To: Michigan Department of Environmental Quality From: Laura Gauger (Duluth, MN) Date: October 6, 2016 RE: Mining Permit Application submitted by

Size: px
Start display at page:

Download "To: Michigan Department of Environmental Quality From: Laura Gauger (Duluth, MN) Date: October 6, 2016 RE: Mining Permit Application submitted by"

Transcription

1 To: Michigan Department of Environmental Quality From: Laura Gauger (Duluth, MN) Date: October 6, 2016 RE: Mining Permit Application submitted by Aquila Resources / Foth for the Back Forty Project

2 To: Michigan Department of Environmental Quality From: Laura Gauger (Duluth, MN) Date: October 6, 2016 RE: Mining Permit Application submitted by Aquila Resources / Foth for the Back Forty Project I hereby go on record in opposition to any action taken by the State of Michigan to approve Aquila Resources Mining Permit Application for the Back Forty project. The Mining Permit Application needs to be denied because, among other things, Aquila has failed to provide Michigan regulators or the public with information regarding: how computer groundwater modeling for projects such as the Back Forty has a track record of being inaccurate; and how the company would deal with potential inaccuracies in the computer groundwater modeling offered by its consultant, Foth Infrastructure and Environment, for the Back Forty project. Michigan regulators and the public need (and deserve) to have this information so they can decide how much confidence to place in the computer modeling supplied by Aquila/Foth for the Back Forty project. The absence of this information renders the Mining Permit Application inadequate. To prove my point, I offer the attached slides that summarize my experience with flawed computer modeling supplied by Foth for the Flambeau Mine project in Wisconsin. Thank you. Laura Gauger 1321 E. 1 st St. Duluth, MN Tel: kettu2010@gmail.com

3 Environmental Degradation at Wisconsin s Flambeau Mine A Cautionary Tale for Michigan Regulators Laura Gauger Duluth, MN October 2016

4 Credentials: Laura Gauger is a pharmacist by trade who was living in northwestern Wisconsin in the 1990s when the Flambeau Mine was built near Ladysmith. She developed an interest in following developments at the mine site and has done numerous open records requests of the Wisconsin Department of Natural Resources (DNR) over the past 15 years to obtain official documents and environmental monitoring reports for the mine. Gauger co authored a 1200 page book about the Flambeau Mine that was published in 2007 and includes a detailed analysis of: (1) existing mining regulations impacting the project; and (2) how groundwater and surface water quality at the mine site fared under those regulations. She was also an official party to three separate legal actions involving the Flambeau Mine, including a federal Clean Water Act lawsuit filed against the mine s owner (Rio Tinto) in 2011 and concluded in 2014.

5 So what does the Flambeau Mine have to do with Aquila Resources Back Forty project?

6 Aquila and Flambeau consultant Stephen Donohue (Foth Infrastructure and Environment, Green Bay, WI) has been quoted as saying: Flambeau was a very successful mining operation, and the two sites are very similar, so we ve been able to use the engineering work done on Flambeau as a template for the Back Forty mine Aquila Resources, Sep 22, 2016 (

7 In addition, here s what Mr. Donohue told the Wisconsin Senate Select Committee on Mining at a hearing in September 2012: Testing on groundwater around the Flambeau Mine site continues to show that groundwater is being protected at this project. Testimony posted online by Wisconsin Eye: Archive/Event Detail/evhdid/6623 *Stephen Donohue is a mining consultant at Foth Infrastructure & Environment of Green Bay, Wisconsin. He and his colleagues at Foth were involved in the permitting, construction, operations and reclamation of the Flambeau Mine. Other projects include Aquila Resources Back Forty project and Rio Tinto s Eagle Mine in Michigan and PolyMet s NorthMet project in Minnesota.

8 If Flambeau is to be used as a template for the Back Forty project, Michigan regulators and the public deserve to know the answer to these questions: What does the water quality data on file with the Wisconsin DNR for the Flambeau Mine really show? Were streams and groundwater reserves at the mine site protected?

9 First, consider this: Even if Mr. Donohue s assertion about the water at Flambeau being protected were true, which it is not, comparing the Back Forty project to the Flambeau Mine is like comparing apples to oranges. Parameter Flambeau 1, 2 Back Forty 3 Size of Mine Pit 32 acres Max depth = 225 ft 83 acres Max depth = 750 ft Ore Production 1.9 million tons 12.5 million tons Waste Rock Production Tailings generated from on site processing of ore 8.6 million tons 54 million tons 0 There was no on site processing of ore at Flambeau. It was all shipped to Canada for smelting, so there are no tailings at Flambeau 11.8 million tons over 7 year life of mine Toxic tailings will be generated from two different processes and in the following amounts: 1.8 million tons from an oxide process 10 million tons from a flotation process 1. Final Environmental Impact Statement for the Flambeau Mine, Wisconsin DNR, Mar 1990, p Backfilling Plan, Flambeau Mining Company, Mar 1997, p. ii. 3. Mining Permit Application for the Back Forty Project, Aquila Resources/Foth, Oct 2015, p. 4 and Table 5 1.

10 Even if Flambeau were similar to the Back Forty project, Mr. Donohue s assertion that the groundwater at Flambeau is being protected is false and misleading. Sure, there are some wells upgradient of backfilled mine pit that are clean, but not the wells that really matter the ones in the line of flow from the backfilled pit to the Flambeau River.

11 Computer modeling for the Flambeau Mine supplied by Foth has proven to be very inaccurate in terms of predicting maximum levels of contaminants in the groundwater within the backfilled Flambeau Mine pit. Here are the numbers on file with the Wisconsin Department of Natural Resources: Contaminant Foth Prediction 1 Max Reported Level, to date, now that real data has started to come in 2 Manganese 550 mcg/l 42,000 mcg/l (76 times higher than Foth predicted) Iron 320 mcg/l 15,000 mcg/l (47 times higher than Foth predicted) Copper 14 mcg/l 810 mcg/l (58 times higher than Foth predicted) Sulfate 1,100 mg/l 2,400 mg/l (2 times higher than Foth predicted) 1. Prediction of Groundwater Quality Downgradient of the Reclaimed Pit for the Kennecott Flambeau Project, Foth, Dec 1989, p. 28 (L 30). 2. Flambeau Mining Company Annual Report, Jan 2016, Appendix A and Appendix B.

12 This schematic from a report on groundwater and surface water contamination at the Flambeau Mine site 1 shows where the various monitoring wells are located. Please note that: the MW 1013 nest is located within the backfilled mine pit, about 600 feet from the river; the MW 1014 nest is located within the backfilled mine pit, about 2300 feet from the river; MW 1000R and MW 1000PR are located directly between the backfilled pit and Flambeau River, within 175 feet of the river.

13 Here s a graph of what some of the Real Flambeau data on file with the Wisconsin DNR shows: Manganese levels in groundwater at the Flambeau Mine are up to 180 times higher than they were before the mine was built and up to 75 times higher than predicted by Foth Engineering. And it s not just one well that has gone high on manganese. Nine of the eleven wells within the backfilled Flambeau pit and/or directly between the pit and Flambeau River have GREATLY exceeded the Foth prediction for manganese.

14 Is the well shown on the previous slide (MW 1013B) the only well at the Flambeau Mine site with elevated manganese (Mn) levels? No. See the below table for a sampling of manganese levels recorded in all 8 of the wells within the backfilled mine pit AND 2 wells between the pit and Flambeau River. Note: This is Rio Tinto s own data.

15 And it s not just Manganese that has gotten out of control in some of the wells at the Flambeau Mine site. Sulfate levels in groundwater at the Flambeau Mine are up to 480 times higher than they were before the mine was built and up to 48 times higher than the accepted surface water standard for wild rice. And it s not just one well that has gone high on sulfate. As of March 2016, nine of the eleven wells within the backfilled Flambeau pit and/or directly between the pit and Flambeau River are exceeding the 5 mg/l baseline value for sulfate by at least 15 times.

16 IRON levels at Flambeau are also of concern. Iron levels in groundwater at the Flambeau Mine are up to 300 times higher than they were before the mine was built and up to 45 times higher than predicted by Foth Engineering.

17 The Real data on file with the Wisconsin DNR also shows that Copper levels have shot up in some of the wells at Flambeau. Copper levels in groundwater at the Flambeau Mine are up to 70 times higher than they were before the mine was built and up to 55 times higher than predicted by Foth Engineering.

18 Wells outside of the backfilled Flambeau Mine pit and within 175 feet of the Flambeau River have also gone high on pollutants. Please see the following graphs.

19 Manganese Levels in Violation of Flambeau Mine Permit Standards MW 1000PR (a so called Intervention Boundary Well located directly between the backfilled mine pit and Flambeau River) has been in violation of the Flambeau Mine Permit standard for manganese on a consistent basis ever since the pit was backfilled in 1997, exceeding the permit standard set for the intervention boundary (550 mcg/l) by up to 10 times. This well is located just 125 feet from the Flambeau River and, according to Rio Tinto, the direction of groundwater flow is toward the river, through fractured bedrock.

20 Manganese Levels in Violation of Flambeau Mine Permit Standards MW 1000R (a so called Intervention Boundary Well located directly between the backfilled mine pit and Flambeau River) has been in violation of the Flambeau Mine Permit standard for manganese on a consistent basis ever since the well rebounded in 2010, exceeding the permit standard set for the intervention boundary (550 mcg/l) by up to 27 times. This well is located just 170 feet from the Flambeau River and, according to Rio Tinto, the direction of groundwater flow is toward the river, through fractured bedrock.

21 Statements made by Stephen Donohue that suggest the groundwater at Flambeau is being protected simply are not true.

22 But what about the Flambeau River and its tributaries? Are they being impacted by the Flambeau Mine?

23 Here is what the owner of the Flambeau Mine told the public about the project site (This plaque was on display at the Flambeau Mine site during the mid 1990s.) Contrary to what the public was told, here is what Foth told the Wisconsin DNR in the Flambeau Mine Permit Application filed in 1989 Flambeau Mine Permit Application, 1989: Under [expected] conditions, all of the groundwater flowing through the Type II waste rock in the reclaimed pit will exit the pit through the Precambrian rock in the river pillar and flow directly into the bed of the Flambeau River. Since this flow path is very short and occurs entirely within fractured crystalline rock, there will be little if any dispersion or retardation of the dissolved constituents in the groundwater. The dissolved constituents that will be added to the background crystalline groundwater by the Type II material in the pit will be copper, manganese, iron and sulfate. Since there will be no dispersion, dilution or retardation in the river pillar, the concentrations of these constituents in the groundwater leaving the pit will be the same as the concentrations entering the river bed.

24 Another complicating factor is this: The Flambeau Mine pit was dug to within just 150 feet of the Flambeau River. In 1994 the river experienced major flooding and came to within 20 horizontal feet and 4 vertical feet of spilling into the pit. Flambeau Mine during flood stage conditions in the Flambeau River (photo by Bob Olsgard, Sep, 1994).

25 Data on file with the Wisconsin DNR clearly shows that monitoring wells between the Flambeau Mine pit and Flambeau River are highly polluted and in violation of mine permit standards (see graph shown earlier for MW 1000PR). Yet, the DNR has not fined the company or required corrective action. When I questioned the DNR about this, they told me that, since no impacts to the Flambeau River have been noted, corrective action was not needed. However, there is no comprehensive program in place to assess for river impacts. All the company does is report limited water quality data from a single upstream monitoring location and one (sometimes two) downstream locations twice a year. Additionally: neither of the downstream sampling sites used by Foth is anywhere near the fractured river pillar that separates the backfilled mine pit from the Flambeau River (see diagram on next slide); and only limited sediment and biotic (macroinvertebrate/crayfish/walleye) sampling was done by the company for only a short time, and that sampling has long since ceased.

26 It is also noteworthy that a tributary of the Flambeau River (Stream C ) was added to the Environmental Protection Agency s list of impaired waters, effective April 2012, due to high copper and zinc levels linked to the Flambeau Mine operation. This tributary was the subject of a federal Clean Water Act lawsuit that went to trial in May The U.S. District Court found the mine s owner to be in violation of the Clean Water Act on numerous counts. But the decision was later overturned on a technicality. In its ruling 1, the Court of Appeals did not dispute that the tributary was polluted. Rather, the polluter was pardoned because the Wisconsin DNR had made a mistake by not requiring them to secure a federallymandated permit that would have put limits on the amount of copper discharged to the stream. 1. United States Court of Appeals for the Seventh Circuit, Appeal Nos and , Document 52, Aug 15, Source: Flambeau Mine Stipulation Monitoring Plan, FMC, Dec 2007.

27 Aerial photos provided by Foth belie what s happening beneath the surface of the grassed over Flambeau Mine site and within its waters.

28 As 8 term Rusk County Board Supervisor Roscoe Churchill of Ladysmith, Wisconsin noted, it s Just Grass Over a Grave

29 In conclusion, the real facts and figures available from the Wisconsin DNR for the Flambeau Mine demonstrate the following: The public has been misled by industry representatives who claim the water at the Flambeau Mine site is being protected. Instead of Flambeau supporting the idea of moving forward with the Back Forty proposal, it proves the need for caution.

Water Pollution at the Flambeau Mine - A Cautionary Tale for Government Regulators and the People of the Great Lakes

Water Pollution at the Flambeau Mine - A Cautionary Tale for Government Regulators and the People of the Great Lakes Water Pollution at the Flambeau Mine - A Cautionary Tale for Government Regulators and the People of the Great Lakes Laura Gauger, Duluth, MN (Dec 2016) Flambeau Mine during flood stage conditions in Flambeau

More information

Water Pollution at the Partially Reclaimed Flambeau Mine Site. Wisconsin Resources Protection Council September 2009

Water Pollution at the Partially Reclaimed Flambeau Mine Site. Wisconsin Resources Protection Council September 2009 Water Pollution at the Partially Reclaimed Flambeau Mine Site Wisconsin Resources Protection Council September 2009 Background Information on the Flambeau Mine The Flambeau Mine: -was an open pit metallic

More information

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF WISCONSIN. Case No. 11-cv-45

IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF WISCONSIN. Case No. 11-cv-45 IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF WISCONSIN Case No. 11-cv-45 WISCONSIN RESOURCES PROTECTION COUNCIL, CENTER FOR BIOLOGICAL DIVERSITY, AND LAURA GAUGER v. FLAMBEAU MINING

More information

Should PolyMet's proposed mine be compared to the Flambeau Mine?

Should PolyMet's proposed mine be compared to the Flambeau Mine? Page 1 of 7 Should PolyMet's proposed mine be compared to the Flambeau Mine? By Stephanie Hemphill 12/18/15 The Flambeau mine operated just 140 feet from the Flambeau River from 1993 to 1997. CC/Flickr/FarTripper

More information

Technical Support for Grassroots Public Interest Groups. Report on Groundwater and Surface Water Contamination at the Flambeau Mine

Technical Support for Grassroots Public Interest Groups. Report on Groundwater and Surface Water Contamination at the Flambeau Mine CENTER for SCIENCE in PUBLIC PARTICIPATION 224 North Church Avenue, Bozeman, MT 59715 Phone (406) 585-9854 / Fax (406) 585-2260 / web: www.csp2.org / e-mail: csp2@csp2.org Technical Support for Grassroots

More information

Technical Support for Grassroots Public Interest Groups. Report on Groundwater and Surface Water Contamination at the Flambeau Mine

Technical Support for Grassroots Public Interest Groups. Report on Groundwater and Surface Water Contamination at the Flambeau Mine CENTER for SCIENCE in PUBLIC PARTICIPATION 224 North Church Avenue, Bozeman, MT 59715 Phone (406) 585-9854 / Fax (406) 585-2260 / web: www.csp2.org / e-mail: csp2@csp2.org Technical Support for Grassroots

More information

Flambeau Mine On-Site Surface Water Monitoring Program (See Appendix I for maps with site locations)

Flambeau Mine On-Site Surface Water Monitoring Program (See Appendix I for maps with site locations) Flambeau Mine On-Site Surface Water Monitoring Program (See Appendix I for maps with site locations) Controlling Document and Specifications COC Stipulation Monitoring Plan (Dec 2007) Frequency: Spring/Fall,

More information

Protecting the Public from the Proposed Back Forty Mine

Protecting the Public from the Proposed Back Forty Mine Protecting the Public from the Proposed Back Forty Mine Out of 250,000+ rivers in the United States the Menominee River was named the 10th most endangered river due to the threats from the proposed Back

More information

Comments on NorthMet Mining Project and Land Exchange Final Environmental Impact Statement. Objection to NorthMet Land Exchange Decision

Comments on NorthMet Mining Project and Land Exchange Final Environmental Impact Statement. Objection to NorthMet Land Exchange Decision Comments on NorthMet Mining Project and Land Exchange Final Environmental Impact Statement and Objection to NorthMet Land Exchange Decision December 4, 2015 Laura Gauger Duluth, MN 55805 Date: December

More information

Case Studies in ARD Management and Mine Closure

Case Studies in ARD Management and Mine Closure Case Studies in ARD Management and Mine Closure Rio Tinto US Sites Rich Borden and Vicky Peacey Rio Tinto April 2012 Environment in Rio Tinto 1 Proactive ARD Management for Mine Closure Proactive ARD management

More information

Mining Impacts. Metal Recycling. Reading Today: Ch. 12 pp , also Ch. 16 pp Wed: Ch. 13

Mining Impacts. Metal Recycling. Reading Today: Ch. 12 pp , also Ch. 16 pp Wed: Ch. 13 Mining Impacts Reading Today: Ch. 12 pp. 306-309, also Ch. 16 pp. 424-426 Wed: Ch. 13 Metal Recycling Benefits resource conservation less land disturbed by mining saves landfill space reduces energy consumption

More information

Metal Recycling. Mining Impacts. Recycling of other mineral resources. Hazardous Work

Metal Recycling. Mining Impacts. Recycling of other mineral resources. Hazardous Work Mining Impacts Reading Today: Ch. 12 pp. 306-309, also Ch. 16 pp. 424-426 Wed: Ch. 13 Metal Recycling Benefits resource conservation less land disturbed by mining saves landfill space reduces energy consumption

More information

Arsenic & Old Landfills

Arsenic & Old Landfills Arsenic & Old Landfills What we have learned from post-closure groundwater monitoring at inactive landfills in NY State Presented by Steven Parisio of NYSDEC at the SBRP Workshop on Arsenic and Landfills:

More information

Golden Sunlight Mine Bio-Treatment of Acid Producing Waste. By Rory Tibbals Operations Superintendent

Golden Sunlight Mine Bio-Treatment of Acid Producing Waste. By Rory Tibbals Operations Superintendent Golden Sunlight Mine Bio-Treatment of Acid Producing Waste By Rory Tibbals Operations Superintendent Golden Sunlight Mine Gold Producing Mine 2.5 Million Ounces Produced 20 Year Operation Ore and All

More information

Incomplete Mining plan

Incomplete Mining plan Incomplete Mining plan Because Rio Tinto s most recent efforts to achieve a Congressional land exchange have stalled, Rio Tinto released an incomplete mining plan of operations in November of 2013, asserting

More information

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT

2.1 INTRODUCTION 2.0 EIS DEVELOPMENT 2.0 EIS DEVELOPMENT 2.1 INTRODUCTION This section describes the development of the EIS for the NorthMet Project first proposed in 2005, through development of this SDEIS, as well as the FEIS planned for

More information

Eagle Project Subsidence Monitoring Plan

Eagle Project Subsidence Monitoring Plan Plan Eagle Project Subsidence Monitoring Plan Project No.: 04W018 Kennecott Eagle Minerals Company Marquette, Michigan December 2007 Eagle Project Subsidence Monitoring Plan Project ID: 04W018 Prepared

More information

Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility

Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility 1 Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility We have reviewed the Environmental Integrity report concerning the Trans Ash Landfill and believe there are several errors and/or

More information

HARDY AND KIDD ACID DRAINAGE AND METAL LEACHING HISTORIES: CONTRASTS AND COMPARISONS

HARDY AND KIDD ACID DRAINAGE AND METAL LEACHING HISTORIES: CONTRASTS AND COMPARISONS HARDY AND KIDD ACID DRAINAGE AND METAL LEACHING HISTORIES: CONTRASTS AND COMPARISONS Ronald V. Nicholson,Ph.D. Stantec Consulting Ltd. 1 th Annual BC ML/ARD Workshop Vancouver, December 2-3, 23 THE ARD

More information

SGC Low Flow 2017 Mayflower Area Field Investigations. April 27, 2017

SGC Low Flow 2017 Mayflower Area Field Investigations. April 27, 2017 SGC Low Flow 2017 Mayflower Area Field Investigations April 27, 2017 1 Purposes of Presentation Provide background on Mayflower area Provide an update regarding SGC s field activities Provide a review

More information

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864) ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864) A. SUMMARY 1. License Issued: August 20, 2003 2. Expiration: July 31, 2043 3. Waterway: Ontonagon River 4. Capacity: 12 MW (megawatts) 5. Licensee:

More information

Category 1 Waste Rock Stockpile Groundwater Containment System

Category 1 Waste Rock Stockpile Groundwater Containment System Memorandum To: Jennifer Saran, Poly Met Mining Inc. Project: 23690862.00-042-008 1.0 Introduction The Co-Lead Agencies have requested a summary of the four containment systems that are planned for the

More information

Groundwater and Well Water Education Program Waushara County - Eastern Towns Part of a study of Nitrate and Chloride in Waushara County

Groundwater and Well Water Education Program Waushara County - Eastern Towns Part of a study of Nitrate and Chloride in Waushara County Groundwater and Well Water Education Program Waushara County - Eastern Towns Part of a study of Nitrate and Chloride in Waushara County Through the University of Wisconsin-Extension, all Wisconsin people

More information

Little Cypress Bayou Special Study - Subwatershed 1.10

Little Cypress Bayou Special Study - Subwatershed 1.10 - Subwatershed 1.1 Sabine River Authority of Texas August 31, 21 Prepared in Cooperation with the Texas Natural Resource Conservation Commission Under the Authorization of the Texas Clean Rivers Act Table

More information

Development of a Statistical Approach to Determining Background Groundwater Conditions at Contaminated Sites in Alberta

Development of a Statistical Approach to Determining Background Groundwater Conditions at Contaminated Sites in Alberta Development of a Statistical Approach to Determining Background Groundwater Conditions at Contaminated Sites in Alberta Liza Flemming and Court SANDAU, TRIUM ENVIRONMENTAL SOLUTIONS. April 30, 2009 OVERVIEW

More information

Bradford/Union County Proposed Phosphate Mine Project Map

Bradford/Union County Proposed Phosphate Mine Project Map Bradford/Union County Proposed Phosphate Mine Project Map Union County Project Boundary 5,421.91 acres Bradford County Project Boundary 5,282.92 acres 1 The Future of the Santa Fe River Basin? The Peace

More information

2002 Water Quality Monitoring Report

2002 Water Quality Monitoring Report 22 Water Quality Monitoring Report Wenck File #2-49 Prepared for: CLEARWATER RIVER WATERSHED DISTRICT Box 276 Annandale, MN 55389 Prepared by: WENCK ASSOCIATES, INC. 18 Pioneer Creek Center P.O. Box 249

More information

Poly Met Mining, Inc. Groundwater Nondegradation Evaluation Preliminary MPCA Determination

Poly Met Mining, Inc. Groundwater Nondegradation Evaluation Preliminary MPCA Determination Attachment 4 Groundwater Nondegradation Evaluation Poly Met Mining, Inc. Groundwater Nondegradation Evaluation Preliminary MPCA Determination Overview The MPCA staff has reviewed the potential effects

More information

PROTECTING GROUNDWATER IN MINING AREAS. MME Workshop Duluth 2015 Bruce Olsen

PROTECTING GROUNDWATER IN MINING AREAS. MME Workshop Duluth 2015 Bruce Olsen PROTECTING GROUNDWATER IN MINING AREAS MME Workshop Duluth 2015 Bruce Olsen WHY PROTECT GROUNDWATER? Principal Source of Drinking Water in MN Recharges Many Lakes and Streams Extensively Used to Irrigate

More information

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT Pete Dronkers Northern Alaska Environmental Center WHAT IS ACID MINE DRAINAGE? (AMD) When a mine is built and operated, thousands or millions of tons of

More information

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? John C. Tracy, Director Idaho Water Resources Research Institute

More information

7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS

7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS 7.0 COMPARISON OF ALTERNATIVES AND OTHER NEPA CONSIDERATIONS 7.1 INTRODUCTION This chapter compares the alternatives and their environmental consequences for the NorthMet Project Proposed Action and Land

More information

Clyde Mine Discharge/Tenmile Creek Water Quality Final Report

Clyde Mine Discharge/Tenmile Creek Water Quality Final Report Clyde Mine Discharge/Tenmile Creek Water Quality Final Report November 01, 2016 Background In follow-up to the Pennsylvania Department of Environmental Protection s (DEP) December 15, 2015, Tenmile Creek

More information

Water-Quality Effects of Stormwater Runoff into Sand Pits on Ground Water in Sedgwick County, Kansas:

Water-Quality Effects of Stormwater Runoff into Sand Pits on Ground Water in Sedgwick County, Kansas: Water-Quality Effects of Stormwater Runoff into Sand Pits on Ground Water in Sedgwick County, Kansas: Phase II Kingston Cove and Pine Bay Pits and Comparison with Phase I Results A report for the Groundwater

More information

Water Reuse for Managing Impacted Water At Sierrita

Water Reuse for Managing Impacted Water At Sierrita Connecting the World Water Reuse for Managing Impacted Water At Sierrita Martha G. Mottley May 3, 2011 www.fcx.com Sierrita Operations ARIZONA Bagdad Miami Morenci Safford SIERRITA Groundwater Sulfate

More information

Coal Ash 101. Overview

Coal Ash 101. Overview Coal Ash 101 Richard Gaskins Executive Director Catawba Riverkeeper Foundation rick@catawbariverkeeper.org 704.408.3487 Overview Summary Background Dan River context Facts about coal ash Issues Water quality

More information

Environmental Services

Environmental Services 215 Environmental Services River Water Quality Summary for the Twin Cities Metropolitan Area In 215, Metropolitan Council Environmental Services (MCES) river monitoring was conducted at six automated and

More information

Discharge and Geochemical Characteristics of Evey Canyon and Icehouse. Canyon Springs, San Gabriel Mountains, During Extended Drought.

Discharge and Geochemical Characteristics of Evey Canyon and Icehouse. Canyon Springs, San Gabriel Mountains, During Extended Drought. 1 Discharge and Geochemical Characteristics of Evey Canyon and Icehouse Canyon Springs, San Gabriel Mountains, During Extended Drought Paula Soto California State Polytechnic University, Pomona Internship

More information

History of the Crandon Mine Project and Implications of Lessons Learned

History of the Crandon Mine Project and Implications of Lessons Learned History of the Crandon Mine Project and Implications of Lessons Learned Larry Lynch, P.G., Hydrogeologist -Wisconsin DNR SME Wisconsin Annual Conference Partnering for Sustainable Mining: Hard Rock and

More information

Mining. Mining: the extraction of valuable minerals or other geological materials from the Earth

Mining. Mining: the extraction of valuable minerals or other geological materials from the Earth Mining Mining: the extraction of valuable minerals or other geological materials from the Earth Ore: rocks that contain high concentrations of metals/minerals 1 Categories of Mineral Resources: energy

More information

Technical Memorandum. 1.0 Introduction

Technical Memorandum. 1.0 Introduction Technical Memorandum To: Jennifer Saran and Christie Kearney, Poly Met Mining, Inc. Project: 23/69-0862.12 100 001 c: Keith Hanson and Tina Pint, Barr Engineering Co. Disclaimer: This is a working document.

More information

Lab 14. Distribution of Natural Resources: Which Proposal for a New Copper Mine Maximizes the Potential Benefits While Minimizing the Potential Costs?

Lab 14. Distribution of Natural Resources: Which Proposal for a New Copper Mine Maximizes the Potential Benefits While Minimizing the Potential Costs? Lab Handout Lab 14. Distribution of Natural Resources: Which Proposal for a New Copper Mine Maximizes the Potential Benefits While Minimizing the Potential Costs? Introduction Copper is a useful metal

More information

Iron Mining In the Lake Superior Basin

Iron Mining In the Lake Superior Basin Iron Mining In the Lake Superior Basin Minntac Iron Mine in Minnesota Project Report 11-1 October 2011 Great Lakes Indian Fish & Wildlife Commission Environmental Section P.O. Box 9 Odanah, WI 54861 (715)

More information

Appendix D Monitoring Program

Appendix D Monitoring Program Appendix D Monitoring Program [This page left intentionally blank.] Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan Monitoring Program Minnesota

More information

Case: 3:11-cv bbc Document #: 256 Filed: 07/24/12 Page 1 of 39

Case: 3:11-cv bbc Document #: 256 Filed: 07/24/12 Page 1 of 39 Case: 3:11-cv-00045-bbc Document #: 256 Filed: 07/24/12 Page 1 of 39 IN THE UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF WISCONSIN - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

More information

Division of Surface Water Response to Comments

Division of Surface Water Response to Comments Division of Surface Water Project: Enon Sand and Gravel, LLC receipt of a National Pollutant Discharge Elimination System permit application Ohio EPA ID #: (1IJ00141) Agency Contacts for this Project Division

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally

More information

Setting ARD Management Criteria For Mine Wastes with Low Sulfide and Negligible Carbonate Content Stephen J. Day and Chris B. Kennedy SRK Consulting

Setting ARD Management Criteria For Mine Wastes with Low Sulfide and Negligible Carbonate Content Stephen J. Day and Chris B. Kennedy SRK Consulting Setting ARD Management Criteria For Mine Wastes with Low Sulfide and Negligible Carbonate Content Stephen J. Day and Chris B. Kennedy SRK Consulting (Canada) Inc. Outline Project setting Observations from

More information

Regulatory and Permitting. for Metallic Mining in Minnesota

Regulatory and Permitting. for Metallic Mining in Minnesota Regulatory and Permitting Framework for Metallic Mining in Minnesota Jennifer Engstrom Reclamation Manager Division of Lands and Minerals Department of Natural Resources May 6, 2010 Overview of Presentation

More information

NEPA & Mining Tribal Lands and Environment Forum. August 17, 2015 Minneapolis, Minnesota

NEPA & Mining Tribal Lands and Environment Forum. August 17, 2015 Minneapolis, Minnesota NEPA & Mining 101 2015 Tribal Lands and Environment Forum August 17, 2015 Minneapolis, Minnesota Cindi Godsey, Permit Writer and Alaska Mining Coordinator Lynne Hood, NEPA Reviewer David Tomten, RPM and

More information

Evaluation of Backfilling the NorthMet West Pit

Evaluation of Backfilling the NorthMet West Pit Report Evaluation of Backfilling the NorthMet West Pit Project I.D.: 12P778 Poly Met Mining, Inc. St. Paul, Minnesota December 2012 Evaluation of Backfilling the NorthMet West Pit Project ID: 12P778 Prepared

More information

Flambeau River Monitoring at the Flambeau Mine Rusk County, Wisconsin

Flambeau River Monitoring at the Flambeau Mine Rusk County, Wisconsin 1 Flambeau River Monitoring at the Flambeau Mine Rusk County, Wisconsin 3. CRAYFISH Analysis, Comments and Recommendations prepared for Wisconsin Resources Protection Council Dr. Ken Parejko Prof. Emeritus

More information

Minnesota Center for Environmental Advocacy 26 East Exchange Street Suite 206 Saint Paul, MN

Minnesota Center for Environmental Advocacy 26 East Exchange Street Suite 206 Saint Paul, MN Minnesota Center for Environmental Advocacy 26 East Exchange Street Suite 206 Saint Paul, MN 55101-1667 651.223.5969 September 30, 2016 Miranda Nichols Minnesota Pollution Control Agency 520 Lafayette

More information

Perspectives and Policy Issues on Indirect Reuse

Perspectives and Policy Issues on Indirect Reuse Perspectives and Policy Issues on Indirect Reuse Lyn Dean Associate General Counsel Lower Colorado River Authority November 2006 Terminology: Direct Reuse Treated wastewater effluent is transported directly

More information

Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T F

Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T F Mount Polley Mining Corporation an Imperial Metals company Box 12 Likely, BC V0L 1N0 T 250.790.2215 F 250.790.2613 November 24, 2016 Ministry of Environment Mining Operations Environmental Protection 2080

More information

Summary of Preliminary Results of EPA Remedial Investigation Molycorp molybdenum mine Questa, New Mexico

Summary of Preliminary Results of EPA Remedial Investigation Molycorp molybdenum mine Questa, New Mexico Summary of Preliminary Results of EPA Remedial Investigation Molycorp molybdenum mine Questa, New Mexico Prepared by Steve Blodgett, Technical Advisor Rio Colorado Reclamation Committee Introduction On

More information

EAGLE RIVER WATERSHED RESTORATION REMEDIATING 150 YEARS OF COPPER CONTAMINATION

EAGLE RIVER WATERSHED RESTORATION REMEDIATING 150 YEARS OF COPPER CONTAMINATION EAGLE RIVER WATERSHED RESTORATION REMEDIATING 150 YEARS OF COPPER CONTAMINATION Kotke, 2008 Chad Kotke Michigan Department of Environmental Quality Water Resources Division The Eagle River is exceeding

More information

St. Peter Wellhead Protection

St. Peter Wellhead Protection St. Peter Wellhead Protection Nitrogen Rate Results September 2003 A Demonstration Project Funded Through Section 319 of the Federal Clean Water Act Page 1 You farm and/or own land within the St. Peter

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Ronson Chee Company: Rosemont Copper Company Date: January

More information

2003 Water Quality Monitoring Report

2003 Water Quality Monitoring Report 23 Water Quality Monitoring Report Prepared for Clearwater River Watershed District January 24 23 Water Quality Monitoring Report File #2-58 Prepared for: CLEARWATER RIVER WATERSHED DISTRICT Box 276 Annandale,

More information

July 13, Via Original to Follow by Mail

July 13, Via  Original to Follow by Mail July 13, 2016 283 Rucker Street, Bldg. 3165 Anniston, Alabama 36205 Phone: 256.847.0780 Fax: 256.847.0905 matrixdesigngroup.com Mr. Stephen A. Cobb, Chief c/o Mrs. Brandi Little Governmental Hazardous

More information

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes 89 90 Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes Tongling Non-Ferrous Metals Group copper smelter Image credit: nerin.com 91 Analysis IV Environmental

More information

Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation.

Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation. Fractured Crystalline Bedrock Ground Water Remediation of Dissolved TCE via Sodium Permanganate Solution Injection & Re-circulation. Abstract William F. Simons, P.G., M.S. and Paul D. Steinberg, P.E.,

More information

EVALUATION OF THE POTENTIAL FOR IMPACTS ON SALMONID MIGRATION ASSOCIATED WITH CIRCULATION OF SALINE POND WATER DURING THE INITIAL STEWARDSHIP PERIOD

EVALUATION OF THE POTENTIAL FOR IMPACTS ON SALMONID MIGRATION ASSOCIATED WITH CIRCULATION OF SALINE POND WATER DURING THE INITIAL STEWARDSHIP PERIOD Report 6/9/03 EVALUATION OF THE POTENTIAL FOR IMPACTS ON SALMONID MIGRATION ASSOCIATED WITH CIRCULATION OF SALINE POND WATER DURING THE INITIAL STEWARDSHIP PERIOD 1. OVERVIEW Prepared by Stephen R. Hansen,

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

PREDICTED VERSUS ACTUAL WATER QUALITY AT HARDROCK MINE SITES: EFFECT OF INHERENT GEOCHEMICAL AND HYDROLOGIC CHARACTERISTICS 1

PREDICTED VERSUS ACTUAL WATER QUALITY AT HARDROCK MINE SITES: EFFECT OF INHERENT GEOCHEMICAL AND HYDROLOGIC CHARACTERISTICS 1 PREDICTED VERSUS ACTUAL WATER QUALITY AT HARDROCK MINE SITES: EFFECT OF INHERENT GEOCHEMICAL AND HYDROLOGIC CHARACTERISTICS 1 Ann Maest 2, James Kuipers, Kim MacHardy, and Gregory Lawson Abstract. The

More information

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA GROUNDWATER MONITORING INFORMATION QUARTERLY REPORT FOR PERIOD APRIL TO JUNE 216 BY LOUTH COUNTY COUNCIL TO ENVIRONMENTAL PROTECTION AGENCY FOR WASTE LICENCE REFERENCE: W33-1 DROGHEDA LANDFILL SITE COLLON

More information

Boron, Salinity, Nutrients and Dissolved Oxygen in the Irrigation Water. Water Conservation District

Boron, Salinity, Nutrients and Dissolved Oxygen in the Irrigation Water. Water Conservation District Boron, Salinity, Nutrients and Dissolved Oxygen in the Irrigation Water within the Yolo County Flood Control and Water Conservation District 8/31/06 Max Stevenson Water Resources Associate YCFC&WCD 34274

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF MISSOURI Application Number: SWL 2013-00260 Date: April 15, 2014 Comments Due: May 6, 2014 TO WHOM IT MAY

More information

Float Down the Kalamazoo River Featured scientist: Leila Desotelle from Michigan State University

Float Down the Kalamazoo River Featured scientist: Leila Desotelle from Michigan State University Float Down the Kalamazoo River Featured scientist: Leila Desotelle from Michigan State University Research Background: Ever since she was a kid, rivers have fascinated Leila. One of her hobbies is to kayak

More information

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID 83404 208-522-8069 ted@tsorenson.net September 26, 2013 Elizabeth A.O. Moats Oregon Department of Fish and Wildlife 107 20 th Street La Grande,

More information

Annex 5 - Hydropower Model Vakhsh

Annex 5 - Hydropower Model Vakhsh Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until

More information

Data Collection and Monitoring

Data Collection and Monitoring One Watershed, One Plan Data Collection and Monitoring Supporting information for Section III.F.5 of the 1W1P Plan Content Requirements This document discusses considerations for local governments in designing

More information

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Cokato Lake (86-263) Wright County. Hydrologic Investigation Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Problem Statement In recent years, heavy rainfall has

More information

Paul Eger Minnesota Department of Natural Resources Division of Lands and Minerals September 2010

Paul Eger Minnesota Department of Natural Resources Division of Lands and Minerals September 2010 Paul Eger Minnesota Department of Natural Resources Division of Lands and Minerals September 2010 What are constructed treatment wetlands? Why would you use them? Questions to ask Data needs Types of wetlands

More information

Newmont Mining Corporation Water Management Standard

Newmont Mining Corporation Water Management Standard Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This Global Standard sets the minimum Newmont requirements to proactively plan and manage water from exploration to post-closure in accordance with Newmont

More information

BAKER RIVER PROJECT DRAFT WATER QUALITY MONITORING PLAN

BAKER RIVER PROJECT DRAFT WATER QUALITY MONITORING PLAN BAKER RIVER PROJECT DRAFT WATER QUALITY MONITORING PLAN Prepared by Puget Sound Energy P.O. Box 97034 Bellevue, WA 98009-9734 March 10, 2009 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 1.1 Background...

More information

Exploring the Possibilities At Prado Dam

Exploring the Possibilities At Prado Dam Exploring the Possibilities At Prado Dam Greg Woodside, P.G., C.HG. Executive Director of Planning & Natural Resources December 5, 2017 The Orange County groundwater basin lies at the base of the Santa

More information

Enbridge Line 6B Incident Public Update and Availability Session

Enbridge Line 6B Incident Public Update and Availability Session Enbridge Line 6B Incident Public Update and Availability Session October 14, 2010 (Day 81) Division A Oil coming out of culvert on Talmadge Creek on first day of spill, July 26, 2010. Exposed pipeline

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Ronson Chee Company: Rosemont Copper Company Date: January

More information

Wickes Manufacturing TCE Plume Site Mancelona, Michigan

Wickes Manufacturing TCE Plume Site Mancelona, Michigan Wickes Manufacturing TCE Plume Site Mancelona, Michigan December 2017 What is TCE? Trichloroethylene (TCE) Common Industrial Solvent Known Human Carcinogen Federal and State Safe Drinking Water of 5 µg/l

More information

Comments from 4/12 - Draft Responses

Comments from 4/12 - Draft Responses Comments from 4/12 - Draft Responses Introduction The following document covers the proposed path forward and responds to questions and comments from the April 12, 2017, Stakeholder Meeting. Please review

More information

Phase II Assessment Potential Impacts of Uranium Mining in Virginia on Drinking Water Sources

Phase II Assessment Potential Impacts of Uranium Mining in Virginia on Drinking Water Sources Phase II Assessment Potential Impacts of Uranium Mining in Virginia on Drinking Water Sources EXECUTIVE SUMMARY February 202 Executive Summary There is interest in mining and milling a large uranium reserve

More information

DRINKING WATER QUALITY MANAGEMENT PLAN 2016/2017 REPORT HINCHINBROOK SHIRE COUNCIL SP62

DRINKING WATER QUALITY MANAGEMENT PLAN 2016/2017 REPORT HINCHINBROOK SHIRE COUNCIL SP62 HINCHINBROOK SHIRE COUNCIL SP62 PO BOX 366 INGHAM QLD 4850 Phone: (07) 4776 4600 Email: council@hinchinbrook.qld.gov.au Version No: A Authorised By: Water and Sewerage Current Version Date: 01/12/2017

More information

Earth Science Department, University of Arkansas at Little Rock, 2801 S University Ave Little Rock, AR 72204

Earth Science Department, University of Arkansas at Little Rock, 2801 S University Ave Little Rock, AR 72204 Determining the Extent of Contamination and Potential Health Effects from Water Quality of the Oklahoma Section of the Historic Tri-State Mining District William Ketcheside 1 (wdketcheside@ualr.edu), Laura

More information

B-7. Predictive Assessment Model of Quaternary Alluvium Hydrogeology. J:\scopes\04w018\10000\FVD reports\final EIA\r-EIA app.doc

B-7. Predictive Assessment Model of Quaternary Alluvium Hydrogeology. J:\scopes\04w018\10000\FVD reports\final EIA\r-EIA app.doc B-7 Model of Quaternary Alluvium Hydrogeology J:\scopes\04w018\10000\FVD reports\final EIA\r-EIA app.doc PREDICTIVE ASSESSMENT MODELING OF THE QUATERNARY ALLUVIUM HYDROGEOLOGY EAGLE PROJECT MARQUETTE COUNTY,

More information

CONCLUSIONS AND RECOMMENDATIONS

CONCLUSIONS AND RECOMMENDATIONS CONCLUSIONS AND RECOMMENDATIONS The Little Schuylkill River is polluted by acid mine drainage from twenty-four primary sources; fourteen deep mine workings, nine refuse storage bank seeps and the effluent

More information

SALTON SEA SOLAR PONDS PILOT PROJECT

SALTON SEA SOLAR PONDS PILOT PROJECT SALTON SEA SOLAR PONDS PILOT PROJECT Agrarian Research 162 East Line Street Suite E Bishop, CA 93514 Under contract to: Goal of Salinity Management Stabilize (or reduce slightly) the salinity of the Salton

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Essar Steel Minnesota L.L.C. Supplement to Environmental Impact Statement (SEIS) Preparation Notice

Essar Steel Minnesota L.L.C. Supplement to Environmental Impact Statement (SEIS) Preparation Notice Essar Steel Minnesota L.L.C. Supplement to Environmental Impact Statement (SEIS) Preparation Notice I. Title of EIS being supplemented and dates of completion: Final Environmental Impact Statement, Minnesota

More information

Responsible Mining in the Lake Superior Basin Dec. 2013

Responsible Mining in the Lake Superior Basin Dec. 2013 Responsible Mining in the Lake Superior Basin Dec. 2013 In this document Introduction Part 1: Statement on Responsible Mining Part 2: Specific Recommendations for Mining Projects in the Lake Superior Basin.

More information

Notice of Intent to Sue for Violations of the Clean Water Act

Notice of Intent to Sue for Violations of the Clean Water Act December 8, 2009 BY CERTIFIED MAIL - RETURN RECEIPT REQUESTED Bill Richter, Manager Thomas A. Korman, Illinois Agent Freeman Coal Industry Mine Freeman United Coal Mining Co., LLC 1480 E. 1200 th St. 222

More information

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below. ARTICLE B: STANDARDS Sec. 16-1-11 Standards All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below. (a) General Standards. 1. REFUSE AND

More information

Mining and Our Natural Resources

Mining and Our Natural Resources Mining and Our Natural Resources February 28, 2008 Jennifer Engstrom Division of Lands and Minerals MN Department of Natural Resources Overview Brief overview of environmental review Permit to Mine for

More information

Partizansk Coal Ash Dam Break and Spill - Observations Compiled September 28, 2004

Partizansk Coal Ash Dam Break and Spill - Observations Compiled September 28, 2004 Partizansk Coal Ash Dam Break and Spill - Observations Compiled September 28, 2004 by Paul Robinson Southwest Research and Information Center PO Box 4524 Albuquerque, NM 87106 USA Phone 505-262-1862/ Cell

More information

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855) DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855) A. SUMMARY 1. License Issued: October 4, 2002 2. Expiration: September 30, 2042 3. Waterway: Dead River 4. Capacity: 15.5 MW (megawatts) 5. Licensee:

More information

GEO-HYDRO, INC Consulting in Geology and Hydrogeology

GEO-HYDRO, INC Consulting in Geology and Hydrogeology Consulting in Geology and Hydrogeology 16 Mesa Oak Littleton, CO 80206 (303) 948-1417 July 24, 2017 Mr. Thomas Cmar Coal Program Attorney Earthjustice 1101 Lake Street, Suite 405B Oak Park, IL 60301 Subject:

More information

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania 6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania The UGI Columbia Gas Plant site is located on less than 1 acre in an industrial area of the Borough of Columbia, Lancaster County,

More information

April 11, Kimberly Prillhart Planning Director Resource management Agency County of Ventura 800 South Victoria Avenue Ventura, CA 93009

April 11, Kimberly Prillhart Planning Director Resource management Agency County of Ventura 800 South Victoria Avenue Ventura, CA 93009 April 11, 2012 Kimberly Prillhart Planning Director Resource management Agency County of Ventura 800 South Victoria Avenue Ventura, CA 93009 RE: April 12, 2012 Hearing on Mosler Rock- Ojai Quarry Reclamation

More information