Chapter Two Process and Project Management

Size: px
Start display at page:

Download "Chapter Two Process and Project Management"

Transcription

1 Chapter Two Process and Project Management TOTAL QUALITY MANAGEMENT SHARED SERVICES OUTSOURCING FOREIGN OPERATIONS IMPLEMENTING TOTAL QUALITY MANAGEMENT BUSINESS PROCESS ENGINEERING THEORY OF CONSTRAINTS SIX SIGMA PROJECT MANAGEMENT ERP, PERT 2-7 MULTIPLE CHOICE QUESTIONS...2Q-1 MULTIPLE CHOICE EXPLANATIONS...2S-1

2 Chapter 2 Process and Project Management This chapter focuses on the process and project management sections in the Business Environment & Concepts section of the CPA Exam. The first part of the chapter will focus on Process Management, whereas the second part will focus on the Project Management area. There are quite a few lists in this chapter that need to be learned and memorized. Part 1 Process Management Process Management can be defined as an all encompassing approach to obtain continuous fitness of product or service improvement in and through the actions performed in an organization. In other words it is the coordination of organizational activity in harnessing improvement and streamlining it to achieve greater profitability. There are many approaches to process management that can be taken. Initially the overall benefits of process management are decreasing customer product returns, decreasing warranty provisions made, decreasing amounts of capital tied to inventory, increasing perception of product value, decreasing processing costs and increasing reliance in process schedules. The key objective is to continually improve every element of an organization s supply chain, including purchasing, manufacturing and sourcing, quality control, logistics and distribution, sales and marketing, customer service and information technology. The ultimate objective is to create positive comparative advantage for consistent superior profit results and customer brand loyalty. This is the primary focus of the study of Strategic Mangement. 1. Total Quality Management (TQM) Total Quality Management (TQM) uses quantitative methods to constantly enhance organizational processes. It also involves coordination of managers and employees goals to those of the organization. In addition, TQM involves strategic planning due to the significant number of quality costs that compose product pricing and the lengthy implementation process. There are four objectives to TQM: a. Top notch consistent product quality. b. Instant and consistent reaction to customer desires. c. More adaptability in maintaining customers varying requirements. d. Lower costs through enhancements and removing non-value added work. Faulty processes are usually the reason for poor quality. An organization may require a paradigm shift in corporate style in order to improve faulty processes. Proactive management, corporate-wide training, and enabling all levels of employees to make decisions on product quality are ways to improve faulty processes. Preventive and not corrective action is encouraged. Improvement teams can be used to help focus on problem awareness. There are five key required aspects of TQM. These are: a. TQM should offer acute focus on customer satisfaction as job retention depends on it. b. Focus on internal and external customers (purchasing, receiving, assembly, shipping, sales) where each department is a customer to the succeeding department. c. Analyzing critical success factors (an organization can only improve if it knows what and how to measure). d. Constant improvement of finished goods and services. 2-1

3 e. Reliance on co-workers and departments across the organization. An organization s ability to measure its performance is an essential factor for improvement. Measurement aspects include the Deming cycle (plan-do-check-act). This cycle measures how processes are thought of, carried out, monitored and improved upon. Another familiar measurement aspect is benchmarking, which compares an organization s processes against the best in the class at a particular process, especially as it relates to its competitors. Other measurement aspects include: a. Statistical Control which uses charts to monitor defects b. The Taguchi quality loss function determines the financial loss due to quality defects in an organization s products and services c. A Pareto Diagram shows that just a few deficient processes create the majority of losses. d. The Ishikawa (cause and effect diagram) shows the cause of a certain event over a time period and isolates reasons for defects. Measurable quality costs can be segregated into two categories in an organization s quality reports. These are conformance costs and nonconformance costs. Conformance costs are those costs that occur before a product is shipped or a service is provided. Examples of these costs (preventative costs) can be training, evaluation and vendor costs. Appraisal costs such as inspections, testing by employees or departments are also examples of conformance costs. Nonconformance costs are those costs that occur after a process is completed internally, or after a product or service is provided to the customer. Examples of these costs are internal failure costs such as scrap or retooling of machines. External failure costs also fall into this category, examples being warranties, product returns, lawsuit and faulty product costs. 2. Shared Services An organization may decide to group non-required and support staff into one separate department, division or company to enhance already existing services. This streamlining action of shared services can improve consistency, core process concentration and tracking of common costs. There can be some pitfalls to utilizing shared services. These can include: a. A narrow focus on needs in the short term to spend needlessly. b. Lack of specialized knowledge to affect proper deployed shared sources. c. Faulty or too rapid of a rate of implementation. A slower implementation is often more effective. d. Administrative and financial failure due to lack of coordination with employees of different skill sets and the inability to set pricing for the services they provide. e. Lost internal control during the change process and inherent risks during the process should be monitored and mitigated immediately. f. Failure to properly manage resistance to change. 3. Outsourcing Outsourcing is acquiring a product or service instead of producing it. In today s business world some of the more common functions to be outsourced include information technology, human resources, customer service and transaction processing. An organization may gain some benefits by outsourcing. These include: a. Gaining outside knowledge and access to new technologies. 2-2

