisher SampleManager LIMS Software for largest Russian LNG project ever

Sakhalin Energy utilizes Thermo Fisher SampleManager LIMS Software for largest Russian LNG project ever Laboratory Data Management Solutions CASE STUDY Thermo Fisher SampleManager LIMS Software Sakhalin Energy utilizes Thermo Fisher SampleManager LIMS Software for largest Russian LNG project ever Sakhalin

More information

Power Supplies. Certified Management Systems for Quality and HSE

Power Supplies. Certified Management Systems for Quality and HSE www.ctsonline.com Power Supplies Certified Management Systems for Quality and HSE Corrosion Technology Services (CTS) is a market leading specialist in the provision of corrosion prevention solutions,

More information

Mastering the Challenges of the Nord Stream Project

Mastering the Challenges of the Nord Stream Project Mastering the Challenges of the Nord Stream Project Ruurd Hoekstra, Deputy Project Director Construction, Nord Stream AG Speech for the Scottish Oil Club Edinburgh, 11 th October 2012 Energy Infrastructure

More information

أبوظبي الفنية. Abu Dhabi Specification. ADS 3 / 2015 Second Edition اإلصدار الثاني

أبوظبي الفنية. Abu Dhabi Specification. ADS 3 / 2015 Second Edition اإلصدار الثاني Abu Dhabi Specification معايير أبوظبي الفنية ADS 3 / 2015 Second Edition م أ ف 1025 / 3 اإلصدار الثاني Plastics piping systems for the supply of gaseous fuels - polyethylene (PE) )Review and Recommendations)

More information

COMPANY PROFILE hssg.com

COMPANY PROFILE hssg.com COMPANY PROFILE hssg.com 2 CONTENTS HLG STFA SOIL GROUP 4 PARTNERS 6 HABTOOR LEIGHTON GROUP 6 STFA CONSTRUCTION GROUP 8 REGIONAL PRESENCE 10 SERVICES 12 EARTH RETAINING SYSTEMS 14 PILED FOUNDATIONS 16

More information

AIM. The Quarterly News Letter of AIM LLC DELIVERING EXCELLENCE IN MANUFACTURING GROUND BROKEN ON AI S NEW MANUFACTURING FACILITY IN ABU DHABI

AIM. The Quarterly News Letter of AIM LLC DELIVERING EXCELLENCE IN MANUFACTURING GROUND BROKEN ON AI S NEW MANUFACTURING FACILITY IN ABU DHABI I s s u e 5, A u g 2 0 1 6 AIM The Quarterly News Letter of AIM LLC DELIVERING EXCELLENCE IN MANUFACTURING GROUND BROKEN ON AI S NEW MANUFACTURING FACILITY IN ABU DHABI I N S I D E T H I S I S S U E :

More information

Sheikh Zayed Bin Sultan Al Nahyan

Sheikh Zayed Bin Sultan Al Nahyan On land and in the sea, our forefathers lived and survived in this environment. They were able to do so because they recognized the need to conserve it, to take from it only what they need to live, and

More information

OIL, GAS AND PETROCHEMICALS DELIVERING INNOVATIVE SOLUTIONS THROUGH LEADING-EDGE EXPERTISE

OIL, GAS AND PETROCHEMICALS DELIVERING INNOVATIVE SOLUTIONS THROUGH LEADING-EDGE EXPERTISE OIL, GAS AND PETROCHEMICALS DELIVERING INNOVATIVE SOLUTIONS THROUGH LEADING-EDGE EXPERTISE Project control management services How we can help Mott MacDonald is a global management, engineering and development

More information

Review of Project Nominated for CSLF Recognition: Al Reyadah CCUS Project

Review of Project Nominated for CSLF Recognition: Al Reyadah CCUS Project Review of Project Nominated for CSLF Recognition: Al Reyadah CCUS Project Arafat Al Yafei - Abu Dhabi Carbon Capture Company - Al Reyadah United Arab Emirates 1 st May 2017 Projects Interaction & Review

More information

Quality & Innovation. Put Together. Australian Piling Technology

Quality & Innovation. Put Together. Australian Piling Technology Quality & Innovation Put Together COMPANY PROFILE Australian Piling Technology Welcome to Australian Piling Technology LLC, Specialist Piling Contractor Introduction Australian Piling Technology L.L.C.

