1 Mobile Bay National Estuary Program Project Implementation Committee Meeting Mobile Bay Interagency Working Group Activities Larry Parson U.S. Army Corps of Engineers, Mobile District February 18, 2016 High Priority 1,200 Acres Trusted Partners Delivering Value, Today and Tomorrow Low Priority 700 Acres Medium Priority 780 Acres US Army Corps of Engineers

2 2

3 Challenge WRDA 1986 Authorization for widening and deepening Dredged material from Mobile Channel shall be disposed of in open water in the Gulf of Mexico WRDA 1996 May consider alternatives to disposal of dredged material in the Gulf of Mexico, including environmental acceptable alternatives for beneficial uses of dredged material and environmental restoration Is removing all the dredged sediment from the Bay the smart thing to do? 3

4 Mobile Bay RSM Watershed Study Recommendations Evaluate alternative management options Development of in-bay disposal strategies both short and long term Considerations for an in-bay disposal demonstration project Demonstrate open water disposal with monitoring and predicting movement of sediment associated with in-bay disposal areas Utilization of cutterhead dredges providing flexibilities to employ a greater percentage of the available dredging fleet Establish interagency working group to develop a sediment management strategy

5 Mobile Bay Interagency Working Group (IWG) Alabama State Port Authority (ASPA) USACE, Mobile District USACE, Engineering Research and Development Center (ERDC) Alabama Dept. of Conservation and Natural Resources (ADCNR), State Lands Division ADCNR, Marine Resources Division (MRD) ADCNR, Wildlife and Freshwater Fisheries Division (WAFF) Alabama Dept. of Environmental Management (ADEM) Geological Survey of Alabama (GSA) U.S. Fish and Wildlife Service (FWS) National Marine Fisheries Service (NMFS), Habitat Conservation Division Mobile Bay National Estuary Program (NEP) Environmental Protection Agency (EPA) Dauphin Island Sea Lab (DISL) The Nature Conservancy (TNC) Mobile County Environmental Department Mobile Bay Keeper

6 Interagency Working Group Goals Development of in-bay disposal strategies both short and long term Utilizing environmentally accepted alternatives for beneficial uses of dredged material Identify, evaluate, and utilize new and existing engineering techniques and management models/tools to evaluate alternative management options 6

7 IWG History February 9, 2012 Initial meeting to introduce Corps RSM Program April 19, 2012 Identified potential opportunities June 12, 2012 Initial discussions on TLD emergency action Refine BU site and Brookley Hole November 8, 2012 Needed actions for BU site Discussions on TLD monitoring/modeling March 18, 2014 Present results of TLD monitoring/modeling Brookley Hole monitoring results December 10, 2014 Projects status Upper Bay BU site December 9, 2015 Projects status Brookley Hole Recommendations Mobile Harbor GRR Agency Scoping 7

8 Accomplishments Mobile Bay Sediment Budget - Funded primarily by MBNEP Brookley Hole - Short term - Two placement activities In-bay disposal - Long term - Added as permanent option Tidal marsh creation in upper Mobile Bay - Long term - planning phase - Submitted to RESTORE Council 8

9 Sediment Dynamics in Mobile Bay: Development of an Operational Sediment Budget Applied Coastal Research and Engineering, Inc. Mobile Bay National Estuary Program U.S. Army Corps of Engineers Contributing 9

10 Mobile Bay Sediment Budget Document long-term regional sediment dynamics in Mobile Bay for developing a sediment budget Compile historical channel dredging and placement quantities to document sediment movement due to engineering activities Compile and analyze historical shoreline and bathymetry data for Mobile Bay 10

11 BU of Dredged Material to Fill Brookley Hole Borrow source for creation of Brookley Air Field Surveys revealed that the Hole is ~65 acres in size with a maximum depth of about 22 feet. Baseline surveys revealed hypoxic/anoxic conditions resulting in degraded ecological productivity. There was minimal benthic infauna and very little finfish usage of the bottom half of the water column during the warmer months.

12 BU of Dredged Material to Fill Brookley Hole Recommendation to pursue permitting processes to implement BU action Fill Options - Fill to some level of productivity - Fill to surrounding grade through successive dredging cycles - Combination of emergent feature w/ marsh vegetation grading into shallow submerged environment 1.2 MCY of initial fill from upper Mobile Bay Channel Monitoring results used to determine desired level of restoration Initial fill completed September 2012 Leveraging other research programs (DOER) - Conducted baseline characterizations - Continued post-fill monitoring

13

14 Example Echograms for Summer, Winter and Spring Sampling at Brookley Hole.

15 Normal Discharge TURBID WATER SILT CURTAIN FLOCCUL ATED MATERIA L Cl/RR NT BOTTOM SEDIMENT (Saucier et al. 1978)

16 Baffled Bottom Discharge

17 Typical Pre- & Post-Placement Profiles 02/ / / / / /2011

18 DO (mg/l) concentrations during pre- and post-restoration sampling within Brookley Hole. (Note: Seasonal results are averaged across five stations occupied within the borrow pit.)

19 During the summer sampling, the number of animals per sample increased significantly (p < 0.05) from 2 (pre) to 102 (post-restoration) per sample, resulting in an increase in density from 45 animals/m 2 to 2,315 animals/m 2, a percentage change of +5,044%.

