Construction Soil and Water Management Sub- Plan
|
|
- Ethan Burns
- 6 years ago
- Views:
Transcription
1 C Appendix C Construction Soil and Water Management Sub- Plan 3 January 22
2
3 CiviLake 3 January 22 Soil and Water Management Plan
4 Prepared for CiviLake Prepared by AECOM Australia Pty Ltd Level 2, 42 George Street, Sydney NSW 2, PO Box Q4, QVB Post Office NSW 23, Australia T F ABN January 22 AECOM in Australia and New Zealand is certified to the latest version of ISO9 and ISO4. AECOM Australia Pty Ltd (AECOM). All rights reserved. AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this document. This document has been prepared based on the Client s description of its requirements and AECOM s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety. 3 January 22
5 Quality Information Document Ref p:\64_lmrc\4. tech work area\cemp\appendices to cemp\appendix c construction soil and water management plan\soil and water management plan - final.doc Date 3 January 22 Prepared by Reviewed by Celeste Swan Andrew Kielniacz Revision History Revision Revision Date Details Name/Position Authorised Signature 3 2-Oct-2 Final Joshua Lasky Project Manager 3 January 22
6 Table of Contents. Introduction. Background.2 Purpose.3 Objectives 2. Site Characteristics 3 3. Water Quality Targets 4 4. Sediment and Erosion Control Measures 5 4. Construction Activities Management of Activities Mitigation Measure Requirements Design Requirements Installation and Maintenance Requirements 5. SWMP Implementation 2 5. Overview Inspection Requirements Pre-Inspection Scope Non-Conformance and Corrective Actions Roles and Responsibilities 5 Appendix A Receiving Environment Plan Appendix B Erosion and Sediment Control Plan (ESCP) and Typical Details Appendix C Control Measure Installation and Maintenance Guidelines A B C List of Tables Table Construction Activities and Management Controls 5 Table 2 Sediment Basin Design Criteria Table 3 Total Sediment basin Volume requirements for 4.7ha site disturbance Table 4 Sediment Basin Volume Requirements Based on disturbed Area of Site Table 5 SWMP Implementation and Operation Requirements 2 Table 6 Roles and Responsibilities 5 3 January 22
7 . Introduction. Background CiviLake is proposing to develop and operate The (referred to as the proposed Facility) on a Site at The Weir Road, Teralba, known as Lots 42, 43, 53 and 54 in Deposited Plan (DP) 662. The proposed Facility would be a crushing, grinding and separating operation for construction and green waste materials including concrete, asphalt, recycled asphalt pavement, road base, green waste, bricks, tiles and soil. The proposed Facility would accept up to 2, tonnes per annum (tpa) of construction and green waste material for reuse within CiviLake operations and resale to the construction industry. The project will significantly decrease both the amount of virgin materials Council is required to purchase for its civil works and the volume of construction waste Council disposes to landfill, providing a dual economic and environmental benefit. The site of the proposed Facility has an area of approximately 7 hectares and is located approximately 2km north of the village of Teralba on a floodplain to the south and west of Cockle Creek. The site will be accessed from a new entry intersection with the Weir Road which adjoins the southern boundary of the site. The site is currently used for light agriculture and is elevated approximately m relative to the adjoining land, due to the previous land use of sanitary disposal involving the deposit of biosolids and fill over the site. The site level is proposed to be further raised through filling to cap existing contamination, raise the site above flood levels and facilitate appropriate water management. The site has been designed in order to enable the practical requirements of the proposed Facility s operation and to minimise the potential impacts of the proposal on the surrounding environment..2 Purpose The purpose of this (SWMP) is to provide a description of the measures to be implemented to mitigate potential soil erosion and resulting water quality impacts on land and water resources within and beyond the areas disturbed during the construction of the Facility. It is a sub-plan of the Construction Environmental Management Plan (CEMP) and assists in ensuring compliance with the DoPI s Conditions of Approval. This document details proposed erosion and sediment controls and is intended to document the performance standards and framework for the preparation and implementation of soil and water management controls by CiviLake. The Conditions of Consent regarding preparation of a specifically relate to the operation of the facility. However the Statement of Commitments included preparation of a Construction Environmental Management Plan that was to include soil and water management measures. : In addition, Condition of Schedule 4 of DoPI s Conditions of Approval relevant to the facility during construction require:. Except as may be expressly provided in an EPL for the site, the Proponent shall comply with Section 2 of the PEOA Act..3 Objectives The objectives of this SWMP are to: - Specify relevant erosion and sediment control (ESC) performance criteria and design guidelines; - Detail the standard ESC controls to be implemented to control soil erosion and water management on site to meet with specified surface water discharge limits - Document maintenance requirements for the controls - Establish an inspection framework to ensure proactive management of erosion and sedimentation impacts 3 January 22
8 2 - Outline the reporting and reviewing requirements - Detail the responsibilities associated with erosion and sedimentation management. Water discharged from the Project follows an existing drainage pathway (man-made channels) through the downstream swamp forest and freshwater wetland communities and conveys flows into a SEPP4 wetland. The flow pathway is illustrated in Receiving Environment Plan provided in Appendix A. If not managed appropriately, construction activities have the potential to cause environmental harm to these waterways, through offsite transport of pollutants (i.e. sediment, oils and greases, contaminated water). Therefore, management of construction activities and implementation of ESCs is required to ensure the project maintains a high level of environmental performance and is compliant with the project Conditions of Consent and statutory requirements. 3 January 22
9 3 2. Site Characteristics The site is located in an alluvial back swamp approximately 2m south of Cockle Creek. The closest point of the creek is approximately 2m from the proposed Facility. A SEPP 4 Wetland exists 2m to the south of the subject site and a number of vegetation communities adjoin the site to the north, west and east. Shallow unlined drainage channels flow east from the site through an existing drainage pathway and eventually into the wetland. The groundwater levels measured at the site range from around.5m RL in dry periods and.5-.8m RL measured following high rainfall. The land is elevated approximately m relative to the adjoining land, due to the previous land use of sanitary disposal involving the deposition of biosolids over the site. Fill depths of greater than 2.9 m have been recorded. Locally the site is gently undulating, and the ground surface is hummocky and irregular due to the presence of fill on the site. The ground surface contains troughs approximately m in depth. Generally the site slopes at <5 to the south. Surface soils consist of loose sand and clayey sand fill. 3 January 22
