uthukela Water (Pty) Ltd
|
|
- Prosper Smith
- 6 years ago
- Views:
Transcription
1 Hannelie Hickley - RCM Bulk Water & Scientific Services Milne Cronwright RCM Waste Water Treatment Plants Zenzele Ndlovu - Trainee Waste Water Treatment Plant Manager uthukela Water (Pty) Ltd Developing and Implementation of uthukela Water W2RAP Osizweni WWTP Wednesday 11 July 2012 Figure 1: Osizweni aerial photo July 2012 Water Master Class #2 1 Figure 2: Newcastle Geographical Layout INTRODUCTION Newcastle is situated in the Northwest KZN at the foot of the Northern Drakensburg Mountains. Newcastle Municipality is classified as a Water Service Authority. uthukela Water is the WSP Population being served is approximately (2007 survey). Average growth of 3.5%. Waste Water Treatment plants within the Newcastle LM area of jurisdiction are: Newcastle WWTP 25 ML/day Osizweni WWTP 14.7 ML/day Madadeni WWTP 12 ML/day Kilbarchan WWTP ML/day Charlestown ponds ML/day July 2012 Water Master Class #2 2 1
2 CHALLENGES AND INTERVENTIONS Water Conservation and Demand Management Hydraulic overload of WWTP Newcastle WWTP 25 Megs/day (Stormwater ingress > 78 Megs/day) Osizweni WWTP 14.7 Megs/day (Stormwater ingress > 30 Megs/day) Madadeni WWTP 12 Megs/day ( Megs/day due to water loss, also storm water ingress > 30 Megs/day). Kilbarchan WWTP 0.5 Megs/day - old infrastructure. These WWTP s are all serviced by aging sewer networks resulting in large volumes of storm water ingress during summer months, this is exacerbated by the severe water loss being experienced in the reticulation system. General Effluent standards compliance Planned maintenance insufficient qualified manpower and systems to record and schedule the maintenance. Staff compliment qualifications and certification. Asset Management No risk abatement plans or process audits in place O & M manuals July 2012 Water Master Class #2 3 GOAL Newcastle WSA and uthukela Water wishes to address all the requirements of the DWA Green Drop Certification programme Development and use of Wastewater Risk Abatement Plans (W 2 RAPs) to plan and manage towards safe and complying municipal wastewater collection and treatment. INTERVENTIONS TO MEET GOALS Appoint service provider to co-ordinate and facilitate Risk Abatement plans. Plant audit of all failing infrastructure. Set action plan to prioritise the highest risk effluent quality failures to meet general compliance standard. Appoint service provider to implement plant man. Reshuffling of available staff and motivation to uthukela Water Board for additional key posts. Updating of existing Process O & M manuals and compilation of documentation where none existed. Osizweni W2RAP development and implementation Service provider EMANTI July 2012 Water Master Class #2 4 2
3 METHODOLOGY AND APPROACH FOLLOWED - W 2 RAP To mitigate potential risks associated with wastewater systems. The primary objectives of a W 2 RAP are to: Prevent contamination during transport of wastewater / storage / disposal of sludge. Reduce or remove contamination through the treatment processes. Minimise contamination of the resource to which the treated effluent is returned to. W 2 RAP contains the following three key components: System assessment (effluent quality) Identifying control measures (i.e. what is in place to prevent an incident occurring?) Management plans (i.e. Normal operation and/or incident conditions, monitoring plans, communication plans, supporting programmes) July 2012 Water Master Class #2 5 APPROACH WHEN DEVELOPING A W 2 RAP COMPRISES THE FOLLOWING STEPS: Assemble project team/ key stakeholders Document and describe the present wastewater treatment system Assess the wastewater treatment system Undertake a hazard/risk assessment Identify hazards, control measures and preventative actions Workshop the risk and control measure with the project team/ key stakeholders Monitoring of control measures and wastewater quality Verify that the W 2 RAP is operational Develop and or review management procedures and supporting programmes Establish documentation and communication procedures Review of the W 2 RAP A site visit was conducted, where after a detailed assessment was drafted using the water services sector tools provided for on the ewqms July 2012 Water Master Class #2 6 3