20 BU of Dredged Material to Brookley Hole Brookley Hole Monitoring Results - No evidence of post-restoration hypoxia/anoxia - Fish density increased during spring and fall - Significant increase in benthic diversity and abundance but still recovering IWG recommended continued placement - Summer 2014 dredging cycle - Additional 750,000 cy placed - Hydrographic surveys and DO monitoring after consolidation - Further recommendations using results of monitoring

21 2014 Placement Beneficial use objective has been achieved Further placement above grade requires containment and other technical constraints IWG recommends no further placement at this time Future placement may be warranted if significant consolidation occurs Area that s been ecological unproductive restored to approximately 50 acres of productive bay bottom Provided significant savings to the O&M maintenance costs for Mobile Harbor

22 Open Bay Disposal in Mobile Bay Northern limit of pipeline dredging Approximately 4 mcy of material removed from Mobile Bay Channel annually at a cost of $12 million Old Hollingers Island Channel Southern limit of pipeline dredging Hopper dredges not able to keep up with shoaling rates in upper Bay channel Critical need to return channel to full operational dimensions Channel width compromised

23 Thin-layer Disposal Considerations WRDA Requirements Is removing all dredged sediment from the Bay the smart thing to do? Current dredging practices not able to keep up Open water disposal has been recently conducted 1998 Hurricane Georges 2005 Hurricane Katrina 2012 recertification included emergency open-bay option IWG Concerns What happens to the material after placement Use demonstration to evaluate opportunities to resolve issues

24 Mobile Bay Channel Open Water Thin-Layer Disposal Summer of 2012 Exercised emergency action in permit Placed 9 MCY in pre-established historic open water disposal areas Disposal Areas 1-3, 10,11 and 13 Utilized hydraulic cutterhead dredge Thin-layer disposal techniques Significant savings in dredging costs Used as demonstration to monitor and model behavior

25 THIN-LAYER PLACEMENT MONITORING Sampling conducted September 2012 Collected sediment profiling imagery at 219 stations Collected push cores for grain size analysis and geotechnical properties at about 185 stations TLP stations represented time series from 24 hours to 6 months postplacement Also included natural bay bottom

26 Sediment Profiling Imagery 27 CM 15 CM

27 OLDER DREDGED MATERIAL SPI IMAGED 09/26/2012

28 SEDFLUME

29 LTFATE Modeling Approach Current- and wave-induced sediment transport was simulated in Mobile Bay for the following conditions: Seasonal Event: Feb May 2010 Storm Events Hurricane Gustav: Aug Sep 2008 Hurricane Ida: Nov 2009 These three simulation periods were modeled with project conditions and without project conditions. The with project conditions assumes that 12 inch thick TLP deposits were placed evenly in the designated disposal areas. The without condition (base case) assumes that no TLP was placed and the sediments at the disposal sites are native (with corresponding erosion rates).

30 Modeling Conclusions Approximately 35% of the sediment that erodes from the designated disposal areas is transported and deposits in the navigation channel. The remaining 65% is widely dispersed throughout the bay by wind-, river-, and tide-driven currents. The dredge material placed in thin-layers is less erodible (~ 45%) than native sediment. Sediment becomes remobilized into Bay s natural sediment system (Not transported along the bottom)

31 Implementation Based on monitoring & modeling results IWG recommended Corps pursue modification of Mobile Harbor WQC to include a long term open-bay thin-layer disposal option WQC modified in June ,000 cy placed Summer million cy placed - Fall 2015 Surveys show material is barely detectable Developed thin-layer placement strategy Each 2-mile reach has 3 open water placement areas adequately sized based on the historic shoaling rates Cutterhead dredge used every 12 to 24 months Placement sites used every 4 to 6 years

32

33 Establishment of Long Term BU Site in Upper Mobile Bay IWG Activity Potential Long Term Beneficial Use Sites in Upper Mobile Bay Low Priority 700 Acres Medium Priority 780 Acres High Priority 1,200 Acres Interagency Working Group to help plan and implement semi-contained, large scale open water disposal area (tidal marsh) in upper Mobile Bay Builds on requests of Alabama State Port Authority (ASPA) to partner in implementation of more effective sediment management associated with maintaining Mobile Harbor Develop feasibility level BU design Planning process to include NEPA coordination, design, and permitting actions. Identify and prioritized potential sites Activities completed - Hydrographic survey of the upper Bay - SAV survey - Cultural resources survey Geotechnical surveys next step Pursue RESTORE Funding

34

35

36 RESTORE Submittal Submitted to RESTORE Federal Council Bucket 2 Funded Priority List as required by Act Council consists of five Gulf States and six Federal agencies Each state gets 1 vote Federal agencies get total of 1 vote Rigorous evaluation process Science Environmental Compliance Budget RESTORE Criteria Public Review Made Funded Priorities List Council to vote to accept recommendation of staff and steering committee 12/9/15 36

37 RESTORE Proposal Goals and Objectives Restore and conserve habitat Approximately 1,200 acres of estuarine tidal marsh Enhance utilization of navigation maintenance sediment and maximize use of dredge material for sustainable coastal restoration Placement of material from Mobile Bay navigation project Federal navigation channel ASPA terminals Local and private dredging activities Construction of semi-submerged containment area and placement of dredge material Secondary Objectives Improve water quality and provide habitat for living coastal and marine resources Enhance community resilience by providing buffer to main thoroughfare Enhancing the regional economy by providing cost effective disposal options for navigation related industries located along the inland waterways 37

