1 VAAL UNIVERSITY OF TECHNOLOGY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING EXPERIENTIAL LEARNING To fulfil the requirements of the National Diploma, a student must complete at least one year (52 weeks) of applicable experiential learning under the supervision of a qualified mentor, preferably during the second year, i.e. after completing the academical components S1 and S2 at the University. The ideal is to give the student practical training in as many aspects related to Mechanical Engineering as possible. This would imply exposure to at least the fundamental and core learning listed below. From the core learning 4 of the 5 topics must be covered. * Proposed P1 Training ** Proposed P2 Training 1 SAFETY MEASURES* FUNDAMENTAL LEARNING The main purpose of safety measures is to know the general safety condition of the plant or mine or factory which will include: Attending safety meetings; Have an understanding of the OHS Act as applied on the plant, factory or mine; NOSA course is recommended; Accompanying the Safety Officer once or twice on safety inspections. 2 FITTING* 2.1 Trained to handle the basic hand tools like: Hammers, chisels, files, hack saw, measuring instruments, etc. 2.2 Trained to do lay-out procedures of parts to be cut, drilled or machined. 2.3 Trained to fit different types of keys. 2.4 Trained to do precise drilling like a five-hole flange. Sillabusgids Feb
2 3 MACHINING* 3.1 Basic Turning Trained to do the following procedures on a centre lathe: Parallel cutting; Cross cutting; Taper cutting; Hole boring with the aid of a boring bar; Drilling; Screw thread cutting; Turning with the aid of a driving plate; Machining of long shaft by using a steady; Off-centre turning with the aid of a four jaw chuck. 3.2 Basic Milling The LT should get training in the following aspects of milling machines and operations: The use of vertical and horizontal milling machines; Various operations on milling machines; Identification and use of milling cutters; Workholding; The use of the dividing head; The relationship between working speed and tool life. 4 BASIC WELDING* Practical exposure to the following welding processes: Arc welding Flat and vertical welding Ratio between current and material thickness Electrode selection. Gas welding Using metal fillers Brasing Flame cutting. Limited exposure to TIG (Tungsten Inhert Gas) and MIG (Metal Inhert Gas) welding, with special reference to welding of metals such as aluminium, stainless steel, copper and brass. 5 INTERPRETATION OF TECHNICAL DRAWINGS* Practical exposure to the following aspects of technical drawings: Orthographic projection. Development and interpenetration. Assembly drawings Tolerance and machining symbols Sectional views of assemblies of machine parts and castings Sillabusgids Feb
3 6 BEARINGS AND LUBRICATION* The Learner Technician (LT) must be exposed to bearing fitting and bearing failure. The Learner Technician must also know the types of lubricants used on the plant. 7 PLANNING SYSTEMS** The purpose is to plan a job in the plant and oversee the execution of the job and then write a report. 8 MAINTENANCE AND FAULT FINDING** The LT must work with the maintenance planning division and also spend some time on an actual maintenance job. Planning and executing of a maintenance job (See 9) is recommended. 9 PROJECT WORK** The LT must be exposed to at least one project. He must also write this project in the correct format as supplied in the Project Report Guidelines for Experiential learning supplied to the student. CORE LEARNING MAINTENANCE & ELECTROMECHANICAL 1 ALIGNMENT OF MECHANICAL SYSTEMS* Trained to align for instance the following mechanical systems: 1.1 Motor to pump; 1.2 Motor to gearbox. The above should be carried out by means of feeler gauges, dial test indicators and if possible using laser technology. 2 ELECTRICAL SYSTEMS* The purpose is to give the mechanical LT some insight of the electrical side of the plant. A short course on the basic electrical systems used is recommended. The LT can then work with the electrical technician for a short period doing fault tracing. Sillabusgids Feb
4 3 ROTARY EQUIPMENT* 3.1 Pumps Trained to distinguish between maintenance and fault tracing on the following types of pumps: Single stage centrifugal pumps; Multi-stage pumps; Pumps for handling slurry (optional); The training should include mechanical seals, and the student must at least be present at a complete overall of the above pumps. 3.2 Compressors Identification of different types of compressors: Axial flow Radial flow Reciprocating Roots Vane Single and multi-stage Identification of rotors: Radial axial tangential Blade directions Application of technical data: Performance characteristics: pressure ratio, mass flow Power required, valves used, type of drive and lubricant used in the compressor Dismantling and assembly of a compressor Identification of various parts Measurement for wear and tear Problems tracing Installation and commissioning of a compressor Sillabusgids Feb
