STANDARD SUMMARY PROJECT FICHE

Size: px
Start display at page:

Download "STANDARD SUMMARY PROJECT FICHE"

Transcription

1 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: RO Title: Tur River environmental protection 1.3 Sector: Environment 1.4 Location: SATU MARE county Romania 2. Objectives 2.1 Wider Objectives: G the improvement of Tur river water quality between Negreşti Oaş and lake Călineşti, and in the bordering region with the Hungarian territory G the protection of the aquatic ecosystem of surface waters (river Tur and lake Călineşti) 2.2 Immediate Objectives: G G Extension and modernisation of the water cleaning installations for a 114 l/s flow. monitoring of Tur river water quality: -On Tur River, at the upstream margin of Călineşti-Oaş lake -On Tur river, at Turulung bordering area. 2.3 Accession Partnership and NPAA priority The measure is in accordance with the following Community priority sectors: water, urban wastewater and drinking water. It is also in accordance with Directives: Urban Wastewater Treatment (91/271/EEC), Drinking Water Quality (80/778/EEC) and IPPC (96/61/EC). The measure will contribute to the improvement of Tur river water quality, Călineşti-Oaş lake water quality and the drinking water quality in Negreşti-Oaş area, and therefore, will contribute to the enforcement of the environmental programme of the Government 2.4 Cross Border Impact The realisation of this project will lead to direct results concerning the environment on short and long term on both sides of the Romanian-Hungarian border, as it follows: - Prevents and removes the main pollution sources along the Tur river. The improvement of ground water quality and the stabilisation of ecosystems equilibrium of both Tur River and Călineşti-Oaş artificial lake will follow this measure. - It will assure water of first quality both of the Tur river and Călineşti-Oaş artificial lake. These waters could mean a potential water supply for the area concerned. - It will allow the compliance with quality limits in the border region according to Cross-border Waters Convention.

2 3. Description 3.1 Background and justification: a. Prevention of pollution The existing purging station has been designed for a 15 l/s wastewater flow, while the source flow is of 120 l/s. It is obvious that the purging capacity is exceeded. As result used water insufficiently purified is evacuated into the Tur river. This leads to the degradation of the water course quality, to negative effects on the aquatic flora and fauna, to the apparition of eutrophic phenomena in the Călineşti lake, while the water quality indicators in the Hungarian border sector have values well over the accepted limits. b. Monitoring Monitoring of Tur river water quality is realised in the following three sections: 1. Upstream Negreşti-Oaş 2. In Turulung village area (near the Hungarian border) 3. In Micula village area, downstream to the river s confluence with Turţ stream. The monitoring of Călineşti-Oaş lake water quality is realised three times a year for the specific parameters: temperature, transparency, colour, dissolved oxygen, saturation with oxygen, CBO5, CCOMn, NH4, NO2, NO3, total phosphorus, orthophosphates, total mineral nitrogen, conductivity, alkalinity, fixed residues, calcium, magnesium, sodium, Mn, chlorides, detergents, extractable substances, number of phyto-plankton cells, number of zoo-plankton organisms, phytoplankton bio-mass, zoo-plankton bio-mass. 3.2 Linked activities: None 3.3 Results: a. Prevention of pollution The project envisages the extension and modernisation of the water purging installations for a 114 l / s flow, capable of ensuring the purging of the existing water source flow, as well as an increased flow resulting from the next development stage of the habitat and private industry From the technological point of view, the project presents the purging technology and the hydraulic installations of the purging station corresponding to the three purging stages: the mechanic stage, the biological stage, the tertiary stage. The designed outputs are: for M.T.S.: 93,2 % for CBO 5 (B.O.D.): 95,6 % for (N): 78,8 % for (P): 92,1 % The purified flow coming out of the station will be within the accepted limits as decreed by the water authorities for the basin, namely maximum 15 mg/l solid matter in suspension and 8,5 mg / l CBO 5 (B.O.D), so the Tur river water be situated in the first quality class. You will find enclosed "The Designed Technological Line" with its components

3 b. Monitoring The project is also aimed for monitoring of Tur river water quality in the area situated between the Negreşti-Oaş water treatment plant and Hungarian border. In order to achieve this objective two stations for automatic drawing of water samples equipped with remote communication devices are going to be set up, and an intervention car for accidental pollution is going to be purchased. These stations will be situated in the following sites: - on Tur river, at the upstream margin of Călineşti-Oaş lake - on Tur river, at Turulung bordering area. These stations are supposed to analyse the following water indicators: PH, turbidity, conductivity, ammonium, oil petroleum products sensor, chlorophyll A, Zn, Cu, Pb, Mn. 3.4 Activities: For project realisation the following activities will be undertaken: G Design and technical assistance G Preparatory works (cleaning the ground, etc) G Buildings and special constructions G Heating station and sanitary and heating installations G Sewerage network and monitoring works G Equipment acquisition G Vertical systematisation 4. Institutional Framework Preparation and launching of tender: Awarding the contract Signing the contract Supervision of works Final acceptance Reporting to the CBC PCU/NARD Programme co-ordination CFCU/NARD/Negreşti-Oaş City Council CFCU/NARD/Negreşti-Oaş City Council CFCU Negreşti-Oaş City Council CFCU/Negreşti-Oaş City Council Negreşti-Oaş City Council Phare CBC PCU/NARD 5. Detailed Budget In MEUR a. Prevention of pollution Design and technical assistance Phare Support Investme Institution nt Building Support Total Phare (=I+IB) National Cofinancing* IFI* TOTAL Preparatory works Buildings and special construction Heating station and sanitary and heating installations Sewerage network and

4 monitoring works b. Monitoring Equipment acquisition Vertical systematisation Total The National Co financing will be provided by the following beneficiaries: Negreşti-Oaş Local Council will provide co financing (in cash and in kind) for the extension of the Waste Water Treatment Plant National Company Romanian Waters will provide in kind co financing for Tur river waters monitoring. 6. Implementation Arrangements 6.1 Implementing Agency The project will be managed under the Decentralised Implementation System (DIS). The Implementing Agency is the Central Finance and Contracts Unit (CFCU) in the Ministry of Finance. The Implementing Authority is the National Agency for Regional Development, within which a CBC Programme Co-ordination Unit has been established. Negresti-Oaş Local Council will be responsible for the implementation of the works concerning the extension of the Waste Waters Treatment Plant. The National Company Romanian Waters, Satu Mare Branch, will be responsible for the implementation of the works regarding Tur river monitoring. 6.2 Non-standard aspects The DIS Manual will strictly be followed. 6.3 Contracts PHARE financed contracts shall be signed by the CFCU as PHARE CBC Programme Implementing Agency. Two contracts are expected to be awarded through an open tendering procedure: One contract for the extension of the Waste Water Treatment Plant One contract for Tur river waters monitoring. 7. Implementation Schedule 7.1 Start of tendering/call for proposals September, Start of project activity: January, Project Completion : December 31, Equal Opportunity Equal participation in project by women and men will be ensured. 9. Environment There is an environmental report and it can be obtained from:

5 G G Satu Mare Environment Protection Agency Study author: ECOTECH S.R.L. Satu Mare, str. Martirilor Deportaţi Nr.20/A Tel - Fax According to the "Environmental impact study", the project effects are POSITIVE, improving the quality of the environmental factors: water, human habitat, waste disposal. 10. Rates of return Financial rate of return / Economic rate of return: N/A Feasibility study elaborated and approved. The study can be obtained from the beneficiary: Negreşti Oaş City Council Str. Victoriei Nr.97 Tel / Fax Investment criteria 11.1 Catalytic effect: The realisation of this objective from budgetary sources will not be possible in the near future. From the local budget it will be possible to assure only the co-financing of the project Co financing: Negreşti-Oaş Local Council and National Company Romanian Waters will provide the 25% co-financing 11.3 Additionality: Phare grants will not displace other financiers Project readiness and Size: a feasibility study is available, and the total cost of the project is above 2 MEUR 11.5 Sustainability: After project implementation the beneficiaries will assure the functioning of the water treatment plant and exploitation of the monitoring installations Compliance with state aids provisions: For this project, the DIS Manual will be strictly followed. 12. Conditionality and sequencing The extension of the waste water purging station in Negreşti Oaş and the Tur River waters monitoring is necessary to ensure first quality water in the Călineşti lake and down-stream to the Hungarian border. This will also lead to the completion of Tur river waters with European environmental legislation. Annexes to project Fiche 1. Logical framework matrix in standard format 2. Detailed implementation chart 3. Contracting and disbursement schedule by quarter for full duration of programme 4. Reference to feasibility/ pre-feasibility studies

6 Annex 1 : Logframe matrix RO Tur River environmental protection Wider objectives: Indicators of achievement How, when and by whom indicators will be measures - the improvement of Tur river water quality between Negreşti Oaş and lake Călineşti - the protection of the aquatic ecosystem of surface waters (river Tur and lake Călineşti) - the improvement of the river Tur water quality in the bordering region with the Hungarian territory - First quality water in the Călineşti lake and down-stream to the Hungarian border - CBC PCU-required or special reports and statistics according to Phare procedures Immediate objectives Indicators of achievement How, when and by whom indicators will be measures Contracting period expires: Total Budget: 2.3 MEUR Assumptions and Risks Assumptions and Risks Disbursement period expires: Phare contribution: 1.7 MEUR - extension and modernisation of the water cleaning installations for a flow of 114 l/s. - monitoring of Tur river water quality: - on Tur river, at the upstream margin of Călineşti- Oaş lake - on Tur river, at Turulung bordering area. - Waste water quality emerging the sewerage station will be within the limits imposed by Romanian Authority for Water Administration (Compania Naţională Române SA) - The quality of river Tur will be in concordance with STAS and with the Romanian-Hungarian convention - Călineşti-Oaş artificial lake quality will correspond for supplying water to Satu Mare town and to localities from downstream. - CBC PCU-required or special reports and statistics according to Phare procedures - SC RECOM SA will assure permanent measurements of waste water quality emerging the sewerage station - Romanian Authority for Water Administration (Compania Naţională Române SA) will provide the permanent monitoring of both Călineşti-Oaş lake and Tur river water quality Outputs Indicators of achievement How, when and by whom indicators will be measured Assumptions and Risks - Prevention of the main pollution sources along the Tur river. - The improvement of ground water quality and the stabilisation of ecosystems equilibrium of both Tur river and Călineşti-Oaş artificial lake will follow this measure. - It will assure water of first quality both of the Tur river and Călineşti-Oaş artificial lake. These waters could mean a potential water supply for the area concerned. - It will allow the compliance with quality limits in the border region according to Cross-border Waters Convention. - The designed outputs are: for M.T.S.: 93,2 %, for CBO 5(B.O.D.): 95,6 %, for (N): 78,8 %, for (P): 92,1 % - The purified flow coming out of the station will be within the accepted limits as decreed by the water authorities for the basin, namely maximum 15 mg/l solid matter in suspension and 8,5 mg / l CBO 5 (B.O.D), so the Tur river water be situated in the first quality class. - CBC PCU records and reports, monitoring and assessment reports - SC RECOM SA reports - Romanian Authority for Water Administration reports - Progress reports from project managers - Minutes of working group and Committee meetings - Design and reports according to specification, budgets and schedules - Works according to specifications, budgets and schedules as outlined in tendering documentation - Ministry of Waters Forests and Environment Protection required statistics and reports

7 Inputs Indicators of achievement How, when and by whom indicators will be measured - Design and technical assistance - Preparatory works (cleaning the ground, etc) - Buildings and special constructions -Heating station and sanitary and heating installations -Sewerage network and monitoring works -Equipment acquisition -Vertical systematisation - extension of housing sewerage network with 50 km - extension of pluvial sewerage network with 45 km - extension and modernisation of the water cleaning installations for a flow of 114 l/s. - monitoring of Tur river water quality: - on Tur river, at the upstream margin of Călineşti-Oaş lake - on Tur river, at Turulung bordering area. - Satu Mare County Council - Negreşti-Oaş Municipality - SC RECOM SA - Romanian Authority for Water Administration - CBC PCU All of these will make evaluations at all stages of investment works.

8 ANNEX 2. Detailed implementation chart RO TUR River environmental protection Activities, tasks / quarter of the year Designing Tendering Organisation of construction site Buildings and special constructions Heating station and installations Sewerage network Acquisition of monitoring equipment Assembling of monitoring equipment Acquisition of WWTP equipment Assembling of WWTP equipment Vertical systematisation Technological tests Sep t Oct Nov Dec Jan Feb Mar Apr May Jun e July Aug Sep t Oct Nov Dec Jan Feb Mar Apr May Jun e July Aug Sep t Oct Nov Dec Jan Feb Mar apr May Jun e July Aug Sep t Oct Nov Dec

9 ANNEX 3 - Contracting and disbursement schedule by quarter RO TUR River environmental protection Contracting Schedule ( Quarters) in Euro Budget Allocatio n I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI Buildings and special constr. Heating station and installation Sewerage network Acquisition of equipment Vertical systematisation Total (Phare) Disbursement (Payment) Schedule ( Quarters) in Euro Budget Allocatio n I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI Buildings and special constr. Heating station and installation Sewerage network Acquisition of equipment Vertical systematisation Total (Phare)

10 ANNEX 3. Reference to feasibility/ pre-feasibility studies RO TUR River environmental protection The feasibility study has been elaborated and approved. The study can be obtained from the beneficiary: Negreşti Oaş City Council Str. Victoriei Nr.97 Tel / Fax There is an environmental report and it can be obtained from: ECOTECH S.R.L. Satu Mare, str. Martirilor Deportaţi Nr.20/A Tel - Fax

11

STANDARD SUMMARY PROJECT FICHE. Preparation of Future Environmental Projects

STANDARD SUMMARY PROJECT FICHE. Preparation of Future Environmental Projects STANDARD SUMMARY PROJECT FICHE 1. Basic Information Number: Title: Sector: Location: BG0107.04 Preparation of Future Environmental Projects Environment (EN) North East Bulgaria Danube River 2. Objectives

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Project Number: SR0113.02 1.2 Title: Waste water disposal system of the villages in the basin of the River Morava 1.3 Sector: Cross-border co-operation

More information

STANDARD SUMMARY PROJECT FICHE LOCAL BUSINESS INFRASTRUCTURE PROJECT NUMBER HU

STANDARD SUMMARY PROJECT FICHE LOCAL BUSINESS INFRASTRUCTURE PROJECT NUMBER HU STANDARD SUMMARY PROJECT FICHE LOCAL BUSINESS INFRASTRUCTURE PROJECT NUMBER HU0008-06-02 1. Basic Information 1.1 Désirée Number: HU 0008.06.02 1.2 Title: Road to the East-West Gate 1.3 Sector: Business

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE PROJECT NUMBER HU0004-01 1. Basic information 1.1 Désirée Number 1.2 Title: 1.3 Sector 1.4 Location: Development of the Hungarian Air Quality Monitoring System Institute

More information

STANDARD SUMMARY PROJECT FICHE 2003 Phare National Programme

STANDARD SUMMARY PROJECT FICHE 2003 Phare National Programme STANDARD SUMMARY PROJECT FICHE 2003 Phare National Programme 1. Basic information 1.1 CRIS Number: BG2003/004-937.06.01: 1.2 Title: Institutional building of the State Agency State Reserve and War-Time

More information

Standard Summary Project Fiche. 1.2 Title: Support for the Design and Implementation of Development and Assessment Programme for Senior Civil Servants

Standard Summary Project Fiche. 1.2 Title: Support for the Design and Implementation of Development and Assessment Programme for Senior Civil Servants Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: 2004-016-919.06 1.2 Title: Support for the Design and Implementation of Development and Assessment Programme for Senior Civil Servants

More information

CRIS Number: 2002/

CRIS Number: 2002/ STANDARD SUMMARY PROJECT FICHE 1. Basic Information CRIS Number: 2002/000-624-03 Title: Sector : Location: Provision of a Waste Water Treatment Plant for Razlog EN Bulgaria South West Region Blagoevgrad

More information

Romania 1999 Accession Partnership (AP) - priorities and intermediate objectives which foresee the followings:

Romania 1999 Accession Partnership (AP) - priorities and intermediate objectives which foresee the followings: PHARE 2001 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Desiree Number: RO-0107.08 1.2 Title: Developing and implementing the nationwide bovine animal Identification and Registration System.

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic information CRIS number: HU - PHARE 2003/ 005-830.03 RO PHARE 2003/005-702.02 Title: Joint Small Project Fund Sector Code (DAC): 15050 Geographical Location: Hungarian

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE PROJECT NUMBER HU0004-02 1. BASIC INFORMATION 1.1. Desiree Number 1.2. Title: Comprehensive waste management information system for planning regional waste management policy

More information

PL Tourism development Sandomierz

PL Tourism development Sandomierz PL01.06.07.03 Tourism development Sandomierz 1. Basic Information 1.1. Desire: PL01.06.07.03 1.2. Title: Tourism development for the town of Sandomierz 1.3. Sector: ESC 1.4. Project Location: Poland, Swietokrzyskie

More information

PL Control of Seveso II accidents

PL Control of Seveso II accidents PL01.05.04 Control of Seveso II accidents 1. Basic information 1.1. Desiree Number: PL01.05.04 Twinning number: PL/IB/2001/EN/04 1.2. Title: Control of Seveso II accidents 1.3. Sector: Environment 1.4.

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Project Number: 2003/005-830.02 1.2 Title: CBC Environmental Infrastructure Networks (Grant Scheme) 1.3 Sector Code Environmental Protection: 41040

More information

STANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Waste Water Treatment Plant "FORDON" in Bydgoszcz Sub-programme: Environment

STANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Waste Water Treatment Plant FORDON in Bydgoszcz Sub-programme: Environment STANDARD SUMMARY PROJECT FICHE: PROJECT PL9806.04 Project Title: Waste Water Treatment Plant "FORDON" in Bydgoszcz Sub-programme: Environment Location: Bydgoszcz Objectives: Construction of a mechanical

More information

STANDARD SUMMARY PROJECT FICHE- TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE- TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE- TRANSITION FACILITY 1. Basic Information 1.1 CRIS Number: CZ2004/006-237/03 1.2 Title: Reconstruction of the Hot Cell at the Richard Repository 1.3 Sector: Energy/ Nuclear

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE 18.12.rr STANDARD SUMMARY PROJECT FICHE Project fiche CZ01-08-01 1. Basic Information 1.1 Désirée Number: CZ 01-08-01 Twinning Number: CZ01/IB/SO/01 1.2 Title: Improvement of the public institutional mechanism

More information

PL Agriculture Information System

PL Agriculture Information System PL01.04.10 Agriculture Information System 1. Basic Information 1.1 Désirée Number: PL01.04.10 Twinning number: PL/IB/2001/AG/09 1.2 Title: Agriculture Information System 1.3 Sector: Agriculture 1.4 Location:

More information

Standard Summary Project Fiche

Standard Summary Project Fiche 1. Basic Information Standard Summary Project Fiche 1.1 CRIS Number: 2003-004-995-03-14 1.2 Title: Preparing for ESF Project Management 1.3 Sector: Regional policy and co-ordination of structural instruments

More information

2002/ WWTP Zawidow & Sulikow

2002/ WWTP Zawidow & Sulikow 2002/000-606.03 - WWTP Zawidow & Sulikow 1. Basic Information 1.1. CRIS number: 2002/000-606.03 1.2. Title: WWTP Zawidow & Sulikow 1.3 Sector: Cross border Co-operation / Environment 1.4. Location: Poland,

More information

1.2 Title: Improvement of Road Safety and Institution Building in the field of Transport

1.2 Title: Improvement of Road Safety and Institution Building in the field of Transport PHARE 2001 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Desiree Number: RO-0107.11 1.2 Title: Improvement of Road Safety and Institution Building in the field of Transport 1.3 Sector: Transport

More information

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development Idris Abdi Doctoral Dissertation Presentation Major Advisor: Dr. Teferi Tsegaye April 18, 2005 Alabama

More information

STANDARD SUMMARY PROJECT FICHE. Project No. HU

STANDARD SUMMARY PROJECT FICHE. Project No. HU STANDARD SUMMARY PROJECT FICHE Project No. HU0105-08 1. Basic Information 1.1. Désirée Number: HU0105-08 1.2. Title: Connecting the Industrial Area of Debrecen to the National Road Network (Northern Great

More information

PL Water Supply and Waste Water Collecting System Lomza

PL Water Supply and Waste Water Collecting System Lomza PL01.06.05.03 Water Supply and Waste Water Collecting System Lomza 1. Basic Information 1.1. Desiree Number: PL01.06.05.03 1.2. Title: The Water Supply and Waste Water Collecting System in Lomza and the

More information

Standard Summary Project Fiche

Standard Summary Project Fiche 1. Basic Information Standard Summary Project Fiche 1.1. Désirée Number CZ00-09-02 1.2. Title Harmonisation of Agricultural and Regional Statistics with the Acquis 1.3. Sector Institutional and Administrative

More information

National Programme for the Adoption of the Acquis (NPAA)

National Programme for the Adoption of the Acquis (NPAA) Updated 28.11.2002 2003 PROJECT FICHE 1. BASIC INFORMATION 1.1 CRIS Number: 2003/004-643. Project 1 1.2 Title: Air Pollution Monitoring System of Cyprus 1.3 Sector: Environment 1.4 Location: Ministry of

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1. Désirée Number: SK0006.01 1.2. Title: Development of Social Dialogue on the Bipartite Level 1.3. Sector: Employment and Social Policy 1.4. Location:

More information

STANDARD PROJECT FICHE

STANDARD PROJECT FICHE STANDARD PROJECT FICHE 1. Basic Information 1.1 CRIS Number 2004/016-782.01.04 1.2 Title Integrated use of the thermo-mineral waters accumulated in the Erma reka-ilidza geothermal system 1.3 Sector Environment

More information

STANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Extension of Waste Water Treatment Plant (WWTP) of Wroclaw

STANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Extension of Waste Water Treatment Plant (WWTP) of Wroclaw STANDARD SUMMARY PROJECT FICHE: PROJECT PL9806.02 Project Title: Extension of Waste Water Treatment Plant (WWTP) of Wroclaw Sub-programme: Environment Location: Wroclaw Objectives: The proposed project

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: HU0109.01 1.2 Title: Development of the road connection between the city of Balassagyarmat and the Slovak border 1.3 Sector: Cross-border

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Désirée Number: HU.01.10.01 SL.01.09.02 1.2 Title : Improvement of joint life space 1.3 Sector: Environment 1.4 Location: Micro-region of Tornyiszentmiklós

More information

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: COMPUTERISED MASTER TARIFF SYSTEM

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: COMPUTERISED MASTER TARIFF SYSTEM Edit Sept 2000 1. Basic Information 1.1 Desiree Number: ES0005-2 STANDARD SUMMARY PROJECT FICHE 1.2 Title: COMPUTERISED MASTER TARIFF SYSTEM 1.3 Sector: Internal Market Twinning code: EE00/IB/FI-02 1.4

More information

Standard Summary Project Fiche

Standard Summary Project Fiche 1. Title Agriculture Standard Summary Project Fiche Project Number LI 9909.01 Ensure Phytosanitary and Veterinary Border Control Measures 2. Geographical Location Ministry of Agriculture, Lithuanian State

More information

Scientific Bulletin of Politehnica University of Timişoara. Transactions on HYDROTECHNICS

Scientific Bulletin of Politehnica University of Timişoara. Transactions on HYDROTECHNICS Scientific Bulletin of Politehnica University of Timişoara Transactions on HYDROTECHNICS Volume 60(74), Issue 2, 2015 Trends and predictive research on Bistra River water quality, Caras Severin County

More information

STANDARD SUMMARY PROJECT FICHE FOR THE TRANSITION FACILITY

STANDARD SUMMARY PROJECT FICHE FOR THE TRANSITION FACILITY STANDARD SUMMARY PROJECT FICHE FOR THE TRANSITION FACILITY 1. Basic Information 1.1 CRIS Number: 2005/017/518.05.02 1.2 Title: Strengthening of Labour Inspection Administration 1.3 Sector: Employment,

More information

Annex 4. List of relevant Laws and Regulations

Annex 4. List of relevant Laws and Regulations Annex 4. List of relevant Laws and Regulations Governmental Decision No. 404/2001 for the designation of the representatives of the Government in the National Board for Regional Development Emergency Ordinance

More information

Standard Project Fiche for Phare 2005

Standard Project Fiche for Phare 2005 Standard Project Fiche for Phare 2005 1. Basic Information 1.1 CRIS Number : 2005/017-454.03.03 1.2 Title: Sustainable development through protection and preservation of waters and biodiversity across

More information

Jordan River TMDL Update

Jordan River TMDL Update Jordan River TMDL Update 2010 Watershed Symposium August 4 th, 2010 Hilary N. Arens Utah Division of Water Quality Jordan River TMDL Outline What is a TMDL and what is the Jordan impaired for? Evaluation

More information

Chemical characteristics of natural watercourses in the Gurahont Depression

Chemical characteristics of natural watercourses in the Gurahont Depression Volume 15(3), 115-122, 2011 JOURNAL of Horticulture, Forestry and Biotechnology Chemical characteristics of natural watercourses in the Gurahont Depression Balaşcău G. D. 1* 1 U.S.A.M.V.B.Timişoara, Faculty

More information

Existence of functioning market economy, ability to face competitive pressure and market forces within EU

Existence of functioning market economy, ability to face competitive pressure and market forces within EU TWINNING LIGHT THE DETAILED PROJECT FICHE 1. Basic Information 1.1 CRIS Number: CZ 2004/006-237/09.01.09 Twinning number: CZ04/IB/FI/02-TL 1.2 Title: Assistance with the assessment of Public Private Partnership

More information

Project Fiche: No. 16. Project Preparation Facility. 1.2 Title: Project Preparation Facility. 1.3 ELARG Statistical code: Supporting Programmes

Project Fiche: No. 16. Project Preparation Facility. 1.2 Title: Project Preparation Facility. 1.3 ELARG Statistical code: Supporting Programmes Project Fiche: No. 16 Project Preparation Facility 1. Basic information 1.1 CRIS Number: 2010/xxx-xxx 1.2 Title: Project Preparation Facility 1.3 ELARG Statistical code: 04 40 Supporting Programmes 1.4

More information

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: POLICE TRAINING AND EDUCATIONAL SYSTEM. Improve the skills and effectiveness of the police force.

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: POLICE TRAINING AND EDUCATIONAL SYSTEM. Improve the skills and effectiveness of the police force. STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: ES0007-2 1.2 Title: POLICE TRAINING AND EDUCATIONAL SYSTEM 1.3 Sector: Justice and home affairs Twinning code: EE00/IB/JH-02 1.4

More information

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks Source Water Protection Integrating with Existing Watershed and Water Management Frameworks Steph Neufeld, M.Sc. Watershed Specialist 1 Overview There are multiple, competing land and water planning and

More information

PL CBC PL/D Wilkanowo by-pass

PL CBC PL/D Wilkanowo by-pass PL01.08.05 CBC PL/D Wilkanowo by-pass 1. Basic information 1.1 Number: PL01.08.05 1.2 Title: Wilkanowo by-pass 1.3 Sector: Infrastructure 1.4 Location: Poland, Province of Ziemia Lubuska and the region

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1. Basic Information 1.1 CRIS Number: 2004/016-689.02.02 Twinning Light: Noise centre establishment to noisemapping 1.2. Title: Noise centre establishment

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE 1. Basic information STANDARD SUMMARY PROJECT FICHE 1.1 CRIS Number: 2003-004-995-03-26 1.2 Title: X-ray inspection systems for protection of the future EU external border 1.3 Sector: Customs Union 1.4

More information

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ Project Title Litomerice Sewage System in a Micro-region

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ Project Title Litomerice Sewage System in a Micro-region 1. Basic Information 1.1 Project Number CZ 01.12.04 1.2 Project Title Litomerice Sewage System in a Micro-region 1.3 Sector Environment 1.4 Project Location Euroregion: Cross-border region: District: Municipality:

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1. Basic Information 1.1 CRIS Number: 2005/017-495-04-01 1.2 Twinning Number: LV/2005-IB/EC/01 1.3 Title: Implementation of Eurocode in structural

More information

PROJECT FICHE FOR PHARE 2006 FOR COMMUNICATIONS PHARE 2006/

PROJECT FICHE FOR PHARE 2006 FOR COMMUNICATIONS PHARE 2006/ PROJECT FICHE FOR PHARE 2006 FOR COMMUNICATIONS PHARE 2006/018-147.03.18 INDEX OF CONTENTS 1. Basic Information...3 1.1 CRIS Number...3 1.2 Title:...3 1.3 Sector:...3 1.4 Location:...3 1.5 Duration...3

More information

The proposed Baddegedara reservoir project could be justified due to following reasons

The proposed Baddegedara reservoir project could be justified due to following reasons CHAPTER 6 6.0 CONCLUSIONS The proposed Baddegedara reservoir project could be justified due to following reasons Salinity survey of existing wells pointed out high salinity in the coastal area of the project.

More information

Industrial zones development

Industrial zones development 1 Industrial zones development 1. BASIC INFORMATION 3 1.1 CRIS NUMBER (PHASE 2): 3 1.2 TITLE: INDUSTRIAL ZONES DEVELOPMENT 3 1.3 SECTOR: ECONOMIC AND SOCIAL COHESION 3 1.4 LOCATION: REPUBLIC OF BULGARIA

More information

Project Proposal for Development of Chu River Basin Management Plan

Project Proposal for Development of Chu River Basin Management Plan 1 Project Proposal for Development of Chu River Basin Management Plan SC meeting for the EUWI NPD on IWRM in Kyrgyzstan Presentation by Leif Iversen, Consultant, October 2012 This document is a Project

More information

INDONESIA. (Summary of contents based on unofficial translation)

INDONESIA. (Summary of contents based on unofficial translation) Annex 3 1/5 INDONESIA GOVERNMENT REGULATION No. 35 OF 14 JUNE 1991 CONCERNING RIVERS (State Gazette No. 44 of 1991) (Summary of contents based on unofficial translation) CHAPTER I - GENERAL PROVISIONS

More information

Annex C 1. OBJECTIVES AND DESCRIPTION OF PROJECTS

Annex C 1. OBJECTIVES AND DESCRIPTION OF PROJECTS Annex C 1. OBJECTIVES AND DESCRIPTION OF PROJECTS All of the projects chosen this year cover waste water treatments and therefore, where applicable, compliance with the Urban Waste Water Treatment directive

More information

Title: Capacity Improvement for Flood Forecasting of Maritsa/Evros river basin in the Bulgaria Greece CBC Region

Title: Capacity Improvement for Flood Forecasting of Maritsa/Evros river basin in the Bulgaria Greece CBC Region Cross border co-operation between Bulgaria and Greece 2006 Project Fiche on Capacity Improvement for Flood Forecasting of Maritsa/Evros river basin in the BG-GR CBC Region ( Priority 3) 1. Basic Information

More information

1.2 Title: Energy efficiency improvement in district heating systems. 1.3 Sector: Infrastructure (Energy, Transport, Telecom)

1.2 Title: Energy efficiency improvement in district heating systems. 1.3 Sector: Infrastructure (Energy, Transport, Telecom) PHARE 2001 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: RO-0108.04 1.2 Title: Energy efficiency improvement in district heating systems 1.3 Sector: Infrastructure (Energy, Transport,

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

The Bucharest Convention

The Bucharest Convention International and regional frameworks for cooperation to improve the safety of navigation and environmental security in the Black Sea Basin The Bucharest Convention Prof Ahmet E. KIDEYS Executive Director

More information

Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka

Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka AYUBOWAN Progress of Water Environmental Governance/Management and Future Challenges in Sri Lanka By Dr. R M S K Ratnayake Director Central Environmental Authority Sri Lanka Democratic Socialist Republic

More information

Water quality monitoring and assessment: general principles and fitness for purpose

Water quality monitoring and assessment: general principles and fitness for purpose Water quality monitoring and assessment: general principles and fitness for purpose Deborah V Chapman GEMS/Water Capacity development Centre University College Cork Considerations Purpose of monitoring

More information

Standard Summary Project Fiche Project PL Sub-programme: Economic reform and industrial restructuring

Standard Summary Project Fiche Project PL Sub-programme: Economic reform and industrial restructuring Standard Summary Project Fiche Project PL9903.01 Sub-programme: Economic reform and industrial restructuring 1. Title: Alleviation of social costs from coal and steel restructuring and regional development

More information

JUDICIAL SYSTEM. Summary Project Fiche

JUDICIAL SYSTEM. Summary Project Fiche JUDICIAL SYSTEM Summary Project Fiche Project n : ES-9804.01 Project title : Strengthening of the Judicial System Location: IT systems project involves all City and County Courts (26), Probation Divisions

More information

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF SIMILKAMEEN RIVER AT US BORDER (1976 2) Prepared by: Burke Phippen BWP Consulting March, 22 Environment Canada Environnement

More information

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF KETTLE RIVER AT MIDWAY (1972 2) Prepared by: BWP Consulting Kamloops, B.C. January, 23 Environment Canada Environnement

More information

Project Fiche IPA Horizontal Programme on Nuclear Safety and Radiation Protection

Project Fiche IPA Horizontal Programme on Nuclear Safety and Radiation Protection Project Fiche IPA Horizontal Programme on Nuclear Safety and Radiation Protection 1. Basic information 1.1 CRIS Number: /019-038 1.2 Title: Equipment for the radioactive waste processing facility at the

More information

PODKARPACIE DEBICA

PODKARPACIE DEBICA 05.25 - PODKARPACIE DEBICA 1. BASIC INFORMATION 1.1. CRIS Number: 2003/004-379/05.25 1.2. Title: Increasing competitiveness of SMEs sector and attractiveness for investments in Debica region 1.3. Sector:

More information

THE EVOLUTION OF THE SEWAGE TREATMENT PROCESS IN ROMANIA IN THE LAST 30 YEARS: CASE STUDY RÂMNICU VÂLCEA

THE EVOLUTION OF THE SEWAGE TREATMENT PROCESS IN ROMANIA IN THE LAST 30 YEARS: CASE STUDY RÂMNICU VÂLCEA THE EVOLUTION OF THE SEWAGE TREATMENT PROCESS IN ROMANIA IN THE LAST 30 YEARS: CASE STUDY RÂMNICU VÂLCEA L. BOTEA 1 ABSTRACT. The evolution of the sewage treatment process in Romania in the last 30 years:

More information

02.01 Customs 1. Basic Information 1.1. Désirée number: PL Title:

02.01 Customs 1. Basic Information 1.1. Désirée number: PL Title: 02.01 Customs 1. Basic Information 1.1. Désirée number: PL0004.01 1.2. Title: Customs 1.3. Sector: Administration Twinning code: PL2000/IB/FI05 1.4. Location: Poland 2. Objectives 2.1. Wider Objectives

More information

Indian Standard DRINKING WATER SPECIFICATION (Second Revision)

Indian Standard DRINKING WATER SPECIFICATION (Second Revision) APPENDIX I BIS (IS 10500: 2012) Indian Standard DRINKING WATER SPECIFICATION (Second Revision) Sl No. Characteristic Requirement (Acceptable Limit) Permissible Limit in the Absence of Alternate Source

More information

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013 Salinity TMDL Development and Modeling in the Otter Creek Watershed 1 Erik Makus DEQ Hydrologist June 6, 2013 Outline for Today: Otter Creek and the Tongue River Previous salinity modeling efforts Existing

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE Date of Drafting : 18.1.2001 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: CZ01-07-03 Twinning Number: CZ01/IB/JH/02 1.2 Title: Improving the Professional Level of the Czech prison

More information

Standard Summary Project Fiche IPA 2008 centralised National and CBC Programmes Upgrading of Environmental Infrastructure

Standard Summary Project Fiche IPA 2008 centralised National and CBC Programmes Upgrading of Environmental Infrastructure Standard Summary Project Fiche IPA 2008 centralised National and CBC Programmes Upgrading of Environmental Infrastructure 1. Basic information 1.1 CRIS Number: 2008/020-316 1.2 Title: Upgrading of environmental

More information

1. Basic Information 1.1 Desiree Number: RO Title: Improvement of railway safety by modernisation of the Romanian railway testing centre

1. Basic Information 1.1 Desiree Number: RO Title: Improvement of railway safety by modernisation of the Romanian railway testing centre PHARE 2001 STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Desiree Number: RO-0107.13 1.2 Title: Improvement of railway safety by modernisation of the Romanian railway testing centre 1.3 Sector:

More information

Little Cypress Bayou Special Study - Subwatershed 1.10

Little Cypress Bayou Special Study - Subwatershed 1.10 - Subwatershed 1.1 Sabine River Authority of Texas August 31, 21 Prepared in Cooperation with the Texas Natural Resource Conservation Commission Under the Authorization of the Texas Clean Rivers Act Table

More information

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3)

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3) NORTH TEXAS MUNICIPAL WATER DISTRICT - Wylie Water Analysis Jan-2018 Mineral Analysis Raw Treated Standards Residue on Evaporation 412 456 500 1000 Silica (SiO2) 3.63 3.41 Iron (Fe) 0.378 0.259 0.3 0.3

More information

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed Sl Product / Material of test 1 Wastewater Colour, true colour units, 2 Turbidity, NTU 3 Total dissolved solids mg/1, IS-3025 (Part 4) -1983 2005: 2120 /C IS-3025 (Part 10)-1984 2005: 2130/B IS-3025 (Part

More information

Biodegradation Test of Chemical Substances

Biodegradation Test of Chemical Substances Biodegradation Test of Chemical Substances I. Scope of application A standard method for the biodegradation test of chemical substances is described as follows. II. Terms The terms used in this test method

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1. Basic Information 1.1 CRIS Number: 2005/017-464.04.02 1.2 Title: Improvement of the safety, quality and availability of organs, tissues and

More information

Standard Project Fiche for Phare Title: Promotion of sustainable development in the Strandja/Yıldız Mountain area

Standard Project Fiche for Phare Title: Promotion of sustainable development in the Strandja/Yıldız Mountain area Standard Project Fiche for Phare 2005 1. Basic Information 1.1 CRIS Number: 2005/017-453.01.02 1.2 Title: Promotion of sustainable development in the Strandja/Yıldız Mountain area 1.3 Sector: Environment

More information

Lake Huron Water Treatment Plant Mineral Report

Lake Huron Water Treatment Plant Mineral Report Lake Huron Water Treatment Plant Mineral Report Turbidity NTU 0.40 0.05 0.3/95% (1) Total Solids mg/l 160 155 500 10 Total Dissolved Solids mg/l 101 0 500 10 Aluminum Al mg/l < 0.050 0.060 0.05-0.2 0.005

More information

The Myakka River. Presented to the Myakka River Management Coordinating Council January 9, 2009

The Myakka River. Presented to the Myakka River Management Coordinating Council January 9, 2009 The Myakka River Presented to the Myakka River Management Coordinating Council January 9, 2009 Kathryn L. Meaux Environmental Specialist III Sarasota County Integrated Water Resources Historical Monitoring

More information

Lake Huron Water Treatment Plant Mineral Report

Lake Huron Water Treatment Plant Mineral Report Lake Huron Water Treatment Plant Mineral Report Turbidity NTU 0.30 0.06 0.3/95% (1) Total Solids mg/l 94 91 500 10 Total Dissolved Solids mg/l 81 51 500 10 Aluminum Al mg/l < 0.050 < 0.050 0.05-0.2 0.005

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Requires Member States to take actions to mitigate the effects of floods and droughts.

Requires Member States to take actions to mitigate the effects of floods and droughts. 2.5 THE WATER FRAMEWORK DIRECTIVE Official Title: Council Directive 2000/60/EC of 23 October 2000 establishing a framework for Community action in the field of water policy 2.5.1 INTRODUCTION The Water

More information

Standard Summary Project Fiche

Standard Summary Project Fiche Standard Summary Project Fiche 1. Basic information 1.1 CRIS Number: TR2010/0310.01 1.2 Title: Prevention of anti-competitive behaviors in the electronic communications sector 1. 1.3 ELARG Statistical

More information

Cooperative Monitoring Program nutrient monitoring results

Cooperative Monitoring Program nutrient monitoring results Cooperative Monitoring Program nutrient monitoring results Nutrient Water Quality Symposium, Santa Maria Central Coast Water Quality Preservation, Inc. Executive Director: Kirk Schmidt (831-750-5449, kschmidt@ccwqp.org)

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: CZ 2003/004-338.03.03 1.2. Title: Strengthening Institutional and Administrative Capacity in the Phytosanitary area (diagnostics,

More information

SUMMARY PROJECT FICHE. 1.2 Title: STRENGTHENING THE REGULATORY FRAMEWORK FOR TELECOMMUNICATIONS

SUMMARY PROJECT FICHE. 1.2 Title: STRENGTHENING THE REGULATORY FRAMEWORK FOR TELECOMMUNICATIONS SUMMARY PROJECT FICHE 1. Basic Information 1.1 Désirée Number: BG 0003.01 1.2 Title: STRENGTHENING THE REGULATORY FRAMEWORK FOR TELECOMMUNICATIONS 1.3 Sector: Internal market 1.4 Location: Bulgaria. 2.

More information

2.2.3 Water Quality of Groundwater and Surface Water

2.2.3 Water Quality of Groundwater and Surface Water The Study on Water Supply Systems in Mandalay City and in the Central Dry Zone Part II Study for Mandalay City 2.2.3 Water Quality of Groundwater and Surface Water (1) Water Quality Standards for Drinking

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

Implementation of the water Directives in Romania

Implementation of the water Directives in Romania National Administration "Apele Române" 6, Edgar Quinet Street, District 1, code 0100180, Bucharest, Romania Tel: 0213151301; 0213110146; Fax: 0213122174; 0213103526 http://www.rowater.ro Implementation

More information

TABLE OF CONTENTS. List of Tables List of Plates. Previously Issued Design Memoranda

TABLE OF CONTENTS. List of Tables List of Plates. Previously Issued Design Memoranda TABLE OF CONTENTS Title List of Tables List of Plates Preface Previously Issued Design Memoranda Page v vi vii viii Section I Introduction 1-01. Authorization 1-1 1-02. Project Purposes 1-2 1-03. Purpose

More information

Detroit Water and Sewerage Department Water Quality Division Laboratory Analysis of Water Samples Collected at Lake Huron Plant 6/9/2015

Detroit Water and Sewerage Department Water Quality Division Laboratory Analysis of Water Samples Collected at Lake Huron Plant 6/9/2015 Lake Huron Plant Turbidity NTU 0.35 0.05 0.3/95% (1) Total Solids mg/l 136 162 500 10 Total Dissolved Solids mg/l 145 136 500 10 Aluminum Al mg/l 0.510 0.142 0.05-0.2 0.005 Iron Fe mg/l 0.082 0.118 0.3

More information

GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: January 12, 2017 PRESS RELEASE

GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: January 12, 2017 PRESS RELEASE GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: January 12, 2017 PRESS RELEASE QUICK ESTIMATES OF INDEX OF INDUSTRIAL PRODUCTION AND USE-

More information

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT WATER QUALITY ASSESSMENT OF Quinsam River NEAR THE MOUTH (1986 24) Prepared by: L. G. Swain, P. Eng. B.C. Ministry of Environment Prepared for:

More information

PHARE 2005 PROJECT FICHE

PHARE 2005 PROJECT FICHE PHARE 2005 PROJECT FICHE 1. BASIC INFORMATION 1.1 CRIS Number: HR2005/6/1 1.2 Title: Strengthening Human Resources Management, Education and Training system of the Ministry of the Interior Police Academy

More information

Temperature Issues. Resolution Plan. Outline DRAFT. June 22, Version 0.1

Temperature Issues. Resolution Plan. Outline DRAFT. June 22, Version 0.1 Temperature Issues Resolution Plan Outline DRAFT Version 0.1 [this page intentionally blank] ii I. Introduction Table of Contents II. III. Problem Identification A. Current Effect of the Discharge on the

More information

Monitoring and data exchange at transboundary rivers, including water quality cooperation Almaty, October 2010

Monitoring and data exchange at transboundary rivers, including water quality cooperation Almaty, October 2010 Monitoring and data exchange at transboundary rivers, including water quality cooperation Almaty, 18-19 October 2010 Zsuzsanna BUZÁS Hungary Photo WWF 801,473 km² Danube River Basin Different levels of

More information

WORKS PROCUREMENT NOTICE 2003/ Giurgiu Improvement of the Border Access Infrastructure Location Giurgiu County ROMANIA

WORKS PROCUREMENT NOTICE 2003/ Giurgiu Improvement of the Border Access Infrastructure Location Giurgiu County ROMANIA WORKS PROCUREMENT NOTICE 2003/005-701.01.03 Giurgiu Improvement of the Border Access Infrastructure Location Giurgiu County ROMANIA 1. Publication reference 2003/005-701.01.03 2. Procedure Local Open Tender

More information

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Strengthening of the BiH Metrology system

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Strengthening of the BiH Metrology system Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Strengthening of the BiH Metrology system 1. Basic information 1.1 CRIS Number: 1.2 Title: Strengthening of the BiH Metrology system

More information

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA GROUNDWATER MONITORING INFORMATION QUARTERLY REPORT FOR PERIOD APRIL TO JUNE 216 BY LOUTH COUNTY COUNCIL TO ENVIRONMENTAL PROTECTION AGENCY FOR WASTE LICENCE REFERENCE: W33-1 DROGHEDA LANDFILL SITE COLLON

More information