1 Circuit of the Future: Interoperability and SCE's DER Program Stephanie L. Hamilton, Manager, Charles K. Vartanian (*), Michael E. Johnson Jr. Distributed Energy Resources, Southern California Edison Southern California Edison TDBU 1000 Potrero Grande, Monterey Park, CA (*) (323) , Ali Feliachi, Karl Schoder West Virginia University Advanced Power and Electricity Research Center Morgantown, WV Paul Hines Research and Development Solutions, National Energy Technology Laboratory Morgantown, WV Abstract This paper describes the concept of improving operation of a distribution circuit of the future through installment of interoperable devices, including distributed energy resources (DER) that are controlled using a multi-agent system approach. This concept for improving distribution service is being considered by SCE s DER Program, with additional assistance from West Virginia University in the development of a conceptual implementation methodology that includes multi-agent control. Key words circuit of the future, DER, control agents Introduction Southern California Edison (SCE) is actively assessing how to maximize the potential grid benefits from Distributed Energy Resource (DER) technologies. Examples of potential grid benefits from DER include: dynamic reactive support of distribution system voltage and participation in circuit emergency reconfiguration for service restoration. To realize the full potential of DER to support and enhance our electric delivery system, understanding and enabling interoperability between DER, local distribution, and the wider grid are essential. This paper describes SCE s Circuit of the Future Project and it s applicability in advancing our industry s insight into this critical issue. SCE participates as a member of DOE s Grid- Wise TM Architecture Council (GWAC) and seeks ways within SCE to embrace and make use of GWAC s interoperability principles. From a utility perspective, the viability of DER increases as the technology matures and more value-added features are incorporated. As technically desirable features are added at the DER device level, accessing these features for wider grid benefit will require well thought out and effective implementation of systems and operating practices that facilitate interoperability between and across integrated electricity delivery systems. SCE s distribution Circuit of the Future project is our effort to increase our understanding of how to implement and leverage DER-Grid interoperability. SCE s Circuit of the Future is a planned 12 kv distribution circuit that will supply customers within our service territory. In addition to our core need to build the circuit to serve customer load, SCE is taking the opportunity to do a variety of collaborative research projects to deploy and test advanced distribution devices on the Circuit of the Future, and to deploy and test advanced operating and control concepts enabled through these devices on the Circuit of the Future. The advanced device systems being deployed on SCE s Circuit of the Future include: Circuit level fault current limiters, IED-ready protective system relays, Circuit fault interrupters, Fiber optic communications backbone, GPS time stamping at circuit sensing/recording devices, Duct bank temperature monitoring, D-FACTS for dynamic VAR compensation and voltage support. The operational scenarios to be tested on the physical circuit will result in an incremental advance from current present operating practices. For example, the tested scenarios are expected to produce tighter isolation of faulted circuit sections and quicker restoration of recoverable customer load. But, the operating paradigm will not be significantly altered since SCE will still use centrally decided and dispatched circuit configuration changes on the physical Circuit of the Future. More innovative operating paradigms will be explored through modeling and simulation of a virtual Circuit of the Future. Several DoE funded research projects are using the Circuit of the Future as their model for testing next-generation advanced distribution concepts. These projects that are using the Circuit of the Future as a model include West Virginia University s DoE-sponsored project Integrated Control of Next Generation Power Systems, which is investigating application of smart agent technology in a utility operating environment. Simulation will be used to assess potential impacts from smart agents participating in circuit reconfiguration for energy management and load restoration, and for control of reactive (VAR) devices. SCE has extensive experience in electrical system planning and operation, from the bulk transmission system down to the customer meter. This experience, and our understanding of the complete delivery chain, will help maximize the benefits to be realized from interoperability of emerging DER technologies. Two illustrative case studies are presented using load flow studies to quantify the electrical distribution system impact of two conceptually advanced distribution system scenarios. The two scenarios are DER, D-FACTS and Voltage Support, and DER and Reconfiguration for Load Restoration.

2 0.96 p.u. AVANTI 12 kv 0.99 p.u. Figure 1: Circuit of the Future Use of multi-agent systems to enable advanced distribution system functionality follows the case studies. The paper concludes with a conceptual level discussion of the potential for significant industry-wide benefits through enabling and leveraging interoperability. Figure 2: STATCOM and SVC Operating Characteristics DER, D-FACTS and Voltage Support The Circuit of the Future project plans to include a distribution-connected Flexible AC Transmission System (FACTS) device. SCE refers to this conceptual device as D-FACTS. To begin designing specifications for the D-FACTS device, a computer-based model of the Circuit of the Future was first created using General Electric s Power Sequence Load Flow (PSLF) software as the tool for steady state analysis. Additional data was extracted from SCE s E-maps system mated with Google Earth and the proposed Circuit of the Future construction drawings. By using this process all of the circuit s lengths and impedances were determined with an extremely high degree of accuracy. Figure 1 illustrates a PSLF format load flow model of the Circuit of the Future (Avanti 12 kv) and two adjacent 12 kv distribution circuits. The electrical system support characteristic desired from the D-FACTS is mitigation of infrequent temporary voltage-sags of up to -12% from nominal for up to one minute duration. This timeframe is considered sufficient to allow protective schemes to operate to clear any faults, and allow existing voltage controlled devices such as mechanically switched capacitors and transformer tap changers to participate in any ongoing steady state voltage regulation that may follow initial voltage sags. The two FACTS technologies considered by SCE for this application were Static VAR Compensator (SVC) and Static Compensator (STATCOM). For our implementation, SVC is essentially Thyristor-switched shunt caps and STATCOM is power-electronic synthesized AC from a DC bus. Figure 2 illustrates their basic operating characteristic. A significant difference between these two technologies is their relative level of correlation between bus voltage and device VAR output. An SVC s output magnitude has a strong correlation to the device s bus voltage, while the STATCOM can sustain its output magnitude relatively independent of bus voltage, down to a very low level of bus voltage. Load flow analysis was used to provide input to the decision between using a SVC or a STATCOM based D-FACTS device for the Circuit of the Future, and to provide an indication

