IEC 2013 Securing tomorrow s energy today: Policy & Regulations Resource Allocation and Pricing

Size: px
Start display at page:

Download "IEC 2013 Securing tomorrow s energy today: Policy & Regulations Resource Allocation and Pricing"

Transcription

1 IEC 2013 Securing tomorrow s energy today: Policy & Regulations Resource Allocation and Pricing February

2 Pricing and Resource Allocation to Take Place Under Market Forces Under an Effective and Credible Regulatory Oversight, as Far as Possible - Integrated Energy Policy, Government of India 2

3 Contents Introduction 4 Policy and regulatory framework 8 Pricing of energy in india 14 Discussion points 17 Resource Allocation and Pricing 3

4 Introduction India is home to one-sixth of the world population however its per capita energy consumption of 585 kilograms of oil equivalent (kgoe) in 2009 is much below the global average of 1,839 kgoe. The stage however, is set for change; with continued economic growth and better living standards the per capita energy consumption in India is expected to be more than double by to around 1,124 kgoe, though this will still be lower than the 2009 world average of 1,839 kgoe. Increasing population, economic activity and rising income levels with further push the demand for energy in India. The Integrated Energy Policy has estimated that India s primary energy supply will need to increase by 4 to 5 times and its electricity generation capacity by 6 to 7 times over its levels to deliver a sustained growth rate of 9 percent through with primary energy supply growth of around 5.8 percent per year. On the other hand, commercial energy supply would need to grow faster at about 6.8 percent per annum as it will incrementally replace non-commercial energy over this period. The primary energy consumption in India is dominated by coal and hydrocarbons, with less than 10 percent of energy accounted by other sources like hydro, renewables and nuclear. In 2011, oil and gas accounted for around ~40 percent of India's total primary energy consumption, next only to coal, which accounts for ~53 percent (Figure 1). Figure 1: Primary Energy Mix of India (2011) 52.9% 1.3% 5.3% 1.6% 9.8% 29.0% Oil Nuclear Energy Natural Gas Hydro electricity Coal Renew- ables Source: BP Statistical Review 2012 In the last five years, India has averaged a growth rate of 8% and the demand for energy has been putting pressure on its supply sources. It is an established fact that if India continues to grow at 8% or so in the coming years a higher than average demand for energy will persist. In such a scenario, it is expected that there will be continued pressure on supply sources in the next decade largely driven by increasing urbanization and increasing demand for consumption. 4

5 Oil & Gas Demand Supply Scenario India has 0.5% of world s proven oil reserves; however it houses more than 15 percent of the world s population. The current reserve to production ration is ~18 years. In terms of Natural Gas, India has 1,241 billion cubic meters (bcm) of proven and indicated reserves, which is 0.6 percent of the world's total proven gas reserves. At the existing production levels of 50.9 bcm per year, the country has a Gas R/P ratio of ~ 26.9 years. India's existing domestic production of about 858,000 barrels of oil per day (bopd) is less than 25 percent of its current consumption of 3,473,000 bopd, creating a wide gap to be met through imports. As a result, the volume of crude oil imports has been increasing steadily in India reaching more than 75 percent of its total crude requirement in According to the draft approach paper on the 12th five year plan ( ), the gap between crude oil requirement and domestic production is expected to widen further over the next five years; this is observed as a result of India's projected increasing GDP growth rate.. As per forecast made by the Working group on energy sector for the 12th Plan, the country requires energy supply to grow at CAGR of 6.5 percent to maintain the growth rate of 9 percent over the next five years. It is projected that the oil and gas requirement by the terminal year of the 12th Plan would reach mtoe and mtoe respectively. This demand for oil and gas would be fulfilled by import of mtoe (or 80.5 percent) crude oil and 24.8 mtoe (28.4 percent) natural gas in Figure 2: Production and consumption of Crude Oil Oil Imports (Percentage) ,000 3,500 3,000 2,500 2,000 1,500 1, Oil Production Oil Consumption Oil Imports Percentage Source: BP Statistical Review 2012 Figure 3: Production and consumption of Natural Gas Import percentage (%) Gas Production Gas Import Gas Import (Percentage) Source: BP Statistical Review ,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Production & Cosnumption ('000 BPD) Production & Cosnumption (Mcm) Natural gas constitutes around 10 percent of India's total primary energy basket, which is well below the world average of 23.7 percent in As per estimates from Ministry of Petroleum and Natural Gas, by 2025, the share of natural gas in India s energy basket is likely to reach 20 percent. The increased consumption of natural gas is expected to be fed both by increased domestic production and import of natural gas Resource Allocation and Pricing 5

6 The natural gas consumption, in India was about 180 mmscmd in FY11 as against an estimated demand of approximately 279 mmscmd in 2011 (as per 11th Five Year Plan). Domestic supplies are not matching with the demand of oil and natural gas in India. Mature gas fields like that of ONGC (Panna Mukta Tapti and Bassein) and Niko in Surat have declining production and mature Bombay High oil fields are also past their peak production levels. In 2002, Reliance Industries Ltd made a large discovery in the Krishna Godavari Basin (KG Basin) with an estimated 337 bcm of gas reserves. Hence, there was a sudden jump in domestic supply in 2010 (45 percent increase over 2009). The field started production in started in The initial production estimates were 28, 53 and 62 mmscmd respectively for FY10, FY11 and FY12. RIL was able to meet the FY10 target by achieving a total production of 40 mmscmd, but after peaking at 61.5 mmscmd in March 2010, the production started declining alarmingly to the extent that the current production levels hover around less than 30 mmscmd. Geological complexity of the basin and high water and sand ingress are the indicated causes of the decline in output volumes. Power and Fertilizer sectors are two major consumers of gas in India. Other consumers include CGD, LPG, refineries, etc. Availability of domestic natural gas is an increasing concern for all the consuming sectors. There has been limited capacity addition in the past for fertilizer plants based on domestic natural gas. Similarly, there has been limited focus on developing natural gas based thermal projects which could have been better in terms of their capital cost, project construction time and also environmental concerns vis-à-vis the coal based projects. The price of imported re-gasified LNG is more than thrice as expensive and is thus considered prohibitive for development of plants which need to enter into PPA s on a competitive bidding basis Figure 4: Demand Supply Scenario of Natural Gas for Power Sector (mmscmd) % % 1.6% Supply Demand Source: CEA India is highly dependent on imports for both for crude oil as well as natural gas and with increasing demand and reducing domestic supplies, this dependence is expected to increase further. Currently, ~76% of the crude oil and ~21% of the natural gas is imported. Import dependence to increase to 80% by FY17 for crude oil and 35% by FY17 for Natural gas. 6

7 Demand Supply Scenario of Coal in India India has fifth largest coal reserves in the world and it is third largest producer after China and USA. Power, steel and cement are the major consuming sectors in India with power sector consuming ~70% of domestic coal produced in the country. Coal accounts for 69% of total power generated in the country. However, coal production has observed slow growth rate. There has been limited commissioning of captive coal blocks allotted to private and public sector companies having presence in end user industries. The Demand Supply scenario after taking Business as usual scenario for coal production augmentation is shown below: According to a press release by Ministry of Coal, India s coal demand increased at CAGR of 8.5% in the 11th plan. Compared to this, CIL s domestic production during this period increased at a CAGR 4.6% only. The cause for slow production is the time consuming procedure to obtain environmental and land permission from MOEF and state governments. CIL reported that 24 out of 44 of its currently delayed projects were due to land acquisition. The production shortage would continue to be a serious issue for the power sector. Recently, CIL agreed on the FSAs with power companies for those plants to be commissioned by March This would make CIL s total coal commitment amount to Mt, nearly 250 Mt increase from the standing FSAs. The uncertainty over whether CIL can deliver the committed volume is definitely an area of deep analysis. Another concern is that any additional coal requirement for new power plants would be unlikely met through FSAs with CIL, hence finding alternative sources is unavoidable. Further, out of the 208 captive coal blocks allotted with 49 billion tonnes of reserve and a production potential of 657 MT per annum, estimated annual production by the end of the 11th plan is only about 37 MT. Figure 5: Demand Supply Scenario of Coal (MMT) XI FYP (MT) XII FYP (MT Projected) XIII FYP (MT Projected) Demand Supply Gap Source: CEA supporting infrastructure. Also, different characteristics of coal typically permit existing power plants to blend imported coal with domestic coal only up to 10% to 15%. In addition, there is a huge price difference between domestic and imported coal. In addition the dynamism in the regulations of the countries from where coal is being imported pose further hurdles by way of political risks. The Indonesian government recently implemented the Indonesian Coal Price Regulation, which requires prices for all transactions to be benchmarked against a set of international and domestic indices and all sale contracts to be modified retrospectively by September. Several developers have already entered into long term PPA s with distribution utilities based on fuel tied up from Indonesian mines which have now been covered under the new law posing uncertainty over the operational viability of the affected plants. Coal remains closed to private sector participation with CIL and SCCL having a monopoly on coal production for commercial sale private participation is present only for captive production. One of the areas of concern for the coal sector is this lack of private investment. Where CIL and SCCL fail to achieve production targets, there are no alternative sources to make up the losses other than possible imports from countries like Indonesia, Australia etc. Most of the coal consuming sectors are thereby looking for imported coal for both, development of new capacities as well as mitigating the fuel risk for plants that have domestic linkages. Several Indian developers have therefore acquired foreign coal mines to secure coal availability for the large portfolio of power plants that they are developing. India s coal imports have more than doubled over the last five years. Coal imports have concerns due to limited Resource Allocation and Pricing 7

8 Policy and Regulatory Framework Regulatory Framework and Allocation in the Hydrocarbon Sector Ministry of Petroleum and Natural Gas (MoPNG) is the apex regulatory body representing Government of India that regulates and oversees exploration, exploitation and utilization of petroleum resources, including natural gas. Two regulatory bodies under MoPNG, Directorate General of Hydrocarbons (DGH) and Petroleum and Natural Gas Regulatory Board (PNGRB) regulate and upstream and downstream hydrocarbon sector respectively. Government of India has constituted an Empowered Group of Ministers to facilitate quick decision making at the apex level. Their role includes pricing of natural gas sources in consultation with the Ministry of Petroleum and Natural Gas and Directorate General of Hydrocarbons, revision of price based on the changes in the market conditions, allocation of the domestic gas to sectors based on the Gas Utilization Policy and framing the Gas Utilization Policy and any changes, if required, based on the market conditions prevalent The Empowered group of ministers meets in order to undertake decision regarding allocation and pricing of domestic natural gas mmscmd of gas was allocated to different sectors at the start of production. However, due to lower than expected production from KG-D6 field, this production was reduced as given in the table below. Figure 6: Allocation of Gas from KG-D6 (MMSCMD) Earlier Current Fertilizer LPG Power Others Total Source: EGoM Gas utilization policy In view of scarcity of natural gas in the country, priority for the commercial utilization of domestic gas was decided by Government of India, to make its most optimal use. The priority for utilization of gas produced from fields under Administered Price Mechanism (APM) i.e. gas produced by NOCs- ONGC and Oil India, for the fields awarded on nomination basis prior to the PSC regime and for the natural gas produced by NELP contractors including RIL's KG D6 field was decided by GoI. The guidelines for the gas sold from NELP fields were issued by Empowered Group of Ministers (EGoM) in May APM gas is mainly allocated to existing power and fertilizer plants. The order of priority has been laid down to give first priority to the existing plants to ensure utilization of capacities already created and to obtain faster monetization of natural gas. The second preference is given to substitute liquid fuels in energyintensive industries and the third preference to plants in easing bottlenecks and expansion. The order of priority is as below: Order of priority for customers with existing units: - Fertilizer plants - LPG and petrochemical plants - Power plants - CGD (PNG + CNG) networks - Refineries Other industries (like steel, ceramic) The guidelines further elaborate that once the gas demand from existing units has been satisfied, the gas should be utilized in the order prescribed for greenfield projects. Order of priority for green-field projects: - Fertilizer plants - Petrochemical plants - CGD (PNG + CNG) networks - Refineries - Power plants The policy-guidelines are to be reviewed every fiveyears in view of demand-supply position of gas. 8

9 The regulatory environment in India is in evolving stage both in terms of upstream and downstream sector. Formation of PNGRB, introduction of NELP regime and increase in FDI limit through automatic route are certain positive steps taken by the government. Indian policy makers are required to make a stable and transparent regulatory environment in order to propel the growth of the sector. Equal treatment to private/ foreign players, transparent and fair bidding, market driven pricing and only need based interventions from state are certain aspects which are being considered by investors to make investment decisions. India's Exploration and Production (E&P) sector has seen success in form of NELP rounds. DGH has awarded 248 blocks covering a total area of 1,468,511 sqkm. Participation by foreign exploration companies has increased since the first NELP-I bidding round in 1999 and in 2006, the number of foreign companies exceeded the domestic companies bidding under NELP VI. While the upstream segment has a well-established framework in the form NELP, the latest round of auctions have experienced declining interest, particularly from foreign oil & gas companies Currently, Government is involved in contract administration, monitoring and review of investments decisions. Also, pricing of natural gas is not market driven and this may further impact the interest of investors. A more attractive set of framework may enhance interest levels in the Indian E&P segment. The GoI is in the process of introducing Open Acreage Licencing Policy; new policy for bidding under which oil and gas acreages will be available round the year instead of cyclic bidding rounds launched under NELP to generate interest of investors. One of the pre-requisite and challenge for the formulation of OALP is to establish a data repository centre to provide quality and reliable geo-scientific data for evaluation by E&P companies. In OALP, geological data would be made available to bidders through the NDR and it will enable bidders to bid for any oil & gas block throughout the year. Figure 7: Number of PSCs signed in the NELP Rounds Source: DGH, India I II III IV V VI VII VIII IX No. of PSCs Signed The recent report from Ranagarajan committee has suggested changes in the existing PSC regime addressing the existing concerns of upstream sector such as clarity on gas pricing, delays in investment approvals from government/ DGH and clearances related delays. Resource Allocation and Pricing 9

10 Figure 8: Key Recommendations of Rangarajan Committee Some Key features of existing PSCs The existing PSC allows the contractor to recover his cost, before giving the Government its share in the contractor's revenues. Under this system, a close scrutiny of costs becomes critical for the Government. Since decisions are taken in a joint committee, called Management Committee, having government and private party representatives, decisions get delayed and execution under the contract is hampered Tax holiday given in the earlier regime was 7 years for all the blocks Eight year timeframe given for frontier, deep water and ultra-deep water blocks Audit of oil and gas blocks done by CAG Changes suggested by Rangarajan Committee The current cost recovery mechanism to be discontinued and to be replaced by full revenue sharing between Government and contractor without setting off costs. The share to be determined through a competitive bid process with bids in form of a matrix with different percentage revenue shares for different levels of production and price levels. Extended tax holiday of 10 years for blocks having a substantial portion involving drilling offshore at a depth of more than 1,500 metres Extension of timeframe for exploration in future PSCs for frontier, deep-water and ultra-deep-water to ten years. CAG audit of selected blocks in different phase of E&P based on financial materiality; and other blocks to be audited by CAG appointed auditors. CAG s authority to audit the blocks would remain. In terms of contract management, it is suggested by Rangarajan committee that for policy related issues, a Secretary-level inter-ministerial committee to be set-up to suggest policy solutions. For issues involving condonation of delay on the part of the contractor in preparing for and seeking approvals, and for minor technical issues, the mandate of the existing Empowered Committee of Secretaries (ECS) could be expanded The downstream sector is evolving in terms of policies and powers of board and bidding framework for gas distribution. PNGRB had completed two rounds of bidding, while authorization in third round is still pending. The fourth round of bidding was called off and subsequent rounds have been suspended due to changes expected in the bidding structure. Also, there is a need to clearly define role and Power of downstream regulator. Due to policy and regulatory challenges, India may lose on foreign investment, especially in areas like deep water E&P, Shale gas, CGD, fuel retailing, etc, despite being an attractive market in terms of demand potential. Stable and consistent regulatory environment and only need-based intervention from state is required to attract investment. Regulatory Framework and Allocation in the Coal Sector Ministry of Coal has the primary responsibility of formulating policies around allocation and pricing for the coal sector. The sector is dominated by public sector companies like Coal India Limited, Nevyeli Lignite Corporation limited and Singareni Collieries Company limited with CIL being the largest producer accounting for more than 80% of domestic coal production. As there is a significant gap between domestic production and demand and coal is consumed by number of sectors such as Power, Cement, Steel, etc., allocation and pricing of coal is a subject of deliberations. Coal sector requires interaction with host of inter-departmental co-ordination. Ministry of coal needs to work in tandem with Ministry of Environment and Forest, state governments, Ministry of Power, Ministry of Steel, Ministry of Railways, Ministry of shipping, etc. on a host of issues related to allocation, pricing, clearances, etc. Coal sector is evolving in terms of policies and regulatory scenario. Some of the prominent policies/ acts formulated by the government in the context of coal are as follows: 10

11 Coal Allocation Policy Captive Coal Mining, 1993 The Coal Mines (Nationalization) Act, 1973 was amended in June 1993 to allow coal mining by both private and public sector for captive consumption for production of iron and steel, generation of power, washing of coal obtained from a mine and other end use, which would be notified by the Government from time to time. New Coal Distribution policy, 2007 On October 18, 2007, the Ministry of Coal issued the New Coal Distribution Policy in order to regulate the distribution of coal. This policy dispenses with the classification of consumers core and non-core sectors and instead treats each new consumer on merit. The salient features of the Policy are as follows: Defence and Railways to get full requirement at notified price. Power (utilities), including Independent Power Producers ("IPP")/Captive Power Plants ("CPP"), the fertilizer sector, would receive 100% of their normative coal requirement at prices notified by Coal India Ltd.; All other consumers would receive 75% of their coal requirement at prices notified by Coal India Ltd. and the balance would be met through e-auction scheme and imports; All consumers through the erstwhile linkage system to enter into Fuel Supply Agreements ( FSA ) with Coal India Ltd.; New consumers such as power utilities, IPP, CPP, fertilizer and cement manufacturers will be issued with a Letter of Assurance ("LOA"), with a validity of 24 months which can be converted to an FSA on successfully meeting certain criteria; The existing Standing Linkage Committee (Long Term) will continue to recommend LOAs in respect of power utilities, IPP, CPP, cement and steel manufacturers; CIL to meet the full requirement of coal under the FSAs even by resorting to imports if necessary; After the execution of FSAs, parties to try to execute a tripartite agreement ( FSTA ) with the transport provider (Railways) as well; Introduction of an e-auction scheme by CIL, which will include provide for (i) access to any buyer, (ii) no floor price but rather an undisclosed reserve price not lower than the notified price, (iii) announcing the program of e-auction well in advance and with sufficient publicity, (iv) an announcement by CIL at the beginning of each financial year declaring the quantity and quality of coal to be available through e-auction, and the location from which it would be available, (v) initially around 10% of CIL production to be earmarked for e-auction. Auction by Competitive Bidding of Coal Mines Rules, 2012 The Central Government has introduced Rules under the Mines & Minerals (Development & Regulations) Act, 1957 with an objective to establish procedure for allocation of area containing coal through auction by competitive bidding. The Rule establishes how coal blocks shall be allocated for specific end use like power projects and also for commercial mining purpose and also outlines the framework for allocation coal blocks for government companies as well as other companies. As of January 2013, proposal for allocation of 17 coal blocks to government companies including 14 coal blocks for specific end use and 3 coal blocks for general mining purposes has been invited by the Ministry of Coal. Resource Allocation and Pricing 11

12 Allocation of Coal through LOA A Standing Linkage Committee (SLC) in Ministry of Coal reviews the applications for coal linkage every six months and based on the recommendation, CIL issues LOA to select consumers, thereafter this is generally firmed up into FSA (fuel supply agreement) upon meeting the conditions in LOA. Any consumer desiring the linkage routes the application through the concerned Ministry to the (SLC) for e.g. a power sector consumer may route it through central electricity authority and ministry of power and a steel sector consumer may route it through ministry of steel. In addition, Ministry of power came up with the Coal Linkage Policy for 12th Plan Projects and sector wise Priority and weightage of available coal was accorded and recommended to ministry of coal: - Central, State sector projects and through Case-II competitive bidding by states (60%) IPP projects (35%) CPPs (5%) However, as per CIL, there may not be any scope for recommending fresh LOAs by the Committee for the 12th plan period. As per CIL, the gap between commitments made through LoAs / FSAs with power sector and other consumers vis-à-vis the production projections is more than 400 MMT, even if no fresh commitment is made throughout the 12th plan period. The Working Group of Coal for the 12th Five Year Plan estimates a best case production scenario of 615 MT of coal in the optimistic scenario by the terminal year (FY ). With about 75 GW of plants dependent on linkage coal under various stages of development, and only about 35 GW of this capacity possible to be supported by this level of production, large proportion of power plants could be stranded for want of fuel. However, coal mine developers faced a host of challenges such as land acquisition, environment and forest clearances, infrastructure issues in terms of logistics and availability of mining equipment, lack of expertise and experience in mining and financing related issues. As a result, only a limited number of allocated coal blocks were put under production. With CAG allegations on the non-transparent manner of coal block allocations, a number of coal blocks have recently been de-allocated. Future coal blocks allocations likely to be through competitive bidding basis. Industry sources indicate that the present regulatory environment in the Indian context needs a dynamic approach in planning resource allocation, development and attracting investment. A few of the concerns are mostly cutting across the sectors include getting the required clearances in time. A coordination committee at the Central and State level involving senior representation from the concerned departments and uniform R&R and land acquisition policies through central legislation could help in resolving the issues related to the sector Coal scarcity in India is not a result of non-availability rather it is a factor of non-exploration and exploitation of new coal blocks. There is a pressing need in the coal sector to institutionalization of the Coal Regulator. In addition, there is a need to attract investment to develop a comprehensive plan for increasing the share of production from underground mines and suitable policy initiatives such as cost plus pricing, fiscal incentives and so on need to be introduced to improve potential returns currently available from underground mines. Captive Coal Block Allocation Apart from the availability of coal from CIL, coal block allocation was the alternate option available with the players in the power or other sectors until the sector was faced with legal trouble. CAG raised the issue that that the Government did not allocate coal blocks by a process of competitive bidding during the period

13 Figure 9: Allocation of Captive Coal Blocks Year of Government Companies Private Companies Power Projects Total allocation No. of blocks GR (in MT) No. of blocks GR (in MT) No. of GR (in MT) No. of blocks GR (in MT) blocks Up to , , , , , , , , , , , , , , , Total 99 28, , , , Source: MoM of SLC Resource Allocation and Pricing 13

14 Pricing of Energy in India Gas Pricing in India There are multiple pricing regimes existing in the country for Natural gas supplies. This could be broadly divided into three categories: APM Gas Non APM Gas LNG Further there is differential pricing existing for different sectors. Subsidized sectors such as power and fertilizer get relatively less prices as compared to other sectors. Also, region specific pricing exists in the country with North Eastern states getting gas at relatively cheaper prices as compared to other parts of the country. Following table gives source wise, customer wise gas prices Further, Pricing of major share of gas supplies in the Indian market is controlled and is not market driven as government approval is required before changing the price. Controlled pricing may result in disincentivizing investments in the sector in terms of limited participation from foreign players, who have access to technology, much required in deep-water E&P activities. Also, controlled pricing hampers the competitiveness of consuming sectors (power/ fertilizer/ domestic) to compete with global energy markets as it leads to low investments in energy efficiency on the demand side. Policy makers have been considering various aspects to look at the pricing of natural gas. Some of the deliberations done by the government of India on pricing include: Pooled Pricing of Gas: As multiple pricing regimes exist in the country, pooling of gas from different sources has been deliberated by the policy makers. A sectoral pool was being considered with separate pools of power and fertilizer customers. Separate pools were considered in view of avoiding cross subsidies between the customer groups and related administrative issues arising. Figure 10: Gas Prices in India Source Customers Gas Price (US S/mmbtu) NOCs (APM) Customer outside North East 4.2 NOCs (APM) Customer in North East 2.52 PMT Wtd. Avg price of PMT except RRVUNL & Torrent 5.65 PMT RRVUNL 4.6 PMT Torrent 4.75 Ravva GAIL 3.5 Ravva Satellite GAIL 4.3 Ravva Satellite GPEC 4.75 Ravva Satellite GSPC 5.5 Ravva Satellite GTCL 6.22 Hazira (Niko)* GACL/GSEG/GSPC Gas* 4.61 Olpad (NSA) (Niko)* GGCL* 5.5 Dholka Small Consumer 1.77 North Balol (HOEC) GSPC 2.71 Palej (HOEC) Small Consumer 3.5 KG-D6 All Consumers 4.2 Amguri Fields (Canero) AGCL 2.15 Amguri Fields (Canero) GAIL 1.29 Term R-LNG For all 6.75 Spot-R-LNG For all Source: GAIL 14

15 Rangarajan Committee recommendations on Pricing: The committee has suggested a uniform gas-pricing, at unbiased arms-length. The formula of domestic gas pricing should be 12-month trailing average of volume-weighted average at well-head (on net-back basis) for gas imports and volume-weighted average of US Henry Hub, UK NBP and Japanese Crude Cocktail prices. Gas prices are expected to increase based on the suggested framework by Rangarajan committee. It is important for the country to have a pricing regime such that it balances between factors like efficient consumption, preserving the incentives to gas suppliers, interest of price sensitive sectors such as power and fertilizer and development of natural gas infrastructure. A single benchmarked price of natural gas in India would be in the larger interest of the consumers, and also benefit the market development of natural gas in this country. A stable and rational pricing regime could help the Indian gas market in the following terms: Introducing new gas sources of gas in the market Long gestation investments based on stable price signals Deepening the pipeline network to expand the gas markets geographically Sending appropriate price signals for efficient use of gas Natural Gas Pricing in the US and UK Both the US and the UK natural gas markets are fed by domestic as well imported natural gas supplies. UK imports gas from countries like Qatar, Algeria, Egypt, Norway, US, Australia, etc. and imports are expected to be 70% of total supplies by FY20. While, the US, which is fed by domestic gas as well as imports from Canada, Middle east, Africa is expected to be self-sufficient till FY 20 because of the shale gas revolution. The favorable regulatory environment the US and the UK has resulted in a highly liquid and transparent market for gas. The gas market in both the countries is well developed with commodity type pricing mechanism existing in these countries including spot and futures trading markets for gas. In the UK gas is predominantly traded at the National Balancing Point and all the contracts are set around the NBP. In the US, the trading system has developed around hubs having pipeline interconnections and Henry Hub is the centre point of gas trading in the US. The national quotations for physical gas trading utilize Henry Hub as a reference point. It is also the focus for the Henry Hub futures market trading on the New York Mercantile Exchange (NYMEX). Resource Allocation and Pricing 15

16 Pricing of coal The price at which the various types and grades of coal were sold was controlled by the Central Government, under the provisions Colliery Control Order of Beginning March 1996, the Government gradually deregulated the price of various types and grades of coal. The pricing of coal in India was completely deregulated pursuant to the Colliery Control Order, 2000 with effect from January 1, As the sector is dominated by CIL, coal pricing is now entirely dependent on the price notified by the company. With effect from 1st January 2012 the GCV method was implemented by CIL resulting in coal being classified into 17 bands (in place of the seven grades under the UHV system) and prices were increased correspondingly for each band. These prices were expected to be 40% higher than the earlier method of UHV based pricing. However, immediately within a period of one month from the date of announcement Coal India rolled back to earlier methodology. It is pertinent to note that globally GCV based methodology is considered for coal pricing. Currently, the import prices are significantly higher than the domestic coal prices given by CIL. In addition, there is e-auction price which depends on the demand supply scenario of coal available for auction. There is a differential pricing in the coal sector on the basis of sector, as well as users in a particular sector. For e.g. CPPs get coal at a higher price than the IPPs and utilities. Pricing of Petroleum Products Pricing of certain petroleum products is another key issue faced by Indian oil and gas sector Pricing of many refined products are controlled, including those which were announced to be decontrolled. Oil marketing companies are not allowed to sell products like diesel, LPG and Kerosene at market driven prices. Even for petrol, which got de-controlled in 2010, government approval is required before price revision. Most of the OMCs are currently operating under heavy burden of under recoveries and if the issue is not addressed on priority, it may lead to problems in sourcing crude, lower the refinery utilization and ultimately disrupt the hydrocarbon supply chain in the country. Also, there is a need for a transparent mechanism to be institutionalized with respect to the subsidies in the hydrocarbon sector. Though private players are present in refining, their participation in Indian fuel retailing sector is abysmally low due to subsidized product pricing. A clearer policy regarding pricing of such products is required as the subsidy burden on the government/ PSUs is ballooning and controlled pricing may also result in inefficiencies in the sector. Considering the limited availability of coal a framework for importing of coal has been considered - a scenario where Coal India would meet its obligations under the FSA is being positioned to be met partly by import of coal in the medium term. Under this regime a framework encompassing blending of domestic coal with imported has been envisaged. This scenario essentially considers a situation where FSA holders may be supplied by a certain portion of coal from imported sources, While, it would be impractical to physically supply imported coal to power generating companies which are at a significant distance from the ports a framework considering blending of price (domestic price with imported price) has been mooted. The mechanism as formulated by Central Electricity Authority in its strategy paper is under discussion by the Stakeholders. 16

17 Discussion Points The most noticeable aspect of the integrated energy policy of Government of India is the focus on ensuring the transition to market economy where private companies can compete with public companies. There is a clear articulation around subsidies and pricing so that correct signal could be provided to the investors and consumers. Though the intent of the IEP has been to drive reforms through bringing in measure around transparent pricing and promoting investment, a lot of required reforms have not been undertaken till date. Market/price volatility Impact on energy security as price volatility discourages long-term investment due to the uncertainty of the long-term direction of the market and creates a barrier to providing adequate energy supply. India needs a functioning energy market, in other words, a system where national energy demand can be met by timely and adequate investment in a sustainable way and business entities operating in the energy market are commercially viable. In the hydrocarbon sector, some regulatory issues faced by companies in the hydrocarbon sector are related to pricing mechanism, multiple pricing regimes of natural gas, subsidies in some of the petroleum products, transparency in subsidy mechanism, clarity regarding CGD bidding structure and role of the downstream regulator. India needs an attractive fiscal regime which incentivizes risk taking and promotes cost control, apart from capturing economic returns. While India s NELP rounds were able to attract investment to a certain extent, there is a need to re-look to further promote interest of foreign companies, especially in terms of ensuring sanctity of contracts and pricing of gas to incentivize the investments. Government has already commenced bidding rounds for Coal Bed Methane (CBM) license while bidding frame work for Under Ground Coal Gasification (UCG) and Shale gas are being formulated. There have been instances to keep energy prices low, however going forward this may not be a sustainable practice. Since domestic energy prices are disconnected from the global trends, there is no signalling mechanism for active demand side management. It has been felt that low energy prices have limited benefit in terms of efficient usage. At this crucial juncture, it is important for the Corporates, Industry experts and the policy makers to work together to create a healthy environment for the Energy sector. World Energy Council- India Energy Congress provides an opportunity for corporates, Industry experts and policy makers to work together and formulate roadmap to seek answers to regulatory, pricing and allocation related issues in the country. Some of the questions are listed below: - How to promote efficient allocation of various fuels and energy forms to different uses? What should be the relative prices of different forms of energy? How to obtain credible, independent, transparent and consistent regulatory oversight in the energy sector? How should Indian energy policy makers provide a level playing field to domestic private players, international players and PSUs in the energy space? What institutional reforms are needed to get competitive efficiency? How to expand domestic coal supply in a cost effective way? How to promote investment in coal production? How to expand production by captive mines? What should India do with respect to rising under recoveries of OMCs? What are the changes required in terms of tax structure of different fuels? In the coal sector, there is a need to expedite clearance mechanism and way to resolve R&R issues, framework to allocate coal blocks on competitive basis, increasing the share of production from underground mines and enhancing the productivity of CIL. Also there is a need for institutionalizing a regulatory body in the coal sector. Energy sector requires regulatory oversight to balance consumer and producer interests, to ensure efficiency and level playing field. However, regulation should be consistent across different energy sources and across regions. Pricing continues to remain a key concern. Resource Allocation and Pricing 17

18 Contacts Vedamoorthy Namasivayam Senior Director I Consulting Deloitte Touche Tohmatsu India Pvt. Ltd. Deloitte Centre, Anchorage II, #100/2, Richmond Road, Bangalore, Karnataka , India vnamasivayam@deloitte.com Shubhranshu Patnaik Senior Director Consulting - Energy and Resources Deloitte Touche Tohmatsu India Private Limited 7th Floor; Building 10, Tower B, DLF Cyber City Complex, DLF City Phase - II, Gurgaon , Haryana, India spatnaik@deloitte.com Debasish Mishra Senior Director Consulting Deloitte Touche Tohmatsu India Pvt. Ltd. 30th Floor, Tower 3, Indiabulls Financial Center Senapati Bapat Marg, Elphinstone Road (West) Mumbai debmishra@deloitte.com 18

19 Resource Allocation and Pricing 19

20 Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and its network of member firms, each of which is a legally separate and independent entity. Please see for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms. This material and the information contained herein prepared by Deloitte Touche Tohmatsu India Private Limited (DTTIPL) is intended to provide general information on a particular subject or subjects and is not an exhaustive treatment of such subject(s). None of DTTIPL, Deloitte Touche Tohmatsu Limited, its member firms, or their related entities (collectively, the Deloitte Network ) is, by means of this material, rendering professional advice or services. The information is not intended to be relied upon as the sole basis for any decision which may affect you or your business. Before making any decision or taking any action that might affect your personal finances or business, you should consult a qualified professional adviser. No entity in the Deloitte Network shall be responsible for any loss whatsoever sustained by any person who relies on this material Deloitte Touche Tohmatsu India Private Limited. Member of Deloitte Touche Tohmatsu Limited 20

Gas in India Now Available. Sector Overview and Outlook: E&P, LNG, Pipelines and CGD. India Infrastructure Research.

Gas in India Now Available. Sector Overview and Outlook: E&P, LNG, Pipelines and CGD. India Infrastructure Research. Now Available Gas in India 2017 Sector Overview and Outlook: E&P, LNG, Pipelines and CGD Report (PDF) Data-set (Excel) India Infrastructure Research Gas in India 2017 Table of Contents 1. Executive Summary

More information

Coal Demand Supply Outlook in India Factoring coal sourcing, logistics, opportunities and strategies

Coal Demand Supply Outlook in India Factoring coal sourcing, logistics, opportunities and strategies Coal Demand Supply Outlook in India Factoring coal sourcing, logistics, opportunities and strategies December 2013 E-REP Outlook Series Copyright 2013, All rights reserved Coal Demand Supply Outlook in

More information

FINDINGS, SUGGESTIONS AND CONCLUSION

FINDINGS, SUGGESTIONS AND CONCLUSION CHAPTER-VIII FINDINGS, SUGGESTIONS AND CONCLUSION.. 8.1 Major Findings of the Research This study has analyzed the economic aspects of petroleum during the pre-reform (1970-1990) and reform (1990-2010)

More information

Gas Price Benchmarking in India Factoring sourcing and development options for LNG,CBM and Shale Gas

Gas Price Benchmarking in India Factoring sourcing and development options for LNG,CBM and Shale Gas Gas Price Benchmarking in India Factoring sourcing and development options for LNG,CBM and Shale Gas June 2014 Copyright 2013, All rights reserved 2007 2008 2009 2010 2011 2012 USD/MMBTU Gas Price Benchmarking

More information

OIL & GAS. September 2009

OIL & GAS. September 2009 OIL & GAS September 2009 OIL & GAS September 2009 The focus of this presentation is to discuss Profile of Indian oil and gas sector Policies and regulations Opportunities in the Indian oil and gas sector

More information

OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA

OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA OUTLOOK OF COAL DEMAND/SUPPLY AND POLICY IN INDIA 2009 APEC CLEAN FOSSIL ENERGY TECHNICAL AND POLICY SEMINAR 12 TH - 14 TH OCTOBER 2009 INCHEON, KOREA 1 Presentation Sturcture Coal Sector Overview Demand

More information

INTERNATIONAL O&M CONFERENCE

INTERNATIONAL O&M CONFERENCE INTERNATIONAL O&M CONFERENCE COAL SUPPLY CHALLENGES & WAY FORWARD 14 TH FEB 2012 - BY DK SAHA, DGM(FM) & JANARTHAN C. DGM(FM) Electricity Per Capita consumption India Egypt China Brazil World Average Russia

More information

Discovered Small Field Bid Round: 2016

Discovered Small Field Bid Round: 2016 Ministry of Petroleum and Natural Gas Government of India Interactive Session Discovered Small Field Bid Round: 2016 Directorate General of Hydrocarbons DGH July 14, 2016 Houston Agenda 1 Exploration and

More information

CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014

CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014 FOUR NEW REPORTS LNG IN INDIA 2014 CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014 E&P IN OIL AND GAS 2014 Each report package will have three elements: Research Report (PDF) Presentation

More information

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update Research Compendium Coal Sector in India 2013 A comprehensive data and information update Release Date : August 2013 Background About the report Coal is the only major conventional source of energy that

More information

Completion report and next steps. Yemen - Petroleum governance Petroleum Governance Initiative funded Technical Assistance P TAS-TF057534

Completion report and next steps. Yemen - Petroleum governance Petroleum Governance Initiative funded Technical Assistance P TAS-TF057534 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Completion report and next steps Yemen - Petroleum governance Petroleum Governance Initiative

More information

Discovered Small Field Bid Round: 2016

Discovered Small Field Bid Round: 2016 Ministry of Petroleum and Natural Gas Government of India Launch of : 2016 Directorate General of Hydrocarbons DGH May 25, 2016 Agenda 1 Evolution of Upstream Sector in India 2 Significant Milestones Achieved

More information

Content. PwC. PwC. Impact of Natural Gas on Liquid Fuel Consumption and downstream Petroleum Sector. September 1, 2010

Content. PwC. PwC. Impact of Natural Gas on Liquid Fuel Consumption and downstream Petroleum Sector. September 1, 2010 Impact of Natural Gas on Liquid Fuel Consumption and downstream Petroleum Sector September 1, 2010 PwC Content 1. Background 2. Liquid Fuels displacement by gas 3. Region wise displacement 4. Domestic

More information

ENERGY OPTIONS & COAL

ENERGY OPTIONS & COAL ENERGY OPTIONS & COAL Amitabha Ray CGM(QC),CIL Coal Connect :: 19 th November 2007, Kolkata Key factors for consideration.. Energy security depends on availability of secure and reliable energy at affordable

More information

17 May Shale Gas Cost And Technology Perspective. Kolkata

17 May Shale Gas Cost And Technology Perspective. Kolkata 17 May 2013 Shale Gas Cost And Technology Perspective Kolkata Supply / Demand Dynamics For Indian Gas AN ATTRACTIVE MARKET FOR YEARS TO COME Current gas supply by source Existing PVT / JV, 37% Existing

More information

ANALYTICAL HIGHLIGHTS

ANALYTICAL HIGHLIGHTS IV ANALYTICAL HIGHLIGHTS 1. Reserves and Potential for Generation India s energy-mix comprises both non-renewable (coal, lignite, petroleum and natural gas) and renewable energy sources (wind, solar, small

More information

Suggestions of Cement Sector on Procedure & Methodology of auction/ allocation of coal blocks : A Presentation before the Nominated Authority

Suggestions of Cement Sector on Procedure & Methodology of auction/ allocation of coal blocks : A Presentation before the Nominated Authority Presentation made to the Nominated Authority on the suggestions of Cement Sector regarding Allocation of Coal Blocks Suggestions of Cement Sector on Procedure & Methodology of auction/ allocation of coal

More information

Chapter: 1.1 Energy Scenario

Chapter: 1.1 Energy Scenario Chapter: 1.1 Energy Scenario Part-I: Objective type questions and answers 1. The energy sources, that are either found or stored in nature are a) Secondary Energy Sources b) Primary Energy Sources c) both

More information

IChina and the US. The total coal production in India was

IChina and the US. The total coal production in India was ndia is the third largest coal producer in the world after IChina and the US. The total coal production in India was around 612 million tonnes (MT) in FY 2015, which has increased to 626 MT in FY 2016.

More information

Comments of Prayas (Energy Group) on Coal Vision 2030

Comments of Prayas (Energy Group) on Coal Vision 2030 Comments of Prayas (Energy Group) on Coal Vision 2030 At the outset, we are glad that a Coal Vision 2030 document is being prepared and comments are being sought on a draft of the key highlights and summary

More information

Platforms, Pipelines and Plants: Energy Infrastructure in India

Platforms, Pipelines and Plants: Energy Infrastructure in India Presentation to Association of International Petroleum Negotiators Reference Presentation for Circulation Platforms, Pipelines and Plants: Energy Infrastructure in India Mr. Rajiv Luthra Managing Partner

More information

Domestic and International Coal Market in India 2013 Understanding Demand Segmentation and Evolving Dynamics of Coal in India

Domestic and International Coal Market in India 2013 Understanding Demand Segmentation and Evolving Dynamics of Coal in India Domestic and International Coal Market in India 2013 Understanding Demand Segmentation and Evolving Dynamics of Coal in India October 2013 October 2013 Business Report Series Copyright 2013, All Rights

More information

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS PRESIDENT OF THE REPUBLIC OF INDONESIA, Considering: that, to enforce the provisions of Articles 8 paragraph

More information

City Gas Distribution Projects

City Gas Distribution Projects City Gas Distribution Projects 8 th Petro India Nitin Zamre Director - Consulting 25 th November 2009 Has the City Gas Space Changed (significantly!) over the previous year(s)? 2. Overview Gas Supplies

More information

May 24, 2018 I Industry Research. Power: Yearly Update and Outlook. Graph 1 Electricity Generation Mix (FY18)

May 24, 2018 I Industry Research. Power: Yearly Update and Outlook. Graph 1 Electricity Generation Mix (FY18) Power: Yearly Update and Outlook Contact: Madan Sabnavis Chief Economist madan.sabnavis@careratings.com 91-22- 6754 3489 Ashish K Nainan Research Analyst ashish.nainan@careratings.com 91-22-6754 3443 Mradul

More information

INTERNATIONAL ENERGY AGENCY WORLD ENERGY INVESTMENT OUTLOOK 2003 INSIGHTS

INTERNATIONAL ENERGY AGENCY WORLD ENERGY INVESTMENT OUTLOOK 2003 INSIGHTS INTERNATIONAL ENERGY AGENCY WORLD ENERGY INVESTMENT OUTLOOK 2003 INSIGHTS Global Strategic Challenges Security of energy supplies Threat of environmental damage caused by energy use Uneven access of the

More information

COAL PRODUCTION, MARKETING & DISTRIBUTION

COAL PRODUCTION, MARKETING & DISTRIBUTION Chapter-7 COAL PRODUCTION, MARKETING & DISTRIBUTION 7.1 COAL PRODUCTION 7.1.1 Coal India Ltd. and its subsidiaries are the major producer of coal. 291.24 Million Tonnes of coal was produced by Coal India

More information

COAL GASIFICATION. By Prem Sawhney. Meeting of Indo-US Working Group on Coal. April, 2006

COAL GASIFICATION. By Prem Sawhney. Meeting of Indo-US Working Group on Coal. April, 2006 By Prem Sawhney Meeting of Indo-US Working Group on Coal April, 2006 1 OUTLINE Underground Coal Gasification Process Advantages Potential end use markets Surface Gasification Critical Issues Technology

More information

Perspectives on Climate Change and Energy for Sustainable Development. Leena Srivastava Executive Director

Perspectives on Climate Change and Energy for Sustainable Development. Leena Srivastava Executive Director Perspectives on Climate Change and Energy for Sustainable Development Leena Srivastava Executive Director Energy Demand 2500.0 2004 2000.0 India is the Fifth Largest Energy Consumer mtoe 1500.0 1000.0

More information

Policy & Economic Report - Oil & Gas Market

Policy & Economic Report - Oil & Gas Market January 2018 Policy & Economic Report - Oil & Gas Market Federation of Indian Petroleum Industry (FIPI) 3rd Floor, PHD House, 4/2, Siri Institutional Area, August Kranti Marg, New Delhi - 110 016 Table

More information

Indonesia s $120 Billion Oil and Gas Opportunity

Indonesia s $120 Billion Oil and Gas Opportunity Indonesia s $120 Billion Oil and Gas Opportunity By Alex Dolya, Asheesh Sastry, Eddy Tamboto, and Fadli Rahman It s a prize within reach: between $90 billion and $120 billion of additional GDP over the

More information

Coal Sector Reforms in India Analysing from the Lens of Competition & Regulatory Architecture

Coal Sector Reforms in India Analysing from the Lens of Competition & Regulatory Architecture Coal Sector Reforms in India Analysing from the Lens of Competition & Regulatory Architecture 9th India Coal Summit, New Delhi Arpit Tiwari CUTS International 29 June 2017 1 Contents Introduction Coal

More information

Relative Environment Economics Of Natural Gas and Other Fossil Fuels for Power Generation and Policy Options for India

Relative Environment Economics Of Natural Gas and Other Fossil Fuels for Power Generation and Policy Options for India Relative Environment Economics Of Natural Gas and Other Fossil Fuels for Power Generation and Policy Options for India A Petroleum Federation Of India Study The Energy and Resources Institute (Knowledge

More information

City Gas Distribution Market in India 2017

City Gas Distribution Market in India 2017 Now Available City Gas Distribution Market in India 2017 Segment Analysis, Outlook and Opportunities Report (PDF) Data-set (Excel) India Infrastructure Research City Gas Distribution Market in India 2017

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

SYNOPSIS OF THE 2017 NATIONAL GAS POLICY

SYNOPSIS OF THE 2017 NATIONAL GAS POLICY SYNOPSIS OF THE 2017 NATIONAL GAS POLICY Introduction On Wednesday, June 28, 2017, the Federal Executive Council (FEC) at its monthly meeting approved the National Gas Policy, 2017 ( NGP ). The NGP, which

More information

Audit Committee and other Board Committees Roles and responsibilities under the Companies Act, 2013

Audit Committee and other Board Committees Roles and responsibilities under the Companies Act, 2013 Audit Committee and other Board Committees Roles and responsibilities under the Companies Act, 2013 A quick reference guide For private circulation only November 2013 www.deloitte.com/in Audit Committee

More information

CHALLENGES FOR NATURAL GAS IN DEVELOPING ECONOMIES INDIAN SCENARIO

CHALLENGES FOR NATURAL GAS IN DEVELOPING ECONOMIES INDIAN SCENARIO CHALLENGES FOR NATURAL GAS IN DEVELOPING ECONOMIES INDIAN SCENARIO 1. INTRODUCTION 2) Chandan Dasgupta, Petronet LNG Limited 1) Sharma Suresh Chandra, Petronet LNG Limited Indian Energy basket is dominated

More information

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary.

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary. ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK Executive Summary ST98 www.aer.ca EXECUTIVE SUMMARY The Alberta Energy Regulator (AER) ensures the safe, efficient, orderly, and environmentally

More information

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary.

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary. ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK Executive Summary ST98 www.aer.ca EXECUTIVE SUMMARY The Alberta Energy Regulator (AER) ensures the safe, efficient, orderly, and environmentally

More information

Urea sector needs pooling of many reforms apart from gas pooling. Ratings. May 29, Impact on urea manufacturing companies

Urea sector needs pooling of many reforms apart from gas pooling. Ratings. May 29, Impact on urea manufacturing companies May 29, 2015 Ratings Urea sector needs pooling of many reforms apart from gas pooling The Cabinet Committee on Economic Affairs (CCEA) approved a major policy initiative to supply gas at uniform price

More information

Good morning ladies and gentlemen and thank your for the introduction. Trends and Opportunities in the Indonesian Oil and Gas sector

Good morning ladies and gentlemen and thank your for the introduction. Trends and Opportunities in the Indonesian Oil and Gas sector Good morning ladies and gentlemen and thank your for the introduction The title of my presentation today is: Trends and Opportunities in the Indonesian Oil and Gas sector 1 To convey my message and provide

More information

The Impact Of Renewables On the Energy Basket & Coal

The Impact Of Renewables On the Energy Basket & Coal The Impact Of Renewables On the Energy Basket & Coal Harsh Sachdev Managing Director S&T Mining (A SAIL-TATA Steel JV Co.) September 13, 2017 Kolkata Steel Authority of India Limited (SAIL) is the largest

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:PHI 30546 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF THE PHILIPPINES FOR INSTITUTIONAL STRENGTHENING FOR THE DEVELOPMENT OF THE NATURAL GAS

More information

Energy Scenario for Achieving Sustainability in Indian Situations

Energy Scenario for Achieving Sustainability in Indian Situations International Journal of Engineering Research and Technology. ISSN 0974-3154 Volume 6, Number 6 (2013), pp. 811-816 International Research Publication House http://www.irphouse.com Energy Scenario for

More information

A monthly publication from South Indian Bank. To kindle interest in economic affairs... To empower the student community...

A monthly publication from South Indian Bank.   To kindle interest in economic affairs... To empower the student community... To kindle interest in economic affairs... To empower the student community... Open YAccess www.sib.co.in ho2099@sib.co.in A monthly publication from South Indian Bank Experience Next Generation Banking

More information

Indian DRI Industry Challenges for Sustainable Growth 2 nd World DRI and Pellet Congress th April, 2014 Ritz-Carlton, Abu Dhabi

Indian DRI Industry Challenges for Sustainable Growth 2 nd World DRI and Pellet Congress th April, 2014 Ritz-Carlton, Abu Dhabi Indian DRI Industry Challenges for Sustainable Growth 2 nd World DRI and Pellet Congress 2014 28-30 th April, 2014 Ritz-Carlton, Abu Dhabi Deependra Kashiva Executive Director World Steel and DRI Growth

More information

The Unconventional Oil and Gas Market Outlook

The Unconventional Oil and Gas Market Outlook The Unconventional Oil and Gas Market Outlook The future of oil sands, shale gas, oil shale and coalbed methane Report Price: $2875 Publication Date: July 2010 E N E R G Y The Unconventional Oil and Gas

More information

A Multi Stakeholder Perspective

A Multi Stakeholder Perspective A Multi Stakeholder Perspective 1 Agenda Wind Vision Initiative Setting up of Wind Vision : 200 GW by 2032 Recommendations Wind Project Development Regulatory Incentives Financing Wind Vision 2032 Grid

More information

Petroleum Planning & Analysis Cell

Petroleum Planning & Analysis Cell Petroleum Planning & Analysis Cell Monthly Report on Natural gas production, availability and consumption - July 2017 1. Highlights of the report for the month of July 2017 are as follows: Gross production

More information

MINING IN INDIA 2016

MINING IN INDIA 2016 Now Available MINING IN INDIA 2016 Sector Analysis and Market Outlook Research Report Data-set (Excel) India Infrastructure Research www.indiainfrastructure.com 1. Executive Summary SECTION I: SECTOR OVERVIEW

More information

Petroleum Planning & Analysis Cell

Petroleum Planning & Analysis Cell Petroleum Planning & Analysis Cell Monthly Report on Natural gas production, availability and consumption - May, 2017 1. Highlights of the report for the month of May, 2017 are as follows: Gross production

More information

Indonesia s Energy Requirements Part One: Current Energy Dynamics

Indonesia s Energy Requirements Part One: Current Energy Dynamics 10 February 2015 Indonesia s Energy Requirements Part One: Current Energy Dynamics Stewart Patterson FDI Associate Key Points Domestic consumption has been a key driver of Indonesian economic growth and,

More information

GAIL (India) Limited CORPORATE OPERATIONS AND MAINTENANCE (O&M) - DEPARTMENT NOIDA

GAIL (India) Limited CORPORATE OPERATIONS AND MAINTENANCE (O&M) - DEPARTMENT NOIDA EXPRESSION OF INTEREST (EOI) 05 th April 2018 INVITING TECHNICAL PROPOSALS FOR ENLISTMENT OF CONSULTANTS FOR ENGAGEMENT OF CONSULTANT FOR BENCHMARKING FOLLOW UP EXERCISE AND PROVIDING ROAD MAP FOR ACHIEVEMENT

More information

3rd Annual Conference on. Overseas Coal in India Imported Coal to fuel India s Economic Growth

3rd Annual Conference on. Overseas Coal in India Imported Coal to fuel India s Economic Growth 3rd Annual Conference on Overseas Coal in India Imported Coal to fuel India s Economic Growth Session 1 : Introduction Indian coal scenario vis-à-vis Global Coal market. World's population is forecast

More information

Session 2: Gas demand growth beyond power generation

Session 2: Gas demand growth beyond power generation Session 2: Gas demand growth beyond power generation IEF-IGU Gas Ministerial 22 nd November 218 Key messages: Gas demand growth beyond power generation Key messages Session objectives Recent global gas

More information

Natural Gas Outlook in India 2017

Natural Gas Outlook in India 2017 Natural Gas Outlook in India 2017 Fact March 2017 Why enincon s report upon Natural Gas Outlook in India 2017 GOVERNMENT OF INDIA AIMING TO INCREASE THE SHARE OF NATURAL GAS IN INDIA S ENERGY MIX BY MORE

More information

NATIONAL ENERGY BOARD

NATIONAL ENERGY BOARD NATIONAL ENERGY BOARD IN THE MATTER OF the National Energy Board Act, being Chapter N-7 of the Revised Statutes of Canada, as amended, and the Regulations made thereunder; AND IN THE MATTER of an Application

More information

IPTC MS The Outlook for LNG Supply to Asia. Stuart Traver, Lalitha Seelam and Nick Fulford Baker Hughes Inc. and Gaffney, Cline & Associates

IPTC MS The Outlook for LNG Supply to Asia. Stuart Traver, Lalitha Seelam and Nick Fulford Baker Hughes Inc. and Gaffney, Cline & Associates IPTC 17774 - MS The Outlook for LNG Supply to Asia Stuart Traver, Lalitha Seelam and Nick Fulford Baker Hughes Inc. and Gaffney, Cline & Associates Slide 2 2013 GLOBAL NATURAL GAS TRADE Units: billion

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: PAK 32381 TECHNICAL ASSISTANCE TO THE ISLAMIC REPUBLIC OF PAKISTAN FOR CAPACITY BUILDING OF THE NATIONAL ELECTRIC POWER REGULATORY AUTHORITY March 2000 CURRENCY EQUIVALENTS

More information

The Role of GCC s Natural Gas in the World s Gas Markets

The Role of GCC s Natural Gas in the World s Gas Markets World Review of Business Research Vol. 1. No. 2. May 2011 Pp. 168-178 The Role of GCC s Natural Gas in the World s Gas Markets Abdulkarim Ali Dahan* The objective of this research is to analyze the growth

More information

HOW AN INDUSTRIAL BASELINE SURVEY CAN INFORM LONG-TERM STRATEGIC PLANNING AND FACILITATE CREATION OF SUSTAINABLE ECONOMIC LINKAGES

HOW AN INDUSTRIAL BASELINE SURVEY CAN INFORM LONG-TERM STRATEGIC PLANNING AND FACILITATE CREATION OF SUSTAINABLE ECONOMIC LINKAGES HOW AN INDUSTRIAL BASELINE SURVEY CAN INFORM LONG-TERM STRATEGIC PLANNING AND FACILITATE CREATION OF SUSTAINABLE ECONOMIC LINKAGES Framework Step: STEP 2 - Build an empirical basis to inform decision-making

More information

Assessing Today's Supplies to Fuel Tomorrow's Growth

Assessing Today's Supplies to Fuel Tomorrow's Growth WORLD ENERGY OUTLOOK - INSIGHTS Assessing Today's Supplies to Fuel Tomorrow's Growth Dr. Fatih Birol Head, Economic Analysis Division International Agency / OECD World Series World 1998 World 1999 Looking

More information

LNG Producer-Consumer Conference Nagoya, Japan

LNG Producer-Consumer Conference Nagoya, Japan LNG Producer-Consumer Conference Nagoya, Japan 22 nd October 2018 Vitol: a global leader in energy distribution For more than 50 years Vitol has distributed energy, efficiently and safely. Today, we move

More information

Liquefied Natural Gas (LNG) Sector Overview June 2018

Liquefied Natural Gas (LNG) Sector Overview June 2018 Liquefied Natural Gas (LNG) Sector Overview June 2018 Global Industry Life Cycle Changes in Gas Markets Global Demand & Supply Dynamics Global Trade Regional Mix Global State of the Industry Trade Countries

More information

Power & Politics Navigating the Changing Vision of Our Energy Future. Rayola Dougher, API Senior Economic Advisor,

Power & Politics Navigating the Changing Vision of Our Energy Future. Rayola Dougher, API Senior Economic Advisor, Power & Politics Navigating the Changing Vision of Our Energy Future Rayola Dougher, API Senior Economic Advisor, dougherr@api.org U.S. oil and natural gas production is increasing as a result of technological

More information

Outlook for Japanese LNG demand, de-linking gas from oil prices and. investment in Australian projects

Outlook for Japanese LNG demand, de-linking gas from oil prices and. investment in Australian projects 0 Outlook for Japanese LNG demand, de-linking gas from oil prices and s investment in Australian projects 26 th February 2014 2 nd Annual Australian Domestic Gas Outlook 2014 Takashi Yoshida Director General

More information

Future Energy in Albania. Eighth International Forum on Energy for Sustainable Development

Future Energy in Albania. Eighth International Forum on Energy for Sustainable Development Future Energy in Albania Eighth International Forum on Energy for Sustainable Development Artan Leskoviku 11-14 June 2017, Astana, Kazakhstan 1 CONTENTS CURRENT CONDITIONS STRATEGIC VISION, POLICIES AND

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: People s Republic of China, 2016 2020 SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Reduction in energy intensity.

More information

China Oil and Gas Market Briefing. April 2014

China Oil and Gas Market Briefing. April 2014 China Oil and Gas Market Briefing April 2014 Summary Summary China s fuel mix China s fuel mix is dominated by coal - accounting for 70% of total fuel consumption, as the serious environmental problems

More information

WORLD ENERGY OUTLOOK 2005 Middle East & North Africa Insights

WORLD ENERGY OUTLOOK 2005 Middle East & North Africa Insights WORLD ENERGY OUTLOOK 2005 Middle East & North Africa Insights Nicola Pochettino Senior Energy Analyst Global Energy Trends: Reference Scenario International Energy Price Assumptions The assumed oil-price

More information

CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: FRANCHISE SHIPPING

CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: FRANCHISE SHIPPING Pacific Private Sector Development Initiative Enabling the private sector to drive sustainable economic growth and lift Pacific people out of poverty CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: FRANCHISE

More information

The Impact of the Recession on Gas Markets

The Impact of the Recession on Gas Markets The Impact of the Recession on Gas Markets What has changed in our Brave New World Gas demand dropped by 2% Bigger drops in OECD region, FSU, Latin America But some notable exceptions: China, India Some

More information

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati Introduction Indonesian power sector is one of the business sectors in Indonesia which is strictly regulated. For the

More information

Final Report Evaluation of Translation Bureau Programs Volume 2: Translation and Other Linguistic Services Program

Final Report Evaluation of Translation Bureau Programs Volume 2: Translation and Other Linguistic Services Program 2012-603 Evaluation of Translation Bureau Programs Office of Audit and Evaluation January 21, 2014 Table of Contents MAIN POINTS... i INTRODUCTION... 1 PROFILE... 1 Background... 1 Authority... 2 Roles

More information

International gas markets: recent developments and prospects

International gas markets: recent developments and prospects International gas markets: recent developments and prospects Christopher Allsopp New College Oxford Director, Oxford Institute for Energy Studies December 2012 International gas markets are changing rapidly

More information

No /15/2016-CPD/CLD Government of India Ministry of Coal

No /15/2016-CPD/CLD Government of India Ministry of Coal 1 No. 23011/15/2016-CPD/CLD Government of India Ministry of Coal IMMEDIATE Shastri Bhawan, New Delhi, the 22nd May, 2017 To Chairman-cum-Managing Director, Coal India Limited, Coal Bhawan, New Town, Rajarhat,

More information

LNG TRADE FLOWS. Hans Stinis Shell Upstream International

LNG TRADE FLOWS. Hans Stinis Shell Upstream International LNG TRADE FLOWS Hans Stinis Shell Upstream International ABSTRACT The LNG industry has witnessed a great deal of change recently, and indications are that this will only continue. Global gas demand is

More information

STRategic PLan

STRategic PLan Driving a Seamless Supply Chain STRategic PLan 2011-2013 DECEMBER 2010 PO Box 20 DEAKIN WEST ACT 2600 P:+61 2 6260 3274 F:+61 2 6260 4978 E: admin@austlogistics.com.au www.austlogistics.com.au Australian

More information

***I POSITION OF THE EUROPEAN PARLIAMENT

***I POSITION OF THE EUROPEAN PARLIAMENT EUROPEAN PARLIAMENT 2004 2009 Consolidated legislative document 23.4.2009 EP-PE_TC1-COD(2008)0247 ***I POSITION OF THE EUROPEAN PARLIAMENT adopted at first reading on 23 April 2009 with a view to the adoption

More information

RUSSIA S ENERGY POLICY: FOCUSING ON NEW MARKETS

RUSSIA S ENERGY POLICY: FOCUSING ON NEW MARKETS Draft November 21, 2005 RUSSIA S ENERGY POLICY: FOCUSING ON NEW MARKETS Vladimir I. Ivanov ERINA In 2006, Russia will assume the rotating presidency of the G8. The G8 Agenda s focus will be on energy security

More information

Potential for CCS in India: Opportunities and Barriers

Potential for CCS in India: Opportunities and Barriers Potential for CCS in India: Opportunities and Barriers Pradeep Kumar Dadhich Senior Fellow, TERI, New Delhi, India Presented United Nations Department of Economic and Social Affairs : Expert Group Meeting

More information

Good morning ladies and gentlemen

Good morning ladies and gentlemen Good morning ladies and gentlemen I am here today to talk about the imperatives of mobilizing investment for domestic oil and gas supply to help secure Indonesia s energy security and independence which

More information

Figure 6.10 Monthly crude arrival

Figure 6.10 Monthly crude arrival List of Figures Figure 1.1 Supply Chain Integration 2 Figure 1.2 Three important flows in a supply chain 11 Figure 3.1 World Crude oil Supply 41 Figure 3.2 Comparison of capacity & throughput 47 Figure

More information

TAPI Pipeline Project. Presentation to ECO Chamber of Commerce and Industry (ECO CCI) 16 October 2018

TAPI Pipeline Project. Presentation to ECO Chamber of Commerce and Industry (ECO CCI) 16 October 2018 TAPI Pipeline Project Presentation to ECO Chamber of Commerce and Industry (ECO CCI) 16 October 2018 Introduction to the Project TAPI Pipeline Project was originally conceived in the 1990s with a view

More information

IEEJ:November 2018 IEEJ2018 China Energy Outlook 2050 CNPC ETRI Tokyo Energy Outlook CNPC ETRI 2018

IEEJ:November 2018 IEEJ2018 China Energy Outlook 2050 CNPC ETRI Tokyo Energy Outlook CNPC ETRI 2018 China CNPC ETRI 217. 11. 13 Tokyo 1 2 2 CONTENT China s Energy Outlook Base Scenario Primary Energy End-use Energy Oil Gas Coal Power Enhanced Policy Scenario Results of different scenarios Base Scenario

More information

Akshaya Kumar*, P.Bhattacharya, U.C.Tandon, & D.K.Rawat

Akshaya Kumar*, P.Bhattacharya, U.C.Tandon, & D.K.Rawat 10 th Biennial International Conference & Exposition P 304 Summary Different Business Models to resolve the sub-surface geological complexities including all poorly explored/ underexplored Indian Sedimentary

More information

TRANSMISSION OPPORTUNITIES, CHALLENGES & WAY FORWARD. Confederation of Indian Industry NEW DELHI November 2, 2012

TRANSMISSION OPPORTUNITIES, CHALLENGES & WAY FORWARD. Confederation of Indian Industry NEW DELHI November 2, 2012 TRANSMISSION OPPORTUNITIES, CHALLENGES & WAY FORWARD Confederation of Indian Industry NEW DELHI RAJEEV DALELA CII - Conference on Transmission and Distribution 1 Power Sector : Demand Drivers Demand far

More information

IEF Industry Advisory Committee Workshop 27 th February,2018 India Energy & Oil demand Outlook

IEF Industry Advisory Committee Workshop 27 th February,2018 India Energy & Oil demand Outlook IEF Industry Advisory Committee Workshop 27 th February,2018 India Energy & Oil demand Outlook Dr. R.K. Malhotra Director General Federation of Indian Petroleum Industry Contents Global economy outlook

More information

Conditions to attract Investment and create Value in the Hydrocarbon Sector. Carlos A. Morales Gil

Conditions to attract Investment and create Value in the Hydrocarbon Sector. Carlos A. Morales Gil Conditions to attract Investment and create Value in the Hydrocarbon Sector Carlos A. Morales Gil Houston November, 2015 Content Elements of a State A State s Role Exploiting resources Companies What do

More information

Developing a Pipeline Infrastructure for CO 2 Capture and Storage: Issues and Challenges

Developing a Pipeline Infrastructure for CO 2 Capture and Storage: Issues and Challenges Interstate Natural Gas Association of America Developing a Pipeline Infrastructure for CO 2 Capture and Storage: Issues and Challenges An INGAA Foundation Study April, 2009 Presented by Lisa Beal Director,

More information

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service (To be published in the Gazette of India, Part I, Section 1) No. 11/5/2005-PG(i) GOVERNMENT OF INDIA Ministry of Power. RESOLUTION New Delhi, Date: 17th April, 2006 Tariff based Competitive-bidding Guidelines

More information

WAXING AND WANING LNG DEMAND IN JAPAN S DEREGULATING ELECTRICITY MARKET A SUPPLIERS PERSPECTIVE.

WAXING AND WANING LNG DEMAND IN JAPAN S DEREGULATING ELECTRICITY MARKET A SUPPLIERS PERSPECTIVE. WAXING AND WANING LNG DEMAND IN JAPAN S DEREGULATING ELECTRICITY MARKET A SUPPLIERS PERSPECTIVE. Smith, S., North West Shelf Liaison Company Miyoshi, M., North West Shelf Liaison Organisation 1. INTRODUCTION

More information

MINISTER S SPEECH. Fourth Asian Round Table in Kuwait City ENERGY PRICE VOTALITY 18 th April 2011.

MINISTER S SPEECH. Fourth Asian Round Table in Kuwait City ENERGY PRICE VOTALITY 18 th April 2011. MINISTER S SPEECH Fourth Asian Round Table in Kuwait City ENERGY PRICE VOTALITY 18 th April 2011. His Excellency, Minister of Oil and Minister of Information, State of Kuwait, Honorable Chair, Honorable

More information

TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/ /C/10 FOR

TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/ /C/10 FOR TANZANIA PETROLEUM DEVELOPMENT CORPORATION TENDER NO. PA/031/2018-2019/C/10 FOR CONSULTANCY SERVICES FOR FEASIBILITY STUDY FOR IMPLEMENTATION OF REGIONAL NATURAL GAS DISTRIBUTION PROJECT UNDER PPP MODEL

More information

Consultation Regulatory Impact Statement

Consultation Regulatory Impact Statement Consultation Regulatory Impact Statement Post Implementation Review of the Industry Levy to fund the petroleum and gas water functions of the Office of Groundwater Impact Assessment December 2016 This

More information

Roadmap for Reduction in Import Dependency in the Hydrocarbon Sector by 2030 Final Report

Roadmap for Reduction in Import Dependency in the Hydrocarbon Sector by 2030 Final Report Roadmap for Reduction in Import Dependency in the Hydrocarbon Sector by 2030 Final Report Ministry of Petroleum and Natural Gas, Government of India September 2014 Preface This Committee has been constituted

More information

Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 2015

Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 2015 Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 215 Who we are Helping Our Clients Create Value Market analysis and insights Asset valuation / M&A Policy / regulation

More information

Public Procurement Reforms to enhance value for money

Public Procurement Reforms to enhance value for money Public Procurement Reforms to enhance value for money 1. It is my pleasure to be here in the inaugural function of the Seminar on Public Procurement Reforms to enhance value for money being organized by

More information