Annex Z to Facilities Management (FM) H&S Policy Safe Systems of Work and Permits

Size: px
Start display at page:

Download "Annex Z to Facilities Management (FM) H&S Policy Safe Systems of Work and Permits"

Transcription

1 Annex Z to Facilities Management (FM) H&S Policy Safe Systems of Work and Permits Compliance with this policy and guidance is mandatory for all work that is undertaken by FM Staff and Contractors engaged by FM working in areas being managed by or under FM Control. Where work is undertaken in areas not under FM direct control, those managing or undertaking the work shall adopt equivalent and approved safe systems of work. Such alternative arrangements should be agreed in writing by the FM Manager/Supervising Officer responsible for the work. This policy and guidance should be read in conjunction with the specific policy document for the work it applies to as contained within University and FM Health and Safety Policies, Codes of Practice and guidance. This guidance should also be read in conjunction with Appendix 5 to Annex G Working with Contractors Guide. Guidelines adopted. All Duty Authorised Persons (DAP) who issue permits or who appoint Nominated Deputies or authorities covered by this guidance shall be appointed in writing by the Director of FM. Nominated Deputies shall be appointed in writing by the DAP in consultation with the relevant stakeholders for the respective Service or work facet. (E.g. Health and Safety Manager, prospective Nominated Deputies (NP), appropriate line managers etc.). The following guidelines form the basis of this policy covering safe systems of work and access. Following a consultation exercise with various stakeholders, the significant change in this procedure from the previous are; - the requirement for DAP and NP to possess relevant experience, competency and training and - that those appointments are in writing. - that the content of the pre-printed written permit be reviewed at east every 3 years and adapted to account for health and safety management improvements adopted. Guidance on the appropriate training, experience and skills required when appointing NPs are included in Appendix 1. 1 P age

2 The permits and permissions are aimed at achieving a common approach to all hazardous FM work across campus and form part of safe systems of work. Permits must not to be considered as an alternative to adequate supervision and management but an integral part of the management process. Permits should reflect the level of risk and should not be utilised for low risk work lest their effectiveness be devalued. The safe systems of work and permits contained within this policy should be utilised with immediate effect, with any modifications required by the Departmental Health and Safety Committee or following audit/revue incorporated as necessary on an ongoing basis. NPs for particular safe systems will authorise and issue access authorities and permits as appropriate. All permits shall be returned to the issuing DAP or NP on completion of the works or when work is suspended for a significant period. (more than one working day). The content, suitability and sufficiency of the individual permit, its distribution and content shall be reviewed annually by the respective DAP with their NPs and no amendments shall be allowed without their permission. All changes to the arrangements, including the permit blank shall be brought to the attention of the Facilities Management Leadership Team and all stakeholders. Permits should be arranged at least two working days before their required date except in emergencies or where business has been interrupted. All DAPs and NPs shall attend specific DAP and/or Authorised Person training as appropriate on their appointment. Training requirements are defined in Appendix 1 and the training gap analysis is undertaken using the form in Appendix 2. Training requirements will be agreed by the DAP and the NPs line manager. Appointment as an NP and the individual training courses will be subject to a refresher period. Communication to other stakeholders. All permits shall be recorded using serial numbered duplicate, triplicate or quadruplicate copies as appropriate with one copy retained in the permit record book by the DAP or NP. Further copies may be made and distributed by Project Managers/Supervising Officers/Supervisors/NP as deemed necessary with a note made on the retained copy. Copies of specific permits should be forwarded to the FM Projects by FM Services and 2 P age

3 vice-versa with a central copy being held by the Helpdesk. (See individual permits). Copies of all permits shall be forwarded to the FM Helpdesk when initially issued and the returned issue copies should be returned similarly to enable the helpdesk to maintain a current list of open permits. Where permits are not issued by NP who Supervise workshops, copies of permits should be sent to the relevant Supervisors. Such permits shall be routed via the FM Helpdesk for incorporation onto a permits database prior to forwarding. Permits should be cross-referenced to numbered Caution Notices where long term isolation is required. Permit and Permissions Documents. The relevant DAP is responsible for the content and maintenance of the Permit records. Examples of Permit and permissions books have not been included in this procedure. Current examples can be viewed in the FM Helpdesk or with the relevant DAP or NP. No permits shall be amended nor replaced without having consulted with the appropriate stakeholders and the approval of the FM Leadership Team and/or the FM Health and Safety Committee as appropriate. Copy distribution and colour coding The following colour coding shall be adopted for multi copy permits: Top Copy Issued to Operative W hite Second Copy Issued to relevant FM Services Supervisor/Helpdesk yellow. Third Copy Issued to FM Services/FM Projects Pink Original retained in permit book light blue. NB The original copy will be the only one to incorporate the permit cancellation section as appropriate. Each permit will be serial numbered and the book will become an accountable document once completed. Spoiled permits should be destroyed and a note made on the retained copy. Used permit books should be returned to the Helpdesk for retention. The Helpdesk should be notified when specified permits are cancelled so that they are able to undertake checks and audits in an effort to assist Authorised Persons manage their permits. Vis-IT Ed. Contractors Swiping in maintained by FM H&S Service. Contractors swipe in and out using the either of the two machines located at the FM 3 P age

