1 Ioannina Project

2 The Project About us Energean is an independent E&P Company focused in the Eastern Mediterranean with a production track record in Greece of more than 36 years Energean s Principles regarding Environment and Society: Activity with low to zero environmental footprint Supporting local communities Repsol is an energy company operating across the entire energy value chain with significant experience and global activity Repsol employs more than 24,000 people in almost 40 countries. The Project Our Mission To fulfill our work commitment under the Lease Agreement with the Greek Government Acquisition and processing of a Geophysical Survey (400km) Geophysical surveying is a well-established technique that provides an image of the subsurface by using pressure waves The geophysical technique provides geologists with an image of the subsurface, just as the ultrasound technique provides doctors with an image of the body s interior Repsol and its Hellenic partner want to maximize the potential of Greek energy resources and to create national and local wealth Operations are carried out in accordance with the European and national laws and regulations, with the approval of the Greek Parliament, applying the strictest safety and environmental practices Participating companies are Energean (40%) and Repsol (60%) Repsol is carrying out a geophysical survey during the next eight months in the municipalities of Souli, Igoumenitsa, Filiates, Zitsa, Dodoni, Zagori and Pogoni. Five (5) of them have already given permission for the survey to pass through municipality owned land.

3 The Project The Process Brief description A geophysical survey is a study used by exploration specialists as a tool to identify the geological conditions needed to have a potential accumulation of hydrocarbons (oil and/or gas) The seismic technique is based on pressure waves generated in the source point, these waves are reflected in the contact between different rock layers. The reflected waves traveled back to the surface where vey sensitive receivers (geophones) record them digitally. After the recording of these images there is a detailed final process followed by an Interpretation of the data. The interpretation could define structures or layers with potential accumulation of hydrocarbons (oil and/or gas). Step 1. De-mining and clearance of unexploded ordnance. Step 2. Surveying and line preparation. Step 3. Hole operations. Step 4. Layout of the recording equipment. Step 5. Loading and recording. Step 6. Collection of equipment and line restoration. Geophysical survey acquisition is a routine industry practice. A similar survey has been conducted in Epirus in the past (1997). It is monitored by an authorized environmental team to ensure that the Environmental Action Plan is enforced. The Project The Process Step 1. De-mining and clearance of unexplored ordance/remnants of war In order to ensure safe field operations, the Hellenic Army has been contracted to provide a mine clearance service. Unexploded ordnance has been identified and cleared already. This represents a lasting benefit to the Epirus region and local landowners. Step 2. Surveying and line preparation (regulated by government-approved Environmental Action Plan) The surveying team is monitored at all times by a team of environmental experts including Foresters, Biologists, Ornithologists, Archaeologists and Environmental Engineers. Step 3. Drilling operations The team uses portable equipment that is transported by either tractor or helicopter. The holes are made to a variable depth of approx. 8m to 20m. The environmental monitoring team is present at all times during the operation.

4 Step 4. Layout of the recording equipment Geophones are passive recording devices used to record pressure waves. The equipment is laid out in the field. Step 5. Loading and recording Once the survey equipment is deployed, approved and tested, the holes are loaded with a charge and the pressure waves produced are recorded. Noise and vibration levels are monitored at all times. Step 6. Collection of equipment and line remedation operations The survey lines are restored to their original condition. Restoration and re-forestation projects are undertaken after the recording equipment has been collected, all under the supervision of authorized environmental experts. The Project The Process During the survey, helicopters will be used to transport material and equipment. Helicopter use is controlled by strict International and Greek safety procedures. The use of helicopter will follow all the procedures and restrictions defined in the Environmental Action Plan. The Project Permitting The companies have applied and received the necessary permits required for the field operations Strategic Environmental Impact Assessment Baseline Environmental Report(s) Environmental Action Plan Archaeology Permit Greek Army (in addition, cooperation for the demining of the geophysical lines) Forestry Authorities (Forest Police Decisions and Installation Protocols) Permits for Accessing Municipality Owned Areas Permits for Accessing Privately Owned Areas Purchase, Transportation and use of Explosives

5 The Project In the Past This work leaves a negligible visible trace after survey completion. A similar geophysical project was carried out successfully in Ioannina during One line passed through the urban area of the city of Ioannina. Impact on farming land and forests is minimal. This line, acquired in 1997, is not identifiable today.

6 The Project In the Future The State granted the companies with the right to explore for up to seven years. 3 YEARS 2 YEARS 2 YEARS FIRST PHASE (I) SECOND PHASE (I) THIRD PHASE (I) 400 km Geophysical Survey 1 Exploration Well 1 Exploration Well At the end of the current phase (phase I) the companies will decide if the results merit a continuation into phase II of the exploration period (drilling one exploration well).

LAMPLHERBERT LAMPLHERBERT

LAMPLHERBERT LAMPLHERBERT October 18, 2013 Damon G. Doumlele Environmental Protection Specialist Big Cypress National Preserve 3300 Tamiami Trail East Ochopee FL 34141 Re: Seismic Methods Research at Raccoon Point Field Dear Mr.