More information

Certificate in Global Upstream Oil & Gas Operations

Certificate in Global Upstream Oil & Gas Operations An Intensive 5 Day Training Course Certificate in Global Upstream Oil & Gas Operations 09-13 Dec 2018, Dubai 17-21 Dec 2018, London 16-20 Sep 2019, Houston TX 11-15 Nov 2019, London 08-12 Dec 2019, Dubai

More information

On Escape Bangladesh Limited

On Escape Bangladesh Limited Welcome to the presentation On Escape Bangladesh Limited 1 About Escape Bangladesh Limited Escape Bangladesh Ltd. has been involved in providing construction, oil & Gas and power sector Project Support

More information

SMART TECHNOLOGY TO POWER MARINE LEADERS OF THE WORLD

SMART TECHNOLOGY TO POWER MARINE LEADERS OF THE WORLD www.southnests.com SMART TECHNOLOGY TO POWER MARINE LEADERS OF THE WORLD Optimize your marine operations with organised data to increase efficiencies in terms of cost, productivity and compliance, through

More information

Abu Dhabi Certification Scheme for Polyethylene Plastic Pipe Systems Used for Utilities

Abu Dhabi Certification Scheme for Polyethylene Plastic Pipe Systems Used for Utilities Abu Dhabi Certification Scheme for Polyethylene Plastic Pipe Systems Used for Utilities Assessment and Surveillance Plan Page 1 of 14 TABLE OF CONTENTS ABOUT THE ABU DHABI QUALITY AND CONFORMITY COUNCIL

More information

Tapping the Kingdom s vast hydrocarbon resources requires best-in-class technology, such as this drilling rig designed in-house.

Tapping the Kingdom s vast hydrocarbon resources requires best-in-class technology, such as this drilling rig designed in-house. Tapping the Kingdom s vast hydrocarbon resources requires best-in-class technology, such as this drilling rig designed in-house. New onshore and offshore drilling joint ventures will ensure we have the

More information

Fundamentals of Offshore Systems Design & Construction

Fundamentals of Offshore Systems Design & Construction An Intensive 5 Day Training Course Fundamentals of Offshore Systems Design & Construction 24-28 Jun 2018, Dubai 16-20 Dec 2018, Dubai 27-MAY-18 This course is Designed, Developed, and will be Delivered

More information

STRATASPHERE ISSUE 12. August 2016 ISSUE 11 1

STRATASPHERE ISSUE 12. August 2016 ISSUE 11 1 STRATASPHERE ISSUE 12 1 August 2016 ISSUE 11 1 Editor-in-chief: Mohammed Shaban Assistant editor: Maitha Al Eisaei INDEX Message from the CEO Page 04 Financial Update Page 04 Introducing 3D Printing Page

More information

Major Milestones The company s name has been changed from Sadid Jahan Sanat to TIV Energy Engineering & Construction.

Major Milestones The company s name has been changed from Sadid Jahan Sanat to TIV Energy Engineering & Construction. Company Profile Company at a Glance Established on 1st Oct. 1997 Headquartered in Tehran / IRAN 100% private ownership Provides General Contracting / EPC services for projects in oil, gas, petrochemical,

More information

Tomakomai CCS Demonstration Project in Japan

Tomakomai CCS Demonstration Project in Japan Tomakomai CCS Demonstration Project in Japan Japan CCS Co., Ltd. Carbon Sequestration Leadership Forum Abu Dhabi, United Arab Emirates December 6, 2017 Copyright 2017 Japan CCS Co., Ltd. 1 Overview of

More information

Education : General Certificate of Education (Technical-Mathematics) Qualifications : Degree of Mechanical And Electrical Engineer (June 1979)