3 of the required capacity. Within the load flow model, the SVC was modeled as a shunt connected capacitor and the STATCOM was implemented as a synchronous condenser. The two proxy devices used in the load flow analysis capture the key characteristic of VAR output relative to bus voltage for each respective device. In order to determine how the devices would affect bus voltage, simulation was performed with no device installed and this was used as the baseline voltage. The initial baseline voltage was 0.91 per unit (p.u.), with an intentionally very stressed 600A peak circuit loading case. Next the amount of capacitive VAR capacity needed from each type of technology to raise the bus voltage in 2.5% intervals to 10% per unit voltage was determined. Strengthening the decision to recommend a SVC over a STATCOM device, the difference in the magnitude of capacity needed was minimal between the SVC and the STATCOM, due to the limited range of desired voltage support. Given the expected significant lower $/KVAR cost for SVC versus STATCOM technology, and the fact that similar capacity was needed of either type technology to meet the desired performance goal, SVC was recommended for the Circuit of the Future. This has been designated the Circuit of the Future s D-SVC. The steady-state load flow analysis showed that an SVC would be able to safely mitigate the baseline voltage up through p.u. volts. An important observation was any mitigation above p.u. volts caused heavy reverse VAR flow in the circuit which was injected back into the substation. This finding was a basis of setting the D-SVC maximum design capacity to 6.5 MVAR. An important conclusion yielded from this steady state study was that the planned circuit will need additional capacitance for meeting SCE s steady-state voltage criteria. SCE Tariff Rules [1] specify that steady state voltage must be no lower than -5% from nominal voltage. The D-SVC should not be use to mitigate steady state voltage. This is not the purpose of installing an SVC. In order to utilize this device to its fullest potential the Thyristor-switched elements should be used to handle temporary events, and remain ready for such events and not encumbered with performing steady state voltage regulation. The model illustrated in Figure 1 and used for additional analysis to be discussed later in the report includes the required amount of additional shunt capacitance needed for SCE to meet an acceptable level of steady-state voltage even under heavy load conditions. With this initial input, SCE is now developing a more detailed specification for a D-SVC connection to the Circuit of the Future. Based on the load flow input, the specification includes, 1) designation of SVC-type technology, 2) maximum capacity of 6.5 MVAR, and 3) 1.2 MVAR of additional mechanically switched capacitor stages for steady state voltage control. Following Figure 3 illustrates the functionality of the proposed Circuit of the Future D-SVC. An additional specification for the D-SVC is a requirement that the control system allow for future coordinated control of all reactive resources on the Avanti 12kV Circuit. For this paper, additional load flow analysis was performed to demonstrate the potential to improve, i.e. flatten, the voltage profile across the Avanti 12 kv circuit through addition of a circuit-connected generator DER asset. Figure 3: Functionality of the D-SVC While the proposed D-SVC adds additional performance capability, voltage sag mitigation, there is no direct benefit during steady state conditions. SCE DER performed an earlier study that evaluated the beneficial impacts from connection of DG with VAR capability to a distribution system. The reported findings from this earlier study [2] indicated that relatively large (MW-scale) DG with VAR capability will 1) reduce circuit losses, and 2) improve a circuit s voltage profile. Using the Circuit of the Future load flow model, these earlier findings are again demonstrated in this report. Figure 1 illustrates a steady-state condition that meets SCE s basic Rule 2 requirement of maintaining steady-state bus voltages between 0.95 and 1.05 p.u.. In this initial case, without DG added, the average circuit voltages range from p.u.. And the total calculated peak losses for the modeled three-circuit system is 0.77 MW. The attached Figure 4 shows the same system scenario, but with a 1 MW synchronous DG operating on the Avanti 12 kv circuit, and regulating its interconnection (12 kv) bus to 1.0 per unit. The voltages on the circuit with the DG operating had an improved range of p.u.. And, the losses were reduced by MW to 0.73 MW Taking a very simplified approach for illustration, this incremental real power MW peak loss savings applied over an annual 8760 hours, using SCE s loss factor of 0.4 1, would be, 0.04 MW * 8760 hours * 0.4 = 140 MWh. Valued at SCE s 2006 average cost of energy, 6.9 cents/kwh [3, p.17], the annual energy cost savings through loss reduction would be approximately $4K. This is the estimated savings from loss reduction for one distribution circuit. SCE has approximately 4,100 distribution circuits. With this number of circuits that are potential hosts for DG interconnection, the potential energy and energy-cost savings are significant, if DG participate in improving circuit voltage and reducing losses. 1 SCE Loss Factor is from SCE s 2005 Transmission Expansion Report

4 DER and Reconfiguration for Load Restoration SCE s existing practice for post-fault circuit reconfiguration for load restoration typically utilizes three types of isolating and/or switching devices: circuit breakers at the substation sending end of the circuit, fault-interrupting-capable normally closed remote controlled automatic reclosers (RAR) at circuit mid/interior-points, and normally open remote controlled switches (RCS) at outer-edge transfer points between circuits. In its most basic and typical implementation, this arrangement of devices allows for isolation of faulted sections through isolation of no more than ½ the circuit, and then recovery and restoration of load to the unfaulted remaining ½ of the circuit. Without this arrangement, the whole circuit and all connected load is exposed to sustained outages for major circuit faults. DG On 0.98 p.u p.u. Figure 4. Avanti Circuit with 1 MW synchronous DG regulating interconnection (12 kv) bus to 1.0 per unit. Figure 5. Planned Fault Interruptors and Switches SCE s Circuit of the Future will apply additional interiorcircuit fault-interrupting capable devices; vacuum fault interrupter based Remote Control Interrupters (RCI). Use of multiple RCI s deployed out on the circuit will allow for higher resolution fault isolation. In this case, the circuit will have four zones of isolation versus the more basic two. Figure 5 illustrates the planned arrangement of the various fault interrupters and switches on the Circuit of the Future. Even assuming that only 25% of additional load would be kept online through a system-wide doubling (100% improvement) of distribution circuit fault isolation zones, the impact to reliability based valuation metrics could still be significant. Assuming for example that doubling fault isolation results in a 25% improvement in post-fault load retention, the resulting savings could be substantial. For the following simple pair of examples, SCE s former performance based rate reliability benchmark value of 56 minutes (0.93 hour) system average interruption duration index (SAIDI) is used. First, based on 2006 system average statistics 2, SCE s potential lost-revenue savings assuming a 25% reduction in SAIDI is, 4.8 million customers * 0.93 hours * 2.3kW * 25% * 11 cents/kwh = $286,000. A more significant potential value for improved reliability is shown using an assumed customer value of service (VOS) in place of the 11 cents/kwh lost electric revenue value that was used in the calculation above. Using an assumed VOS of $5/kWh, just for illustration purposes, the customer-side potential value from reducing the system SAIDI by 25% is, 4.8 million customers * 0.93 hours * 2.3kW * 25% * 5 dollars/kwh = $51 million. 2 Using 2006 EIX statistics [2]: 96,146 million kwh energy sales/4.8 million customers/8760 hours = 2.3 kw avg.. SCE s 2006 average electric service revenue was 11 cents/kwh.

5 This very simple pair of valuation examples shows how a broad consideration of the value of improved reliability, which considers both utility and customer value of reliability improvement, could justify performance based payment incentives for utilities to improve system service reliability. While adding switches will increase circuit reconfiguration flexibility, the value of this increased flexibility can be enhanced and extended by use of DER as a participant in reconfiguration for load restoration. Figures 6 and 7 illustrate a load flow based example of DG support of reconfiguration. DG Off Open Closed Overloads Figure 6: Overloaded Sections (red) Under Peak Load conditions 3 DG On No Overloads Figure 7: Overload Mitigation with a 1 MW DG put online on the Avanti 12 kv circuit. 3 The units for the values shown in Fig s 6 & 7 are Amperes and percent of the circuit conductors emergency Ampacity ratings.