More information

EN 31 EN. Annex 5 : Action Fiche for Lebanon/ENPI/Demining and Unexploded Ordnance 1. IDENTIFICATION. Demining and Unexploded Ordnance

EN 31 EN. Annex 5 : Action Fiche for Lebanon/ENPI/Demining and Unexploded Ordnance 1. IDENTIFICATION. Demining and Unexploded Ordnance Annex 5 : Action Fiche for Lebanon/ENPI/Demining and Unexploded Ordnance 1. IDENTIFICATION Title/Number Total cost 7,000,000 Aid method / Method of implementation Demining and Unexploded Ordnance Project

More information

SEISMIC CONSULTANCY SERVICES

SEISMIC CONSULTANCY SERVICES SEISMIC CONSULTANCY SERVICES rpsgroup.com Improving data quality adding value RPS Energy helps its clients develop natural energy resources across the asset life cycle. We combine our technical skills

More information

New Approach to use Ground Penetrating Radar (GPR) integrated with a drone (UAV)

New Approach to use Ground Penetrating Radar (GPR) integrated with a drone (UAV) New Approach to use Ground Penetrating Radar (GPR) integrated with a drone (UAV) Ground Penetrating Radar (GPR) The advent of Ground Penetrating Radar (GPR) can be traced back to as early as 1910 when

More information

BLOCK EP-1 2D SEISMIC FUELLING OUR LIVES

BLOCK EP-1 2D SEISMIC FUELLING OUR LIVES BLOCK EP-1 2D SEISMIC FUELLING OUR LIVES Image from http://shutupandtakemethere.com/bagan-sunset-myanmar.html. All right reserved by the original owner. FUELLING OUR LIVES FOCUS: CONTRIBUTE TO MYANMAR

More information

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and

More information

For personal use only

For personal use only First Quarter Activities Report FY2018 Bird #13-18 Well Fremont County, Colorado For the period ended 30 September 2017 With additional information on subsequently completed activities 2 QUARTERLY HIGHLIGHTS

More information

New Approach to use Ground Penetrating Radar (GPR) integrated with a drone (UAV)

New Approach to use Ground Penetrating Radar (GPR) integrated with a drone (UAV) New Approach to use Ground Penetrating Radar (GPR) integrated with a drone (UAV) 1 Ground Penetrating Radar (GPR) The advent of Ground Penetrating Radar (GPR) can be traced back to as early as 1910 when

More information

DECISION MEMORANDUM: Quartz Dreams Minerals Exploration Project, Nogales Ranger District

DECISION MEMORANDUM: Quartz Dreams Minerals Exploration Project, Nogales Ranger District United States Department of Agriculture Forest Service Coronado National Forest 303 Old Tucson Road Nogales, Arizona 85621 Phone (520) 281-2296 FAX (520) 281-2396 File Code: 1950/2820 Date: Route To: Subject:

More information

Marine Imaging Systems

Marine Imaging Systems Marine Imaging Systems The challenges the E&P industry faces today are far more complex than a generation ago, when conventional resources were more readily available. The hydrocarbons sought after today

More information

Stage 4 Geotechnical Investigations Information Sheet

Stage 4 Geotechnical Investigations Information Sheet Stage 4 Geotechnical Investigations Information Sheet Geotechnical specialists will use a range of equipment to examine ground conditions by either excavating small shallow test pits of soil, using a mechanical

More information

When time and precision are crucial, aerial construction is an extremely productive and cost effective solution.

When time and precision are crucial, aerial construction is an extremely productive and cost effective solution. 2 When time and precision are crucial, aerial construction is an extremely productive and cost effective solution. Our team works with yours, tailoring the project plan, selecting the right aircraft for

More information

CO2CRC Otway Stage 3 Project

CO2CRC Otway Stage 3 Project CO2CRC Otway Stage 3 Project Project Summary Dr Maxwell Watson Program Manager - Storage CO2CRC Ltd CSLF Projects Interaction and Review Team 3 rd December 2017, Abu Dhabi, UAE Presentation Outline CO2CRC

More information

A proposal for investigation and excavation to of the Roman Villa at Blacksmith s Corner, Walberton, West Sussex.