5 4 BOILERS/PRESSURE VESSELS** The LT must work with the boiler department. He must do inspections, fault tracing and if possible work with the inspection panel during the 2,5 yearly compulsory inspection. He must also help prepare the boiler for inspection and testing. 5 CONDITION MONITORING** 5.1 Vibration monitoring Identify the vibration monitoring methods used in that company Obtain hands on experience with the most common methods used, by taking some vibration readings Study vibration charts recorded by the company and know how to identify a failure from the chart. 5.2 Oil analyses Identify the methods of oil analyses used by the company, if the company performs their own oil analyses Obtain hands on experience with the most common methods used, by analysing oil samples Study oil analyses charts recorded by the company or obtained from contracting oil analyses companies. Learn how to identify a bad oil sample Identify the sampling technique used by the company. Students can be asked to write a report on there findings with respect to the methods used in vibration monitoring and oil analyses. Students must state the advantages and disadvantages of the methods used. Students must always be asked to scrutinise the methods used and give their recommendations. 1 ROTARY EQUIPMENT * 1.1 Pumps DESIGN Trained to distinguish between maintenance and fault tracing on the following types of pumps: Single stage centrifugal pumps; Multi-stage pumps; Pumps for handling slurry (optional); The training should include mechanical seals, and the student must at least be present at a complete overall of the above pumps. 1.2 Compressors Identification of different types of compressors: Axial flow Radial flow Reciprocating Sillabusgids Feb
6 Roots Vane Single and multi-stage Identification of rotors: Radial axial tangential Blade directions Application of technical data: Performance characteristics: pressure ratio, mass flow Power required, valves used, type of drive and lubricant used in the compressor Dismantling and assembly of a compressor Identification of various parts Measurement for wear and tear Problems tracing Installation and commissioning of a compressor 2 VALVES AND SAFETY VALVES* The purpose is to give the LT an insight into the different valves used in the plant. How to test valves and the method of replacing valves. 3 HEAT EXCHANGERS** 3.1 The LT must be exposed to different types of heat exchangers. 3.2 The LT must take part or supervise the following: The dismantling and assembly of a heat exchanger Identification of various parts Measurement for wear and tear Cleaning of the heat exchanger Tracing of problems Installation and commissioning. 4 PRESSURIZED EQUIPMENT** Boilers/Pressure Vessels/Compressors The LT must work with the boiler department. He must do inspections, fault tracing and if possible work with the inspection panel during the 2,5 yearly compulsory inspection. He must also help prepare the boiler for inspection and testing. Sillabusgids Feb
7 5 MATERIAL SELECTION* Physical, Mechanical & Thermal properties Materials selction process: Analysis of material requirements; Screening of candidate materials; Selection of candidate materials; Final selection. Sources of information on material Properties. Economics of materials: Cost vs. Performance; Failure analysis. (Eng. Design; George Dieter ISBN ) MANUFACTURING 1 QUALITY CONTROL TECHNIQUES* Strategic quality management. Organisation for quality. Control of quality. Quality assurance. Sample selection. Acceptance sampling. Assessment of quality. 2 PRODUCTION MANAGEMENT** Production perspectives. Production planning & control Material management. Materials requirement planning. Scheduling of process operations. Line balancing. 3 BUDGET CONTROL** Elements of cost. Methods of valuing material issues. Depreciation & obsolescence. Cost control accounts. Reconciliation of cost and financial accounts. Types of costing. Budgetary control. Profitability of new projects. Sillabusgids Feb
8 4 MATERIALS HANDLING* Elementary flow system. Material, equipment, people. Handling systems: Types, designs, constructing, evaluation. Materials handling problems. 5 INVENTORY SYSTEMS* Reasons for inventory. Objectives of inventory. Different types of inventory. Inventory models. ELECTIVE LEARNING 1 PNEUMATICS AND HYDRAULICS Trained to distinguish between and know the applications of the following hydraulic or pneumatic circuit components: 1.1 Pumps 1.2 Motors 1.3 Actuators 1.4 Accumulators 1.1 Filters 1.6 Reservoir 1.7 Heat exchangers 1.8 Seals 1.9 Different types of fluid. Trained in fault tracing on systems. 2 VIBRATION ANALYSIS, MEASUREMENT AND BALANCING 2.1 Vibration Detection (on-line) Vibration Analysis (diagnosis) Vibration Correction (balancing on balancing machine) Case Histories. 2.2 Areas that need attention (practical approach) What is vibration? What causes vibration? Characteristics of vibration: Frequency, displacement, velocity, acceleration, phase How much vibration is too much? 2.3 Equipment FFT-analysers Transducers - pick-ups (accelerometers) etc. Balancing machines - types of unbalance and balance problems - single plane, etc. Predictive maintenance (vibration) program. Sillabusgids Feb
9 3 PROPULSION OF MECHANICAL SYSTEMS Trained to understand and maintain the following methods of propulsion: 3.1 V-belt drives 3.2 Chain drives 3.3 Fluid couplings 3.4 Braking systems. 4 VALVES AND SAFETY VALVES The purpose is to give the LT an insight into the different valves used in the plant. How to test valves and the method of replacing valves. 5 WATER TREATMENT The LT must work with the water treatment department. The main purpose is to know what type of water is used in the different sections, the re-use of water and the type of pumps used in the sections. 6 RIGGING Wire rope construction. Types of rope. Tensile strenght. Tolerances. Torque in ropes. Handling and maintenance of ropes. 7 ADVANCED ELECTRICAL SYSTEMS Cables & overhead lines. Transformers. Three phase induction motors. Synchronous machines Lighting. Various three phase systems. 8 SUPERVISION It is recommended that the LT work with the foreman or supervisor towards the end of his 2 nd semester of in-service-training and also do supervision work. Sillabusgids Feb