38 Project Implementation Phase 1 - Planning Geotechnical investigations of prioritized area Determine final footprint Preliminary design Environmental compliance and NEPA documentation Regulatory permitting Phase 2 Construction (not part of initial funding) Construction of containment feature Using material from onsite or dredged stockpiles along the BWT Initial 100 acres of marsh Using material from upper Bay maintenance 38

39 Funding Process Working through process of Interagency Agreement February/March timeframe $2.5 million 2 years Opportunity to request construction funds upon completion of Phase 1 39

40 Additional IWG Recommendations Airport Hole - Short term - Similar to Brookley Hole - Used as monitoring control Use of Dredged Material to Fill Oyster Holes - Short term - National RSM Study 40

41 Realized Benefits Establishment of IWG Emphasize connection between maintenance dredging requirements, beneficial uses, and sediment management methods that reduce dredging costs Integration of the regulatory, planning, engineering, and operational processes Reducing amount of sediment disposal in the ODMDS Return sediment into natural system Establish long-term beneficial use opportunities Implementation of environmental restoration alternatives

42 Thanks! Questions? Larry Parson U.S. Army Corps of Engineers, Mobile District Planning and Environmental Division Coastal Environment Team 42

Ms. Jenny Jacobson Mr. Justin McDonald. Delta Roundtable Five Rivers Delta Center June 17, 2015

Ms. Jenny Jacobson Mr. Justin McDonald. Delta Roundtable Five Rivers Delta Center June 17, 2015 Alabama Department of Conservation and Natural Resources Alabama-Mississippi Sea Grant Mobile Bay National Estuary Program U.S. Army Corps of Engineers, Mobile District Ms. Jenny Jacobson Mr. Justin McDonald

More information

Strategies for Implementing Regional Sediment Management: Using a Collaborative Approach to Implementing RSM Principles in Alabama

Strategies for Implementing Regional Sediment Management: Using a Collaborative Approach to Implementing RSM Principles in Alabama Strategies for Implementing Regional Sediment Management: Using a Collaborative Approach to Implementing RSM Principles in Alabama CEER 2014 New Orleans, Louisiana July 28, 2014 Carl Ferraro Biologist

More information

DRAFT ENVIRONMENTAL ASSESSMENT AND SECTION 404(b)(1) EVALUATION

DRAFT ENVIRONMENTAL ASSESSMENT AND SECTION 404(b)(1) EVALUATION ENVIRONMENTAL ASSESSMENT AND SECTION 404(b)(1) EVALUATION MODIFICATION TO MOBILE HARBOR OPERATIONS AND MAINTENANCE ADDITION OF OPEN BAY THIN-LAYER DISPOSAL OPTION MOBILE COUNTY, ALABAMA A FEDERALLY AUTHORIZED

More information

Regional Sediment Management (RSM) Strategy for Mobile Bay, Alabama

Regional Sediment Management (RSM) Strategy for Mobile Bay, Alabama Regional Sediment Management (RSM) Strategy for Mobile Bay, Alabama by Larry Parson, Nathan Lovelace, Elizabeth Godsey, Kevin Reine, and Joseph Gailani PURPOSE: This Coastal and Hydraulics Engineering

More information

DOTS Webinar Thin Layer Placement

DOTS Webinar Thin Layer Placement DOTS Webinar Thin Layer Placement By: Tim Welp, Coraggio Maglio, Trudy Estes, Damarys Acevedo-Acevedo http://el.erdc.usace.army.mil/thinlayer/ 30 July 2014 at 1 PM CDT US Army Corps of Engineers DOTS Request

More information

DREDGING FOR BENEFICIAL USE

DREDGING FOR BENEFICIAL USE DREDGING FOR BENEFICIAL USE Linda S. Lillycrop Program Manager, Regional Sediment Management Program US Army Engineer Research and Development Center PIANC Inland Rivers, Ports and Terminals Annual Conference

More information

Comprehensive Barrier Island Restoration Plan

Comprehensive Barrier Island Restoration Plan Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan 202 National Conference on Beach Preservation Technology February 0, 202 Justin McDonald, P.E. Lead Project

More information

RESEARCH & DEVELOPMENT UPDATE

RESEARCH & DEVELOPMENT UPDATE RESEARCH & DEVELOPMENT UPDATE 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 Patricia DiJoseph, PhD Harbors

More information

Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan

Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan BOEM Gulf of Mexico Sand Management Working Group October, 205 Justin McDonald, P.E. US Army Corps of Engineers

More information

Salt Marsh Restoration

Salt Marsh Restoration Salt Marsh Restoration through the Beneficial Re-Use of Dredged Material JACQUELINE JAHN PROJECT ECOLOGIST, GREENVEST, LLC Project Background Objective: Three trial projects to test the marsh restoration

More information

Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience

Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience 200 Coastal Resilience Symposium 26 May 200 US Army Corps of Engineers BUILDING STRONG Mississippi Coastal Improvements

More information

U.S. Army Corps of Engineers Mobile District

U.S. Army Corps of Engineers Mobile District U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama Sandy P. Gibson Regulatory Specialist, Coastal Alabama Regulatory Division, Mobile District US Army Corps of

More information

ENGINEERING WITH NATURE TO CREATE SUSTAINABLE VALUE

ENGINEERING WITH NATURE TO CREATE SUSTAINABLE VALUE ENGINEERING WITH NATURE TO CREATE SUSTAINABLE VALUE 237 237 237 217 217 217 200 200 200 Todd S. Bridges, Ph.D. 255 0 163 131 239 255 0 163 132 65 Senior 255 Research 0 163 Scientist 122 (ST), 53 Environmental