A proposal for investigation and excavation to of the Roman Villa at Blacksmith s Corner, Walberton, West Sussex. A proposal for investigation and excavation to of the Roman Villa at Blacksmith s Corner, Walberton, West Sussex. 1. Introduction A request by Luke Wishart has given the opportunity to perform a number

More information

TOGETHER, WE GET THE JOB DONE. :: Hawk

TOGETHER, WE GET THE JOB DONE. :: Hawk TOGETHER, WE GET THE JOB DONE. :: Hawk ::Hawk recording system Hawk - The ultimate autonomous nodal system. Engineered to be the most flexible and rugged recording system with unmatched wireless field

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

Proposed regulation change under the Oil, Gas and Salt Resources Act

Proposed regulation change under the Oil, Gas and Salt Resources Act Proposed regulation change under the Oil, Gas and Salt Resources Act Regulating Compressed Air Energy Storage (CAES) in Porous Rock Reservoirs and Solution-Mined Salt Caverns October 2017 Ministry of Natural

More information

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover. 5.3.2. Rural Zone 5.3.2.1. Permitted Activities 5.3.2.1.1. Residential, recreational, agricultural, exotic forestry or tourist related activities which comply with the standards for permitted activities

More information

Unexploded Ordnance Survey and investigation of contaminated features filled with weathered crude

Unexploded Ordnance Survey and investigation of contaminated features filled with weathered crude [Sustainable Environmental Economic Development (S.E.E.D)] Unexploded Ordnance Survey and investigation of contaminated features filled with weathered crude 22 nd IPEC Denver, November 2015 Khaled Al-Haid

More information

SHALE FACTS. Production cycle. Ensuring safe and responsible operations

SHALE FACTS. Production cycle. Ensuring safe and responsible operations SHALE FACTS Production cycle Ensuring safe and responsible operations Statoil is committed to developing our shale projects in a safe, responsible and open manner. Statoil takes a long term perspective

More information

Introduction Petroleum Exploration, Development and Production

Introduction Petroleum Exploration, Development and Production Introduction Petroleum Exploration, Development and Production Consultative Meeting with Turkana County Leaders 24 th July 2014 Mohammed Amin Adam (PhD) Africa Centre for Energy Policy 1 Oil and Gas Project

More information

Field Report. Area and period. ENCLOSURE 7.01 September 2008

Field Report. Area and period. ENCLOSURE 7.01 September 2008 ENCLOSURE 7.01 September 2008 Government of Greenland Bureau of Minerals and Petroleum P.O.Box 930, Imaneq 29, DK-3900 Nuuk, Greenland Tel. +299 34 68 00 Fax: +299 32 43 02 E-mail: bmp@gh.gl Field Report

More information

What The Stakeholders Are Asking For

What The Stakeholders Are Asking For What The Stakeholders Are Asking For Proactively advance Agriculture & Natural Resource/FFA educational opportunities & Ag. Literacy Increase FFA membership while providing more leadership and scholarship

More information

VIBRATION AND STRUCTURAL INTEGRITY

VIBRATION AND STRUCTURAL INTEGRITY FACT SHEET VIBRATION AND STRUCTURAL INTEGRITY Objective The Canadian Malartic Mine (CMM) Team wants to harness the creativity of stakeholders to find solutions to eliminate, mitigate or, if necessary,

More information

Draft. Scope of Work. Task 1 RCRA Facility Investigation and Corrective Measures Study

Draft. Scope of Work. Task 1 RCRA Facility Investigation and Corrective Measures Study Draft Scope of Work Task 1 RCRA Facility Investigation and Corrective Measures Study DRAFT Table of Contents Task 1 RCRA Facility Investigation and Corrective Measures Study... 2 Scope of Work:... 2 Technical

More information

Report on Timber Cruising, Oil or Gas Geology and Geophysical Exploration

Report on Timber Cruising, Oil or Gas Geology and Geophysical Exploration Workers Compensation Insurance Rating Bureau of California Workers Compensation Insurance Rating Bureau of California Report on Timber Cruising, Oil or Gas Geology and Geophysical Exploration Excerpt from

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017

More information

POWER FUGRO GROUP. Client- Focused. Delivering Excellence. Driving Innovation

POWER FUGRO GROUP. Client- Focused. Delivering Excellence. Driving Innovation POWER FUGRO GROUP Client- Focused Delivering Excellence Driving Innovation POWER Finding new ways to harness the elements and meet our energy requirements without detriment to future generations requires

More information

Proposed South Western Karoo Basin Gas Exploration Project by Shell Exploration Company B.V

Proposed South Western Karoo Basin Gas Exploration Project by Shell Exploration Company B.V Proposed South Western Karoo Basin Gas Exploration Project by Shell Exploration Company B.V BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT CENTRAL PRECINCT First document for comment January

More information

SLR Consulting (Pty) Ltd

SLR Consulting (Pty) Ltd SLR Consulting (Pty) Ltd Page i SCOPING REPORT FOR THE PROPOSED EXPLORATION RIGHT APPLICATION FOR PETROLEUM ON VARIOUS FARMS IN THE MAGISTERIAL DISTRICTS OF MATATIELE AND MT FLETCHER, EASTERN CAPE March

More information

SPG Mineração S. A. Tartarugal Grande Iron Ore Project

SPG Mineração S. A. Tartarugal Grande Iron Ore Project THE PROJECT Introduction 3 Amapa State 5 DNPM Process / Procedures 6 Capacity 7 LOGISTICS Cost Position / Expected Sales Destination 9 Actual Scenery 10 Existing Railroad 12 Railroad Project 14 CURRENT

More information

Contents 1. Introduction HSE Studies Design of Environmental Parameters Monitoring System Environmental Parameters and

Contents 1. Introduction HSE Studies Design of Environmental Parameters Monitoring System Environmental Parameters and WEST PATRAIKOS LEASE AREA ENVIRONMENTAL REPORT 2018 Contents 1. Introduction... 3 2. HSE Studies... 4 2.1. Design of Environmental Parameters Monitoring System... 4 2.2. Environmental Parameters and Monitoring

More information

TOGETHER, WE GET THE JOB DONE.

