SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES
|
|
- Marvin Glenn
- 5 years ago
- Views:
Transcription
1 SAWS WATER PROJECTS MODELING CRITERIA GUIDELINES July U.S. Highway 281 North San Antonio, Texas 78212
2 Modeling Criteria Guidelines, July 2016 TABLE OF CONTENTS MODELING CRITERIA GUIDELINES FOR SAWS WATER PROJECTS... 3 HYDRAULIC GRADE LINE REQUEST FORM... 3 DEVELOPER PROCESS FOR SUBMITTING A HYDRAULIC MODEL... 3 APPENDIX A - HYDRAULIC GRADE LEVEL MAP APPENDIX B - EXAMPLE OF HYDRAULIC MODEL INPUTS... 6 APPENDIX C - EXAMPLE OF HYDRAULIC MODEL OUTPUTS
3 Modeling Criteria Guidelines for SAWS Water Projects Modeling Criteria Guidelines, July 2016 Hydraulic Grade Line Request Form Date Project Name Location Map - must include boundary of development tract and proposed connection point to existing water main Location of Development - if an address cannot be provided, then the closest street intersection and intersection corner will need to be provided Engineer s contact name, company, phone number, fax number, mailing address and address EDU s by Pressure Zone Fire Flow 25 psi Type of Development: Commercial/Industrial, Residential/Apartment Comments Developer Process for Submitting a Hydraulic Model Obtain the Pressure Zone static gradient for the development (Appendix A) Provide Development Master Plan reflecting roads, development densities, pressure zone limits, development units and contours with labels Provide development unit schedule by years with estimated service requirements (EDU s) by development unit per year Provide information on fire flow requirements for each development unit, per COSA adopted Fire Code and Local amendments, and SAWS Development criteria Submit hydraulic model using the criteria stated in Chapter 9 of the Utility Service Regulations and identify the software version used for the hydraulic model Submit the following to SAWS for review: a. Master Water Plan Exhibit to show the following: Water pipe layout of the development Unit or sub-development boundary limits Road alignments All anticipated water easements Pressure Zone boundary line(s) Contours with labels Pipe size(s) and location Fire hydrant locations state if existing or proposed Connection point(s) to existing SAWS/District Special Project (DSP) water main All proposed water infrastructure required to serve the proposed development including, but not limited to; tanks, wells, pumps, etc. b. Hydraulic Model Input Data (Appendix B) associated with the above map shall include the following: Establish scenarios by unit(s), when applicable. Scenarios should include domestic demands and fire flow evaluations for all areas within each scenario. One scenario shall reflect completed development of all units at full build-out. Pipe diameter, pipe length, C factor Fire hydrant existing and proposed with elevation and demand value 3
4 Modeling Criteria Guidelines, July 2016 Junction ground elevation and demand value Connection point(s) to SAWS/DSP water line ground elevation and hydraulic grade line Tanks hydraulic grade line, volume, ground surface elevation, configuration (ground storage or elevated storage) Pumps design point (flow and total dynamic head) or a pump curve, ground surface elevations, firm and ultimate capacities Wells sustainable yield c. Hydraulic Model Output (Appendix C) associated with the above map shall be legible and include the following: Provide data result tables and graphic exhibits for each scenario Data Result/Output Tables Pipe domestic flow velocity and head loss for each scenario Fire hydrant residual pressure under fire flow conditions Junction pressure for domestic Connection Point(s) to SAWS/DSP water line pressure/hydraulic grade line for domestic Tanks fill/drain rate Pumps flow from each pump Exhibits to be provided for each scenario Pipe size, show labels, domestic flow direction and velocities Node show labels, domestic condition pressures, estimated fire flow values, identify node(s) with minimum pressure that control fire flows throughout the development piping network. Junction locations must include the lowest and highest ground elevations where the proposed pipe will be located. If the proposed pipe has a dead-end, then the length from previous junction to the end of pipe along with pipe diameter must be stated. Pumps, tanks, wells show labels, provide graphs of flow rates, water levels, etc. as part of the scenario summary Fire hydrants show label, estimated fire flow values for mains at those locations Model ID s shall be labeled on the exhibit and legible. Summary of findings d. Engineering Report shall include the following: A brief summary of the development A brief description of development schedule reflecting service requirements by year and by units Summary of scenario descriptions Summary of scenario modeling results Available fire flow based on existing and proposed infrastructure Provide recommendations, if any, for potential oversizing of mains or facilities Exhibits printed on sizes that are easily readable and clearly illustrate required output data and results (tables, etc.) for hydraulic model A CD with appropriate dwg, dgn, shp files as noted above, with the complete Master Water Plan included. 4
