CONSULTATION. SMKI and Repository Testing Approach Document. Consultation opens: 12 th March Consultation closes: 10 th April 2015

Size: px
Start display at page:

Download "CONSULTATION. SMKI and Repository Testing Approach Document. Consultation opens: 12 th March Consultation closes: 10 th April 2015"

Transcription

1 CONSULTATION SMKI and Repository Testing Approach Document Consultation opens: 12 th March 2015 Consultation closes: 10 th April 2015 DCC Public Page 1 of 11

2 Contents 1 Executive summary Introduction to the document Phasing of SRT Entry & Exit Criteria Scope of Testing Test Reporting Responsibilities Test Assurance / Audits Test Issue Management Test Scenarios Consultation questions How to respond Referenced Documents DCC Public Page 2 of 11

3 1 Executive summary The Data and Communications Company (DCC) is committed to a safe and secure smart metering environment to allow all electricity and gas customers in Great Britain to enjoy the benefits of being in control of their energy usage. The Smart Metering Key Infrastructure (SMKI) is a vital part of this safe and secure environment, so we are seeking stakeholders views on the SMKI and Repository Testing (SRT) Approach Document which sets out the scope of SMKI and Repository Testing and the manner in which testing will be conducted. On 28 November 2014 DCC published the SRT Approach Document as a working document with an informal invitation to provide comments. The comments received have been taken into consideration and the document is now published for consultation. This consultation paper briefly summarises the SRT Approach Document and asks questions to which we would welcome responses. The document is consistent with Section T5 of the Smart Energy Code (SEC). Following the consultation, and taking respondents feedback into account, this document will be submitted to the SEC Panel for approval as the basis for SRT. DCC Public Page 3 of 11

4 2 Introduction to the document SRT, which is required under Section T5 of the SEC, demonstrates the capability of the DCC and the component parts of the DCC Systems to interoperate with the Systems of Parties to the extent necessary for the SMKI Services and the SMKI Repository Service. The SRT Approach Document contains the entry criteria that must be met before testing can commence; sets out the manner in which the testing will be conducted; and describes the exit criteria that must be achieved. These exit criteria include the requirement for two Large Supplier Parties to complete SMKI and Repository Entry Process Tests (SREPT). The SRT Approach Document is based upon version 4,1 of the Smart Energy Code (SEC4.1). 3 Phasing of SRT The SRT Approach Document sets out three distinct parts within SMKI and Repository Testing: Part 1 SRT (DCC Testing conducted in isolation from any SMIP Test Phases): to test the SMKI Test Service and Test SMKI Repository in isolation, and is limited to the issuing of Test Certificates including the lodging of Test Certificates into the Test SMKI Repository. This testing will enable live certificates to be available in time for DCC Live Operations. Part 2 SRT (DCC Testing conducted during SIT): to validate the integration of the SMKI and Repository Service within the wider DCC ecosystem. Particular focus will be given to the interfaces between the Test SMKI Repository and the DSP. No Parties will participate in this testing. SMKI and Repository Entry Process Testing against the SMKI Test Service. Parties, RDPs and non-dcc Users must successfully complete the SREPT on the SMKI Test Service (incorporating Test SMKI Repository) before Live SMKI Certificates can be obtained. The tests that are required are set out in the SMKI and Repository Test Scenarios Document (SRTSD). Parties will not participate in Part 1 or Part 2 SRT. Once Parties, RDPs and non- DCC Users have successfully completed SREPT, they will be able to obtain Live SMKI Certificates. Q1 Phasing of SRT Do you agree with the phasing of SRT as set out above? If not, please give a rationale for your answer DCC Public Page 4 of 11

5 4 Entry & Exit Criteria The SRT Approach Document contains the entry criteria that must be achieved before SMKI and Repository Testing can commence and the exit criteria that must be achieved before SMKI and Repository Testing can complete. These are further deconstructed into entry and exit criteria for each of the three parts set out above. The exit criteria, which demonstrate that the SMKI and Repository Testing Objective (SEC T5.2) has been achieved, will form the basis of a report that will be provided to the SEC Panel for approval. Q2 Q3 Entry & Exit Criteria Do you agree with the entry and exit criteria that are included in the SMKI and Repository Testing Approach Document? If not, please give a rationale for your answer Do you agree that attainment of the exit criteria will demonstrate that the SMKI and Repository Testing Objective has been met? If not, please give a rationale for your answer. 5 Scope of Testing The SRT Approach Document sets out the scope of testing for each part of SRT. Part 1 testing validates the functions of the SMKI Service and SMKI Repository, while Part 2 testing validates the Recovery Procedures and the use of SMKI within the wider DCC ecosystem and will be performed within the Systems Integration Testing (SIT) environment. Part 1 non-functional testing will validate the performance of the test SMKI Service and SMKI Repository, confirming that Target Response Times can be met and that processing capability is maintained under periods of system stress, subject to the constraints of the test environments used. No non-functional testing is defined for Part 2 SRT as this is performed within the SIT environment and, as such, SIT nonfunctional testing could not be passed until the required level performance and resilience of SMKI is achieved. Q4 Scope of Testing Do you agree with the scope of functional and non-functional testing for Part 1 and Part 2 SRT, as set out in the SMKI and Repository Testing Approach Document? If not, please give a rationale for your answer 6 Test Reporting The DCC will provide the SEC Panel and the Secretary of State with a copy of the weekly Test Execution Reports for information. Part 1 SRT will report the progress of testing, quantity of issues, progress toward exit criteria, key risks and issues and an overall assessment of the status of testing. DCC Public Page 5 of 11