TOGETHER, WE GET THE JOB DONE. TOGETHER, WE GET THE JOB DONE. ::INTRODUCING INOVA Poised to become the land seismic technology company of the 21st century, INOVA was established in March 2010 as a joint venture of BGP and ION Geophysical.

More information

301 Part A The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli

301 Part A The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli 301 Part A The Chemical Crusher: Drilling and Blasting Bill Hissem & Larry Mirabelli How to Create Value and Maximize Profit in the New Economy Answer: 1. Provide exactly the right amount of energy to

More information

CASE STUDY. Bridge T8 Egnatia MotorWay

CASE STUDY. Bridge T8 Egnatia MotorWay CASE STUDY Bridge T8 Egnatia MotorWay DESCRIPTION Modern Egnatia Motorway borrows its name from the homonymous Roman work which was built between 146-120 BC, on the traces of an ancient Roman road stretching

More information

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT Enacted in 1969 to provide review of Federal projects to identify significant impacts. NEPA applies to a project that requires discretionary actions by a

More information

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope Scoping Document for the Strategic Environmental Assessment for Exploration Activities on the Southwestern Scotian Slope Canada-Nova Scotia Offshore Petroleum Board July 2011 Table of Contents 1.0 Introduction...

More information

PETRATHERM LIMITED ABN

PETRATHERM LIMITED ABN ASX Release PETRATHERM LIMITED ABN 17 106 806 884 Company Update Australian Geothermal Energy Conference Petratherm s Managing Director, Mr. Terry Kallis and Exploration Manager, Mr. Peter Reid, will present

More information

SHELL ONSHORE OPERATING PRINCIPLES

SHELL ONSHORE OPERATING PRINCIPLES SHELL ONSHORE OPERATING PRINCIPLES FOR TIGHT SAND OR SHALE OIL AND GAS In 2011, Shell publicly shared five aspirational operating principles that govern the activities where we operate and where hydraulic

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

Exploration Services. Your First Choice for Energy, Industrial & Environmental Management

Exploration Services. Your First Choice for Energy, Industrial & Environmental Management Exploration Services Your First Choice for Energy, Industrial & Environmental Management Comprehensive Exploration Services At Clean Harbors, we've built a reputation for providing the most comprehensive

More information

Cardno is a leading provider in the mapping and management of underground utilities, and excavating within high-risk and sensitive environments.

Cardno is a leading provider in the mapping and management of underground utilities, and excavating within high-risk and sensitive environments. Utility Engineering Cardno is a leading provider in the mapping and management of underground utilities, and excavating within high-risk and sensitive environments. Cardno can undertake all geotechnical

More information

STOCK EXCHANGE ANNOUNCEMENT SOUTHDOWN MAGNETITE PROJECT PROGRESS REPORT HIGHLIGHTS

STOCK EXCHANGE ANNOUNCEMENT SOUTHDOWN MAGNETITE PROJECT PROGRESS REPORT HIGHLIGHTS STOCK EXCHANGE ANNOUNCEMENT SOUTHDOWN MAGNETITE PROJECT PROGRESS REPORT HIGHLIGHTS 100 diamond drill holes aggregating 28,723 metres have been completed, representing approximately 80 of the planned resource

More information

About the Swiss-Croatian Cooperation Program

About the Swiss-Croatian Cooperation Program About the Swiss-Croatian Cooperation Program The contribution of Switzerland is an important element of bilateral relations between Switzerland and Croatia. The Swiss-Croatian co-operation program will

More information

Land Seismic Acquisition

Land Seismic Acquisition Land Seismic Acquisition Land seismic acquisition Today, onshore seismic acquisition faces numerous challenges. Seismic crews require substantial human and capital resources. Surveys are often situated

More information

MONTHLY FIELD STUDIES SUMMARY

MONTHLY FIELD STUDIES SUMMARY The Site C Clean Energy Project is continuing to conduct environmental and engineering field studies on and around the Peace River between the Williston Reservoir and the Alberta border to inform detailed

More information

Thorpe Salvin Parish Council

Thorpe Salvin Parish Council Thorpe Salvin Parish Council 13 February 2017 INEOS Who Are We? A leading global chemical company Sales $40bn 17,000+ employees* 65 manufacturing sites in 16 countries including 6 in the UK 60 million

More information

UP Express Electrification Transit Project Assessment

UP Express Electrification Transit Project Assessment 7. Commitments and Future Work... 2 7.1 Implementation of Mitigation Measures & Compliance Monitoring... 2 7.2 Permits and Approvals... 2 7.3 Heritage and Archaeological Resources... 3 7.4 Stormwater Management...

