1 ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE ESCIENCE ASSOCIATES (PTY) LTD POSTAL ADDRESS: PO Box 2950 Saxonwold 2132 PHYSICAL ADDRESS: 9 Victoria Street Oaklands Johannesburg 2192 Background Information Document (BID) TEL: +27 (0) CELL: +27 (0) March 2011 FAX: info@escience.co.za

2 PURPOSE OF THIS DOCUMENT The purpose of this Background Information Document (BID) is to provide information to Interested and Affected Parties (IAPs) on the Environmental Impact Assessment process, as well as related applications for authorisation and licensing, which will be undertaken for the proposed Pan Palladium South Africa (Pty) Ltd Volspruit Mine in the Mokopane District of the Limpopo Province. The BID is the first communication regarding the Environmental Impact Assessment (EIA) process, and serves as an invitation to register as an IAP and participate as a stakeholder throughout the EIA processes. This would include the opportunity to attend possible briefing meetings, review all reports generated, and submit comments during the process. The BID presents the first opportunity to provide comment, and your participation will assist in identifying any environmental and socio-economic issues that should be evaluated during these processes. EScience Associates (Pty) Ltd. (ESA), as independent Environmental Assessment Practitioners (EAP), was appointed by Sylvania Resources Limited and its subsidiary company Pan Palladium South Africa (Pty) Ltd to conduct the scientific investigations of the EIA, and to facilitate the associated legal and administrative application processes. For further information and/or to register as an IAP by submission of the attached Registration Form together with any initial comments, please contact: Mr Brian Gardner at EScience Associates: Tel: (011) / Fax: brian@escience.co.za INTRODUCTION & BACKGROUND Sylvania Resources Limited as well as its subsidiary company Pan Palladium South Africa (Pty) Ltd and the proposed Volspruit Mining Company (Pty) Ltd proposes the mining of two (2) open cast pits on the farm Volspruit 326 KR and the farm Zoetveld 294 KR near Mokopane in the Limpopo Province. It is proposed that various Platinum Group Metals (PGM s) will be mined on the site, and processed both onsite and offsite. The site is currently a greenfields site under intense agriculture. The development is expected to include access roads, administration buildings, various workshops, storage/ lay-down yards, salvage yards, sewage treatment plants, tailings storage facilities, waste rock dumps, return water dams, conveyors, product stockpiles and general waste disposal sites. An Environmental Impact Assessment (EIA) process is required for facilitating Pan Palladium and the proposed Volspruit Mining Company (Pty) Ltd to obtain an environmental authorization for the development of Volspruit Mine. The services of an Environmental Assessment Practitioner (EAP) as well as related Specialists in various fields are required in order to facilitate the EIA process and the compilation of the Environmental Management Programme Report (EMPR). EScience Associates (Pty) Ltd Page 2

3 Associated with the requirements stated above, and included in the scope of work for the entire EIA phase of the project is: An application for a Water Use Licence (WUL) in terms of the National Water Act (NWA) (Act 36 of 1998), including the compilation of an Integrated Water and Waste Management Plan (IWWMP) AN application for a Waste Management licence (WML) in terms of the National Environmental Management: Waste Act (NEMWA) (Act 59 of 2008) The compilation of an Environmental Management Program Report (EMPR) in terms of Mineral and Petroleum Resources Development Act (Act 28 of 2002) and in support of the Mining Right Application will be undertaken. An application for Scoping and EIA in terms of R543 of 18 June 2010 has already been made to the Limpopo Department of Economic Development, Environment and Tourism (LEDET), whilst the mining right application will be submitted to the DMR on completion of the draft Scoping report to the Limpopo Department of Mineral Resources (DMR). LOCALITY The study area for the EIA is located in the Limpopo Province of South Africa, some 18 km s south of the town of Mokopane. The farms making up the proposed mine area are currently used for agriculture, livestock grazing and game farming. Areas of the Farms are under intensive irrigation as there are a variety of commercial crops grown on the property. The farm has river frontage on the Nyl River, which lies to west of the property. The study properties are the farm Volspruit 326 KR and Zoetveld 294 KR. Figure 1 demonstrates the regional location of the proposed mine; Figure 2 depicts the property boundary of the subject farms in red, as well as the position of the ore bodies that are proposed for mining (yellow North, and green South ore bodies) and the 1:100 year floodline indicated as the blue line. The site is located in the Waterberg District Municipality, and falls within the Mogalakwena Local Municipality. The town of Mokopane (previously known as Potgietersrus) is approximately 20km to the North of the site, and the capital city of the Limpopo Province, Polokwane (formally Pietersburg) is approximately 60km s north of Mokopane. EScience Associates (Pty) Ltd Page 3

4 Figure 1: Regional locality map for Volspruit Mine Figure 2: Property boundary as well as the ore bodies that are proposed for mining (Yellow and green areas) as well as the 1:100 year floodline in blue EScience Associates (Pty) Ltd Page 4