10 4 3. Water Quality Targets All stormwater runoff from the construction area must be stored and treated prior to any controlled discharged offsite. No uncontrolled discharge off-site must occur unless the design criteria of the proposed mitigation measures specified in this SWMP or the Blue Book are exceeded (ie. higher rainfall events than that designed for the sediment basin capacity). Based on the Blue Book and The Australian Water Quality Guidelines for Fresh and Marine Waters (ANZECC, 2) guidelines, all controlled water releases off-site must meet the flowing requirements prior to discharge: - ph within the range of 6.5 to Suspended solids - no greater than 5mg/L - Oils and grease no visible films or odour - Litter no visible litter washed (or blown) from the site. As discussed in the Water Cycle Management Plan (AECOM, 2), suspended solids testing is impractical due to the expensive and time-consuming nature of the tests. As such, turbidity may be estimated to give an estimation of TSS concentration with 5mg/L roughly correlating to a 9 percentile NTU reading not exceeding and the 5 percentile NTU not exceeding 6. However, this is required to be confirmed by correlating TSS and turbidity for the site early in the construction program and preferably prior to the first discharge. The proposed water quality monitoring program consisting of weekly ph and turbidity testing of the water in the sediment pond/s will also produce confidence in the level of continuous TSS and turbidity levels in the sediment basins. 3 January 22
11 5 4. Sediment and Erosion Control Measures 4. Construction Activities The construction of the will comprise the following civil works activities: - Site preparation including clearing and any regrading of the site required - Construction of a perimeter earth bund and pad for the facility using compacted fill materials - Construction of water storage / treatment ponds - Construction of stormwater diversion drains - Construction of a site access intersection and internal roadways - Utility installations - Construction of buildings and carpark/hardstand areas - Erection of perimeter fencing - Landscaping of embankment batters and channels. 4.2 Management of Activities Construction activities provided in Section 3.2 above have the potential to result in erosion and water quality impacts. The proposed management controls and mitigation measures to be implemented by CiviLake to minimise the potential impacts for these activities is summarised in Table below. Table Construction Activities and Management Controls Construction Activity Management Controls Site Preparation - Prior to commencement of work on the site, install all erosion and sedimentation control measures as detailed in the erosion and sedimentation control plans and ensure they are operational. - Where practicable runoff from undisturbed catchments will be diverted around the construction areas via diversion drains and banks to discharge into natural watercourses. Diversion drains will be installed and adequately lined/stabilised before adjacent ground is disturbed and the excavation is commenced. - All runoff from disturbed areas will be captured and treated for removal of sediment prior to discharge. Where practicable, water captured within the construction zone will be stored and reused in construction (i.e. dust suppression). - A minimum 2 metre buffer shall be maintained between construction works and creeks, waterways and sensitive vegetation, where possible. - Area of soil disturbance will be limited to the minimum extent required for construction activities. No works are to occur outside the approved disturbance boundary. 3 January 22
12 6 Construction Activity Management Controls Clearing - Clearing will be delayed as long as practicable and must be undertaken in conjunction with the development of each stage of works unless otherwise approved by the Project Manager. - All reasonable and practicable efforts will be taken to delay the removal of, or disturbance to, existing ground cover prior to land-disturbing activities. - Bulk tree clearing must occur in a manner that minimises disturbance to existing ground cover. - No land clearing shall be undertaken unless preceded by the installation of adequate drainage and sediment control measures, unless clearing is required for the purpose of installing such measures, in which case only minimum clearing required for such measures shall occur. Sediment Basins - Temporary sediment basins are required to be employed throughout the project. Additional basins may be required other than those shown on the ESCP (Appendix B) as construction progresses in stages. These are to be designed and installed as per this SWMP. - Water from sediment basins is to preferentially be used on site in construction (i.e. dust suppression) prior to consideration of offsite discharge. - Controlled discharge from the sediment basins is not permitted without prior water quality testing to confirm the stored water meets the specified water quality targets Specified in the SWMP. Treatment of flocculants may be required. Any planned offsite discharge events are to occur only with the permission of the Project Manager. - Detailed procedures for the construction and maintenance of temporary sediment basins are provided in Appendix C. Site Maintenance - Ensure that all drains are operating effectively and shall make any necessary repairs. - Remove any spilled material from area subject to runoff or concentrated flow. - Remove trapped sediment where the capacity of the trapping device falls below 6% of the capacity. - Inspect the sediment basins after each rainfall event and/or weekly. Ensure that all sediment is removed prior to the sediment storage zone being full. Ensure that the outlet and emergency spillway works are maintained in a fully operational condition at all times, and that the dam is dewatered within 5 days of the last rainfall event. - Construct additional erosion or sediment control works as may be appropriate to ensure protection of downslope lands and waterways. - Maintain erosion and sediment control measures in a fully functioning condition at all times until the site is rehabilitated. - Ensure that the revegetation scheme is adhered to and that the all grass covers are kept healthy (including watering and mowing). - Remove temporary soil conservation structures as the last activity in the rehabilitation program. 3 January 22