6 Multi-Agent Control for Distribution System Operation With the integration of DERs, D-Facts devices and other Intelligent Electronic Devices (IEDs) in a traditional distribution system, the problem at hand becomes the coordination and the control of this complex system to achieve the objectives of improved circuit reliability, power quality and availability. The authors are addressing these issues through the development of a multi-agent system architecture that will autonomously control the smart distribution system of the future. This section describes this approach. Software agents and multi-agent systems While there is no single accepted definition of what constitutes an agent, most would agree that an agent is an object that can sense and act upon its environment with some degree of autonomy. In the context of software-based agents (as opposed to biological ones) the following definition is commonly cited, An agent is a computer system that is situated in some environment, and that is capable of autonomous action in this environment in order to meet its design objectives [4, p. 29]. This definition is fairly broad as it allows agents to occupy any environment. Also, it deliberately avoids including the term intelligent and leaves the necessity and ability to incorporate intelligence, for example through learning, to the need of the application at hand. The extension to intelligent agents can be made by designing agents that take flexible autonomous actions, where flexibility is the ability to react to the perceived environment in a timely fashion. In other words flexibility is to be pro-active through initiative taking, goaldirected behavior, and social behavior through interactions with other agents. Though none of these three key components are difficult to implement, the challenge lies in finding a balance among them. For example, any real-time control system continuously reacts and even communicates with other parts of the system. An intelligent agent, on the other hand, may change its objective while interacting with others after realizing that its original operating objectives do not align well with some overarching goals [5]. For this project, we will refer to agents when we mean encapsulated software components that have the ability to retrieve information about their respective environments, perform computations, communicate with other agents, and autonomously act on their environment. What differentiates an agentbased concept from the object-oriented software design is that agents have autonomy. Autonomy is another concept that is difficult to define accurately but means here that agents operate without external intervention and have control over their state and behavior while acting according to their programmed objectives. In other words, agents have their own thread of execution rather than simply responding to messages and requests. Also, an agent may decline to perform services for other agents or decline to act as requested if the agent finds that such action would not be in its best interest (would not align with its objectives). A multi-agent system is composed of a population of autonomous agents, which interact with each other to reach common objectives, while each agent simultaneously pursues individual objectives [6]. The agents help to decompose the problem into smaller entities that deploy domain (expert) knowledge. There are many reasons to use a decentralized, agent-based design as opposed to a centralized control system. Among these are actuation speed, robustness, and overall quality of design. Agents that are co-located with actuation devices (switches, knobs, etc.) can generally collect information and act faster than centrally located controllers, as communication and processing delays tend to slow down centralized schemes. Decentralized, agent-based designs tend to be more robust to small failures, thereby increasing the overall system reliability. Finally, the combination of computational intelligence, and goal-based methods, with the decentralized agent-based control concepts can often result in designs that give better overall control results, relative to traditional controller designs. On the other hand, it can be difficult to get autonomous agents to act in accordance with the objectives of the system as a whole. Because an agent generally operates according to a local objective function, it can act in ways that are incongruent with a set of global objectives. This is the challenge of agentbased control system design to design the agents such that they consistently act according to the goals of the system as a whole, without limiting the agents autonomy too much. Distribution systems provide an excellent test case for agentbased control. An autonomous, self-healing distribution system would have a number of advantages in terms of restoration speed and overall quality of service. A control system that was robust to single point failures, and required minimal intervention by operators would be particularly valuable during high-stress operating periods (such as a storm) as it could reduce the burden on human operators and increase restoration speed. If the distribution system could continuously optimize its voltage profile and its use of distributed generation, it may be possible to improve power quality and reduce the cost of service. Control agents for smart distribution systems With respect to this project agents will be software processes located within industrial PC s located near major control equipment within the distribution circuit. Each agent will have the ability to collect sensor data, including voltages, currents, frequency, and temperature from the measurement hardware that is located in the circuit. The collected data will allow the agent to observe its environment. Missing or uncertain information can be retrieved/validated through communication with other agents while each agent calculates control actions roughly according to the objectives and constraints described in the next subsection. The agents will then enact their decisions by making adjustments to control devices (switches, distributed generators, reactive power devices) in the circuit.

7 While ours is not the first agent-based approach to distribution system control, it has several unique properties that should lead to significant performance benefits. In [11], researchers present a conceptual, agent-based design to estimate service needs for distribution system components, identify and isolate faults, and restore service after a fault. Ref. [12] describes an agent-based design applied to the control of power output from DG units. This design has been shown to successfully facilitate load following in the test distribution system. Finally, the authors of [13, 14] describe an agent-based approach to bulk power system restoration (including the distribution system) that uses agents at each load and generator in a six substation system. The distribution network model used is fairly simple (all loads/generators are connected to a bus bar at the substation), but the method is shown to effectively solve the restoration problem. Our approach differs from the above research projects, primarily in the use of a rolling time horizon/mixed integer programming approach, and by application to the problem of voltage control, DER control and loss minimization. Problem formulation The structure of the agent control problem is based upon Model Predictive Control (MPC) [7]. MPC is a control method that integrates concepts from feedback-control and model-based predictive (feed-forward) control. The controller uses a discrete time model of the system to predict how it will react to control actions and uses feedback from sensors to adjust for modeling errors. MPC is particularly useful in systems that have discrete variables, hard constraints, and objectives that include costs and benefits, as opposed to only controlling an error trajectory to zero. An MPC controller is designed by carefully describing the objectives, constraints, and control/state variables in the form of an optimization problem. One of the distinctive features of an MPC problem is optimization over a discrete time horizon. The structure of the timehorizon for the distribution circuit problem is something that will need to be designed as this project progresses, and may need to change based upon the condition of the circuit. For example during circuit restoration after a fault, the problem will need to model enough time steps to account for each switching action, allowing enough time to collect measurements from devices, between subsequent switching actions. A time horizon with about 10 time steps spaced 10 seconds apart (100 seconds total) will probably be sufficient for most conditions. With this in mind t 0 will represent the current time period, and the complete time horizon is T = { t t... t } 0 1 K where K represents the full sequence of time step subscript variables. At least initially, the problem will include the following control variables: P G : a vector of active power injected into buses in the circuit by distributed energy resources and at the transmission system connection. The subscript G gives the set of all buses that include DER devices. Q G : a vector of reactive power injected by DER devices, defined broadly to include controllable reactive power devices (switched capacitor banks, SVCs, etc.) a: the position of switches at each branch in the circuit. a i is 0 when the switch is open, 1 when closed. At locations where no switch exists, a i is always 1. R: a vector of controllable transformer tap ratios (one entry for each branch, though most will be fixed at 1). These will most likely only be located at the transmission substations, except for very large distribution circuits. The problem will include two objectives: (O1) to minimize the cost of energy services, and (O2) to avoid/minimize unserved energy within the circuit. These two objectives will function well during the restoration phase, when the goal is to serve as much load as possible, and during normal operation, when the goal is to serve the existing load at minimum operating cost, while considering security risks to existing loads (estimated unserved energy). If we define ρ (0,1], ρ k is a discount factor that can be used to give some preference among control actions, O1 and O2 can be written as follows: min K (O1) i i k= 0 i G k min ρ C ( P) K k ρ P E ik, P ik, (O2) k= 0 i D In O1 above, C i (P i ), i G is the cost of the power injection (generation) at bus i. In (O2), E[ P ] gives the expected value ik, of power injection due to demand at bus i given no load reduction, and P i,k is the actual injection from demand. Because both values are negative, O2 measures the unserved demand for power at each time step. The most important constraints in the problem include standard power-flow constraints (C1, C2) that relate power injections to currents and voltages, and constraints on voltage and current magnitudes (C3, C4) that allow the system to steer away from high current or off-nominal voltage conditions. Finally, one additional constraint is needed in distribution systems that are designed to operate only radially. Eq. (C5) will maintain radial circuit operation at all time. I = a y R V V (C1) ( ) bk, bk, b bk, F( b), k T( b), k P + Q = V ik, ik, ik, Ibk, b Bi (C2) 0.95 V 1.05 k (C3) I I bk, b max (C4) aik, = 0, l (C5) i Ll Each of the constraints (C1-C5) must hold for all k within the prescribed time horizon. Eq. (C1) gives the standard relationship between complex voltage and current in a power system. In (C1), F(b) and T(b) represent the set of buses on either end of branch b, i.e., from- and to-bus. Eq. (C2) gives the standard *