5 PROJECT DESCRIPTION The project requires a Scoping and EIA process as set out in Regulations gazetted in Government Notice No. R543, promulgated under 24(5), 24M and 44 of the National Environmental Management Act, 1998 (NEMA) (Act No. 107 of 1998), known as the NEMA 2010 EIA regulations and in terms of the Mineral and Petroleum Resources Development Act (MPRDA), (Act 28 of 2002). Furthermore, the project will entail the following main aspects: Facilitate a site selection process, with the aid of the EIA, for tailing dams, process plants and other above ground infrastructure (including administration buildings, internal roads, storage/ lay-down yards, salvage yards, sewage treatment plants, tailings storage facilities, waste rock dumps, return water dams, conveyors, product stockpiles and general waste disposal sites). Undertake an EIA process for the proposed mine, including all pits and surface infrastructure, in line with the relevant legislation listed above, and any other legislation that is deemed to be necessary. Compile an Environmental Management Programme Report (EMPR) for the mining licence process in term of Section 39 of the MPRDA and Section 51 of Regulation 527 of Compile an Integrated Water and Waste Management Plan (IWWMP) for the Mine which will inform the submission of an Integrated Water Use licence application in term of Section 21 of the National Water Act (NWA) (Act. 36 of 1998) to the Department of Water Affairs. Application will be made for a Waste Management Licence (WML), which will be applied for under the National Environment Management: Waste Act (NEMWA) (Act 59 of 2008). A WML will be required to undertake a number of listed activities as defined in GN R 718 of 3 July 2009 for the storage, including temporary storage, of general and/or hazardous waste. Develop a Closure Cost plan which includes the total plan for rehabilitation leading to the issue of a closure certificate at the end of the life of mine which is estimated to be in 15 to 20 years. Strict adherence to the EIA process requirements as confirmed by the Competent Authorities (LEDET and DMR as lead authorities) as well as requirements of other adjudicating authorities for the above applications is stipulated as is a Minimum Requirement for this mining project. LEGAL & REGULATORY FRAMEWORK The National Environmental Management Act (NEMA), 1998, is South Africa s overarching environmental legislation, and contains a comprehensive legal framework to give effect to the environmental rights contained in section 24 of The Constitution. The proposed project would trigger several listed activities, which may not commence prior to obtaining an Environmental Authorisation in terms of Section 24 of NEMA, or a Waste Management Licence in terms of Section 20(b) of the National Environmental Management: Waste Act (NEMWA), or a Water Use Licence in term of Section 21 of the NWA. A full inventory of the listed activities can be requested from the EAP. Due to the nature and/or scale of some of these activities, both NEMA and NEMWA require that the potential environmental impacts must be considered, investigated, assessed and reported on to the competent authorities through a detailed Scoping and Environmental Impact Assessment (EIA) process, described in the NEMA 2010 EIA Amendment Regulations of 18 June EScience Associates (Pty) Ltd Page 5

6 The MPRDA also requires a Scoping and EIA process to be undertaken that will inform the compilation of an Environmental Management Programme Report (EMPR). The objectives and reporting format for the required MPRDA scoping process are mirrored by those required for the environmental authorisation and waste licensing procedures. As such, a single Scoping and EIA process and reports would be compiled that conforms to the regulatory requirements of NEMA, NEMWA and the MPRDA in relation to the identification of potential environmental impacts resultant from the proposed Volspruit Mine. In terms of the Integrated Water Use Licence Application (WULA) for the proposed mine, the National Water Act (NWA), 1998, aims to manage national water resources in order to achieve sustainable use of water for the benefit of all water users. This requires that the quality of water resources is protected, and integrated management of water resources takes place. As indicated, a water use licence will be applied for in terms of Section 21 of the NWA, which will be supported by a detailed IWWMP, for submission to the DWA Limpopo Province Regional Office. A preliminary list of Section 21 water uses which will be applied for include (but is not limited to) the following: (a) taking water from a water resource; (b) storing water; (c) impeding or diverting the flow of water in a watercourse; (d) engaging in a stream flow reduction activity contemplated in section 36; (e) engaging in a controlled activity identified as such in section 37(1) or declared under section 38(1); (f) discharging waste or water containing waste into a water resource through a pipe, canal, sewer, sea outfall or other conduit; (g) disposing of waste in a manner which may detrimentally impact on a water resource; (i) altering the bed, banks, course or characteristics of a watercourse; (j) removing, discharging or disposing of water found underground if it is necessary for the efficient continuation of an activity or for the safety of people; WHAT IS AN EIA? An Environmental Impact Assessment is a methodical and systematic process to identify potential positive and negative impacts on the bio-physical, socio-economic and cultural environment that may result from a proposed activity. The EIA aims to ensure effective compliance and governance concerning the sustainable use of environmental resources, while simultaneously focusing on key issues such as stakeholder empowerment, and providing access to relevant and concise information to enable informed decision-making. The EIA process is also used to examine alternatives and management measures to minimise negative and optimise positive impacts. The ultimate objectives of the EIA process are to prevent significant detrimental impact on the environment and to ensure sustainable development. The EIA has to consider the different perspectives and requirements of all role players, who derive different benefits from participating in the EIA process. These include the following: Decision-making Authorities:- Enables informed decision making; EScience Associates (Pty) Ltd Page 6

7 Ensuring protection of environmental quality; Supporting the management, monitoring and sustainable utilisation of resources; Understanding demands on bulk services, waste disposal sites, etc. Project proponents / Developers of identified activities:- Proactively considering environmentally sustainable design principles; Investigating natural resource opportunities and constraints; Identifying the risks and opportunities associated with environmental aspects; Evaluating the potential for pollution and the prevention thereof; Optimising energy, water and other resource use. Interested and affected parties:- Providing an opportunity to be informed and give comment / express concerns; Protecting environmental rights; Utilising local and indigenous knowledge; Increasing knowledge and environmental awareness; Informing the decision-making process. EScience Associates (Pty) Ltd Page 7