10 9 MATERIAL SELECTION Physical, Mechanical & Thermal properties Materials selction process: Analysis of material requirements; Screening of candidate materials; Selection of candidate materials; Final selection. Sources of information on material Properties. Economics of materials: Cost vs. Performance; Failure analysis. (Eng. Design; George Dieter ISBN ) 10 HEAT EXCHANGERS 3.1 The LT must be exposed to different types of heat exchangers. 3.2 The LT must take part or supervise the following: a b c d e f The dismantling and assembly of a heat exchanger Identification of various parts Measurement for wear and tear Cleaning of the heat exchanger Tracing of problems Installation and commissioning. 11 NON-DESTRUCTIVE EXAMINATION/TESTING The LT should be exposed to both destructive and non-destructive testing. Destructive Testing: Tension test. Torsion test. Hardness; Fatigue; Creep and stress rupture. Brittle fracture & Impact testing. Non-destructive Testing: Surface & Sub-surface defects. Dye-penetrant testing. Magnetic particle testing. Eddy current testing. Ultrasonic testing. Radiographic testing. Sillabusgids Feb
MANUFACTURING MECHANICAL. Twist Drills, Reamers, and Rotary Cutting Devices. Bearing Identification. Fasteners and Screw Threads
Twist Drills, Reamers, and Rotary Cutting Devices Bearing Identification MANUFACTURING The objective of this course is to provide the student with an expanded understanding of the use, design, construction,
More informationMechanical Engineering Workshop. Location: Block G, L1. Lab Facilities
Mechanical Engineering Workshop Location: Block G, L1 Lathe Lathe Digital machine. Wood Cutting Saw machine. Milling machine. Hydraulic Press. Drilling machine (vertical). MIG Welding machine. Arc welding
More informationCENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS
Training Title CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS Training Duration 5 days Training Dates & Venue Centrifugal Compressors Maintenance & Failure Analysis 5 14 18 Apr $3,750 Riyadh, KSA
More informationVALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur
VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF MECHANICAL ENGINEERING QUESTION BANK VII SEMESTER ME 6008-WELDING TECHNOLOGY Regulation 2013 Academic Year 2017 18 Prepared
More informationMechatronics Courses by School Period
Mechatronics Courses by School Period Year One P1 P1 P2 P3 P3 P3 P4 P4 P4 Integrated Systems Industrial Math (Geometry, Trig, Algebra,) Blueprint Reading Machine Tool I (Hand tools-measuring-saws & Drill
More informationCourse Description EMME 1
Course Description 01211211 Introduction to CAD/CAM 3(2 3 6) CAD/CAM systems for production engineering, hardwares and softwares for CAD/CAM systems, wireframe, surface and solid design, three dimension
More informationGENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS
- June 2013 Addendum GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS SUBSECTION "A" : GENERAL RULES SUBSECTION "B" : CLASS 1 COMPONENTS SUBSECTION "C" : CLASS 2 COMPONENTS SUBSECTION "D" : CLASS
More informationSEMEM SQA Unit Code H2B3 04 Assisting in the installation of mechanical equipment
Overview This unit identifies the competences you need to assist in the installation of mechanical equipment, in accordance with approved procedures. You will be required to assist in the installation
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 11294 - Stainless Steel Sluice Gates C O N T E N T S PART 1 - GENERAL... 1 1.01 SUMMARY... 1 1.02 REFERENCES... 1 1.03 DEFINITIONS... 1 1.04 DESIGN REQUIREMENTS...
More informationComparison of BS and BS EN for steel materials
Comparison of BS and BS EN for steel materials Appendix This table only highlights the comparison of BS and BS EN on steel materials, which are relevant to plan approval. Title of BS BS BS EN Title of
More informationConventional Paper II (a) Draw a crank rocker mechanism and identify all instantaneous centers.
Conventional Paper II-2014 1. Answer of the following (Each part carries 4 marks): (a) Draw a crank rocker mechanism and identify all instantaneous centers. (b) A steel tube 2.5 cm external diameter and
More informationTotal Quality Management. Quick and Accurate Response to Inquiries. As-Promised Deliveries. Fair and Competitive Prices
FORGED SHAPES 1 2 MISSION STATEMENT The Anderson Shumaker team is dedicated to earning your loyalty and gaining your trust through: Total Quality Management Quick and Accurate Response to Inquiries As-Promised
More informationSECTION PACKAGE BOOSTER PUMP STATIONS
SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to
More informationCast Steel Propellers W27. (May 2000) (Rev.1 May 2004)
(May 2000) (Rev.1 May 2004) Cast Steel Propellers 1. Scope 1.1 These unified requirements are applicable to the manufacture of cast steel propellers, blades and bosses. 1.2 Where the use of alternative
More informationSCIENTIFIC MANAGEMENT TECHNIQUES, INC.