8 bus injection complex power constraint. The set B i gives the subset of all branches (B) that are connected to bus i. It is assumed that the sign on the branch currents (I B ) are adjusted such that positive current flow is defined out of the bus. (C3- C4) give the constraints on voltage and current magnitudes, and (C5) gives the radial system constraint. In eq. (C5) L l represents each set of branches that form a loop such that one can travel over each branch in L l and arrive at the starting bus. The resulting non-linear mixed integer programming problem accounts for both intentional and unintentional switching events, including capacitor bank switching, relay actions, and the control of distributed resources including reactive power resources. The problem will force the system to plan for and implement control actions that result in voltages and currents within acceptable limits, while minimizing operating costs and unserved energy. The same problem can be used during both normal operation and restoration after a fault, because during both cases the goals and constraints of the problem are roughly the same the main difference being the initial condition of the network. Approach In the proposed design, one agent is placed at each switch, DG unit, and reactive power device. Each agent is given the responsibility to maintain the circuit model and chooses actions according to the mixed integer programming problem described above. The agents collect data from their neighbors and potentially from a central operator via the transmission substation using existing communications channels. Interoperability Benefits Interoperability, or the capability for different aspects of a circuit to work together effectively with little or no human interaction is vital to the effective use of the grid [8]. Interoperability requires components to be connected to each other using both hardware and software. Once this connection is complete, components can automatically receive data from each other and react accordingly with little to no human input. To be implemented, interoperability has three fields that need to be addressed: technical, informational, and organizational. Technical interoperability involves the physical and communicative connectivity between actual devices. The devices must have a common protocol in order to interface with each other regardless of component brand, manufacturer, etc. Informational interoperability pertains to the content and format for data or instructions. Organizational interoperability means that the businesses involved have compatible processes and procedures. All parties must address their business, economic, and legal relationships among themselves to ensure organizational interoperability works. These three elements are all required for an effective implementation of interoperability [9]. In other words, interoperability is achieved when users can easily exchange and use information among various devices from different providers. It must be noted that without interoperability, the benefits soon to be discussed are still possible to achieve. However, they require much more resources and human involvement. When dealing with power systems, interoperability not only has benefits to promote effective use of elements of the grid, but it also has significant economic repercussions to the parties involved. Interoperability directly affects grid reliability by providing equipment with information about components in the grid that may or may not be working. In addition, operators can have faster access to more accurate information concerning energy flow. This information can allow for rapid response to not only help mitigate system disruptions due to natural disasters, but also correct unwanted power fluctuations that could otherwise result in outages. Related to this would be schedule modification. If elements of a grid have the ability to communicate with each other, a change in energy production or distribution could be communicated faster to and throughout the grid to prevent energy loss or rolling blackouts. This is also an easier form of schedule modification since more automation is present. In the event that a power outage occurs or power needs to be cut from a portion of the grid, interoperability would allow for an efficient shut down and startup procedure. Compared to the old method of all or nothing, interoperability would allow for a gradual shut down with less critical elements (i.e. air conditioners) shut down first and key elements shut down last (i.e. water pumps). The reverse would be true for restoring the grid following an event. In this manner, key processes would remain undisturbed for as long as possible. Similarly, gradual restoration of the grid would not only re-energize key elements first, but would also prevent a power overload due to inrush ( cold load pick-up ). Interoperability also allows for increased customer involvement. If advanced technology is implemented successfully, customers will have access to the status of the grid at their own homes. This will allow them to remain informed and possibly help resolve undesirable energy anomalies by, for example, reducing power usage at times of high demand. Since interoperability uses advanced technology to facilitate better monitoring and understanding of the grid, it enhances opportunities for harnessing a wide range of new resources (such as renewables) as dispersed generation. With easier access to data, interoperability can have a direct economic benefit. Operators will be able to access real-time electricity prices and grid status which can allow them to reduce energy use when prices are high or supply is insufficient. Not only does this save consumers money, but it also lowers the costs and risks to wholesale power purchasers. Economically, interoperability can also reduce the cost of creating and maintaining a grid. New devices leveraging information technology and containing advanced electronics will be able to complete tasks faster and for a lower cost than the elec-

9 tromechanical devices we have today. In addition, these new devices can be integrated and maintained much more easily than existing devices. Interoperability is directly supported by the GridWise Architecture Council (GWAC), a team of experts sponsored by the US Department of Energy. GWAC s mission is to establish broad industry consensus regarding the integration of advanced technology and communications into electric power operations in order to enhance our socio-economic well-being and security [10]. One of the visions of GWAC is to integrate interoperability with distributed energy resources. GWAC works toward this vision by creating a framework to help identify issues and create a context that can facilitate understanding and change among those involved in the electric system. GWAC also plans to establish a consensus building process and foster cross industry segment collaboration. In this sense, GWAC acts as the overseer for the support and eventually the implementation of interoperability. GWAC focuses heavily on the transformation of the power industry. Such a transformation will result from widespread adoption and use of information technology (IT) which incorporates open architecture and standards. The scope of this transformation includes the integration of new distributed technologies such as demand response, distributed generation, and storage with existing grid technology to allow for a collaborative management of the grid from power production to consumption by the ultimate customer. Conclusion This paper describes the concept of improving operation of a distribution circuit of the future through installment of interoperable devices which are controlled using a muti-agent system approach. The devices that are considered for deployment include D-FACTS for voltage support, DERs, and control agents. The benefits of interoperability are presented, and a multi-agent system control architecture for distribution system operation is discussed. This concept is being considered by SCE s DER Program and its Circuit of the Future. The project team involves SCE, the Advanced Power & Electricity Research Center (APERC) at West Virginia University and the US DoE National Energy Technology Laboratory (NETL). Acknowledgment This material is based in part on work supported by the Department of Energy Office of Electricity Delivery and Energy Reliability under Award Number DE-FC26-06NT Disclaimer This report was prepared in part as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. References [1] SCE Tariff Rule 2: Description of Service, [2] Hamilton S, Ang A., Hessenius C., Fuel Cells: A Utilities Perspective, Journal of power sources (J. power sources), 2006, vol. 158, no1, pp [3] Edison Int Financial and Statistical Report, [4] Gerhard Weiss, ed. Multiagent Systems: A Modern Approach to Distributed Artificial Intelligence, Cambridge, MA: MIT Press, [5] M. Wooldridge and N. R. Jennings, Intelligent agents: Theory and Practice, The Knowledge Engineering Review, vol. 10, pp [6] Ferber, J., Multi-Agent Systems: An Introduction to Distributed Artificial Intelligence, Addison Wesley, Harlow, UK, [7] E.F. Camacho and C. Bordons, Model Predictive Control, London: Springer-Verlag, [8] European Industry Association, EICTA Interoperability White Paper, June 2004, p. 5. [9] Silverstein, Alison and Schomberg, Richard. Highlighting Interoperability. Public Utilites. June 07. pp [10] GridWise AC website: [11] Nordman, An Agent Concept for Managing Electrical Distribution Networks, IEEE Trans. Power Delivery, [12] Hiyama, Multi-Agent Based Control and Operation of Distribution System with Dispersed Power Sources, Proceeedings IEEE/PES Transmission and Distribution Conference and Exhibition 2002: Asia Pacific, Vol. 3, pp , [13] Nagata, T., Y. Tahara and H. Fujita, An agent approach to bulk power system restoration. Proc. of the 2005 IEEE Power Engineering Society General Meeting. vol. 1, pp [14] Nagata, T. and H. Sasaki, A Multi-agent approach to power system restoration, IEEE Trans. on Power Systems, v. 17, pp , 2002.