More information

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 REPLY TO ATTENTION OF: JOINT PUBLIC NOTICE U. S. ARMY CORPS OF ENGINEERS, MOBILE DISTRICT AND FLORIDA

More information

Updates on EWN Activities and Opportunities: USACE, Galveston District (SWG)

Updates on EWN Activities and Opportunities: USACE, Galveston District (SWG) Updates on EWN Activities and Opportunities: USACE, Galveston District (SWG) Coraggio Maglio Hydraulics and Hydrology Branch Chief USACE, Galveston District 26 July 2017 USACE SWG Mission and Area of Responsibility2

More information

Public Meeting - Workflow

Public Meeting - Workflow Public Meeting - Workflow Step 1 Sign in at information table Step 2 Visit information and resource tables in any order you choose Step 3 Ask questions and obtain clarification from the experts at each

More information

Mobile Bay National Estuary Program Project Implementation Committee Trade Center February 18, 2016

Mobile Bay National Estuary Program Project Implementation Committee Trade Center February 18, 2016 Mobile Bay National Estuary Program Project Implementation Committee Trade Center February 18, 2016 Presented by: Elizabeth S. Godsey, P.E, United States Army Corps of Engineers, Mobile District US Army

More information

Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material

Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material Predictive Modeling and Design Solutions for Beneficial Use of Dredged Material Presented by Tom Wang, P.E., and Kathy Ketteridge, Ph.D., P.E. January 28, 2016 Overview of Presentation Introductions Examples

More information

GIWW Dredging at West Bay Response to Public Concerns

GIWW Dredging at West Bay Response to Public Concerns GIWW Dredging at West Bay Response to Public Concerns Colonel Chris Sallese Commander, Galveston District January 25, 2012 US Army Corps of Engineers Overview Project Purpose & History Sequence of Events

More information

Coastal Science and Engineering Collaborative (CSEC) Overview

Coastal Science and Engineering Collaborative (CSEC) Overview Coastal Science and Engineering Collaborative (CSEC) Overview 1 237 237 237 217 217 217 200 80 252 NNBF 200 119 174 200 Workshop 27.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112

More information

Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency

Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency HSC PDR for HSC Flare at Bayport Ship Channel Environmental Assessment This page left intentionally

More information

NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT

NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 INTEGRATED FEASIBILITY STUDY AND ENVIRONMENTAL IMPACT STATEMENT 131 132 122 PUBLIC

More information

Beneficial Use of Dredged Material to Restore Salt Marsh Resiliency: A New Jersey Case Study

Beneficial Use of Dredged Material to Restore Salt Marsh Resiliency: A New Jersey Case Study Beneficial Use of Dredged Material to Restore Salt Marsh Resiliency: A New Jersey Case Study Metthea Yepsen New Jersey Department of Environmental Protection Metthea.Yepsen@dep.nj.gov Jackie Jahn, Joel

More information

Coastal Texas Protection and Restoration Project

Coastal Texas Protection and Restoration Project Coastal Texas Protection and Restoration Project Sharon Tirpak / Sheridan Willey / Janelle Stokes Project Management / Planning / Environmental USACE, Galveston District August 2014 US Army Corps of Engineers

More information

New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement

New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement New Haven Harbor, Connecticut Navigation Improvement Feasibility Study and Environmental Impact Statement Public Informational Meeting NEPA Scoping 24 January 2017 Planning Division New England District

More information

COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY

COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY Stakeholders Forum Dr. Kelly Burks-Copes, Project Manager Mr. Tony Williams, Coastal Resources US Army Corps of Engineers, Galveston District Texas

More information

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 2011 Environmental Excellence Award Application May 4, 2011 Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 Contact: Mr. Channing Hayden, Jr. Director

More information

Asharoken Coastal Storm Damage Risk Reduction Feasibility Study

Asharoken Coastal Storm Damage Risk Reduction Feasibility Study Asharoken Coastal Storm Damage Risk Reduction Feasibility Study Megan Jadrosich Project Manager U.S. Army Corps of Engineers Project Progress New York District Public Update April 23, 2009 Outline Summary

More information

The USACE Dredged Material Management Decisions (D2M2) Tool

The USACE Dredged Material Management Decisions (D2M2) Tool The USACE Dredged Material Management Decisions (D2M2) Tool DOTS Webinar Wednesday Jan 28, 2014 Presented by: Matthew Bates Matthew.E.Bates@usace.army.mil ERDC EL Risk and Decision Science Team Background

More information

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING Public Notice In replying refer to: Public Notice No. GREAT KILLS HARBOR FY13 Published: April 30, 2013, Expires: May 30, 2013 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN: CENAN-OP-ST

More information

Tampa Port Authority

Tampa Port Authority McKay Bay Restoration (McKay Bay Mitigation Site and McKay Bay Dredge Hole Restoration) Tampa Port Authority 2014 AAPA Environmental Awards Competition June 2014 Contact: Andy Fobes, Director of Public

More information

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019 Introduction The Bolsa Chica Land Trust (BCLT) has applied for and been selected to receive

