1 VALIDATION REPORT TITLE Logo (optiona) BUREAU VERITAS CERTIFICATION 62/71 Bouevard du Château Neuiy Sur Seine Cdx - France Project Tite Repacement of existing uminaires with LED ightings in common areas of residentia buidings Version Version 2.0 Report ID SINGAPORE/036(a) / A Report Tite Cient Vaidation report Repacement of existing uminaires with LED ightings in common areas of residentia buidings UGL Services Premas Operations Limited, Pages 71 Date of Issue 28/11/2012 Prepared By Contact Approved By Work Carried Out By Bureau Veritas Certification Hoding SAS Mr. Favio Gomes Bureau Veritas Certification Hoding SAS 67/71 Bouevard du Château, Neuiy Sur Seine Cdx T: +33 (0) F: +33 (0) Mr. Sanjay Patankar Mr. Ram Desai ( Lead Verifier) Ms. So Shuk Ling (Verifier) Mr. H.B. Muraidhar (Technica Speciaist) v3.1 1

2 Summary: Bureau Veritas Certification has carried out the vaidation of VCS project Repacement of existing uminaires with LED ightings in common areas of residentia buidings, deveoped by Jurong Town Counci Services Premas Operations Limited, on the basis of Verified Carbon Standard, Version 3. The vaidation scope is defined as an independent and objective review of the design document, the project s baseine study, monitoring pan and other reevant documents, and consists of the foowing three phases: Desk Review of the project design and the baseine and monitoring pan Foow up interviews with project stakehoders Resoution of outstanding issues and the issuance of the fina vaidation report and opinion. The overa vaidation, from Contract Review to Vaidation Report & Opinion, was conducted using Bureau Veritas Certification interna procedures. The project activity at Jurong Town Counci invoves repacement of existing uminaires with Light Emitting Diodes (LED) ightings in the corridors, staircases and void decks (hereinafter referred to as common areas ) of severa existing buidings ocated in Jurong Town, Singapore. Buidings participating in this VCS project activity are residentia buidings which have been constructed by Singapore s Pubic Housing Authority known as Housing Deveopment Board (HDB). Jurong Town consists of 5 zones : 1) Bukit Batok, 2) Bukit Batok East, 3) Jurong Centra, 4) Taman Jurong and 5) Yuhua. Tota there are 588 HDB bocks from these 5 zones participating in the project. There were different type of baseine uminaires used in the baseine scenario: 2 feet (T8)- 25 watt, 2 feet (T5)- 17 watt, 4 feet (T8)- 43 watt, 4 feet (T5)- 31 watt and PLC- 17 watt. The baseine uminaires wi be repaced with 12 watt LED uminaires. The project invoves a one to one repacement except in the case of 4 feet uminaires. Each 4 feet uminaries in baseine wi be repaced with two LED uminaires during project scenario. In baseine scenario, a residentia buidings having T5 and T8, PLC type uminaries were consuming higher eectricity than that of efficient LED uminaries instaed in Project scenario, thus resuted in higher CO 2 emissions. Primary objective of the project activities is to repace the existing higher power watt uminaires with energy efficiency amp (LED) to reduce the eectricity consumption and thereby reducing corresponding CO 2 emissions. Project Proponent has utiized an approved methodoogies for deveoping project to reduce the GHG emissions as given beow: AMS II. C version 13 Demand- side energy efficiency activities for specific technoogies. The first output of vaidation was ist of corrective action requests; carifications are presented in exure II of this document. Based on this output, the project document was revised. In summary, it is Bureau Veritas Certification s opinion that the project correcty appies the baseine and monitoring methodoogy AMA II.C (version 13) meets the requirements of Verified Carbon Standard, Version 3. v3.1 2

3 Tabe of Contents 1 Introduction Objective Scope and Criteria Leve of assurance Summary Description of the Project Vaidation Process Method and Criteria Document Review Interviews Site Inspections Resoution of Any Materia Discrepancy Vaidation Findings Project Design Project scope, type, technoogies and measures impemented, and eigibiity of the project Project proponent Project start date Project crediting period Project scae and estimated GHG emission reductions or removas Project activities Project ocation Project compiance with appicabe aws, statutes and other reguatory frameworks Ownership Emissions trading programs and other binding imits v3.1 3

4 Participation under other GHG programs Other forms of environmenta credit sought or received Rejection by other GHG programs Eigibiity criteria for grouped projects Appication of Methodoogy Tite and Reference Appicabiity Project Boundary Baseine Scenario Additionaity Quantification of GHG Emission Reductions and Removas Methodoogy Deviations Monitoring Pan Environmenta Impact Comments by stakehoders Vaidation concusion Tabe 1 Vaidation requirements based on the Verified Carbon Standard v3.1 4

5 1 INTRODUCTION 1.1 Objective The vaidation serves as project design verification and is a requirement of a projects. The vaidation is an independent third party assessment of the project design. In particuar, the project's baseine, the monitoring pan (MP), and the project s compiance with reevant Verified Carbon Standard, Version 3 are vaidated in order to confirm that the project design, as documented, is sound and reasonabe, and meet the stated requirements and identified criteria. Vaidation is a requirement for a VCS projects and is seen as necessary to provide assurance to stakehoders of the quaity of the project and its intended generation of Verifiabe Carbon Units (VCU). 1.2 Scope and Criteria The vaidation scope is defined as an independent and objective review of the project design document, the project s baseine study and monitoring pan and other reevant documents. The information in these documents is reviewed against Verified Carbon Standard, Version 3 and associated interpretations. The vaidation is not meant to provide any consuting towards the Cient. However, stated requests for carifications and/or corrective actions may provide input for improvement of the project design. The criteria used in vaidation were to assess the project document (PD) against the requirements of Verified Carbon Standard, Version 3, VCS Guidance Document ver 1.1 and associated documents. 1.3 Leve of assurance The eve of assurance was used to determine the depth of detai that the vaidator paced in the vaidation samping pan to determine if there are any errors, omissions, or misrepresentations (ISO :2006). BVCH assessed the project (genera principes, data, samping descriptions, documentation, cacuations, etc.) to provide reasonabe assurance to meet the Project Leve requirements of the VCS Program. The evidence used to achieve a reasonabe eve of assurance is specified in the foowing sections. 1.4 Summary Description of the Project The project activity at Jurong Town Counci Premas Operation Limited invoves repacement of existing uminaires with Light Emitting Diodes (LED) ightings in the corridors, staircases and void decks (hereinafter referred to as common areas ) of severa existing buidings ocated in Jurong Town, Singapore. The buiding participating in the project are residentia buidings which has been constructed by Singapore s Pubic Housing Authority known as Housing Deveopment Board (HDB). Jurong Town consists of 5 zones : 1) Bukit Batok, 2) Bukit Batok East, 3) Jurong Centra, 4) Taman Jurong and 5) Yuhua. Tota there are 588 HDB bocks from these 5 zones participating in the project. /Ref -11/ & /Ref-17/ Type of baseine uminaires 2Feet (T8) -25 Watt 72,252 2Feet (T5) -17Watt 874 Number of Baseine uminaires repaced v3.1 5

6 4 Feet (T8) -43 Watt 6,830 4 Feet (T5) -31Watt 10 PLC -17 Watt 8,179 Tota 88,145 The baseine uminaires wi be repaced with 12 watt LED uminaires. The project invoves a one to one repacement except in the case of 4 feet uminaires each of which wi be repaced with two LED uminaires. Number of baseine uminaries to be repaced presented in above tabe is verified by vaidation team using the Contract Document JRTC-LED SS Dated 16/10/2009 /Ref-17/and it is confirmed through Instaation reports /Ref-22/and fina handing over document to Jurong Town Counci, Singapore/Ref-11/. The baseine scenario is to continue the usage of existing baseine uminaires which has higher power in terms of watt, resuting in the higher eectricity consumption eading to higher CO 2 emissions as compared to project uminaries i.e. LED s. LED uminaires wi have operationa ifetime of around 50,000 hours (i.e. more than 11 years, based on 12 operating hours a day) /Ref -14/. The power requirement of LED uminaires (in terms of Watt) is expected to be amost haf of the power requirement of baseine uminaires. Repacing existing uminaires with the LEDs woud therefore significanty reduce eectricity consumption and thus wi aso contribute in reducing GHG emissions associated with the eectricity generation. For this project activity tota 94,985 LED uminaires used to repace the baseine uminairies. PP has caimed in the PDD submitted for vaidation that LED s are having operationa ifetime of 50,000 Hrs, the ifetime of the LED ights is confiremd by the vaidation team using manufacturers specification /Ref-14/ and it was further corsschecked using pubicay avaiabe information i.e. From US Department of Energy, Energy Efficiency and Renewabe energy/ref-13/ 2 VALIDATION PROCESS 2.1 Method and Criteria The overa vaidation, from Contract Review to Vaidation Report & Opinion, was conducted using Bureau Veritas Certification interna procedures. The vaidation activity performed was a combination of desk review and site visit from 11/08/2012 incuding discussions and interviews with cient, consutant and stakehoders. The Vaidation Criteria aso foowed the guidance documents provided by VCS and incuded foowing VCS Program Guide (1 Feb 2012 v3.2) VCS Standard (1 Feb 2012, v3.2) Program Definitions (1 February 2012 v 3.2) 2.2 Document Review The Project Document submitted by UGL Services Premas Operations Limited and additiona background documents reated to the project design and baseine, i.e. approved methodoogy, Verified Carbon Standard, Version 3 were reviewed. v3.1 6