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado, U.S.A.

More information

A VISION FOR THE SMART GRID

A VISION FOR THE SMART GRID The Modern Grid Strategy A VISION FOR THE SMART GRID Developed for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability by the National Energy Technology Laboratory June

More information

Standards de planification du NERC

Standards de planification du NERC Demande R-3498-2002 Standards de planification du NERC PREUVE EN CHEF DE TRANSÉNERGIE Original : 2002-11-27 HQT-4, Document 2 (en liasse) NERC PLANNING STANDARDS North American Electric Reliability Council

More information

(D2-01_28) ROLE OF ICT in Power System

(D2-01_28) ROLE OF ICT in Power System CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS http:d2cigre.org STUDY COMMITTEE D2 INFORMATION SYSTEMS AND TELECOMMUNICATION 2013 Colloquium November

More information

Enabling Integration of Distributed Renewables - Program 174

Enabling Integration of Distributed Renewables - Program 174 Enabling Integration of Distributed Renewables - Program 174 Program Description Program Overview The integration of distributed renewable generation sources into the electricity grid poses a number of

More information

NERC PLANNING STANDARDS

NERC PLANNING STANDARDS NERC PLANNING STANDARDS North American Electric Reliability Council April 2004 Version of All Planning Standards Terms and Their Definitions As Used in the Analysis (Study) an examination or simulation

More information

Multi-Agent Model for Power System Simulation

Multi-Agent Model for Power System Simulation Multi-Agent Model for Power System Simulation A.A.A. ESMIN A.R. AOKI C.R. LOPES JR. G. LAMBERT-TORRES Institute of Electrical Engineering Federal School of Engineering at Itajubá Av. BPS, 1303 Itajubá/MG

More information

Sustainable Transportation and Energy Plan

Sustainable Transportation and Energy Plan Exhibit A Rocky Mountain Power Investment Justification for Smart Inverter Project Sustainable Transportation and Energy Plan Utah Innovative Technologies Team Project Sponsor: Doug Bennion Revision: 0

More information

OPTIMAL RECLOSER DEPLOYMENT TO LEVERAGE SELF-HEALING: A TECHNO-ECONOMIC ROBUSTNESS ASSESSMENT

OPTIMAL RECLOSER DEPLOYMENT TO LEVERAGE SELF-HEALING: A TECHNO-ECONOMIC ROBUSTNESS ASSESSMENT OPTIMAL RECLOSER DEPLOYMENT TO LEVERAGE SELF-HEALING: A TECHNO-ECONOMIC ROBUSTNESS ASSESSMENT Eduardo RODRIGUES Ismael MIRANDA Nuno SILVA EFACEC Portugal EFACEC Portugal EFACEC - Portugal eduardo.rodrigues@efacec.com

More information

Transactive Energy, Transactive Control and OpenADR

Transactive Energy, Transactive Control and OpenADR Transactive Energy, Transactive Control and OpenADR (OpenADR as a Transactive Energy Component) June 19, 2014 James Mater, Jim Zuber QualityLogic 2014 QualityLogic Inc. I-1 6/23/2014 QualityLogic and Transactive

More information

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3,

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3, EB-00-0 Exhibit G Tab Schedule Page of SMART GRID PLAN SUMMARY Table presents the proposed 00 Smart Grid costs for Operations and Information Technology. Table : 00 Smart Grid Projects Smart Grid Projects

More information

Transactive Control in the Pacific

Transactive Control in the Pacific Transactive Control in the Pacific Northwest Smart Grid Demonstration Project IEEE SusTech 2013 August 2, 2013 Dr. Ronald B. Melton, Project Director Battelle, Pacific Northwest Division PNNL-SA-93659

More information

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017

Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA. March 21, 2017 Rochelle Municipal Utilities TRANSMISSION PLANNING CRITERIA March 21, 2017 Contents 1 Background...3 2 National and Regional Criteria and Guides...4 2.1 2.1 NERC Transmission Planning Standards...4 2.2

More information

Generator Interconnection Affected System Impact Study. Plains & Eastern Clean Line Final Report

Generator Interconnection Affected System Impact Study. Plains & Eastern Clean Line Final Report Generator Interconnection Affected System Impact Study Plains & Eastern Clean Line Final Report May 19, 2015 MISO 2985 Ames Crossing Eagan Minnesota - 55121 http://www.misoenergy.org Midcontinent Independent

More information

Smart Distribution Applications and Technologies - Program 124

Smart Distribution Applications and Technologies - Program 124 Smart Distribution Applications and Technologies - Program 124 Program Description Program Overview New technologies will be critical to future smart grid operation. These technologies will include advanced

More information

Phasor measurement units gain credibility through improved test and calibration standards

Phasor measurement units gain credibility through improved test and calibration standards Phasor measurement units gain credibility through improved test and calibration standards Smart grid; PMU calibration position 1 The North American interconnection, or electric transmission grid, is a

More information

PNSGD Project Overview & Transactive Energy

PNSGD Project Overview & Transactive Energy PNNL-SA-111398 PNSGD Project Overview & Transactive Energy Presented to PNWER Summit Energy and Environment Working Group Session Ron Melton, Ph.D., Project Director Pacific Northwest National Laboratory

More information

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004 Glossary of Terms Used in Standards Preliminary Draft Version 0 Standards September 1, 2004 Source References (Noted in draft only will not be part of final glossary) Functional Model () Glossary (GL)

More information

An Oracle White Paper June Microgrids: An Oracle Approach

An Oracle White Paper June Microgrids: An Oracle Approach An Oracle White Paper June 2010 Microgrids: An Oracle Approach Executive Overview Microgrids are autonomous electricity environments that operate within a larger electric utility grid. While the concept