4 b. Acquiring less expensive services than those produced in-house. c. Avoiding inventory obsolescence. d. Minimizing administrative headcount and overhead. e. Enhancing quality in products or services. Outsourcing can also expose an organization to some risks. Risks include: a. Excess costs involved in specific unnecessary knowledge. b. Loss of human expertise. c. Internal control loss of quality. d. Loss of knowledge exclusivity. e. Strategic planning suffers due to reliance on outside expertise. f. Production rigidity may be experienced on supply chain loss. g. Potential of slower reaction to specific issues due to other client priorities. 4. Foreign Operations Off-shore (Foreign) operations offer the allure of cost savings as costs of doing business in the United States can appear to be prohibitive. Other gains that can be had by off-shore operations are: a. Quality of service can be maintained or improved. b. New sources of expertise acquired that may not be available domestically. c. The off-shore operation may turn into a strategic business unit for the foreign operation. d. Can offer a refocus on core domestic business operations. e. New processes are implemented quicker in a new operation. f. Drains on capital decreased if core business is profitable and off-shoring is done inexpensively. There are many different business and control problems associated with off-shore operations. Conditions such as language and cultural differences can have a substantial effect on the success (or failure) of off-shore operations. Problems include: a. The savings never materialize. b. Exorbitant training costs and language barriers. c. Unproductive staff. d. Inability to acquire productive staff due to competition abroad in particular services. e. Focus on tasks may shift from a foreign worker s standpoint. f. Cultural differences in work habits. g. Initiative to be proactive might not occur in order not to be disrespectful of the corporate office. h. Plateaued employees become unmotivated with mundane tasks. i. Lack of control over quality control, work processes and conditions. 5. Implementing Total Quality Management The implementation of TQM does not occur instantly. It involves careful consideration and patience to succeed in a procedural insertion. There are basic steps and organization should take when instituting TQM. The year one step is to prepare and plan. Organizations must develop a quality oversight committee and implementation team. This implementation team and their techniques must be approved by the Board of Directors and CEO for the TQM to work properly. Year one steps also include instilling training programs on TQM techniques in order to increase awareness of quality, determine common data recognition regarding quality 2-3

5 techniques, and develop appropriate goals and minimum standards. These training programs should occur at all organization levels. In addition, year one activities include conducting quality audits. These audits will review and compare organizational steps against those of best practice organizations. The first year audits will also determine organizational assets and liabilities regarding quality. Gap analysis should also be conducted to pinpoint the exact areas where quality enhancements are needed in an organization s process. The organization should then develop a plan to improve quality in the short and long term. The short term plan should use smaller implementation projects and gradually build to larger ones in the long term. Year two steps are to teach and deploy employee training sessions conducted by qualified instructors in TQM techniques. Quality teams should also be developed. These teams should have a member from each applicable area of the organization participate in order to monitor the results of improvements throughout the organization. These members become owners of the quality process. Year two steps also include creating a gauging system of performance that would revamp the accounting system to communicate and pinpoint accuracies in appropriate tasks that may entail many general ledger accounts. In year three the steps will examine, make decisions and change the TQM program. These steps include: a. Compensating and reinforcing TQM enhanced improvement and employee behavior (morale boosting). b. Involve vendor participation to ensure reasonable expectations of quality, timeliness of product delivery, commitments as colleagues of TQM, and consistency of products. c. Update TQM techniques on regular basis 6. Business Process Engineering (BPR) Business Process Engineering (BPR) is the intricate scrutiny and complete makeover of business and production activities in an organization. It is done to increase quality and cut costs. Key considerations of BPR are: a. Asking why we are doing this? Is there a reason we are performing this task this way? b. Creating new thoughts regarding work patterns. c. Upheaval of processes needed. d. Linking all process together in a cause and effect relationship. e. Creating a culture to welcome and seek out change. BPR requires that some steps be taken in order to support it. First, emphasis should be placed on the process and not the organization in review of the workflow. Second, BPR supports paradigm shifts and large changes over time versus a few incremental changes in work flow processes. Previous thought processes regarding workflow are eliminated. Technology may be used to drive the change in thought process. Positive accelerated change can be taught to be pursued. 7. Management Schools of Thought There are several management schools of thought that may be asked on the CPA Exam. One of these thoughts is the Just-In-Time Inventory System that has the following characteristics: a. Demand-pull in nature. Customer orders trigger activity. b. Work teams are multiskilled across manufacturing functions to get the work accomplished. c. Inventory is reduced or eliminated as it is worked on as soon as it arrives from a vendor. This is also known as lean production, no waste or inventory is allowed. d. Vendors must adhere to on-time quality product delivery. 2-4

6 e. Operates on Kanban or ticket system to move inventory between workstations to attain a finished product. 8. Process (Demand Flow) Process (or demand flow) is the study of activities that combine to take a raw material and turn it into a finished good. There are value added steps throughout the process that should encompass effectiveness, efficiency and adaptability. The process should address the following: a. Does the work involved improve the product? b. Does the output end up when and where a customer would want it? c. Does the product cost too much compared to other products? d. Is the workflow process adaptable to customer requirements should those requirements change? e. Do we have the right product available to the right customer at the right time? 9. Theory of Constraints (TOC) Theory of Constraints (TOC) is based upon the premise that time is money. It focuses on quickening of the manufacturing process. Time is measured in cycles and the main cycle is the time between receipt of a customer purchase order to the shipment of that order. Imbedded in the cycle are non-value added activities. This subset of cycle time is called processing, or value added time. The percentage of processing time that encompasses the cycle time is called manufacturing cycle efficiency. The manufacturing cycle efficiency percentage should be monitored by management and should be as high as possible. In manufacturing processes TOC views all costs except raw materials as fixed costs. The reason is that the processes can be delayed (bottlenecked) because of labor, overhead and machinery (not the raw material). The process of TOC Review involves these aspects: a. Determine constraints using a workflow diagram. b. Decide which products should be manufactured given the constraints. Those with the greatest throughput margin offer the greatest opportunities for future sales. This margin is (Sales minus Raw Materials Costs). The costs are deemed supervariable. c. Optimize process flow through the constraint by determining a proper time amount for the process. This is done while keeping the flow constant and identifying the steps in the process right up to the constraint. d. Add labor, overhead or fixed assets to alleviate the constraint and improve cycle time. e. Reengineer the workflow process if necessary for flexibility and cycle time improvement. f. Can also work for overhead management and adopting activity based costing to properly allocate activity costs. 10. Six Sigma Six Sigma is a management technique to eradicate defects and minimize variations in a manufacturing process. It uses experts (sometimes call black belts) to keep improving the process using quantifiable measures such as increased income and decreased costs. Six standard deviations from a man in a population is where the term Six Sigma is derived. It means that near 100% of product contains no defects. The goals and aspects used are quite similar to those of TQM and were inspired by William Edward Deming s model of quality improvement. Six Sigma has two main processes. The first one enhances existing product and follows the following steps: a. Define a problem from a customer s viewpoint. 2-5