4 Building or the main security gatehouse. Contractors shall swipe in and out on a daily basis upon works completion. The Project Manager for the work shall be responsible for those who they engage or sponsor and for their safe access to and egress from the University campus or work site when off campus. Other than these two locations, only ring fenced contracts under contractors control will utilise further signing in/out arrangements. Contractors shall be instructed to sign in before works commencement and out at the end of each job or the working day (whichever is soonest) unless recorded alternative arrangements have been made to cover early starts, weekend working etc. Contractors and Staff Handbooks Maintained by the Health and Safety team. This policy should be read in conjunction with the existing notes that are issued to Contractors and Direct Labour staff as part of their induction training. Copies are accessible from the front page of the Health and Safety website. Key Authority FM Controlled Areas Triplicate Book DAP: Maintenance Manager NPs to be appointed by DAP This form of authority is to be used as a key authorisation note for accessing common areas for contractor access, technical areas, plant rooms, boiler rooms, technical spaces etc. for which a specific permit is not utilised (E.g. High Voltage, Roof etc.) and for which FM are responsible. The DAP shall ensure that any NPs who they appoint to issue access authorities on their behalf have sufficient knowledge of the hazards associated with the area before nominating them. All DAP and NPs shall be appointed in writing. The Key Authority form may also be utilised as a form of authority to work as required by managers and supervisors who wish to reinforce any verbal agreements covering specific risks that may arise from time to time that are not covered by other permits. Where a higher order permit or written form of authority is issued, the authority to draw keys may be indicated on that permit. (E.g. void or roof access). Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person Bottom Copy (Light Blue) To be retained in permit book 4 P age

5 Fire Alarm Isolation Record Triplicate Book DAP: Maintenance Manager NPs To be confirmed in writing by the DAP. No person shall isolate nor inhibit fire alarm detection and alarm equipment unless they have been authorised in writing by the DAP. A Fire Alarm Isolation request can be made by anyone managing works, where fumes or dust might be produced and where the work might interfere with the normal operation of the fire alarm and detection system. All fire alarm isolations shall be initiated by FM members of staff who should have undertaken suitable fire awareness training. The standard of suitable fire training required is currently exemplified by attendance on the Fire Marshall training or completion of the DVD based University Fire awareness training. The use of this document is mandatory for all fire alarm isolations where University staff still occupy buildings in which work is taking place or where the fire alarm system for the building announces in Security. (I.e. it remains connected to the BOLD system.) The isolation record will serve as a reminder where sensors and detectors have been temporarily bagged to be re-enabled following works completion or as arranged. Only the FM Services Electrical Supervisor and their team have authority to isolate fire alarm and detection equipment covered by this procedure, including the use of temporary bagging. It should be noted that the person authorising a significant isolation of an automatic Fire alarm/detection system, especially outside of normal working hours, should inform the University s Insurers via the Health, Safety and Environment Office on the appropriate form via the FM Services Electrical Supervisor or Project Manager. An alarm system or significant part thereof should not be isolated for more than an 8 hour period during the normal working day i.e. 8.45am to 4.45pm. without a valid reason. (E.g. a cable has been damaged or the work has to take place outside normal working hours). If the system does need to be off for a period or more than 8 hours then the person in charge of the project should agree alternative arrangements with the University Fire Officer, obtain a UMAL insurance form from the University s Insurance Officer, complete it and return it to the Insurance Officer and copy to the University s Fire Officer. 5 Page

6 Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person. 1st Copy (Yellow) Helpdesk. Bottom Copy (Light Blue) To be retained in permit book. Electrical Low Voltage Permit to Work/Test Quadruplicate Book DAP: Senior Authorised Person Electrical No work shall be carried out on any of the University s Low Voltage Electrical systems unless authorised through the issue of a Low Voltage Permit to Work or is exempted as detailed in Annex J to FM H&S Policy Low Voltage Electricity System Safety Rules and Associated Safety Guidance This permit is to be utilised for all work on the Low Voltage systems other than work agreed by NPs, who may allow suitable, competent electrical contracts managers to discharge this duty on their behalf and simple local maintenance works like single sockets and light switches undertaken by competent electricians. In such circumstances, the competent person carrying out the work shall fully accord to the requirements contained in the FM Procedures for Low Voltage Electricity System Safety Rules and Associated Safety Guidance. Part 1 Should be completed by the FM DAP or the NP responsible for the work. Where the person authorising the work is also responsible for the switching etc, they may issue this permit to themselves as a check on procedures. The apparatus is to be disconnected from all live conductors before work commences. Part 2 Should be complete by the FM NP who is responsible for switching, isolating, testing and earthing operations prior to issuing the permit and work commencement. Part 3 Should be signed by the Competent Person actually in charge of the work on the apparatus. The original should be retained by the Competent Person actually in charge of the work until the work is stopped or completed. One copy should be retained in the book by the person authorising the work. Part 4 Should be signed by the Competent Person actually in charge of the work when the work has been stopped or completed and the handed back to the person who authorised the work. Part 5 Should be signed by the FM NP responsible for signing Part 2, or in his/her 6 P age