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

CHAPTER 6 TRANSMISSION SYSTEM EXPANSION PLANNING AND APPLICATION OF FACTS CONTROLLERS

CHAPTER 6 TRANSMISSION SYSTEM EXPANSION PLANNING AND APPLICATION OF FACTS CONTROLLERS 108 CHAPTER 6 TRANSMISSION SYSTEM EXPANSION PLANNING AND APPLICATION OF FACTS CONTROLLERS 6.1 INTRODUCTION Planning and development of power system infrastructure to cater to the needs of the people is

More information

Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols

Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols Presentation to the U.S. Department of Energy by the IEEE Joint Task Force on QER U.S. DOE Requested Insights

More information

Power Quality Improvement in Distribution System Using Distribution Static Compensator

Power Quality Improvement in Distribution System Using Distribution Static Compensator Power Quality Improvement in Distribution System Using Distribution Static Compensator Jay Kumar Sharma 1, Om Prakash Mahela 2 and Sunil Agarwal 1 1 Department of Electrical Engineering, Apex Institute

More information

2014 Grid of the Future Symposium

2014 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Concepts and Practice Using Stochastic Programs for Determining Reserve Requirements

More information

What makes a Wind Plant Grid Friendly?

What makes a Wind Plant Grid Friendly? Stable Renewable Plant Voltage and Reactive Power Control NERC ERSTF June 11-12, 2014 Sebastian Achilles Nicholas Miller Einar Larsen Jason MacDowell GE Energy Consulting 1 / Topics Features of modern

More information

Overview of DOE Microgrid Activities

Overview of DOE Microgrid Activities Montreal 2006 Symposium on Microgrids Overview of DOE Microgrid Activities Poonum Agrawal Office of Electricity Delivery and Energy Reliability June 23, 2006 Mission Lead national efforts to modernize

More information

Enhancing Utility Outage Management System (OMS) Performance

Enhancing Utility Outage Management System (OMS) Performance Enhancing Utility Outage Management System (OMS) Performance by John Dirkman, P.E. Executive summary Traditional grid outage management systems suffer from two fundamental flaws: they lack an accurate,

More information

Implementing the Smart Grid: Enterprise Information Integration

Implementing the Smart Grid: Enterprise Information Integration Implementing the Smart Grid: Enterprise Information Integration Ali Ipakchi, VP, Integration Services KEMA, Inc. ali.ipakchi@kema.com Keywords: Smart Grid, Enterprise Integration, Assets, Utility Applications,

More information

AEP Guidelines for Transmission Owner Identified Needs

AEP Guidelines for Transmission Owner Identified Needs AEP Guidelines for Transmission Owner January 2017 1 Document Control Document Review and Approval Action Name(s) Title Prepared by: Kevin Killingsworth Principal Engineer, Asset Performance and Renewal

More information

Connection Study Requirements

Connection Study Requirements Document Release Released: September 20, 2010 The Customer shall comply with all the applicable requirements in this document when performing connection studies to produce the engineering study report.

More information

Standard MH-TPL Transmission System Planning Performance Requirements

Standard MH-TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: MH-TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

2030 Distributed Electricity Environment - independent, sustainable, and sassy

2030 Distributed Electricity Environment - independent, sustainable, and sassy 2030 Distributed Electricity Environment - independent, sustainable, and sassy International Student Energy Summit Presented by Steve Pullins, Modern Grid Team June 2009 Funded by the U.S. Department of

More information

Transmission Losses Report 2015

Transmission Losses Report 2015 SP Energy Networks October 2015 Transmission Losses Report 2015 1. INTRODUCTION Special condition 2K of SPT s transmission licence requires SPT to publish an annual transmission losses report detailing

More information

Reference Document. Interconnected Operations Services

Reference Document. Interconnected Operations Services N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 Reference Document Prepared by the Subcommittee Version 1.1 with Proposed

More information

Mapping Document for FAC-010-3

Mapping Document for FAC-010-3 Mapping Document for FAC-010-3 The Project 2015 09 standard drafting team (SDT) is proposing the retirement of the NERC FAC 010 3 Reliability Standard. The SDT further proposes a new paradigm regarding

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Innovation & Grid Modernization at ComEd. Laura García García Grid Strategy & Analytics Commonwealth Edison

Innovation & Grid Modernization at ComEd. Laura García García Grid Strategy & Analytics Commonwealth Edison Innovation & Grid Modernization at ComEd Laura García García Grid Strategy & Analytics Commonwealth Edison ComEd, An Exelon Company 2 Our Customers: 4 million electric customers in northern Illinois, including

More information

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation Prepared by: Entergy Services, Inc. T & D Planning 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date Description

More information

Distribution Automation. What? D A. How? Why?

Distribution Automation. What? D A. How? Why? Distribution Automation What? How? D A Why? Typical Power System Generating Plant Step-up transformers Generation System Circuit breakers Transmission System Transmission System Distribution System substations

More information

Daniel Feltes Phone: Fax:

Daniel Feltes Phone: Fax: Coordination of Controls of Renewable Power Plants to Meet Steady State and Dynamic Response Requirements for Voltage Control and Reactive Power Supply Dinemayer Silva Phone: 518-395-5169 Fax: 518-346-2777

More information

Determination of Smart Inverter Control Settings to Improve Distribution System Performance

Determination of Smart Inverter Control Settings to Improve Distribution System Performance 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Determination of Smart Inverter Control Settings to Improve Distribution System Performance

More information

TSOs, taking into account the following: Whereas

TSOs, taking into account the following: Whereas All TSOs proposal for a common grid model methodology in accordance with Articles 67(1) and 70(1) of Commission Regulation (EU) 2017/1485 of 02 August 2017 establishing a guideline on electricity transmission

More information

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA For Compliance with NERC Reliability Standard: TPL-001-4 1/10/2017 Version: 4.2 Table of Contents 1 Revision and Approval History... 2 1.1 Revision

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

Business Impact of Using the Remote Disconnect Switch October, 2013

Business Impact of Using the Remote Disconnect Switch October, 2013 Business Impact of Using the Remote Disconnect Switch October, 2013 Agenda Introduction Advanced Metering System Use of the Remote Switch Benefits What s Next? 2 CenterPoint Energy (CNP) Headquartered

More information

GENe DMS. Why choose GENe DMS? GE Energy Digital Energy

GENe DMS. Why choose GENe DMS? GE Energy Digital Energy GE Energy Digital Energy GENe DMS GE Energy s GENe Distribution Management System helps utilities optimize the performance of their networks. GENe DMS software reduces costs via intelligent peak-shaving

More information

Grid Integration of Renewable Energy. Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO)

Grid Integration of Renewable Energy. Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO) Grid Integration of Renewable Energy Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO) October 2012 Contents HELCO System Overview Challenges of integrating

More information

FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0

FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0 FACILITY CONNECTION REQUIREMENTS NERC TO-FAC 001-0 TABLE OF CONTENTS (NERC TO-FAC-001-0) Facility Connection Requirements Introduction Procedures for Coordinated Joint Studies...1 Procedures for Notification...1