7 To address Bureau Veritas Certification corrective action and carification requests UGL Services Premas Operations Limited revised the Project Document (PD) and resubmitted it on 28/08/2012 as Version 02. The vaidation findings presented in this report, reates to the project as described in the Project Document (PD) Version 01 Dated 12/07/2012 and the same stand corrected to Version 02 to incude a corrections done in the PD based on the reported CAR s & CL s during Vaidation process. The ist of documents reviewed is presented in exure-i. 2.3 Interviews Bureau Veritas Certification performed site visit and interviews with Project Proponent, and project stakehoders to confirm seected information and to resove issues identified in the document review. The site visit was carried out on 11/08/2012. Representatives of UGL Services Premas Operations Limited and Jurong Town Counci were interviewed. The main topics of the interviews are summarized in Tabe 1 and personne interviewed are given in Tabe 2. Tabe 1 Interview topics Interviewed organization UGL Services Premas Operations Limited Jurong Town Counci UGL Services Premas Operations Limited Interview topics Project Design and impementation Technica specifications of LED / associated equipment Compiance with Nationa Laws and reguations. Additionaity Monitoring Pan GHG Cacuation Environmenta Impacts Tabe 2: Name of Officias Interviewed. Interviewed Organization Person Interviewed UGL Services Premas Operations Limited Mr. Ng Koon Siang Mr. Panchaksharam Thirumaavan Mr Sonny Chuah Jurong Town Counci Mr. Chan Wee Lee (Assistant Director, JRTC-Township Management Mr. Diip Kumar Operation Staff 2.4 Site Inspections Vaidation team performed an onsite vaidation of the project activity on 11/08/2012. During onsite vaidations foowing activities were performed: An assessment of the impementation and operation of the proposed project activity through visua inspection and through interviews with the representatives of project proponent. Confirmation of the pre-project scenario Confirmation of the appicabiity of the methodoogy, mainy regarding the instaation of Luminaries and their capacities, make and monitoring and controing instruments and operationa arrangements. Assessment of the project boundaries Assessment of the monitoring provisions by checking the monitoring arrangements v3.1 7

8 2.5 Resoution of Any Materia Discrepancy The objective of this phase of the vaidation is to raise the requests for corrective actions and carification and any other outstanding issues that needed to be carified for Bureau Veritas Certification positive concusion on the project design. List of corrective action request, carifications is presented in exure- II of the report. Corrective Action Requests (CAR) are issued, where: i) There are mistakes in PD that have direct impact on project resuts. ii) Vaidation protoco requirements have not been met. iii) There is a risk that the project woud not be abe to deiver (high quaity) VCUs. The vaidation team may aso use the term Carification Request (CL), which woud be where: i) Additiona information is needed to fuy carify an issue. Corrective action requests and carifications raised during vaidation activity by the vaidation team are a resoved and addressed by the PP in the respective sections of PD as we as Monitoring pan. PD and monitoring pan are found updated accordingy. 3 VALIDATION FINDINGS 3.1 Project Design Project scope, type, technoogies and measures impemented, and eigibiity of the project Bureau Veritas Certification recognizes the initiative of Jurong Town Counci fufiing its goas of promoting sustainabe deveopment in Host Country Singapore by repacement of existing uminaires with Light Emitting Diodes (LED) ightings in the corridors, staircases and void decks so as to reduce the eectricity consumption. The LED uminaires wi have operationa ifetime of around 50,000 hours (i.e. more than 11 years, based on 12 operating hours a day). The power requirement of the LED uminaires (in terms of Watt) is expected to be amost haf of the power requirement of the baseine uminaires. Repacing existing uminaires with the LEDs woud therefore significanty reduce eectricity consumption and thus wi aso contribute in reducing GHG emission associated with eectricity generation. PP has estimated the eectricity savings using formua (2) provided in the Approved Methodoogy AMS II.C, Version 13 which reveaed that that the existing eectricity consumption is MWh/year for a identified buiding in the Jurong Town Counci and after repacement with LED, the annua eectricity consumption wi be MWh/year, Thus, the project wi substantiay reduce the eectricity consumption in the ighting system which otherwise woud have been consumed in the baseine scenario. The scope of the vaidation incuded the GHG project and baseine scenarios; physica infrastructure, activities, technoogies and processes of the GHG project; GHG sources, types of GHG s. The scope of the project is Repacement of existing uminaires with LED ightings in common areas of residentia buidings outined in Section 1.2 of this report. v3.1 8

9 Repacement of existing uminaires with LED ightings in common areas of residentia buidings is a energy demand project, which fas under VCS Sectora Scopes 03. The project invoves utiization of energy efficiency LED uminaires with 12 watt to repace existing baseine uminaires (T8, T5 and PLC) with varied watt from 17 watt to 43 watt to reduce energy consumption. The Technoogy: The LED uminaires wi have operationa ifetime of around 50,000 hours (i.e. more than 11 years, based on 12 operating hours a day). The power requirement of the LED uminaires (in terms of Watt) is expected to be amost haf of the power requirement of the baseine uminaires. The LED uminaires using in the project activity is 12 watt, whereas power requirement of baseine uminaires varies between 17 to 43 watts. The quantity of eectricity consumption reduction is cacuated by utiising AMS II.C (Version 13) Demandside energy efficiency activities for specific technoogies. The said project is categorised under Project Category (with Tota Emission Reduction of 2397 tco 2 / um) as per Verified Carbon Standard, Version 3 definition for Project Category based on the emission reduction quantity in tco 2 / um. Project Start date is the date on which project wi start reducing or removing GHG emissions consistenty i.e after commissioning and stabiization of the project 29th March Years fixed Crediting Period and the crediting period for the project starts from 29th March 2011 There is no doube counting as the project has not been considered under any other GHG program. Project participant has given a decaration that they wi not be caiming any other credits other than VCUs. As per Verified Carbon Standard, Version 3, the scope of VCS program incudes foowing 1. A six Kyoto Protoco greenhouse gases; 2. A technoogies supported by an approved VCS Program methodoogy, incuding AFOLU project types as set out on 3. Any approved GHG Programs; 4. Project category (ies) which is part of an approved GHG Program; 5. Project methodoogies, not part of an approved GHG Program, when approved under the VCS program under doube approva process The project is adoption of energy- efficient equipment. The project uses approved methodoogy AMS II.C (Demand-side energy efficiency activities for specific technoogies) Version no.13, thus the project is eigibe under VCS Project proponent Mr. Chan Wee Lee (Assistant Director, JRTC-Township Management) Jurong Town Counci Bock 255, Jurong East Street 24, # Singapore Teephone: v3.1 9

10 Fax: Emai: Website: Mr. Panchaksharam Thirumaavan (Manager, Energy Services) UGL Services Premas Operations Limited, Bock 750 Oasis, Chai Chee Road, Chai Chee #01-01, Singapore Teephone: Fax: Emai: thiru.p@ug-premas.com Website: Project start date As per the definition of the Project Start Date provided by the Verified Carbon Standard, Version 3, PP has mentioned expected start date of Project activity as 29/03/2011. This date was vaidated by the Vaidation Team using the fina handing over document submitted by United Premas Operations Limited to HDB. The handing over of project was done in phases, however the fina handing over was competed on 29/03/2011 and hence the start date is considered as 29/03/2011. PP has shown a handing over reports to Vaidation Team, which was counter signed by the Jurong Town Counci Authorities. Based on the above vaidation, Vaidation team confirms that the Start Date of the project activity is in accordance with Definition of Start Date given by VCS Standard, Version Project crediting period Project proponent has provided information on crediting period in VCS PD Section 1.6. PP seects fixed crediting period of 10 years and the crediting period commences from the expected start date of project activity i.e. 29/03/2011, as mentioned in section in this report. The seected crediting period is found in ine with the estimated operation ife time of the LED, PP has estimated around 50,000 hours (i.e. more than 11 years, based on 12 operating hours a day) as ife time of LED at the Project Site, hence the seected fixed crediting period found appropriate. The Technica ife time of the LED seected by PP was vaidated using the manufacturers Specification and it is found in accordance with Option (a) of Methodoogica Too Too to determine the remaining ifetime of equipment. (Version 01) EB 50 ex 15, This was further reconfirmed using pubicay avaiabe credibe references I.e. Document on Lifetime of White LED s, as per the document it is scientificay proven that the if LED s are working 24/7 it can work efficienty without much drop in Lumen eve for more than Hrs. hence the Life time evidence given by PP is acceptabe to Vaidation Team Project scae and estimated GHG emission reductions or removas Based on the estimation of GHG emission reductions due to impementation of project activity presented by PP in the VCS PD, it vaidation team confirms that the project activity fas under project scae. PP has correcty identified the Scae and appropriatey presented in the VCS PD section 1.7 in the prescribed format. As per the definition of the Project scae provided by the VCS, Average annua project emissions v3.1 10

11 estimated by PP are found beow 1,000,000 tco 2e and hence the categorization of proposed project activity is in accordance with para of VCS, Version 3. Estimated Average ua Emission Reductions due to impementation of project activity are 2397 tco2e Project activities The project activities invoves repacement of existing uminaires with Light Emitting Diodes (LED) ightings in the corridors, staircases and void decks (hereinafter referred to as common areas ) of severa existing buidings ocated in Jurong Town. There is tota 5 zones under Jurong Town Counci: 1) Bukit Batok, 2) Bukit Batok East, 3) Jurong Centra, 4) Taman Jurong and 5) Yuhua. Tota 588 bocks invoved in the Jurong Town. PP is instaing LED uminaires using ower power watt i.e 12 watt, which wi consume approximatey MWh eectricity consumption per year and generate average annua emissions of 2,452 tco2 In the absence of this project activity, Jurong Town wi continue to use the existing baseine uminaires with varies power in term of watt from 17 watt to 43 watt which wi consume amost doube of project activities eectricity consumption at MWh per annum and generated 4849 tco2 emissions. Impementation of project activity wi resut in reducing CO 2 emissions due to the usage of high energy efficiency LED uminaires Project ocation The project is impemented in HDB Bocks ocated in 5 zones of Jurong Town, Singapore. The centra GPS coordinated for the 5 zones are as foows: Centra GPS coordinates of the five zones covered under the project: Bukit Batok N E Bukit Batok East N E Jurong Centra N E Taman Jurong N E Yuhua N E Vaidation team confirms that the ocation detais mentioned in the VCS PD found precise and it is physicay verified during site visit and by checking Googe geographica coordinates of Jurong Town Counci 5 zones Project compiance with appicabe aws, statutes and other reguatory frameworks PP has decared in the VCS PD that there is no oca reguation exists in the host country which prevents or promotes impementation of project activity i.e. repacement of existing uminaires with LED ightings in common areas of residentia buidings. Repacement of existing uminaires with LED ightings in common areas of residentia buiding is in compiance with this standard and PP has ensured that adequate and energy efficiency LED uminaires are instaed. During site visit vaidation team verified the scrapped od uminaires have been dispose off by independent third party which have foow the above mentioned reguations. Hence vaidation team finay concudes that Project is impemented in accordance with appicabe oca aws, statues and other reguatory frameworks exist in the host country Singapore at that time of vaidation. v3.1 11