6 The DCC will provide a Test Completion Report to the SEC Panel for information at the end of Part 1 SRT. Similarly, the DCC will provide a Test Completion Report at the end of Part 2 SRT. Once the SRT exit criteria have been met in accordance with SEC 5.19 and 5.20, and having consulted with the Parties who have participated, the DCC will provide an SRT Completion Report to the SEC Panel for approval. Q5 Q6 Technical Readiness Do you agree with the weekly reporting of test execution progress? If not, please give a rationale for your answer. Do you agree with the approach to reporting the completion of Part 1 SRT and Part 2 SRT? If not, please give a rationale for your answer. 7 Responsibilities The SRT Approach Document sets out the main responsibilities for the parties involved in SMKI and Repository Testing, including those of the DCC, the DCC s Service Providers and of Testing Participants. A general obligation exists that requires participants to comply with the SEC, follow industry good practice and to take all reasonable steps to facilitate the achievement of the SRT Objective. The obligations on Testing Participants are limited to complying with the general obligations, above, and to conform to the SMKI and Repository Test Scenarios Document (SRTSD) with regards to planning, preparation, execution and completion of SMKI and Repository Entry Process Tests 1. Q7 Responsibilities Do you agree with the responsibilities for the parties involved in SMKI and Repository Testing? If not, please give a rationale for your answer. 8 Test Assurance / Audits The SRT Approach Document sets out the assurance processes that the DCC will undertake to assure the testing carried out during Part 1 and Part 2 SRT. These activities are: witnessing the execution of a subset of tests performed by the Data Service Provider (DSP) and the Trusted Service Provider (for SMKI); and 1 A Working Document version of the SRTSD was published by the DCC on 28 November 2014 and can be found on the DCC s website using this link. This document will be shortly be republished to address responses following the invitation to comment on the Working Document. DCC Public Page 6 of 11

7 an entitlement for the DCC to conduct product inspections, in line with the Service Providers contracts. Q8 Test Assurance / Audits Do you agree with the provisions for the DCC to assure and audit the execution of SRT? If not, please give a rationale for your answer 9 Test Issue Management Testing issues impacting the DCC will be managed via HP Quality Centre (HP QC), or a similar test management system. The processes and procedures for managing testing issues are in line with those proposed and consulted upon for other testing stages (namely Systems Integration Testing and Interface Testing). Similarly, the resolution of testing issues has been the subject of previous consultations. The requirements for Testing Participants to record testing issues during SMKI and Repository Entry Process Tests will be documented in the SMKI and Repository Test Scenarios Document 2. The SRT Approach Document provides an overview of the manner in which the test management system will be configured and the manner in which Issue Review Boards will be convened. It also sets out the manner in which issue severities will be allocated. Appendix A of the SRT Approach Document sets out the classification and description of Test Issue Severities and Test Issue Priorities. Q9 Q10 Test Issue Management Do you agree with the manner in which Issue Review Boards will be convened? If not, please provide a rationale for your answer. Do you agree with the issue severities and priorities set out in the SRT Approach Document? If not, please provide a rationale for your answer 10 Test Scenarios The SRT Approach Document sets out the Test Scenarios which will be conducted during Part 1 and Part 2 SRT, which the DCC will perform i.e. not requiring the participation of other Testing Participants. Part 1 testing validates the functions of the SMKI Service and SMKI Repository and will assure the functions and interfaces that Testing Participants will be required to 2 A Working Document version of the SRTSD was published by the DCC on 28 November 2014 and can be found on the DCC s website using this link. This document will be shortly be republished to address responses following the invitation to comment on the Working Document. DCC Public Page 7 of 11

8 test during SMKI and Repository Entry Process Testing and Users will access in the live environment. These tests are defined in sections 12.1 to 12.8 of the SRT Approach Document and will be completed before Testing Participants will be able to conduct SREPT. Part 2 testing validates the Recovery Procedures and the use of SMKI within the wider DCC ecosystem and will be performed within the Systems Integration Testing (SIT) environment. The Recovery Procedures are defined in sections 12.9 and in the SRT Approach Document. No Test Scenarios are defined for the use of SMKI within the wider DCC ecosystem as this will be validated by the tests performed during SIT. Q11 Q12 Test Scenarios Do you agree with the phasing of Test Scenarios, with Part 1 SRT covering the functions and interfaces for SMKI Service and SMKI Repository and Part 2 SRT covering Recovery Procedures and use of SMKI? If not, please give a rationale for your answer. Do you agree that the Test Scenarios defined provide sufficient coverage of the functions and interfaces for the SMKI Service and SMKI Repository? If not, please provide a rationale for your answer, including details of Test Scenarios that you believe to be missing, erroneous or excessive. Q13 Q14 General Are there any other points that you would like to raise on the SMKI and Repository Testing Approach Document? Please provide a rationale for each point raised. Do you consider that the approach to testing that is set out in the SMKI and Repository Testing Approach is consistent with a Good Industry Practice methodology? If not, please provide a rationale for your answer. 11 Consultation questions Q1 Q2 Q3 Do you agree with the phasing of SRT as set out above? If not, please give a rationale for your answer Do you agree with the entry and exit criteria that are included in the SMKI and Repository Testing Approach Document? If not, please give a rationale for your answer Do you agree that attainment of the exit criteria will demonstrate that the SMKI and Repository Testing Objective has been met? If not, please give a rationale for your answer. Q4 Do you agree with the scope of functional and non-functional testing for Part 1 and Part 2 SRT, as set out in the SMKI and Repository Testing Approach Document? If not, please give a rationale for your answer Q5 Q6 Do you agree with the weekly reporting of test execution progress? If not, please give a rationale for your answer. Do you agree with the approach to reporting the completion of Part 1 SRT and DCC Public Page 8 of 11

