Hardrock Project Final EIS/EA Report Highlights

Size: px
Start display at page:

Download "Hardrock Project Final EIS/EA Report Highlights"

Transcription

1 Greenstone Gold Mines (GGM) is a 50/50 partnership between Centerra Gold Inc. and Premier Hardrock Project Description Area Gold Mines Limited for the joint ownership and development of the Hardrock, Brookbank and Viper properties. GGM is equipped with an experienced Management Team possessing years of mine development and operations experience. GGM's objective is to become an environmentally and socially responsible gold producer. Consultation Activities Coordinated Federal / Provincial Approach Hardrock Project Final EIS/EA Report Highlights In consultation with the Canadian Environmental Assessment Agency (CEAA) and the Ministry of the Environment and Climate Change (MOECC), the environmental assessment process was refined to address both the federal and provincial environmental assessment requirements, and align where practical the provincially approved Terms of Reference and the federally issued Environmental Impact Statement Guidelines. The coordinated approach reduced duplication and streamlined the review process, which now includes a 4 week extension to the MOECC review period to align with the federal process. The coordination was guided by the Canada-Ontario Agreement on Environmental Assessment Cooperation. The federal and provincial environmental assessment review and decision-making processes will be initiated according to specific federal and provincial requirements. G reenstone Gold Mines (GGM) proposes to construct, operate and decommission a new open pit gold mine, process plant, and associated ancillary facilities, collectively known as the Hardrock Project. The Hardrock gold deposit is located approximately 275 kilometres northeast of Thunder Bay, Ontario. It is situated in the Ward of Geraldton, part of the Municipality of Greenstone. The Project is located on a brownfield site that was actively mined in the s. Construction of the Project is anticipated to take 2 years. Local suppliers and contractors will be utilized wherever possible based on quality, schedule, cost-effectiveness, Aboriginal participation and proximity to site. At full capacity, the Hardrock Project will process up to 30,000 tonnes of ore per day and employ 450 people on average over the life of mine. The life of mine is expected to be 15 years. During the preparation of the Final EIS/EA, GGM consulted with a wide range of stakeholders, government agencies and Aboriginal communities. GGM used a broad range of consultation tools to support the consultation efforts to provide Project information, and to receive input at key stages in the preparation of the Final EIS/EA. Following the submission of the Final EIS/EA, GGM will continue to consult and engage with stakeholders, government agencies and local Aboriginal communities throughout construction, operation and into closure. P1

2 Project Components Project Development Area (PDA) The Project footprin t is the an ticipated ar ea of physical disturbance associated with the construction, operation and closure of the Project. The Hardr ock Project footpr int is ~2,200 hectar es. The key components of the Project include: open pit waste rock storage areas topsoil and overburden storage areas ore stockpile crushing plants and mill feed ore storage area process plant tailings management facility water management facilities including collection ditches and ponds combined heat and power plant explosives facility buildings and supporting infrastructure water supply and associated infrastructure sewage treatment plant effluent treatment plant site roads and parking areas Goldfield Creek diversion temporary camp aggregate sources To develop the Project, the relocation of existing infrastructure located within the Project development area is required, including a portion of Highway 11, a Ministry of Transportation Patrol Yard, and Hydro One facilities. Utilities within the Ministry of Transportation right-of-way of Highway 11 (Hydro One, Union Gas, Greenstone Municipal Services, Bell Canada and Ministry of Transportation) will be relocated along the new Highway 11 alignment. P2

3 A I R / N O I S E How were the effects assessed? The noise and vibration assessments used computerized models with source specific sound emission data, site specific source and receiver data from baseline studies, and building locations and construction types. Dispersion modelling was used to estimate air quality concentrations for different scenarios. RESID UAL EFFEC TS ON AIR / NOISE Emissions within regulatory limits at all off property locations The incremental contribution from Project operations to total Ontario annual Greenhouse gas emissions will be ~0.1% Noise and vibration below regulatory thresholds at closest G R O U N D WAT E R How were the effects assessed? A three dimensional groundwater flow model was used to predict changes in groundwater levels and flow, and to predict changes in discharge to surface water features. RESIDUAL EFFECTS ON GRO UNDWA TER Dewatering of the open pit predicted to result in lowering of groundwater levels, there are no water zone users within the zone of influence The removal of portions of the historical tailings, enhanced cover layer, seepage collection system and open pit dewatering will reduce the existing arsenic loading to Kenogamisis Lake from groundwater discharge by 99% during operation compared to the baseline and 59% during closure AIR MITIGATION MEASURES Use best management practices to control fugitive dust including dust suppressants (e.g. water), dust collection systems for equipment, limiting vehicle speeds, regular maintenance of equipment, reducing haul routes where possible and no idling policy Implement Air Quality Management and Monitoring Plan and Greenhouse Gas Management and Monitoring Plan NOISE MITIGATION MEASURES Implement noise mitigation measures (e.g., muffler systems) on equipment and selecting equipment and/or designing building enclosures to limit overall noise emissions Implement Noise and Vibration Management and Monitoring Plan GROUNDWATER MITIGATION MEASURES Reduce infiltration through Project design and progressive rehabilitation Remove of approximately 22% of the historical MacLeod tailings and 77% of the historical Hardrock tailings Accelerate open pit filling at closure Ensure contingency measures available Implement Water Management and Monitoring Plan and Waste Rock Management Plan Natural Environment FAQs WILL GERALDTON BE COVERED IN DUST? Geraldton will not be covered in dust. Operational controls such as watering roads and covering or containing dust sources will be implemented. WILL THE DUST AFFECT KENOGAMISIS LAKE? GGM has modeled the impact of dust in the air and landing in the lake. The results show that with proper dust control measures being undertaken there will be no significant impact on water quality in the lake. Simulated Drawdown within Overburden and Shallow Bedrock at Closure P3