SCIENTIFIC MANAGEMENT TECHNIQUES, INC. Unique Testing and Training Solutions for Industry Solving the Skills Crisis by Helping Manufacturers Identify, Train, and Keep the Best People Forty Six Years of
More informationProgram Description MECHATRONIC SYSTEMS TECHNICIAN ACADEMY
Program Description MECHATRONIC SYSTEMS TECHNICIAN ACADEMY 7107 Elm Valley Drive Kalamazoo, MI 49009 Phone: 269.353.1282 Fax: 269.353.1580 careeracademies@kvcc.edu www.kvcc.edu/training MECHATRONIC SYSTEMS
More informationSUMMER 15 EXAMINATION
SUMMER 15 EXAMINATION Subject Code: 17413 ( EME ) Model Answer Important Instructions to examiners: 1) The answers should be examined by key words and not as word-to-word as given in the model answer scheme.
More informationFLOWSERVE CORPORATION Guardian Pumps. Centrifugal ANSI Pumps Product Training Program
FLOWSERVE CORPORATION Guardian Pumps Centrifugal ANSI Pumps Product Training Program April 2017 Sealless Pumps Definition A pump that is designed with no externally actuated shaft penetrating the pump
More informationSEMPEO SQA Unit Code H Carrying out pipe fitting activities
Overview This standard covers a range of basic pipe fitting competences that will prepare you for entry into the engineering or manufacturing sectors, creating a progression between education and employment,
More informationMARKET PRODUCT APPLICATION CUSTOMISATION LOGISTICS INFRASTRUCTURE. All the PUMP Know-How you need.
MARKET PRODUCT APPLICATION CUSTOMISATION LOGISTICS INFRASTRUCTURE All the PUMP Know-How you need. Distribution with a difference Why should you work with ERIKS? More leading brands, more products, more
More informationSENTRY was created to solve this Challenge.
Technical Description of the SENTRY System by Horsburgh and Scott. Document purpose: The information is for REFERENCE ONLY to illustrate the broad capability of the SENTRY solution which includes hardware
More informationDANIELI TOTAL ASSET MANAGEMENT SYSTEM*
DANIELI TOTAL ASSET MANAGEMENT SYSTEM* Andrea Donadon 1 Riccardo Chiozza 2 Guiseppe Santarossa 3 Pietro Palma 4 Abstract This article introduces the Danieli Total Asset Management System, which involves
More informationPART 5 WELDING. 5.1 General 5.2 Preparation 5.3 Dimensions of welds 5.4 Materials 5.5 Aluminium alloys 5.6 Welding details 5.
PART 5 WELDING PART 5 WELDING SECTION SUBJECT 5.1 General 5.2 Preparation 5.3 Dimensions of welds 5.4 Materials 5.5 Aluminium alloys 5.6 details 5.7 Symbols WELDING Section 5.1 General 5.1.1 of structures
More informationA Twin City Fan Company COMPANYPROFILE
A Twin City Fan Company COMPANYPROFILE Who We Are Clarage is the heavy duty division of Twin City Fan Companies Ltd. that specializes in designing and manufacturing custom heavy duty fans. And with nearly
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 11931 - Horizontal Centrifugal Water Pumps C O N T E N T S PART 1 - GENERAL... 1 1.01 PUMP - GENERAL... 1 1.02 CERTIFIED PUMP CURVES... 1 1.03 NPSH REQUIREMENTS...