7 unavoidable absence, by a person of equivalent status and who has knowledge of the work. A Switching Schedule (Appendix 7) may be completed and incorporated in the Low Voltage Electrical permits as appropriate as an accountable document for all complicated Switching and permitted work and used as an aid memoir during the switching process. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person undertaking/in charge of the work. 2 nd Copy (Yellow) To FM Electrician via FM Helpdesk. 3 rd Copy (Pink) FM Projects or FM Services as appropriate. 4 th Copy (Bottom copy) Retained in permit book as an accountable document. Electrical High Voltage Permit to Work/Test Quadruplicate Book. DAP: Senior Authorised Person NDs: Authorised Persons Electrical only who have been appointed in writing by the Senior Authorised Person. No work whatsoever shall be carried out on or adjacent to any High Voltage electrical system without permission from the DAP (The Senior Authorised Person Electrical) or in their prolonged absence their NP. The High Voltage Electrical permit shall be utilised for access to all substations and all work on the High Voltage electrical systems. Part 1 Should be completed by the Authorised Person responsible for the switching, isolation, testing and earthing operations and issued to the person responsible for carrying out the work. Where the person authorising the work is also responsible for the switching etc, they should issue this permit to themselves as a check on procedures. Part 2 Should be completed and signed by the Authorised Person responsible for switching, isolating, testing and earthing operations after their completion. Part 3 Should be signed by the Competent Person actually in charge of the work on 7 P age

8 the apparatus. The original (top copy) should be retained by the Competent Person actually in charge of the work until the work is stopped or completed. The bottom copy should be retained in the permit book by the person authorising the work. See also below. Part 4 Should be signed by the Competent Person actually in charge of the work when the work has been stopped or completed and the handed back to the person who authorised the work. Part 5 Should be signed by the Authorised Person responsible for signing Part 2, or in his/her unavoidable absences, by a person of equivalent electrical authority who has thorough knowledge of the work. A Switching Schedule must be completed and incorporated in Electrical permits as appropriate as an accountable document for all High Voltage Switching and permitted work and used as an aid memoir during the switching process. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person undertaking/in charge of the work. 2nd Copy (Yellow) To FM Electrician via FM Helpdesk. 3rd Copy (Pink) FM Projects or FM Services as appropriate. 4 th Copy (Bottom copy) Retained in permit book as an accountable document. Permit to Work Pressure Systems Quadruplicate Book DAP: FM Projects Asset Development Manager The DAP shall appoint NPs to assist the with the day to day management arrangements in writing. No work on the compressed air and pressure systems that fall under the Pressure Systems Regulations and for which FM are the duty holder shall be undertaken except as prescribed in Annex B to FM H&S Policy Pressure Systems Safety Procedures and as covered by an appropriate permit to Work Pressure Systems which has been issued by the DAP or their NP. The Person Issuing this permit is to: 8 P age

9 (1) Complete and sign Part 1 of the Permit and the copy contained in the Book and hand the Permit to the person permitted-to-work. (2) Return white Permit when the section contained in the Book covering Return of Permit has been complete and signed. File with yellow copy. (3) Sign the section contained in the Book covering Cancellation of Permit to confirm that action as at A (2) has been taken. The Person permitted-to-work is to: (1) Acknowledge holding the Permit by signing Part 2 of the Permit and of the copy contained in the Book. (2) Retain the Permit while the work is proceeding. (3) Retain the Permit when the work is completed/suspended, and (4) Complete and sign the section contained in the Book covering Return of Permit. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person undertaking/in charge of the work. 2 nd Copy (Yellow) To FM Mechanical Section via FM Helpdesk. 3 rd Copy (Pink) FM Projects or FM Services as appropriate. 4 th Copy (Bottom copy) Retained in permit book as an accountable document. Confined Spaces and Controlled Areas access request forms. Triplicate Book DAP FM Services Assistant Director The DAP shall appoint NPs to assist the with the day to day management arrangements in writing. The permit to enter a Confined Space must be issued for all work undertaken in such spaces. The NP issuing the permit should be fully competent to manage such work and conversant with their legislative responsibilities. Attendance on a one day Confined Spaces training with Escape Apparatus course (or approved equivalent) allied to a thorough knowledge of the space, site conditions and hazards contained therein would exemplify such competence. The person responsible for the work and who signs to accept the permit to work shall ensure that all persons involved in the work are suitably competent, fully aware of the hazards associated with the work and the access and egress procedures, including emergency release or extraction arrangements. On completion of the works, the person who has signed in receipt of the permit shall ensure that all persons involved in the work have withdrawn and that the space is left in a safe condition and that 9 P age