12 3.1.9 Ownership The ownership of project activity was verified in detaied by the vaidation team during site visit and observed that the LED uminaires instaed at the Jurong Town Counci- 5 Zones faciity is owned by Jurong Town Counci. Vaidation team has verified the Owner ship of the Jurong Town Counci through officia web site, from where it was confirmed that divisions invoved in the Project Activity are beonging to the Jurong Town Counci, and it is in accordance with Singapore Government s constituency aocation. Hence Vaidation Team has concuded that ownership proofs are correct and there is no ambiguity exists in the ownership of the project activity Emissions trading programs and other binding imits The project activity s emissions reduction is not incuded in an emission trading program and do not take pace in a jurisdiction with binding imits on GHG emissions. There are no binding imits on GHG emission reduction in Singapore. The project activity wi be submitted for registration as a VCS project activity ony. PP has provided a decaration on its etter head that the project activity wi neither participate in any emission trading programs, GHG Programs nor avai any form of environmenta credits Participation under other GHG programs The project activity has not been registered nor is seeking registration under any other GHG programs such as. The project activity wi be submitted for registration as a VCS project activity ony. PP has provided a decaration on its etter head that the project activity wi neither participate in any emission trading programs, GHG Programs nor avai any form of environmenta credits Other forms of environmenta credit sought or received This project activity wi ony be registered under the VCS program to generate VCUs ony and wi not caim any other forms of environmenta credits. The project activity wi be submitted for registration as a VCS project activity ony. PP has provided a decaration on its etter head that the project activity wi neither participate in any emission trading programs, GHG Programs nor avai any form of environmenta credits Rejection by other GHG programs The project activity has never been registered nor rejected by any other GHG programs Eigibiity criteria for grouped projects This project activity does not invove incusion of new project activity within an existing group; thus, eigibiity criteria for grouped project is not appicabe. v3.1 12

13 3.2 Appication of Methodoogy Tite and Reference PP has utiized a Approved Sma Scae monitoring Methodoogy to deveop this VCS project. As VCS Aows utiization of approved methodoogies from it is in accordance with Verified Carbon Standard, Version 3 Para 3.1.5, under section 3 Project Requirements. An appied Approved methodoogy utiized by the PP is methodoogy AMS-II.C (Version 13): Demand-side energy efficiency activities for specific technoogies Appicabiity The appicabiity of the chosen baseine methodoogy has been adequatey addressed in the Project description. The appicabiity conditions of AMS-II. C (Version 13) are satisfied as given beow. A. Appicabiity Conditions of AMS II.C (Version 13) Appicabiity Condition No 1: The project is encouraging the adoption of energy-efficient equipment / appiances (e.g amps, baasts, refrigerators, motors, fans, air conditioners, pumping systems) at many sites. These technoogies may repace existing equipment or be instaed at new sites. In the case of new faciities, the determination of baseine scenario sha be as per the procedures described in the genera guidance to SSC methodoogies under the section Type II and III Greenfied project (new faciities). The aggregate energy savings by as singe project may not exceed the equivaent to 60GWh per year for eectrica end use energy efficiency technoogies. For Fossi fue end use energy efficiency technoogies, the imit is 180GWh therma per year in fue input. The project invoves suppy and instaation of energy efficient LED uminaires as a repacement to existing uminaires in common areas of severa existing HDB bocks in Jurong Town, Singapore. It therefore contributes in reducing eectricity consumption for ighting in common areas in HDB Bocks compared to what woud have been consumed in the baseine scenario. The eectricity savings from the project activity is ~5 GWh per annum (refer to section 3.4, baseine eectricity consumption = MWh and project eectricity consumption = MWh) which is within the aggregate imit of 60 GWh provided under the methodoogy. This is confirmed by using the Baseine Luminary detais and Project Luminary Detais, PP has provided a transparent cacuation in Appendix 1 of PD to show each how each HDB bock participating in the Project activity achieves the Saving and it is within 60 GWh. Appicabiity Condition No 2: For each repaced appiance / equipment / system the rated capacity or output or eve of services (e.g igh output, water output, room temperature and comfort, the rated output capacity of airconditioners etc.) is no significanty smaer (maximum 10%0 than the baseine or significanty arger (maximum + 50%) than the baseines. v3.1 13

14 The ux output of the LEDs is not significanty smaer (maximum - 10%) or significanty arger (maximum + 50%) than the baseine uminaires. In order to justify compiance with this appicabiity condition, ux sampes were coected for different types of baseine uminaires instaed in different ocations (corridor, staircases, void decks) in HDB bocks before dismanting them. Simiary, ux data was aso coected for LED uminaires for the same ocation (at which baseine ux was recorded) after the instaation of LEDs. The two sets of ux data was compared to concude that it is within the -10% to +50% range as provided under the methodoogy. Vaidation team has verified the Lux Measurement data obtained through a campaign which invove measurement before repacement and measurement after repacement. This Measurement was carried out for the samped HDB bocks, totay 100 bocks were samped. The Samping methodoogy is ceary mentioned in the PD. From the Lux measurement data it is confirmed that the project activity meets this appicabiity condition. Appicabiity Condition No 3: If the energy efficient equipment contains refrigerants, then the refrigerant used in the project case sha be CFC free. Project emission from the baseine refrigerant and / or project refrigerants sha be considered in accordance with the guidance of the Board (EB34, paragraph 17). This methodoogy credits emission reductions ony due to the reduction in eectricity consumption from use of more efficient equipment / appiance. Not Appicabe due to LED do not consists any refrigerant Project Boundary The project boundary is the 588 HDB bocks ocated within 5 zones of Jurong Town Counci. Bukit Batok N E Bukit Batok East N E Jurong Centra N E Taman Jurong N E Yuhua N E The main source of GHG from this project wi be CO2 from the eectricity energy consumption drawn from Singapore nationa grid. The Vaidation Team vaidated the project boundary by: a) Site visit on 11/08/2012 to assess the physica instaation of LED uminaires was done at the above mentioned 5 zones in Jurong Town Counci, Singapore. During Site visit Vaidation Team Verified 20 Bocks in various Divisions to confirm that repacement is competed and is in accordance with the Description provided in the PD. The project boundary incudes the LED uminaires and Energy Monitoring and Contro System instaed at each HDB bock. The List of project equipment s seen at the time of Site visit is given as beow - LED Luminaries instaed at various common areas of HDB Bocks v3.1 14

15 - Pane Room - Energy Meters (in Samped Bocks) - Timer Switch b) Foowing documentation reated to the project have been verified to confirm the boundary: 1. Contract Document JRTC-LED SS Darted 16/10/2009 between Jurong Town Counci to UGL Services Premas Operations Limited for the repacement of LED uminaires in Listed HDB Bocks of Five Divisions. 2. Fina Handing Over Document and Certificate of competion Dated 29/03/2011 towards repacement of existing uminaires with LED uminaires in common areas of residentia buidings at Jurong Town Councia Based on the above assessment, the Vaidation Team hereby confirms that the identified boundary and the seected sources and gases are justified for the project activity Baseine Scenario The PP has defined the baseine as according to the methodoogy AMS II.C (Version 13). Based on the PD section 2.4 description of baseine identification, PP has identified the baseine scenario is to continuation of current situation i.e HDB bocks participating in the project wi continue to use the baseine uminaires in their common areas thus resuting in higher eectricity consumption compared to what wi be consumed in the project scenario. Hence, the baseine scenario identified found in ine with the requirement of approved methodoogy requirement. Since the baseine is energy dispaced eectricity, PP has demonstrated the cacuation of baseine eectricity consumption by mutipying number of uminaires repaces (ni) x power (watts) (pi) x annua operating hours and average annua technica grid osses (y) in baseine scenario which is further mutipied by the combined margin emission factor to arrive at baseine emissions. PP has estabished baseine Emissions using Number of uminaries repaced, for which the project energy efficient uminaries are operating during the year and Power of the Baseine uminaries.detaied documents on baseine uminaries with specific anaysis on number of uminaires repaced in each zone in the common areas, power watt, annua operating running hours and average annua technica grid oss are made avaiabe for the vaidation purpose. Based on these documents Vaidation Team confirms that baseine uminaire s eectricity consumption and the reevant parameters are transparenty cacuated and presented by PP. The Vaidation team is of the opinion that the baseine determination is correct and appropriate in accordance with appied baseine and monitoring methodoogies i.e. AMS. II.C, Version 13. Vaidation team therefore confirms that the seected baseine scenario reasonaby represents the scenario in the absence of the project activity. It was aso confirmed by the vaidation team that there were no nationa or sectora poicies were prevaiing at the time of the project participants decision to impement the said project activity i.e. there was no mandate for impementing repacement of existing uminaires with LED uminaires in common area of residentia buidings. The project activity, thus was the vountary decision of the project participant. v3.1 15

16 Based on the above assessment the vaidation team hereby confirms that: VALIDATION REPORT: VCS Version 3 (a) A the assumptions and data used by the project participants are isted in the PD, incuding their references and sources; (b) A documentation used is reevant for estabishing the baseine scenario and correcty quoted and interpreted in the PD; (c) Assumptions and data used in the identification of the baseine scenario are justified appropriatey, supported by evidence and can be deemed reasonabe; (d) Reevant nationa and/or sectora poicies and circumstances are considered and isted in the PD; (e) The approved baseine methodoogy has been correcty appied to identify the most reasonabe baseine scenario and the identified baseine scenario reasonaby represents what woud occur in the absence of the proposed VCS project activity Additionaity PP has demonstrated the additionaity of project activity by using category of micro scae energy efficiency project activities ( guideine ex 26, Executive Board Meeting 68) which is described in PD section 2.5. In accordance with Para 3 of EB 68 ex 26, the energy efficiency project activity is considered as additiona if project activity fufis both beow conditions, 1) Each of the independent subsystem/measure in the project achieves an estimated annua energy savings of equa to smaer than 600 megawatt hours; and 2) End users of the subsystem or measure are househods/communities/sme. Whie Verifying the submitted PD, Vaidation team found that it was not cear how PP has caimed that condition 1 i.e. each independent subsystem / measure in the project achieves estimated annua energy savings of ess than 600 MWh. Hence Vaidation team has raised CL 01. In response to the CL1 PP has presented detaied cacuation in the PD Version 2 Dated 28/08/2012 transparenty. As per the cacuation provided in the revised PD Appendix 1, it is confirmed that independent subsystem / measure in the project activity is one residentia bock. As per the cacuation it is observed that the eectricity saving in each bock is in the range of 0.24 MWh / um to MWh/um. Vaidation team performed an independent cacuation based on the data verified during site visit and found that on an average the energy efficiency per bock (division wise) is in the range of 7.51 MWh to 10. MWh per annum.. Divisions Bukit Batok Bukit Batok East Juring Centra No. of bocks (A) Energy Consumption in Baseine per annum per div (B) MWh Energy Consumption in Project Scenario per um per div (C) MWh ua Energy Saving per um Per Div (D= B-C) MWh Average Energy Saving Per Bock (Div. wise) E = D/A) MWh Yuhua Taman Jurong Tota v3.1 16

17 From the above cacuation and site vaidation team herewith confirms that, VALIDATION REPORT: VCS Version 3 (a) ua energy savings expected from the project are ~5 GWh per annum. 588 HDB Bocks are participating in the project. Therefore the energy saving per HDB Bock (i.e. an independent subsystem/measure) is we within the cap of 600 MWh provided under the guideine. (b) The project activity invoves repacement of baseine uminaries in common areas HDB Bocks meant for residentia purpose with more efficient LED uminaries for identified HDB bock of Jurong Town in Singapore hence 2 nd condition of EB 68 ex 26 is aso fufis. Vaidation Team hereby confirms that Project activity satisfactoriy fufis both condition as prescribed under Para 3 of EB 68 ex 26 and hence considered as additiona under micro scae additionaity requirement of Quantification of GHG Emission Reductions and Removas PP has used the agorithm and formuae in ine with the AMS II.C Version 13 and corresponding toos to cacuate emission factor stated in AMS I.D. (EB63 ex 19 methodoogica Too Too to cacuate the emission factor for an eectricity system version The project activity wi gather data from: 1. Number of LED umianire repaced (ni) 2. Power of the LED uminaires in terms of watt 3. ua average operating hours (Oi) hours 4. Average annua technica grid osses (y) Data wi then computed from the eectronic data management system to get the vaue of tota eectricity consumption in the baseine scenario (MWh). Since the baseine is energy dispaced eectricity, PP has the cacuated the baseine eectricity consumption by mutipying number of uminaires repaces (ni) x power (watts) (pi) x annua operating hours and average annua technica grid osses (y) in baseine scenario which is further mutipied by the combined margin emission factor to arrive at baseine emissions. The assumptions used for cacuating baseine emissions are presented by PP in transparent eectronic data form (output of monitoring eectronic data management system), hence, the baseine emission cacuated by PP was found satisfactory. During site visit Vaidation team cross checked the repacement of the Luminaries in seected bock and samping approach for verifying the repacement is as given beow Number of Bocks samped during Vaidation Site visit = of Tota Number of Bocks = 588 = Based on the above cacuation vaidation team seected 25 bocks randomy from the given ist of HDB bocks provided by PP. The ist of randomy seected bocks is provided in beow tabe. v3.1 17

18 Division Bukit Batok Jurong Centra Yuhua & Taman Jurong Bukit Batok East Bock No A 288F 289D 291B Cacuation of Baseine emission: 1. Cacuation of eectricity consumption in the baseine in year y (E BL,y ) E = ( n * ρ * ο ) /(1 ) BL, y i i i i y EBL,y = MWh BE y = EBL, y * EFCO2, ELEC, y + Qref, BL GWPref, BL 2. Cacuation of combined margin emission factor: Cacuated by appying 0.5 weight to both Operating Margin and Buid Margin emission factor. Operating Margin emission factor = Buid Margin emission factor = Combined margin is = Operating Margin emission factor and buid margin emission factor are pubished by oca Singapore Nationa Environmenta Agency. v3.1 18

19 3 Cacuation of baseine emissions due to eectricity consumption (E BL,y ) * (EF CO2,Eec,y ) = x = 4849 tco2 4 Baseine emissions due to annua eakage of refrigerant (Q ref,bl ) * (GWP ref,bl ) = 0- LED do not consist any refrigerant 5 Cacuation of project emissions due to eectricity consumption E = ( n * ρ * ο ) /(1 ) PJ, y i i i i y (E PJ,y ) = MWh 6 Cacuation of tota project emissions (E PJ,y ) * (EF CO2,Eec,y ) = x = 2452 tco2 VALIDATION REPORT: VCS Version 3 7 Cacuation of eakages As per section 3.3 of the PD, eakages are not appicabe. 8 Cacuation of annua emission reductions: Tota baseine emission (BEy) Tota project Emission PEy = 4849 tco tco2 = 2397 tco2 PP has estimated Project emission based on ex-ante baseine monitoring study. PP has demonstrated the cacuation of project emission in carbon emission cacuation spreadsheet in a transparent manner. Vaues obtained through this cacuation is reproduced as give beow: Estimated eectricity consumption in the project scenario (EpJ,y) = MWh Average annua technica grid osses (y) = 3.6% (data pubished by SP Services Website) Combined margin emission factor (EFCO2,y)= tco2/mwh) (data from NEA website) Project Emission = 2452 tco2e / year Emission Reductions: As per approved methodoogy emission reduction cacuation is done using foowing formua ER y = BE PE ) LE ( (1) y y y Where: ER y LE y Emission reductions in year y (tco2e) Leakage emissions in year y (tco2e) PP has demonstrated the emission reduction cacuation in exce spreadsheet as we as PD. As per the demonstration eakage emission in the project is not appicabe because there is no transfer of the equipment, the od uminaires were scrapped, hence, no eakage account in the cacuation. v3.1 19

20 The vaidation team found the cacuation is in ine with the approved methodoogy for the cacuation of emission reduction. Grid Emission factor: Grid emission factor is pubished by Singapore DNA which is Nationa Environmenta Agency on 25 Feb 2011 based on 3 years data 2007, 2008 and Whie verifying the submitted PD Version 1 Dated 12/07/2012, it was observed that PP has utiized grid Emission factor for year 2011 i.e tco 2 /MWh, however the project was started in year 2010 and hence the CAR 3 was raised. In response to the CAR3 PP revised the emission factor to 2010 i.e tco 2 /MWh. Baseine emissions, project emission and emission reduction cacuations are corrected appying revised grid emission factor and hence the CAR 3 was cosed. PP decided to use the Ex ante option which compies with the Too to cacuate the emission factor for an eectricity system (version )(Ref-XX). A 3-year generation weighted average has been derived for the years, 2007, 2008 and The buid and operating margins of the grid are considered as a product of the weighted average for each margin and summed to give the fina vaue of the emission factor (EF grid,cm,y ) and expressed in kiogramsco 2 per kwh as foows: EF grid,cm,y = EF grid,om,y x W OM + EF grid, BM,y X W BM EF grid,bm,y = Buid margin CO2 emission factor in year y (tco 2 /MWh) EF grid,om,y = Operating margin CO2 emission factor in yeary y (tco 2 /MWh) W OM = Weighting of operating margin emission factor (%) W BM = Weighting of buid margin emission factor (%) Then the emission reduction wi be cacuated by energy saved per month x EF grid,cm,y where EF grid,cm,y = tco2/mwh Hence the annua MWh energy saving x tco 2 /MWh = tonco2e per annum. DOE has vaidated the emission factor pubished by NEA on 25 Feb 2011 and it is accordance to the too to cacuate the emission factor for an eectricity system. Based on the above assessment, the Vaidation Team hereby confirms that: (a) A assumptions and data used by the project participants are isted in the PD, incuding their references and sources; (b) A documentation used by project participants as the basis for assumptions and source of data is correcty quoted and interpreted in the PD; (c) A vaues used in the PD are considered reasonabe in the context of the proposed project activity; (d) The baseine methodoogy has been appied correcty to cacuate project emissions, baseine emissions, eakage and emission reductions; v3.1 20

21 (e) A estimates of the baseine emissions can be repicated using the data and parameter vaues provided in the PD Methodoogy Deviations There is no Methodoogy deviations notices and hence this is Not Appicabe Monitoring Pan A. Data and parameters avaiabe at vaidation as foow: 1. Combined margin emission factor in year y cacuated in accordance with the provision in AMS I. D. (EFCO2,ELEC,y ; EFCO2,y ) - tco2/mwh. The combined margin emission factor is cacuated by appying 0.5 weights to simpe operating margin and buid margin emission factor. Simpe operating margin and buid margin emission factor are pubished by Singapore DNA which is Nationa Environmenta Agency on 25 Feb 2011 based on 3 years data 2007, 2008 and Vaidation Team has vaidated the emission factor pubished by NEA on 25 Feb 2011 and it is accordance to the too to cacuate the emission factor for an eectricity system. 2. Average annua technica grid osses (transmission and distribution) during year y for the grid serving the ocations where the devices are instaed. Data is determined by Energy Market Authority (EMA), Government of Singapore then pubished by Sinapore Power. Vaidation Team has vaidated the annua technica grid oss from EMA on 25 Feb 2011 and confirmed the cacuation of the grid osses is according to methodoogy AMS I.D. 3. Project sampe group (PSG) for monitoring average annua operating hours of the project devices. The project sampe size is determined based on the Standard for samping for surveys for project activities and programme of activities (ex-2, Executive Board Meeting 65) and Best Practice Exampes Focusing on Sampe Size and Reiabiity Cacuations (ex-6, Executive Board Meeting 67). Aso refer to section 4.3 of the PD for further information on determination of sampe size. Base on the samping method mentioned above, tota 100 bocks wi be seected in monthy checks to ensure that the LED uminaires instaed in HDB bocks are sti in operating. 4. Number of devices of the group of i devices (e.g., 24W or 41W or 36W baseine uminaires) repaced, for which the project energy efficient equipment is operating during the year. This data is coected at the time of repacing the existing uminaires with the LED. Data was coected and recorded in data ogs. Tota number appied 88, pi ( for baseine uminaires)- Data pertaining to this parameter is coected at the time of repacing the existing uminaires with the LEDs. It is cross checked with the data provided in the tender document foated by a group of town councis in Singapore for repacing existing uminaires in common areas of HDB bocks with LEDs. Data was coected and recorded in data ogs. It wi remain constant for the entire crediting period and wi be used for cacuating baseine emissions. Vaue appied in the baseine uminaires are: v3.1

22 2Feet (T8) - 25 Watt 2Feet (T5) - 17Watt 4Feet (T8) - 43 Watt 4Feet (T5) -31Watt PLC -17 Watt 6. ni (for project uminaires)- Number of LED instaed in the project Data pertaining to this parameter was coected at the time of repacing the existing uminaires with the LEDs and therefore regarded as the most reiabe source of data. Data was coected and recorded in data ogs deveoped for this purpose. This parameter wi remain constant for the entire crediting period. 7. pi ( for project uminaires) Power of the LEDs instaed in the project This is the name pate power of the LEDs. The data for this parameter wi remain constant for the entire crediting period and wi be used for cacuating project emissions. Vaue appied for Luminaires is 12 watt. B. Monitoring pan compies with the requirements of the methodoogy AMS II.C Version 13 which is a approved methodoogy. The Vaidation Team considers the monitoring pan to be compying with the requirements of the methodoogy. The reasons are as given beow PP has described the monitored pan wi monitor the foow data: 1 The monitoring pan has covered the baseine uminaires and LED operation hour Operation hours are controed using the Timers at each HDB Bock. An operation time schedue for different months are fixed and is found dispayed at each HDB Bock in Pane Room. The Schedue is as given beow Months Time for Switch On in the Evening Time for Switch Off in the Morning January to March 19:00 07:15 Apri to August 19:00 07:00 September to December 18:45 07:00 2. Sampe size is determined according to Best Practice Exampes Focusing on Sampe Size and Reiabiity Cacuations (ex 6, EB meeting 67). Vaue appied is 100 HDB bocks out of the tota 588 bocks wi be monitored. Monitoring Processes: At the end of each month, the project proponent wi review the timers instaed in the project sampe group and verify whether the inbuit programme is correcty cocking 12 hours a day of operation or whether the programme is corrupt and cocking any different number of hours per day. Data on number of hours cocked per day wi be recorded for each timer in the sampe group and based on such data, the mean daiy operating hour cocked and the standard deviation of the mean wi be cacuated. It is most ikey that the standard deviation wi be cacuated as zero and mean hours wi be cacuated as 12 hours a day, uness in the case of any timer(s) whose programming is corrupted and was cocking different number of hours a day during the previous month. If during the monthy review any timer is found fauty, it wi be immediatey repaced with a new timer. v3.1 22

Energy Performance Certificate

Energy Performance Certificate 3 Harequin Road Sieby LOUGHBOROUGH Leicestershire LE12 7UR Dweing type: Date of assessment: Date of certificate: Reference number: Tota foor area: Mid-terrace house 09 November 2007 09 November 2007 9547-1831-6293-0503-2641

More information

Liability Data Reporting: Lessons Learned from the 2016 data collection process and changes for the 2017 LDT template and collection process

Liability Data Reporting: Lessons Learned from the 2016 data collection process and changes for the 2017 LDT template and collection process 1/31/2017 Fifth Industry Diaogue Liabiity Data Reporting: Lessons Learned from the 2016 data coection process and changes for the 2017 LDT tempate and coection process Dominique Laboureix, Member of the

More information

Solar Roof Top in Thailand

Solar Roof Top in Thailand Soar Roof Top in Thaiand Presentation outine 1 Soar potentia in Thaiand 2 Technoogy and system overview 3 The project deveopment process Soar Systems in Thaiand - Opportunity and Market Deveopment 4 5

More information

Chapter 2 Understanding the PMBOK Guide

Chapter 2 Understanding the PMBOK Guide Chapter 2 Understanding the PMBOK Guide Chapter Summary This chapter examines: The PMBOK Guide is a guide rather than a methodoogy and the difference is expored. This section aso summarizes some important

More information

World Accreditation Day

World Accreditation Day Word Accreditation Day 9 June 2016 www.pubicsectorassurance.org Accreditation: A goba too to support Pubic Poicy Accreditation: A goba too to support Pubic Poicy Standards, accreditation and conformity

More information

Presentation Outline

Presentation Outline Sector-Based Approach for Post-2012 Ned Heme, President Center for Cean Air Poicy EU-China Seminar Towards a Goba Carbon Market 14-15 November 2005 Beijing, China Presentation Outine Sector-based approach»

More information

IQ ASSURED. Delivering Building Energy Management

IQ ASSURED. Delivering Building Energy Management IQ ASSURED Deivering Buiding Energy Management A BEMS can efficienty contro as much as 84% of your buiding s energy consumption but, to do so, it must be working effectivey The Buiding Energy Management

More information

Approved baseline and monitoring methodology AM0076

Approved baseline and monitoring methodology AM0076 Approved baseine and monitoring methodoogy AM0076 Methodoogy for impementation of fossi fue trigeneration systems in existing industria faciities I. SOURCE, DEFINITIONS AND APPLICABILITY Sources This baseine

More information

SA grid code compliance for medium-high voltage renewable power plants

SA grid code compliance for medium-high voltage renewable power plants SA grid code compiance for medium-high votage renewabe power pants by Sanjeeth Sewchurran, Jay Kaichuran, and Sandie Maphumuo, ethekwini Eectricity Renewabe energy with its short ead times has become an

More information

An important responsibility

An important responsibility GRI-index 2016 In addition to a compete GRI index for 2016, this document contains a ord from the CEO, information about Lindab s environmenta ork as e as a materiaity anaysis and stakehoder diaogue 1

More information

Considerations for Layer of Protection Analysis for Licensed Plant

Considerations for Layer of Protection Analysis for Licensed Plant Considerations for Layer of Protection Anaysis for Licensed Pant Jo Fearney Senior Consutant, Aker Kvaerner Consutancy Services, Aker Kvaerner, Ashmore House, Stockton on Tees, TS18 3RE, UK E-mai: jo.fearney@akerkvaerner.com

More information

PV Power Plant Project Development and Implementation in Southeast Asia. Renewable Energy Asia Exhibition 6th June, 2012

PV Power Plant Project Development and Implementation in Southeast Asia. Renewable Energy Asia Exhibition 6th June, 2012 PV Power Pant Project Deveopment and Impementation in Southeast Asia Renewabe Energy Asia Exhibition 6th June, 2012 Presentation outine 1 The PV project deveopment process 2 Key components of a PV farm

More information

Energy Consumption. U.S. Energy Consumption by Sector, Energy Use. Who Uses Energy? Residential and Commercial Sectors

Energy Consumption. U.S. Energy Consumption by Sector, Energy Use. Who Uses Energy? Residential and Commercial Sectors OFF Energy Consumption Energy Use Think about how you use energy every day. You wake up to an aarm cock. You take a shower with water warmed by a hot water heater. You isten to music on the radio as you

More information

Sustainability Report

Sustainability Report Strategic Report Annua Report and Accounts 2013/14 Sustainabiity Report The NHS aims to reduce its carbon footprint by 10% between 2009 and 2015. In support of this target we have deveoped a Sustainabe

More information

International Laboratory Accreditation Cooperation. Why use an Accredited Laboratory?

International Laboratory Accreditation Cooperation. Why use an Accredited Laboratory? Internationa Laboratory Accreditation Cooperation Why use an Accredited Laboratory? What factors shoud you consider when choosing a aboratory? When seecting a aboratory to fufi your testing, caibration

More information

Questions and Guidance Notes REPORT

Questions and Guidance Notes REPORT Report Tite: DREAM (Defence Reated Environmenta Assessment Methodoogy) Questions and Guidance Notes REPORT Question Set : Hangars and Workshops - New Buid Version: 6 Page 2 Stage: Survey Biodiversity &

More information

Presentation Outline

Presentation Outline Sector-Based Approach: Overview & Lessons from Country Anaysis Jake Schmidt, Internationa Program Manager Center for Cean Air Poicy Diaogue on Future Internationa Actions to Address Goba Cimate Change

More information

CEQA Portal Topic Paper. Thresholds of Significance. What Is a Threshold of Significance?

CEQA Portal Topic Paper. Thresholds of Significance. What Is a Threshold of Significance? CEQA Porta Topic Paper What Is a Threshod of Significance? Threshods of Significance CEQA requires a Lead Agency to determine the significance of a environmenta impacts (Caifornia Pubic Resources Code

More information

Single Ply Roofing System

Single Ply Roofing System Insua t i o n Second Revision Juy 2018 Singe Py Roofing System NEXT GENERATION INSULATION SOLUTION FOR FLAT ROOFS Optimum performance rigid vacuum insuation pane Insuating performance up to five times

More information

e-profit Monitor Analysis Drystock Farms 2012 Teagasc e-profit Monitor Analysis Drystock Farms 2012

e-profit Monitor Analysis Drystock Farms 2012 Teagasc e-profit Monitor Analysis Drystock Farms 2012 e-profit Monitor Anaysis Drystock Farms 2012 Teagasc e-profit Monitor Anaysis Drystock Farms 2012 e-profit Monitor Anaysis Drystock Farms 2012 CONTENTS Drystock Farms 2012 Introduction 1 Catte farms -

More information

O R A C L E H Y P E R I O N E N T E R P R I S E P E R F O R M A N C E M A N A G E M E N T S Y S T E M

O R A C L E H Y P E R I O N E N T E R P R I S E P E R F O R M A N C E M A N A G E M E N T S Y S T E M O R A C L E H Y P E R I O N E N T E R P R I S E P E R F O R M A N C E M A N A G E M E N T S Y S T E M O R A C L E H Y P E R I O N S T R A T E G I C F I N A N C E, F U S I O N E D I T I O N R E L E A S

More information

Study Session 6 Operation and Maintenance of Water Treatment and Supply Systems

Study Session 6 Operation and Maintenance of Water Treatment and Supply Systems Study Session 6 Operation and Maintenance of Water Treatment and Suppy Systems Copyright 2016 The Open University Contents Introduction 3 Learning Outcomes for Study Session 6 3 6.1 How water utiities

More information

City of Cupertino Guidelines for Non-Residential Building Trash and Recycling Enclosures

City of Cupertino Guidelines for Non-Residential Building Trash and Recycling Enclosures City of Cupertino Guideines for Non-Residentia Buiding Trash and Recycing Encosures 1. SOLID WASTE REQUIREMENTS During the deveopment review process, prior to issuing grading, demoition, tenant improvement

More information

CUSTOMS SELF ASSESSMENT PROGRAM IMPORTER PART II APPLICATION

CUSTOMS SELF ASSESSMENT PROGRAM IMPORTER PART II APPLICATION Canada Customs and Revenue Agency Agence des douanes et du revenu du Canada 3URWHFWHGZKHQFRPSOHWHG CUSTOMS SELF ASSESSMENT PROGRAM IMPORTER PART II APPLICATION The Customs Sef Assessment (CSA) program

More information

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT Document Prepared By: Bureau Veritas Certification Holding SAS Report No.BVC/China-VR/7066/2012 Project Title Version Report ID Yunnan Mangli Hydropower

More information

Practices for Improving Quality and Safety

Practices for Improving Quality and Safety 2 Practices for Improving Quaity and Safety Practices for Improving Quaity and Safety The capabiity of boards and board quaity committees to function effectivey and to move appropriatey between fiduciary

More information

Industrial Extrusion

Industrial Extrusion Industria Extrusion The Best Twin-Screw Design for Powder Coating Baker Perkins manufactures a comprehensive range of twin-screw extruders specificay for powder coating production, from the MPX19 for sma

More information

The width of single glazing. The warmth of double glazing.

The width of single glazing. The warmth of double glazing. Therma Insuation CI/SfB (31) Ro5 (M5) September 2011 The width of singe gazing. The warmth of doube gazing. Pikington Spacia Revoutionary vacuum gazing. Pikington Spacia Revoutionary vacuum gazing soution.

More information

Emergency lighting maintenance at your fingertips

Emergency lighting maintenance at your fingertips Emergency ighting maintenance at your fingertips At Thomas & Betts, our focus is on improving your business performance by providing practica, reiabe eectrica products and services that connect and protect

More information

2.5. Type 90. MediaManagement system the modern handling of hazardous substances

2.5. Type 90. MediaManagement system the modern handling of hazardous substances 2.5 MMS System 192 2.5 Type 90 MediaManagement system the modern handing of hazardous substances 193 The MediaManagement System (MMS) is a diverse, mutifunctiona and high-quaity soution for modern aboratory

More information

2.5. Type 90. MediaManagement system the modern handling of hazardous substances

2.5. Type 90. MediaManagement system the modern handling of hazardous substances 2.5 MMS System 192 2.5 Type 90 MediaManagement system the modern handing of hazardous substances 193 The MediaManagement System (MMS) is a diverse, mutifunctiona and high-quaity soution for modern aboratory

More information

K10 FM Soffit Board. Insulation INSULATION FOR STRUCTURAL CEILINGS (SOFFITS) Higher R value per inch than any commonly used insulation

K10 FM Soffit Board. Insulation INSULATION FOR STRUCTURAL CEILINGS (SOFFITS) Higher R value per inch than any commonly used insulation Insuation First Revision March 2017 K10 FM Soffit Board INSULATION FOR STRUCTURAL CEILINGS (SOFFITS) Premium performance rigid thermoset insuation R vaue of 16.5 on 2 in Higher R vaue per inch than any

More information

Leadership for Improving Quality and Safety

Leadership for Improving Quality and Safety 1 Leadership for Improving Quaity and Safety Leadership for Improving Quaity and Safety Board eadership is a critica ingredient to achieving better, safer care and governing boards can choose to be either

More information

K10 FM Soffit Board. Insulation INSULATION FOR STRUCTURAL CEILINGS (SOFFITS) Higher R value per inch than any commonly used insulation

K10 FM Soffit Board. Insulation INSULATION FOR STRUCTURAL CEILINGS (SOFFITS) Higher R value per inch than any commonly used insulation Insuation Third Revision June 2018 K10 FM Soffit Board INSULATION FOR STRUCTURAL CEILINGS (SOFFITS) Premium performance rigid thermoset insuation R vaue of 16.5 on 2 in Higher R vaue per inch than any

More information

The importance of carbon capture and storage technology in European refineries

The importance of carbon capture and storage technology in European refineries storage technoogy in European refineries This artice describes the importance of carbon capture and storage (CCS) in meeting future emission targets. It presents an evauation of the costs of retrofitting

More information

Improvement in One Day Strength in PPC to Increase the Customer Satisfaction and Sustain/Improve Brand Value

Improvement in One Day Strength in PPC to Increase the Customer Satisfaction and Sustain/Improve Brand Value Improvement in One Day Strength in PPC to Increase the Customer Satisfaction and Sustain/Improve Brand Vaue Key words: Portand Gypsum Pozzoana Cement, Baine, Compressive Strength, Abstract In the present

More information

Mowing lawns to creek banks just love them to death!

Mowing lawns to creek banks just love them to death! 2 The deveopment of the RCP is a mutifaceted endeavor invoving a probem soving (panning) procedure, with various modes of pubic participation, professiona reviews of pan components, and other activities.

More information

Tailored Services for All

Tailored Services for All Symphony Housing Group Vauing Difference Framework 2012 Purpose of the Framework This framework has been deveoped by ead officers for Equaity and Diversity from across Symphony Housing Group. It sets out

More information

DECEMBER Good practice contract management framework

DECEMBER Good practice contract management framework DECEMBER 2008 Good practice contract management framework The Nationa Audit Office scrutinises pubic spending on behaf of Pariament. The Comptroer and Auditor Genera, Tim Burr, is an Officer of the House

More information

Using Multiple Regression Analysis to Develop Electricity Consumption Indicators for Public Schools

Using Multiple Regression Analysis to Develop Electricity Consumption Indicators for Public Schools Using Mutipe Regression Anaysis to Deveop Eectricity Consumption Indicators for Pubic Schoos CorJitz NO&I, Lund Institute of Technoogy, Sweden Jurek Pyrko, Lund Institute of Technoogy, Sweden ABSTRACT

More information

ISO/IEC JTC1/SC7 N4545

ISO/IEC JTC1/SC7 N4545 ISO/IEC JTC1/SC7 Software and Systems Engineering Secretariat: CANADA (SCC) ISO/IEC JTC1/SC7 N4545 2010-01-26 Document Type Tite Source NWIP NWIP, ISO/IEC 19770-4 Information technoogy -- Software asset

More information

Existing knowledge from CDM/JI on baseline and emission reduction calculation. Version Harry Vreuls and Li Hua

Existing knowledge from CDM/JI on baseline and emission reduction calculation. Version Harry Vreuls and Li Hua Existing knowledge from CDM/JI on baseline and emission reduction calculation. Version 24032010 Harry Vreuls and Li Hua Introduction This paper gives a short overview of the CDM/JI methodologies and summaries

More information

Municipal tariffs: where to from here?

Municipal tariffs: where to from here? Municipa tariffs: where to from here? by Hendrik Barnard, Eexpert Municipa eectricity tariffs are in a shambes: Nersa tariffs (IBT) have created chaos beyond comprehension. Eectricity is being sod at prices

More information

Sedex Members Ethical Trade Audit (SMETA) Best Practice Guidance

Sedex Members Ethical Trade Audit (SMETA) Best Practice Guidance Sedex Members Ethica Trade Audit (SMETA) Best Practice Guidance Version 4.0 May 2012 (Repaces V. 2.2. Sept 2010 ). This BPG covers both a 2-Piar SMETA audit and a 4-Piar SMETA audit which incudes the 2

More information

COMPOSITE FLOORS - II

COMPOSITE FLOORS - II 24 COMPOSITE FLOORS - II 1.0 INTRODUCTION This chapter describes the basis for design of composite foors using profied deck sheets adopting the equations described in the chapter on composite foors - I

More information

The Supply Chain Challenge "Supply Ireland"

The Supply Chain Challenge Supply Ireland I N T E R T R A D E I R E L A N D TRADE & BUSINESS DEVELOPMENT BODY The Suppy Chain Chaenge "Suppy Ireand" A Discussion Paper on the North-South Dimension Od Gasworks Business Park, Newry, County Down

More information

of Grazing Activities

of Grazing Activities Approved VCS Methodoogy Modue VMD0040 Version 1.0, 22 Apri 2014 Leakage from Dispacement of Grazing Activities Copyright FAO 2014 Methodoogy deveoped by: Food and Agricuture Organization of the United

More information

Director of Retirement Living & Care Services

Director of Retirement Living & Care Services Operations Services Directorate Recruitment pack for: Director of Retirement Living & Care Services Director of Supported Living Contents Wecome etter from David Tayor Executive Director of Operations

More information

What Are Baseline and Environmental Setting?

What Are Baseline and Environmental Setting? CEQA Porta Topic Paper Baseine and Environmenta Setting What Are Baseine and Environmenta Setting? Under CEQA, the impacts of a proposed project must be evauated by comparing expected environmenta conditions

More information

CURlS RESOURCES (ARIZONA) INC. APPLICATION TO AMEND APP NO ATTACHMENT 13- CONTINGENCY PLAN (ITEM 19G) SWVP

CURlS RESOURCES (ARIZONA) INC. APPLICATION TO AMEND APP NO ATTACHMENT 13- CONTINGENCY PLAN (ITEM 19G) SWVP CURS RESOURCES (ARIZONA) INC. APPICATION TO AMEND APP NO. 101704 ATTACHMENT 13- CONTINGENCY PAN (ITEM 19G) SWVP-014136 CURS RESOURCES (ARIZONA) INC. APPICATION TO AMEND AQUIFER PROTECTION PERMIT N0.101704

More information

Financial Reporting Council. June 2008

Financial Reporting Council. June 2008 Financia Reporting Counci on Corporate Governance June 2008 THE COMBINED CODE ON CORPORATE GOVERNANCE June 2008 CONTENTS Pages on Corporate Governance Preambe 1-3 Section 1 COMPANIES 5-20 A Directors

More information

africa adaptation programme An insight into AAP and Country project Profiles

africa adaptation programme An insight into AAP and Country project Profiles africa adaptation programme An insight into AAP and Country project Profies January 2010 AAP COUNTRIES About the Programme The Africa Programme (AAP) has been designed to support the ong-term efforts of

More information

Nationally Important Agro-biodiversity Heritage Sites (NIABHS): An Innovative Concept for Sustainable Conservation Efforts

Nationally Important Agro-biodiversity Heritage Sites (NIABHS): An Innovative Concept for Sustainable Conservation Efforts Nationay Important Agro-biodiversity Heritage Sites (NIABHS): An Innovative Concept for Sustainabe Conservation Efforts P. K. Singh ICAR- Indian Institute of Sugarcane Research, Dikusha P.O., Lucknow 226

More information

THE FUTURE OF WORK: HOW TO EFFECTIVELY INCORPORATE ROBOTS IN YOUR WORKFORCE

THE FUTURE OF WORK: HOW TO EFFECTIVELY INCORPORATE ROBOTS IN YOUR WORKFORCE THE FUTURE OF WORK: HOW TO EFFECTIVELY INCORPORATE ROBOTS IN YOUR WORKFORCE Monday, June 5th: 2:30 p.m. 3:15 p.m. This information is not a commitment, promise or ega obigation made by Pegasystems, incuding

More information

Introduction to Alliance Audit

Introduction to Alliance Audit Introduction to Aiance Audit Scott Okuno, MD Audit Committee Chair Audit Preparation Workshop, November 1, 2018 Why Do Audits? Investigators of cinica trias have an obigation to take appropriate steps

More information

K12 Framing Board. Insula t i o n INSULATION FOR WOOD AND STEEL FRAMING SYSTEMS. Premium performance rigid thermoset insulation. R value of 16 on 2

K12 Framing Board. Insula t i o n INSULATION FOR WOOD AND STEEL FRAMING SYSTEMS. Premium performance rigid thermoset insulation. R value of 16 on 2 Insua t i o n First Issue Apri 2017 K12 INSULATION FOR WOOD AND STEEL FRAMING SYSTEMS Premium performance rigid thermoset insuation R vaue of 16 on 2 Higher R vaue per inch than any commony used insuation

More information

Statistical Assessment of Changes in Bird Certification Rules for Aero-Engines Through Time

Statistical Assessment of Changes in Bird Certification Rules for Aero-Engines Through Time University of Nebraska - Lincon DigitaCommons@University of Nebraska - Lincon 2011 Bird Strike North America Conference, Niagara Fas Bird Strike Committee Proceedings 9-2011 Statistica Assessment of Changes

More information

K20 Concrete Sandwich Board

K20 Concrete Sandwich Board Insuation Third Revision November 2017 K20 Concrete Sandwich Board HIGH PERFORMANCE INSULATION FOR CONCRETE SANDWICH WALL SYSTEMS Premium performance rigid thermoset insuation R vaue of 17 on 2 in Higher

More information

Landscape Irrigation Management Program IS005 Quick Answer

Landscape Irrigation Management Program IS005 Quick Answer Landscape Irrigation Management Program IS005 Quick Answer Copyright (2003) Regents of the University of Caifornia Created on November 15, 2003 Revised June 1, 2004 R. L. Snyder, Biometeoroogy Speciaist

More information

K20 Concrete Sandwich Board

K20 Concrete Sandwich Board Insuation Fourth Revision June 2018 K20 Concrete Sandwich Board HIGH PERFORMANCE INSULATION FOR CONCRETE SANDWICH WALL SYSTEMS Premium performance rigid thermoset insuation R vaue of 17 on 2 in Higher

More information

The role of Independent Reviewing Officers (IROs) in England

The role of Independent Reviewing Officers (IROs) in England Research summary 11 March 2014 The roe of Independent Reviewing Officers (IROs) in Engand Heena Jeicic, Ivana a Vae and Di Hart, with Lisa Homes from the Centre for Chid and Famiy Research, Loughborough

More information

Agility, access and acceleration wherever and whenever needed: supporting and empowering your digitally enabled workforce

Agility, access and acceleration wherever and whenever needed: supporting and empowering your digitally enabled workforce Goba IT Infrastructure and Depoyment Speciaists End User Workspace Agiity, access and acceeration wherever and whenever needed: supporting and empowering your digitay enabed workforce We put every resource

More information

East Asian Trading Ships

East Asian Trading Ships EAST ASIAN TRADING SHIPS East Asian Trading Ships BTheme Tami Kaiser-Poge Cary Academy PURPOSE Each student wi work with a partner as an owner of an overseas shipping company with one cargo ship in East

More information

Farming with Your Nutrient Management Plan

Farming with Your Nutrient Management Plan Farming with Your Nutrient Management Pan A Comprehensive Guide to Maryand s Nutrient Management Reguations and Requirements -- What s Inside: 1 2 3 4 5 Impementing Your Nutrient Management Pan Nutrient

More information

STRATEGIC PLAN

STRATEGIC PLAN STRATEGIC PLAN 2012-2016 CIT Bishopstown CIT Cork Schoo of Music CIT Crawford Coege of Art & Design Nationa Maritime Coege of Ireand Our Institute STRATEGIC PLAN 2012-2016 Cork Institute of Technoogy (CIT)

More information

Forms Development and RAVE

Forms Development and RAVE Forms Deveopment and RAVE Shauna Himan, MS Mayo-Rochester, MN May 11 th, 2017 Presentation Objectives Provide the Aiance high eve process for deveoping forms (both paper and eectronic) Provide a basic

More information

5.3 ESTIMATING URBAN LANDSCAPE EVAPOTRANSPIRATION

5.3 ESTIMATING URBAN LANDSCAPE EVAPOTRANSPIRATION 5.3 ESTIMATING URBAN LANDSCAPE EVAPOTRANSPIRATION Richard L. Snyder 1 * and Simon Eching 2 1 University of Caifornia, Atmospheric Science, Davis, Caifornia, 2 Caifornia Department of Water Resources, Office

More information

Progressive Design-Build

Progressive Design-Build Progressive Design-Buid Progressive Design-Buid Design-Buid Procured with a Progressive Design & Price A Design-Buid Done RightTM Primer 1 Progressive Design-buid Progressive Design-Buid Design-Buid Procured

More information

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :17:40:11

For inspection purposes only. Consent of copyright owner required for any other use. EPA Export :17:40:11 EPA Export 25-07-2013:17:40:11 Quinn-therm Environment Manua Environm&ita Management System Manua DRAFT EPA Export 25-07-2013:17:40:11 EPA Export 25-07-2013:17:40:12 Quinn-therm Environment Manua INDEX

More information

Energy Prices and the Laws of Supply and Demand

Energy Prices and the Laws of Supply and Demand Energy Prices and the Laws of Suppy and Demand Summary: By using the aws of suppy and demand, students demonstrate how the marketpace sets energy prices and show how these prices change. Objectives Students

More information

A Comparison of Design, Construction and Dynamic Performance of Timber Floors in the UK and Finland

A Comparison of Design, Construction and Dynamic Performance of Timber Floors in the UK and Finland Napier University Schoo of Engineering and the Buit Environment Centre for Timber Engineering Merchiston Campus 10 Cointon Road Edinburgh EH10 5DT 26 November 2007 Revised: June 2009 A Comparison of Design,

More information

A cross-sector guide for implementing the. Mitigation Hierarchy. Executive summary and Overview. Prepared by The Biodiversity Consultancy

A cross-sector guide for implementing the. Mitigation Hierarchy. Executive summary and Overview. Prepared by The Biodiversity Consultancy A cross-sector guide for impementing the Mitigation Hierarchy Executive summary and Overview Prepared by The Biodiversity Consutancy Prepared by The Biodiversity Consutancy. CSBI woud ike to express its

More information

Commissioning Chilled Water Systems

Commissioning Chilled Water Systems Commissioning Chied Water Systems BUILD. CONNECT. ACHIEVE. James Anderton, CPMP, CxA, LEED GA INDEPENDENT COMMISSIONING CONSULTING, LLC 0 Learning Objectives PRESENTATION OVERVIEW Introduction to Cx CHWS

More information

PROBABILISTIC PRODUCTION COSTING OF TRANSMISSION CONSTRAINED POWER SYSTEMS UNDER GENERATION COST UNCERTAINTY

PROBABILISTIC PRODUCTION COSTING OF TRANSMISSION CONSTRAINED POWER SYSTEMS UNDER GENERATION COST UNCERTAINTY PROBABILISTIC PRODUCTION COSTING OF TRANSMISSION CONSTRAINED POWER SYSTEMS UNDER GENERATION COST UNCERTAINTY P D C Wijaytunga Dept of Eectrica Eng University of Moratuwa Sri Lanka B J Cory E D Farmer C

More information

Study Session 13 Commercial Opportunities in Urban Sanitation and Waste Management

Study Session 13 Commercial Opportunities in Urban Sanitation and Waste Management Study Session 13 Commercia Opportunities in Urban Sanitation and Waste Management Copyright 2016 The Open University Contents Introduction 3 Learning Outcomes for Study Session 13 3 13.1 Opportunities

More information

Incident management system for the oil and gas industry. Good practice guidelines for incident management and emergency response personnel

Incident management system for the oil and gas industry. Good practice guidelines for incident management and emergency response personnel Incident management system for the oi and gas industry Good practice guideines for incident management and emergency response personne The goba oi and gas industry association for environmenta and socia

More information

Gatic Vortex gives you control of drainage volume and speed.

Gatic Vortex gives you control of drainage volume and speed. Unicass Juy 2014 L731 CI/SfB (52.7) h Gatic Vortex gives you contro of drainage voume and speed. Speciaised Engineering. Specia Advice. Harness the power of Vortex Gatic Vortex has been deveoped to bring

More information

Optimal Distributed Generation Allocation and Load Shedding for Improving Distribution System Reliability

Optimal Distributed Generation Allocation and Load Shedding for Improving Distribution System Reliability Optima Distributed Generation Aocation and Load Shedding for Improving Distribution System Reiabiity A. S. A. Awad 1, T. H. M. EL-Fouy 2, and M. M. A. Saama 1 1 Eectrica and Computer Engineering Department,

More information

ASSA ABLOY Mercury Energy Efficient Door

ASSA ABLOY Mercury Energy Efficient Door Environmenta Product Decaration Stee Door ASSA ABLOY is committed providing products and services that are environmentay sound throughout the entire production process and the product ifecyce. Our unconditiona

More information

Guidelines on implementing spill impact mitigation assessment (SIMA)

Guidelines on implementing spill impact mitigation assessment (SIMA) Guideines on impementing spi impact mitigation assessment (SIMA) A technica support document to accompany the IPIECA-IOGP guidance on net environmenta benefit anaysis (NEBA) Oi spi preparedness THE GLOBAL

More information

European Self-regulation for Online Behavioural Advertising. Transparency and Control for Consumers

European Self-regulation for Online Behavioural Advertising. Transparency and Control for Consumers European Sef-reguation for Onine Behavioura Advertising Transparency and Contro for Consumers Onine Behavioura Advertising IAB Europe and its members have worked on a European Framework for Onine Behavioura

More information

Qualification in Forensic Psychology (Stage 2) Candidate Handbook

Qualification in Forensic Psychology (Stage 2) Candidate Handbook Quaification in Forensic Psychoogy (Stage 2) Candidate Handbook January 2011 Revised June 2017 Quaifications Office The British Psychoogica Society, St Andrews House, 48 Princess Road East, Leicester,

More information

Oil and gas industry guidance on voluntary sustainability reporting

Oil and gas industry guidance on voluntary sustainability reporting Oi and gas industry guidance on vountary sustainabiity reporting A Reporting 2015 THE GLOBAL OIL AND GAS INDUSTRY ASSOCIATION FOR ENVIRONMENTAL AND SOCIAL ISSUES www.ipieca.org Endorsed by: REGIONAL ASSOCIATION

More information

Rolling Stock Asset Health

Rolling Stock Asset Health MARTS Omaha, NE - October 2016 Roing Stock Asset Heath Mike Lesniak (AAR) Jamie Wiiams (NS) Chip Summey (Raiinc) MARTS Roing Stock Asset Heath 2 Asset Heath Strategy Committee Reducing Mechanica Service

More information

Streamflow Prediction Based on Least Squares Support Vector. Machines

Streamflow Prediction Based on Least Squares Support Vector. Machines Streamfow Prediction Based on Least Squares Support Vector Machines Nian Zhang nzhang@udc.edu Chares Wiiams chares.wiiams4@udc.edu Esther Ososanya eososanya@udc.edu Wagdy Mahmoud wmahmoud@udc.edu University

More information

CONNECT TO BETTER. corporate. social. responsibility. report

CONNECT TO BETTER. corporate. social. responsibility. report CONNECT TO BETTER corporate socia responsibiity report 14 CSR report tabe of contents 1. Message from the CEO 3 2. About Wavin 4 2.1. Introduction 4 2.2. Wavin and Sustainabiity 5 2.3. Wavin s organisationa

More information

The Metropolitan Glasgow Strategic Drainage Partnership. White Cart Water flood defences pass first test. Briefing Note 7 - Summer 2011

The Metropolitan Glasgow Strategic Drainage Partnership. White Cart Water flood defences pass first test. Briefing Note 7 - Summer 2011 Briefing Note 7 - Summer 2011 The Metropoitan Gasgow Strategic Drainage Partnership The Metropoitan Gasgow Strategic Drainage Partnership (MGSDP) is an innovative and coaborative venture between oca authorities

More information

HEMPADUR MULTI-STRENGTH GF 35870

HEMPADUR MULTI-STRENGTH GF 35870 because prevention is better than cure Tough, tougher Product description is an amine cured pure epoxy coating reinforced with a high content of speciay seected amear gass fakes. The product provides exceent

More information

Pegasus CIS (4.01) Guide to enhancements

Pegasus CIS (4.01) Guide to enhancements Pegasus CIS (4.01) Guide to enhancements PEGASUS CIS (4.01): GUIDE TO ENHANCEMENTS Pegasus CIS provides companies operating in the construction industry an unparaeed eve of contro over every aspect of

More information

Optimal Model and Algorithm for Multi-Commodity Logistics Network Design Considering Stochastic Demand and Inventory Control

Optimal Model and Algorithm for Multi-Commodity Logistics Network Design Considering Stochastic Demand and Inventory Control Systems Engineering Theory & Practice Voume 29, Issue 4, Apri 2009 Onine Engish edition of the Chinese anguage journa Cite this artice as: SETP, 2009, 29(4): 176 183 Optima Mode and Agorithm for Muti-Commodity

More information

CPA VALIDATION REPORT STANDARD BANK PLC

CPA VALIDATION REPORT STANDARD BANK PLC CPA STANDARD BANK PLC VALIDATION OF THE ENERGY EFFICIENCY IN CHILLER PLANT AT THE CAPRICORN BUILDING LOCATED AT 1 SCIENCE PARK ROAD, THE CAPRICORN, SINGAPORE 117528 (CAPRICORN CPA) BUREAU VERITAS CERTIFICATION

More information

TAYLOR ROSE. Design Project Management Construction. The High Care Project Specialists

TAYLOR ROSE. Design Project Management Construction.  The High Care Project Specialists TAYLOR ROSE The High Care Project Speciaists Design Project Management Construction www.tayorroseuk.co.uk Contents Introduction What We Can Offer Services Civi & Structura Works Fooring & Drainage Mechanica

More information

Urbanization and Energy Nexus

Urbanization and Energy Nexus BANGKOK 21-23 JUNE 2016 Urbanization and Energy Nexus Avi Sarkar UN-Habitat 1 SDG 7 and 11 Ensure access to affordabe, reiabe, sustainabe and modern energy for a Make cities incusive, safe, resiient and

More information

NATIONAL ANNEX TO STANDARD. SFS-EN EUROCODE 5: DESIGN OF TIMBER STRUCTURS Part 1-1: Common rules and rules for buildings

NATIONAL ANNEX TO STANDARD. SFS-EN EUROCODE 5: DESIGN OF TIMBER STRUCTURS Part 1-1: Common rules and rules for buildings ANNEX 16 NATIONAL ANNEX TO STANDARD SFS-EN 1995-1-1 EUROCODE 5: DESIGN OF TIMBER STRUCTURS Part 1-1: Common rues and rues for buidings Preface This Nationa Annex is used together with standard SFS-EN 1995-1-1:2004.

More information

POSSIBLE. Marketing Opportunities DISCOVER THE PROMISE OF WHAT S. Connect with the Top Minds in Surgical Oncology. 70th SSO Annual Cancer Symposium

POSSIBLE. Marketing Opportunities DISCOVER THE PROMISE OF WHAT S. Connect with the Top Minds in Surgical Oncology. 70th SSO Annual Cancer Symposium Connect with the Top Minds in Surgica Oncoogy DISCOVER THE PROMISE OF WHAT S POSSIBLE Marketing Opportunities 70th SSO Annua Cancer Symposium Symposium: March 15-18, 2017 Exhibits: March 16-17, 2017 Washington

More information

REGULATORY APPLICATIONS OF REAL WORLD EVIDENCE

REGULATORY APPLICATIONS OF REAL WORLD EVIDENCE REGULATORY APPLICATIONS OF REAL WORLD EVIDENCE by Nei A. Beson R ea-word Evidence (RWE) hods out the promise of reducing time and costs of product approvas, identifying 54 new uses for existing products,

More information

Petroleum refinery waste management and minimization

Petroleum refinery waste management and minimization Petroeum refinery waste management and minimization An IPIECA Good Practice Guide Operations Good Practice Series 2014 www.ipieca.org The goba oi and gas industry association for environmenta and socia

More information

COMMERCIAL PROPERTY SECTOR

COMMERCIAL PROPERTY SECTOR Mpumaanga 2017 THE ROLE AND IMPACT of the COMMERCIAL PROPERTY SECTOR THE ECONOMIC VALUE of the COMMERCIAL PRIVATE PROPERTY SECTOR APPLICATION PROCESSING REPORT Siyabuswa KwaMhanga Emaaheni Lydenburg Sabie

More information

PEFC CERTIFIED PAPER FOR THE PRINT, PACKAGING AND PUBLISHING INDUSTRIES

PEFC CERTIFIED PAPER FOR THE PRINT, PACKAGING AND PUBLISHING INDUSTRIES PEFC CERTIFIED PAPER FOR THE PRINT, PACKAGING AND PUBLISHING INDUSTRIES PEFC/01-00-01 Growing Demand for Sustainabe Products Demand for sustainaby produced goods is growing in major markets gobay. Consumers

More information

Applying the sub-sector analysis in practice: FAIDA s experiences in Northern Tanzania

Applying the sub-sector analysis in practice: FAIDA s experiences in Northern Tanzania Author: John Bet Editor: Maya Artist: Roy DTP: Hannah 3rd Draft #11 Appying the sub-sector anaysis in practice: FAIDA s experiences in Northern Tanzania SUB-SECTOR ANALYSIS BEFORE AFTER L ike many other

More information