Education : General Certificate of Education (Technical-Mathematics) Qualifications : Degree of Mechanical And Electrical Engineer (June 1979) Name : MOHAMED ZRIBI Present Employment Title : PETROLIE TECHNICAL MANAGER Date of Birth : October 28, 1954 Nationality : Tunisian Education : General Certificate of Education (Technical-Mathematics) :

More information

THE INTEGRATED TRADE, LOGISTICS AND INDUSTRIAL HUB OF ABU DHABI

THE INTEGRATED TRADE, LOGISTICS AND INDUSTRIAL HUB OF ABU DHABI THE INTEGRATED TRADE, LOGISTICS AND INDUSTRIAL HUB OF ABU DHABI CONTENTS 04 CONTENTS 04 The Capital Emirate 08 Connecting You to the World 16 Tailored Solutions 22 Master Plan 06 The Pulse of Trade 12

More information

Integrated Management System QHSE

Integrated Management System QHSE Manual Integrated Management System QHSE In the Field of Surface Preparation & Treatment Protective Coating Scaffolding Tank lining Passive Fire Protection Concrete Repair & Rehabilitation Concrete Surface

More information

Tank Farm Operations and Performance

Tank Farm Operations and Performance An Intensive 5 Day Training Course Tank Farm Operations and Performance 21-JAN-18 01-05 Jul 2018, Dubai 25-29 Nov 2018, Dubai www.petroknowledge.com Tank Farm Operations and Performance Why Chse this Training

More information

PETROCHEMICAL SECTOR WORKFORCE DEVELOPMENT

PETROCHEMICAL SECTOR WORKFORCE DEVELOPMENT PETROCHEMICAL SECTOR WORKFORCE DEVELOPMENT DEVELOPING THE WORKFORCE OF TODAY AND THE FUTURE In challenging times, petrochemical companies cannot afford to pour resources (time and money) into generalized

More information

TRANSFORMING THE HEAVY OIL VALUE CHAIN

TRANSFORMING THE HEAVY OIL VALUE CHAIN HOSTED BY CONGRESS & EXHIBITION 3-5 September 2018 Muscat, Sultanate of Oman TRANSFORMING THE HEAVY OIL VALUE CHAIN worldheavyoilcongress.com SUPPORTED BY ORGANISERS OF ORGANISED BY EGYPS EGYPT PETROLEUM

More information

COMPANY CIVIL CONSTRUCTION PROFILE

COMPANY CIVIL CONSTRUCTION PROFILE MQS LTD COMPANY CIVIL CONSTRUCTION PROFILE 76, Babek Avenue Baku AZ 00 30, Phone: (+ 99412) 570 14 04, 570 06 96, 570 09 07, 570 07 37 www.mqs.az Page 1 of 23 Contents 1 Contact Details 2 About the Company

More information

Zainab Incident and Developments in Oil Spill Response Programs after the Incident

Zainab Incident and Developments in Oil Spill Response Programs after the Incident Zainab Incident and Developments in Oil Spill Response Programs after the Incident Bruce McKenzie Crisis Management Coordinator Abu Dhabi National Oil Company PO Box 898, Abu Dhabi UAE Abstract Oil spills

More information

Case Study: Al Reyadah CCUS Project

Case Study: Al Reyadah CCUS Project Case Study: Al Reyadah CCUS Project Dipak Sakaria (BDM - Abu Dhabi Carbon Capture Company - Al Reyadah), United Arab Emirates 2 nd May 2017 Panel 2: Carbon Capture Process: Lessons Learned in Project Start-Up

More information

May 11, Copyright INPEX CORPORATION. All rights reserved. Medium-term Business Plan

May 11, Copyright INPEX CORPORATION. All rights reserved. Medium-term Business Plan May 11, 2018 Copyright INPEX CORPORATION. All rights reserved. Medium-term Contents 1. INPEX Growth Strategy to 2040 2 2. Assumptions 3 3. Cash Allocation 4 4. Financial Targets 5 5. Business Targets (1)