4 Pollution Sites What is a risk? The likelihood that a hazard could cause harm and the consequences. RISK MATRIX: The following Risk Assessment Matrix was used to calculate the likelihood of a risk occurring and consequences of the hazard. RISK RATING = LIKELIHOOD x CONSEQUENCES Table 2: Risk Matrix Risk Rating Range Low 0-10 Medium High July 2012 Water Master Class # ASSEMBLING THE TEAM: Team members included: WSP: RCM WWTP, Senior Process Controllers, Superintendants, Safety Officer, Specialist Technical Input, Specialist Water Quality and WSA: WSA Manager and Technical Specialist. 2. SYSTEM DESCRIPTION: 2.1 Waste Water Plant Class C Activated Sludge system Design capacity of 15 ML/day Hydraulically overloaded - ingress of storm water and poor WCDM System units: Inlet works Primary Sedimentation Tanks 3 Bio filters Primary Sludge Pump Station Activated Sludge Reactor Figure 3: Process Flow Diagram July 2012 Water Master Class #2 8 4
5 Final Clarifiers RAS and WAS Pump Station Chlorination Tank Maturation ponds Sludge Screening and Building Digester Feed Pump Station and Pumps Sludge drying beds Emergency ponds 2.2 Pump Station and Infrastructure Site visits at selected pump stations to identify risks. Risk assessment findings were presented and work shopped with the WWRAP team July 2012 Water Master Class # Average Daily Dry Weather Flows July 2012 Water Master Class #2 10 5
6 3. HAZARDOUS ASSESSMENT The hazard assessment entailed; Site investigations of wastewater treatment works, pump stations, wastewater related infrastructure. Populating of Wastewater Risk Abatement Plan on the electronic Water Quality Management System (ewqms) Findings were workshoped to determine user defined risks. Proposed corrective actions were discussed and tabled indicating the person responsible, targeted time and the estimated cost. Figure 4: A screenshot of the risk assessment tool as seen on ewqms is shown below July 2012 Water Master Class # Risk Assessment Summary Photo Diary July 2012 Water Master Class #2 12 6
7 3.2 Cumulative Risk Rating (CRR) CRR = A*B+C+D A - Design Capacity B - Receiving Flow C - Technical Skills (required vs. actual) D - Effluent quality compliance CRR for Osizweni WWTP calculated using DWA Progress Assessment Tool, as per screenshot from Green Drop Progress Report 2012 is shown on the right. CRR: 45.5 % - Low Risk July 2012 Water Master Class # Critical Control Points The critical control points as indicated in red on the flow diagrams of Plant 1 & 2 below, is for present and future monitoring purposes. Figure 5. Osizweni Plant 1: Critical Control points July 2012 Water Master Class #2 14 7
8 Figure 6. Osizweni Plant 2: Critical Control Points July 2012 Water Master Class # Risk Assessment Findings Figure 7. Snapshot of findings July 2012 Water Master Class #2 16 8
9 4. CONTROL MEASURES VALIDATION AND ACTION The outcomes of the hazard risk assessment and workshops with the WSA, the following key aspects were highlighted Appropriateness of control measures. Responsible person for the control measures. Budget implication for the control measure where available. Time implication for the control measure where available. Figure 8. Snapshot of Control measures and actions July 2012 Water Master Class #2 17 Osizweni Old Head of works Manual screens and grit removal 5. IMPACTS AND RESULTS 5.1 Infrastructure refurbishment program New Head of works: Consisting of automated mechanical screen, washer and compactor July 2012 Water Master Class #2 18 9