More information

FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA FERC Form No. 715 Part 4 TRANSMISSION PLANNING RELIABILITY CRITERIA The following information submitted for this Part 4 of FERC Form No. 715 consists of PJM's current Planning Criteria, and each member

More information

Managing intelligent electronic devices

Managing intelligent electronic devices White Paper WP913001EN Managing intelligent electronic devices COOPER POWER SERIES As part of their Smart Grid initiatives, utilities have been deploying large numbers of Intelligent Electronic Devices

More information

1.3 Planning Assumptions and Model Development

1.3 Planning Assumptions and Model Development Section 1: Process Overview In addition, projects that originate through local Transmission Owner planning will be posted on the PJM web site. This site will include all currently planned transmission

More information

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO Renewable Energy Impact to Distribution Network Performance and Reliability ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO Presentation Outline 1. RE Integration and changes in the Electric

More information

Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012

Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012 Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25, 2012 1 Presentation Overview Joint Working Group The Issue Structure of the Report Wind Plant Configuration Wind Turbine Generators

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Stanly County, NC Total Output Requested By Customer: 30 MW Commercial Operation Date Requested By Customer: 12/1/2019 Feasibility

More information

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS Reliability Coordinator Processes and Tools Objectives Describe how the FRCC Security Process addresses planning/coordination of the Bulk Electric System Describe

More information

Smart Grid Concept, Applications and Lessons Learned from Recent Deployments

Smart Grid Concept, Applications and Lessons Learned from Recent Deployments GE Energy POWERING POTENTIA L Smart Grid Concept, Applications and Lessons Learned from Recent Deployments Gagan KAKKAR General Manager India Region GE Energy What is Smart Grid P O W E R I N G P O T E

More information

SYSTEM OPERATING LIMITS METHODOLOGY FOR THE OPERATIONS HORIZON. Rev. 1.0

SYSTEM OPERATING LIMITS METHODOLOGY FOR THE OPERATIONS HORIZON. Rev. 1.0 No. RC0610 SYSTEM OPERATING LIMITS METHODOLOGY FOR THE OPERATIONS HORIZON Rev. 1.0 By California Independent System Operator (CAISO RC) No. RC0610 Table of Contents A. Conventions... 5 B. Introduction

More information

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved.

ASSOCIATED NERC STANDARD(S): TPL (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved. ASSOCIATED NERC STANDARD(S): TPL-001-4 (referred to as TPL-001 in this document) IMPLEMENTATION: In effect when approved. Phase in of individual TPL-001 requirements will be based on the effective dates

More information

Grid Modernization Initiatives at ComEd

Grid Modernization Initiatives at ComEd Grid Modernization Initiatives at ComEd i-pcgrid Workshop 2017 Michelle Blaise SVP, Technical Services ComEd ComEd, An Exelon Company Our Customers: 3.85 million customers in northern Illinois, including

More information

The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network

The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network The Effect of the Volt/Var Control of Photovoltaic Systems on the Time-Series Steady-State Analysis of a Distribution Network Insu Kim, Ronald G. Harley, and Raeey Regassa Georgia Institute of Technology,

More information

OUTAGE COORDINATION PROCESS

OUTAGE COORDINATION PROCESS OUTAGE COORDINATION PROCESS March 13, 2017 www.peakrc.com. Classification: Public Page 0 of 68 Effective Date: Apr 01, 2017 Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...

More information

Edison SmartConnect. The Role of IT in. John Bubb Southern California Edison Edison SmartConnect TM May 20, 2008

Edison SmartConnect. The Role of IT in. John Bubb Southern California Edison Edison SmartConnect TM May 20, 2008 Edison SmartConnect The Role of IT in Smart Grid Infrastructure John Bubb Southern California Edison Edison SmartConnect TM May 20, 2008 PG&E LADWP SCE SDG&E SCE Overview Serving over 13 million people

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position AA1-038 Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position AA1-038 Lexington Low Moor 230kV 10.1MW Capacity / 78.2MW Energy September / 2015 Introduction

More information

Virtual Power Plant Simulation

Virtual Power Plant Simulation AEP/EPRI Smart Grid Demo Virtual Power Plant Simulation Project Overview Smart Grid Advisory Meeting June 23, 2009 Tom Jones / Tom Walker Virtual Power Plant Simulation Project Virtual Power Plant (VPP)

More information

Itron Analytics Maximize the Value of Your Smart Grid

Itron Analytics Maximize the Value of Your Smart Grid Itron Analytics Maximize the Value of Your Smart Grid Act Measure Predict Closed-Loop Analytics Store Analyze Complete Data Intelligence Lifecycle The ultimate goal of the smart grid is to ensure safe

More information

ISSN Vol.07,Issue.16, November-2015, Pages:

ISSN Vol.07,Issue.16, November-2015, Pages: ISSN 2348 2370 Vol.07,Issue.16, November-2015, Pages:3181-3185 www.ijatir.org Improvement of Power Quality in A Grid Connected Induction Generator Based Wind Farm using Static Compensator K. YOSHMA 1,

More information

NERC Reliability Functional Model

NERC Reliability Functional Model NERC Reliability Functional Model Function Definitions and Responsible Entities Version 3 Approved by Standing Committees: Operating Committee: December 6, 2006 Planning Committee: December 6, 2006 Standards

More information

Itron Analytics. Maximize the Full Value of Your Smart Grid. Image

Itron Analytics. Maximize the Full Value of Your Smart Grid. Image Itron Analytics Maximize the Full Value of Your Smart Grid Image Complete Data Intelligence Lifecycle The ultimate goal of the smart grid is to ensure safe and reliable delivery of energy. Building your

More information

Approved RMWG Discussion was held. ??? John Simpson need to assign SMART rating

Approved RMWG Discussion was held. ??? John Simpson need to assign SMART rating ALR1-1 Generator Reactive Limit Metric:Voltage schedules How many times did generators encounter var limits associated with holding voltage schedule. 10 3 2 1 1 3 1 Initial pilot effort completed, reaching

More information

Synergistic Project Planning Enables Intelligent Grid Vision and Real Business Benefits.