4 Natural Environment S U R FA C E WAT E R Surface Water Quality Monitoring Stations Water balance and water quality models were used to assess the water quantity and quality changes associated with Project activities during construction, operation and closure. R E S I D U A L EFFECTS O N S U R F A CE WATER Predicted changes in mean annual flows are within ±5% of baseline conditions Predicted increase in flow and water levels for Southwest Arm Tributary - mitigated through the design of the Goldfield Creek diversion channel Enhanced reclamation of the historical tailings will result in a reduction in arsenic concentrations and metal loadings to Kenogamisis Lake Treated effluent will meet the Provincial Water Quality Objective for arsenic at the point of discharge and meet the lower Interim objective criteria within a mixing zone contained in the Southwest Arm of Kenogamisis Lake SURFACE WATER MITIGATION MEASURES Implement enhanced reclamation measures for the historical tailings Recycle contact water in Project processes particularly from the TMF (tailings management facility) Use of water management infrastructure to collect and contain contact water Treat contact water prior to discharging to the environment Implement Water Management and Monitoring Plan F I S H A N D F I S H H A B I TAT Methods used to predict effects on fish and fish habitat included measuring the amount of habitat loss and permanent alteration and evaluation of potential fish mortality risk. R E S I D U A L EFFECTS O N F I S H A N D F I S H H A B I T A T No anticipated effects on the sustainability and productivity of fish resources Due to the geographic range of fish, long-term exposure to parameters of potential concern is not anticipated, especially given the overall predictions of improved water quality on a lake-wide basis Changes expected to be negligible with respect to fish habitat FISH AND FISH HABITAT MITIGATION MEASURES Minimize Project footprint In-water works to be conducted within timing window (restricted from April 1 to June 20) Implement a Blasting and Explosives Management Plan for the Project to reduce risk of lethal or sub-lethal effects on fish Fish habitat that is altered or lost will be offset by creating new habitat within the Goldfield Creek diversion Implement Aquatic Management and Monitoring Plan Proposed Goldfield Creek Diversion P4

5 V E G E TAT I O N Ecosite mapping was developed during field surveys and utilized geographic information systems to derive quantitative measurements to assess upland vegetation, wetland and wildlife habitat areas. RESID UAL EFFEC TS ON VE GETATIO N Permanent removal of upland and wetland vegetation communities within the Project development area Changes are not predicted to threaten the function of landscape connections or wetland systems, or to threaten the long-term viability and quality of wetlands and other vegetation communities in the local and regional area Long-term shift of wetland community types due to the changes in surface water flow and groundwater drawdown The Project may alter the quality of vegetation communities within approximately 30 m of the Project development area through dust deposition and edge effects Natural Environment VEGETATION MITIGATION MEASURES Vegetation clearing activities will be restricted to the Project description area Minimize Project footprint and road length Avoidance of the fen habitat area north of the TMF access road Progressive rehabilitation of vegetation communities with test plots during operations Stockpiling of topsoil and overburden for use in reclamation Where there is interest, provide opportunities to local communities for harvesting of plants for traditional purposes prior to construction Implement Biodiversity Management and Monitoring Plan and Closure Plan W I L D L I F E A N D W I L D L I F E H A B I TAT How were the effects assessed? Ecosite mapping was developed during field surveys and utilized geographic information systems to derive quantitative measurements to assess wildlife habitat areas. RESIDUAL EFFECTS ON WIL D LIFE AND WILDLIFE HABI TAT The amount of wildlife and wildlife habitat loss will not affect the long-term persistence or viability of wildlife species within the regional area Wildlife mortality (e.g. from vehicle collisions along Highway 11) is predicted to be within the normal variability of baseline conditions Wildlife are expected to shift their movement patterns during the life of the mine to areas of available habitat outside of the Project development area WILDLIFE AND WILDLIFE HABITAT MITIGATION MEASURES Minimize project footprint and haul road lengths Give wildlife the right of way on site roads Implement Biodiversity Management and Monitoring Plan and Closure Plan Progressive rehabilitation of vegetation communities and wildlife habitat P5

6 Social and Economic Environment L A B O U R A N D E C O N O M Y The assessment examined the Project s labour demand compared to the local and regional labour supply. Effects on the economy examined local purchases of goods and services, local industries and effects on government revenues. RESID UAL EFFEC TS ON L ABOUR AND ECONOMY The Project will have a positive effect on labour and economy Increase in the size of the labour force, income for local and regional businesses, and municipal revenue from taxes Reduction in the unemployment rate by more than 6% Effects on tourism are predicted to be at or near baseline conditions and occur over the short-term, and GGM has addressed tourism related infrastructure in the agreement with the Municipality of Greenstone LABOUR AND ECONOMY MITIGATION MEASURES Avoid using the portion of the Project area that would overprint the golf clubhouse and the front nine holes unless needed Labour and training framework will be implemented, which includes partnerships with Aboriginal communities and education institutes, information sharing and employment preparation and training Mitigate the effects of Project closure by supporting re-training to establish transferable skills, providing opportunities for early retirement, providing redundancy payments and offering job search assistance FAQ WILL GGM BE HIRING LOCALLY? GGM wants a local workforce in place for operations and will be supporting training initiatives to prepare the workforce for the Project. Labour Type The Project will generate direct employment, indirect employment through businesses that provide services to the Project, and induced employment through businesses that provide services to employees ~800 person years of local indirect/induced labour during the construction phase and an additional 1,300 regional (Thunder Bay) person years ~500 person years of local indirect/induced labour during operations C O M M U N I T Y S E R V I C E S A N D I N F R A S T R U C T U R E The assessment compared anticipated Project demand for services and infrastructure with existing capacity. R E S I D U A L EFFECTS O N COM M U N I T Y S E R V I CES AND INFRASTRUCTURE COMMUNITY SERVICES AND INFRASTRUCTURE MITIGATION MEASURES Temporary camp will be in place for construction and for short term resource needs Project rescue vehicles and trained First Responders will be at the worksite GGM will maintain communication with relevant agencies and organizations, including municipal authorities, health agencies and school boards GGM has developed a Waste Management Plan, to limit demands on local landfills Standard construction procedures and a Traffic Management Plan will be implemented to reduce traffic delays during construction of realigned Highway 11 Population decline in the area has led to an abundant supply of housing that will be available to house Project employees during operations Site preparation activities during construction will lead to the removal of some existing recreation facilities. Demands on community services and infrastructure will not be above current capacity such that standards of service will not be reduced below current levels for an extended period P6