13 7 Construction Activity Management Controls Site Access and Vehicle Movements Topsoil and Stockpile Management - Prior to the commencement of site works, the location of site access point(s) must be identified on the ESCP (Appendix B). - Site access must be restricted to the minimum practical number of locations. - Site exit points will be appropriately managed to ensure vehicles leaving the premises are sufficiently free from dirt, aggregate or other materials such that materials are not transported onto public roads (i.e. shakedowns or other appropriate methods for the removal of soil materials from vehicles at access and exit areas as required). - Stormwater runoff from access roads and stabilised entry/exit points must be drained to an appropriate sediment control device. - Any material transported or spilled on the road are to be cleaned up prior to cessation of same days work and/or commencement of any rain event. - Traffic movements will be limited to cleared areas by barriers and signage - Vehicle movement on disturbed areas will be minimised during wet weather periods. - Avoid overloading which could result in spillage. - Cover loads to/from site. - Stripping of additional areas within the disturbance boundary, other than the designated access routes, will require the approval of the Project Manager. - Ensure stockpiles are free draining at all times - All stockpiles will be located at least 5 metres from areas of concentrated flows (i.e. stormwater drains), roads and steep slopes. A 2m buffer will be maintained to creeks and waterways. - Sediment fences shall be established down slope of stockpiles or disturbed areas to prevent off-site transport of sediment. - Disturbed areas / stockpiles shall be stabilised if unused for longer than 4 days (options include topsoil, mulch, dampening, latex-type sprays, bitumen emulsion sprays, cover with tarps, grass-seeding). - Stockpiles shall not be built on the bunds of the sediment basin. - Stockpiles shall be a maximum of 8m high except in the electrical easement where Energy Australia requirements apply. Site Drainage - Install diversion drainage works before the removal of topsoil and commencement of earthworks. - Promptly complete all permanent and temporary drainage works, once commenced, to minimise the period of exposure of disturbed areas. - Stabilise diversion and catch drains to divert uncontaminated runoff from undisturbed areas clear of the construction area. - Site drainage works shall be installed to convey stormwater from undisturbed catchments safely around (or through) the site, without mixing with contaminated runoff from the site. - Maintain water velocities within diversion drains below a level which causes erosion during the design storm event through maintaining low gradients, providing check dams (if required), and ensuring good ground cover is maintained. - When installing fabrics for protection of earth based drains ensure that topsoil is a minimum 75mm thick and standard practices for installation are followed. - Where rocks are used for energy dissipation they should be placed over a filter layer of suitable geotextile. 3 January 22
14 8 Construction Activity Management Controls Batter Protection - All necessary measures to protect batters from erosion will be undertaken during construction including progressive stabilisation of all cut/fill batters throughout earthworks formation. Where final revegetation/stabilisation cannot be completed immediately, temporary stabilisation is to be provided. Site rehabilitation and revegetation of exposed areas Construction Access Roads - All completed earthworks are to be stabilised/ revegetated as soon as practicable. - Stabilisation/ revegetation activities are to occur progressively throughout construction and monitored during construction. - All erosion and sediment control measures will remain in place until exposed areas are rehabilitated and stabilised. - Continue to inspect and maintain erosion and sediment controls until the site is fully rehabilitated. - Access to the site to be via a stabilised access only. Utility Installation - Trench widths and depths will be kept to the minimum necessary. - Divert surface water away from trench openings. - Where trench runs across grade, excavated soil to be placed upslope and clear of trench, sediment fence to be placed down slope. - Where trench runs up/down grade, measures should be employed to capture sediment laden water, including trench stops. (i.e. use sandbags as bulkheads across trench invert to shorten the length slope and capture sediment laden water flow within trench. - Complete and close trench excavations as soon as practicable (aim to complete and close within 3 days). - Avoid opening trenches whenever risk of heavy rainfall/storms is high. - Organise service installations to enable progressive backfilling. - Trenches not located within roadways or civil infrastructure must be backfilled, and compacted to a level at least 75mm above adjoining ground level, capped with topsoil, and appropriately stabilised. - All service trenches, not located within roadways or other infrastructure must be mulched and seeded within 7 days after backfill. - No more than 5m of service trench must be open at any one time. - Water captured within service trenches should be pumped out and disposed of or alternatively used in construction (i.e. dust suppression) and must not be discharged off site. Water Discharge - Dewatering of sediment dams is detailed in the Sediment Basin Dewatering Procedure contained in Appendix C. - No controlled water is to be discharged off-site unless water quality is compliant with the relevant water quality targets specified in the SWMP. - If a pump is used to decant the basin, then the decanting must cease prior to settled sediments being drawn into the intake pipe. The use of a floating inlet to any pump will reduce the opportunity for picking up any settled sediment - A marker peg should be installed in the basin to clearly identify the maximum sediment storage level. - Sediment extracted from the basin shall be suitably disposed of in sediment dumps, or mixed with on-site soils in a manner that will not result in soil erosion or sediment runoff from the site 3 January 22
15 9 Construction Activity Management Controls Batter Stabilisation - Batters to be progressively stabilised, as soon as practicable, throughout construction. - Topsoil and vegetate in accordance with the Landscape Plan. Works within / adjacent to watercourses - Works being undertaken close to water courses should have the same techniques for erosion and sediment control applied with increased management measures to adapt to the differing influences from the water course. Design for works in or near water bodies should ensure the retention and enhancement of their natural functions. - Works in these areas should be undertaken with least impact practicable. - Critical aspects of work near water courses or in stream should be scheduled for forecasted dry weather periods. - Removal of vegetation or sediment from the beds or banks of watercourses should be minimised to ensure that erosion is not promoted. - To stabilise watercourse embankments place rock that cannot be washed away against the base of the bank to hold it in place. - Detention basins should be designed to handle any increased surface runoff associated with the development so that there is no impact on the water course. In conjunction with this the basins should be built away from natural wetlands, watercourses or remnant natural vegetation. - The construction of sediment basins should not be in line on a water course. - Contingencies to manage risks associated with flood events during construction are required. All machinery and construction materials (including any fuel and other chemical containers) should be stored away from drainage/flood areas and the site stabilised as best as possible at the end of each day. 4.3 Mitigation Measure Requirements Based on the management requirements of the construction activities summarised in Table above, the proposed mitigation measures during construction would comprise the following: - Sediment Fences - Diversion drains - Rock check dams - Temporary sediment basins The design requirements for the above mitigation measures are provided below. In general, these measures are to be designed and constructed according to the Blue Book (Managing Urban Stormwater: Soils and Construction (Landcom 24)) as a minimum standard: 4.3. Design Requirements Sediment Fences Sediment Fences will be implemented to prevent sediment being transferred throughout the site. For details refer to Appendix B. Diversion Drains Diversion Drains will be implemented to direct dirty water from within the site to the temporary sediment basin inlet. For details refer to Appendix B. Rock Check Dams Rock check dams will be used within diversion drains to progressively slow down and filter water before it reaches the temporary sediment basin inlet. Refer to Appendix B for details. 3 January 22