More informationOptional Drill Pipe Products
Drill Pipe At RDT we understand our customer s need for durability and performance when choosing the drill pipe that they will use. Each joint of pipe we produce goes through our intense quality assurance
More informationHeavy-Duty Rolling and Plain Bearings. for Mining, Processing, On- and Offshore Technology
Heavy-Duty Rolling and Plain Bearings for Mining, Processing, On- and Offshore Technology E x p e r t i s e For Advanced Bearings in the Mining and Processing Sector... Technical progress in the fields
More informationCONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION
More informationREFERENCE SYLLABUS. for WELDING EXAMINER & WELDING EXAMINER IN TRAINING CERTIFICATES OF COMPETENCY EXAMINATIONS
WELDING EXAMINER & CERTIFICATES OF COMPETENCY S AB-94 Edition 1, Revision 6, 2016-05-01 This syllabus is being phased out and will be discontinued on April 30, 2018. GENERAL INFORMATION INTRODUCTION: This
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationLearn the fundamentals of Shaft Alignment Hands-on Experience
From basic to advanced concepts The Complete Course Author of the 800-page industry reference book Shaft Alignment Handbook John Piotrowski Back by popular demand! 12 th to 15 th June 2018 Perth, WA Every
More informationPumping System Vibration
Pumping System Vibration Understanding the Fundamentals Eric J. Olson Mechanical Solutions, Inc. (MSI) ejo@mechsol.com Agenda 1. Vibration testing and analysis fundamentals 2. Structural and acoustic resonance
More informationPrecision Machining, Grinding & Thermal Spray Since thermal spray coatings metallurgical laboratory machining grinding
Precision Machining, Grinding & Thermal Spray Since 1960 thermal spray coatings metallurgical laboratory machining grinding MACHINING, GRINDING & THERMAL SPRAY SOLUTIONS Full service manufacturing, thermal
More informationTable of Contents. A Operate and monitor Micro Hydel Power Plant (MHP) plant 04
Page 2 Table of Contents Competency Standards A Operate and monitor Micro Hydel Power Plant (MHP) plant 04 B Carry out corrective maintenance procedures on electrical components in a MHP plant 05 C Carry
More informationGoulds Two Stage, Horizontally Split Case Pump
Goulds 3316 Two Stage, Horizontally Split Case Pump 3316 Two Stage, Horizontally Split Case Pumps designed for boiler feed, mine dewatering and other applications requiring moderately high heads with a
More informationIHRDC s Competency-Based e-learning Pathways for Refinery Personnel
International Human Resources Development Corporation V.2.0 IHRDC s Competency-Based e-learning Pathways for Refinery Personnel COMPETENCY-BASED TRAINING PATHWAYS FOR REFINERY TECHNICIANS Our highly regarded
More informationEASTERN ARIZONA COLLEGE Welding
EASTERN ARIZONA COLLEGE Welding Course Design 2015-2016 Course Information Division Industrial Technology Education Course Number WLD 101 Title Welding Credits 2-3 Developed by Carlton Penn Lecture/Lab
More informationSample Questions for Welding Engineering Examinations
Sample Questions for Welding Engineering Examinations AWS Welding Engineer Revision 2 August 2003 Part 1 Basic Fundamentals of Science Examination Mathematics 1. Determine the acute angle _ when tan 63
More informationDetailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content
Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide
More informationSECTION VIBRATION ISOLATION
SECTION 15240 VIBRATION ISOLATION PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15450 - Plumbing Equipment. 2. 15510 - Piping (HVAC). 3. 15515 Valves, Hangers, and Specialties. 4. 15540 - Pumping
More informationMetal Bellows INNOVATIVE COMPONENT AND ASSEMBLY SOLUTIONS FOR HYDRAULIC, PNEUMATIC, FUEL AND COOLING SYSTEMS
Metal Bellows INNOVATIVE COMPONENT AND ASSEMBLY SOLUTIONS FOR HYDRAULIC, PNEUMATIC, FUEL AND COOLING SYSTEMS INNOVATIVE COMPONENT AND ASSEMBLY SOLUTIONS FOR HYDRAULIC, PNEUMATIC, FUEL AND COOLING SYSTEMS
More informationElectrochemical Die-Sinking (ECM) in Practice
Electrochemical Die-Sinking () in Practice Copyright by Maschinenfabrik Köppern GmbH & Co.KG. Distribution, forwarding or duplication of this document, whether in part or in full, is only allowed with
More informationJob Ready Assessment Blueprint. Welding. Test Code: 4272 / Version: 01. Copyright 2017 NOCTI. All Rights Reserved.
Job Ready Assessment Blueprint Welding Test Code: 4272 / Version: 01 Copyright 2017 NOCTI. All Rights Reserved. General Assessment Information Blueprint Contents General Assessment Information Written
More informationPower Recovery Turbines
Power Recovery Turbines Fixed and Variable Geometry Vertical Horizontal Bulletin PS-90-1 (E/A4) Pump Supplier To The World Flowserve is the driving force in the global industrial pump marketplace. No other
More informationSUGGESTED SPECIFICATIONS Pump Frames through 64132
TYPE HBB - HORIZONTAL SOLIDS-HANDLING WASTEWATER PUMPS Pump Frames 44081 through 64132 GENERAL Furnish and install Horizontal Flexible Coupled Dry Pit Pumping Units complete with all accessories and appurtenances
More informationSteel Forgings: Design, Production, Selection, Testing, and Application. Edward G. Nisbett. ASTM Stock No. MNL53
Steel Forgings: Design, Production, Selection, Testing, and Application Edward G. Nisbett ASTM Stock No. MNL53 INTERNATIONAL Standards Worldwide ASTM International 100 Barr Harbor Drive PO Box C700 West
More informationG E N E R A L C AT A L O G
G E N E R A L C AT A L O G C G 1 1 2 0 1 5 C O N T E N T Measurement High pressure Instrumentation Electronic devices Electromechanical Mechanical Transmission Diaphragm pumps Hydraulics Filtration Pneumatics
More informationTrainee Maintenance Technician
Trainee Maintenance Technician The Trainee Maintenance Technician performs aircraft maintenance tasks under supervision, and in accordance with organisational procedures and safety precautions as specified.