10 unauthorised entry is prevented whenever the space is left unattended. The space shall be left clean with all waste, tools and equipment removed before the permit is returned for cancellation. All those who propose to work in a confined space shall have received training as exemplified for the person issuing the permit. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person directly managing work in the confined space. 1st Copy (Yellow) Helpdesk. Bottom Copy (Light Blue) To be retained in permit book. Access Request Form - Controlled Areas Triplicate Book DAP Assistant Director FM Services The DAP shall appoint NPs to assist the with the day to day management arrangements for working in Controlled Areas in writing. This authority to enter a Controlled Area ( Not a Confined Space, for which a more detailed risk assessment and a higher order permit is required) shall be utilised for access control of all technical areas where specific hazards exist over and above routine access into areas designed for such. Such areas will be incorporated into the Safe System of Work to which these permissions relate and include W est Park Voids, Edward Herbert Building plantroom void, Holywell Park underground walkways and the like. The person responsible for the work and who signs to accept the permit to work shall ensure that all persons involved in the work are suitably competent, fully aware of the hazards associated with the work and the access and egress procedures, including emergency release or extraction arrangements. On completion of the works, the person who has signed in receipt of the permit shall ensure that all persons involved in the work have withdrawn and that the space is left in a safe condition and that unauthorised entry is prevented whenever the space is left unattended. The space shall be left clean with all waste, tools and equipment removed before the permit is returned for cancellation. All those who propose to work in a confined space shall have received training as exemplified for the person issuing the permit. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person. 1st Copy (Yellow) Helpdesk. Bottom Copy (Light Blue) To be retained in permit book. 10 P age

11 Access Request Forms - Roofs Triplicate Book. DAP: Assistant Director FM Services The DAP shall appoint NPs to assist the with the day to day management arrangements for working in Controlled Areas in writing. The Roof Access request Form is an integral part of The University Code of Practice for Access to Roofs. Where access is required through voids and loft areas onto roofs, the appropriate risk assessments and method statements shall be checked for suitability and sufficiency by the sponsor of the person requiring access, or a University Officer on their behalf in the case of contractors working for departments. Once this has been completed, the form may be completed and signed by the FM DAP or their NP. The Key Clerk will issue keys only when this form has been completed and has no authority to waiver or adapt this requirement. The FM NP retains the responsibility to ensure that those being allowed access have conformed to the policy and for forwarding a copy of the completed Roof Access request Form to the FM Helpdesk. The person responsible for the work and who signs to accept the permit to work shall ensure that all persons involved in the work are suitably competent, fully aware of the hazards associated with the work and the access and egress procedures, including emergency release or extraction arrangements. On completion of the works, the person who has signed in receipt of the permit shall ensure that all persons involved in the work have withdrawn and that the space is left in a safe condition and that unauthorised entry is prevented whenever the space is left unattended. The space shall be left clean with all waste, tools and equipment removed before the permit is returned for cancellation. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person. 1st Copy (Yellow) Helpdesk. Bottom Copy (Light Blue) To be retained in permit book. Please route a copy via Helpdesk and inform them when the permit is cancelled. Excavations - Permit to Dig 4 part copy book. DAP: Facilities Services Health and Safety Co-ordinator NDs: The DAP shall appoint NPs to assist the with the day to day management 11 P age

12 arrangements for work involving excavations in writing. All NPs shall accord to the requirements indicated in Appendix 1 and have appropriate training and competency. The Permit to Dig shall be utilised to cover work at all University locations both internally and externally. Work shall include all excavating, the driving of pickets and pegs and similar work which extends to a depth of 150mm or more, regardless of the extent of the work. Digging with mechanical equipment is not permitted within 500mm of underground services as advised by the latest guidance (HSG 47). A current record drawing of the area, which should indicated the area of work geographically, must accompany the completed permit. Contractors undertaking excavations shall ensure their operatives have the necessary competence to carry out CAT scans for services as required by HSG47. Proof of the contractor s employee s competence together with the calibration records of the scanning equipment shall be obtained by the Project Manager. The Project Manager requiring/requesting the permit or designated authority and the person producing the permit are required to attend the proposed work site and risk assess the area prior to the permit to be prepared. On large ring fenced sites the Project Manager should ensure that alternative arrangements to identify hazards associated with buried services (e.g. ground radar surveys) are carried out and the alternative arrangements, together with any drawings and sketches produced should be recorded on the permit. The visit might be combined where detailed permits are required covering extensive areas. Other than in emergency situations, the permit request must be made at least two working days in advance. The permit shall be issued directly to the person in charge of the work following consideration of the associated hazards and risks and shall not be delivered via third parties. The Project Manager/ S.O. or designated authority shall ensure that a specific risk assessment and/or method statement covering the work for which the permit is required has been prepared by the contractor, together with details of the contractors operatives competence to carry out CAT scans for services as required by HSG 47, before the permit is issued. The permit makes reference to a requirement to accord with the requirements of HSG 47 or an approval equivalent standard. 12 Page

13 As a client, LUFM have a responsibility to provide up to date information to relevant parties before excavation work can commence. This will include the provision of up to date drawings of service records. If this information is not available, a marked up drawing following a scan of the area shall be issued. When a Contractor is engaged to undertake scanning of underground services on behalf of LUFM, they must submit to LUFM the findings of the scan for agreement before the permit is signed and issued. Only then can the excavation work commence. The Contractor has the responsibility to continually scan as their work proceeds as per HSG 47. The findings and or modifications made during construction shall be submitted by the contractor to the Project Manager / Engineer upon completion of the project so the service record drawings can be updated. The Project Manager / S.O. must check the competence of the contractor who undertakes scanning. Only competent contractors are permitted to carry out their own scanning. If any LUFM employee has the necessary competence and wishes to continue scanning, that is permitted. Where a contractor is recognised as not having the necessary competence to fulfill the requirements of HSG 47, the person issuing the permit (Project Manager/Engineer) will use LUFM staff, who have undertaken CAT scanning training for the role. NB. This would not be the case for contractors carrying out excavations but is included to cover contractors such as those erecting marquees, driving pickets and the like. Contractors as built drawings shall be forwarded to the Project Manager/S.O. The Project Manager/S.O. shall then arrange for the site record drawings to be updated accordingly. Copies to be distributed as follows: Top Copy (White) Contractor or Trades Person. 1st Copy (Yellow) Helpdesk. 2nd Copy (Pink) Grounds and Gardens Section. Bottom Copy (Light Blue) To be retained in permit book. Hot Work Duplicate Book. DAP: Maintenance Manager FM Services NDs: The DAP shall appoint NPs to assist with the day to day management arrangements for Hot Work in writing. 13 P age