More information

NATIONAL OCEAN SERVICE

NATIONAL OCEAN SERVICE NATIONAL OCEAN SERVICE Jeff Payne, Ph.D., Office for Coastal Management Steve Thur, Ph.D., Acting Director National Centers for Coastal Ocean Science February 23, 2017 NATIONAL OCEAN SERVICE oceanservice.noaa.gov

More information

PUBLIC SCOPING MEETING AGENDA

PUBLIC SCOPING MEETING AGENDA PUBLIC SCOPING MEETING AGENDA MANATEE HARBOR NAVIGATION IMPROVEMENTS Integrated Feasibility Study & Environmental Impact Statement Opening Poster Session 1 Presentation Poster Session 2 Presentation Adjourn

More information

Estuarine Restoration in San Francisco Bay: Design and Adaptive Management. Environmental Management of Enclosed Coastal Seas

Estuarine Restoration in San Francisco Bay: Design and Adaptive Management. Environmental Management of Enclosed Coastal Seas Estuarine Restoration in San Francisco Bay: Design and Adaptive Management Environmental Management of Enclosed Coastal Seas August 31, 2011 Eric Jolliffe, Bill Brostoff, and Fari Tabatabai U. S. Army

More information

Report Synopsis for Mobile Harbor General Reevaluation Report

Report Synopsis for Mobile Harbor General Reevaluation Report Report Synopsis for Mobile Harbor General Reevaluation Report 1.0 Stage of Planning Process The current stage of this study is the development of a focused array of alternatives for the Alternatives Milestone

More information

The Army Corps of Engineers and America s Coasts and Estuaries

The Army Corps of Engineers and America s Coasts and Estuaries The Army Corps of Engineers and America s Coasts and Estuaries Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 16 November 2010 US Army Corps of Engineers 1 Federal Role in

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT Public Notice U.S. Army Corps Permit Application No: SWG-2013-00147 Of Engineers Date Issued: 23 May 2017 Galveston District Comments Due: 23 June 2017 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

SECTION 404(b)(1) EVALUATION REPORT FOR THE FOR THE OPERATIONS AND MAINTENANCE OF THE FEDERALLY AUTHORIZED BILOXI HARBOR NAVIGATION PROJECT OTT BAYOU

SECTION 404(b)(1) EVALUATION REPORT FOR THE FOR THE OPERATIONS AND MAINTENANCE OF THE FEDERALLY AUTHORIZED BILOXI HARBOR NAVIGATION PROJECT OTT BAYOU SECTION 404(b)(1) EVALUATION REPORT FOR THE FOR THE OPERATIONS AND MAINTENANCE OF THE FEDERALLY AUTHORIZED BILOXI HARBOR NAVIGATION PROJECT OTT BAYOU HARRISON COUNTY, MISSISSIPPI I. PROJECT DESCRIPTION:

More information

Charleston Harbor Deepening Feasibility Study (Post 45 Study) Public Meeting

Charleston Harbor Deepening Feasibility Study (Post 45 Study) Public Meeting Charleston Harbor Deepening Feasibility Study (Post 45 Study) Public Meeting LTC Edward P. Chamberlayne, P.E. District Commander Charleston District U.S. Army Corps of Engineers 30 April 2013 US Army Corps

More information

RESTORATION OF THE NORTHERN TIP OF MON LOUIS ISLAND Mobile Bay National Estuary Program. Fowl River WMP Steering Committee May 19, 2015

RESTORATION OF THE NORTHERN TIP OF MON LOUIS ISLAND Mobile Bay National Estuary Program. Fowl River WMP Steering Committee May 19, 2015 RESTORATION OF THE NORTHERN TIP OF MON LOUIS ISLAND Mobile Bay National Estuary Program Fowl River WMP Steering Committee May 19, 2015 Project Site / Background Historical Maps (Note New Outlet ) 1889

More information

OPEN WATER SITE MANAGEMENT AND CONTROLS

OPEN WATER SITE MANAGEMENT AND CONTROLS OPEN WATER SITE MANAGEMENT AND CONTROLS Susan E. Bailey US Army ERDC, Vicksburg, MS Susan.E.Bailey@usace.army.mil Risk Management Risk Assessment Risk Management CONTROL CONTROL CONTROL Implemented controls

More information

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Public Notice Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Seattle, WA 98124-3755 Reference: PMP-18-15 ATTN: John Pell (OD-TS-NS) or Joanne Gardiner (PMP-E) US

More information

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE Ravi Sanga 1 ABSTRACT In 2003, the EPA entered into an agreed order with

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Update to Chesapeake Bay Program Management Board June 14, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Update to Chesapeake Bay Program Management Board June 14, 2018 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

BAPTISTE COLLETTE BAYOU NAVIGATION CHANNEL DEEPENING SECTION 203 FEASIBILITY STUDY

BAPTISTE COLLETTE BAYOU NAVIGATION CHANNEL DEEPENING SECTION 203 FEASIBILITY STUDY BAPTISTE COLLETTE BAYOU NAVIGATION CHANNEL DEEPENING SECTION 203 FEASIBILITY STUDY 2018 LOUISIANA TRANSPORTAION CONFERENCE February 28, 2018 Melissa Kennedy, PE AGENDA Project History Section 203 Feasibility

More information

ENVIRONMENTAL RESTORATION IN COASTAL MISSISSIPPI: MARSH RE-ESTABLISHMENT PROJECT HARRISON AND JACKSON COUNTIES, MISSISSIPPI