More information

ENERGY. Responding to the Upstream Boom

ENERGY. Responding to the Upstream Boom ENERGY Responding to the Upstream Boom CURRENT OPPORTUNITIES AND CHALLENGES IN MIDSTREAM/LNG 1 GROWTH Responding to demand for new and expanded oil and gas processing, transportation and storage following

More information

We deliver gas infrastructure

We deliver gas infrastructure We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern

More information

We invite you to find out more at careers.conocophillips.com

We invite you to find out more at   careers.conocophillips.com We invite you to find out more at www.conocophillips.com.au careers.conocophillips.com Australia and Timor-Leste Proudly delivering oil and gas to the world (Front Cover) Australia Pacific LNG operated

More information

Among these I cover the following: - Fields development plan (FDP) - Conceptual studies for surface facilities

Among these I cover the following: - Fields development plan (FDP) - Conceptual studies for surface facilities SAID ALI CURRICULUM VITEA Cite du 20 Aout, Villa N 44 BOUMERDES 35000 ALGERIA Tel : 00 213 24 794 367 Mobile : 00 213 553 394 856 E-mail :saidali.al@hotmail.com Skills My activities refer to the oil and

More information

Utilizing the home advantage: Crude oil and natural gas from Germany

Utilizing the home advantage: Crude oil and natural gas from Germany Utilizing the home advantage: Crude oil and natural gas from Germany Important contribution to supply security Know-how creates international competitive advantage Highest environmental and safety standards

More information

Development. and. Further

Development. and. Further 03 TowardGrowth Further Development and The Osaka Gas Group is actively investing in areas aimed at expanding new businesses as part of efforts to realize its long-term management vision and mediumterm

More information

2009 Japan-Russia Energy and Environment Dialogue in Niigata S3-9 NOMURA ERINA

2009 Japan-Russia Energy and Environment Dialogue in Niigata S3-9 NOMURA ERINA November 11, 2009 INPEX CORPORATION Our Business Overview of Naoetsu LNG Receiving Terminal Construction Schedule of Naetsu LNG Receiving Terminal History INPEX CORPORATION Established in 1966 Japanese

More information

Certificate in Global Downstream Oil & Gas Operations

Certificate in Global Downstream Oil & Gas Operations An Intensive 5 Day Training Course Certificate in Global Downstream Oil & Gas Operations 24-28 Sep 2018, Houston 19-23 Nov 2018, London 16-20 Dec 2018, Dubai 03-MAY-18 This course is Designed, Developed,

More information

Early Production in Deep Waters. Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil

Early Production in Deep Waters. Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil Early Production in Deep Waters Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil Abstract Early production in deep and ultra deep waters may at greater water depths call for a Dynamically Positioned

More information

Reducing the Carbon. Contents. Responsibility. July 15, 2012

Reducing the Carbon. Contents. Responsibility. July 15, 2012 Contents Sustainability 3 Waste Management 9 Green Events 10 Corporate Social 12 Responsibility Executive Editor Patrick Michael s Editor Suchitra Steven Samuel Director Advertising Haroon Qureshi Senior

More information

PCE005. Process Plant Optimization Technology and Continuous Improvement

PCE005. Process Plant Optimization Technology and Continuous Improvement PCE005 Process Plant Optimization Technology and Continuous Improvement H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Process plant optimization

More information

Development in the East Med from VTTI

Development in the East Med from VTTI Development in the East Med from VTTI Editorial: Roland Douglas In November 2014 the new 300m VTTV terminal project opened in Vasiliko, Cyprus. Its strategic location will be the first of its kind in the

More information

DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS

DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS 05 DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS 2 END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS List of contents Page 3 End-to-end EPCIC solutions Page 4 Integrated project execution

More information

Challenges of Revamping Leixoes Oil Terminal, Portugal

Challenges of Revamping Leixoes Oil Terminal, Portugal Challenges of Revamping Leixoes Oil Terminal, Portugal By Liam Knowles, Pierre Flammang, Ulf Jungclaussen The most challenging type of project for any Engineering Consultancy is the design and construction