14 The Hot W ork Permit shall be utilised for all hot work carried out by both contractors and the direct labour force. The use of all flame and spark producing apparatus and tools (welding, soldering, flame cutting, tar boilers etc.) plus hot air burning and welding equipment shall require a hot work permit. Hot Work permits shall be issued for periods of not more than seven days. Where a hot work permit is issued for more than a day, the recipient shall be responsible for in filling the requisite information on a daily basis. Hot Work permits shall be returned to the DAP or the issuing NP at the completion of the work or the end of the week, whichever is the sooner. Top Copy (White) Contractor or Trades Person. 1st Copy (Yellow) Helpdesk. Bottom Copy (Light Blue) To be retained in permit book. Nominated Persons competence and authority Appendix 1 Nominated Persons Competence and authority NPs must be competent and have the necessary theoretical and practical knowledge as well as sufficient experience to enable them to identify defects and weaknesses in work practices or equipment without direct supervision, for the safety of employees and contractors staff as appropriate. Competence Competence is difficult to define but will include a member of staff having the following attributes, relevant to the work being undertaken or managed. Such training as would ensure the necessary knowledge of the field for the task which they are about to perform Adequate knowledge of the hazards and failures of the equipment for which they are responsible Knowledge and understanding of the working practices used in the organisation Ability to communicate effectively with their peers, with any staff working under their supervision and with their supervisors An appreciation of their own limitations and constraints, whether of knowledge, experience, authority, facilities, resources etc. and a willingness to point these out. 14 P age

15 Table 1 below indicates typical competencies, limitations and authority for those NPs associated with issuing permits or authorising formal requests. 15 P age

16 Table 1 Authorised Persons competencies and limitations Area of authority (See also column e) Issuing key access authorities technical areas for general work. Plant rooms, tank rooms, general LV switch rooms. NB Does not include valving or switchgear operations and associated locking arrangements. The individuals authority must be recorded on the appropriate departmental database. Fire alarm isolation request Isolations carried out by FM Electrical staff only, who are individually authorised by the Maintenance Manager in writing. Training/Skills Hazard knowledge Work practices knowledge Limitations IOSH Managing Safely. Engineering Minimum 1 months experience at LU Must have relevant engineering knowledge. General engineering appreciation of Thorough knowledge of the University and No authority to authorise work on the plant within principles hazards and potential departmental health and safety the area unless in own area of expertise and risk associated with arrangements. managing the specific work. out of normal status Specific permit or authority required as appropriate within the technical and key authority may be a higher authority permit. areas for which (E.g. void or roof access). access is required IOSH Managing Safely. Knowledge of Thorough knowledge of Safe Systems of No authority to be issued without sight of task General fire awareness. hazards and Fire Work and Permits arrangements Annex Z. specific RA and associated MS, including University Fire warden Prevention and alarm Individuals authority to issue permits must consideration of the effects of, and alternative training. Attendance at system installed in be recorded on the appropriate arrangements for fire detection and alarm following FM Permit to Work or building(s) affected. departmental database. isolation. Access training. Electrical low voltage permit to work/test Must be authorised in writing by the FM DAP, the Senior Authorised Person Electrical. Issuer should be a member of FM Services. IOSH Managing Safely. Appropriate electrical training as exemplified by an electrical apprenticeship and appropriate electrical engineering qualification. Thorough knowledge of installation and testing regimes to current approved standards. Attendance at FM Permit to Work or Access training. Knowledge of fault and electric shock potential of all systems being worked on. A person who has proved to satisfaction of the DAP Electrical, that they have the experience and knowledge to carry out safely all operations associated with LV electrical systems Thorough knowledge of Safe Systems of Work and Permits arrangements, University policy and departmental Annexes J and Z Detailed knowledge of building services and hazards of affected circuits/buildings. 3 years Min managerial experience. Individuals authority to issue permits must be recorded on the appropriate departmental database. No authority for high voltage work unless additionally nominated and authorised in writing by the Senior Authorised Person Electrical. No permit to be issued without sight of task specific RA and associated MS. Facilities Management Page 17 15/11/2011