10 Infrastructure refurbishment program Maturation ponds Before After Cleaning of maturation ponds and installing a temporary chlorine contact tank July 2012 Water Master Class #2 19 Infrastructure refurbishment program Staff quarters - Electrical panel upgrade July 2012 Water Master Class #
11 Palisade fencing erected around plant for safety purposes Infrastructure refurbishment program. Foreground: Refurbished Sludge drying beds July 2012 Water Master Class # Water quality performance indicators Ammonia results from Suspended solids results from July 2012 Water Master Class #
12 5.3 Staff : - Registration of all Process Staff and Plants - NQF 2 Training of Process Staff July 2012 Water Master Class # CONCLUSION The compilation of a W2RAP is a time-consuming process. But the benefits gained from a management point allows an in-depth control and management tool for the efficient operation of a WWTP. The efficiency of the W2RAP requires continues maintenance and updating to ensure effective management. The implementation and up keeping of the system is a team effort and involves all personnel from Assistant Process Controller level to Management. What we learned / What was working? What you don t measure you cant manage Remaining Challenges WCDM Infrastructure refurbishment and upgrading Maintenance of our W2RAP Effluent microbiological compliance July 2012 Water Master Class #
13 CHALLENGES STILL TO BE ADRESSED Digesters need to be cleaned Sludge Drying beds need repairing July 2012 Water Master Class #2 25 Water quality performance indicators challenge E. coli results from July 2012 Water Master Class #
14 6. RECOMMENDATIONS Obtain an experienced Service provider to assist and lead the compilation of an effective W2RAP Get all Staff and Stakeholder motivated to buy into the system. 7. ACKNOWLEDGEMENT emanti Newcastle WSA uthukela Water Staff July 2012 Water Master Class #
Wastewater Risk Abatement Plan of STEVE TSHWETE LOCAL MUNICIPALITY
Wastewater Risk Abatement Plan of STEVE TSHWETE LOCAL MUNICIPALITY This document should be read in conjunction with WRC Report TT 489/11 (Wastewater Risk Abatement Plan A W 2 RAP guideline to plan and
More information6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works
6 WASTEWATER 6.1 Overview Umgeni Water currently owns and operates the Darvill and Ixopo Wastewater Works (WWWs). It also operates the Howick WWW for umgungundlovu District Municipality under a management
More informationReplacing an old Sewage Treatment Plant
Replacing an old Sewage Treatment Plant GILGANDRA S ASSET MANAGEMENT AND FINANCIAL PLANNING JOURNEY Rolly Lawford Director of Works and Technical Services Gilgandra Shire Council Jacqui Hansen Principal
More informationORGANOGRAM AREA MANAGER PC 12. Technical Inspector MECHANICAL PC9. Semi-Skilled Assistant PC6 PURPOSE
HR191 JOB DESCRIPTION NOTES Forms must be downloaded from the UCT website: http://forms.uct.ac.za/forms.htm This form serves as a template for the writing of job descriptions. A copy of this form is kept
More informationWESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council
WESTDALE WWTP AUGMENTATION AND REUSE FARM Paper Presented by: Stephen Sullivan and Jamie Hunt Authors: Stephen Sullivan, Team Leader, Jamie Hunt, Wastewater Headworks Operator, Tamworth Regional Council
More informationWATER POLLUTION CONTROL PLANT
WATER POLLUTION CONTROL PLANT Welcome to the Sunnyvale Water Pollution Control Plant For 60 years, Sunnyvale s Water Pollution Control Plant has worked tirelessly 24 hours a day and 7 days a week. Rain
More informationTexas Commission on Environmental Quality Page 1 Chapter 30 - Occupational Licenses and Registrations
Texas Commission on Environmental Quality Page 1 SUBCHAPTER J: WASTEWATER OPERATORS AND OPERATIONS COMPANIES ''30.331, 30.337, 30.340, 30.342, 30.346, 30.348, 30.350, 30.355 Effective September 27, 2007
More informationHISTORY
HISTORY Protecting the environment and meeting all requirements of the national and the EU legislation in this area are a major priority and inseparable part of the business strategy of Sofiyska Voda JSC.