ENVIRONMENTAL RESTORATION IN COASTAL MISSISSIPPI: MARSH RE-ESTABLISHMENT PROJECT HARRISON AND JACKSON COUNTIES, MISSISSIPPI SECTION 404(b)(1) EVALUATION REPORT FOR THE SECTION 204 ECOSYSTEM RESTORATION PROJECT IN CONNECTION WITH CONSTRUCTION, OPERATION, OR MAINTENANCE DREDGING OF A FEDERALLY AUTHORIZED PROJECT ENVIRONMENTAL

More information

HOUSTON SHIP CHANNEL EXPANSION CHANNEL IMPROVEMENT PROJECT, HARRIS, CHAMBERS, AND GALVESTON COUNTIES, TEXAS

HOUSTON SHIP CHANNEL EXPANSION CHANNEL IMPROVEMENT PROJECT, HARRIS, CHAMBERS, AND GALVESTON COUNTIES, TEXAS COASTAL ZONE CONSISTENCY COMPLIANCE WITH GOALS AND POLICIES - SECTION 501.25(a)-(f) DREDGING AND DREDGED MATERIAL DISPOSAL AND PLACEMENT HOUSTON SHIP CHANNEL EXPANSION CHANNEL IMPROVEMENT PROJECT, HARRIS,

More information

Coastal Science and Engineering Collaborative (CSEC) Overview

Coastal Science and Engineering Collaborative (CSEC) Overview Coastal Science and Engineering Collaborative (CSEC) Overview 1 237 237 237 217 200 80 252 Winter 217 200 119 174 217 200 Partnering 27.59 Forum 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110

More information

Beneficial Use of Dredged Material: A Gulf Coast Perspective

Beneficial Use of Dredged Material: A Gulf Coast Perspective Beneficial Use of Dredged Material: A Gulf Coast Perspective Southeast Region Habitat Conservation Division Rusty Swafford Gulf of Mexico Branch Chief Prepared for the USACE 2012 Dredging Conference October

More information

Coastal Restoration in Louisiana

Coastal Restoration in Louisiana Coastal Restoration in Louisiana Presentation Topics Wetland Loss & the Importance of Coastal Louisiana The Coastal Restoration Effort The Louisiana Coastal Area Plan Development Components Status How

More information

21 st West Ave. Pilot Project

21 st West Ave. Pilot Project 21 st West Ave. Pilot Project Providing a cost effective and environmentally acceptable solution to maintenance dredging in the Duluth-Superior Harbor while supporting the partnership of SLR-AOC delisting

More information

PRESENTATION TITLE. Regional Sediment Management. Common goals for uncommon results. AAPA Presentation September 16, 2015 BUILDING STRONG

PRESENTATION TITLE. Regional Sediment Management. Common goals for uncommon results. AAPA Presentation September 16, 2015 BUILDING STRONG Regional Sediment Management PRESENTATION TITLE Common goals for uncommon results AAPA Presentation September 16, 2015 Presented by: Jackie Keiser, PG, PMP Dredging Program Manager Director, RSM-RTCX Jacksonville

More information

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL 36628-0001 CESAM RD-A April 15, 2018 PUBLIC NOTICE NO. SAM-2018-01191-DCH JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 7, 2017

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 7, 2017 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-00042 September 7, 2017 Application

More information

COASTAL SHORE PROTECTION WITH LIVING SHORELINES

COASTAL SHORE PROTECTION WITH LIVING SHORELINES COASTAL SHORE PROTECTION WITH LIVING SHORELINES Role of the Army Corps Regulatory Program UCONN, Clear Living Shorelines II Workshop June 24, 2015 Groton CT Cori M. Rose Senior Project Manager/PWS cori.m.rose@usace.army.mil

More information

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study Stakeholder Partnering Forum Modernizing of the GIWW August 4, 2016 Partnering Under a Systems Approach for Sustaining Commercial

More information

Gulf of Mexico Hydrological Restoration Criteria for Identifying and Prioritizing Projects

Gulf of Mexico Hydrological Restoration Criteria for Identifying and Prioritizing Projects Gulf of Mexico Hydrological Restoration Criteria for Identifying and Prioritizing Projects Definition of hydrological restoration for this Partnership To remove or modify anthropogenic barriers to restore

More information

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico

Design of CAD Pits in San José Lagoon, San Juan, Puerto Rico Second LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCEI 2004) Challenges and Opportunities for Engineering Education, Research and Development 2-4 June

More information

SAN FRANCISCO DISTRICT TRAVIS J. RAYFIELD, PE, PMP LIEUTENANT COLONEL, US ARMY DISTRICT COMMANDER/ENGINEER

SAN FRANCISCO DISTRICT TRAVIS J. RAYFIELD, PE, PMP LIEUTENANT COLONEL, US ARMY DISTRICT COMMANDER/ENGINEER SAN FRANCISCO DISTRICT 1 ENGINEERING WITH NATURE SYMPOSIUM UC SANTA CRUZ 237 217 200 80 NATURAL 237 AND 217 NATURE 200 BASED 119 237 217 200 27 FEATURES 252 174.59 255 255 255 0 0 0 163 163 163 131 132

More information

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to:

Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy. This policy shall be supported by three policy objectives which are to: Habitat Policy and Procedures: 1. Policy: Gulf of Mexico Fishery Management Council 1/30/02 Habitat Policy Because all species are dependent on the quantity and quality of their essential habitats, it