More information

HELLENIC REPUBLIC Official Government Gazette. PART THREE EUROPEAN TERRITORIAL COOPERATION EUROPEAN GROUPINGS OF TERRITORIAL COOPERATION (EGTCs)

HELLENIC REPUBLIC Official Government Gazette. PART THREE EUROPEAN TERRITORIAL COOPERATION EUROPEAN GROUPINGS OF TERRITORIAL COOPERATION (EGTCs) Ελληνική L.4483/2017 (Issue A /107/31-7-2017) HELLENIC REPUBLIC Official Government Gazette PART THREE EUROPEAN TERRITORIAL COOPERATION EUROPEAN GROUPINGS OF TERRITORIAL COOPERATION (EGTCs) Article 108

More information

5 JULY 2018 COMPLETION OF AUTHIER ENVIRONMENTAL STUDIES AND PERMITTING UPDATE

5 JULY 2018 COMPLETION OF AUTHIER ENVIRONMENTAL STUDIES AND PERMITTING UPDATE 5 JULY 2018 COMPLETION OF AUTHIER ENVIRONMENTAL STUDIES AND PERMITTING UPDATE All major base-line environmental studies completed and no significant environmental issues identified Technical studies determined

More information

Status of Shale Gas Development in New Brunswick. Habitation 2012

Status of Shale Gas Development in New Brunswick. Habitation 2012 Status of Shale Gas Development in New Brunswick Angie Leonard, Senior Advisor, CAPP Habitation 2012 St. Andrews, New Brunswick February 9, 2012 What Is CAPP? CAPP s mission is to enhance the economic

More information

Photovoltaic Power Generation Facility, Prieska EXECUTIVE SUMMARY

Photovoltaic Power Generation Facility, Prieska EXECUTIVE SUMMARY ii EXECUTIVE SUMMARY Introduction Mulilo Renewable Energy (Pty) Ltd, the applicant, intends to develop a 20 mega watt solar farm in Prieska. The context within which this development is proposed is the

More information

MINING OPERATION SERVICES

MINING OPERATION SERVICES METROMIX PTY LIMITED Lower Level Management Plan Prepared in conjunction with: MINING OPERATION SERVICES SEPTEMBER 2016 CONTENTS Page COMMONLY USED ACRONYMS... 4 1 INTRODUCTION... 5 2 APPROVED ACTIVITIES...

More information

Standardization of the Evaluation Criteria on Petroleum Resources

Standardization of the Evaluation Criteria on Petroleum Resources Standardization of the Evaluation Criteria on Petroleum Resources Standardization of Korean Petroleum Resources Classification and Definition (Unofficial Report) Contents I. Introduction 1. Significance

More information

Advances in Electromagnetics for Reservoir Monitoring

Advances in Electromagnetics for Reservoir Monitoring KMS Technologies KJT Enterprises, Inc. An EMGS/RXT company Advances in Electromagnetics for Reservoir Monitoring Strack, K.-M. 8 th International Conference & Exposition on Petroleum Geophysics, Hyderabad

More information

Aquistore. Saskatchewan s Deep Saline CO 2 Storage Research Project. April 19, Presented by Kyle Worth, P.Eng., PMP to INRS, Quebec City

Aquistore. Saskatchewan s Deep Saline CO 2 Storage Research Project. April 19, Presented by Kyle Worth, P.Eng., PMP to INRS, Quebec City Aquistore Saskatchewan s Deep Saline CO 2 Storage Research Project Presented by Kyle Worth, P.Eng., PMP to INRS, Quebec City April 19, 2012 Petroleum Technology Research Centre Mission: To develop world-leading

More information

SPE Subcontractor Management: A Key Safety Issue in Geophysical Operations

SPE Subcontractor Management: A Key Safety Issue in Geophysical Operations SPE 152274 Subcontractor Management: A Key Safety Issue in Geophysical Operations Ian M Threadgold, SPE, Threadgold Safety Management Slide 2 Agenda Introduction Nature of Seismic & subcontractor issues

More information

Seismic Testing. The following is a synopsis of the seismic project scheduled to be conducted in the Municipality of Murrysville.