Synergistic Project Planning Enables Intelligent Grid Vision and Real Business Benefits. Synergistic Project Planning Enables Intelligent Grid Vision and Real Business Benefits. Experience you can trust. Executive Summary Electric utilities today face pressures to reduce costs, enhance power

More information

Power Systems Fundamentals

Power Systems Fundamentals Power Systems Fundamentals This seminar will be valuable to participants in the power industry who need a fundamental understanding of the power system, and how system operation can impact power market

More information

Peak Reliability Synchrophasor Program (PRSP) NASPI Data Quality Workshop

Peak Reliability Synchrophasor Program (PRSP) NASPI Data Quality Workshop Peak Reliability Synchrophasor Program (PRSP) NASPI Data Quality Workshop 03-21-2016 Peak Reliability Synchrophasor Program (PRSP) Acknowledgment: This material is based upon work supported by the Department

More information

Extending the CCS Retrofit Market by Refurbishing Coal Fired Power Plants

Extending the CCS Retrofit Market by Refurbishing Coal Fired Power Plants Extending the CCS Retrofit Market by Refurbishing Coal Fired Power Plants DOE/NETL-2009/1374 Simulations with the National Energy Modeling System July 31, 2009 Disclaimer This report was prepared as an

More information

Extended Microgrid Using (DER) Distributed Energy Resources

Extended Microgrid Using (DER) Distributed Energy Resources Extended Microgrid Using (DER) Distributed Energy Resources Robert H. Lasseter, Paolo Piagi University of Wisconsin-Madison Madison, Wisconsin Email: lasseter@engr.wisc.edu I. INTRODUCTION The electric

More information

A. RECOMMENDATIONS ON PROPOSED RELIABILITY PROJECTS

A. RECOMMENDATIONS ON PROPOSED RELIABILITY PROJECTS Public Advocates Office California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 Tel: 415-703-1584 www.publicadvocates.cpuc.ca.gov COMMENTS OF THE PUBLIC ADVOCATES OFFICE

More information

Project System Operating Limits

Project System Operating Limits Project 2015-09 System Operating Limits Technical Conference Background Materials These background materials were prepared by members of the Standard Drafting Team solely for use in conjunction with the

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

2018 General Rate Case Rebuttal Testimony

2018 General Rate Case Rebuttal Testimony Application No.: Exhibit No.: Witnesses: A.1-0-001 SCE-1 A K. Payne (U -E) 01 General Rate Case Rebuttal Testimony Policy ERRATA Before the Public Utilities Commission of the State of California Rosemead,

More information

Critical Load Serving Capability by Microgrid using 100% Renewable Energy

Critical Load Serving Capability by Microgrid using 100% Renewable Energy 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Critical Load Serving Capability by Microgrid using 100% Renewable Energy P. PENKEY,

More information

Maui Electrical System Model Development: Data and Assumptions

Maui Electrical System Model Development: Data and Assumptions Maui Electrical System Model Development: Data and Assumptions Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC-06NT42847 Task 8 Deliverable

More information

Mitigating Extraordinary Events using Wide Area Monitoring Applications

Mitigating Extraordinary Events using Wide Area Monitoring Applications 2, rue d Artois, F-75008 PARIS 53 RECIFE 20 http : //www.cigre.org Mitigating Extraordinary Events using Wide Area Monitoring Applications E. JOHANSSON, K. UHLEN, G. KJØLLE Norwegian University of Science

More information

Lecture Notes in Energy 5

Lecture Notes in Energy 5 Lecture Notes in Energy 5 For further volumes: http://www.springer.com/series/8874 . Hortensia Amaris Monica Alonso Carlos Alvarez Ortega Reactive Power Management of Power Networks with Wind Generation

More information

8 th Annual Electric Power Industry Conference

8 th Annual Electric Power Industry Conference 8 th Annual Electric Power Industry Conference STATCOM Application to Address Grid Stability and Reliability: Part I November 11 th, 2013 Authors: Donald Shoup, P.E. and Dr. Gregory Reed Support: Nick

More information

IDE4L project overview and ANM concept. Distributed automation system

IDE4L project overview and ANM concept. Distributed automation system SLIDE 1 04/12/2015 IDE4L project overview and ANM concept Aggregator concept Developed functionalities Distributed automation system Demonstrations Conclusions SLIDE 2 04/12/2015 From concept to demonstrations

More information

Walk-through of long-term utility distribution plans: Part 1 - Traditional Distribution Planning

Walk-through of long-term utility distribution plans: Part 1 - Traditional Distribution Planning Walk-through of long-term utility distribution plans: Part 1 - Traditional Distribution Planning Lavelle Freeman GE Energy Consulting Distribution Technology Training for NASUCA 2018 Mid-Year Meeting,

More information

1 Descriptions of Function

1 Descriptions of Function Distributed Energy Resource Controller Reconfigure s in response to Faulted Segment with Islanding 1 Descriptions of Function Version 1.2 January 13, 2010 This function describes the sequence of activities

More information

International ejournals

International ejournals ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER

More information

What new capabilities

What new capabilities White Paper Emerging Trends in Analytics What new capabilities mean for distribution grid management Kent Hedrick Director of Grid Management Solutions at Landis+Gyr Future. Ready. SM July 2014 Analytics

More information

DEW-ISM Implementation at PEPCO: A Model and Data Driven Approach to Automating PV Interconnection Studies

DEW-ISM Implementation at PEPCO: A Model and Data Driven Approach to Automating PV Interconnection Studies 1 DEW-ISM Implementation at PEPCO: A Model and Data Driven Approach to Automating PV Interconnection Studies July 20, 2017 Jason Bank Electrical Distribution Design Inc. (EDD) jason-bank@edd-us.com 2 EDD

More information

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria March 2016 Section 1 Overview and General Discussion The primary purpose of East Kentucky Power Cooperative s (EKPC s) transmission

More information

Voltage Optimization: Distribution Planning Considerations and Demand Savings Potential for an Emerging IDSM Technology

Voltage Optimization: Distribution Planning Considerations and Demand Savings Potential for an Emerging IDSM Technology Voltage Optimization: Distribution Planning Considerations and Demand Savings Potential for an Emerging IDSM Technology Tamer Rousan Ameren Illinois Company Lily Brown Opinion Dynamics 38 th PLMA Conference

More information

Managing Power Outage with OpenWay

Managing Power Outage with OpenWay Managing Power Outage with OpenWay Dave Stensland Product Manager Katrina Hutchinson Sr. Product Manager 2010, Itron Inc. All rights reserved. 1 Executive Overview 3 Introduction to Outage Reliability

More information

Managing Power Outage with OpenWay

Managing Power Outage with OpenWay Managing Power Outage with OpenWay Dave Stensland Product Manager Katrina Hutchinson Sr. Product Manager 2010, Itron Inc. All rights reserved. 1 Executive Overview 3 Introduction to Outage Reliability

More information

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS J O G Tande and K Uhlen SINTEF Energy Research, Norway SUMMARY Cost efficient utilisation of the wind energy resource requires wind farms to be located

More information

REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION)

REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION) REVENUE METERING REQUIREMENTS MANUAL (REDLINE VERSION) 9-10-2004 Revenue Meter Requirements Manual Revision: 1.0 Revision Date:9-10-2004 Disclaimer The information contained within this manual, along with

More information

Grid Planning - Program 40

Grid Planning - Program 40 Program Description Program Overview Traditional power system planning methods and tools are becoming less effective in today s power system environment. Transmission owners and operators not only need

More information

Public Webinar Feb. 5, 2015

Public Webinar Feb. 5, 2015 Public Webinar Feb. 5, 2015 U.S. DOE Acknowledgement Acknowledgment: "This material is based upon work supported by the Department of Energy under Award Number(s) DEOE0000734." Disclaimer: "This report

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS

B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS Draft 7/15/14 rev7 1 B-R1 TRANSMISSION SYSTEM PLANNING PERFORMANCE REQUIREMENTS A. Reliability Rule NYCA transmission facilities in the NYS Bulk Power System shall be planned to operate reliably over a

More information