More information

Appendix D 404(b) Analysis

Appendix D 404(b) Analysis Appendix D 404(b) Analysis Appendix D - Evaluation of Section 404(b)(1) Guidelines I. Project Description A. Location: Delaware Bay and bayshore communities (Pickering Beach, Kitts Hummock, Bowers Beach,

More information

Sustaining the MTS through RSM & EWN

Sustaining the MTS through RSM & EWN Sustaining the MTS through RSM & EWN Ms. Linda Lillycrop USACE RSM Program Manager Engineer Research and Development Center Coastal and Hydraulics Laboratory Dr. Todd Bridges Senior Research Scientist

More information

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 This page intentionally blank. SECTION

More information

Prioritizing Climate Change Impacts and Action Strategies

Prioritizing Climate Change Impacts and Action Strategies Prioritizing Climate Change Impacts and Action Strategies Chesapeake Bay Program STAC December 8, 2015 2014 Chesapeake Bay Agreement CLIMATE RESILIENCY GOAL: Increase the resiliency of the Chesapeake Bay

More information

Meeting the Non-federal Cost Share, and other Financial/Administrative Issues

Meeting the Non-federal Cost Share, and other Financial/Administrative Issues Meeting the Non-federal Cost Share, and other Financial/Administrative Issues Beneficial Use of Dredged Materials Summit March 15, 2013 Jan Miller Great Lakes & Ohio River Division US US Army Army Corps

More information

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION INTRODUCTION The Project includes providing erosion control and shoreline stabilization measures including beach nourishment, maintenance dredging and bypassing,

More information

Coastal Texas Protection and Restoration Study

Coastal Texas Protection and Restoration Study Coastal Texas Protection and Restoration Study SSPEED Center Conference Sheri Willey Project Manager Galveston District April 26, 2016 US Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG

More information

The release of the Final Environmental Impact Statement (FEIS) for the Bogue

The release of the Final Environmental Impact Statement (FEIS) for the Bogue This document is scheduled to be published in the Federal Register on 03/05/2018 and available online at https://federalregister.gov/d/2018-04408, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE

More information

TEXAS COASTAL PROTECTION PLANNING INITIATIVES

TEXAS COASTAL PROTECTION PLANNING INITIATIVES TEXAS COASTAL PROTECTION PLANNING INITIATIVES Ray Newby, P.G. Coastal Resources Program Texas General Land Office GICA Annual Seminar New Orleans, Louisiana July 27, 2017 THE TEXAS GENERAL LAND OFFICE

More information

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION FOR THE IMPROVEMENT DREDGING OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT (NEW HAVEN, CONNECTICUT) SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW

More information

A World of Solutions

A World of Solutions Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master

More information

Restoring The Elizabeth River From The Bottom Up

Restoring The Elizabeth River From The Bottom Up Restoring The Elizabeth River From The Bottom Up Presented by: Joe Rieger Elizabeth River Project Co-author: Walter Priest, NOAA Restoration Center www.elizabethriver.org The Elizabeth River Project Mission:

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 PLAN - UPDATE 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92

More information

VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT

VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT Prepared By: U.S. Army Corps of Engineers Wilmington District and Land Management Group, Inc. (Third Party

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE GUILFORD HARBOR FEDERAL NAVIGATION PROJECT GUILFORD, CONNECTICUT

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE GUILFORD HARBOR FEDERAL NAVIGATION PROJECT GUILFORD, CONNECTICUT US Army Corps of Engineers New England District 696 Virginia Road Concord, MA 1742-2751 Public Notice In Reply Refer to: Daniel Stenstream nae-pn-nav@usace.army.mil Programs/Project Management Division

More information

Engineering With Nature

Engineering With Nature Engineering With Nature Dr. Todd S. Bridges Senior Research Scientist, Environmental Science U.S. Army Engineer Research and Development Center, U.S. Army Corps of Engineers todd.s.bridges@usace.army.mil

More information

Overview of NOS Work with Linkages to Coastal Resilience and Natural and Nature-based Solutions. Jeff Payne NOAA Office for Coastal Management

Overview of NOS Work with Linkages to Coastal Resilience and Natural and Nature-based Solutions. Jeff Payne NOAA Office for Coastal Management Overview of NOS Work with Linkages to Coastal Resilience and Natural and Nature-based Solutions Jeff Payne NOAA Office for Coastal Management Healthy Coasts - Critical for Nation s Vitality The coast has

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

Nearshore: Restoring the Sound, One Process at a Time. National Conference on Ecosystem Restoration. August 3, 2011

Nearshore: Restoring the Sound, One Process at a Time. National Conference on Ecosystem Restoration. August 3, 2011 Nearshore: Restoring the Sound, One Process at a Time National Conference on Ecosystem Restoration August 3, 2011 Presented by : Kelly Baxter-Osborne Planner and Economist U.S. Army Corps of Engineers,

More information

Nags Head Beach Nourishment Project

Nags Head Beach Nourishment Project Proposed Plan Up to 4.6 million CY Construction in Spring- Summer 2011 Via Hopper Dredge & Other Feasible Equipment All Previous NC Beach Nourishment Projects Oct 2006 Wilmington District Washington Regulatory

More information

Maryland s Living Shorelines Program. Bhaskaran Subramanian February 27, 2015

Maryland s Living Shorelines Program. Bhaskaran Subramanian February 27, 2015 Maryland s Living Shorelines Program Bhaskaran Subramanian February 27, 2015 1 Erosion & traditional approaches Living shorelines- what is it? Maryland s Living Shorelines program LS Law Products Funding-