9 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Part 2 SRT? If not, please give a rationale for your answer. Do you agree with the responsibilities for the parties involved in SMKI and Repository Testing? If not, please give a rationale for your answer. Do you agree with the provisions for the DCC to assure and audit the execution of SRT? If not, please give a rationale for your answer Do you agree with the manner in which Issue Resolution Boards will be convened? If not, please provide a rationale for your answer. Do you agree with the issue severities and priorities set out in the SRT Approach Document? If not, please provide a rationale for your answer Do you agree with the phasing of Test Scenarios, with Part 1 SRT covering the functions and interfaces for SMKI Service and SMKI Repository and part 2 SRT covering Recovery Procedures and use of SMKI? If not, please give a rationale for your answer. Do you agree that the Test Scenarios defined provide sufficient coverage of the functions and interfaces for the SMKI Service and SMKI Repository? If not, please provide a rationale for your answer, including details of Test Scenarios that you believe to be missing, erroneous or excessive. Are there any other points that you would like to raise on the SMKI and Repository Testing Approach Document? Please provide a rationale for each point raised. Do you consider that the approach to testing that is set out in the SMKI and Repository Testing Approach is consistent with a Good Industry Practice methodology? If not, please provide a rationale for your answer. DCC Public Page 9 of 11

10 12 How to respond Please provide responses in the attached template by 10 th April 2015 to the DCC at If you have any questions about the consultation documents, please contact Consultation responses may be published on our website Please state whether all, or any part, of your consultation response is confidential. Please note that responses in their entirety (including any text marked confidential) may be made available to the Department of Energy and Climate Change (DECC) and the Gas and Electricity Markets Authority (the Authority). If you have questions about our approach to consultations, please contact our Regulation Manager at DCC Public Page 10 of 11

11 13 Referenced Documents Document Title Issue Dated Smart Energy Code SEC /01/15 SMKI and Repository Test Scenarios Document (Working Document) /11/14 Table 1 Referenced Documents DCC Public Page 11 of 11

Smart Metering Implementation Programme. Consultation on New Smart Energy Code Content

Smart Metering Implementation Programme. Consultation on New Smart Energy Code Content Smart Metering Implementation Programme Consultation on New Smart Energy Code Content Page 1 of 9 Contents 1 Executive Summary... 3 1.1 Introduction and background... 3 1.2 DCC's response... 3 2 Notifying

More information

DCC Operations update. Industry Event 15 th December Dave Broady Operations Director, Smart DCC. DCC Public

DCC Operations update. Industry Event 15 th December Dave Broady Operations Director, Smart DCC. DCC Public DCC Operations update Industry Event 15 th December 2015 Dave Broady Operations Director, Smart DCC DCC Public Service Desk Core Team All staff trained by DCC 100% Availability in year up to 30 th November

More information

DCC OPERATIONS UPDATE

DCC OPERATIONS UPDATE DCC OPERATIONS UPDATE 02 February 2016 Dave Broady Operations Director, Smart DCC DCC Public Service Desk Core Team All staff trained by DCC 100% Availability in year up to 31 December 2015 SD has gained

More information

Consultation on the Transition and Migration Approach Document for DCC s Service for SMETS1 Devices and accompanying changes to the SMETS1 Supporting

Consultation on the Transition and Migration Approach Document for DCC s Service for SMETS1 Devices and accompanying changes to the SMETS1 Supporting Consultation on the Transition and Migration Approach Document for DCC s Service for SMETS1 Devices and accompanying changes to the SMETS1 Supporting Requirements Date: 3 May 2018 Classification: DCC Public

More information

Self Service Interface (SSI) Design Specification sections and 1.9.4; and Self Service Interface Code of Connection 1.14

Self Service Interface (SSI) Design Specification sections and 1.9.4; and Self Service Interface Code of Connection 1.14 Self Service Interface (SSI) Design Specification sections 1.9.3 and 1.9.4; and Self Service Interface Code of Connection 1.14 DCC conclusions and report to Secretary of State Date: Classification: 10

More information

Smart Metering Implementation Programme

Smart Metering Implementation Programme Smart Metering Implementation Programme Consultation on Smart Metering Rollout Strategy DCC response 19 th May 2015 DCC PUBLIC Page 1 of 14 1 Executive Summary 1.1 Introduction and background 1. DCC provides

More information

Risk Management Strategy. Version: V3.0

Risk Management Strategy. Version: V3.0 Risk Management Strategy Version: V3.0 Date: October 2016 Classification: DCC Public Document Control (Document Control Heading) Revision History (Document Control Subtitle) Revision Date Summary of Changes

More information

Part 2 Business Transformation and Delivery. Price Control 2017/18 Submission

Part 2 Business Transformation and Delivery. Price Control 2017/18 Submission and Delivery Price Control 2017/18 Submission Date: July 2018 Classification: DCC Public Table of Contents 1 Introduction to Part 2: Business Transformation and Delivery... 4 Orientation and Purpose...