More informationMinnesota Pollution Control Agency
Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE
More informationPolishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.
Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,
More informationFAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY
FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three
More informationBest practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest
Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan
More informationChapter 2: Description of Treatment Facilities
2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes
More informationBEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.
BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Application of Pennsylvania-American Water Company for (1) approval of the transfer, by sale, of substantially all of the Borough of New Cumberland s assets,
More informationAdvanced Wastewater Treatment Plant Plant Profile
Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.
More informationSanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview
Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public
More informationCopies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100
MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033
More informationAnn Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
More informationBEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary
BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred
More informationSTATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT
STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION
More informationStorm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015
Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015 Mack Overton, VP Industrial Services KERAMIDA, Inc. Stormwater Rule Purpose is to limit
More informationRegional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study
Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief
More informationFunding Efficient and Sustainable Energy for Wastewater Treatment Facilities
Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities Diane W. Duva, Office of Energy Demand May 6, 2015 Connecticut Department of Energy and Environmental Protection Benefits of
More informationWatertown Wastewater Facility Plan. August 11, 2015
Watertown Wastewater Facility Plan August 11, 2015 Watertown Wastewater Wastewater Treatment Facility History Comprehensive Planning Wastewater Concerns Capacity Condition Permitting Requirements Watertown
More informationThe licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.
Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not
More informationStorm Water Management Plan (SWMP)
Storm Water Management Plan (SWMP) Nebraska Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Authorization Number NER300010 Issued: January 1, 2006 Plan Contact Information Scott A.
More informationProject Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14
Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with
More informationNorthfield Township WWTP Capacity Evaluation Report
Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site
More informationBLUE Drop. Overview of current requirements
BLUE Drop Overview of current requirements SALGA / Ethekwini / MILE / IMESA Training Workshop Mariette Swart Depart: Water Affairs Directorate: Water Services Regulation Blue Drop 2011 Requirements DWQ
More informationConstruction of first wastewater treatment plant in Kosovo: an EU pilot project
Water Utility Journal 14: 41-46, 2016. 2016 E.W. Publications Construction of first wastewater treatment plant in Kosovo: an EU pilot project B.Sh. Kajtazi European Union Office in Kosovo, Kosovo Street
More informationPlanning for Infrastructure Service Delivery in Municipalities: The Role of Comprehensive Infrastructure Plans. DJW Wium
Planning for Infrastructure Service Delivery in Municipalities: The Role of Comprehensive Infrastructure Plans DJW Wium Aurecon South Africa (Pty) Ltd Scope Background on Infrastructure Planning Concepts
More informationINFRASTRUCTURE ELEMENT
Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN
More informationFOR PUBLIC PARTICIPATION
Integrated Risk Management Final Risk Assessment Report: Eskom Holdings Generation: Proposed installation of an additional 500m³ bulk storage fuel oil tank at Grootvlei Power Station 13 February 2012 FOR
More informationEco-Efficient Solids Separation
Eco-Efficient Solids Separation Benchmarking water solutions THREE CRITICAL PROCESSES In a Salsnes Filter system SOLIDS SEPARATION, SLUDGE THICKENING and DEWATERING are performed in one compact unit, removing,
More informationINSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /
INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL 61764 815/844-7174 MALINDA HILLMAN, ADMINISTRATOR DONNIE SIMMONS, L.E.H.P. DIRECTOR
More informationEconomic Criteria and Parameters to Evaluate Wastewater Pond Systems
Economic Criteria and Parameters to Evaluate Wastewater Pond Systems K.-U. Rudolph, T. Fuhrmann, M. Harbach Slide 1 Table 1 Basic characteristics of core wastewater pond systems No 1 2 3 Characteristic
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationStormwater Management Plan (SWMP)
Stormwater Management Plan (SWMP) - NPDES Stormwater Discharge Authorization Number NER300008 Issued: January 1, 2006 Plan Amended: March 5, 2009 - Plan Contact Information Andy L. Harter Engineering Assistant
More informationHazardous Waste Management
Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective
More informationTHE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY
THE WASTEWATER MANAGEMENT IMPROVEMENT PROJECT OF DARKHAN CITY Asian Development Bank Ministry of Construction and Urban Development Governor s Office of the Darkhan Uul aimag Project Goals, Outcomes and
More informationRefurbishment of Emalahleni Bulk Scheme
Refurbishment of Emalahleni Bulk Scheme Sedimentation tank Rapid Gravity Sand Filter Hartbeespoort Dam Integrated Biological Remediation Programme CLIENT: DWA Gauteng SCOPE: Rand Water is appointed by
More informationYour Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance
Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment Design Supply Integration Installation Maintenance The Challenge for Businesses that Use Water PUBLIC HEALTH EPA state
More informationCase Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.
Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.
More informationEast Coast P Removal Technology Performance Summary
East Coast P Removal Technology Performance Summary Charles B. Bott Hampton Roads Sanitation District NonReactive Phosphorus Workshop Spokane, Washington August 11 12, 2009 Acknowledgements Numerous slides
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Waste Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site ) to a
More informationReview of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng
Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores
More informationCase Study XII* - Kingdom of Jordan
Water Pollution Control - A Guide to the Use of Water Quality Management Principles Edited by Richard Helmer and Ivanildo Hespanhol Published on behalf of the United Nations Environment Programme, the
More informationNeed-to-Know Criteria Wastewater Treatment Operator Class III
2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is
More informationPEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE
REQUEST FOR QUALIFICATIONS CITY OF PORTSMOUTH NEW HAMPSHIRE Public Works Department ENGINEERING SERVICES PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE VALUE ENGINEERING REVIEW RFQ No. 59-14 City
More informationGRASS VALLEY WASTEWATER TREATMENT INQUIRY
GRASS VALLEY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
More informationNeed-to-Know Criteria Wastewater Treatment Operator Class IV
2017 Need-to-Know Criteria Wastewater Treatment Operator Class IV A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class IV Certification Exam Before You Dive In What is ABC
More informationJEDDAH INDUSTRIAL CITY
JEDDAH INDUSTRIAL CITY WASTEWATER TREATMENT PLANT A Presentation by : Engr. Mowafaq Al-Sugeir Managing Director ICDOC SAWEA 2007 WORKSHOP, AL-KHOBER 4 December 2007 Built & Being Operated by : on Build-Operate-Transfer
More informationMunicipal Case Study Achieving the Blue Drop. R Britz Specialist: Scientific Services April 2012
Municipal Case Study Achieving the Blue Drop R Britz Specialist: Scientific Services April 2012 Where is Mogale City Local Municipality? Where is Mogale City Local Municipality? Mogale City in a nutshell
More informationUnit Treatment Processes in Water and Wastewater Engineering
Unit Treatment Processes in Water and Wastewater Engineering T J Casey AQUAVARRA RESEARCH LIMITED 22A Brookfield Avenue Blackrock Co. Dublin. October 2006 Author s Note Water and wastewater treatment technology
More informationMUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT
MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:
More informationEnvironmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group
Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date
More informationE5. On-site and small scale wastewater treatment and disposal
E5. On-site and small scale wastewater treatment and disposal E5.1. Background On-site wastewater systems are utilised for residential dwellings, commercial and industrial activities and facilities not
More informationInformation Requirements Table for Liquid Waste
Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry
More informationOPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT. Iain Fairbairn. Iain Fairbairn, Plant Manager, Sydney Water
Winner of the Actizyme Prize for Best Paper at the NSW Operators Conference held in October 2005 OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT Paper Presented by : Iain Fairbairn Author: Iain
More informationWWETCO FlexFilter and Bio-FlexFilter
Innovative Filter Technology Tool for Reducing Energy, Expanding Capacity, Wet Weather Management and Nutrient Control WWETCO WWETCO FlexFilter and Bio-FlexFilter AGENDA WWETCO FlexFilter & Bio-FlexFilter
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationCity of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL
City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES PEASE WASTEWATER TREATMENT FACILITY HEADWORKS UPGRADE INVITATION Sealed
More informationi
1 i ii iii iv v GLOSSARY AND ABBREVIATION ABBREVIATIONS BPG Best Practice Guideline BCR Benefit/cost ratio CBA Cost Benefit Analysis CMA Catchment Management Agency CMS Catchment Management Strategy DWA
More informationWastewater Management in Developing Countries. Dr. Mushtaq Ahmed Memon Programme Officer, UNEP IETC
Wastewater Management in Developing Countries Dr. Mushtaq Ahmed Memon (mushtaq.memon@unep.or.jp) Programme Officer, UNEP IETC Overview Paradigm shift and technology needs Assessment of demand Challenges
More informationWater Reclamation Facility Master Plan. Community Workshop November 14, 2016
Water Reclamation Facility Master Plan Community Workshop November 14, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview Big Picture
More informationTHE COMPLETE GUIDE TO ISO14001
THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...