More informationAASHTO/AWS D1.5M/D1.5:2008. Table of Contents
Table of Contents Personnel...v Foreword...ix List of Tables... xviii List of Figures...xix List of Forms...xxi 1. General Provisions...1 1.1 Application...1 1.2 Base Metal...1 1.3 Welding Processes...1
More informationC. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions.
15240 VIBRATION ISOLATION ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 230548 An optional keynote
More informationNUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A
TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 DATA SHEET A ANNEXURE - A Sr. Item Description Sr. Item Description A. GENERAL DATA B. PUMP DUTY PARAMETERS 1. System Name 1. Rated capacity,
More informationb) provide evidence of his qualifications and practical experience in welding.
NEPALESE CIVIL AIRWORTHINESS REQUIREMENTS SECTION D APPROVAL PROCEDURES CHAPTER D.6 ISSUE 1 NOVEMBER 1994 1. GENERAL WELDERS 1.1 This chapter is applicable to persons who weld parts which are essential
More informationVERTICAL TURBINE PUMPS
VERTICAL TURBINE PUMPS for the PETROLEUM INDUSTRY www.nationalpumpcompany.com API-610 Vertical Pumps Vertical turbine pumps that meet or exceed API 610 requirements. Since 1969, National Pump Company has
More informationJohnson. We now offer a real step forward in reliability with our newly designed riser pipes.
RISER PIPES Johnson enjoys today an enviable reputation with drilling and water industry professionals as the exclusive designer and manufacturer of wire-wrapped screens. In addition to our skills and
More informationImproving Rotating Equipment Reliability and Machinery Health Training Course. Introduction to Rotating Equipment and Machinery Reliability:
Improving Rotating Equipment Reliability and Machinery Health Training Course This 3-day course explains the methods and techniques for outstanding rotating equipment and mechanical plant reliability.
More informationField Analysis and Balancing Tools Needs and Solutions
The Toolkit for Success Field Analysis and Balancing Tools Needs and Solutions Dennis H. Shreve Commtest, Inc. September 2006 1 A Look at Industry Today The Economic Driving Forces Improving operating
More informationIndustrial Mechanic (Millwright) Level 4
Level 4 Unit: D1 Mechanical Installation Drawings and Equipment Installation and Alignment Duration: 21 hours 10 hours 11 hours This unit is designed to introduce knowledge of mechanical installation drawings,
More informationKEYSTONE RMI DUBEX BUTTERFLY VALVE AWWA FACE-TO-FACE
The Dubex is a double flanged, triple eccentric resilient seated valve design for services in the water industry FEATURES GENERAL APPLICATION Drinking water pump station and transportation/distribution.
More informationModel EVMS Vertical Multistage Pumps for the Global Market
New Products & New Techniques Model EVMS Vertical Multistage Pumps for the Global Market Hiroyuki KAWASAKI*, and So KUROIWA* Abstract As key products for the global market, new model EVMS stainless vertical
More informationDept. of Mechanical Engineering Technology (MCET)
Dept. of Mechanical Engineering Technology (MCET) Course Code (Revamped) Course Title Course Description 1 ENGT101 Engineering Drafting This course is an introduction to technical drawing and computer-aided
More informationCore Curriculum Welding Level 1 Welding Level 2 Welding Level 3
A Correlation of Core Curriculum Welding Level 1 Welding Level 2 Welding Level 3 to the South Carolina Standards for Welding Technology 1, 2, 3, & 4 Required Competencies South Carolina Welding Technology
More informationVibration Analysis Machinery Inspection & Evaluation Level II
Training Title Vibration Analysis Machinery Inspection & Evaluation Level II Training Duration 5 days Training Venue and Dates Vibration Analysis Machinery Inspection & Evaluation Level II 5 03-07 June
More informationInstallation Guidelines for Flygt Pumps Pump Anchoring Recommendations
Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration
More informationELECTRICAL MOTOR MAINTENANCE AND MANAGEMENT KPI S Electrical Maintenance
Electrical Maintenance 1. Drawings (Check all that apply) a. Do updated as-built drawings exist and are they available? (3pts) b. Are all relevant equipment instruction manuals available? (3pts) c. Is
More informationHAUSNER HARD CHROME DEVELOPERS OF H.H.CHROMESEAL
HAUSNER HARD CHROME I N C O R P O R A T E D DEVELOPERS OF H.H.CHROMESEAL WHAT IS HAUSNER HARD-CHROME'S H.H.CHROMESEAL? H.H. Chromeseal is HHC's special Hard Chrome process that is enhanced with various
More informationQualification scheme for welders of aluminium alloys
(March 2009) Qualification scheme for welders of aluminium alloys 1. Scope 1.1 This document provides guidance for a qualification scheme for welders intended to be engaged in welding of aluminium alloys
More informationMinerals. WARMAN Centrifugal Slurry Pumps WBV Vertical Cantilever Slurry Sump Pump Series
Minerals WARMAN Centrifugal Slurry Pumps WBV Vertical Cantilever Slurry Sump Pump Series The Warman WBV ultra heavy-duty range of vertical cantilevered slurry pumps sets a new industry benchmark for general
More informationWELDING TECHNOLOGY. Contact Information. Overview. Degrees/Certificates. Faculty. Certificate of Achievement
Technology 1 WELDING TECHNOLOGY Contact Information Division Liberal Arts Dean Anne Fleischmann (Interim) Associate Dean Lynn Medeiros (Interim) Division Office W 107, Rocklin Campus Overview The Technology
More informationHWX. API OH3 Pump Bearing Frame. API OH4 Rigidly Coupled. API OH5 Close Coupled. API 610 Vertical In-Line Process Pumps.