More information

Energy and Climate Change Committee Enquiry Progress on Smart Meter Roll Out

Energy and Climate Change Committee Enquiry Progress on Smart Meter Roll Out Energy and Climate Change Committee Enquiry Progress on Smart Meter Roll Out 1. The roll out of smart meters is vitally important to our energy future; therefore we welcome the opportunity to submit evidence

More information

DCC OPERATIONS UPDATE

DCC OPERATIONS UPDATE DCC OPERATIONS UPDATE 7 June 2016 Dave Broady Operations Director, Smart DCC DCC Public Service Desk Core Team All staff trained by DCC 100% Availability in year up to 31 st May 2016 SD has gained ISO

More information

Core Humanitarian Standard

Core Humanitarian Standard Core Humanitarian Standard on Quality and Accountability Version 3 - Final Draft 01.10.2014 www.corehumanitarianstandard.org 1 Table of Contents i.introduction... 3 ii. Structure of the Standard... 4 iii.

More information

Core Humanitarian Standard

Core Humanitarian Standard Core Humanitarian Standard on Quality and Accountability Draft 2 for consultation & testing 17.06.2014 www.corehumanitarianstandard.org 1 Table of Contents i. Introduction... 3 Structure... 4 ii. The Eight

More information

Citizens Advice Response to DECC s Consultation on Home Area Network (HAN) Implementation of 868MHz and Alternative HAN

Citizens Advice Response to DECC s Consultation on Home Area Network (HAN) Implementation of 868MHz and Alternative HAN Citizens Advice Response to DECC s Consultation on Home Area Network (HAN) Solutions: Implementation of 868MHz and Alternative HAN solutions Introduction The Citizens Advice service provides free, independent,

More information

Level 3 NVQ Certificate in Management (QCF) Qualification Specification

Level 3 NVQ Certificate in Management (QCF) Qualification Specification Level 3 NVQ Certificate in Management (QCF) Qualification Specification Created: January 2012 Version: 1.0 Accreditation Number: 600/4473/1 Qualification Start Date: 1 st February 2012 Qualification Last

More information

9001:2015, ISO 14001:2015 & ISO

9001:2015, ISO 14001:2015 & ISO Quality management input comprises the standard requirements from ISO 9001:2015 which are deployed by our organization to achieve customer satisfaction through process control. Environmental input comprises

More information

E-job planning the clinical workforce: levels of attainment and meaningful use standards

E-job planning the clinical workforce: levels of attainment and meaningful use standards E-job planning the clinical workforce: levels of attainment and meaningful use standards November 2018 We support providers to give patients safe, high quality, compassionate care within local health systems

More information

Smart Meter Testing & Trialling Discussion Paper ERA SRSM Group 2.7 7th December 2011

Smart Meter Testing & Trialling Discussion Paper ERA SRSM Group 2.7 7th December 2011 Smart Meter Testing & Trialling Discussion Paper ERA SRSM Group 2.7 7th December 2011 Introduction Recognising the criticality of a successful test and trial phase within the Smart Meter programme the

More information

OUTPUT CLASS 1 POLICY ADVICE OUTPUT DELIVERY TARGETS

OUTPUT CLASS 1 POLICY ADVICE OUTPUT DELIVERY TARGETS OUTPUT CLASS 1 POLICY ADVICE OUTPUT DELIVERY TARGETS Performance Delivery and Measurement Document 2012/13 Page 1 of 9 Output 1.1 List of Performance Measures - Policy Advice in Relation to Tax and Social

More information

Consultation on extending the existing smart meter framework for data access and privacy to Smart-Type Meters and Advanced Meters

Consultation on extending the existing smart meter framework for data access and privacy to Smart-Type Meters and Advanced Meters Consultation on extending the existing smart meter framework for data access and privacy to Smart-Type Meters and Advanced Meters Consultation Contact: Colin Down, Senior Policy Manager Publication date:

More information

WAMITAB Level 3 Certificate in Facilities Management

WAMITAB Level 3 Certificate in Facilities Management WAMITAB Level 3 Certificate in Facilities Management Guided Learning Hours: 24 Total Qualification time: 76 Total Credits: 21 Qualification Code: 601/1722/9 WAMITAB Code: FMCER3 Version 7, October 2017

More information

Initial Enrolment Project Feasibility Draft Report Consultation Document

Initial Enrolment Project Feasibility Draft Report Consultation Document Initial Enrolment Project Feasibility Draft Report Consultation Document Date issued: 11/11/2016 Consultation closes: 20/01//2017 Classification: DCC Public Contents 1 Executive Summary... 4 2 Introduction...

More information

DCC Draft Development Priorities to

DCC Draft Development Priorities to DCC Draft Development Priorities 2018-19 to 2022-23 Date: December 2017 Classification: DCC Public Table of Contents 1 Executive Summary... 3 2 Introduction... 4 3 Drivers for our development... 7 4 Horizon

More information

Quality Improvement Policy

Quality Improvement Policy [insert organisation name/logo] Quality Improvement Policy Document Status: Date Issued: Lead Author: Approved by: Draft or Final [date] [name and position] [insert organisation name] Board of Directors

More information

Engage Consulting Briefing Note: Smart Metering Implementation Programme: Prospectus

Engage Consulting Briefing Note: Smart Metering Implementation Programme: Prospectus Engage Consulting Briefing Note: Smart Metering Implementation Programme: Prospectus Introduction This briefing note summarises the content from the Smart Metering Implementation Programme: Prospectus

More information

PRINCE2 - Quality Management Strategy

PRINCE2 - Quality Management Strategy Created/updated 05/11/17 PRINCE2 - Quality Management Strategy Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Quality Management Strategy template

More information

CMMI V2.0 MODEL AT-A-GLANCE. Including the following views: Development Services Supplier Management. CMMI V2.0 outline BOOKLET FOR print.