More informationfinal report Water quality improvement strategy for a processing site
final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY
More informationKaipara District Plan: Proposed Plan Change 2 - Fire Safety Rules SUMMARY
Kaipara District Plan: Proposed Plan Change 2 - Fire Safety Rules SUMMARY Kaipara District Council is proposing changes to the Fire Safety Rules in the Kaipara District Plan. Research has been undertaken
More informationW O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W
Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF
More informationWastewater Master Plan Status Update. City of Portsmouth, New Hampshire
Wastewater Master Plan Status Update City of Portsmouth, New Hampshire November 21, 2011 Topics for Discussion Review of Master Plan Effort Regulatory Status Pilot Effort to Verify Technology Selection
More informationMobile Treatment Units
Mobile Treatment Units DE-WATERING SEDIMENT CONTROL TECHNIQUE Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils High Flow Rates High Filtration Polluted Soils [1]
More informationPublic Notice: Wetland/Waterway/Water Quality Regulations
Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under
More informationMartinborough Wastewater Treatment Plant - Operation & Maintenance Manual
Martinborough Wastewater Treatment Plant - Operation & Maintenance Manual South Wairarapa District Council March 2014 Working Draft Martinborough Wastewater Treatment Plant - Operation & Maintenance Manual
More informationCHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA
CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)
More informationDealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017
Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;
More informationRemoval of High Ammonia Levels from Municipal Wastewater Using Humic Acid and Selective Bio-Augmentation
Removal of High Ammonia Levels from Municipal Wastewater Using Humic Acid and Selective Bio-Augmentation Prepared by: Brent W. Cowan, P.E. Coatesville, PA 19320 Steven M. Cawley Cawley Environmental Services,
More informationEvaluation of Compliance ISO 14001:
1. PURPOSE: This document describes the procedure for planning, performing, and documenting periodic internal environmental compliance assessments completed as part of the Office of Quality (OEQ) Compliance
More informationc: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries
Climate Change and Environmental Protection Division Environmental Approvals Branch 123 Main Street, Suite 160, Winnipeg, Manitoba R3C 1A5 T 204 945-8321 F 204 945-5229 www.gov.mb.ca/conservation/eal CLIENT
More informationEnergy, the water sector and rapid urbanization in the South. Lessons from Asia, Africa and Latin America
Energy, the water sector and rapid urbanization in the South Lessons from Asia, Africa and Latin America Structure of presentation Introduction the context and overview of efficiency and energy-related
More informationTHE TRANSITION FROM TRICKLING FILTER TO SBR TREATMENT PLANTS. Peter Sharp & Wayne Krause. GWMWater
THE TRANSITION FROM TRICKLING FILTER TO SBR TREATMENT PLANTS Paper Presented by: Peter Sharp & Wayne Krause Authors: Peter Sharp & Wayne Krause, Water Service Operators, GWMWater 77 th Annual WIOA Victorian
More informationWhat is a stormwater utility fee?