17 Electrical High Voltage permit to work/test Must be authorised in writing by the FM As Electrical Low Voltage plus: Appropriate training and experience in High Detailed knowledge of layout and current status of all LU High Thorough knowledge of Safe Systems of Work and Permits arrangements, University policy and departmental No permit to be issued without sight of task specific switching schedule and where appropriate a task specific RA and associated MS. DAP, The Senior Authorised Person Voltage Electrical Voltage system Annexes I, J and Z Electrical Engineering delivered by including safe Detailed knowledge of building services and a suitably approved operation of hazards of affected circuits/buildings Issuer should be a member of FM authority. switchgear. 5 years min. managerial experience. Services. Attendance at FM Permit Individual s authority to issue permits must to W ork or Access be recorded on the appropriate training. departmental database. Permit to work Pressure Systems To be authorised in writing by the FM DAP IOSH Managing Safely. Appropriate mechanical Detailed knowledge of layout and current Thorough knowledge of Competent Person (Pressure Systems) duties and testing No permit to be issued without sight of task specific RA and associated MS. (Currently the FM Asset Development engineering grounding status of all LU procedures. Manager - Engineering), or a nominated as exemplified by Pressure Systems Thorough knowledge of Safe Systems of Senior Chartered/Incorporated apprenticeship in including safe Work and Permits arrangements, the Mechanical/Building Services/Plant relevant mechanical isolation and safety content of and restrictions of the Pressure Engineer. Issuer should be a member of services discipline plus arrangements. Systems Log books, University policy and FM Services. appropriate training in Working knowledge departmental Annexes B and Z 5 years Building Services, of welding and min. managerial experience. Individual s Mechanical or Plant fabrication authority to issue permits must be Engineering as competency recorded on the appropriate departmental exemplified by a NVQ requirements for database. level 3 qualification or those working on higher. pressure systems Attendance at FM Permit to Work or Access training and Pressure Systems specific management training. Facilities Management Page 19 15/11/2011

18 Confined Space permit to enter IOSH Managing Safely. Detailed knowledge Thorough knowledge of working in confined No permit to be issued without sight of task specific To be authorised in writing by the FM DAP Attendance at one day of layout and potential spaces, controlled areas and departmental RA and associated MS. confined spaces specific hazards within area procedures. Annex F and Z. Issuer should be a member of FM training including practical for which permit is to 5 years min. managerial experience. Services. use of escape apparatus be issued. Individual s authority must be recorded on or an equivalent approved the appropriate departmental database. by the University Health Individual s authority to issue permits must and Safety manager. be recorded on the appropriate Attendance at FM Permit departmental database. to Work or Access training. Access Request Form Controlled Area To be authorised in writing by the FM DAP IOSH Managing Safely. General engineering principles. Attendance at FM Permit Detailed knowledge of layout and potential hazards within area Thorough knowledge of working in confined spaces and controlled areas and departmental procedures. Annex F and Z. No permit to be issued without sight of task specific RA and associated MS. to W ork or Access for which permit is to 3 years min. managerial experience. training. be issued. Individual s authority must be recorded on the appropriate departmental database. Access Request Form Roofs To be authorised in writing by the FM DAP NEBOSH Construction Certificate. General Risks associated with Work at height in Thorough knowledge of work at height departmental procedures. Annex M and Z. No permit to be issued without sight of task specific RA and associated MS. engineering principles. combination with Specifically Appendix 2 Work on roofs. 3 Competence and knowledge of operatives Attendance at FM Permit to industry standard risk Years min. managerial experience. awareness of potential hazards on roof being Work or Access training. reduction and Individuals authority to issue permits must be accessed should be tested prior to issuing permit to mitigation recorded on the appropriate departmental access roofs. arrangements. database. Facilities Management Page 19 15/11/2011

19 Excavations Permit to Dig IOSH Managing Thorough knowledge General awareness of fault or hazard potential No permit to be issued without sight of task specific When using competent contractors to scan, the Issuer shall be a member of FM staff. When no competent contractors available, scanning to be undertaken by DAP or NP who has been trained to use the CAT scanner. Safely. General engineering principles. Specialist delivered training in the use of tracing equipment as used by FM including contents of HSG 47 Avoiding Danger from Underground Services. Attendance of FM of potential hazards and location of U/G services at Loughborough University. Access to record drawings and a colour printer. of energy release from damaged services. 3 years min. construction related managerial experience. Individual s authority to issue permits must be recorded on the appropriate departmental database. Individual s authority to issue permits must be recorded on the appropriate departmental database. FM Staff undertaking CAT scanning before issuing permits shall have undertaken appropriate training. Only competent staff or contractors carry out RA and associated MS. FM Staff undertaking CAT scanning shall be authorised in writing by the relevant FM DAP. Permit should only be issued to staff or contractors who can accord to the ongoing requirements of HSG 47 when digging or driving pickets, pegs and support stays. Otherwise the issuer should oversee that aspect of the works. FM Staff shall issue the permit on site at all times. Permit to W ork CAT scanning. training, when using competent contractors to undertake scanning. Hot Work permit NEBOSH Construction Certificate. General engineering principles General fire awareness. Attendance at relevant FM Permit to Work or Local flammable materials or sources. Details of work to be undertaken by those requesting permit. Thorough knowledge of requirements of Annex Z and specifically the Hot work permit requirements. 3 years min. managerial experience. Individuals authority to issue permits or allocate work to staff must be recorded on the appropriate departmental database. No permit to be issued without sight of task specific RA and associated MS. Not to be issued without obtaining fire related information when working in hazardous areas utilising flammable substances without the permission of local responsible person. (E.g. technician or researcher in charge of work local to proposed hot work.) Access training. Facilities Management Page 20 15/11/2011