CMMI V2.0 MODEL AT-A-GLANCE. Including the following views: Development Services Supplier Management. CMMI V2.0 outline BOOKLET FOR print. CMMI V.0 MODEL AT-A-GLANCE Including the following views: Development Services Supplier Management CMMI V.0 outline BOOKLET FOR print.indd CMMI V.0 An Integrated Product Suite Designed to meet the challenges

More information

Revisions to the internal DCC Business Case for the Switching Programme up to May 2019 Switching Programme - Smart DCC

Revisions to the internal DCC Business Case for the Switching Programme up to May 2019 Switching Programme - Smart DCC Revisions to the internal DCC Business Case for the Switching Programme up to May 2019 Switching Programme - Smart DCC Version: v1.0 Date: 28/09/2018 Author: Classification: DCC Authored DCC Public Document

More information

This proposal will outline a solution that will enable suppliers to be compliant with the EU three week switching directive.

This proposal will outline a solution that will enable suppliers to be compliant with the EU three week switching directive. Stage 02: What stage is this document in the process? : EU Third package: Three week switching This proposal will outline a solution that will enable suppliers to be compliant with the EU three week switching

More information

Group Environment Policy

Group Environment Policy Our commitment to good business Protecting the environment 7 Version 1 July 2014 Our Business Principles 1 Demonstrating integrity in corporate conduct 2 Ensuring openness and transparency 3 Respecting

More information

UNC 0630R: Review of the consequential changes required in UNC as a result of the Ofgem Switching Programme. UNC Request Workgroup Report

UNC 0630R: Review of the consequential changes required in UNC as a result of the Ofgem Switching Programme. UNC Request Workgroup Report UNC Request Workgroup Report At what stage is this document in the process? UNC 0630R: Review of the consequential changes required in UNC as a result of the Ofgem Switching Programme Purpose of Request:

More information

International Civil Aviation Organization FIRST INFORMATION MANAGEMENT PANEL (IMP/1) Montreal, Canada January, 25 30, 2015

International Civil Aviation Organization FIRST INFORMATION MANAGEMENT PANEL (IMP/1) Montreal, Canada January, 25 30, 2015 International Civil Aviation Organization WORKING PAPER 15/01/2015 rev. 0 FIRST INFORMATION MANAGEMENT PANEL (IMP/1) Montreal, Canada January, 25 30, 2015 Agenda Item 5: Review and elaborate on concepts,

More information

National Aeronautics and Space Administration Washington, DC 20546

National Aeronautics and Space Administration Washington, DC 20546 Technical Standards Division Publication NASA-STD-2100-91 NASA Software Documentation Standard Software Engineering Program NASA-STD-2100-91 -91 Approved: July 29, 1991 National Aeronautics and Space Administration

More information

ISO 14001:2015. EMS Manual.

ISO 14001:2015. EMS Manual. www.iso-9001-checklist.co.uk Insert your company s name or logo, and address. This EMS manual is the property of Your Company. It must not be reproduced in whole or in part or otherwise disclosed without

More information

Certificate IV in Project Management Student Assessment Guide

Certificate IV in Project Management Student Assessment Guide Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 4 NVQ Diploma in Spectator Safety Management (6852-04) October 2011 Version 1.0 Qualification at a glance Subject area City & Guilds number 6852 Spectator Safety Age group

More information

QuEST Forum. TL 9000 Quality Management System. Requirements Handbook

QuEST Forum. TL 9000 Quality Management System. Requirements Handbook QuEST Forum TL 9000 Quality Management System Requirements Handbook Point Release 6.1 The ICT Quality Management System Performance Excellence through Global ICT Quality Copyright Copyright 2017 Quality

More information

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 QUALITY MANAGEMENT SYSTEM... 2 2.1 Quality Management

More information

DRAFT EXAMPLE ACTIVITY / PROJECT PLAN. Compliance with the Transportation Requirements for Special Waste. South Coast Region

DRAFT EXAMPLE ACTIVITY / PROJECT PLAN. Compliance with the Transportation Requirements for Special Waste. South Coast Region DRAFT EXAMPLE ACTIVITY / PROJECT PLAN Compliance with the Transportation Requirements for Special Waste South Coast Region Prepared By: Date: Project Manager Approved By: Project Sponsor Date: Note: Appendix

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

TECHNOLOGY POLICY SUMMARY FOR THIRD PARTY SUPPLIERS

TECHNOLOGY POLICY SUMMARY FOR THIRD PARTY SUPPLIERS TECHNOLOGY POLICY SUMMARY FOR THIRD PARTY SUPPLIERS RATIONALE Group Policy Rationale This Policy has been designed to assist in managing the risk that Lloyds Banking Group (the Group) fails to simultaneously

More information

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme Version: V3.0 Date: 29 March 2017 Author: Classification: Aimi Hayman and Bryn Coles DCC Public Document Control

More information

NHS West Essex Clinical Commissioning Group

NHS West Essex Clinical Commissioning Group NHS West Essex Clinical Commissioning Group Annual Audit Letter for the year ended 31 March 2015 July 2015 Ernst & Young LLP Contents Contents Ernst & Young LLP 400 Capability Green Luton LU1 3LU Tel:

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

Discussion Paper by the Chartered IIA

Discussion Paper by the Chartered IIA Discussion Paper by the Chartered IIA The Chartered IIA s discussion paper on corporate governance reform in the UK and the update of the UK Corporate Governance Code Introduction Despite the UK s global

More information

Discussion Paper by the Chartered IIA

Discussion Paper by the Chartered IIA Discussion Paper by the Chartered IIA The Chartered IIA s discussion paper on corporate governance reform in the UK and the update of the UK Corporate Governance Code Introduction Despite the UK s global

More information

GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD

GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD NHS Bury CCG Governing Body Paper 6 appendix 6a 5ci GREATER MANCHESTER HEALTH AND SOCIAL CARE PARTNERSHIP STRATEGIC PARTNERSHIP BOARD Date: 29 April 2016 Subject: The Transformation Fund Report of: Katy

More information

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS

More information

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS

More information

Level 7 NVQ Diploma in Construction Site Management. Qualification Specification

Level 7 NVQ Diploma in Construction Site Management. Qualification Specification Level 7 NVQ Diploma in Construction Site Management Qualification Specification ProQual 2016 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support

More information

Procedure 14 Internal Audits

Procedure 14 Internal Audits Procedure 14 Internal Audits Table of Contents 1 Introduction... 2 2 Audit Planning... 2 2.1 Head Office... 2 2.2 Critical Locations... 3 3 Conducting the Audit... 3 4 Non-conformances... 3 5 Client file

More information

Frameworx 11.5 Product Conformance Certification Report. WeDo Technologies RAID Version 6.3

Frameworx 11.5 Product Conformance Certification Report. WeDo Technologies RAID Version 6.3 Frameworx 11.5 Product Conformance Certification Report WeDo Technologies RAID Version 6.3 June 2012 TM Forum 2012 Page 1 of 29 Table of Contents Table of Contents... 2 List of Tables... 3 List of Figures...

More information

Technical Integration Testing Requirements. Trusted Digital Identity Framework August 2018, version 1.0

Technical Integration Testing Requirements. Trusted Digital Identity Framework August 2018, version 1.0 Technical Integration Testing Requirements Trusted Digital Identity Framework August 2018, version 1.0 Digital Transformation Agency This work is copyright. Apart from any use as permitted under the Copyright

More information

Public Sector Climate Change Duties 2016 Summary Report: The Scottish Children's Reporter Administration. Required TABLE OF CONTENTS

Public Sector Climate Change Duties 2016 Summary Report: The Scottish Children's Reporter Administration. Required TABLE OF CONTENTS TABLE OF CONTENTS Required PART 1: PROFILE OF REPORTING BODY PART 2: GOVERNANCE, MANAGEMENT AND STRATEGY PART 3: EMISSIONS, TARGETS AND PROJECTS PART 4: ADAPTATION PART 5: PROCUREMENT PART 6: VALIDATION

More information

Apprenticeship standards funding rules 2016 to 2017

Apprenticeship standards funding rules 2016 to 2017 Document reference: D Apprenticeship standards funding rules 2016 to 2017 Version 2 This document sets out the funding rules which apply to apprenticeship standards These rules apply for all organisations

More information

GOVERNANCE HANDBOOK COMMUNITY REHABILITATION COMPANIES PUBLIC SECTOR OWNERSHIP MAY May

GOVERNANCE HANDBOOK COMMUNITY REHABILITATION COMPANIES PUBLIC SECTOR OWNERSHIP MAY May GOVERNANCE HANDBOOK COMMUNITY REHABILITATION COMPANIES PUBLIC SECTOR OWNERSHIP MAY 2014 May 2014 1 CONTENTS 1. Introduction 3 2. Community Rehabilitation Companies Background and Legal Basis 3 3. NOMS

More information

RELATIONSHIP CLIENT IMPROVEMENT LEADERSHIP PROCESSES INFORMATION PEOPLE

RELATIONSHIP CLIENT IMPROVEMENT LEADERSHIP PROCESSES INFORMATION PEOPLE RELATIONSHIP CLIENT IMPROVEMENT LEADERSHIP PROCESSES INFORMATION PEOPLE Created by Richard Kill Analyzed by Olcinio Santos Vieira Approved by Gustavo Carvalhinho Term 2017 Revision 00 Updated May/10/2017

More information

Level 3 Diploma for Domestic Energy Assessors ( )

Level 3 Diploma for Domestic Energy Assessors ( ) Level 3 Diploma for Domestic Energy Assessors (6020-01) Assignment Guide for Candidates 500/1628/3 www.cityandguilds.com February 2007 Version 1.0 About City & Guilds City & Guilds is the UK s leading

More information

ICAEW Level 4 Accounting Technician Apprenticeship - a guide for students

ICAEW Level 4 Accounting Technician Apprenticeship - a guide for students ICAEW Level 4 Accounting Technician Apprenticeship - a guide for students This guidance document is designed to provide you with an overview of the Level 4 Accounting Technician Apprenticeship, the journey

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 320/8 Official Journal of the European Union 17.11.2012 COMMISSION REGULATION (EU) No 1078/2012 of 16 November 2012 on a common safety method for monitoring to be applied by railway undertakings, infrastructure

More information

Contractual Aspects of Testing Some Basic Guidelines CONTENTS

Contractual Aspects of Testing Some Basic Guidelines CONTENTS CONTENTS 1 Introduction... 1 1.1 Background... 1 1.2 Structure... 1 1.3 Some Conventions... 1 1.4 Feedback... 1 2 Test Schedule List of Contents... 2 3 Testing Deliverables... 3 4 Coverage Guidance...