16 Temporary Sediment Basins Temporary sediment basins are required to collect all stormwater runoff from disturbed areas within the site to effectively capture and allow treatment of stored prior to controlled discharge to the downstream drainage system. It is assumed that as site filling progresses, the earthworks pad will be graded to drain all surface runoff into a temporary basin located in the north-western corner of the site. This location is the site for the permanent Main Water Storage Dam and it is envisaged that the temporary sediment basin will be converted to the permanent Main Water Storage Dam at the completion of the filling works. If staging of the filling operations results in portions of the site temporarily grading in a different location, then additional temporary basins may be required which and sized appropriately based on the design criteria provided in Table 2 below. The temporary sediment basins are to be designed and constructed in accordance with the Blue Book guidelines. The design of these basins is based on the following assumptions and criteria: - The site bulk fill material characteristics is currently unknown, however, the material is assumed to be fine grained (ie. containing predominately clay/silt particles) and therefore a Type F/D sediment basin will be required in accordance with the Blue Book. A Type F/D basin required the containment of a specific percentile 5 day rainfall event for the area prior to treatment (if required) and disposal. - Given the environmentally sensitive location of the site with respect to the close proximity to the existing SEPP4 wetland, a conservative 95 th percentile 5 day rainfall event was adopted for the site. The resultant sediment basin design parameters and criteria is summarised in Table 2 below. Table 2 Sediment Basin Design Criteria Design Parameters Value Comment Soil Texture Group Type F/D Assumes fine particle (clay) soils Design Rainfall (R) Volumetric Runoff Coefficient (Cv) Total catchment area (A) 8.5 mm.8 4.7ha 95 th percentile, 5 day rainfall event interpolated between Newcastle and Wyong (Blue Book) Blue Book Total disturbed area of the site (excluding the perimeter bund extents) Basin Internal Batters No steeper than 3H:V For landscape planting Basin Length (L) to Width (W) Ratio Basin emergency spillways Minimum spillway total depth (including freeboard) 3 (min) L:W in year ARI 5mm Blue Book Calculated as approximately 2.2m 3 /s for total catchment area Allow bypass of design flow The temporary Sediment Basin design provided in the ESCP (Appendix C has been sized for the entire site runoff using the parameters above and equations below. Settling Zone Volume (m 3 ) = x Cv x A x R Sediment Storage Zone (m 3 ) = 5% x Settling Zone Volume Total Basin Volume (m 3 ) = Settling Zone Volume + Sediment Storage Zone Volume Based on the above design criteria, the sediment basin volumes requirements for the site (for a total disturbed area of the site within the perimeter bund of 4.7ha) is provided in the Table 3 below. 3 January 22
17 Table 3 Total Sediment basin Volume requirements for 4.7ha site disturbance Component Minimum Volume Requirements (m 3 ) Sediment Zone Volume (m 3 ) 5 Settling Zone Volume (m 3 ) 3 Total Basin Volume (rounded) 45 The total basin depth would be based on available space/area during construction but should not exceed 3m total depth (including freeboard) or a maximum sediment and water depth of 2 m. The base of the basin should not be lower than RL. m AHD or the groundwater level during construction, whichever is greater. For a maximum sediment/water depth of 2m, the resultant minimum water surface area of the sediment basin would be approximately 3, m 2 (adopting 3H:V internal batters). For a basin surface area of 3, m 2, the nominal basin dimensions would be approximately 32 m x 96 m to provide a nominal minimum basin length (L) to width (W) ratio of 3L:W. A minimum spillway width of approximately m is required for a spillway depth of.5 m (including 2 mm minimum freeboard) for discharge of the in year ARI event (approx 2.2 m 3 /s) from the total catchment area. Lining of the sediment basin is not required as there is minimal risk in regard to groundwater contamination.the storage volume for the basin/s can be progressively built up as new site areas are disturbed. The volume of basin required is directly proportional to the disturbed area. Table 4 below provides the required volume of basin/s based on a range of disturbed site areas. Table 4 Sediment Basin Volume Requirements Based on disturbed Area of Site Disturbed Site Area (ha) Sediment Zone Volume (m 3 ) Settling Zone Volume (m 3 ) Total Basin Volume (m 3 ) Where design of sediment basins cannot meet the above site-specific criteria due to space constraints (i.e. existing infrastructure, disturbance boundary or property boundary), a lesser design standard may be adopted (with the approval of the Project Manager) provided that: - The design remains compliant with the minimum standards contained with this SWMP and the Blue Book; - Enhanced erosion controls are designed and adopted within the catchment; and - The sediment basins are managed to mitigate the increased risk of overflows and meet the specified water quality targets Installation and Maintenance Requirements The installation and maintenance requirements for the above specified mitigation measures is provided in Appendix C. 3 January 22
18 2 5. SWMP Implementation 5. Overview The implementation and operation requirements of this SWMP are provided in Table 5below. Table 5 Aspect SWMP Implementation and Operation Requirements Controls Planning - Risk assessments are to include an assessment of the erosion and sedimentation potential of the activity and identify appropriate controls. - All Contractors and staff must attend the Site Induction prior to commencing work on-site. The induction will ensure an awareness and understanding of the erosion and sediment control objectives and incident response procedures. - Construction schedule will be developed to minimise the duration that any areas of soil are exposed. Monitoring - Erosion and Sediment Control measures to be inspected daily by the Site Supervisor during periods of runoff producing rainfall, and de-silted, repaired and amended as appropriate to maintain their efficiency. (a) Daily site inspections must include: all drainage, erosion and sediment control measures; occurrences of excessive sediment deposition (whether on-site or offsite); and all site discharge points. (b) Weekly site inspections must include: all drainage, erosion and sediment control measures; occurrences of excessive sediment deposition (whether on-site or offsite); occurrences of construction materials, litter or sediment placed deposited, washed or blown from the site, including deposition by vehicular movements; oil, fuel and chemical storage facilities; Water quality monitoring in sediment ponds. (c) Site inspections prior to anticipated run-off producing rainfall must include; all drainage, erosion and sediment control measures; all temporary (e.g. over-night ) flow diversion and drainage works (d) Site inspections following run-off producing rainfall must include; treatment and de-watering requirements of sediment basins; sediment deposition within sediment basins and the need for its removal; all drainage, erosion and sediment control measures; occurrences of excessive sediment deposition (whether on-site or offsite); occurrences of construction materials, litter or sediment placed deposited, washed or blown from the site, including deposition by vehicular movements; and occurrences of excessive erosion, sedimentation, or mud generation around the site office, car park and material storage areas. (e) In addition to the above, monthly site inspections must include; surface coverage of finished surfaces (both area and percentage cover); 3 January 22