7 Built and Cultural Environment LAND AND RESOURCE USE ENVIRONMENT Surface Water Quality Monitoring Stations Spatial analysis and baseline data collection was used to assess the extent of land and resource use activity in the Project development area including local and regional areas. RESIDUAL EFFECTS ON LAND AND R E SO U R C E U SE Loss of existing land uses within the Project development area Sensory disturbance may also affect local wildlife resources and local recreational and commercial uses LAND AND RESOURCE USE MITIGATION MEASURES Where possible in accessible areas, leave trees and other vegetation in place to buffer the view of Project components, reducing the change in viewshed and muffling nuisance noise Maintain access to mining claims located on the peninsula east of the Project development area Maintain alternate access within the Project Development Area to the Southwest Arm of Kenogamisis Lake during construction and operation Provide labour and equipment to assist Greenstone Snowmobile Club in improving existing trails Implement Biodiversity Management and Monitoring Plan, Aquatic Management and Monitoring Plan, Air Quality Management Plan, Water Management and Monitoring Plan, and Noise and Vibration Management and Monitoring Plan H E R I TA G E RESOURCES HERITAGE RESOURCES MITIGATION MEASURES ENVIRONMENT How were the effects assessed? For archaeological resources, Stage 1 and 2 Archaeological Assessments were conducted. For architectural and historical resources, evaluating the location of resources within the Project development area relative to construction or operation activities was undertaken. Key construction and operation staff will be trained in the recognition of basic archaeological artifacts such as Aboriginal material culture and Euro-Canadian material If an archaeological resource is discovered, all work will cease within a 20m radius of the archaeological resource Effects on heritage resources will be managed through 60m buffer zones, documentation and salvage, or commemoration Implement Archaeology and Heritage Resources Management Plan RESIDUAL EFFECTS ON HERITAGE RESOURCES Effects on archaeological resources will be avoided, having carried out archaeological assessment programs in areas of archaeological potential prior to ground disturbance activities in the construction phase Protocols to protect archaeological resources in the event of a chance find will be implemented No residual environmental effects on architectural and/or historical resources are anticipated P7

8 T R A D I T I O N A L L A N D A N D R E S O U R C E U S E Project specific traditional knowledge studies, Project engagement activities, past Project experience and literature review were assessed. R E S I D U A L EFFECTS O N T R A D I T I O N A L LAND A N D R E S O U R C E S U S E Cultural and Social Environment Reduced access to land and availability of resources for the pursuit of plant harvesting, fishing, hunting, trapping, and cultural practices and sites within the Project description area and immediate Project vicinity Lahtis Road will be closed during construction and operation Harvesting areas and cultural or spiritual sites or areas will not likely be directly disturbed in the local assessment area, although there will be a change in access patterns TRADITIONAL LAND AND RESOURCE USE MITIGATION MEASURES Where there is interest, provide opportunities to local communities for harvesting of plants for traditional purposes prior to construction Maintaining alternate access within the Project development area to the Southwest Arm of Kenogamisis Lake during construction and operation Implement Biodiversity Management and Monitoring Plan, Aquatic Management and Monitoring Plan, Air Quality Management Plan, Water Management and Monitoring Plan, Noise and Vibration Management and Monitoring Plan Aboriginal communities will have the ability to maintain traditional land and resource use outside of the Project development area Within the Project development area, residual environmental effects to cultural sites and areas are considered adverse because of removal of sites H U M A N A N D E C O L O G I C A L H E A LT H A risk assessment tool was used to estimate potential health risks to human and ecological receptors resulting from exposure to Project-related emissions. R E S I D U A L EFFECTS O N H U M A N A N D E COL O G I CA L HEA LTH Health and ecological risks for chemicals of potential concern will not exceed regulatory thresholds and where exceedances are predicted, they are due to baseline conditions HUMAN AND ECOLOGICAL HEALTH MITIGATION MEASURES Follow-up monitoring programs for surface water and air emissions will serve to confirm the risk assessment predictions GGM recognizes that Aboriginal communities are interested in participating in a moose health (i.e tissues sampling) monitoring study. Given the large ranges of these animals and mandate of the Ministry of Natural Resources and Forestry (MNRF), GGM will participate in an MNRF-led study Implement Biodiversity Management and Monitoring Plan, Aquatic Management and Monitoring Plan, Air Quality Management Plan, Water Management and Monitoring Plan, Noise and Vibration Management and Monitoring Plan P8

9 Environmental Benefits A L BENEFITS OF THE PROJECT R E M O V A L O F P O R T I O N S O F T H E H I S T O R I C AL M A C L E O D A N D H A R D R O C K T A I L I N G S R E S U L T I NG I N IMPROVEMENTS TO WATER QUALITY COMPARED T O B A SE L I N E C O N D I T I O N S E N H A N C E D C O V E R A N D S U B SU R F A C E SE E P A G E C O L L E C T I O N SY ST E M F O R T H E H I S T O R I C A L M AC L E O D H I G H T A I L I N G S D E C R E A SI N G L O A D I N G S T O K E N O G AM I S I S L AK E C O M P A R E D T O B A SE L I N E C O N D I T I O N S O P E N P I T D E W A T E R I N G R E D U C I N G T H E C U R R E NT L O AD I N G T O K E N O G A M I SI S L A K E A S SO C I A T E D W I T H T H E H I S T O R I C AL T A I L I N G S, A N D T H E R E F O R E A P O S I T I V E E F FE C T O N W A T E R Q U A L I T Y O V E R T I M E I N K E N O G A M I SI S L A K E, I N PARTICULAR BARTON BAY AND CENTRAL BASIN Economic and Community Benefits ECONOMIC AND COMMUNITY BENEFITS OF THE PROJECT O N A V E R A G E, T H E P R O J E C T W I L L R E SU L T I N T H E EQUIVALENT OF 1,225 JOBS IN ONTARIO IN E A C H Y E A R A N D O F T H E SE, J O B S P E R Y E A R W O U L D B E D I R E C T L Y A S SO C I A T E D W I T H T H E PROJECT T H E P R O J E C T W I L L D I R E C T L Y A N D I N D I R E C T L Y C R E AT E $ M I L L I O N I N R E V E N U E S F O R T H E O N T A R I O G O V E R NM E NT L O C A L A N D R E G I O N A L B U SI N E SSE S, I N C L U D I NG A B O R I G I N A L - O W N E D B U SI N E S SE S, ST A N D T O B E NE FI T F R O M S U C C E S S F U L B I D S T O SU P P L Y T H E P R O J E C T W I T H G O O D S A N D SE R V I C E S HIRING OF LOCAL WORKERS CAN REDUCE THE LOCAL UNEMPLOYMENT RATE BY MORE THAN 6% ~ $ M I L L I O N SP E N T L O C A L L Y A N D ~ $ 1. 9 M I L L I O N SP E NT IN THE REGION P9

10 Goldfield Creek Realignment THE PROJECT COMPONENTS WILL OVERPRINT GOLDFIELD CREEK. TO ADDRESS THE LOSS OF THIS AREA INCLUDING EXISTING FISH HABITAT, GGM WILL REALIGN GOLDFIELD CREEK SO THERE IS NO DECREASE IN OVERALL FISHERIES PRODUCTIVITY. What will the Goldfield Creek realignment include? Development of approximately 7.5 hectares of new pond habitat at the interface between the existing Goldfield Creek and the new diversion channel Construction of a new 2.7km Goldfield Creek between the Goldfield Creek diversion pond and the existing Southwest Arm Tributary watercourse Reconstruction of the existing Southwest Arm Tributary channel between Southwest Arm Pond 2 (SWP2) and Southwest Arm Pond 3 (SWP3) to convey larger flows and facilitate the replacement of the existing Lahtis Road crossing Construction of the two valley wide grade control structures within the existing Southwest Arm Tributary to impound and lessen flows, reducing water velocity to address erosion potential and increasing available habitat for fish Example of Constructed Channel Early spring Late summer P10

11 Tailings Management Facility (TMF) Tailings Management Facility An engineered tailings management facility will be built using a robust downstream raise construction design to store tailings from the process plant. The downstream dam construction method creates the strongest and safest facility for environmental protection. The TMF is designed to store 145,000 kilotonnes of tailings. The surface area of the TMF is expected to cover 518 hectares and will be designed in two cells (north and south) to reduce water management requirements during early operations and facilitate progressive reclamation. The TMF maximizes use of natural topography to contain the tailings and has an ultimate dam height of approximately 35m. INDEPENDENT TAILINGS REVIEW BOARD GGM has formed an Independent Tailings Review Board (ITRB) to provide an independent assessment and opinion on the design, construction, operation and closure of the TMF to ensure it meets accepted design and operational guidelines based on internationally accepted practices. The ITRB will make recommendations to improve the design, construction, operation and closure of the TMF and/or reduce the risks associated with the TMF. The ITRB s objective is to ensure long-term safety and environmental protection. ITRB reports and feedback will be made available to interested stakeholders. FAQs 1. HOW WAS THE LOCATION OF THE TMF SELECTED? The TMF site was selected to minimize the disturbance to fish bearing water bodies, maximize the use of natural containment and optimize project economics. 2. WILL THERE BE A BUFFER BETWEEN THE TMF AND KENOGAMISIS LAKE? The TMF is set back from other waterbodies by an environmental buffer width of approximately 125m. 3. WILL THERE BE ANY LEACHING FROM THE TMF INTO KENOGAMISIS LAKE? The TMF is being designed to have very little leaching into Kenogamisis Lake. A perimeter ditch around the outside of the dam will capture the greater majority of seepage water and this will be pumped back into the facility. P11

12 Monitoring and Adaptive Management Plans A comprehensive set of monitoring programs will be implemented to verify the accuracy of the Final EIS/EA predictions and to determine the effectiveness of measures taken to mitigate the adverse environmental effects of a project. Water Management and Monitoring Plan Waste Rock Management Plan Emergency Response Plan Waste Management Plan Erosion and Sediment Control Plan Greenhouse Gas Management and Monitoring Plan Air Quality Management and Monitoring Plan Closure Plan COMMUNITY RELATIONS OFFICE Before mining operations can begin, the Ministry of Northern Development and Mines requires that a Closure Plan with financial assurance be submitted under the Mining Act. GGM has developed a Conceptual Closure Plan as part of the EIS/EA. After the closure activities have been carried out, a post-closure monitoring program will continue until the closure objectives have been met MA IN S TREE T P.O. BOX GE RALD T ON, ON TAR IO P 0T 1M 0 T: F: Spill Prevention and Response Plan Soil Management Plan Noise and Vibration Management and Monitoring Plan Explosives and Blasting Management Plan Aquatic Management and Monitoring Plan Biodiversity Management and Monitoring Plan Archaeology and Heritage Resources Management Plan Site Plan at Closure GGM 3D table top model is available for viewing at the Community Relations office. The Community Relations office serves as a key location for community stakeholders to meet with the Community Relations team, receive updates and discuss issues of interest on the project. Drop by and visit us. Your comments are important to us! E: cr@ggmines.com MONDAY TO FRIDAY 8:30 a.m. to 4:30 p.m. Dina Quenneville Manager - Community Relations Cheryl Lesperance Manager - Aboriginal Relations E: dina.quenneville@ggmines.com E: cheryl.lesperance@ggmines.com V1.0 P12

To: Steve Lines From: Fiona Christiansen. File: Date: September 15, 2015

To: Steve Lines From: Fiona Christiansen. File: Date: September 15, 2015 Memo To: From: Fiona Christiansen Greenstone Gold Mines (GGM) Guelph ON Office File: 160960946 Date: CONTEXT As part of the provincial individual environmental assessment (EA) process for the Hardrock

More information

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval

More information

24.0 FOLLOW-UP MONITORING AND ENVIRONMENTAL MANAGEMENT PLANS

24.0 FOLLOW-UP MONITORING AND ENVIRONMENTAL MANAGEMENT PLANS 24.0 FOLLOW-UP MONITORING AND ENVIRONMENTAL MANAGEMENT PLANS 24.1 OBJECTIVES AND CONTEXT Under CEAA 2012, an EA must consider the need for, and the requirements of, follow-up monitoring. A follow-up program

More information

PIC Comment Responses. Geraldton November 18 th PIC. - Will the pit increase in size after the pit is complete or will they go underground?

PIC Comment Responses. Geraldton November 18 th PIC. - Will the pit increase in size after the pit is complete or will they go underground? PIC s Geraldton November 18 th PIC - Will the pit increase in size after the pit is complete or will they go underground? At its largest extent the open is anticipated to be approximately 1,800 m long,

More information

HARDROCK PROJECT Final Environmental Impact Statement / Environmental Assessment

HARDROCK PROJECT Final Environmental Impact Statement / Environmental Assessment Final Environmental Impact Statement / Environmental Assessment Chapter 23.0: Follow-Up and Monitoring Programs and Environmental Management Plans Prepared for: Greenstone Gold Mines GP Inc. 365 Bay Street

More information

HARDROCK PROJECT Final Environmental Impact Statement / Environmental Assessment

HARDROCK PROJECT Final Environmental Impact Statement / Environmental Assessment Final Environmental Impact Statement / Environmental Assessment Chapter 1.0: Prepared for: Greenstone Gold Mines GP Inc. 365 Bay St, Suite 500 Toronto ON M5H 2V1 Prepared by: Stantec Consulting Ltd. 1-70

More information

HARDROCK PROJECT CONCEPTUAL GREENHOUSE GAS MANAGEMENT AND MONITORING PLAN

HARDROCK PROJECT CONCEPTUAL GREENHOUSE GAS MANAGEMENT AND MONITORING PLAN HARDROCK PROJECT CONCEPTUAL GREENHOUSE GAS MANAGEMENT AND MONITORING PLAN Greenstone Gold Mines GP Inc. 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 April 2017 Plan Conceptual GHG Management and

More information

HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN

HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN April 2017 Greenstone Gold Mines GP Inc. 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 Table of Contents 1.0 Introduction and Environmental

More information

Highway 11 Realignment

Highway 11 Realignment Highway 11 Realignment Preferred Alternative Option 1D (optimized) Key Advantages (+) / Disadvantages (-) + Comparatively lowest cost to construct. Comparatively lowest construction complexity. + Optimal

More information

Côté Gold Project. Where is the Côté Gold Project located? Who owns the Côté Gold Project? Frequently Asked Questions. May 2018.

Côté Gold Project. Where is the Côté Gold Project located? Who owns the Côté Gold Project? Frequently Asked Questions. May 2018. May 2018 Côté Gold Project Frequently Asked Questions Where is the Côté Gold Project located? The Côté Gold Project, a proposed open pit gold mine, is located in northeastern Ontario halfway between two

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

HARDROCK PROJECT CONCEPTUAL EROSION AND SEDIMENT CONTROL PLAN

HARDROCK PROJECT CONCEPTUAL EROSION AND SEDIMENT CONTROL PLAN HARDROCK PROJECT CONCEPTUAL EROSION AND SEDIMENT CONTROL PLAN Greenstone Gold Mines GP Inc. 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 April 2017 Table of Contents 1.0 Introduction and Environmental

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview 1 INTRODUCTION Screening level environmental impact assessment provided in application package Many of the potential

More information

HARDROCK PROJECT Draft Environmental Impact Statement / Environmental Assessment Summary

HARDROCK PROJECT Draft Environmental Impact Statement / Environmental Assessment Summary Draft Environmental Impact Statement / Environmental Assessment Summary Prepared for/préparé pour: Greenstone Gold Mines GP Inc. 365 Bay Street Suite 500 Toronto, ON M5H 2V1 Prepared by/préparé par: Stantec

More information

to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1 st Floor Quebec, Quebec G1K 3X2

to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1 st Floor Quebec, Quebec G1K 3X2 Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street,

More information

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES RAINY RIVER PROJECT APPENDIX O: COMPARATIVE ALTERNATIVES ANALYSIS GLOSSARY AND ABBREVIATIONS ARD EA EC DFO GHG HONI MMER MOE MTO NA NLSA NPAG NRSA

More information

APPENDIX C Updated Mitigation and Monitoring Commitments

APPENDIX C Updated Mitigation and Monitoring Commitments APPENDIX C Updated Mitigation and Monitoring Commitments C-1: C-2: Site-Specific Mitigation Measures and Future Work for Archaeological Sites C-3: Summary of Monitoring Commitments Côté Gold Project Environmental

More information

Environmental Regulation & Mine Permitting in Ontario

Environmental Regulation & Mine Permitting in Ontario Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory

More information

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,

More information

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan Magino Project Environmental Impact Statement Technical Support Document 20-14 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION 1.0 INTRODUCTION... 1 SECTION 2.0 BACKGROUND...

More information

Technical Data Report: Hardrock Project Water Balance and Water Quality Model

Technical Data Report: Hardrock Project Water Balance and Water Quality Model Technical Data Report: Hardrock Project Water Balance and Water Quality Model Prepared for: Greenstone Gold Mines GP Inc. 365 Bay St, Suite 500 Toronto, ON M5H 2V1 Prepared by: Stantec Consulting Ltd.

More information

EAGLE S NEST PROJECT

EAGLE S NEST PROJECT A Federal/Provincial Environmental Impact Statement/Environmental Assessment Report Draft Copy December 20, 2013 VOLUME 1 EXECUTIVE SUMMARY PAGE EXECUTIVE SUMMARY... 1-1 1 INTRODUCTION... 1-1 1.1 PROJECT

More information

HARDROCK PROJECT CONSULTATION PLAN for Long Lake #58 First Nation

HARDROCK PROJECT CONSULTATION PLAN for Long Lake #58 First Nation GREENSTONE GOLD MINES GP INC. 2016 HARDROCK PROJECT CONSULTATION PLAN for Long Lake #58 First Nation LONG LAKE #58 FIRST NATION JANUARY 2016 Contents Section Page 1. Introduction... 2-1 1.1 Project Background...

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Hardrock Project Update. To the Municipality of Greenstone, July 10, 2017

Hardrock Project Update. To the Municipality of Greenstone, July 10, 2017 Hardrock Project Update To the Municipality of Greenstone, July 10, 2017 Forward Looking Information Information contained in this news release and the documents referred to herein which are not statements

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

Operating and Reclamation Plan

Operating and Reclamation Plan Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of

More information

HARDROCK PROJECT Final Environmental Impact Statement / Environmental Assessment

HARDROCK PROJECT Final Environmental Impact Statement / Environmental Assessment Final Environmental Impact Statement / Environmental Assessment Chapter 24.0: Summary of Environmental Effects and Commitments Prepared for: Greenstone Gold Mines GP Inc. 365 Bay St, Suite 500 Toronto

More information

APPENDIX D EA Conditions Review D-1: Federal EA Conditions Review D-2: Provincial EA Conditions Review

APPENDIX D EA Conditions Review D-1: Federal EA Conditions Review D-2: Provincial EA Conditions Review APPENDIX D EA Conditions Review D-1: D-2: Provincial EA Conditions Review Côté Gold Project Environmental Effects Review Report September 2018 EA: EA 05-09-02; EAIMS: 13022; CEAA: 80036 D-1: CÔTÉ GOLD

More information

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process. 10.0 Table 10-1 represents a preliminary list of anticipated permits and approvals required to implement the Project and additional details regarding each anticipated permit/approval including the agency

More information

Yeelirrie Uranium Project. Environmental Management

Yeelirrie Uranium Project. Environmental Management Yeelirrie Uranium Project Environmental Management Yeelirrie Uranium Project Yeelirrie is one of Australia s largest undeveloped uranium deposits. The deposit is located approximately 660 km north east

More information

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED

More information

1.2 Below Normal Water Level and Outflow Conditions at Raft Lake Dam

1.2 Below Normal Water Level and Outflow Conditions at Raft Lake Dam DATE November 26, 2015 REFERENCE No. 1408383_3201_Rev 0 TO Cathryn Moffett, Sustainable Development Project Manager Canadian Malartic Corporation CC Darrin Johnson; Adam Auckland - Golder Associates Ltd.

More information

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION

More information

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic

More information

TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT. Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc.

TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT. Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc. TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc. NOVA SCOTIA ENVIRONMENT October 14, 2018 1.0 INTRODUCTION The Goldboro Gold

More information

Amisk Hydroelectric Project Update

Amisk Hydroelectric Project Update Amisk Hydroelectric Project Update AHP Development Corporation (AHP) is providing an update on the Amisk Hydroelectric Project ( Amisk /the Project ). Amisk is a proposed run-of-river hydroelectric project,

More information

Jeremy s Construction Ltd.

Jeremy s Construction Ltd. Jeremy s Construction Ltd. Environmental Assessment Registration Document Proposed Doyles Quarry Extension Submitted by: Jeremy s Construction Limited P.O. Box 137 Doyles, NL A0N 1J0 March 2017 Table of

More information

HARDROCK PROJECT CONCEPTUAL BIODIVERSITY MANAGEMENT AND MONITORING PLAN

HARDROCK PROJECT CONCEPTUAL BIODIVERSITY MANAGEMENT AND MONITORING PLAN HARDROCK PROJECT CONCEPTUAL BIODIVERSITY MANAGEMENT AND MONITORING PLAN Greenstone Gold Mines GP Inc. 365 Bay Street, Suite 500 Toronto, Ontario M5H 2V1 April 2017 0 Table of Contents 1.0 Introduction

More information

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment

More information

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 185 NOVEMBER 2012 GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES TABLE OF CONTENTS 185.01 SCOPE 185.02 REFERENCES

More information

CONDITIONS OF ENVIRONMENTAL IMPACT ASSESSMENT APPROVAL SISSON MINE PROJECT

CONDITIONS OF ENVIRONMENTAL IMPACT ASSESSMENT APPROVAL SISSON MINE PROJECT CONDITIONS OF ENVIRONMENTAL IMPACT ASSESSMENT APPROVAL SISSON MINE PROJECT This Approval does not relieve Sisson Mines Limited (SML; the proponent) from the necessity to comply with any other applicable

More information

MINISTERIAL APPROVAL UNDER THE ENVIRONMENTAL ASSESSMENT ACT RABBIT LAKE SOLUTION PROCESSING PROJECT Cameco Corporation and AREVA Resources Canada Inc.

MINISTERIAL APPROVAL UNDER THE ENVIRONMENTAL ASSESSMENT ACT RABBIT LAKE SOLUTION PROCESSING PROJECT Cameco Corporation and AREVA Resources Canada Inc. MINISTERIAL APPROVAL UNDER THE ENVIRONMENTAL ASSESSMENT ACT RABBIT LAKE SOLUTION PROCESSING PROJECT Cameco Corporation and AREVA Resources Canada Inc. REASONS FOR DECISION Introduction Section 16(1) of

More information

The last update was March 4, 2016.

The last update was March 4, 2016. From: To: Subject: Date: Long Lake Stewardship longlakesudbury@gmail.com LONG LAKE STEWARDSHIP - Gold Mine Site Reclamation Work - Project Update May 29, 2017 6:14:57 PM Hello - Some of you will remember

More information

Information Request 37

Information Request 37 Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5 Federal Review Panel Information

More information

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No. Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE

More information

Public Information Centre

Public Information Centre Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Technical Data Report: Hardrock Project - Water Management Plan

Technical Data Report: Hardrock Project - Water Management Plan Technical Data Report: Hardrock Project - Water Management Plan Prepared for: Greenstone Gold Mines GP Inc. 365 Bay Street Suite 500 Toronto, Ontario Prepared by: Stantec Consulting Ltd. 1-70 Southgate

More information

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016 Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of

More information

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment Meliadine Division Potential Impacts and Mitigations from a Saline Discharge into Marine Environment DECEMBER 2017 VERSION 1 Table 1: Potential Impacts and Mitigations Marine Environment Benthic Invertebrates

More information

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket10-13-2015part3-1Nsm 10.19. SMALL SCALE SAND AND GRAVEL EXTRACTION. 10.19.1. Applicability. This section applies to any mineral

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

HAMMOND REEF GOLD PROJECT Final EIS/EA Report Part 1: Response to Comments from Federal Regulators

HAMMOND REEF GOLD PROJECT Final EIS/EA Report Part 1: Response to Comments from Federal Regulators June 2015 HAMMOND REEF GOLD PROJECT Final EIS/EA Report Part 1: to Comments from Federal Regulators Project Number: 13-1118-0010 FINAL EIS/EA REPORT RESPONSE TO FEDERAL COMMENTS TABLE OF CONTENTS Reference

More information

Operations Mine Site, Tote Road and Railway

Operations Mine Site, Tote Road and Railway Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,

More information

7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS

7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS 7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS 7.1 INTRODUCTION This chapter compares the alternatives and their environmental consequences for the NorthMet Project Proposed Action and Land

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health

More information

10.0 MITIGATION MEASURES

10.0 MITIGATION MEASURES 10.0 MITIGATION MEASURES Mitigation measures proposed herein are the result of an iterative process that took place between the environmental effects prediction and the engineering design teams. Based

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED S PROPOSED HORIZON NORTH PIT EXTENSION PROJECT

TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED S PROPOSED HORIZON NORTH PIT EXTENSION PROJECT TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED S PROPOSED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED

More information

TABLE OF CONTENTS. Page

TABLE OF CONTENTS. Page TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1-1 1.1 PROJECT BACKGROUND... 1-2 1.2 PROJECT PROPONENT... 1-2 1.3 PROJECT OVERVIEW... 1-3 1.4 PROJECT REGULATORY APPROVAL PROCESS... 1-4 1.4.1 Existing

More information

September 2016 ID Competency Statement Type

September 2016 ID Competency Statement Type September 06 Ensures that the impact assessment scope, criteria and conditions (geographic, environmental, economic, social, and cultural) are defined adequately. Develops a project management plan for

More information

February 15, Mr. Kyle Stanfield Prodigy Gold Incorporated Box 209, 3 Dree Road Dubreuilville, ON P05 1BO

February 15, Mr. Kyle Stanfield Prodigy Gold Incorporated Box 209, 3 Dree Road Dubreuilville, ON P05 1BO Environmental Assessment Canadian Agency Agence canadienne devaluation environnementale Ontario Regional Office Bureau regional de Ontario 55 St. Clair Avenue East, 55, avenue St-Clair est, Room 907 bureau

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest THANK YOU for attending this Open House We want to hear from you www.nextbridge.ca Purpose of the Open House We are here to provide you

More information

AND WHEREAS the Minister is satisfied that all the requirements of the Act have been met, including those required of Premier Tech;

AND WHEREAS the Minister is satisfied that all the requirements of the Act have been met, including those required of Premier Tech; PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT PREMIER TECH HORTICULTURE LTD. SMOKEY RIDGE PEAT HARVESTING PROJECT WHEREAS

More information

SCHEDULE A DOCUMENTATION AND CORRESPONDENCE FOR THE PROSPERITY GOLD-COPPER PROJECT (Project) Produced by or for Taseko Mines Limited March 17, 2009 Ap

SCHEDULE A DOCUMENTATION AND CORRESPONDENCE FOR THE PROSPERITY GOLD-COPPER PROJECT (Project) Produced by or for Taseko Mines Limited March 17, 2009 Ap SCHEDULE A DOCUMENTATION AND CORRESPONDENCE FOR THE PROSPERITY GOLD-COPPER PROJECT (Project) Produced by or for Taseko Mines Limited March 17, 2009 April 2009 April 13, 2009 April 16, 2009 April 20, 2009

More information

The Federal Environmental Impact Statement (EIS) Guidelines require that the Environmental Assessment (EA) Report include:

The Federal Environmental Impact Statement (EIS) Guidelines require that the Environmental Assessment (EA) Report include: 11.0 SUMMARY OF RESIDUAL EFFECTS AND CONCERNS 11.1 Changes to the Project since Initially Proposed The Environmental Impact Statement (EIS) Guidelines require that the Environmental Assessment (EA) Report

More information

Technical Review Comments. Environmental Impact Statement for the Rabbit Lake Solution Processing Project. submitted by:

Technical Review Comments. Environmental Impact Statement for the Rabbit Lake Solution Processing Project. submitted by: Saskatchewan Environmental Impact Assessment Technical Review Comments Environmental Impact Statement for the submitted by: Cameco Corporation and AREVA Resources Canada Inc. Environmental Assessment Branch

More information

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were

More information

Grassy Mountain Coal Project Environmental Impact Assessment Project Summary Table

Grassy Mountain Coal Project Environmental Impact Assessment Project Summary Table Grassy Mountain Coal Project Environmental Impact Assessment Project Summary Table Benga Mining Limited 233 20 Avenue PO Box 660 Blairmore, Alberta, T0K 0E0 Phone: + 403 73 60 Business: 470 93 Riversdale

More information

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017 Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...

More information

Environmental Risk Assessment

Environmental Risk Assessment 4 Environmental Risk Assessment Section 4 Environmental Risk Assessment CONTENTS 4 Environmental Risk Assessment 4-1 4.1 4.1 Introduction Introduction 4-1 4-1 4.2 4.2 Methodology Methodology 4-1 4-1 4.2.1

More information

ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY. Town of Shelburne Long-Term Well for Additional Water Supply Project

ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY. Town of Shelburne Long-Term Well for Additional Water Supply Project ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY Town of Shelburne Long-Term Well for Additional Water Supply Project EXECUTIVE SUMMARY Introduction Project Summary In order to accommodate future growth

More information

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador REGISTRATION PURSUANT TO PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR Snook s Arm Area, Baie Verte Peninsula, Newfoundland and Labrador RAMBLER METALS AND MINING CANADA LTD.

More information

Reasons for Ministers Decision

Reasons for Ministers Decision In the matter of the Environmental Assessment Act S.B.C. 2002, c. 43 (Act) and In the matter of an Application for an Environmental Assessment Certificate (Application) by Teck Coal Limited (Proponent)

More information

Option #2 Impact on Agriculture

Option #2 Impact on Agriculture Environmental Assessment Figure 5-27 5-81 Option #2 Impact on Agriculture Socio-Economic The ratio of air space achieved to volume of soil handled has a ratio of 6.5 million m 3 to 2.2 million m 3. There

More information

Detour Lake Gold Mine Project Follow-up Program

Detour Lake Gold Mine Project Follow-up Program Detour Lake Gold Mine Project Follow-up Program Last revised: June 2014 CONTENTS 1 Context... 3 2 Purpose of the Detour Lake Gold Mine Follow-up Program... 3 3 Ensuring Implementation of the Follow-up

More information

Project Update for Joyce Lake Direct Shipping Iron Ore Project: Additional Information Requirements

Project Update for Joyce Lake Direct Shipping Iron Ore Project: Additional Information Requirements Project Update for Joyce Lake Direct Shipping Iron Ore Project: Additional Information Requirements Prepared for: Labec Century Iron Ore Inc. 200 University Avenue, suite 1301 Toronto, ON M5H3C6 Tel: (416)

More information

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO

More information

Environmental Assessment Approval

Environmental Assessment Approval Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper

More information

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,

More information

Review of ML/ARD Geochemistry & Water Quality Predictions

Review of ML/ARD Geochemistry & Water Quality Predictions Review of ML/ARD Geochemistry & Water Quality Predictions Presented by Kim Bellefontaine, M.Sc., P.Geo. Senior Mine Review Geologist, MEMPR With contributions from: Kelly Sexsmith, M.S., P.Geo. Senior

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

POINTE DU BOIS MODERNIZATION PROJECT

POINTE DU BOIS MODERNIZATION PROJECT POINTE DU BOIS MODERNIZATION PROJECT CONSTRUCTION OF NEW FACILITIES AT PRESENT SITE AND DECOMMISSIONING OF EXISTING FACILITIES ENVIRONMENTAL ASSESSMENT DRAFT SCOPING DOCUMENT Submitted By Manitoba Hydro

More information

BUMSTEAD PIT. Part Lot 27, Concession 7 Geographic Township of Holland Township of Chatsworth County of Grey

BUMSTEAD PIT. Part Lot 27, Concession 7 Geographic Township of Holland Township of Chatsworth County of Grey BUMSTEAD PIT Applications to Amend the County of Grey Official Plan and Township of Chatsworth Zoning By-law to facilitate an Application for a Class A, Category 1 License for Mineral Resource Extraction

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

H28. Special Purpose Quarry Zone

H28. Special Purpose Quarry Zone H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction

More information

BERGER PEAT MOSS LIMITED

BERGER PEAT MOSS LIMITED BERGER PEAT MOSS LIMITED Terms of Reference for the Big River Peat Harvest Project Submitted to: Ministry of Environment Environmental Assessment and Stewardship Branch 3211 Albert Street, 4th Floor Regina,

More information

Environmental Impact Statement for the Slave Falls Tramway Conversion Project

Environmental Impact Statement for the Slave Falls Tramway Conversion Project Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT

More information

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5 Arafura Resouces Ltd Nolans volume one 05 Risk assessment Chapter 5 5. Risk assessment 5.1 Introduction This chapter provides a description of the whole-of-project risk assessment undertaken for the identification,

More information

EIS TABLE OF CONTENTS

EIS TABLE OF CONTENTS EIS TABLE OF CONTENTS GLOSSARY OF TERMS... GL-1 Glossary and Abbreviations... GL-1 Units... GL-14 EXECUTIVE SUMMARY... ES-1 INTRODUCTION... ES-1 PROJECT PROPONENTS... ES-1 LOCATION... ES-1 PROJECT DESCRIPTION...

More information

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project

Mohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project Mohawk College Hamilton, ON Fennell Campus Wind Project H336493-0000-07-124-0001 Rev. C September 24, 2010 Project Report Mohawk College Fennell Campus Wind Project September 24, 2010 Table of Contents

More information

Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION

Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION April 2018 AGENDA Introductions Goffs Update - 2017 Environmental Assessment Process Overview of the undertaking Valued Environmental Components

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information