What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville
More informationAsset Risk Management Journey Plan
Asset Risk Management Journey Plan STRATEGIC PLAN 2010-2013 Transpower New Zealand Limited April 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 1. PURPOSE... 4 2. OVERVIEW OF TRANSPOWER S RISK MANAGEMENT
More informationNeed-to-Know Criteria Wastewater Treatment Operator Class II
2017 Need-to-Know Criteria Wastewater Treatment Operator Class II A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class II Certification Exam Before You Dive In What is ABC
More informationHillsdale Wastewater Treatment Plant
Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background
More informationCity of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017
City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy
More informationCONSULTING ENGINEERS
Civil WATER,WASTEWATER & REUSE Environment STORMWATER & HYDROLOGY TRAFFIC & Transport Structural Process Electrical EDUCATION Capability statement CONSULTING ENGINEERS Nov 2010 QUEENSLAND AUSTRALIA admin@macreadyassociates.com.au
More information. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)
. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA) ENVIRONMENT STATISTICS IN SUPPORT OF THE IMPLEMENTATION OF THE FRAMEWORK FOR THE DEVELOPMENT OF ENVIRONMMENT (FDES 2013) PRESENTED BY MKAMA
More informationAttachment C Management of the Installation
Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental
More informationWASTEWATER TREATMENT SYSTEM
WASTEWATER TREATMENT SYSTEM PrintStudioOne.com Nelson Environmental Inc. The Nelson Environmental OPTAER system is an efficient pond-based wastewater treatment solution utilized in a broad spectrum of
More informationSection 8: Amended Soil Mounds. 8. Amended Soil Mounds
Section 8: Amended Soil Mounds 8. Amended Soil Mounds 8. Amended Soil Mounds 8.1 Design...95 8.2 Installation...96 8.3 Inspection...101 8.4 Operation...101 8.5 Common technical issues...105 8.6 Case study...105
More informationSulaibiya world s largest membrane water reuse project
Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi
More informationTHE NEW DUBBO SEWAGE TREATMENT PLANT UPGRADE. Glenn Clifford. Dubbo City Council
THE NEW DUBBO SEWAGE TREATMENT PLANT UPGRADE Paper Presented by: Glenn Clifford Author: Glenn Clifford, Water Operations Treatment Supervisor, Dubbo City Council 6 th Annual WIOA NSW Water Industry Engineers
More informationProposed Wastewater Treatment Facility Equipment Repair and Replacement Project
Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Presented August 29 th, 2016 Function of IMKWWTP Treatment Facility History Reasons for Proposed Project Why Now? Modest
More informationCOMBINED CONTROL OF SEWER AND WASTEWATER TREATMENT PLANT UNSING IDENTIFIABLE MODELS THE SMArt CONTROL OF WASTEWATER SYSTEMS PROJECT
COMBINED CONTROL OF SEWER AND WASTEWATER TREATMENT PLANT UNSING IDENTIFIABLE MODELS THE SMArt CONTROL OF WASTEWATER SYSTEMS PROJECT D. Thornberg*, M.K. Nielsen** and S. Bay Jørgensen*** * Helsingør kommune,
More informationHOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN
HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins
More informationENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL ASSESSMENT Project Identification Name: Piqua Wastewater Plant Expansion NRD WPCLF#: CS390755-0009, AIMS #5945 Contact: Gary Huff, City Manager City of Piqua 201 Water Street Piqua, OH 45356
More informationWater Solutions for the Mining Industry
Water Solutions for the Mining Industry Reliable Mining Expertise EXPERIENCED. From the extreme heat of remote Australia and Africa, to the cold climates of Mongolia and Kazakhstan, MAK Water has delivered
More informationTexas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions
Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance
More informationModular Sediment Barriers (Instream)
Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More information