20 Annex Z Appendix 2 Safe Syste ms of Work and Permits - Training Re quire me nts (to be read in conjunction with Annex Z Appendix 1) To issue forms or permits i n relation to Safe Systems of Work individuals are required to have completed identified training as indictated by the Safe Systems Of Work and Permits Checklist. The Training Gap Analysis needs to be signed by each Duty Holder for the area where permit issuing authority is required. upon completion of the gap analysis the DAP can then issue a certificate of appointment to the Candidate as a Authorised Persons. Candidate Name: Role Title: Select authority required, as appropirate. Gap Analysis Complete (yes/no/probation) Key Authority FM Controlled Areas Signed: (Duty Holder) Fire Alarm Isolation Request Signed: (Duty Holder) Electrical LV Permit to W ork/test Signed: (Duty Holder) Electrical HV Permit to Work/Test Signed: (Duty Holder) Confined Spaces Signed: (Duty Holder) Controlled Areas access request forms Signed: (Duty Holder) Permit to W ork Pressure Systems Signed: (Duty Holder) Roof Access Request Form Signed: (Duty Holder) Permit to Dig Signed: (Duty Holder) Hot W ork Signed: (Duty Holder) Training Requirement required complete Training Requirement required complete Training Requirement required complete NEBOSH Construction Certificate General fire awareness appropriate Electrical training, qualification: knowledge of installation & testing regimes Knowledge of LU FM H&S arrangements (Induction) Specific Hot Work Permit training knowledge of fault and electrical shock potential of systems: attendance at ptw or access training Knowledge of fire hazard training & experience in HV Electrical Engineering min. 1 month experience at LU Knowledge of Annex B: Pressure Systems Detailed knowledge of LU HV system, including safe operation of switchgear: General engineering principles Knowledge of Annex F: Confined Spaces detailed knowledge of LU PS including safe isolation and safety arrangements: appreciation of hazard and risk associated within technical areas Knowldege of Annex I: HV Electrical working knowledge of welding & fabrication appropriate Mechanical training, qualification Any Technical member of staff after 3 months in the post Knowledge of Annex J: LV Electrical Knowledge of Annex M: W orking at Height Knowledge of Annex Z: Safe Systems of W ork NEBOSH Construction Certificate knowledge of working at height attendance at one day confined spaces training including practical use of escape apparatus: knowledge of underground services at LU: specialist training in the use of tracing equipment as used by FM including contents of HSG 47 'avoiding danger from underground servcies' : Training Actions Required: Signed: (Authorised Persons) Review period Facilities Management Page 21 15/11/2011

21 Revision Revisions made Date 2 Inclusion of Appendix 2, detailing training requirements June 2011 and competencies as identified in Table 1 Annex Z. Minor changes to fire alarm isolation requests. 3 Revise Permit to dig and Appendix 1, to allow competent Contractors to scan. LUFM to still issue permits. 4 Revised Table 1, Appendix 1 Hot Work Permit to reflect new training requirement, replacing previous requirement of attending the fire wardens training. NEBOSH Construction Certificate requirement also added, replacing the previous IOSH Managing Safely requirement. Appendix 2 similarly changed for issuing Hot Work Permits. Revised Table1, Appendix 1 Roof Access Permit, NEBOSH Construction Certificate requirement added, replacing the previous IOSH Managing Safely requirement. July 2012 Appendix 2 similarly changed for issuing Roof Access Permits. 5 Revise Policy following a recent audit (April 2016) MJC. June Replace Authorised Person with Nominated Deputy Nov 2017 Facilities Management Page 22 15/11/2011

Annex Z to LUES H&S Policy Estates Services Safe Systems of Work and Permits

Annex Z to LUES H&S Policy Estates Services Safe Systems of Work and Permits Annex Z to LUES H&S Policy Estates Services Safe Systems of Work and Permits Compliance with this policy and guidance is mandatory for all work that is undertaken by Estates Services Staff and Contractors

More information

Annex CC To Facilities Management Department. Routine Audit and Monitoring of Health and Safety management functions.

Annex CC To Facilities Management Department. Routine Audit and Monitoring of Health and Safety management functions. Annex CC To Facilities Management Department Routine Audit and Monitoring of Health and Safety management functions. The responsibilities and monitoring approaches contained within this guide are to be

More information

Policy, Responsibilities & Procedures

Policy, Responsibilities & Procedures Health and Safety Services Policy, Responsibilities & Procedures for the management of Asbestos Containing Materials 1 Contents 1 Introduction... 3 2 Asbestos Policy... 4 2.1. Statement of Intent... 4

More information

Route to Authorisation

Route to Authorisation Route to orisation 1. SCOPE This document was previously included in OPSAF-13-001 orisation Procedures as Attachment 1 Route to orisation Manual. This document has now been issued as an individual document

More information

Permit to Work Manual

Permit to Work Manual Permit to Work Manual Release Date March 2016 CS-PTW-01 Version 3.1 Originator PTW Committee For further information, contact your supervisor or the site safety department. THIS DOCUMENT IS UNCONTROLLED