More information

Industrial Internet Reference Architecture

Industrial Internet Reference Architecture Industrial Internet Reference Architecture Shi-Wan Lin CEO & Co-Founder Thingswise, LLC Co-Chair, Architecture Task Group & Technology Working Group, IIC Industrial Internet Reference Architecture (IIRA)

More information

Proposed Document. Global Harmonization Task Force GHTF/SG4(PD)/N83R5:2009

Proposed Document. Global Harmonization Task Force GHTF/SG4(PD)/N83R5:2009 1 2 3 4 5 GHTF/SG4(PD)/N83R5:2009 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Global Harmonization Task Force Proposed Document Title: Guidelines for Regulatory Auditing

More information

Quality Manual Template ISO 9001:2015 Quality Management System

Quality Manual Template ISO 9001:2015 Quality Management System Quality Manual Template Table of Contents 1 INTRODUCTION... 5 2 QUALITY MANAGEMENT PRINCIPLES... 6 3 REFERENCES & DEFINITIONS... 6 4 CONTEXT OF THE ORGANIZATION... 8 4.1 ORGANIZATIONAL CONTEXT... 8 4.2

More information

Microgeneration Certification Scheme: MCS 006

Microgeneration Certification Scheme: MCS 006 Microgeneration Certification Scheme: MCS 006 Product Certification Scheme Requirements: Small Wind Turbines Issue 2.1 This Microgeneration Installation Standard is the property of Department of Energy

More information

A Quality Assurance Framework for Knowledge Services Supporting NHSScotland

A Quality Assurance Framework for Knowledge Services Supporting NHSScotland Knowledge Services B. Resources A1. Analysis Staff E. Enabling A3.1 Monitoring Leadership A3. Measurable impact on health service Innovation and Planning C. User Support A Quality Assurance Framework for

More information

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program

More information

Confidentiality and Rights Maintenance of Audit Standards. Detail Fee Structure for Program Participants Audit Access System Security

Confidentiality and Rights Maintenance of Audit Standards. Detail Fee Structure for Program Participants Audit Access System Security PROGRAM GOVERNANCE PROGRAM GOVERNANCE Issue Date: 06/10/17 Issue and Revision Number: 3 Governance Elements Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section

More information

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2)

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2) POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2) Published: July 2017 VERSION RELEASE HISTORY Version Date Summary of Changes 0.1 25/05/2017 First draft issued for discussion

More information

Asset Management Policy

Asset Management Policy Asset Management Policy January 2018 Introduction Our Asset Management Policy was last published in 2014. It is being updated to reflect our commitment to regularly review and improve all of our Asset

More information

PROCUREMENT GUIDELINES FOR DEVELOPER DELIVERED INFRASTRUCTURE

PROCUREMENT GUIDELINES FOR DEVELOPER DELIVERED INFRASTRUCTURE PROCUREMENT GUIDELINES FOR DEVELOPER DELIVERED INFRASTRUCTURE SEPTEMBER 2017 VERSION: 1.0 TABLE OF CONTENTS Table of Contents... 2 1 INTRODUCTION... 3 1.1 Objective... 3 2 REVIEW OF PROCUREMENT APPROACH...

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

MEASURING THE EFFECTIVENESS OF INTERNAL AUDIT

MEASURING THE EFFECTIVENESS OF INTERNAL AUDIT Annex 1 Agenda Item 8.2 CORPORATE RESOURCES INTERNAL AUDIT SECTION MEASURING THE EFFECTIVENESS OF INTERNAL AUDIT 1 Audit Committee Subject: Measuring the Effectiveness of Internal Audit (Quality Assurance

More information

SENIOR PROJECT MANAGER

SENIOR PROJECT MANAGER POSITION Reports To; Direct Reports; Key Relationships; SENIOR PROJECT MANAGER Regional Construction Manager Site Managers, other staff allocated to assigned projects Project Directors, Clients, Consultants,

More information

The Clean Growth Strategy included the following key proposals and policies (for full detail under each heading see Appendix):

The Clean Growth Strategy included the following key proposals and policies (for full detail under each heading see Appendix): Collaborative Working on Energy 1. Purpose The purpose of this note is to brief the LEP Finance and Resources meeting on the Joint LEP Energy Strategy which has been developed as a collaborative piece

More information

The Ten Principles are set out in three groups, each group addressing a fundamental objective, as follows:

The Ten Principles are set out in three groups, each group addressing a fundamental objective, as follows: Corporate Governance THE QUOTED COMPANIES ALLIANCE CORPORATE GOVERNANCE CODE The Company s shares are listed on the Alternative Investment Market (AIM) of the London Stock Exchange. As an AIM-listed company,

More information

Professional Services Higher Level Apprenticeships

Professional Services Higher Level Apprenticeships Professional Services Information Sheet Professional Services Higher Level Apprenticeships New for August 2012 Level 4 Apprenticeships deliver real returns to your business Technical ability is essential

More information

Competition in Connections Code of Practice Annual Report September 2016

Competition in Connections Code of Practice Annual Report September 2016 Competition in Connections Code of Practice Annual Report September 2016 Introduction Standard licence condition (SLC) 52 requires DNOs to comply with the Competition in Connections Code of Practice (CiC