API 6 Vertical In-Line Process Pumps API OH3 Pump Bearing Frame API OH4 Rigidly Coupled API OH5 Close Coupled Bulletin PS--27 (E) Pump Supplier To The World Flowserve is the driving force in the global
More informationPrinting Version: for optimal viewing set the print to A3 and print two pages of the catalogue (including this one) on each sheet.
Printing Version: for optimal viewing set the print to A3 and print two pages of the catalogue (including this one) on each sheet. CUSTOM-MADE WATERWORKS VALVES SINCE 1967 Table of Contents The company
More informationDevelopment Of Condition Based Maintenance For Coal Handling Plant Of Thermal Power Stations. By: Makarand M. Joshi
Development Of Condition Based Maintenance For Coal Handling Plant Of Thermal Power Stations By: Makarand M. Joshi Email: makarandj@hotmail.com 1.0 Abstract: - In the thermal power plants maximum requirements
More informationSEMMME SQA Unit Code H2AF 04 Assembling Fluid Power Components to Mechanical Equipment
Assembling Fluid Power Components to Mechanical Equipment Overview This unit identifies the competences you need to assemble and fit fluid power components (such as pneumatic, hydraulic, or vacuum) to
More informationLesson. Using Hydraulic Systems
Lesson Using Hydraulic Systems Interest Approach n Have you ever used a floor jack or driven an automobile equipped with power brakes or power steering? Student Learning Objectives n Define hydraulics
More informationSAMPLE. MEM05026C Apply welding principles. Learner Guide. MEM05 Metal and Engineering Training Package. Version 1. Product Code: 5672
MEM05 Metal and Engineering Training Package MEM05026C Apply welding principles Learner Guide Version 1 Training and Education Support Industry Skills Unit Meadowbank Product Code: 5672 Acknowledgments
More informationMaterials and Qualification Procedures for Ships
Materials and Qualification Procedures for Ships Approval of Works for the Manufacture of Fusion Welded Pressure Vessels Revision 4, July 2015 Page 1 of 17 Lloyd s Register Group Limited, its subsidiaries
More informationUNCONVENTIONAL MACHINING PROCESS UNIT 1 INTRODUCTION. Prepared by S. SENTHIL KUMAR AP / MECH SVCET
UNCONVENTIONAL MACHINING PROCESS UNIT 1 INTRODUCTION Prepared by S. SENTHIL KUMAR AP / MECH SVCET INTRODUCTION Conventional machining process Metal is removed by means of tool which is harder than work
More informationAftermarket Technical Service Solutions for Pumping Technologies
Aftermarket Technical Service Solutions for Pumping Technologies HIGH QUALITY OEM PARTS, SERVICE, REPAIR, UPGRADES + RE-RATES: DELIVERING VALUE FOR OUR CUSTOMERS SPX - An Introduction SPX is a Fortune
More informationNUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY
NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY NUCLEAR TRAINING COURSE COURSE 134 1 - Level 3 - Equipment & System Principles 4 - TURBINE, GENERATOR & AUXILIARIES Index 134.00-0 Objectives
More informationPreparing and using manual TIG or plasma-arc welding equipment
Unit 028 Preparing and using manual TIG or plasma-arc welding equipment Level: 2 Credit value: 15 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences
More informationLIQUID-SPECIFIC PRODUCT LINE: ABRASIVE LIQUID PUMPS SERIES DESCRIPTION OPERATING RANGE: IMPROVEMENTS NOMINAL FLOW RATES:
SERIES 4624B (Cast Iron - Replaces Series 4625 Models) Page 410.1 Issue K SERIES DESCRIPTION The Abrasive Liquid Series heavy duty internal gear pumps utilize hard parts in key wear areas, combined with
More informationSUBMERSIBLE ELECTRIC PUMPS
SUBMERSIBLE ELECTRIC PUMPS SUBMERSIBLE PUMPS Gruppo Aturia started developing the Submersible Pump for pumping water in agriculture and for distribution of water in the municipalities. For these applications
More informationWeir Specialty Pumps. WEMCO Torque-Flow
Weir Specialty Pumps WEMCO Torque-Flow HIGH LOW OIL LEVEL WEMCO Torque-Flow Model C WEMCO Torque-Flow Model C Materials of Construction Ni-Hard, High Chrome Configurations Horizontal Sealing Multiple options
More informationQualification scheme for welders of hull structural steels
(Sept 2016) Qualification scheme for welders of hull structural steels 1. Scope 1.1 This document gives requirements for a qualification scheme for welders intended to be engaged in the fusion welding