19 3 Aspect Controls health of recently established vegetation; proposed staging of future site clearing, earthworks and site/soil stabilisation. - Water quality monitoring must be carried out on any controlled discharge of water from a sediment basin - Meteorological forecasts and daily conditions will be monitored and recorded during construction activities. If adverse conditions are expected this information will be shared with construction crews at pre-start meetings. Auditing - SWMP reviews are to be carried out on a monthly basis to assess the implementation strategy Identification of incident or failure - Non-compliance with agreed performance criteria will be identified by visual inspections identifying: build-up of sediment off the site; excessive sediment build-up on the site; excessive erosion on the site; release of construction material from the site; release of un-tested water from the site; poor vegetation establishment; poorly maintained, damaged or failed ESC devices. Corrective Action - After any identification of incident or failure, the source/cause is to be immediately located and the following measure implemented: Build-up of sediment off the site the material must be collected and disposed of in a manner that will not cause ongoing environmental nuisance or harm; then on-site ESC measures amended, where appropriate, to reduce the risk of further sedimentation. Excessive sediment build-up on the site collect and dispose of material, then amend up slope drainage and/or erosion control measures, then amend up-slope drainage and/or erosion control measures as appropriate to reduce further occurrence. Severe or excessive rill erosion investigate cause, control up-slope water movement, re-profile surface, cover dispersive soils with a minimum mm layer of non-dispersive soil, and stabilise with erosion control blankets and vegetation as necessary. Release of construction material from the site collected and disposed of in a manner that will not cause ongoing environmental nuisance or harm; then inspect litter and waste receptors. Poor vegetation growth or soil coverage plant and previously planted areas may require supplementary watering and replanting. Sediment fence failure replace and monitor more frequently. Regular failures may mean that the sediment fence location, alignment or installation may need to be amended Release of excessive sediment and/or other materials off the site - clean up deposition, and inspect all control measures. Then review and revise the ESCP, or otherwise reduce the rate, extent and/or duration of soil exposure. Release of un-tested water off-site visually inspect discharge location for presence of oils, grease and litter and take photographs if possible. Test water in pond as well as upstream and downstream of discharge location where possible for turbidity and ph, compare with discharge limits and weekly results. If basin is non-compliant and there is a variation between upstream and downstream results in the discharge channel, report as incident to OEH and provide results in accordance with the incident reporting procedure described in CEMP Section.. If monitoring levels in any sediment basin do not conform to the release 3 January 22
20 4 Aspect Controls criteria for; a) TSS flocculate as per determined flocculation procedure and re-test; b) ph dose with hydrated lime if ph is too low, and retest. If still does not comply then consider options which may include further redosing with flocculent / lime or offsite disposal by tanker to an appropriate facility. Reporting - As detailed in Section. in CEMP. 5.2 Inspection Requirements The site inspections should consider how the individual erosion and sediment controls act as part of a whole system and the individual performance of each ultimately determines the success or malfunction of the system Pre-Inspection Items which should be reviewed / understood before conducting a site inspection are as follows: - Legislation required by the governing body to be adhered to by site; and - Policies and guidelines specific to the project should be reviewed to check they are being followed; and - Aim of the erosion and sediment control plan, to ensure that what is implemented on site as per the plan is suitable; and - Practices and operations being used on site (this includes and is not limited to client-specific as well as contractor-specific procedures and operations relevant to the project); and - Weather forecast and construction schedule should be assessed to ensure the inspection is not being carried out at an inappropriate or unsafe time; and - Plans for construction to gain an understanding of project; and - Compliance history to allow an understanding of where the project may be lacking or has improved Scope Ideally the full site should be inspected; however, where this is too large and packages of work are being carried out the area of current development should be covered. Appendix H of the CEMP contains a template for site inspections. These are prompts and as site specific items are observed, these should be noted in the additional comments section of the inspection checklist. The site inspection report should: - Note where an ESC is not appropriate and where it may need an amendment or additional information; - Focus on the good and bad practices as well as identify where aspects of erosion and sediment control are critical within any given works; - Record all non conformances, maintenance and amendments necessary to achieve and/or maintain the required treatment and performance standard; If an inspection is not carried out according to the inspection schedule then this should also be reported and recorded with justification as to why the inspection did not occur Non-Conformance and Corrective Actions Refer to Section 2 of the CEMP for Non-conformance and Corrective Action procedures to be followed. For incident response procedures, refer to Section of the CEMP. 3 January 22
21 5 5.3 Roles and Responsibilities Specific roles and responsibilities associated with the SWMP are presented in the table below. These are in addition to those described in Section 5. the CEMP. Table 6 Roles and Responsibilities Role Project Manager Site Supervisor Works Assistants and Contractors Responsibilities Provide that sufficient resources are allocated for the implementation of this SWMP; Authorise the implementation of specific management measures to minimise erosion and sedimentation impacts in accordance with this plan; Ensure that the outcomes of monitoring are systematically evaluated as part of ongoing construction planning. Ensure all reporting requirements are met. Undertake regular inspections and document issues, actions taken. Coordinate the implementation of corrective actions and evaluate their effectiveness; Coordinate incident investigation processes including associated reporting requirements; Ensure that all monitoring records are effectively maintained on site. Undertake construction activities in a manner that is consistent with this plan. Ensure that all erosion and sedimentation controls are in place and effective. 3 January 22