5 Appendix A - Hydraulic Gradient Level Map HGL (ft) PZ Max Ground Elev (ft) Min Ground Elev (ft) B A C, 950E, 950W , 5A C A W B D D Y , C Z F L D , 10A, 10B N X D T , 11A, 11M CTI S B, 11O E E, 11K B, 12SSH C , 12A F C A ") ") µ Created: July 2016
6 Appendix B - Example of Hydraulic Model Inputs Note: The following examples should be used more as a reference due to varying hydraulic modeling software having different layout styles for model inputs. Pipe: Junction:
7 Modeling Criteria Guidelines, July 2016 Appendix B (continued) Note: The following examples should be used more as a reference due to varying hydraulic modeling software having different layout styles for model inputs. Tank: Pump: Well: 7
8 Modeling Criteria Guidelines, July 2016 Appendix C - Example of Hydraulic Model Outputs Note: The following examples should be used more as a reference due to varying hydraulic modeling software having different layout styles for model outputs. Pipes: Junctions: 8
San Antonio Water System Infrastructure Planning Application for Subdivision Plat Review
FN001-4 REV A 6/09 Applicant / Developer / Owner San Antonio Water System Infrastructure Planning Application for Subdivision Plat Review Plat I.D. # Name Contact Person Address Phone / Fax Number Applicant
More informationCHAPTER 4 HYDRAULIC ANALYSIS
CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is
More informationIvins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards
2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous
More informationUNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS
UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION
More informationENGINEERING REPORT WATER SUPPLY
PROPOSED RESIDENTIAL DEVELOPMENT, CORAL SPRINGS TRELAWNY FCS #: 1124/76/C ENGINEERING REPORT WATER SUPPLY PREPARED FOR Gore Developments Limited 2c Braemar Ave, Kingston 10 FEBRUARY 2012 1 TABLE OF CONTENTS
More informationCITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM
CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM 2018 TABLE OF CONTENTS Section Four Water Distribution System SECTION PAGE NUMBER 1. Objective...1 2. Submissions
More informationSection 7 Hydraulic Model Development and Evaluation Criteria
Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.
More informationAgua Consulting Inc. Engineered Water Solutions
Agua file: 023-01.340 District of Summerland 9215 Cedar Avenue Box 159 Summerland, BC V0H 1Z0 Attention: Mr. Devon van der Meulen, Manager of Utilities Dear Devon: RE: Banks Crescent Proposed 346 Unit
More information3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES
3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In
More informationFREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY
FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507 NOVEMBER 2013 FREELAND WATER & SEWER DISTRICT ISLAND COUNTY WASHINGTON BERCOT ROAD INTERTIE STUDY G&O #13507
More informationAPPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM
APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: March 16, 2011 FROM: Victor M. Alaniz, P.E. Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth
More informationWATER MAIN EXTENSION DESIGN REQUIREMENTS
This guideline provides minimum requirements for the design of new water main extensions. This guide is not to be used as a substitution for the detailed design of the water system. The Developer s Engineer
More informationKUM & GO 300 SUBDIVISION THORNTON, COLORADO
FINAL UTILITY STUDY KUM & GO 300 SUBDIVISION THORNTON, COLORADO PREPARED FOR: KUM & GO, L.C. 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 PH: (515) 457-6232 CONTACT: RYAN J. HALDER PREPARED BY: OLSSON
More informationPRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS
PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS 39 AUGUST 2005 TABLE OF CONTENTS PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS PAGE SECTION 1 DESIGN CRITERIA 41 SECTION 2 SUBMITTAL 44 SECTION 3 STRUCTURES
More informationTxDOT Houston District Permit Requirements (Information contained herein is subject to change)
Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three
More informationSection 5 - Planning Criteria. Section 5
Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities
More informationADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT
H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction
More information255 NORTHFIELD DRIVE EAST
255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,
More informationAPPENDIX B. WSSC Design Criteria for Water Distribution Systems
a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to
More informationEl Margarita Development Analysis
303 Second Street, Suite 300 South San Francisco, California 94107 415-243-2150 FAX: 415-896-0999 El Margarita Development Analysis 28 January 2015 Prepared for City of Yuba City 1201 Civic Center Boulevard
More informationThis is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.
COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please
More informationWATER AND SANITARY SEWER
RUBIDOUX COMMUNITY SERVICES DISTRICT WATER AND SANITARY SEWER DESIGN & CONSTRUCTION MANUAL THIS PAGE INTENTIONALLY BLANK RUBIDOUX COMMUNITY SERVICES DISTRICT WATER AND SANITARY SEWER SYSTEM DESIGN AND
More informationPresentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies
Uday Khambhammettu Randolph Rostas VA AWWA Presentation Summary What, Why, and How Building the Model Facility Data Acquisition Model Calibration Real World Applications/Case Studies Model Maintenance
More informationEXISTING SYSTEM ANALYSIS
Chapter 6 EXISTING SYSTEM ANALYSIS This chapter describes the evaluation of the existing water distribution system, using the calibrated hydraulic model and the 2006 water demands. The system evaluations
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationPermit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System
Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)
More informationENGINEERING REVIEW CHECKLIST City of Mount Clemens
(To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact
More informationNZQA registered unit standard version 4 Page 1 of 5
Page 1 of 5 Title Describe drinking-water supply reticulation systems Level 5 Credits 8 Purpose People credited with this unit standard are able to describe: the reticulated services found on public and
More informationSYSTEM ID: KY 10 NARRATIVE DESCRIPTION
SYSTEM ID: KY 10 NARRATIVE DESCRIPTION KY 10 is primarily a branched system in Kentucky with the following assets: 13 Tanks, 13 Pumps, 1 Water Treatment Plant, and approximately 1353879 feet of pipe. KY
More informationSYSTEM ID: KY 3 NARRATIVE DESCRIPTION
SYSTEM ID: KY 3 NARRATIVE DESCRIPTION KY 3 is primarily a grid system in Kentucky with the following assets: 3 Tanks, 5 Pumps, 1 Water Treatment Plant, and approximately 277,022 feet of pipe. KY 3 provides
More informationStorage and pumping capacity analysis using hydraulic modeling
Storage and pumping capacity analysis using hydraulic modeling G. MacPherson City of Chilliwack, B.C., Canada W. de Schaetzen & S. Cripps GeoAdvice Inc., Vancouver, B.C., Canada ABSTRACT: This paper summarizes
More informationSUBDIVISION IMPROVEMENT PLANS FORM
Page 1 of 9 CITY OF CONROE SUBDIVISION IMPROVEMENT PLANS CHECKLIST SUBMIT THREE FINAL SETS OF PLANS (maximum size 24 X36 ), OTHER ITEMS LISTED, AND THIS COMPLETED, CERTIFIED CHECKLIST TO THE ENGINEERING
More informationAPPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT
APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:
More informationCITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BENICIA DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 250 EAST L STREET, BENICIA, CA 94510 Phone: (707) 746-4240 CITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST Tract Map # This checklist is
More informationSilver Seven Corporate Centre Phase 1
SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y
More informationWoodbury - Aurora Metro Station
Woodbury - Aurora Metro Station Master Utility Report Aurora, Colorado E. Centrepoint Dr. and E. Alameda Dr. Prepared By: Galloway 6162 S. Willow Drive, Suite 32 Greenwood Village, CO 8111 33.77.8884 POC:
More informationa. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)
CITY OF OXNARD ENGINEERING DIVISION REQUIRED FORMAT AND CONTENTS HYDROLOGIC AND HYDRAULIC DRAINAGE REPORTS This report will provide a basis for design of the drainage system for the subject project. The
More informationCITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413
Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated
More informationCHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN
CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth
More informationRiverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT
Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,
More informationProject: Developer/Designer: Reviewer:
City of Charlottesville, Virginia Engineering Plan Review Checklist (Site Plans, Site Plan Amendments, and Major Subdivisions) 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182;