More information

Energy and Water in Figures. Abu Dhabi Emirate 2016

Energy and Water in Figures. Abu Dhabi Emirate 2016 Energy and Water in Figures Abu Dhabi Emirate 216 Release date: November 217 1 Contents Introduction 3 Key points 4 1- Oil and Refined Petroleum 4 2- Natural Gas 6 3- Electrical Energy 8 4- Desalinated

More information

PEDEC s Ongoing Projects

PEDEC s Ongoing Projects Main Objectives PEDEC s Ongoing Projects 1. Development Project of MasjedSoleiman Oil Field Increasing a daily production of 25,000 barrels of crude oil to the current production Carrying out reservoir

More information

Sustainability Report

Sustainability Report Sustainability Report 2010 Table of Contents 1 I Message from the General Manager 11 I Social Performance 2 I FERTIL Philosophy 11 I TRI Frequency 3 I FERTIL Overview 11 I Occupational Health Performance

More information

Press information. Wintershall continues to grow at the source. Record earnings again at 1.2 billion euros. Oil and gas production reach a new high

Press information. Wintershall continues to grow at the source. Record earnings again at 1.2 billion euros. Oil and gas production reach a new high Press information Wintershall continues to grow at the source Record earnings again at 1.2 billion euros 12 March 2013 Michael Sasse Tel. +49 561 301-3301 Fax +49 561 301-1321 press@wintershall.com www.wintershall.com

More information

Fundamentals of Offshore Systems Design & Construction

Fundamentals of Offshore Systems Design & Construction An Intensive 5 Day Training Course Fundamentals of Offshore Systems Design & Construction 10-14 Dec 2017, Dubai 17-MAY-17 This course is Designed, Developed, and will be Delivered under iso Quality Standards

More information

Marine Vapor Recovery with a Twist

Marine Vapor Recovery with a Twist Marine Vapor Recovery with a Twist By Melissa Lenhart Senior Applications Engineer John Zink Company, LLC Tulsa, Oklahoma MARINE VAPOR RECOVERY WITH A TWIST Abstract John Zink Company has completed the

More information

LNG Supply, Demand & Pricing

LNG Supply, Demand & Pricing LNG Supply, Demand & Pricing This course is Designed, Developed, and will be Delivered under ISO Quality Standards 24-28 Jul 2017 London, United Kingdom 09-JAN-17 LNG Supply, Demand & Pricing WHY CHOOSE

More information

CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN )

CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN ) CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN 002 066 784) GLOBAL EXPRESSION OF INTEREST / PRE-QUALIFICATION FOR PROVISION OF LAND DRILLING UNITS, WORKOVER RIGS AND VARIOUS

More information

final adgas qxd 20/5/09 10:53 Page 1

final adgas qxd 20/5/09 10:53 Page 1 final adgas 23.4.7.qxd 20/5/09 10:53 Page 1 General Sheikh Mohammed bin Zayed Al-Nahyan Crown Prince of Abu Dhabi, Deputy Supreme Commander of the UAE Armed Forces, and Chairman of the Abu Dhabi Executive

More information

Machining, Bolting and Flange Management

Machining, Bolting and Flange Management Machining, Bolting and Flange Management www.storktechnicalservices.com 02 03 04 05 08 09 10 11 introduction overview machining & bolting hot bolt replacement pipe cutting in-situ machining IBOLT FLANGE

More information

WE FOCUS, ON PROJECT MANAGEMENT, DESIGN, ENGINEERING, SUPERVISION, TESTING AND COMMISSIONING, SUPPORT SERVICES AND FACILITIES MANAGEMENT

WE FOCUS, ON PROJECT MANAGEMENT, DESIGN, ENGINEERING, SUPERVISION, TESTING AND COMMISSIONING, SUPPORT SERVICES AND FACILITIES MANAGEMENT WE FOCUS, ON PROJECT MANAGEMENT, DESIGN, ENGINEERING, SUPERVISION, TESTING AND COMMISSIONING, SUPPORT SERVICES AND FACILITIES MANAGEMENT THE GROUP OF COMPANIES 4DIMENSION SERVICES AND MANAGEMENT CONSULTANCY

More information