22 Appendix A Receiving Environment Plan 3 January 22
23 TRANSMISSION TOWER TRANSMISSION TOWER TRANSMISSION TOWER TRANSMISSION TOWER TRANSMISSION TOWER Discharge Pathway High flow bypass Flora Quadrat Transfer to additional water storage ponds Endangered Ecological Communities (map from Ecotone report) Freshwater Wetland ad e i r Ro The W Site runoff drains to Freshwater wetland Water flow / treatment direction. Site boundary Angophora inopina 3. Clean water ponds Freshwater wetland Water flow / treatment direction. Forest Red Gum / Woollybutt / Mahogany Floodplain Forest boundary. Water storage pond Ball Honeymyrtle Swamp Forest SEPP 4 wetland boundary Legend Endangered Ecological Communities Legend Bioretention system. Swamp Mahogany / Paperbark / Woollybutt Swamp Forest. Sediment deposition pond Plan View Site Plan View Receiving Environment Legend. Plan View Site Appendix A Plan View Receiving Environment
24
25 Appendix B Erosion and Sediment Control Plan (ESCP) and Typical Details 3 January 22
26
27 TRANSMISSION TOWER CHECK PRINT REVISION IN PROGRESS CHECK PRINT TERALBA SUSTAINABLE RESOURCE CENTRE
28
29 FOR CONSTRUCTION MIA - BULK CIVIL WORKS
30
31 Appendix C Control Measure Installation and Maintenance Guidelines 3 January 22
32
33 Table B Installation and Maintenance Guideline Type of Control Installation Inspection / Maintenance Removal Rock Check Dam Prior to placement of the check dams ensure the type and size of each check dams will not cause a safety hazard or cause water to spill out of the drain; Locate the first check dam at the downstream end of the section of channel being protected. Locate each successive check dam such the crest of the immediate downstream dam is level with the tow of the check dam being installed; Ensure the channel slope is no steeper than : (H:V) otherwise consider the use of a suitable channel liner instead of the check dams; Construct the check dam to the dimensions and profile shown with the approved plan; Where specified, the check dams shall be constructed on a sheet of geotextile fabric used as a downstream splash pad; and Each check dam shall be extended up the channel bank (where practical) to an elevation at least 5mm above the crest of the level of the dam. Repair any damage noted during inspections as soon as practicable; If scour erosion occurs between any of the check dams install intermediate check dams or a suitable channel liner; Check for displacement of the check dams; Check for soil scour around the ends of each check dam for such erosion occurring, consider extending the width of the check dam to avoid such problems; If severe soil erosion occurs either under or around the check dams. Then seek expert advice on an alternative treatment measure; Remove any sediment accumulated by the check dams; and Dispose of collected sediment in a suitable manner that will not cause erosion or a pollution hazard. When construction work within the drainage area above the check dams has been completed and the disturbed areas and the drainage channel are sufficiently stabilised to restrain erosion, all temporary check dams must be removed; and Remove the check dams and associated sediment and dispose of in a suitable manner that will not cause an erosion or pollution hazard. Sediment Fences All sediment (silt) fences throughout the project are to be constructed of nonwoven geofabric (A34 bidim) or equivalent. To be installed in the locations shown on the Erosion & Sediment Control Plans (as a minimum) and in accordance with the Typical Details. If gaps or tears are observed during site inspections, the sediment fence should be repaired or the fabric should be replaced immediately. Accumulated sediments should be removed from the fence base when the sediment reaches one-third to one-half the height of the fence to avoid failure. Sediment removal should occur more frequently if accumulated sediment is creating noticeable strain on the fabric. When the sediment fence is removed, the accumulated sediment should also be removed and disposed of in a suitable manner that will not cause erosion or a pollution hazard. Rock Filter Dam Prior to placement of rock filter dams. Ensure the type and size of each dam will not cause a safety hazard or cause water to spill out of the drain; Height of each rock filter dam to be determined on site to suit surrounding surface levels of channel depth (where applicable) each rock filter dam shall be extended up to the channel bank or up the natural slope (where applicable) to an elevation at least 5mm above the crest level of the dam; Inspect each rock filter dam at least weekly and after runoff producing rainfall events; Correct all damage immediately if required; Remove any sediment accumulated by the rock filter dam and dispose in accordance with the construction environmental management plan; and When construction work upstream of the dam is completed and the disturbed areas and drainage channels are sufficiently stabilised to resist erosion, temporary rock filter dams are to be removed. Stabilised Site Access Strip the topsoil, level the site and compact the subgrade; Cover the areas with needle punched geotextile; Construct a 2mm thick pad over the geotextile using road base or 3mm aggregate; Ensure the structure is at least 5 metres long or to building alignment and at least 3 metres wide; and Where a sediment fence joins onto the stabilised access, construct a hump in the stabilised access to divert water to the sediment fence. Correct all damage immediately if required; Remove any sediment accumulated and dispose in accordance with the construction environmental management plan; and When earthworks are completed stabilise the area to resist erosion. Grass Channel Linings Remove all trees, brush, stumps and other objectionable material from the channel footprint and dispose of properly. Excavate the channel and shape it to neat lines and dimensions shown on the plan. Ensure an adequate allowance in the excavated dimensions, typically 75mm, for the placement of topsoil and turfing. Remove and properly dispose of all excess soil so that surface water may freely enter the channel. Ensure the turf is not laid on gravel, heavily compacted soils, or soils that have been recently treated with herbicides. Lay the first row of turf in a straight line, perpendicular to the direction of flow. During the initial root establishment period, check grassed channels after every rainfall. After grass is established, periodically check the channel including after significant storm events. Check for erosion along the edge of the turfed area. If erosion is occurring, take appropriate measures to avoid further erosion. If damage has occurred, immediately repair with turf or by seeding as appropriate. Remove excessive sediment deposition or debris from the channel to maintain the channel s required hydraulic capacity. Maintain a health and vigorous grass condition whenever and wherever possible, including water and fertilising as needed. Mowing should not be attempted until the turf is firmly rooted (usually 2 3 weeks after laying). Pegs used to secure turf strips may be removed and reused elsewhere once turf is firmly rooted.