More informationCITY OF ANAHEIM SEWER DESIGN MANUAL
CITY OF ANAHEIM CITY OF ANAHEIM DEPARTMENT OF PUBLIC WORKS SUBDIVISION SECTION SEWER DESIGN MANUAL TABLE OF CONTENTS 1. SIZING... 2 Design flows:... 2 Roughness coefficient (n):... 2 Velocity (Average
More informationCHAPTER 4 Hydraulic Model Management and Documentation Protocols
CHAPTER 4 Hydraulic Model Management and Documentation Protocols It is important for the City s hydraulic model to be updated regularly to reflect newly installed/modified water system pipelines and facility
More informationDraft Report. Prepared for: City of Ottawa. Prepared by: Stantec Consulting Ltd Clyde Avenue Ottawa, ON, K2C 3G4. Insert revision record
Feasibility Study - Extension of Carlsbad Springs Trickle Feed Water System Area East of Carlsbad Springs (Russell Road, Carlsbad Lane, Sabourin Road & Boundary Road Industrial Park Draft Report Prepared
More informationPLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL
PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL Date Submitted: Project Number: CITY OF ALEXANDRIA 8236 WEST MAIN STREET ALEXANDRIA, KY 41001 (859) 635-4125 FAX (859) 635-4127
More informationTable of Contents. 3.1 Source Capacity Analysis
Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity
More informationAbout Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities
About Me Water System Analysis and Design at Seattle Public Utilities Jon C. Ford, P.E. CEE 481 October 1, 8 Senior Civil Engineer, Seattle Public Utilities BSCE, Seattle University MSCE, University of
More informationMASTER WATER SYSTEM DESIGN REPORT DESERT TRAILS
MASTER WATER SYSTEM DESIGN REPORT FOR DESERT TRAILS SURPRISE, ARIZONA Prepared for: HE Capital Fox Trails, LLC 2850 E. Camelback Road Suite 110 Phoenix, Arizona 85016 1 st Submittal February, 2009 2 ND
More informationReport. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012
Lake Water Supply Hydraulic Modeling Report Village of Lindenhurst, IL April 2012 R:\MAD\Documents\Reports\Archive\2012\Lindenhurst, IL\Lake Water Supply.HM.1290.039.mjf.jan\Report\!Front Cover (Blue=Water)
More informationSECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS
SECTION 2 - DESIGN STANDARDS FOR GRAVITY SANITARY SEWERS 2.1. General Requirements Sanitary sewers are to be provided solely for the removal of sanitary waste. Under no circumstances shall any roof drains,
More informationSouth Coast Water District 2017 Master Plan Updates
South Coast Water District 2017 Master Plan Updates SCWD Sara Mathis, PE AECOM Henry Liang, PE Kelly McEnerney, EIT June 22, 2017 2017 Master Plan Update Presentation Outline Approach Potable Water System
More informationCHAPTER 5 WATER SYSTEM DESIGN STANDARDS
CHAPTER 5 WATER SYSTEM DESIGN STANDARDS TABLE OF CONTENTS CHAPTER 5 WATER SYSTEM DESIGN STANDARDS 5.00 Objective Page 1 5.01 Additional Referenced Standards Page 1 5.02 Special Design Problems Page 2 5.03
More informationWastewater Flow Monitoring Services
Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,
More informationEastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018
Eastern Sewershed Package IV Project Solicitation Number: CO-00149 Job No.: 17-4527 ADDENDUM 1 April 20, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to
More informationLeveraging Hydraulic Models
Leveraging Hydraulic Models presented by Melissa Brunger, P.E. GAWP Fall Conference November 14, 2017 Hydraulic Modeling Applications Case Studies Conclusions/Lessons Learned AGENDA System curves for pump
More informationCITY OF LA MARQUE, TEXAS CHAPTER 3 WATER SYSTEM DESIGN CRITERIA
CITY OF LA MARQUE, TEXAS CHAPTER 3 WATER SYSTEM DESIGN CRITERIA CHAPTER 3 WATER SYSTEM DESIGN 3.1 WATER SYSTEM DESIGN GENERAL 3.1.1 Criteria for the design of water service and water distribution lines
More informationT a b l e o f C o n t e n t s
C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General
More informationTOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK
TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,
More informationPRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.
PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION
More informationF. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.
Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway
More informationJ. PAUL GUYER, P.E., R.A.
J. PAUL GUYER, P.E., R.A. Paul Guyer is a registered civil engineer, mechanical engineer, fire protection engineer and architect with over 35 years experience designing all types of buildings and related
More informationPART VII - WATER SYSTEM DESIGN CRITERIA
PART VII - WATER SYSTEM DESIGN CRITERIA A. Water Distribution, General 1. The water system layout shall be approved by the City Engineer. The fire hydrant layout shall be approved by the Redwood City Fire
More informationFinal - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for
Final - reliminary Design Report Interstate 10 and Indian Avenue Area Sewer System repared for Mission Springs Water District July 2012 Mission Springs Water District I-10 & Indian Area Sewer System DR
More informationSECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES
SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable
More informationDRAFT TECHNICAL MEMORANDUM
Stetson Engineers, Inc. Technical Memorandum - New City of Solvang Well Field, May 14, 2010 DRAFT TECHNICAL MEMORANDUM 2171 E. Francisco Blvd., Suite K San Rafael, California 94901 TEL: (415) 457-0701
More informationWastewater Collection. (Sewer Alternatives)
Wastewater Collection (Sewer Alternatives) Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs. Wastewater Characterization Solids Liquids Pipe
More informationFunctional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1
Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...
More informationLand Use Assumptions Technical Memorandum
San Antonio Water System Water and Wastewater Facilities Land Use Assumptions Plan, Capital Improvements Plan, and Maximum Impact Fees Study Land Use Assumptions Technical Memorandum November 2018 Contents
More informationSewer Modeling of Near- Term Development Technical Memorandum
Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently
More informationCITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES
CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES SECTION A NOTES TO ENGINEERS This manual is intended to aid and assist private engineers in the layout and design of sanitary sewers
More informationCEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN
CEE 371 Fall 2009 Design Problem 1 (work in teams of 3) DESIGN OF AMHERST TRANSMISSION MAIN Background The drinking water sources for the Town of Amherst include two surface water (reservoir) supplies
More informationTABLE OF CONTENTS. 5 WATER SUPPLY 5-1 Sources of Supply TOC-1 City of Ontario Water Master Plan. R:Reports\Ontario\Water Master Plan
Section Page 1 EXECUTIVE SUMMARY 1-1 Purpose... 1-1 1-2 Study Area... 1-1 1-3 Water Use... 1-2 1-4 Water Supply... 1-9 1-5 Existing System... 1-11 1-6 Service Criteria... 1-16 1-7 Hydraulic Model... 1-18
More informationYorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report
Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345
More informationTOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements
TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves
More informationCITY OF MERIDIAN LAND DEVELOPMENT SERVICES SUBDIVISION PLAN REVIEW CHECK LIST
Project Name: Hearing Date: Reviewer: Date of Review: # OK NEED N/A General Plan Design All documents, design standards, specifications, and forms should be taken from the website each time they are used
More informationProposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report
453211 Ontario Ltd. Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721
More informationHydraulic Modeling and System Optimization
DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: Hydraulic Modeling and System Optimization Steven Jones, M.S., P.E. September 4, 2013 What is a Water System
More informationIndex. Composition and Order of Plan Set. Utility Plan... 5
City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading
More informationDEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA
DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA This report was prepared to present development information (Utility availability, Development Regulations, Flood Plain information,
More informationOVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for
OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for all roadways. Identify utility locations/separations from gutter lip and
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More informationA Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR
A Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 Overview 02 Approach 03 Findings 04 Alternatives
More information[] Brochure, picture, drawing, etc., of the use to be conducted (if applicable).
TEMPORARY USE PERMIT APPLICATION ACCOUNT # 4232 Temporary Use Permit procedures are contained in Section 83.030705 of the Yucaipa Development Code. Temporary Use Permits shall be first issued for a period
More informationHydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems
Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems 1 Agenda: - Background - Objectives - Water Distribution System Overview - GIS and Hydraulic Modeling Relationship - Hydraulic
More informationEnvironmental Engineering-I
Environmental Engineering-I Prof. Dr. Muhammad Zulfiqar Ali Khan Engr. Muhammad Aboubakar Farooq Water Distribution Systems & Analysis 1 Water Distribution Systems & Analysis References Water Supply &
More informationTABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.
TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM SECTION TITLE PAGE 115.1 GENERAL 115.1 115.2 SIZING LINES 115.1 115.3 DISTRIBUTION SYSTEM 115.2 115.3.1 Layout
More informationSECTION 4 STORM DRAINAGE
4.01 GENERAL SECTION 4 STORM DRAINAGE These standards shall provide minimum requirements for the design of Storm Drainage and related appurtenances within the City of West Sacramento rights of way and
More informationPRELIMINARY WASTEWATER CAPACITY STUDY
PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared
More informationBy Kimbal A. Hall, PE. Submitted to: WESTFALL MANUFACTURING COMPANY. May ALDEN RESEARCH LABORATORY, INC. 30 Shrewsbury Street Holden, MA 01520
COMPUTATIONAL FLOW MODEL OF WESTFALL'S 36 3050 THREE STAGE MIXER TO BE INSTALLED IN THE PERCHLORATE BLENDING STATION FOR THE CITY OF REDLANDS, CALIFORNIA GFS-411507-1R2 By Kimbal A. Hall, PE Submitted
More informationSpecial Land Use Permit Application Planning Division
Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out. 1. Applicant Name:_ Address: Phone Number: Fax Number: Email address: 3. Applicant s
More informationPENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES
CHAPTER 8: OTHER UTILITIES Sections Page # 8.0 INTRODUCTION 4 8.1 GENERAL 4 8.1.1 Act 287: PA OneCall 4 8.2 LOCATION 4 8.3 TRENCHING AND BACKFILL STANDARDS 4 8.4 EASEMENTS 6 8.5 PETROLEUM AND NATURAL GAS
More informationSanitary Sewer Design. Sanitary Sewers, Page 1
Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination
More informationDRAINAGE SUBMITTAL CHECKLIST
Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following
More informationWater Utility Science Water Math and Hydraulics 050. Name: Date:
Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces
More informationSpecial Land Use Permit Application Planning Division Form will not be processed until it is completely filled out.
Special Land Use Permit Application Planning Division Form will not be processed until it is completely filled out. 1. Applicant Name:_ Address: Phone Number: Fax Number: Email address: 3. Applicants Attorney/Contact
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationMarianneville Developments Ltd.
Estates of Glenway Project No. L09-301 March 2012 Executive Summary Cole Engineering Group was retained by Marianneville Developments Limited to undertake a Functional Servicing Report in support of the
More informationWATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY
WATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY Britton Corbin, P.E. Janet McSwain, P.E. AUTHORS: Britton Corbin, Project Engineer, Earth Tech AECOM 2456 Remount Rd. Charleston, SC 29406 Janet McSwain,
More informationDesign Checklist for Water and Sewer for Extensions and Subdivisions
Design Checklist for Water and Sewer for Extensions and Subdivisions The proponent s hydraulic engineer/designer is required to complete this checklist and submit to Services Development, when submitting
More informationTank Name: Cornwell 0.5MG Reservoir
TIDEFLEX MIXING SYSTEM (TMS) PRELIMINARY DESIGN REPORT Tank Name: Cornwell 0.5MG Reservoir Water Utility/Owner: Soquel Creek Water District, CA Consultant: CONTENTS TMS - GENERAL ARRANGEMENT DRAWING CFD
More information