More information

FERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG

FERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC or Commission) prepared this Environmental Impact Statement (EIS) to assess the environmental issues associated with the construction

More information

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425)

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425) US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

The Currituck Sound Array: Introducing a new estuarine field site and test bed for Corps research. RSM Webinar, 18 February 2016

The Currituck Sound Array: Introducing a new estuarine field site and test bed for Corps research. RSM Webinar, 18 February 2016 The Currituck Sound Array: Introducing a new estuarine field site and test bed for Corps research. RSM Webinar, 18 February 2016 Heidi M. Wadman, Patrick J. Dickhudt U.S. Army Research and Development

More information

Managing Environmental Risks for Riverine Infrastructure Projects Burton C. Suedel, Ph.D.

Managing Environmental Risks for Riverine Infrastructure Projects Burton C. Suedel, Ph.D. Managing Environmental Risks for Riverine Infrastructure Projects Burton C. Suedel, Ph.D. Research Biologist US Army Corps of Engineers Engineer Research and Development Center Vicksburg, MS, USA Overview

More information

Estuary Habitat Restoration STRATEGY 2012

Estuary Habitat Restoration STRATEGY 2012 Estuary Habitat Restoration STRATEGY 2012 INTRODUCTION The Estuary Restoration Act of 2000 (ERA), as amended, (title I of Pub. L. 106 457) fosters a collaborative and comprehensive process among federal

More information

Appendix H. Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas

Appendix H. Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas Appendix H Coastal Zone Management Act Coordination Consistency Determination Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas U.S. Army Corps of Engineers, Galveston District

More information

ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET

ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET March 16, 2006 ANNOUNCEMENT OF PUBLIC SCOPING MEETINGS The U.S.

More information

CHESAPEAKE BAY. DRAFT Primer. May 2018

CHESAPEAKE BAY. DRAFT Primer. May 2018 CHESAPEAKE BAY DRAFT May 2018 This document was developed in coordination with multiple stakeholders, including the Chesapeake Bay Program, U.S. Fish and Wildlife Service, District of Columbia, states

More information

Town of Duck North Carolina

Town of Duck North Carolina Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7. 2017). Beach Maintenance Plan August 2017 Prepared By:. 4038 Masonboro Loop Road Wilmington, NC 28409

More information

NORTH CAROLINA TERMINAL GROIN STUDY. Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device

NORTH CAROLINA TERMINAL GROIN STUDY. Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device NORTH CAROLINA TERMINAL GROIN STUDY Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device Science Panel Meeting December 1, 2009 Meeting Agenda Introductions Status of

More information

Charleston Harbor Post 45 Draft Integrated Feasibility Report/Environmental Impact Statement Executive Summary

Charleston Harbor Post 45 Draft Integrated Feasibility Report/Environmental Impact Statement Executive Summary Charleston Harbor Post 45 Draft Integrated Feasibility Report/Environmental Impact Statement i U.S. ARMY CORPS OF ENGINEERS NAVIGATION MISSION Provide safe, reliable, efficient, and environmentally sustainable

More information

Cat Island Chain Restoration, Green Bay

Cat Island Chain Restoration, Green Bay Cat Island Chain Restoration, Green Bay Victoria Harris, UW Sea Grant January 27, 2005 Southern Green Bay historically provided diverse coastal wetland habitats for fish and wildlife Expansive emergent

More information

DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C

DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C. 20310-2600 DAEN 1 61fR 2014 MEMORANDUM FOR ASSISTANT SECRETARY OF THE ARMY (CIVIL WORKS) 108 ARMY PENTAGON, WASHINGTON, DC

More information

Project Alternatives: The Parsons Sill Project History

Project Alternatives: The Parsons Sill Project History Project Alternatives: The Parsons Sill Project History Project Impetus Over the past 150 years, human actions have altered the tidal, freshwater, and sediment processes that are essential to support and

More information

DRAFT SECTION 404(b)(1) EVALUATION REPORT CONTINUED MAINTENANCE DREDGING OF THE FEDERALLY AUTHORIZED EASTPOINT NAVIGATION PROJECT

DRAFT SECTION 404(b)(1) EVALUATION REPORT CONTINUED MAINTENANCE DREDGING OF THE FEDERALLY AUTHORIZED EASTPOINT NAVIGATION PROJECT DRAFT SECTION 404(b)(1) EVALUATION REPORT CONTINUED MAINTENANCE DREDGING OF THE FEDERALLY AUTHORIZED EASTPOINT NAVIGATION PROJECT FRANKLIN COUNTY, FLORIDA I. PROJECT DESCRIPTION: A. Location: The federally

More information

Ocklawaha River Restoration as Mitigation

Ocklawaha River Restoration as Mitigation Ocklawaha River Restoration as Mitigation Dredging Will Further Harm the St. Johns Salinity = Farther Upstream Impacting Wetlands Damaging Submerged Grasses Further Stressing Trees Altering Dissolved Oxygen

More information

Process to detemine the integrity of the Southern berm to support addition of dredge materials

Process to detemine the integrity of the Southern berm to support addition of dredge materials 1 2 ACT was contracted to support the City s 2015 dredging program. Initially, the team conducted a review of historic information and permits as well as a field inspection of the bay areas you may have

More information