Filter Tube Barriers (Instream)
Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationPahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)
Tararua District Council Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) NOTE: This is a draft ESCP in current preparation. Additional and updated information will
More informationModular Sediment Barriers (Instream)
Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN
More informationErosion & Sedimentation Control Policy
Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of
More informationEnvironmental Assessment Chapter 8 Surface Water
Environmental Assessment Chapter 8 Surface Water 8.2.7 Rainfall and Evaporation Based on recorded data for the area of interest, the mean annual rainfall is about 700mm, with maximum monthly rainfalls
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More informationUnderstanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department
More informationWater Pollution Control for Work in Sensitive Areas
Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationSACHSE EROSION CONTROL GUIDELINES
SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the
More informationCatch Drains Part 4: Geotextile-lined
Catch Drains Part 4: Geotextile-lined DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationTEMPORARY SEDIMENT TRAP CODE
ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice
More informationPART 1 GENERAL REQUIREMENTS
PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...
More informationSITE DESIGN ENGINEER'S STATEMENT:
SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED
More informationOrder of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.
SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL
More informationDesign Specifications & Requirements Manual
Design Specifications & Requirements Manual 10 SEDIMENT AND EROSION CONTROL 10.1 INTRODUCTION... 1 10.2 REFERENCE... 1 10.3 GENERAL INFORMATION REQUIREMENTS... 1 10.3.1 ESC Plan... 1 10.3.2 Servicing Drawings...
More informationErosion and Sediment Control
Erosion and Sediment Control FACTSHEET 1 OF 10 Why is sediment a problem? Soil particles washed off the land into our waterways are called sediment, which contain pollutants and reduce water quality. This
More informationApplication for resource consent Form B Damming and diversion of water
Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or
More informationB. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationCHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS
CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for
More informationGRASS-LINED CHANNEL (acre) CODE 840
NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed
More informationConstruction Management Plan (CMP) 227 Princess Highway, Dandenong
Construction Management Plan (CMP) 227 Princess Highway, Dandenong - Construction Management Plan (CMP) June 2017 S2966 CMP.D2 PREPARED BY: Sustainable Development Consultants 2nd Floor, 555 Riversdale
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability
More informationBest Management Practice (BMP) Guidance Manual
Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these
More informationSUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields
4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater
More informationBuilder s enviro guide
BC3337 Builder s enviro guide Preventing pollution from your building project Find out more: phone Auckland Council on 09 301 0101 or visit aucklandcouncil.govt.nz Contents Why compliance matters 2 The
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More informationSTORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction
More informationConstruction Inspection Checklists
III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationThe Good, The Bad, and The Ugly
Overview The Good, The Bad, and The Ugly Stormwater Regulations for the Construction Industry Seminar March 20, 2012 Wendy Terlizzi Arizona Department of Transportation Office of Environmental Services
More informationGeneral Permit No.: OHR Page 53 of 146
Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated
More informationInstallation and Maintenance of Erosion Control BMPs
Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving
More informationSite EMP Kit- Guidance Notes
Site EMP Kit- Guidance Notes Introduction This Guide has been designed to assist applicants to understand council s requirements for Site Environmental Management Plans (Site EMP s) for subdivisions. The
More informationSCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS
SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary
More informationEnvironmental Management Plan
Environmental Management Plan EMP for the Stage 1 Construction and Operation of the Trainers Allotment Area at the Pakenham Racecourse located at Nar Nar Goon / Longwarry Road, Tynong Pty Ltd abn: 44 706
More informationBest Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group
Best Practices for Building High-Performance Resource Roads Road Drainage Developed by: The Roads and Infrastructure Group THIS GUIDE IS INTENDED FOR EQUIPMENT OPERATORS CONSTRUCTION CONTRACTORS FIELD
More informationTEMPORARY STREAM DIVERSION
ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM DIVERSION (ft,) CODE 976 (Source: Aukland Regional Council Stream Facts) DEFINITION A temporary channel or pipe used to convey stream flow around
More informationSEDIMENT AND EROSION CONTROL PROGRAM APPENDIX ENVIRONMENTAL IMPACT STATEMENT
SEDIMENT AND EROSION CONTROL PROGRAM APPENDIX W ENVIRONMENTAL IMPACT STATEMENT Erosion and Sediment Control Program BORAL Gold Coast Quarry, Reedy Creek B12119CR001 April 2013 TABLE OF CONTENTS GLOSSARY
More informationDiversion Dikes. Fe=0.95
2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationOutline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control
Inspecting Construction Site BMPs Kristin Kerr EOA, Inc. Outline of Presentation Back to Basics Erosion and Sediment Control Good Site Non-Stormwater Run-on and Run-off Control Construction Inspection
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose
STANDARD FOR GRASSED WATERWAYS Definition A natural or constructed watercourse shaped or graded in earth materials and stabilized with suitable vegetation for the safe conveyance of runoff water. Purpose
More informationAPPENDIX C DURING CONSTRUCTION BMP TABLES
APPENDIX C DURING CONSTRUCTION BMP TABLES Table C.1 Table C.2 Table C.3 Erosion Prevention BMPs Sediment Control BMPs Stormwater Runoff and Ground Control Measures STORM WATER QUALITY DESIGN MANUAL Appendix
More informationINSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN
INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN Bates College 55 & 65 Campus Avenue Housing Lewiston, Maine Introduction The following plan outlines the anticipated inspection and maintenance procedures
More information901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT
SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants
More informationBuilding on small sites
BC5850 Building on small sites Doing it right Find out more: phone 09 301 0101 or visit aucklandcouncil.govt.nz Good building site management 3:41 Stabilising entranceways 2:32 How-to videos To view our
More informationWaitarere Beach Road Curves Project Erosion and Sediment Control Plan
APPENDIX D Waitarere Beach Road Curves Project Prepared for The New Zealand Transport Agency November 2015 QUALITY STATEMENT PROJECT MANAGER Jon England PROJECT TECHNICAL LEAD Phil Peet PREPARED BY Stephen
More informationAsbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041
Asbestos in Grounds, Asbestos Management Plan, Sydney Secondary College Balmain Campus, Balmain, NSW 2041 March 2014 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level
More information9.3.9 Industry uses code
9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of
More informationSTANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018
STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -
More informationFact Sheet: Stormwater biofilter monitoring and maintenance
Appendix A Stormwater biofilter monitoring and maintenance i Fact Sheet: Stormwater biofilter monitoring and maintenance Why monitor and maintain systems? Routine maintenance is important to ensure the
More informationStormwater Management and Sediment and Erosion Control Plan Review Checklist for Design Professionals
Page 1 of 7 Florence County MS4 Stormwater Management and Sediment and Erosion Control Plan Review Checklist for Design Professionals Please indicate the location and page number(s) where each item below
More informationConstructed Wetland Use in Nonpoint Source Control
Constructed Wetland Use in Nonpoint Source Control Description Constructed wetlands are excavated basins with irregular perimeters and undulating bottom contours into which wetland vegetation is purposely
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE
Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS
More informationDIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL
DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL 1. General la. Purpose VII-1 1B. Necessity of Grading Permit... VII-1 1C. Additional Requirements... VII-2 1D. Responsibility of Permittee... VII-2 2.