More information

C-Roads Platform Terms of Reference

C-Roads Platform Terms of Reference C-Roads Platform Terms of Reference Dissemination level: C-Roads Platform internal Author: AustriaTech Status: Final Index 1 Purpose... 3 2 Governance Structure... 4 3 C-Roads Steering... 6 3.1 Tasks and

More information

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2 Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our

More information

NSMP Business Requirements Work Stream Smart Metering Infrastructure Vendor Request for Information

NSMP Business Requirements Work Stream Smart Metering Infrastructure Vendor Request for Information Smart Metering Program NSMP Business Requirements Work Stream Version number: Status: Author: Date published: File name: Version 1.0 Final for release to Vendors Stakeholder Steering Committee 31 May 2010

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

C-Roads Platform Terms of Reference

C-Roads Platform Terms of Reference C-Roads Platform Terms of Reference Dissemination level: C-Roads Platform internal Author: AustriaTech Status: Final C-Roads Platform Coordinator AustriaTech www.austriatech.at Index 1 Purpose... 3 2 Governance

More information

The operation of this BCMS has many benefits for the business, including:

The operation of this BCMS has many benefits for the business, including: 1 Introduction As a modern, forward-looking bank, Union Bank of Nigeria recognises at senior levels the need to ensure that its business operates smoothly and without interruption for the benefit of its

More information

Frameworx 14.0 Implementation Conformance Certification Report

Frameworx 14.0 Implementation Conformance Certification Report Frameworx 14.0 Implementation Conformance Certification Report JAWWAL BUSINESS PROCESS IMPLEMENTATION December 2014 Version 1.0 1 Table of Contents List of Figures... 4 List of Tables... 5 1 Introduction...

More information

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER PETROLEUM, PETROCHEMICAL AND NATURAL GAS INDUSTRIES -- SECTOR-SPECIFIC QUALITY MANAGEMENT SYSTEMS -- REQUIREMENTS FOR PRODUCT AND SERVICE SUPPLY ORGANIZATIONS

More information

Microgeneration Installation Standard MIS 3006

Microgeneration Installation Standard MIS 3006 Microgeneration Installation Standard MIS 3006 REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION, SET TO WORK COMMISSIONING AND HANDOVER OF MICRO-HYDROPOWER SYSTEMS Issue 2.0 This

More information

Benchmarking of audit regime against audit best practices

Benchmarking of audit regime against audit best practices Benchmarking of against best practices Introduction 1. In February 2015, the Authority engaged PA Consulting Limited (PA Consulting) to develop a comparison framework to allow the Electricity Authority

More information

Response to Smart Meter Implementation Code of Practice

Response to Smart Meter Implementation Code of Practice Response to Smart Meter Implementation Code of Practice 8 March 2013 Smart Meter Implementation Code of Practice Ombudsman Services consultation response 1 Summary 1.1 About Ombudsman Services The Ombudsman

More information

Critical Systems Guidelines

Critical Systems Guidelines Architecture, Standards and Planning Branch Office of the CIO Province of BC Document Version 1.5 Feb 14, 2017 Table of Contents... 1 Architecture, Standards and Planning Branch...1 Office of the CIO Province

More information

Gas Daft. Unaccounted for Gas Report. National Grid. Gas Transmission. October Target audience. Ofgem and other interested industry parties

Gas Daft. Unaccounted for Gas Report. National Grid. Gas Transmission. October Target audience. Ofgem and other interested industry parties Gas Daft Unaccounted for Gas Report National Grid Gas Transmission October 2017 Target audience Ofgem and other interested industry parties About this document This document sets out the work undertaken

More information

REQUIREMENT DRIVEN TESTING. Test Strategy for. Project name. Prepared by <author name> [Pick the date]

REQUIREMENT DRIVEN TESTING. Test Strategy for. Project name. Prepared by <author name> [Pick the date] REQUIREMENT DRIVEN TESTING Test Strategy for Project name Prepared by [Pick the date] [Type the abstract of the document here. The abstract is typically a short summary of the contents of

More information

Patrick Malloy Communities Quality Assurance System

Patrick Malloy Communities Quality Assurance System Patrick Malloy Communities Quality Assurance System Page 1 of 83 Log of Quality Manual Revisions Version Number Revision Date Type of Revision 1 April 9, 2007 1 st release 1 April 13, 2007 Sec 1.10 removed

More information

I. Development, Submittal, and Acceptance of a Quality Management System

I. Development, Submittal, and Acceptance of a Quality Management System I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor

More information

Business Principles. For. Invoicing. Xoserve Project Nexus

Business Principles. For. Invoicing. Xoserve Project Nexus Business Principles For Invoicing Xoserve Project Nexus Submitted to Project Nexus Workgroup (PN UNC) Author (for this version): Xoserve Version: 2.4 Date: 20 th March 2015 Copyright 2011 Xoserve Ltd V2.4

More information

Data and Information. Work session for Non-Practitioners

Data and Information. Work session for Non-Practitioners Data and Information Work session for Non-Practitioners Eight Dimensions of an Organisation Strategy Governance Investment Policy Standards Performance Business Data and Information Application and Software

More information

Smart Metering Device Assurance Scheme Operator Services. Request for Proposal 10 th September VERSION: V1.2 Final September 2014

Smart Metering Device Assurance Scheme Operator Services. Request for Proposal 10 th September VERSION: V1.2 Final September 2014 Smart Metering Device Assurance Scheme Operator Services Request for Proposal 10 th September 2014 VERSION: V1.2 Final September 2014 1 P a g e SMDA Scheme Operator RFP THE RESPONDENT SHALL AT ALL TIMES

More information