7 b. Measure job flow tasks and gather data. c. Analyze the data to discover problems in job flows. d. Improve the process by experimenting with new process flows. e. Control future work flows by creating control points in the new work flow patterns and monitor improvements. The second Six Sigma Process determines new work flow processes for a product. This second Six Sigma process will: a. Define goals consistent with customer desire and international. b. Measure steps and procedures that are essential to product quality, capability and risks. c. Analyze different work flow patterns and decide on the ideal one. d. Design the detail of the new work patterns and roll it out incrementally. e. Verify the ideal design will work properly, prepare a trial run and deliver it to the new process owners. 11. The International Standard Organization (ISO) The International Standards Organization (ISO) developed areas of quality control standards that are used throughout the world in many companies and provide common databases of knowledge for constant improvements by gauging efforts within organizations and steps to alleviate environmental issues. The different ISO Series are: a. ISO 9000 Series covers quality management standards b. ISO Series covers management of environmental systems c. ISO and relate to software and security quality in information systems Part 2 Project Management Project Management is a procedure to plan, organize, direct and control organizational assets in order for goals to be accomplished within a specific time period and a specified monetary figure. Organizational assets include human capital, fixed assets, funding and time. A project s life expectancy encounters four phases. These phases are: a. Contemplating the start of a project by determining goals, scope, funding, management and participants. b. Determine work quality specifications, milestones, finished product details and amount of work required. c. Carry out the project as well as monitor, adjust and document it as necessary. d. Finish the project; turn it in for evaluations and recommendations. e. Modify as is necessary. 2-6

8 The project management environment can be depicted by a triangle show below. Scope & Quality Time Constraints Monetary The most important of these constraints is the quality of the items given to the organization at the end of the project. The Project Management Environment includes as part of the three constraints: a. Monetary Budgets b. Time Budgets c. Work parameters to guard against Scope Creep, where non essential tasks are included in the actual performance of the project. d. All of the constraints work either conversely or inversely with one another. 1. Enterprise Resource Planning (ERP) is used to manage a project throughout all of an organization s departments. This is the use of one database for all of the required information to complete the project (SAP, Oracle). Customizing ERP is a costly, cumbersome process and it may be easier to change certain business processes than to update ERP software. 2. Project Management techniques include Gantt charts that depicts starting and ending times of projects noted on a calendar. Gantt charts show the interrelationships of tasks within a project. Histograms are bar charts used to determine the number of instances for certain events. Network analysis determines the quickest route through a project by detailing each event involving work steps within a project. 3. Performance Evaluation Review Technique (PERT) is used when constructing a large asset such as an airplane, skyscraper, etc. Each project has a starting and ending point with milestones and accomplished tasks interspersed though the diagram. Connecting lines between the milestones depict time spent to accomplish a certain task. By mapping out and measuring the time required to accomplish tasks, the longest time to complete a project can be determined. This is called the Critical Path. The critical path has no slack time on it, thus all of the tasks on the critical path cannot be delayed, or the entire project is delayed. PERT is also known as the critical path method since the concepts are intertwined. Since there is no slack time on the critical path, if the time to complete a project is shortened, the first place to crash the project are the tasks on the critical path. The tasks that alleviate the greatest time constraints or are the least costly should be crashed first. Using PERT s Critical Path Method will also identify: a. Idle or slack time. b. Where additional personnel are required. c. The need for lead time to receive outside inventory or labor. 2-7

9 d. Tasks that can be completed simultaneously. PERT does not clearly depict relationships of one task to another as clearly as a Gantt Chart. PERT uses a weighted average of time expected to perform each task. One sixth of the weight is given each to the shortest possible and longest possible expected times to complete the tasks. Two-thirds of the weight is given to the most suitable amount of time needed to complete a task. Critical Path Method is helpful when times to complete tasks are previously known and incentive is given to shorten times for future tasks. 4. Other Models used in Project Management There are other models that are used in Project Management. Algorithms are used to determine shortest routes for scheduling in transportation situations. This can be used to determine movement of products by trucks or the flow of a product such as oil. 5. Job Responsibilities for Project Personnel A Steering Committee oversees the entire project. They are specifically responsible for: a. Alleviating disputes between organization management and project members. b. Making sure the project stays within budget and on time. c. Funding is made to the project in a timely manner. d. Representing stakeholders in negotiations with management. Stakeholders can be one person or an organization within or external to the project organization. The stakeholders have a financial interest in the success and completion of a project. Managers, sponsors, suppliers, customers and team members can be stakeholders. Whereas sponsors provide monetary backing for the projects, managers actually lead the team members of the project. The manager s primary goal is to manage people, deal with and resolve conflict within and between teams. Managers do not need to be experts in every aspect of the project. Team members carry out the tasks required to complete the specific tasks of a project. They enter and leave the project as requested. 2-8

KillTest *KIJGT 3WCNKV[ $GVVGT 5GTXKEG Q&A NZZV ]]] QORRZKYZ IUS =K ULLKX LXKK [VJGZK YKX\OIK LUX UTK _KGX

KillTest *KIJGT 3WCNKV[ $GVVGT 5GTXKEG Q&A NZZV ]]] QORRZKYZ IUS =K ULLKX LXKK [VJGZK YKX\OIK LUX UTK _KGX KillTest Q&A Exam : IIA-CIA-Part3 Title : Certified Internal Auditor - Part 3 study guide with online review Version : Demo 1 / 8 1.A traditional quality control process in manufacturing consists of mass

More information

Project Quality Management

Project Quality Management 1 Project Quality Management Unit 8 Eng.elsaka09@gmail.com Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and

More information

Online Course Manual By Craig Pence. Module 12

Online Course Manual By Craig Pence. Module 12 Online Course Manual By Craig Pence Copyright Notice. Each module of the course manual may be viewed online, saved to disk, or printed (each is composed of 10 to 15 printed pages of text) by students enrolled

More information

IT 470a Six Sigma Chapter X

IT 470a Six Sigma Chapter X Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor

More information

Managerial Accounting and the Business Environment

Managerial Accounting and the Business Environment Managerial Accounting and the Business Environment Chapter 1 1-2 Managerial accounting is concerned with providing information to manager that is, people inside organization who direct and control its

More information

IIA-CIA-Part3 IIA. Certified Internal Auditor - Part 3, Business Analysis and Information Technology

IIA-CIA-Part3 IIA. Certified Internal Auditor - Part 3, Business Analysis and Information Technology IIA IIA-CIA-Part3 Certified Internal Auditor - Part 3, Business Analysis and Information Technology http://killexams.com/pass4sure/exam-detail/iia-cia-part3 Question: 145 Quality costing is similar in

More information

PROJECT QUALITY MANAGEMENT. 1 Powered by POeT Solvers LImited

PROJECT QUALITY MANAGEMENT. 1   Powered by POeT Solvers LImited PROJECT QUALITY MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers LImited WHAT S PROJECT QUALITY MANAGEMENT? WHAT S PROJECT QUALITY MANAGEMENT? Project Quality Management processes include all the activities

More information

Part 3 : 11/10/10 21:33:42. The four factors that derive from a company's distinctive competencies and which create competitive advantage are

Part 3 : 11/10/10 21:33:42. The four factors that derive from a company's distinctive competencies and which create competitive advantage are Question 1 - HOCK CMA P3A H45 - Strategic Planning The four factors that derive from a company's distinctive competencies and which create competitive advantage are A. the value (utility) customers place

More information

Chapter 8 Producing Quality Goods and Services

Chapter 8 Producing Quality Goods and Services Chapter 8 Producing Quality Goods and Services 1 Explain the nature of production. 2 Outline how the conversion process transforms raw materials, labor, and other resources into finished products or services.

More information

GUIDE TO THE CHANGES IN PMP simpl learn i

GUIDE TO THE CHANGES IN PMP simpl learn i GUIDE TO THE CHANGES IN PMP- 2015 simpl learn i Table of contents Introduction the purpose of this manual 1 New Tasks: Initiating 3 New Tasks: Planning 4 New Tasks: Executing 6 New Tasks: Monitoring and

More information

Material available on web at

Material available on web at Material available on web at http://gtumcain.wordpress.com Major topics Modules of ERP Human Resources Management Financial Management Inventory Management Quality Management Sales and Distribution (Murlidhar

More information

THE PMP EXAM PREP COURSE

THE PMP EXAM PREP COURSE THE PMP EXAM PREP COURSE Session 2 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falconppm.com Agenda 9:00 10:15 Practice the PMP Questions 10:15 10:30 Break 10:30

More information

Assignment #2 IE 2303/AME 2303 Spring 2012 Introduction to Manufacturing. Example Answers

Assignment #2 IE 2303/AME 2303 Spring 2012 Introduction to Manufacturing. Example Answers Assignment #2 IE 2303/AME 2303 Spring 2012 Introduction to Manufacturing Example Answers 1. Short Response 2 to 3 sentences each (10 pts.) Explain in your own words the challenges/opportunities for U.S.

More information

Quality. Monitoring & Controlling Processes. Planning. Processes. Executing Processes. Process. Knowledge Area. Monitoring &

Quality. Monitoring & Controlling Processes. Planning. Processes. Executing Processes. Process. Knowledge Area. Monitoring & PMBOK 5 Ed. DEI- Monitoring & Controlling Processes Planning Processes Enter phase/ Start project Initiating Processes Closing Processes Exit phase/ End project Executing Processes Knowledge Area Process

More information

Project Quality Management. For the PMP Exam using PMBOK

Project Quality Management. For the PMP Exam using PMBOK Project Quality Management For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. Contacts Name: Khaled El-Nakib, PMP, PMI-RMP

More information

Managerial Accounting and the Business Environment

Managerial Accounting and the Business Environment Managerial Accounting and the Business Environment Chapter 1 McGraw-Hill/Irwin Copyright 2010 by The McGraw-Hill Companies, Inc. All rights reserved. Customer Value Propositions Customer Intimacy Strategy

More information

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal

Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal Project Management CTC-ITC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:

More information

Malay (Rumi, Roman script)

Malay (Rumi, Roman script) Hai Malay (Rumi, Roman script) Project Management Process Groups Project Integration Management Initiating Planning Executing Scope Monitoring & Controlling Closing Knowledge Areas Time Cost Quality Human

More information

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 ( Lean Principles By Jerry D. Kilpatrick This article was originally written for and published by MEP Utah in 2003 (www.mep.org) Page 1 of 6 Introduction Lean operating principles began in manufacturing

More information

PMP Exam Preparation Workshop Project Quality Management

PMP Exam Preparation Workshop Project Quality Management PMP Exam Preparation Workshop Project Quality Management 1 Learning Objectives By the end of this session you will understand: The PM Quality Processes The PM Process Groups Project Quality Management

More information

Quality Management Chapter 14

Quality Management Chapter 14 Quality Management Chapter 14 1 Objectives What is Quality? Total Quality Management TQM in Service Cost of Quality Quality Improvements Quality Awards and Certifications 2 What is Quality? The Meaning

More information

Operational Effectiveness Unlocks Profits and Incremental Revenue

Operational Effectiveness Unlocks Profits and Incremental Revenue Operational Effectiveness Unlocks Profits and Incremental Revenue By Max R. Davis Operations Operations improvement can be the key to increased profit margins and revenues. Operational efficiency, quality,

More information

Unit 3: Traditional Project Delivery Using IT Applications

Unit 3: Traditional Project Delivery Using IT Applications Unit 3: Traditional Project Delivery Using IT Applications 3.1 Construction Project Process Flow i. In a typical construction project, the major key to its success hinges on how well the project process

More information

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM APPROVED BY: JOSE ALBERTO APPROVED ON: 08/10/2017 Rev.: 1 M001 QUALITY MANAGEMENT SYSTEM PAGE: 1 of 20 TABLE OF CONTENTS SECTION TITLE PAGE Table of Contents

More information

5.3 Supply Management within the MES

5.3 Supply Management within the MES Technical 6x9 / Manufacturing Execution Sytems (MES): Design, Planning, and Deployment / Meyer / 0-07-162383-3 / Chapter 5 Core Function Production Flow-Oriented Planning 85 Customer data (e.g., customer

More information

Total Fastening Service (TFS) in SCM

Total Fastening Service (TFS) in SCM OF ILS ILS is a principal division of Park-Ohio, which is a 153-year-old company, headquartered in Cleveland, Ohio, U.S.A. It is a leading provider of business-to-business supply chain logistics services

More information

Global Operations and Supply Chain Management Final Exam Notes

Global Operations and Supply Chain Management Final Exam Notes Global Operations and Supply Chain Management Final Exam Notes Lecture One Operations Management: the process that effectively produce, transform and deliver a product or service. Inputs -> transformation

More information

For the PMP Exam using PMBOK. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

SHORT ANSWER QUESTIONS (KEY) UNIT- I

SHORT ANSWER QUESTIONS (KEY) UNIT- I SHORT ANSWER QUESTIONS (KEY) UNIT- I 1. Define quality. Quality is the totality of characteristics of an entity that bear on its ability to satisfy stated and implied needs. 2. What do you mean by quality

More information

Lean Gold Certification Blueprint

Lean Gold Certification Blueprint The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types

More information

CH (8) Hot Topics. Quality Management

CH (8) Hot Topics. Quality Management CH (8) Hot Topics Quality Management 1 CH ( 8 ) Quality Management 2 Introduction This knowledge area requires you to understand three processes, as described in the book PMP : Plan Quality Management,

More information

International Association of Certified Practicing Engineers

International Association of Certified Practicing Engineers www.iacpe.com Knowledge, Certification, Networking Page: 1 71 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International is providing the introduction to the Training Module for your

More information

Chapter 5 Building and Changing Global Business Processes

Chapter 5 Building and Changing Global Business Processes Chapter 5 Building and Changing Global Business Processes Managing and Using Information Systems: A Strategic Approach by Keri Pearlson & Carol Saunders Learning Objectives List how IT enables business

More information

Software Helps You Manage the Project Portfolio

Software Helps You Manage the Project Portfolio Software Helps You Manage the Project Portfolio As illustrated in the previous section, you can practice project portfolio management (PPM) without software. However, software makes it much easier and

More information

MMOG/LE Evaluation. Data Collection Process Improvement

MMOG/LE Evaluation. Data Collection Process Improvement MMOG/LE Evaluation Data Collection Process Improvement 1. STRATEGY AND IMPROVEMENT 1.2 Objectives 1.2.2 Key Performance Indicators (KPIs) shall cover objectives for all areas of the materials planning

More information

SHOULD YOUR BARCODE LABELING SOLUTION BE FULLY INTEGRATED WITH YOUR BUSINESS SYSTEM?

SHOULD YOUR BARCODE LABELING SOLUTION BE FULLY INTEGRATED WITH YOUR BUSINESS SYSTEM? SHOULD YOUR BARCODE LABELING SOLUTION BE FULLY INTEGRATED WITH YOUR BUSINESS SYSTEM? B U S I N E S S T R A N S F O R M AT I O N T H R O U G H T O TA L S Y S T E M I N T E G R AT I O N TEKLYNX Americas

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

Managerial Accounting: An Overview

Managerial Accounting: An Overview Managerial Accounting: An Overview Chapter 1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright

More information

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success  Presented by Larry Akre May 17, 2007 "Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007 LAKRE 2007 1 Lean Manufacturing What is Lean Manufacturing? A philosophy

More information

SNAP-ON INCORPORATED STANDARD ON FACILITY SPECIFIC REQUIREMENTS

SNAP-ON INCORPORATED STANDARD ON FACILITY SPECIFIC REQUIREMENTS SNAP-ON INCORPORATED STANDARD ON FACILITY SPECIFIC REQUIREMENTS Approval: Date: SEQ80.01.doc Page 1 of 15 Rev. 05/01/05 0.0 Introduction and overview The QFS system document (Tier I) includes both corporate

More information

Introduction to Project Management

Introduction to Project Management Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George 2008 Prentice Hall 7-1 Project Resources

More information

716 West Ave Austin, TX USA

716 West Ave Austin, TX USA FRAUD-RELATED INTERNAL CONTROLS GLOBAL Headquarters the gregor building 716 West Ave Austin, TX 78701-2727 USA Figure 2.1 COSO defines an internal control as a process, effected by an entity s board of

More information

UNIVERSITY OF TOLEDO INTERNAL AUDIT DEPARTMENT PURCHASE CAPITAL GOODS

UNIVERSITY OF TOLEDO INTERNAL AUDIT DEPARTMENT PURCHASE CAPITAL GOODS The following control objectives provide a basis for strengthening your control environment for the process of purchasing capital goods. When you select an objective, you will access a list of the associated

More information

Project Management Framework

Project Management Framework Project Management Framework What s Project? - Why Project? What s Project Management? - Why Project Management? What s Project Management Professionals? - Why Project Management Professionals? Project

More information

Digitizing Complex Discrete Manufacturing Processes

Digitizing Complex Discrete Manufacturing Processes GE Intelligent Platforms Digitizing Complex Discrete Manufacturing Processes Driving lower costs, higher quality and faster production to stay competitive today and ensure success tomorrow Introduction

More information

Return on Investment Upon Upgrading to Oracle E-Business Suite Release R12

Return on Investment Upon Upgrading to Oracle E-Business Suite Release R12 White Paper Return on Investment Upon Upgrading to Oracle E-Business Suite Release R12 Abstract This white paper provides a description of several financial and intangible advantages that Oracle E-Business

More information

INFORMATION SYSTEMS IN THE ENTERPRISE

INFORMATION SYSTEMS IN THE ENTERPRISE Chapter 2 INFORMATION SYSTEMS IN THE ENTERPRISE 2.1 2003 by Prentice Hall OBJECTIVES What are the key system applications in a business? What role do they play? How do information systems support the major

More information

CHAPTER 1. Business Process Management & Information Technology

CHAPTER 1. Business Process Management & Information Technology CHAPTER 1 Business Process Management & Information Technology Q. Process From System Engineering Perspective From Business Perspective In system Engineering Arena Process is defined as - a sequence of

More information

Content Break-up & Methodology for awarding Contact Hours / PDUs

Content Break-up & Methodology for awarding Contact Hours / PDUs N.I.T.E - Project Management Professional (PMP) Exam Prep Course Content Break-up & Methodology for awarding Contact Hours / PDUs This course is based on Project Management Book of Knowledge PMBOK Guide

More information

MCQ: Unit-1: introduction to Operations and Supply Chain management

MCQ: Unit-1: introduction to Operations and Supply Chain management MCQ: Unit-1: introduction to Operations and Supply Chain management 1."Quality is defined by the customer" is : An unrealistic definition of quality A user-based definition of quality A manufacturing-based

More information

International Journal on Textile Engineering and Processes, ISSN: , Vol 1, Issue 1, Jan2015

International Journal on Textile Engineering and Processes, ISSN: , Vol 1, Issue 1, Jan2015 Total Quality Management in Terry Fabric Manufacturing Pranjali Chandurkar, CTF Abstract The challenge that companies face as the 21st Century gets underway, is to succeed in global economy where competition

More information

LCS International, Inc. PMP Review. Chapter 7 Planning Project Resources. Presented by David J. Lanners, MBA, PMP

LCS International, Inc. PMP Review. Chapter 7 Planning Project Resources. Presented by David J. Lanners, MBA, PMP PMP Review Chapter 7 Planning Project Resources Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study

More information

ICMI PROFESSIONAL CERTIFICATION

ICMI PROFESSIONAL CERTIFICATION ICMI PROFESSIONAL CERTIFICATION Contact Center Management Competencies The ICMI Professional Certification Contact Center Management Competencies specify job role-specific knowledge, skills and abilities

More information

SAP Supply Chain Management

SAP Supply Chain Management Estimated Students Paula Ibanez Kelvin Thompson IDM 3330 70 MANAGEMENT INFORMATION SYSTEMS SAP Supply Chain Management The Best Solution for Supply Chain Managers in the Manufacturing Field SAP Supply

More information

Project and Program Management in ehealth

Project and Program Management in ehealth Project and Program Management in ehealth Foundational Curricula: Cluster 10: Leadership & Management Module 19: Project and Resource Management Unit 1: Project and Program Management in ehealth 53/60

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

Project Management Knowledge Areas SECTION III

Project Management Knowledge Areas SECTION III Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all

More information

CC 01-Principles & Practices of Management

CC 01-Principles & Practices of Management Module-5 CC 01-Principles & Practices of Management Module 5 Management Control Control:- System and process of Controlling - Requirements for effective control - The Budget as Control Technique - Information

More information

McGraw-Hill /Irwin. n Education

McGraw-Hill /Irwin. n Education P-1 Management Accounting Lecture 1 (Prologue) An Introduction to Managerial Accounting Bangor University Transfer Abroad Programme Today s Agenda What is Managerial Accounting? About me and why I m here

More information

QUALITY POLICY MANUAL

QUALITY POLICY MANUAL C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision

More information

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston Subbu Ramakrishnan Manufacturing Finance with SAP ERP Financials Bonn Boston Contents at a Glance 1 Overview of Manufacturing Scenarios Supported by SAP... 25 2 Overview of Finance Activities in a Make-to-Stock

More information

Software Quality Engineering Courses Offered by The Westfall Team

Software Quality Engineering Courses Offered by The Westfall Team Building Skills is a 3-day course that is a subset of our course. The course is designed to provide a fundamental knowledge base and practical skills for anyone interested in implementing or improving

More information

Transforming Your ERP System into a Solution for Higher Profitability. White Paper. Chris Jones, MAVERICK Technologies, LLC

Transforming Your ERP System into a Solution for Higher Profitability. White Paper. Chris Jones, MAVERICK Technologies, LLC Transforming Your ERP System into a Solution for Higher Profitability White Paper Chris Jones, MAVERICK Technologies, LLC Transforming Your ERP System into a Solution for Higher Profitability...3 Understanding

More information

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma, Project vs Operation PROJECTS OPERATIONS Temporary Ongoing Unique Repetitive Closes after attaining the objectives Objective is to sustain business Prototyping the new car model Assembly line production

More information

Enterprise Information Systems

Enterprise Information Systems Instructor: Kevin Robertson Enterprise Information Systems Lecture Outline 6/7 Learning Objectives 1. Explain how organizations support business activities by using information technologies across the

More information

THE IMPACT OF FACILITIES MANAGEMENT ON CUSTOMER EXPERIENCE

THE IMPACT OF FACILITIES MANAGEMENT ON CUSTOMER EXPERIENCE THE IMPACT OF FACILITIES MANAGEMENT ON CUSTOMER EXPERIENCE Drive customer loyalty, revenue and brand value with a smarter approach to operations 1 Table of Contents The Intersection of Operations and Customer

More information

Information Systems in the Enterprise

Information Systems in the Enterprise Chapter 2 OBJECTIVES Information Systems in the Enterprise Evaluate the role played by the major types of systems in a business and their relationship to each other Describe the information systems supporting

More information

Software Quality Engineering Courses Offered by The Westfall Team

Software Quality Engineering Courses Offered by The Westfall Team Courses is a 2-day course that is a subset of our course. The course is designed to provide an overview of techniques and practices. This course starts with an overview of software quality engineering

More information

HOW MANUFACTURING FIRMS CAN USE BPM TO OPTIMIZE OPERATIONAL PERFORMANCE

HOW MANUFACTURING FIRMS CAN USE BPM TO OPTIMIZE OPERATIONAL PERFORMANCE >> White Paper August 2016 HOW MANUFACTURING FIRMS CAN USE BPM TO OPTIMIZE OPERATIONAL PERFORMANCE Brian Reale In today's competitive manufacturing environment, it takes more than incremental improvement

More information

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping?

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping? Process Mapping What It Means for You At Fastenal, we do much more than just ship products out of a catalog; we can work closely with you to uncover hidden sources of supply chain waste and provide total

More information

PRECISE INDUSTRIES INC. Quality Manual

PRECISE INDUSTRIES INC. Quality Manual PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary

More information

Achieving Best-in-Class Financial Management

Achieving Best-in-Class Financial Management Best Practices for Choosing the Right Accounting Software: Achieving Best-in-Class Financial Management Get Started It starts innocently enough. You need a report your current accounting system can t deliver,

More information

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar L7 Project Time Management - II www.notes638.wordpress.com Content 1. Slack Time 2. Network Replanning 3. Estimating Activity

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

Management Information Systems, Sixth Edition. Chapter 3: Business Functions and Supply Chains

Management Information Systems, Sixth Edition. Chapter 3: Business Functions and Supply Chains Management Information Systems, Sixth Edition Chapter 3: Business Functions and Supply Chains Objectives Identify various business functions and the role of ISs in these functions Explain how ISs in the

More information

2. Define e-buisness. Explain with a neat sketch the transaction processing cycle in detail.

2. Define e-buisness. Explain with a neat sketch the transaction processing cycle in detail. 1. With the help of neat figure, explain the enterprise application architecture illustrating the major cross functional enterprise application and their interrelationships. 2. Define e-buisness. Explain

More information

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set4.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are

More information

Managing Quality: Integrating the Supply Chain, 5e (Foster) Chapter 2 Quality Theory

Managing Quality: Integrating the Supply Chain, 5e (Foster) Chapter 2 Quality Theory Managing Quality: Integrating the Supply Chain, 5e (Foster) Chapter 2 Quality Theory 1) A coherent group of general propositions used as principles of explanation for a class of phenomena is referred to

More information

Manufacturing Information Systems. deden08m.com 1

Manufacturing Information Systems. deden08m.com 1 Manufacturing Information Systems deden08m.com 1 Computers in the Physical System CAD (computer-aided design) Design database CAM (computer aided manufacturing) Robotics deden08m.com 2 Reorder Point (ROP)

More information

Rethinking the way personal computers are deployed in your organization

Rethinking the way personal computers are deployed in your organization IBM Global Technology Services August 2009 Rethinking the way personal computers are deployed in your organization Leveraging an innovative, end-to-end model to save time and reduce costs 2 IBM Global

More information

Chapter Eight. Learning Objectives

Chapter Eight. Learning Objectives Chapter Eight Production Management 8 1 Learning Objectives 1. Explain the nature of production. 2. Outline how the conversion process transforms raw materials, labor, and other resources into finished

More information

The Quality Paradigm. Quality Paradigm Elements

The Quality Paradigm. Quality Paradigm Elements The Quality Paradigm We shall build good ships here; at a profit if we can, at a loss if we must, but always good ships. motto used at Newport News Shipbuilding Quality Paradigm Elements Defining the nature

More information

Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Project Management. Chapter 3-4

Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Project Management. Chapter 3-4 Chapter 3-4 Project Management 3-4-1 Project Management Six Sigma involves a process of improvement projects. In order for these to be successful they must be managed. 3-4-2 Administrative Support Steering

More information

CAPITAL AVIONICS, INC. Quality Manual

CAPITAL AVIONICS, INC. Quality Manual CAPITAL AVIONICS, INC. Issued 31 July 2018 Conforms to ISO 9001:2015 2018 ; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

Process Performance and Quality Chapter 6

Process Performance and Quality Chapter 6 Process Performance and Quality Chapter 6 How Process Performance and Quality fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process

More information

Chapter 4 Project Management

Chapter 4 Project Management Chapter 4 Project Management For internal use of BSNL only Page 1 Project Management 1.0 Introduction Project management is concerned with the overall planning and co-ordination of a project from conception

More information

PMP. Processexam.com. PMI Project Management Professional. Exam Summary Syllabus Questions

PMP. Processexam.com. PMI Project Management Professional. Exam Summary Syllabus Questions PMP PMI Project Management Professional Processexam.com Exam Summary Syllabus Questions Table of Contents Keys to success in PMP Exam on PMI Project Management Professional... 2 PMI PMP Certification Details:...

More information

EVERYTHING CAN BE IMPROVED.

EVERYTHING CAN BE IMPROVED. EVERYTHING AN BE IMPROVED.. W. BARRON IV - 1 PRODUT/SERVIE REQUIREMENTS/INTERNAL DESIGN REVIEWS III.A.1 Supplier Selection Supplier Selection is presented in the following topic areas: Product/Service

More information

CERTIFIED QUALITY IMPROVEMENT ASSOCIATE

CERTIFIED QUALITY IMPROVEMENT ASSOCIATE CQIA CERTIFIED QUALITY IMPROVEMENT ASSOCIATE Quality excellence to enhance your career and boost your organization s bottom line asq.org/cert Certification from ASQ is considered a mark of quality excellence

More information

Process Performance and Quality

Process Performance and Quality Process Performance and Quality How Process Performance and Quality fits the Operations Management Philosophy Chapter 6 Operations As a Competitive Weapon Operations Strategy Project Management Process

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

Sample Chapter. Producing Meaningful Metrics

Sample Chapter. Producing Meaningful Metrics 8 Producing Meaningful Metrics The purpose of every process is to produce an outcome that is of value to its customer. Metrics provide the ability to determine how capable a process is of producing the

More information

Chapter 9 1. List and briefly explain the dimensions of product and service quality

Chapter 9 1. List and briefly explain the dimensions of product and service quality Chapter 9 1. List and briefly explain the dimensions of product and service quality Product Quality the dimensions of product quality include: 1. performance main characteristics or function of the product

More information

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc Ace Industrial Dr.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc Ace Industrial Dr. Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. AW2 Logistics, Inc. 6001 Ace Industrial Dr. Cudahy, WI 53210 Quality Manual Rev 3 Page 1 of 30 Table

More information

Lean Government Metrics Guide

Lean Government Metrics Guide Lean Government Metrics Guide Lean Government Metrics Guide This Lean Government Metrics Guide is a resource to help government agencies understand and select metrics to support their implementation of

More information

PMPA Tech Conference Do we have the Tools and Knowledge to weather the Storm?

PMPA Tech Conference Do we have the Tools and Knowledge to weather the Storm? PMPA Tech Conference 2014 Do we have the Tools and Knowledge to weather the Storm? Quality Initiatives Malcolm Baldrige National Quality Award ISO Standards (ISO 9001, ISO 14001, AS 9100, ETC ) Six Sigma

More information

CHAPTER 7: BUSINESS SKILLS FOR TECHNICAL PROFESSIONALS

CHAPTER 7: BUSINESS SKILLS FOR TECHNICAL PROFESSIONALS CHAPTER 7: BUSINESS SKILLS FOR TECHNICAL PROFESSIONALS A Guide to Customer Service Skills for the Service Desk Professional Third Edition 302 OBJECTIVES In this chapter students will learn: How to acquire

More information

The Value of Strategically Sourced Sub-Assembly. Outsourced sub-assembly creates measurable savings and fulfillment flexibility.

The Value of Strategically Sourced Sub-Assembly. Outsourced sub-assembly creates measurable savings and fulfillment flexibility. The Value of Strategically Sourced Sub-Assembly. Outsourced sub-assembly creates measurable savings and fulfillment flexibility. Introduction Strategic Sourcing of Value-Added Assembly provides benefits

More information

GE 6757 TOTAL QUALITY MANAGEMENT LECTURE NOTES UNIT 1

GE 6757 TOTAL QUALITY MANAGEMENT LECTURE NOTES UNIT 1 GE 6757 TOTAL QUALITY MANAGEMENT LECTURE NOTES UNIT 1 UNIT I INTRODUCTION 1.1 Meaning of Quality Quality referred as Grade of service / productreliability safetyconsistencyconsumer's perception Quality

More information

Learning Objectives. Defining Quality. Defining Quality 5 Ways. Manufacturing Quality vs. Service Quality. Cost of Quality. Chapter 5 Managing Quality

Learning Objectives. Defining Quality. Defining Quality 5 Ways. Manufacturing Quality vs. Service Quality. Cost of Quality. Chapter 5 Managing Quality Chapter 5 Managing Quality Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition Wiley 2010 Learning Objectives Explain the meaning of TQM Identify the costs of Quality Identify Quality leaders

More information