More informationJEFFERSON COUNTY STORM WATER MANAGEMENT
JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All
More informationErosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)
Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential
More informationBMP #: Infiltration Basin
Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with
More informationModule 4 Regulatory requirements for Land Disturbing Activities
Module 4 Regulatory requirements for Land Disturbing Activities MODULE 4 REGULATORY REQUIREMENTS FOR A LDA Module 4a Overview MODULE 4A REGULATORY REQUIREMENTS FOR A LDA ESC Regulations Overview 1990 First
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition
STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm
More information28 February 2017 ATTENTION: MR HENNIE WOOD AND MS MAGGIE VON RONGE NORTHAM BOOYSENDAL CC: AMANDA PYPER AMEC FOSTER WHEELER NOTE FOR THE RECORD
Project Reference: 720.01092.00001 File Ref. 170228 Erosion & Silt Management NFTR Rev1 28 February 2017 PROJECT: Booysendal South EIA Hydrology Specialist Study CLIENT: Amec Foster Wheeler ORDER No: 2338/9149/1294
More informationConstruction Environment Management Plan
Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated
More informationSection 8: Amended Soil Mounds. 8. Amended Soil Mounds
Section 8: Amended Soil Mounds 8. Amended Soil Mounds 8. Amended Soil Mounds 8.1 Design...95 8.2 Installation...96 8.3 Inspection...101 8.4 Operation...101 8.5 Common technical issues...105 8.6 Case study...105
More informationExtended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]
Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationCITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587
CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE
More informationCHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN
CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN Chapter Organization 9.1 Purpose... 9-1 9.2 Applicability... 9-1 9.2.1 Exemptions... 9-2 9.3 Design Criteria... 9-3 9.4 Erosion and Sediment Control (ESC)
More informationEnvironmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores
Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores October 2015 Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores WaterNSW on behalf of the NSW Government
More informationAPPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.
APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:
More informationPlanning & Building Department. Requirements for Erosion and Sediment Control
Planning & Building Department 455 County Center, 2nd Floor Redwood City, California 94063 Tel: 540/863-4161/Fax: 650/363-4849 Mail Drop PLN122 plngbldg@smcgov.org http://planning.smcgov.org Requirements
More informationSection 1I-3 - Bioswales
BIOSWALES (Numbering pending) These specifications compliment the bioswale design portion of the Iowa Stormwater Management Manual in Chapter 2, Section 2I-3. Sections of the following documents, as referenced
More informationWorks, services and infrastructure code
9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the
More informationRetaining Wall System
Your local distributor Retaining Wall System Prestige & Quality Near Vertical Walls Do It Yourself No Concrete Footings Flexible - 90 o Corners, Steps, Straight or Curved Walls Commercial or Civil Walls
More informationErosion and Sedimentation Pollution Control (ESPC) Plan Narrative
Model Poultry Burial E&S Plan (7-2-15) 1. GENERAL INFORMATION Name of project Name of person responsible Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Address Phone number Municipality
More informationConcrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationAppendix K: Soil Erosion and Sedimentation Control Plan Check List
Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted
More informationSediment Basin. Fe= (Depends on soil type)
3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment
More informationFACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES
FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth
More informationUMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist
UMD Storm Water Program Construction Requirements Greg Archer, MBA Environmental Compliance Specialist Phase 2 Regulatory Overview Dec. 1999 EPA issues Phase 2 Federal Register Municipalities (MS4) from
More informationCHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2
CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty
More informationSection SNOW DISPOSAL SITE DESIGN CRITERIA
Section 2.150 SNOW DISPOSAL SITE DESIGN CRITERIA 2.150 A. Introduction Snow disposal sites provide storage areas for snowfall that exceeds the storage capacity of street rights-of-way and other public
More informationInfiltration Guidelines
Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage
More informationCW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS
CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4
More informationStraw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow
Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationAlberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects
Alberta Transportation Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects January 9, 2009 INFTRA Table of Contents Page Table of Contents... i 1.0 INTRODUCTION...1
More information5.0 SURFACE WATER CONTROL MEASURES
5.0 SURFACE WATER CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell civil engineers, construction personnel, and environmental personnel walked both Newgate/Phelps Road
More informationConstruction Site Erosion Control and Phase II of the Stormwater Permit Program
Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,
More informationModule 1: Construction Site Erosion Control
Module 1: Construction Site Erosion Control Problems and Regulations Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL Problems Associated with Erosion
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT
More informationHoneysuckle Reservoir decommissioning
Honeysuckle Reservoir decommissioning Christopher Dwyer Earth Tech, PO Box 165 Wangaratta, 3676. Web: www.earthtech.com.au, Email: chris.dwyer@earthtech.com.au Abstract Often significant investment is
More informationSECTION 903 EROSION CONTROL
SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration