1 NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION 1. INTRODUCTION This (EIR) has been compiled as part of an Environmental Impact Assessment (EIA) that is being undertaken for the proposed N3 De Beers Pass Route (DBPR) between Keeversfontein (just north of the N3 Tugela Toll Plaza) in KwaZulu-Natal via the De Beers Pass area to Warden in the Free State. The total length of the proposed route will be approximately 98 km (see Figure 1-1). Interested and Affected Parties (I&APs) are invited to submit comments on the Draft EIR. The document will then be updated to a Final EIR, having given due consideration to the comments received. This chapter provides background to the proposed project, outlines the Terms of Reference (ToR) for the EIA process, explains the report structure and describes the public participation process associated with the availability of the Draft EIR. 1.1 BACKGROUND TO THE PROJECT In 1971 construction of the dual carriage freeway from Durban to Johannesburg was accepted by Government as part of the new National Road Programme. At that time a dual carriageway already existed between Mooi River and Durban. The existing N3 highway between Heidelberg and Cedara (Pietermaritzburg) is shown in Figure 1-1. The map also shows the remaining portion of the N3 to be completed between Keeversfontein and Warden which includes the new De Beers Pass. Following a route location study between Estcourt and Villiers, in which several alternatives were investigated by the then National Transport Commission, the final route was chosen. In 1974 the basic planning for the N3 highway was finalised, and construction of the most critical portions commenced. However, because of a shortage of funds the completion of construction was delayed. In 1983 the authority to charge tolls on national roads was promulgated in the National Roads Amendment Act 79 of This resulted in much-needed new funding sources for national roads, allowing projects to proceed such as the N2 Tsitsikamma highway, including its three striking arch bridges. The much-needed Marianhill toll road followed almost immediately. Cave Klapwijk and Associates 1-1

2 Figure 1-1: Existing route from Heidelberg to Cedara and proposed De Beers Pass Section Cave Klapwijk and Associates 1-2

3 A concession contract was entered into in 1986 for the design, construction and operation of the N3. This resulted in the upgrading of the older sections of the N3 and the construction of the Frere-Keeversfontein (approximately 50 km) and Warden-Villiers (approximately 100 km) sections. This concession contract was subsequently terminated in Following a public tender process, the South African National Roads Agency SOC Ltd (SANRAL) appointed the N3 Toll Concession (Pty) Ltd (N3TC) in 1999 as the Concessionaire responsible for the Design, Construction, Financing, Operation and Maintenance of National Route 3 from Cedara in KwaZulu-Natal to the Heidelberg South Interchange in Gauteng as a Toll Highway. The Concession Contract included a requirement to construct the Keeversfontein-Warden section once traffic volumes on the Van Reenen s Pass reached a specified level. The N3TC obtained a conditional environmental authorisation in 1999 for the construction and upgrading of the N3 between Cedara and Heidelberg, including the DBPR, and proceeded to construct the Villiers-Heidelberg section as well as to rehabilitate and upgrade the existing sections. 1.2 THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS The N3TC obtained environmental authorisation by means of a Record of Decision (RoD), issued by the Department of Environmental Affairs and Tourism (DEAT), on 26 March 1999, authorising the construction and upgrading of the N3 Toll Road System from Heidelberg to Cedara, comprising two sections, (i) Cedara to Heidelberg (via Van Reenen) and (ii) Keeversfontein to Warden (DBPR). The RoD was issued subject to certain conditions (Volume 2, Appendix A) In particular, the following conditions under the heading De Beers Pass Route were specified: Provision must be made in the EMP for a detailed study on the influence of the new De Beers Pass/Warden route as proposed by Naidoo and Associates; Hydrology and Water Quality. An analysis of the current indicated alignment of the De Beers Pass/Warden route versus alternative routing to avoid wetlands must be done. This needs to be done as part of the detailed road design. Wetland specialists should be consulted. An analysis of improved designs for road drainage versus the offset of investing in appropriate wetland assets elsewhere is to be done as part of the detail road design. Hydrologists and wetland specialists should be consulted. The exact location of the proposed tunnel should be determined and the materials to be removed during the construction should be stockpiled as far away from the gorge as possible. Tunnel entrance lights must be directed so that it has minimal or no impact on the ambience of the area. Cave Klapwijk and Associates 1-3

4 That the route alignment from the bottom of De Beers Pass to the top of the escarpment be re-evaluated during the detailed design phase so as to ensure that the road and tunnel have the least negative impact on the landscape. The functions of the wetlands in the De Beers Pass section must under no circumstances be negatively impacted on. Further detailed studies should be completed during the detailed design. The results and recommendation of the studies must be approved by this Department as well as provincial environmental departments. Other conditions in the 1999 RoD considered in this EIA are: Provision must be made in the EMP that the influence of the road on Alex Pan will be researched and appropriate mitigation measures must be implemented in order to minimise the effect thereof on the pan and its associated wildlife. Provision must be made in the EMP that a study on the current location of sun gazers in the road reserve, quarries and road camps will be done. A management plan for translocation of sun gazers from known locations and other unexpected sun gazer findings must be developed. This plan must stipulate detailed actions to be taken. The project has the greatest potential on the area s wetland resources at every point where the road will cross a wetland. The critical issue with regard to the mitigation of impacts to wetlands will therefore be the design and placement of drainage structures under the road. Emphasis must be on ensuring that these structures pose minimal disruption to the natural flow patterns of water through the wetland. Inadequate or badly placed structures will result in the loss of wetland functions or values which will be felt some distance downstream, and by most of the users of the wetland. This must be reflected in the EMP. Since new EIA Regulations were enacted in terms of the National Environmental Management Act (No 36 of 1998) (NEMA) in 2006 (and again in 2010), SANRAL and the N3TC jointly approached the Department of Environmental Affairs (DEA), (previously the (DEAT), to clarify the way forward. It was agreed that SANRAL would submit a new Application for Environmental Authorisation for the DBPR, via a full Scoping and EIA study, including consideration of reasonable and feasible alternatives. A new application for environmental authorisation was submitted on 23 July 2010 for the construction of the National Road 3: Keeversfontein to Warden (De Beers Pass Section). In order to facilitate this process Mr. Alan Cave, who was the Independent Environmental Assessment Practitioner (EAP) for the original EIA, was again appointed as the EAP for this assessment. Cave Klapwijk and Associates 1-4

5 1.3 STRUCTURE OF THE REPORT Chapter 1 of this report provides a general background to the proposed project, ToR for the EIA study and report structure, and outlines the procedure for comment on the Draft EIR. An explanation of the study approach and methodology, together with associated legal considerations, are then dealt with in Chapter 2. A detailed description of the proposed project is presented in Chapter 3, followed by the need and desirability of the project in Chapter 4. Reasonable and feasible alternatives and mitigation deviations are described in Chapter 5, and the receiving environment is covered in Chapter 6. The DBPR and alternatives have been divided into four sections for ease of assessment and reporting. These sections are described in Chapter 3. Chapter 7 contains the findings of the specialist studies and assessment of the impacts for Section 1 of the DBPR and alternatives. Similarly, Sections 2, 3 and 4 are dealt with in Chapters 8, 9 and 10 respectively. The results of the economic assessments are given in Chapter 11, and the synthesis by the EAP is included in Chapter 12 together with a conclusion and recommendations. 1.4 OPPORTUNITY TO COMMENT ON THE DRAFT EIR I&AP Notification All I&APs on the project database will be notified via personalised letters of the availability of the Draft EIR. All reports, including Specialist Study reports, will be uploaded on the ACER website under the N3EIA Draft EIA Report link. They will also be available on Reports/ Public Open Days Public Open Days will be held in the study area to present the findings on the Draft EIR at the following areas: Ladysmith; Van Reenen; Harrismith; and Warden Availability of draft reports at public places The Draft EIR will be made available at various public places similar to the ones used for the DSR as follows: Ladysmith Public Library; Green Lantern Inn (Van Reenen); Harrismith Public Library; and Warden Public Library. Cave Klapwijk and Associates 1-5

6 1.4.4 Comments on draft Reports For comments to be included in the Final EIR, they should reach the offices of ACER within 90 days of the availability of this document. Comments should be forwarded to ACER at the contact details given below: Bongi Shinga ACER (Africa) Environmental Management Consultants P O Box 503, Mtunzini, 3867 bongi.shinga@acerafrica.co.za Tel: Fax: Cave Klapwijk and Associates 1-6

REPORT TITLE : National Road 3: Keeversfontein to Warden (De Beers Pass Section) Scoping Report

REPORT TITLE : National Road 3: Keeversfontein to Warden (De Beers Pass Section) Scoping Report REPORT TITLE : National Road 3: Keeversfontein to Warden (De Beers Pass Section) Scoping Report CLIENT : N3 Toll Concession (Pty) Ltd. (N3TC) PROJECT NAME : National Road 3: Keeversfontein to Warden (De

More information

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality 1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District

More information

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE

More information

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality 1 INTRODUCTION Hendrina Power Station is located at Pullenshope (near Hendrina) in the Mpumalanga Province and falls within the Steve Tshwete Local Municipality (Figure 1.1) which falls within the Nkangala

More information

Proposed Windhoek - Gocheganas Road upgrade. Environmental Assessment Scoping Risk Report

Proposed Windhoek - Gocheganas Road upgrade. Environmental Assessment Scoping Risk Report Proposed Windhoek - Gocheganas Road upgrade Environmental Assessment COPYRIGHT ENVIRO DYNAMICS, 2014. ALL RIGHTS RESERVED PROJECT NAME STAGE OF REPORT CLIENT LEAD CONSULTANT DATE OF RELEASE AUTHOR MAPPING

More information

VLAKVARKFONTEIN COAL MINE

VLAKVARKFONTEIN COAL MINE VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION

More information

APPENDIX 1 LETTER CIRCULATED TO MUNICIPALITIES CONCEPTUAL DIAGRAM OF PROPOSED N2 TOLL HIGHWAY ALIGNMENT

APPENDIX 1 LETTER CIRCULATED TO MUNICIPALITIES CONCEPTUAL DIAGRAM OF PROPOSED N2 TOLL HIGHWAY ALIGNMENT APPENDIX 1 LETTER CIRCULATED TO MUNICIPALITIES CONCEPTUAL DIAGRAM OF PROPOSED N2 TOLL HIGHWAY ALIGNMENT File:EL324 26 June 2007 C O N S U L T I N G c.c. Wanklin & Naidoo Development Specialists Registration

More information

1 INTRODUCTION 1.1 PROJECT APPLICANT

1 INTRODUCTION 1.1 PROJECT APPLICANT 1 INTRODUCTION 1.1 PROJECT APPLICANT Transnet State Owned Company (SOC) Limited (Transnet) is a wholly state owned company in South Africa, which strives to enable competitiveness, growth and development

More information

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010

2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 2010 EIA Regulations GNR 543 of 18 June 2010, effective 2 August 2010 CH 1 INTERPRETATION AND PURPOSE OF THESE REGULATIONS S 1 Interpretation; S 2 Purpose of Regulations CH 2 COMPETENT AUTHORITY S3 Who;

More information

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION

BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION DEDEA Ref: EC04/C/LN1/M/53-2014 BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT: Return address for comments:

More information

ENVIRONMENTAL IMPACT ASSESSMENT. for the proposed NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) DEA ref. no.

ENVIRONMENTAL IMPACT ASSESSMENT. for the proposed NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) DEA ref. no. ENVIRONMENTAL IMPACT ASSESSMENT for the proposed NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) DEA ref. no. 12/12/20/1992 Agricultural Economic Specialist Report Prepared for Cave Klapwijk

More information

3 EIA PROCESS AND METHODOLOGY

3 EIA PROCESS AND METHODOLOGY 3 EIA PROCESS AND METHODOLOGY 3.1 Introduction The Environmental Impact Assessment (EIA) and Waste Licence Application process for the proposed Majuba Continuous Ashing project is comprised of two main

More information

DEA Reference Number: To be announced

DEA Reference Number: To be announced ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED DEVELOPMENT AND INCLUSION OF THE METAL CONCENTRATORS (METCON) REFINERY FACILITY IN THE JEWELLERY MANUFACTURING PRECINT (JMP) WITHIN THE OR TAMBO INTERNATIONAL

More information

Background Information Document

Background Information Document Environmental Assessment Proposed Windhoek- Gocheganas Road upgrade Background Information Document Introduction The Roads Authority appointed Lithon/GIBB Joint Venture Consultants to conduct a study on

More information

Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4

Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4 Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4 NOTICE OF APPLICATION FOR WASTE MANAGEMENT LICENCE, SUBJECT

More information

Annex B2.3. Background Information Document

Annex B2.3. Background Information Document Annex B2.3 Background Information Document Background Goldfields South Deep Mine, in partnership with Enel Green Power, proposes to design, construct, and operate 2x20MW Solar PV plants on Mine owned property

More information

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,

More information

N2 WILD COAST TOLL HIGHWAY ENVIRONMENTAL MANAGEMENT PROGRAMME

N2 WILD COAST TOLL HIGHWAY ENVIRONMENTAL MANAGEMENT PROGRAMME N2 WILD COAST TOLL HIGHWAY ENVIRONMENTAL MANAGEMENT PROGRAMME Prepared for: National Department of Environmental Affairs On behalf of: The South African National Roads Agency SOC Limited Prepared by: CCA

More information

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD. ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE

More information

INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT

INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT REPORT APPENDIX B6: ISSUES AND RESPONSES REPORT VERSION 3 November

More information

BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL

BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL BIOMASS POWER PLANT NEAR MKUZE, KWAZULU-NATAL DEA ref: 14/12/16/3/3/1/619 MOTIVATION FOR AMENDMENT OF ENVIRONMENTAL AUTHORISATION March 2014 Prepared for: Navosync (Pty) Ltd Suite 103 Dixon Street, Cape

More information

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA BACKGROUND INFORMATION DOCUMENT SRK Project 364470/42G June 2007

More information

1 INTRODUCTION 1.1 PROJECT BACKGROUND

1 INTRODUCTION 1.1 PROJECT BACKGROUND 1 INTRODUCTION 1.1 PROJECT BACKGROUND The International Power Consortium South Africa (IPCSA) has developed a solution to Saldanha Steel s requirement for stable, economical electricity over the long term.

More information

The Project will consist of the following key components: PV solar panels/modules (arranged in arrays); DC-AC current inverters and transformers;

The Project will consist of the following key components: PV solar panels/modules (arranged in arrays); DC-AC current inverters and transformers; 1 INTRODUCTION 1.1 OVERVIEW Solaire Direct Southern Africa (Pty) Ltd, hereafter referred to as Solaire Direct, appointed Environmental Resources Management Southern Africa (Pty) Ltd, hereafter referred

More information

Cape Environmental Assessment Practitioners(Pty) Ltd

Cape Environmental Assessment Practitioners(Pty) Ltd Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,

More information

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL

PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL BACKGROUND INFORMATION DOCUMENT April 2014 (2 nd Edition) Project developer: South Africa Mainstream

More information

SANRAL DELIVERING TOWARDS ECONOMIC GROWTH IN SOUTH AFRICA. Presenter : Zandile Nene Project Manager : Design & Construction SANRAL : Eastern Region

SANRAL DELIVERING TOWARDS ECONOMIC GROWTH IN SOUTH AFRICA. Presenter : Zandile Nene Project Manager : Design & Construction SANRAL : Eastern Region SANRAL DELIVERING TOWARDS ECONOMIC GROWTH IN SOUTH AFRICA Presenter : Zandile Nene Project Manager : Design & Construction SANRAL : Eastern Region CONTENTS 1. SANRAL background 2. SANRAL current network

More information

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall.

Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water

More information

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND

More information

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE

BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE 1. INTRODUCTION The Saldanha Bay Industrial Development Zone (IDZ) is located

More information

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT: PROPOSED ESTABLISHMENT OF A STAGED MOBILE CRUSHING PLANT WITHIN THE CURRENT FOOTPRINT OF THE AMASUNDU GRAVEL CC

More information

BRAAMHOEK TRANSMISSION POWER LINE AND SUB-STATION INTEGRATION ANNEXURE 4: PUBLIC MEETING RECORD (Proceedings including attendance registers)

BRAAMHOEK TRANSMISSION POWER LINE AND SUB-STATION INTEGRATION ANNEXURE 4: PUBLIC MEETING RECORD (Proceedings including attendance registers) BRAAMHOEK TRANSMISSION POWER LINE AND SUB-STATION INTEGRATION ANNEXURE 4: PUBLIC MEETING RECORD (Proceedings including attendance registers) ENVIRONMENTAL IMPACT ASSESSMENTS ESKOM BRAAMHOEK 400KV TRANSMISSION

More information

PROPOSED CAPACITY UPGRADES TO THE N3 FROM LYNNFIELD PARK (KM 30.6) TO GLADYS MANZI (FORMERLY MURRAY) ROAD (KM 6.1) (DEA REF NO: 14/12/16/3/3/1/1966)

PROPOSED CAPACITY UPGRADES TO THE N3 FROM LYNNFIELD PARK (KM 30.6) TO GLADYS MANZI (FORMERLY MURRAY) ROAD (KM 6.1) (DEA REF NO: 14/12/16/3/3/1/1966) 23 October 2018 Ms Zama Hadebe For Attention Thulani Mbokdo Department of and Sanitation (Licensing) PO Box 1018 Durban 4000 Dear Ms Hadebe, PROPOSED CAPACITY UPGRADES TO THE N3 FROM LYNNFIELD PARK (KM

More information

11 CONCLUSIONS, RECOMMENDATIONS AND WAY FORWARD Need for the project 11-1

11 CONCLUSIONS, RECOMMENDATIONS AND WAY FORWARD Need for the project 11-1 11 CONCLUSIONS, RECOMMENDATIONS AND WAY FORWARD 11-1 11.1 Need for the project 11-1 11.2 Alternatives 11-1 11.2.1 Site alternative 11-1 11.2.2 Generation alternatives 11-2 11.2.3 Modes of transport during

More information

Section Three. Engineering Overview

Section Three. Engineering Overview Section Three Engineering Overview Road Network Management he Agency's contribution towards increasing the Tcountry's global competitiveness is to ensure that the primary road network functions efficiently,

More information

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389 ENVIRONMENTAL AUTHORISATION PROCESS AND APPLICATION FOR REQUIRED LICENCES FOR THE PHOLA COAL PROCESSING PLANT, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE BACKGROUND INFORMATION DOCUMENT SEPTEMBER

More information

BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE

BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE PROJECT: The expansion of Singita Sweni Lodge, N Wanetsi Private Concession, Kruger National Park BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE CONSULTANT: EMROSS Consulting (Pty) Ltd.

More information

Environmental Impact Assessment for the Proposed Upgrade of the Sani Pass Road (P318): Phase 2

Environmental Impact Assessment for the Proposed Upgrade of the Sani Pass Road (P318): Phase 2 Environmental Impact Assessment for the Proposed Upgrade of the Sani Pass Road (P318): Phase 2 Final Scoping Report Project No.: J27344 DEAT Ref. No.: 12/12/20/1184 June 2009 PURPOSE OF THIS REPORT The

More information

ethekwini Environment al Health Department.

ethekwini Environment al Health Department. E12.2 Response to Comments received on DRAFT BAR Licensing of existing waste facilities within the South African National Blood Service (SANBS) Pinetown Campus, Pinetown, Durban, KwaZulu-Natal Department

More information

PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK

PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK SCOPING REPORT EXECUTIVE SUMMARY 1 INTRODUCTION SANParks proposes, as a key element of a wider infrastructure

More information

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS 11 August 2017 Dear Stakeholder ENVIRONMENTAL IMPACT ASSESSMENT AND PUBLIC PARTICIPATION PROCESS DEVELOPMENT OF THE RICHARDS BAY COMBINED CYCLE POWER PLANT (CCPP) AND ASSOCIATED INFRASTRUCTURE ON A SITE

More information

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE

PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE Background Information Document DEDEA Ref No s: EC 155/ORT/LN1&LN2/M/13 34 EC 157/ORT/LN1&LN3/M/13

More information

BACKGROUND INFORMATION DOCUMENT:

BACKGROUND INFORMATION DOCUMENT: BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a

More information

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY EXECUTIVE SUMMARY PROJECT BACKGROUND AND DESCRIPTION On the 16 February 2009, Agni Steels SA (Pty) Ltd (formerly Afro Asia Steels), was issued an Environmental Authorisation for the construction and operation

More information

BACK GROUND INFORMATION DOCUMENT

BACK GROUND INFORMATION DOCUMENT PROJECT: Basic Environmental Assessment for the Construction of a lodge and additional staff accommodation, Lion Sands, Sabi Sand Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: EMROSS Consulting

More information

APPENDIX 8 POSSIBLE DEVIATIONS TO DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT

APPENDIX 8 POSSIBLE DEVIATIONS TO DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT APPENDIX 8 POSSIBLE DEVIATIONS TO DE BEERS PASS ROUTE AVIFAUNAL ASSESSMENT 1 EXECUTIVE SUMMARY This appendix assesses, from an avifaunal perspective, the expected impacts of six possible deviation sections

More information

PUBLIC PARTICIPATION REPORT

PUBLIC PARTICIPATION REPORT ESKOM HOLDINGS SOC (PTY) LTD PUBLIC PARTICIPATION REPORT PROPOSED CONSTRUCTION OF ESKOM TYALARA-QUNU 132 KV POWER LINE AND ASSOCIATED INFRASTRUCTURE September 2013 J31096 Head Office 14 Eglin Road, Sunninghill

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

INTRODUCTION PROJECT DESCRIPTION

INTRODUCTION PROJECT DESCRIPTION JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe

More information

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE

BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial

More information

EDGE SEMINAR SIP2 Logistics and Industrial Corridor. 19 February 2015

EDGE SEMINAR SIP2 Logistics and Industrial Corridor. 19 February 2015 EDGE SEMINAR SIP2 Logistics and Industrial Corridor 19 February 2015 1 Contents SIP2 Overview and Context Port and Logistics Observations Infrastructure Programme Conclusion 2 The National Infrastructure

More information

ENVIRONMENTAL IMPACT REPORT JULY DEAT Reference Number: 12/12/20/1399

ENVIRONMENTAL IMPACT REPORT JULY DEAT Reference Number: 12/12/20/1399 i ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF AN ESKOM GENERAL LANDFILL AND A HAZARDOUS WASTE STORAGE FACILITY IN LEPHALALE, LIMPOPO PROVINCE ENVIRONMENTAL IMPACT REPORT JULY 2009

More information

Annexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report

Annexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Annexure E.3 Comment Response Report Project 113084 / 11081File Kriel Ash Disposal Facility Scoping_2017

More information

SECTION 1: INTRODUCTION 1.1 BACKGROUND TO THE PROJECT

SECTION 1: INTRODUCTION 1.1 BACKGROUND TO THE PROJECT SECTION 1: INTRODUCTION 1.1 BACKGROUND TO THE PROJECT Transnet is a State-owned Enterprise (SOE) under the National Department of Public Enterprises (Public Finance Management Act, Act No. 29 of 1999).

More information

IMPORTANT NOTICE. Kindly note that:

IMPORTANT NOTICE. Kindly note that: 1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department

More information

Background Information Document

Background Information Document Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background

More information

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT

BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT WASTE MANAGEMENT LICENCE APPLICATION FOR THE MANAGEMENT OF ALL WASTE STREAMS FOR THE OPEN PIT AND UNDERGROUND OPERATIONS AT VENETIA MINE, LIMPOPO

More information

A comparison of road vs rail investment options on the Gauteng-Durban Corridor

A comparison of road vs rail investment options on the Gauteng-Durban Corridor SOUTH AFRICAN ROAD FEDERATION KwaZulu-Natal Region THE ROAD TO THE NATIONAL DEVELOPMENT PLAN IN KZN Friday, 17 October 2014, The Durban Country Club A comparison of road vs rail investment options on the

More information

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT 1 ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA DEA REF. NO. 12/12/20/2273 AUGUST 2011 EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT Eskom Holdings

More information

KEYSTONE PARK LOGISTICS, WAREHOUSING & LIGHT INDUSTRIAL PRECINCT

KEYSTONE PARK LOGISTICS, WAREHOUSING & LIGHT INDUSTRIAL PRECINCT KEYSTONE PARK LOGISTICS, WAREHOUSING & LIGHT INDUSTRIAL PRECINCT At the N3 Keystone Park / Hammarsdale Interchange, on the primary Western Corridor, Kwazulu Natal Table of Contents 2 ABOUT KEYSTONE PARK

More information

THOMAS O BRIEN PERSONAL INFORMATION DIRECTOR: GEOTECH

THOMAS O BRIEN PERSONAL INFORMATION DIRECTOR: GEOTECH THOMAS O BRIEN ARQ has recently appointed Thomas as Director of Geotech (Pty) Ltd, and together with David Cameron- Ellis, they are setting the standards high for delivering outstanding services to their

More information

Purpose of this Document

Purpose of this Document Purpose of this Document The International Power Consortium South Africa (Pty) Ltd ( IPCSA ) with Saldanha Steel (ArcelorMittal South Africa AMSA ) being the primary user proposes to develop a 1400 MW

More information

The PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development;

The PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development; 7 PUBLIC PARTICIPATION PROCESS 7.1 INTRODUCTION Consultation with Interested and Affected Parties (I&APs) forms an integral component of an ESIA process. It enables inter alia directly affected and neighbouring

More information

PUBLIC PARTICIPATION REPORT PPP SUMMARY

PUBLIC PARTICIPATION REPORT PPP SUMMARY PUBLIC PARTICIPATION REPORT PPP SUMMARY PUBLIC PARTICIPATION SUMMARY This serves as a summary of the Public Participation Process (PPP) followed for the Proposed egoli Water Supply Project, Ugu District

More information

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE

BACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce

More information

Proposed establishment of a quarry in the Ngquza Hill Local Municipality, Eastern Cape

Proposed establishment of a quarry in the Ngquza Hill Local Municipality, Eastern Cape Final and Environmental Management Programme Report SLR Project No.: 723.19083.00003 Report No.: 5 South African National Roads Agency SOC Ltd Final and Environmental Management Programme Report SLR Project

More information

13 July

13 July 13 July 2018 1792943 GRINDROD TERMINALS (PTY) LIMITED: APPLICATION FOR WATER USE LICENCE AT THE NAVITRADE SITE, UMHLATHUZE LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE Notice issued in terms of sections

More information

Environmental Management Programme: Langhoogte Wind Farm, Western Cape

Environmental Management Programme: Langhoogte Wind Farm, Western Cape SAGIT Energy Ventures Environmental Management Programme: Langhoogte Wind Farm, Western Cape Version 1 February 2013 J30284A Head Office 14 Eglin Road, Sunninghill 2191 Johannesburg, South Africa Tel:

More information

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN Zitholele Consulting Reg. No. 2000/000392/07 PO Box 6002 Halfway House 1685 South Africa Thandanani Park, Matuka Close Halfway Gardens, Midrand Tel + (27) 011 207 2079 Fax + (27) 011 805-2100 E-mail :

More information

Environmental Impact Assessment for the Proposed Upgrade of the Sani Pass Road (P318): Phase 2

Environmental Impact Assessment for the Proposed Upgrade of the Sani Pass Road (P318): Phase 2 Environmental Impact Assessment for the Proposed Upgrade of the Sani Pass Road (P318): Phase 2 Draft Scoping Report Project No.: J27344 DEAT Ref. No.: 12/12/20/1184 December 2008 PURPOSE OF THIS REPORT

More information

David Hoare Consulting cc Biodiversity Assessments, Vegetation Description and Mapping & Species Surveys

David Hoare Consulting cc Biodiversity Assessments, Vegetation Description and Mapping & Species Surveys PROPOSED N2 WILD COAST TOLL HIGHWAY: ADDENDUM TO SPECIALIST SCREENING STUDY ON POTENTIAL IMPACTS OF ALTERNATIVE ALIGNMENTS ON FLORA AND VEGETATION: ADDITIONAL PROPOSED ALIGNMENTS Prepared for CCA Environmental

More information

UMGENI RIVER CANALISATION: ENVIRONMENTAL MANAGEMENT PROGRAMME Revision 0.1

UMGENI RIVER CANALISATION: ENVIRONMENTAL MANAGEMENT PROGRAMME Revision 0.1 ethekwini Municipality: Coastal, Stormwater and Catchment Department UMGENI RIVER CANALISATION: ENVIRONMENTAL MANAGEMENT PROGRAMME Revision 0.1 DAEA EIA Reference: DM/0068/2012 April 2013 J25130/D Head

More information

Introduction. The Proposed Project

Introduction. The Proposed Project RAISING OF CLANWILLIAM DAM AND ASSOCIATED REALIGNMENT OF AFFECTED ROADS IN THE CLANWILLIAM AREA DRAFT ENVIRONMENTAL IMPACT REPORT: EXECUTIVE SUMMARY ~ APRIL 2007 Introduction The Clanwilliam Dam, located

More information

Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility

Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility BACKGROUND INFORMATION DOCUMENT (BID) Prepared for: Prepared by: Project Ref No: N.N. Metals (Pty) Ltd Bokamoso Landscape

More information

BOLAND ENVIRONMENTAL CONSULTANTS CC

BOLAND ENVIRONMENTAL CONSULTANTS CC BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND

More information

6. CONCLUSIONS AND RECOMMENDATIONS

6. CONCLUSIONS AND RECOMMENDATIONS Environmental Impact Assessment Report: Proposed third 400 kv Transmission line between Poseidon and Grassridge, Eastern Cape and Extension to Grassridge 6. CONCLUSIONS AND RECOMMENDATIONS This Environmental

More information

Kendal /Kusile to Zeus Environmental Monitoring Report

Kendal /Kusile to Zeus Environmental Monitoring Report MONTHLY ENVIRONMENTAL MONITORING REPORT Power Lines from Kendal/Kusile to Zeus Substation Bravo Integration Project Bravo 4: Construction of two 400 kv lines DEA Ref # 12/12/20/1095 Report Prepared for:

More information

NOTICE OF INTENT. 2. This notification should be submitted not less than 14 days prior to initiating the basic assessment process.

NOTICE OF INTENT. 2. This notification should be submitted not less than 14 days prior to initiating the basic assessment process. Notice of intent to submit an application in terms of regulation 22 (b) of Government Notice No. R 385 in terms of Chapter 5 of the National Environmental Management Act, 1998 (Act 107 of 1998). July 2006

More information

LINE LINKING TSITSIKAMMA COMMUNITY WIND ENERGY FACILITY TO THE EXTENSION OF THE DIEP RIVER SUBSTATION, EASTERN CAPE PROVINCE

LINE LINKING TSITSIKAMMA COMMUNITY WIND ENERGY FACILITY TO THE EXTENSION OF THE DIEP RIVER SUBSTATION, EASTERN CAPE PROVINCE PROPOSED WITTEKLEIBOSCH SWITCHING STATION AND 132kV POWER LINE LINKING TSITSIKAMMA COMMUNITY WIND ENERGY FACILITY TO THE EXTENSION OF THE DIEP RIVER SUBSTATION, EASTERN CAPE PROVINCE ENVIRONMENTAL MANAGEMENT

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN EMPr APPENDIX F SOUTH AFRICAN NATIONAL ROADS AGENCY SOC LIMITED (SANRAL) TRAFFIC MANAGEMENT PLAN FOR THE STRATEGIC INFRASTRUCTURE PROJECT (SIP2) PROPOSED CAPACITY UPGRADES TO THE N2 AND N3 FROM DURBAN

More information

BACK GROUND INFORMATION DOCUMENT

BACK GROUND INFORMATION DOCUMENT PROJECT: Basic Environmental Assessment for the Replacement of a Causeway Crossing of the Klaserie River, Klaserie Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: P.O. Box 507 White River 1240

More information

Background Information Document

Background Information Document Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Richards Bay: ERM Ref Number: 0320839 Purpose of this Background

More information

ISSUES WITH TRAFFIC IMPACT ASSESSMENTS

ISSUES WITH TRAFFIC IMPACT ASSESSMENTS ISSUES WITH TRAFFIC IMPACT ASSESSMENTS van Rensburg, J.F. 1 and van As, S.C. 2 1 City of Tshwane Metropolitan Municipality. 2 Traffic Engineer. ABSTRACT As part of the process of managing transportation

More information

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED EXTENSION OF ASH DAM FACILITY, KRIEL POWER STATION, MPUMALANGA DECEMBER 2010

ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED EXTENSION OF ASH DAM FACILITY, KRIEL POWER STATION, MPUMALANGA DECEMBER 2010 1 ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED EXTENSION OF ASH DAM FACILITY, KRIEL POWER STATION, MPUMALANGA DECEMBER 2010 SUMMARY DOCUMENT: DRAFT SCOPING REPORT Eskom proposes to expand the existing ash

More information

BASIC ASSESSMENT PROCESS

BASIC ASSESSMENT PROCESS BASIC ASSESSMENT PROCESS BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A CHICKEN LAYER FACILITY FOR NEW AGE CHICKEN SUPPLY PRIMARY CO-OPERATIVE ON HOLDING 75 ENDICOTT NEAR SPRINGS IN GAUTENG. DRAFT

More information

3 APPROACH TO EIA PROCESS AND PUBLIC PARTICIPATION

3 APPROACH TO EIA PROCESS AND PUBLIC PARTICIPATION SLR Environmental Consulting (Namibia) (Pty) Ltd Page 3-1 3 APPROACH TO EIA PROCESS AND PUBLIC PARTICIPATION This chapter provides presents the EIA assumptions and limitations and outlines the EIA process,

More information

EXECUTIVE SUMMARY 1. INTRODUCTION

EXECUTIVE SUMMARY 1. INTRODUCTION I 1. INTRODUCTION EXECUTIVE SUMMARY Mulilo Renewable Energy (Pty) Ltd (later referred to as Mulilo) has identified two alternative sites for the establishment of a 10MW photovoltaic (PV) power generation

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL AUTHORISATIONS FOR THE PROPOSED KLIPSPRUIT EXTENSION: WELTEVREDEN PROJECT Project Number Prepared for BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA)

More information

COMMENT AND RESPONSE REPORT (CRR) VERSION 2

COMMENT AND RESPONSE REPORT (CRR) VERSION 2 APPLICATION FOR ENVIRONMENTAL AUTHORISATION, AN AMENDMENT OF AN ENVIRONMENTAL MANAGEMENT PROGRAMME AND AN INTEGRATED WATER USE LICENCE APPLICATION ON BEHALF OF BHP BILLITON ENERGY COAL SOUTH AFRICA (PTY)

More information

Appendix A: Details of EAP

Appendix A: Details of EAP Appendix A: Details of EAP Appendix A1: EAP Qualifications Appendix A2: EAP Curriculum Vitae Curriculum Vitae Gerlinde Wilreker Principal Consultant Professional Registration South African Council

More information

Mangaung Gariep Water Augmentation Project (MGWAP)

Mangaung Gariep Water Augmentation Project (MGWAP) Mangaung Gariep Water Augmentation Project (MGWAP) Mangaung Gariep Water Augmentation Project (MGWAP) 1 Introduction It is estimated that the Mangaung Metropolitan Municipality (MMM) has a population of

More information

DRAFT BASIC ASSESSMENT REPORT FOR PUBLIC REVIEW 15 MARCH APRIL 2018 VOLUME 1: (MAIN REPORT & APPENDIX A to D)

DRAFT BASIC ASSESSMENT REPORT FOR PUBLIC REVIEW 15 MARCH APRIL 2018 VOLUME 1: (MAIN REPORT & APPENDIX A to D) ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE LULAMISA-DIEPSLOOT EAST-BLUE HILLS-CROWTHORNE 88 kv POWER LINE AND ASSOCIATED SUBSTATIONS NEAR MIDRAND IN GAUTENG PROVINCE DRAFT BASIC

More information

National Environmental Management Act, 1998: Draft National Biodiversity Offset Policy

National Environmental Management Act, 1998: Draft National Biodiversity Offset Policy National Environmental Management Act, 1998: Draft National Biodiversity Offset Policy A summary of the Draft National Biodiversity Offset Policy, and critical comments on some of the content, follow below.

More information

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION HIGH SPEED TWO INFORMATION PAPER E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION This paper outlines the framework for the control and management of traffic associated with the construction of the Proposed

More information

DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. TRANSPORT STUDY AND TRAFFIC MANAGEMENT PLAN

DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. TRANSPORT STUDY AND TRAFFIC MANAGEMENT PLAN DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. TRANSPORT STUDY AND TRAFFIC MANAGEMENT PLAN Reference: A43448 Prepared for: ATLANTIC RENEWABLE ENERGY PARTNERS (Pty) Ltd Revision: 1 4 November 2014 Document

More information

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015

BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015 Introduction EOH Coastal & Environmental Services has been appointed by K2014173145 (South Africa) (Pty) Ltd (Reg No. 2014/173145/07), to undertake the Public Participation Process and associated Basic

More information

Waste Management Activities. Collection Transportation Storage Re-use, recycling and recovery Treatment Disposal. Waste Management Operators

Waste Management Activities. Collection Transportation Storage Re-use, recycling and recovery Treatment Disposal. Waste Management Operators Waste management licenses, permits, authorisations and registration on the national South African Waste Information System (and provincial and municipal waste information systems where applicable) are

More information

BASIC ASSESSMENT REPORT. Appendix F: Environmental Management Plan (EMP)

BASIC ASSESSMENT REPORT. Appendix F: Environmental Management Plan (EMP) BASIC ASSESSMENT REPORT Appendix F: Environmental Management Plan (EMP) ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED UPGRADING OF THE N2 SECTION 26 FROM MOUNT EDGECOMBE INTERCHANGE TO TONGAAT TOLL PLAZA

More information