Seismic Testing. The following is a synopsis of the seismic project scheduled to be conducted in the Municipality of Murrysville. Seismic Testing Introduction Beginning December 1, 2017 and going forward for the next six months, Cougar Land Services will be conducting seismic surveying throughout the Municipality. If you have questions

More information

A COMPREHENSIVE UXO CLEARANCE QUALITY ASSURANCE PLAN TRACADIE RANGE, NEW BRUNSWICK, CANADA

A COMPREHENSIVE UXO CLEARANCE QUALITY ASSURANCE PLAN TRACADIE RANGE, NEW BRUNSWICK, CANADA A COMPREHENSIVE UXO CLEARANCE QUALITY ASSURANCE PLAN TRACADIE RANGE, NEW BRUNSWICK, CANADA CAPTAIN FRANCOIS LEDUC, M. Eng., P. Eng. Director Construction and Property Services Delivery 7-8 National Defence

More information

Oil India Limited (A Govt. of India Enterprise)

Oil India Limited (A Govt. of India Enterprise) Oil India Limited (A Govt. of India Enterprise) Notice Inviting Expression of Interest (EOI) for Hiring of services for Seismic data acquisition and processing in Arunanchal Pradesh Oil India Limited (OIL),

More information

David H. Johnston ExxonMobil Production Company. Time-Lapse Seismic for Optimum Reservoir Management Deepwater West Africa

David H. Johnston ExxonMobil Production Company. Time-Lapse Seismic for Optimum Reservoir Management Deepwater West Africa David H. Johnston ExxonMobil Production Company Time-Lapse Seismic for Optimum Reservoir Management Deepwater West Africa SHORT ABSTRACT Time-lapse or 4D seismic data has proven value in reservoir management,

More information

Overcoming RES Permitting and Grid Access Barriers in Greece

Overcoming RES Permitting and Grid Access Barriers in Greece GREEK ASSOCIATION OF RES ELECTRICITY PRODUCERS Overcoming RES Permitting and Grid Access Barriers in Greece A short presentation for the 9 th Workshop of the International Feed-In Cooperation Friday, 27

More information

CTSCo s Surat Basin Carbon Capture and Storage Project

CTSCo s Surat Basin Carbon Capture and Storage Project CTSCo s Surat Basin Carbon Capture and Storage Project The Surat Basin Carbon Capture and Storage Project aims to determine the viability of industrial-scale carbon capture and storage in the Surat Basin.

More information

For personal use only

For personal use only 13 APRIL 2018 AUTHIER PROJECT PRESENTATION TO KEY STAKEHOLDERS & PERMITTING UPDATE Sayona Mining Limited (ASX: SYA) ("Sayona" or the "Company") is pleased to announce that the Company held information

More information

HELLENIC REPUBLIC REGION OF EPIRUS. Special Advisor in EU affairs at Vice Governor of Region of Epirus

HELLENIC REPUBLIC REGION OF EPIRUS. Special Advisor in EU affairs at Vice Governor of Region of Epirus Grigorios Vangelidis HELLENIC REPUBLIC REGION OF EPIRUS Special Advisor in EU affairs at Vice Governor of Region of Epirus g.vangelidis@php.gov.gr 21 April, 2015 Information seminar in Rome Epirus: geographic

More information

APPENDIX C - OIL AND GAS EXPLORATION, DEVELOPMENT AND PRODUCTION

APPENDIX C - OIL AND GAS EXPLORATION, DEVELOPMENT AND PRODUCTION APPENDIX C - OIL AND GAS EXPLORATION, DEVELOPMENT AND PRODUCTION Table of Contents INTRODUCTION... C-3 PRELIMINARY INVESTIGATIONS (PHASE 1)... C-4 Permitting Process... C-4 Geologic and Remote Investigations

More information

Purpose - Minimize or eliminate potential adverse impacts of waste or produced water from drilling operations.

Purpose - Minimize or eliminate potential adverse impacts of waste or produced water from drilling operations. Evaporative Pond Facilities Policies Purpose - Minimize or eliminate potential adverse impacts of waste or produced water from drilling operations. Requires a Conditional Use Permit. Provides guidance

More information

Listening from a Distance

Listening from a Distance Listening from a Distance microseismic inc active listening to passive seismic pays off for shale plays a Buriedarray of geophones deployed across a field enables the monitoring of multiple wells simultaneously

More information

Guidance on Exploration

Guidance on Exploration Guidance on Exploration Guidance on Exploration Svemin, 2018 Version 1.0 (May 2018) Svemin Kungsträdgårdsgatan 10 Box 1721 111 47 Stockholm, Swedan +46 8 762 6730 info@svemin.se www.svemin.se Design: Serpentin

More information

Physical Works Terms of Reference

Physical Works Terms of Reference Physical Works Terms of Reference Williston Targeted Debris Management GMSWORKS #22 Order/Clause: Schedule A 3 (c ) and 5 (a) November 26, 2008 1.0 Introduction Terms of Reference for the Peace Water Use

More information

Chapter 8 Natural Resources

Chapter 8 Natural Resources Chapter 8 Natural Resources 127-134 8.1 Introduction 8.2 Extractives Industry 8.3 Forestry 8.4 Fishing / Aquaculture 8.1 Introduction Kerry has a number of naturally occurring resources that contribute

More information

PRE-FEASIBILITY REPORT ON DRILLING OF ONE EXPLORATORY WELL PDAL (RPD-11) IN SIVASAGAR DISTRICT, ASSAM.