More informationDRUM MOTOR 138LS 138.5Ø 0.10kW kW, with steel helical gearbox
8 DRUM MOTOR DRUM MOTOR 18LS 18.5Ø 0.10kW - 1.00kW, with steel helical gearbox Product description The drum motor 18LS is a very fl exible component thanks to the wide range of powers and speeds. Characteristics
More informationWelding Units and Understanding Statements
Course #: IT73 Grade Level: 9-12 Course Name: Welding and Materials Processes Level of Difficulty: Average Prerequisites: IT72 # of Credits: 2 semesters 1 Credit The following is a Career and Technical
More informationSupplier self-information
Page 1 of 5 GENERAL INFORMATION General corporate data Address: Legal form: Homepage: V.A.T. Registration No.: Group membership: Subsidiary companies: Ownership: Line of business: Contact person Name Phone
More informationEAL Level 2 NVQ Diploma in Performing Engineering Operations (QCF) Qualification Code: 500/9836/6
EAL Level 2 NVQ Diploma in Performing Engineering Operations (QCF) Qualification Code: 500/9836/6 Engineering Practices Scheme Number/Pathway: 500/9836/6PEA The learner is required to complete all three
More informationABRASION resistant ACID resistant
MIN-TEC (Caspian Mineral Processing Co.) Official Exclusive Representative In IRAN ABRASION resistant ACID resistant Caspian Mineral Processing Co - MINTEC +98 (21) 88535792-3 info@mintecco.com Iran, Tehran,
More informationAUTOMATIC CUT-OFF LA THES for Bar and Tubular Stock
AUTOMATIC CUT-OFF LA THES for Bar and Tubular Stock Chamfer, Form, Groove, Cut Off Up to 8" Tubing; Up to 3" Bar Stock Rugged Construction Application Engineering Automatic Load/Unload Maximum Productivity
More informationRA17-4 stainless. Introduction
RA17-4 stainless Introduction RA17-4 is an age-hardening martensitic alloy combining high strength with the corrosion resistance of stainless steel. Hardening is achieved by a short-time, simple lowtemperature
More informationUnconventional. Machining Processes. M. Adithan ATLANTIC PUBLISHERS & DISTRIBUTORS (P) LTD
Unconventional M. Adithan ATLANTIC PUBLISHERS & DISTRIBUTORS (P) LTD Contents Preface v Introduction 110 Need of Unconventional 1 Characteristic Features of Modern 1 Processes Basic Principle of New Methods
More informationOverhaul Issues on Vertical Pumps
Overhaul Issues on Vertical Pumps EPRI/NMAC Pump Users Group August 10, 2004 Kurt Schumann ProPump ProPump Services Services Vertical Pumps Come in All Sizes Repair Goals Repair Only Get what you got Solve
More informationWelding Units and Understanding Statements
Course #: IT72 Grade Level: 9-12 Course Name: Welding II Level of Difficulty: Average Prerequisites: None # of Credits: 2 semesters 1 credit The following is a Career and Technical Education (CTE) class
More informationManufacturing Technology
Measuring What Matters in Job Ready Assessment Blueprint Manufacturing Technology Test Code: 2084 / Version: 01 Copyright 2007 General Assessment Information Blueprint Contents General Assessment Information
More informationUnited Surface Technologies
United Surface Technologies Engineered Coating Solutions Established 1986 www.ust.com.au Introduction United Surface Technologies (UST) Pty Ltd is an ISO 9001:2008 certified surface engineering company
More informationDARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES
PART 1 DESIGN DIRECTIVE 1.1 RELATED DOCUMENTS SECTION 15240 SEISMIC RESTRAINT AND VIBRATION CONTROL A. This section shall be considered as a part of each DC Standards, Part 15. 1.2 QUALITY ASSURANCE A.
More informationTOOL ROOM FOR SHEET METAL DIES
Profile No.: 28 NIC Code: 24209 TOOL ROOM FOR SHEET METAL DIES 1. INTRODUCTION: Sheet metal forming processes are complex and have interaction several parameters of material like geometry, surface topology,
More informationLUBRICATION PUMP Z2 CENTRAL LUBRICATION
LUBRICATION PUMP APPLICATION Lubrication pumps are used as a source of pressure lubricant in the circuits of two-line central lubrication systems. Pumps can be used for lubrication of high number of lubricated
More informationHydraulic cutting units
Product range Produced by ATLAS Maschinen GmbH Hydraulic cutting units Hydraulic cutting units SCHAEFF hydraulic cutting units Proven for the toughest day-to-day use If you work with the toughest rock
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More information