8 Figure 3: The scoping and EIA process flow in term of Regulation 543 of 18 June EScience Associates (Pty) Ltd Page 8

9 PUBLIC PARTICIPATION PROCESS The public participation process during the entire process will consist of the following main activities: NOTIFICATION of IAPs regarding the commencement of the process, consultation activities and availability of reports and decisions by the authorities, using a variety of mechanisms. KEY STAKEHOLDER MEETINGS with relevant stakeholder groups (groups of role players with similar interest, such as the tourism and agricultural sector, local government, etc.). PUBLIC MEETINGS that will be advertised. These will provide IAPs with information and opportunities to record concerns, issues and suggestions, as well as to identify other IAPs. COMMENT PERIODS (30 calendar days) will be communicated to all IAP s for the review of all reports. This is in order to provide registered IAPs with the opportunity to review and comment on the information and reports compiled through the process. Everyone has the right to be involved in decisions that may affect them. Participation in the process as an IAP is in everyone s best interest because: It provides opportunities for IAPs and the authorities to obtain clear, accurate and understandable information about the expected environmental and socio-economic impacts of the proposed development/s. It provides members of the public with the opportunity to voice their concerns and to raise questions regarding the project. It provides IAPs with the opportunity to suggest ways for reducing or mitigating any negative impacts of the project, and for enhancing its benefits. It will enable the project proponent to consider the needs, preferences and values of IAPs in their decisions. It provides opportunities for the clearing up of misunderstandings about technical issues, resolving disputes and reconciling conflicting interests. It is vital for ensuring transparency and accountability in decision-making. It contributes toward maintaining a healthy, vibrant democracy. You are important to the process and we urge you to participate by registering as an Interested or Affected Party (Registration Form attached). The sharing of information forms the basis of any stakeholder engagement process and offers IAPs the opportunity to become actively involved in the project from the outset. It also plays an important role in the understanding of environmental investigations, as input from IAPs helps to ensure that all potential issues are considered in the EIA, WULA, WML and EMPR process. EScience Associates (Pty) Ltd Page 9

10 IAP REGISTRATION FORM (REF: SRVM) Please complete and return to EScience Associates, either on or before 10 th May 2011, by means of the following (or alternatively phone Brian Gardner at (011) / ): brian@escience.co.za; or Fax: ; Post: PO Box 2950, Saxonwold, 2132 PERSONAL DETAILS: Title: Initials: Surname: Company / Organisation (if applicable): Position/Nature of involvement (e.g. property owner): Street address: Postal address: Tel (incl. area code): Fax number: Cell: I want to receive correspondence/updates regarding the project: YES / NO Preferred method of communication: Post / Phone / Fax / COMMENTS/QUESTIONS: 1. Do you have any specific interest in the proposed project? 2. What issues, comments and concerns would you like to raise with regard to the proposed EIA and public participation process? 3. What potential impacts do you foresee associated with the proposed project? 4. Are there any other role-players/stakeholders that you feel we should consult with? (please state name & contact details)? EScience Associates (Pty) Ltd Page 10

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION

More information

A. OWENS 1 and J. BURKE 2

A. OWENS 1 and J. BURKE 2 A CONSOLIDATED APPROACH TO IMPLEMENTING BEST PRACTICE GUIDELINES, WATER USE LICENCE CONDITIONS AND INTEGRATED WATER AND WASTE MANAGEMENT PLANS IN THE MINING ENVIRONMENT OPPORTUNITIES AND CHALLENGES ABSTRACT

More information

GP 30/5/1/3/2/10242 MP

GP 30/5/1/3/2/10242 MP ! Before Dawn Property Developers (Pty) Ltd GP 30/5/1/3/2/10242 MP Background Information Document For the proposed mining permit On the farm Malony s Eye 169 IQ. Report Ref: 2017/BDPD0001 Prepared by:

More information

De Beers Consolidated Mines Ltd. Final Scoping Report Waste Management of All Waste Streams for Venetia Mine, Limpopo Province.

De Beers Consolidated Mines Ltd. Final Scoping Report Waste Management of All Waste Streams for Venetia Mine, Limpopo Province. De Beers Consolidated Mines Ltd Final Scoping Report Waste Management of All Waste Streams for Venetia Mine, Limpopo Province 18 November 2014 www.erm.com Final Scoping Report Waste Management of All Waste

More information

RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS

RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS 6 October 2016 Dear Stakeholder, RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS As indicated in our previous notification dated 12 February 2016, Consol Glass (Pty) Limited ( Consol

More information

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017

Annesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017 Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project

More information

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD

NOVEMBER 2016 REVISION 0. Prepared by: JG AFRIKA (PTY) LTD DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT & ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT: PROPOSED ESTABLISHMENT OF A STAGED MOBILE CRUSHING PLANT WITHIN THE CURRENT FOOTPRINT OF THE AMASUNDU GRAVEL CC

More information

EWA ENVIRONMENTAL AFFAIRS

EWA ENVIRONMENTAL AFFAIRS 326 National Environmental Management Act (107/1998): Amendments to the Environmental Impact Assessment Regulations, 2014 40772 STAATSKOERANT, 7 APRIL 2017 No. 40772 211 DEPARTMENT OF ENVIRONMENTAL AFFAIRS

More information

Environmental Impact Report for the proposed establishment of a New Coal-Fired Power Station in the Lephalale Area, Limpopo Province

Environmental Impact Report for the proposed establishment of a New Coal-Fired Power Station in the Lephalale Area, Limpopo Province 3. SCOPE OF ENVIRONMENTAL INVESTIGATIONS 3.1. Approach to Undertaking the Study An Environmental Scoping Study for the proposed establishment of a new coalfired Power Station, in Lephalale, was undertaken

More information

Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study

Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study Rehabilitation of an Abandoned Open Cast Mined Area: From an Open Cast Pit to a Waste Disposal Facility - A Case Study A Venter. Golder Associates Africa (Pty) Ltd, Rustenburg, South Afirca. anventer@golder.co.za

More information

DUDFIELD CEMENT FACTORY - ALTERNATIVE FUEL RESOURCE

DUDFIELD CEMENT FACTORY - ALTERNATIVE FUEL RESOURCE DEA REFERENCE NUMBER: 12/9/11/L44260/7 DUDFIELD CEMENT FACTORY - ALTERNATIVE FUEL RESOURCE ADDENDUM TO THE SCOPING AND ENVIRONMENTAL IMPACT REPORTS SEPTEMBER 2015 DUDFIELD CEMENT FACTORY - ALTERNATIVE

More information

Background Information Document

Background Information Document Environmental Impact Assessment (EIA) of the Proposed Development of Phosphate Deposits off the Coast of Namibia Background Information Document Note 1. This BID addresses the proposed activities within

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

EXTERNAL AUDIT REPORT IN FULFILMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE REHABILITATION OF THE VAAL WASTE DUMP SITE ARCELORMITTAL SOUTH AFRICA

EXTERNAL AUDIT REPORT IN FULFILMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE REHABILITATION OF THE VAAL WASTE DUMP SITE ARCELORMITTAL SOUTH AFRICA EXTERNAL AUDIT REPORT IN FULFILMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE REHABILITATION OF THE VAAL WASTE DUMP SITE AT ARCELORMITTAL SOUTH AFRICA VEREENIGING WORKS Report Nr: 296-ZANAMVE-2015 Audit

More information

DEPARTMENT OF WATER AFFAIRS. Submitted to: Department of Water and Sanitation Chamber of Mines of South Africa

DEPARTMENT OF WATER AFFAIRS. Submitted to: Department of Water and Sanitation Chamber of Mines of South Africa REPORT July 2014 DEPARTMENT OF WATER AFFAIRS Water Conservation / Water Demand Management Implementation Guideline for the Mining Sector Submitted to: Department of Water and Sanitation Chamber of Mines

More information

Third document for comment October 2011 Scoping Phase

Third document for comment October 2011 Scoping Phase Third document for comment October 2011 Scoping Phase ENVIRONMENTAL IMPACT ASSESSMENT FOR A WASTE MANAGEMENT LICENSE Proposed New General Waste Disposal Site within the Lesedi Local Municipality GDACE

More information

Second document for comment March 2011 Scoping Phase

Second document for comment March 2011 Scoping Phase Second document for comment March 2011 Scoping Phase ENVIRONMENTAL IMPACT ASSESSMENT Proposed New General Waste Disposal Site within the Lesedi Local Municipality GDACE REF NO: Gaut 002/10-11/E0194 Proponent:

More information

Mine closure, rehabilitation and retention of financial provision (s43)

Mine closure, rehabilitation and retention of financial provision (s43) Mine closure, rehabilitation and retention of financial provision (s43) A personal experience in Sierra Leone After large companies disappeared Open access small mining digging pits and washing ores Clearing

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED CONCENTRATING SOLAR POWER (CSP) PLANT AND ASSOCIATED INFRASTRUCTURE IN THE NORTHERN CAPE AREA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED CONCENTRATING SOLAR POWER (CSP) PLANT AND ASSOCIATED INFRASTRUCTURE IN THE NORTHERN CAPE AREA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED CONCENTRATING SOLAR POWER (CSP) PLANT AND ASSOCIATED INFRASTRUCTURE IN THE NORTHERN CAPE AREA BRIEFING PAPER March 2006 WHAT DOES THIS DOCUMENT TELL YOU?

More information

Environmental Management Programme: Langhoogte Wind Farm, Western Cape

Environmental Management Programme: Langhoogte Wind Farm, Western Cape SAGIT Energy Ventures Environmental Management Programme: Langhoogte Wind Farm, Western Cape Version 1 February 2013 J30284A Head Office 14 Eglin Road, Sunninghill 2191 Johannesburg, South Africa Tel:

More information

Basic Assessment Report (BAR) and Environmental Management Programme (EMPr)

Basic Assessment Report (BAR) and Environmental Management Programme (EMPr) Naudesbank Prospecting Project Vuna Mining Resources (Pty) Limited Basic Assessment Report (BAR) and Environmental Management Programme (EMPr) Compiled in terms of Appendix 1, Appendix 4 of the Environmental

More information

A User-Friendly Guide to the EIA Regulations

A User-Friendly Guide to the EIA Regulations A User-Friendly Guide to the EIA Regulations 2015 COMPANY CONTACT DETAILS: Chand Environmental Consultants Chand Environmental Consultants (Chand) is an all-female, affirmative business enterprise offering

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (Gazette No. 23922, Notice No. 1273 dated 10 October 2002. Commencement date: 1 May 2004 [Proc. No. R25, Gazette No. 26264])

More information

IAIAsa August 2014 Betty Mdala Department of Environmental Affairs

IAIAsa August 2014 Betty Mdala Department of Environmental Affairs D R A F T S TA N D A R D F O R T H E S T O R A G E O R S T O R A G E A N D H A N D L I N G O F D A N G E R O U S G O O D S A N D I D E N T I F I C AT I O N O F A C T I V I T I E S W H I C H M AY C O M

More information

Basic Assessment and Environmental Management Programme Helam Mining Page 1

Basic Assessment and Environmental Management Programme Helam Mining Page 1 BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT NAME OF APPLICANT: Helam Mining (Pty) Ltd TEL NO: +27 11 702 6922 FAX NO: + 27 11 706 3071 POSTAL ADDRESS: Post Office Box 71007, Bryanston,

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT And ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR PUBLIC REVIEW JULY 2016

ENVIRONMENTAL IMPACT ASSESSMENT REPORT And ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR PUBLIC REVIEW JULY 2016 ENVIRONMENTAL IMPACT ASSESSMENT REPORT And ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR PUBLIC REVIEW JULY 2016 DMR REFERENCE NUMBER MP 30/5/1/2/2 (74) EM SUBMITTED FOR ENVIRONMENTAL AUTHORIZATIONS IN

More information

i

i 1 i ii iii iv v GLOSSARY AND ABBREVIATION ABBREVIATIONS BPG Best Practice Guideline BCR Benefit/cost ratio CBA Cost Benefit Analysis CMA Catchment Management Agency CMS Catchment Management Strategy DWA

More information

C.1. Minutes of meeting with DWS

C.1. Minutes of meeting with DWS C.1. Minutes of meeting with DWS G038_REP-01_r2_TH_MvZ_Bokpoort GW abstract Jones & Wagener (Pty) Ltd Engineering & Environmental Consultants Jones & Wagener Engineering & Environmental Consultants 59

More information

ENVIRONMENTAL MANAGEMENT COMMITTEE VELE COLLIERY ANNUAL REPORT

ENVIRONMENTAL MANAGEMENT COMMITTEE VELE COLLIERY ANNUAL REPORT 2013 ENVIRONMENTAL MANAGEMENT COMMITTEE VELE COLLIERY ANNUAL REPORT TABLE OF CONTENTS 1. INTRODUCTION 2 2. MANDATE 2 3. VELE COLLIERY PROJECT DEFINITION 3 Environmental Authorisation. 3 Section 24G Applications...

More information

Bauxite Hills Project. Supplementary Report to the. Metro Mining. Section 3 Introduction. Environmental Impact Statement

Bauxite Hills Project. Supplementary Report to the. Metro Mining. Section 3 Introduction. Environmental Impact Statement Metro Mining Bauxite Hills Project Supplementary Report to the Environmental Impact Statement Section 3 Introduction 3 Introduction This section refers to submission comments relating to Chapter 1 Introduction

More information

CHINA AFRICAN PRECIOUS METALS ORKNEY GOLD MINE CLOSURE LIABILITY UPDATE

CHINA AFRICAN PRECIOUS METALS ORKNEY GOLD MINE CLOSURE LIABILITY UPDATE CHINA AFRICAN PRECIOUS METALS ORKNEY GOLD MINE CLOSURE LIABILITY UPDATE FEBRUARY 2015 MINE CLOSURE LIABILITY UPDATE CHINA AFRICAN PRECIOUS METALS ORKNEY GOLD MINE CLOSURE LIABILITY UPDATE FEBRUARY 2015

More information

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants The Effluent Permitting Process under the Environmental Management Act An Overview for Mine Project Applicants APRIL 2013 Disclaimer This document does not replace the Environmental Management Act or its

More information

Environmental Management Programme (EMP)

Environmental Management Programme (EMP) Appendix D Environmental Management Programme (EMP) Please note that although Construction and Operational Phase measures are included in this EMP they are relevant to the issued Waste Management Licence

More information

IMPROVING WATER MANAGEMENT IN THE MINING SECTOR

IMPROVING WATER MANAGEMENT IN THE MINING SECTOR IMPROVING WATER MANAGEMENT IN THE MINING SECTOR PRESENTED BY: MATTHEW DAMHUIS IMPULSE WATER (PTY) LTD Overview The Mining Life Cycle Types of Water Impacts from Mining Types of Water Impacts on Mining

More information

A S T A T E M E N T O F P R I N C I P L E S A N D P R O C E S S

A S T A T E M E N T O F P R I N C I P L E S A N D P R O C E S S LAND AND RESOURCE MANAGEMENT PLANNING A S T A T E M E N T O F P R I N C I P L E S A N D P R O C E S S EDITION NO. 1 PROVINCE OF BRITISH COLUMBIA NOTE: THIS DOCUMENT HAS BEEN PRODUCED FROM AN EARLIER VERSION

More information

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN Zitholele Consulting Reg. No. 2000/000392/07 PO Box 6002 Halfway House 1685 South Africa Thandanani Park, Matuka Close Halfway Gardens, Midrand Tel + (27) 011 207 2079 Fax + (27) 011 805-2100 E-mail :

More information

OVERVIEW OUR VISION OUR MISSION

OVERVIEW OUR VISION OUR MISSION COMPANY PROFILE OVERVIEW Mutole Services (Pty) LTD was founded in 2011 and is steadily growing to be a significant player in the Safety, Health, and Environment & Quality consulting industry in South Africa.

More information

Discharge of water containing waste emanating from land to the marine environment: A water quality management perspective

Discharge of water containing waste emanating from land to the marine environment: A water quality management perspective Discharge of water containing waste emanating from land to the marine environment: A water quality management perspective SHH Oelofse 1, P Viljoen 1, S Taljaard 2 and WAM Botes 3 1 Department of Water

More information

Groundwater Reserve, Ecological Reserve, National Water Act, water resource protection, water resource classification, RQOs

Groundwater Reserve, Ecological Reserve, National Water Act, water resource protection, water resource classification, RQOs Groundwater Reserve a critical review Umvoto Africa (Pty) Ltd, P.O. Box 61, Muizenberg 7950, South Africa Kornelius@umvoto.com, +27217096700 (work), +27865240001 (fax) Abstract The concept of the Groundwater

More information

Background Information Document and Invitation to Comment

Background Information Document and Invitation to Comment Background Information Document and Invitation to Comment Environmental Impact Assessment for the Proposed Drennan Photovoltaic (PV) Solar Power Plant, Cradock, Eastern Cape Province Scoping/EIA DEA Ref

More information

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL COMPLIANCE IN UGANDA-A REGULATORY PERSPECTIVE/ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PROCESS IN UGANDA PRESENTED AT A TRAINING WORKSHOP FOR USAID/UGANDA STAFF FROM 9 TH TO 12 TH SEPTEMBER,

More information

SECTION 1: INTRODUCTION 1.1 BACKGROUND TO THE PROJECT

SECTION 1: INTRODUCTION 1.1 BACKGROUND TO THE PROJECT SECTION 1: INTRODUCTION 1.1 BACKGROUND TO THE PROJECT Transnet is a State-owned Enterprise (SOE) under the National Department of Public Enterprises (Public Finance Management Act, Act No. 29 of 1999).

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME 1 Introduction and Background To meet its environmental and social obligations and commitments, the Lesotho Highlands Development

More information

THE LESOTHO ELECTRICITY AUTHORITY. Presentation by the LEA Chief Executive on the occasion of the Launch 04 May 2006

THE LESOTHO ELECTRICITY AUTHORITY. Presentation by the LEA Chief Executive on the occasion of the Launch 04 May 2006 THE LESOTHO ELECTRICITY AUTHORITY Presentation by the LEA Chief Executive on the occasion of the Launch 04 May 2006 1 Structure of the Presentation Issues concerning the Power Sector of Lesotho Power Sector

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction TABLE OF CONTENTS 1 INTRODUCTION... 1-1 1.1 General... 1-1 1.2 Background to the WREP... 1-1 1.3 Rationale for WREP-SR Project... 1-2 1.4 WREP Operator: GPC and BP Relationship...

More information

DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE FOR BELA BELA FARMYARD ESTATE (PTY) LTD ON THE FARM NOODHULP 492 KR

DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE FOR BELA BELA FARMYARD ESTATE (PTY) LTD ON THE FARM NOODHULP 492 KR ENVIRONMENTAL ASSURANCE (Pty) Ltd Draft EIA Report BELA BELA Report Number PROJ-115-LIM-RW-EIA 01 Revision Number 02 Page Number Page i of 113 DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED

More information

ENVIRONMENTAL LEGISLATION AND WATER MANAGEMENT ISSUES DURING MINE CLOSURE IN SOUTH AFRICA

ENVIRONMENTAL LEGISLATION AND WATER MANAGEMENT ISSUES DURING MINE CLOSURE IN SOUTH AFRICA MINE, WATER & ENVIRONMENT. 1999 IMWA Congress. Sevilla, Spain ENVIRONMENTAL LEGISLATION AND WATER MANAGEMENT ISSUES DURING MINE CLOSURE IN SOUTH AFRICA Julie L McCourt Chamber of Mines of South Africa

More information

ENVIRONMENTAL MANAGEMENT TRAINING A CIVIL BASED INSTRUMENT TO ENSURE ENVIRONMENTAL PROTECTION AND LEGAL COMPLIANCE: THE MOOIRIVIER MALL CASE STUDY

ENVIRONMENTAL MANAGEMENT TRAINING A CIVIL BASED INSTRUMENT TO ENSURE ENVIRONMENTAL PROTECTION AND LEGAL COMPLIANCE: THE MOOIRIVIER MALL CASE STUDY ENVIRONMENTAL MANAGEMENT TRAINING A CIVIL BASED INSTRUMENT TO ENSURE ENVIRONMENTAL PROTECTION AND LEGAL COMPLIANCE: THE MOOIRIVIER MALL CASE STUDY Wessels, J.A. and Mkhari, B Centre for Environmental Management,

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Mining Closure and Rehabilitation Plan

Mining Closure and Rehabilitation Plan Mining Closure and Rehabilitation Plan Sand Mining Permit Application Application to mine Silica sand over an approximate 2.67 ha section over ERF 9231 Golden Gate on the Mzumbe River (KwaZulu-Natal) SUBMITTED

More information

This report should be cited as: Disclaimer: Consultants: Pulles Howard & de Lange Inc. P O Box 861 AUCKLAND PARK Republic of South Africa

This report should be cited as: Disclaimer: Consultants: Pulles Howard & de Lange Inc. P O Box 861 AUCKLAND PARK Republic of South Africa PUBLISHED BY Department of Water Affairs and Forestry Private Bag X313 PRETORIA 0001 Republic of South Africa Tel: (012) 336-7500 This report should be cited as: Department: Water Affairs and Forestry,

More information

A1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871

A1 Australian and South Australian Government Guidelines 813. A2 South Australian Government Guidelines 871 Appendix A EIS Guidelines CONTENTS A1 Australian and South Australian Government Guidelines 813 A2 South Australian Government Guidelines 871 A3 Northern Territory Government Guidelines 929 Olympic Dam

More information

DIFFERENCES BETWEEN APPA- AQA AUTHORISATION REGIMES

DIFFERENCES BETWEEN APPA- AQA AUTHORISATION REGIMES DIFFERENCES BETWEEN APPA- AQA AUTHORISATION REGIMES Lekgotla Session 2.4, 12:15 12:30, Monday 29 September 2008 Presentation to the 3 rd Annual Air Quality Governance Lekgotla, Nelspruit, Emnotweni Arena,

More information

Pollution & Environmental Harm

Pollution & Environmental Harm Pollution & Environmental Harm Fact Sheet 27 Updated December 2010 An introduction to Pollution and Environmental Harm There are a large range of activities that can lead to pollution or cause environmental

More information

LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006

LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 AGENDA Opening and Welcome Introduction of Consultants Profile of Izwelisha Consortium Explanation of the EMF process Environmental

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

25 Year GMID Asset Strategy

25 Year GMID Asset Strategy 25 Year GMID Asset Strategy Working Group Terms of Reference and Appointment Process October 2017 Document Number: 4461292 Terms of reference 1. Purpose GMW is establishing a 25 Year GMID Asset Strategy

More information

Buffalo City Municipality. Proposed Potsdam Low-cost Housing Development: Environmental Impact Assessment (EIA)

Buffalo City Municipality. Proposed Potsdam Low-cost Housing Development: Environmental Impact Assessment (EIA) Buffalo City Municipality Proposed Potsdam Low-cost Housing Development: Environmental Impact Assessment (EIA) Final Environmental Impact Report J28058 April 2010 DEDEA Reference No: AR/7/F/2/5/08 PROPOSED

More information

Environmental Regulation & Mine Permitting in Ontario

Environmental Regulation & Mine Permitting in Ontario Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Trans Canada Highway, 8.5 KM west of Springdale Jct, NL. Department of Environment and Conservation File Ref No. 200.20.2475 Prepared for.

More information

DRAFT SCOPING REPORT

DRAFT SCOPING REPORT DRAFT SCOPING REPORT DIEPSLOOT MIXED USE TOWNSHIP THE REMAINING EXTENT OF PORTIONS 1 AND 6 OF THE FARM DIEPSLOOT 388 JR CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY Prepared for: NOVEMBER 2015 TABLE

More information

Risk Management Update ISO Overview and Implications for Managers

Risk Management Update ISO Overview and Implications for Managers Contents - ISO 31000 highlights 1 - Changes to key terms and definitions 2 - Aligning key components of the risk management framework 3 - The risk management process 4 - The principles of risk management

More information

Consultation Basic Assessment Report:

Consultation Basic Assessment Report: Consultation Basic Assessment Report: in support of the Emergency Nondabula Water Reticulation Project July 2015 I L E M B E D I S T R I C T M U N I C I P A L I T Y N E A S / K Z N E D T E A R E F E R

More information

Register of Contaminated Land Consent Conditions

Register of Contaminated Land Consent Conditions Regional Contaminated Land Capacity Building Program Register of Contaminated Land Consent Conditions AUGUST 2017 Regional Contaminated Land Capacity Building Program This publication was produced by the

More information

Loy Yang B Environment Improvement Plan

Loy Yang B Environment Improvement Plan Loy Yang B Environment Improvement Plan 2017 Table of Contents 1 Endorsement 1 2 Environment Policy 2 3 Operating Arrangements 3 4 Site Management and Business Systems 4 5 Environmental Impacts and Risks

More information

SLR Consulting (South Africa) (Pty) Ltd

SLR Consulting (South Africa) (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd Page i SCOPING REPORT FOR THE PROPOSED EXPLORATION RIGHT FOR PETROLEUM ON VARIOUS FARMS IN THE MAGISTERIAL DISTRICTS OF MATATIELE AND MT FLETCHER, EASTERN CAPE October

More information

Procurement Policy 4P/ Institutional Chief Director: Finance. Financial Administration. Approved by Council. Council

Procurement Policy 4P/ Institutional Chief Director: Finance. Financial Administration. Approved by Council. Council Procurement Policy Reference number Accountable executive manager Policy owner Responsible division Status Approved by 4P/4.2.1 Executive Director: Finance and Facilitities Institutional Chief Director:

More information

APPENDIX 5 ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY

APPENDIX 5 ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY APPENDIX 5 ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY ENVIRONMENTAL IMPACT ASSESSMENT METHODOLOGY In line with the Minerals and Petroleum Resource Development Act 20 of 2002 (MPRDA), an Impact Assessment

More information

Environmental Information Form

Environmental Information Form CITY OF MODESTO Community and Economic Development Department/Planning Division 1010 Tenth Street, Suite 3300, P.O. Box 642 Modesto, CA 95353 (209) 577-5267 (209) 491-5798 FAX This questionnaire will assist

More information

Stakeholder Concerns An International Perspective

Stakeholder Concerns An International Perspective Stakeholder Concerns An International Perspective Peter Booth Hylton Environmental Presentation Content A summary of the types of nuclear and radiological projects requiring stakeholder engagement. Barriers

More information

ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA GAUTENG

ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA GAUTENG ENVIRONMENTAL MANAGEMENT PROGRAMME COMPLIANCE ASSESSMENT REPORT FOR SOUTH32 LEANDRA PROSPECTING RIGHT, GAUTENG PROVINCE PROJECT: LEANDRA GAUTENG May 2017 PREPARED BY: NTC GROUP (PTY) LTD AMP BUILDING,

More information

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No. R August 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No. R August 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO. STAATSKOERANT, 23 AUGUSTUS 2013 No. 36784 3 GOVERNMENT NOTICE DEPARTMENT OF ENVIRONMENTAL AFFAIRS No. R. 634 23 August 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO. 59 OF 2008) WASTE

More information

ENVIRONMENTAL IMPACT ASSESSMENT EIA PHASE

ENVIRONMENTAL IMPACT ASSESSMENT EIA PHASE ENVIRONMENTAL IMPACT ASSESSMENT EIA PHASE PROPOSED ESTABLISHMENT OF THE PUMPED STORAGE SCHEME AND ASSOCIATED INFRASTRUCTURE IN THE STEELPOORT AREA, LIMPOPO AND MPUMALANGA PROVINCES FINAL MINUTES OF THE

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

UMGENI RIVER CANALISATION: ENVIRONMENTAL MANAGEMENT PROGRAMME Revision 0.1

UMGENI RIVER CANALISATION: ENVIRONMENTAL MANAGEMENT PROGRAMME Revision 0.1 ethekwini Municipality: Coastal, Stormwater and Catchment Department UMGENI RIVER CANALISATION: ENVIRONMENTAL MANAGEMENT PROGRAMME Revision 0.1 DAEA EIA Reference: DM/0068/2012 April 2013 J25130/D Head

More information

ENVIRONMENTAL SCREENING REPORT

ENVIRONMENTAL SCREENING REPORT ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling

More information

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015

Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental

More information

Nxuba Wind Farm NERSA PUBLIC HEARINGS. 10 September 2015

Nxuba Wind Farm NERSA PUBLIC HEARINGS. 10 September 2015 Nxuba Wind Farm NERSA PUBLIC HEARINGS 10 September 2015 1 Nxuba Wind Farm has been appointed as a Preferred Bidder in the Fourth Round of the Department of Energy s (DoE) Renewable Energy IPP Procurement

More information

Annex A. Legislative Framework

Annex A. Legislative Framework Annex A Legislative Framework CONTENTS A1 LEGISLATIVE FRAMEWORK 1 A1.1 INTRODUCTION 1 A1.2 GOVERNMENT DEPARTMENTS AND REGULATORS 1 A1.2.1 National 1 A1.2.2 Provincial 3 A1.2.3 Municipal 3 A1.3 LEGISLATIVE

More information

Disclaimer: Consultants:

Disclaimer: Consultants: Published by Department of Water Affairs and Forestry Private Bag X313 PRETORIA 0001 Republic of South Africa Tel: (012) 336-7500 This report should be cited as: Department of Water Affairs and Forestry,

More information

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories DRAFT Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories Preface... 5 Introduction... 7 Purpose... 7 Authority... 7 How These Guidelines

More information

WIND ENERGY FACILITY ON KANGNAS FARM NEAR SPRINGBOK IN THE NORTHERN CAPE FINAL LIFE-CYCLE ENVIRONMENTAL MANAGEMENT PROGRAMME DEA 14/12/16/3/3/2/346

WIND ENERGY FACILITY ON KANGNAS FARM NEAR SPRINGBOK IN THE NORTHERN CAPE FINAL LIFE-CYCLE ENVIRONMENTAL MANAGEMENT PROGRAMME DEA 14/12/16/3/3/2/346 Report Number: 10335/108495 WIND ENERGY FACILITY ON KANGNAS FARM NEAR SPRINGBOK IN THE NORTHERN CAPE FINAL LIFE-CYCLE ENVIRONMENTAL MANAGEMENT PROGRAMME DEA 14/12/16/3/3/2/346 NOVEMBER 2015 CONSULTANT

More information

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment Chapter 4 Section 4.05 Ministry of the Environment Groundwater Program Follow-up to VFM Section 3.05, 2004 Annual Report Chapter 4 Follow-up Section 4.05 Background Groundwater is defined as water located

More information

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group Environmental Management System Integrated Pollution Control Document No. 5.2.1 Version no. 1 Origination Date 1 st February 2017 Area: The Group Approval: Group Services & Facilities Last Revision Date

More information

Kurnell Refinery Conversion Project

Kurnell Refinery Conversion Project Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site

More information

CONCERNS REGARDING SHALE GAS MINING IN SOUTH AFRICA

CONCERNS REGARDING SHALE GAS MINING IN SOUTH AFRICA 18 August 2015 Mr. Ngoako Ramathlodi Minister of Mineral Resources Building 2 C C/O Meintjies & Francis Baard Streets Sunnyside Pretoria By hand; and Email: refilwe.motau@dmr.gov.za CONCERNS REGARDING

More information

Report for Agenda Item: 2

Report for Agenda Item: 2 QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage

More information

Environmental Management Programme

Environmental Management Programme Environmental Impact Assessment of the Used Fuel Transient Interim Storage Facility at Koeberg Nuclear Power Station Environmental Management Programme Report Prepared for Order Reference Number: 4600057255

More information

LAO PEOPLE'S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

LAO PEOPLE'S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY LAO PEOPLE'S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY President s Office No. 60/PO DECREE of the PRESIDENT of the LAO PEOPLE S DEMOCRATIC REPUBLIC on the Promulgation of the Law

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

7.1 Constitutional Requirement for Environmental Protection in Madagascar

7.1 Constitutional Requirement for Environmental Protection in Madagascar 7. MADAGASCAR 7.1 Constitutional Requirement for Environmental Protection in Madagascar The Constitution of the Republic of Madagascar was passed on 19th August 1992. In relation to the environment, Article

More information

Annex K. Environmental and Social Management Programme (EMPr)

Annex K. Environmental and Social Management Programme (EMPr) Annex K Environmental and Social Management Programme (EMPr) CONTENTS ABBREVIATIONS 1 DEFINITIONS AND TERMINOLOGY 1 1 BACKGROUND TO PROJECT 4 1.1 REGULATORY REQUIREMENT FOR THE EMPR 4 1.2 OBJECTIVES OF

More information

New Mexico WATER RIGHTS FACT SHEET. August 15, 2001

New Mexico WATER RIGHTS FACT SHEET. August 15, 2001 New Mexico WATER RIGHTS FACT SHEET August 15, 2001 Water Rights System: New Mexico s water law is based on the doctrine of prior appropriation or "first in time - first in right. All waters in New Mexico

More information

Basic Assessment for the Vopak Efficiency (Growth 4) Project, Durban, South Africa

Basic Assessment for the Vopak Efficiency (Growth 4) Project, Durban, South Africa Basic Assessment for the Vopak Efficiency (Growth 4) Project, Durban, South Africa Open House Public Meeting Insert then choose Picture select your picture. 30 June 2016 Right click your picture and Send

More information