PRE-FEASIBILITY REPORT ON DRILLING OF ONE EXPLORATORY WELL PDAL (RPD-11) IN SIVASAGAR DISTRICT, ASSAM. PRE-FEASIBILITY REPORT ON DRILLING OF ONE EXPLORATORY WELL PDAL (RPD-11) IN SIVASAGAR DISTRICT, ASSAM. NORTH ASSAM SHELF A&AA BASIN ONGC, JORHAT Assam &Assam Arakan Basin, ONGC 1 1. Introduction Pre-Feasibility

More information

THIRD ENERGY & MOORLAND CONSULTATION EVENT

THIRD ENERGY & MOORLAND CONSULTATION EVENT THIRD ENERGY & MOORLAND CONSULTATION EVENT WELCOME Welcome to the Third Energy & Moorland consultation event. This exhibition outlines our plans and proposals to install a pipeline to connect the existing

More information

ELECTROMAGNETIC INDUCTION (PAPER I)

ELECTROMAGNETIC INDUCTION (PAPER I) Appendix A ELECTROMAGNETIC INDUCTION (PAPER I) Yoga Das, Defence R&D Canada Suffield 1 OPERATING PRINCIPLE Electromagnetic induction (EMI) is the basis for the familiar handheld metal/mine detectors. The

More information

Quality Assurance Audit Evaluation. Foster Wheeler Environmental Corporation Digital Geophysical Survey Results

Quality Assurance Audit Evaluation. Foster Wheeler Environmental Corporation Digital Geophysical Survey Results Quality Assurance Audit Evaluation On Foster Wheeler Environmental Corporation Digital Geophysical Survey Results For The Ft. McClellan Eastern Bypass Area Jon Durham Geologist CEHNC-ED-CS-G June 02, 2003

More information

For personal use only

For personal use only NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JULY 2015 27 August 2015 Quarter Ended 12 Months Ended Jul 15 Jul 14 Change (%) Jul 15 Jul 14 Change (%) Raw Coal Production

More information

1.9 Greece s climatic parameters 30

1.9 Greece s climatic parameters 30 Contents Chapter 1 The climate of the Eastern Mediterranean and Greece: past, present and future 1.1 Introduction 1 1.2 Paleoclimatic changes 3 1.3 Climate change in the Holocene 7 1.4 Past rates of increase

More information

Pilot experiments in Australia. Jonathan Ennis-King CSIRO

Pilot experiments in Australia. Jonathan Ennis-King CSIRO Pilot experiments in Australia Jonathan Ennis-King CSIRO Webinar on Geologic Capture and Sequestration of Carbon Nov 15, 2017 Location of CO2CRC Otway Project Otway Site Operations Current Site Layout

More information

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA CEQA and its Role in Historic Preservation Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA General CEQA Requirements and Limitations Mitigation Measures

More information

Site selection: Technical site selection criteria and information needs

Site selection: Technical site selection criteria and information needs UNFCCC SBSTA Technical Workshop on modalities and procedures for carbon dioxide capture and storage in geological formations as clean development mechanism project activities Site selection: Technical

More information

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING

HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING HEAP CHARACTERIZATION AND MONITORING WITH ELECTRICAL RESISTIVITY FOR OPTIMIZING SECONDARY LEACHING Dale RUCKER and Jim FINK hydrogeophysics, Inc., USA ABSTRACT Electrical resistivity geophysics has been

More information

Programmatic Environmental Assessment Forest-Wide Erosion Abatement USDA Forest Service Shawnee National Forest

Programmatic Environmental Assessment Forest-Wide Erosion Abatement USDA Forest Service Shawnee National Forest Programmatic Environmental Assessment Forest-Wide Erosion Abatement USDA Forest Service Shawnee National Forest Alexander, Gallatin, Hardin, Jackson, Johnson, Massac, Pope, Saline, Union and Williamson

More information

Using Multi Scale Seismic Measurements for CO 2 Monitoring in CCUS/EOR Project - Farnsworth

Using Multi Scale Seismic Measurements for CO 2 Monitoring in CCUS/EOR Project - Farnsworth Using Multi Scale Seismic Measurements for CO 2 Monitoring in CCUS/EOR Project - Farnsworth George El-Kaseeh, Robert Will, Robert Balch 5 October 2017 www.slb.com/carbonservices CS1611-118-GEK Any interpretation,

More information

The three alternative sites were inspected by the specialists in order to:

The three alternative sites were inspected by the specialists in order to: 5. SITE SELECTION PROCESS UNDERTAKEN DURING THE ENVIRONMENTAL SCOPING STUDY The Environmental Scoping Study identified the potential positive and negative environmental (biophysical and social) impacts

More information

U.S. ATLANTIC OCS GEOPHYSICAL SURVEYS: What are Seismic Surveys and How are They Done?

U.S. ATLANTIC OCS GEOPHYSICAL SURVEYS: What are Seismic Surveys and How are They Done? U.S. ATLANTIC OCS GEOPHYSICAL SURVEYS: What are Seismic Surveys and How are They Done? Purpose Image the subsurface Evaluate the acreage Identify potential hydrocarbon accumulations Reducing risk fewer

More information

ENVIRONMENTAL MANUAL FOR WORLDWIDE GEOPHYSICAL OPERATIONS

ENVIRONMENTAL MANUAL FOR WORLDWIDE GEOPHYSICAL OPERATIONS ENVIRONMENTAL MANUAL FOR WORLDWIDE GEOPHYSICAL OPERATIONS 2013 Edition Revision History Edition Date Comments 2001 2001 Initial Edition 2013 2013 Update Next-2016 Page 1 IAGC is the international trade

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

City of Dallas Urban Forestry Activities. Quality of Life Committee January 26, 2009

City of Dallas Urban Forestry Activities. Quality of Life Committee January 26, 2009 City of Dallas Urban Forestry Activities Quality of Life Committee January 26, 2009 Purpose of Briefing Review of existing codes and ordinances related to trees and urban forestry Overview of municipal

More information

APRIL 2017 UNDER CONSTRUCTION

APRIL 2017 UNDER CONSTRUCTION APRIL 2017 UNDER CONSTRUCTION Highway construction is a complicated process that involves many tasks. Some of these, by nature, have an impact on nearby residents. To minimize these impacts, the Pennsylvania

More information

Brief presentation of the Greek EIONET members Organizations as related to soil data and information in Greece

Brief presentation of the Greek EIONET members Organizations as related to soil data and information in Greece Presentation Brief presentation of the Greek EIONET members Organizations as related to soil data and information in Greece National Agricultural Research Foundation NAGREF: 2 members Dr. Christos Tsadilas,

More information

Environmental Remediation Workshop KERP UXO Briefing

Environmental Remediation Workshop KERP UXO Briefing Environmental Remediation Workshop KERP UXO Briefing Kuwait Environmental Remediation Projects Restoring Kuwait Treasures v. 19 Jan 2015 Purpose of this presentation. History Gulf War Impact / Results

More information

Planned & implemented wind energy projects in Greece in protected areas Challenges & successes

Planned & implemented wind energy projects in Greece in protected areas Challenges & successes Seminar on Good Practices for Reconciling Wind Energy Development and Biodiversity Conservation, Ministry of Environment & Energy Planned & implemented wind energy projects in Greece in protected areas

More information

The Landowner s Toolkit Series. Oil & Gas Development. Opportunities to Minimize Environmental Impacts on Your Land.

The Landowner s Toolkit Series. Oil & Gas Development. Opportunities to Minimize Environmental Impacts on Your Land. Oil & Gas Development Opportunities to Minimize Environmental Impacts on Your Land 3 rd edition 2010 Oil or gas wells on private land have become a common sight. If you are considering this type of development

More information

POST-EARTHQUAKE TECHNICAL CLEARINGHOUSE. November Geological Survey and Office of Emergency Management INTRODUCTION

POST-EARTHQUAKE TECHNICAL CLEARINGHOUSE. November Geological Survey and Office of Emergency Management INTRODUCTION POST-EARTHQUAKE TECHNICAL CLEARINGHOUSE November 2001 Geological Survey and Office of Emergency Management INTRODUCTION An earthquake disaster in will attract a large number of earthquake professionals

More information

Strategic mine planning of surface mining projects incorporating sustainability concepts

Strategic mine planning of surface mining projects incorporating sustainability concepts 6th International Conference on Sustainable Development in the 645 Strategic mine planning of surface mining projects incorporating sustainability concepts C. Roumpos and E. Papacosta Public Power Corporation

More information

Publishing geoscientific papers

Publishing geoscientific papers Publishing geoscientific papers as of 08/2014 Bundesverband Erdgas, Erdöl und Geoenergie e. V. 1. Basic principles The exchange and the publication of scientific data as well as its evaluation are essential

More information

ground stability unexploded ordnance utility services infrastructure surveying and monitoring environment and archaeology foundations and geotechnics

ground stability unexploded ordnance utility services infrastructure surveying and monitoring environment and archaeology foundations and geotechnics environment and archaeology foundations and geotechnics utility services infrastructure surveying and monitoring ground stability unexploded ordnance Reduce the risk of the unknown contents How Zetica

More information

Identification and Removal of Unexploded Ordnance at a WWII Bombing Range in an Area Undergoing Rapid Development

Identification and Removal of Unexploded Ordnance at a WWII Bombing Range in an Area Undergoing Rapid Development Identification and Removal of Unexploded Ordnance at a WWII Bombing Range in an Area Undergoing Rapid Development David G. Nichols, P.G. Kestrel Horizons, LLC, 20-B Creekview Court, Greenville, SC 29615

More information

Road Network Planning, Timber Harvesting and Forest Road Construction in Austria

Road Network Planning, Timber Harvesting and Forest Road Construction in Austria Faculty of Forestry March 2016, Zagreb Road Network Planning, Timber Harvesting and Forest Road Construction in Austria Univ. Prof. Dipl.-Ing. Dr. Karl Stampfer Institute of Forest Engineering, Department

More information