More information

University of Portsmouth Safe System of Work Policy

University of Portsmouth Safe System of Work Policy University of Portsmouth Safe System of Work Policy Document title University of Portsmouth Safe System of Work Policy Document author and department Jonathan Latter Health & Safety Compliance Manager

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

Permits and authorisations

Permits and authorisations Procedure Index Section Title 1 Introduction. 2 Purpose 3 Definition 4 Primary authorisations 5 Secondary authorisations 6 Specific permits and authorisations Appendix 1 Primary Authorisation Quick Reference

More information

Safe System of Work Policy

Safe System of Work Policy Reviews and Revisions Safe System of Work Policy Action Date Reason Reviewer Safe System of Work Policy 1 1. Introduction Campus Services manage and deliver a wide range of activities, accommodation, catering,

More information

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 The following is an outline of the Safe Working Requirements for all Companies, staff and any other persons for this event. Please note that the terms Company

More information

HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance

HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance Version:- 2.0 Date of Issue:- March 2017 Page 1 of 13 HAS/042/001 Code of Practice for Work on Street Lighting and Street Furniture including Installation, Repairs and Maintenance 1. Purpose The purpose

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

University of Birmingham

University of Birmingham University of Birmingham Health and Safety Policy Manager responsible for review: Facilities Manager Date of last review and update: April 2015 Approved by: H&S committee 2015 Next scheduled review date:

More information

High voltage for apparatus under Safe Access Rules and statutory regulations is defined as being greater than 1000V ac or 1500V dc.

High voltage for apparatus under Safe Access Rules and statutory regulations is defined as being greater than 1000V ac or 1500V dc. Clean, Green & Safe Management System SP 24-76 Process Authority: HV Test Engineer Peter New High Voltage Testing Approval: EO Engineering & Projects Ken Lister Version Date: 22/02/2012 Revision: A 1.

More information

Quality and Environmental Business Process Manual

Quality and Environmental Business Process Manual PMC SOIL SOLUTIONS 2 Fountain Court Victoria Square St Albans Hertfordshire AL1 3TF T: 01727 822500 F: 01727 821600 E: headoffice@pmcsoilsolutions.com W: www.pmcsoilsolutions.com Quality and Environmental

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 53.0 EHS Management During Construction Work Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

Portable Appliance Testing

Portable Appliance Testing OHSS: Guidance 111.1 Portable Appliance Testing Portable Appliance Testing Contents Scope... 3 Legislation and Best Practice Guidance... 3 Fixed Electrical Installation... 4 Types and Classifications of

More information

Quality Assurance Manual

Quality Assurance Manual Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability

More information

Hazardous Materials Management

Hazardous Materials Management CONTENTS 1 Purpose... 1 2 A Brief Overview of the Contract Worksheet... 1 3 Completion of the Worksheet... 1 1 Purpose This document is designed to assist any person responsible for scoping a Contract

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide

More information

ISO 9001:2015 ISO 14001:2015 OHSAS

ISO 9001:2015 ISO 14001:2015 OHSAS JSM Group Management System Manual January 2017 ISO 9001:2015 ISO 14001:2015 OHSAS 18001:2004 National Electricity Registration Scheme (NERS) Fleet Operators Recognition Scheme (FORS) Issue & Amendment

More information

Safer Recruitment Policy

Safer Recruitment Policy Safer Recruitment Policy 2014-2017 Issue 5 July 2014 Summary of Policy: The Policy outlines how the College meets Safeguarding legislation requirements in respect of the recruitment and selection of staff

More information

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes Document Control Revision No. Date Document Reviewed Publication on Web Site Date of next Review Summary of main changes Draft May 2017 New version of document 1 May 2017 May 2017 May 2018 Update of document

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088)

Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088) Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088) National occupational standards and Assessment requirements www.city-and-guilds.co.uk Version 1 August 2003 Publications and enquiries

More information

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation Mini Tender Questionnaire for Subcontractors Section B involves a questionnaire oriented around the provision of key

More information

National self-insurer OHS management system audit tool. Version 3

National self-insurer OHS management system audit tool. Version 3 National self-insurer OHS management system audit tool Version 3 Release Date: 4 August 2014 Next Review Date: 2016 Approval Status: Prepared by: Approved by Heads of Workers Compensation Authorities WorkCover

More information

Site Safety Plus. Site Management Safety Training Scheme (SMSTS) Course appendix G

Site Safety Plus. Site Management Safety Training Scheme (SMSTS) Course appendix G Site Safety Plus Site Management Safety Training Scheme (SMSTS) Course appendix G 1. Introduction 2. Aims and objectives 3. Entry requirements 4. Assessment 5. Delegate numbers 6. Course duration and attendance

More information

Annex G to Loughborough University Facilities Management Health and Safety Procedure

Annex G to Loughborough University Facilities Management Health and Safety Procedure Annex G to Loughborough University Facilities Management Health and Safety Procedure Working with Contractors Including the Construction (Design and Management Regulations) 2015 General 1. The Construction

More information

The Independent Regulatory Board for Auditors (IRBA)

The Independent Regulatory Board for Auditors (IRBA) The Independent Regulatory Board for Auditors (IRBA) THE AUDIT DEVELOPMENT PROGRAMME BOOKLET 2015 THE AUDIT DEVELOPMENT PROGRAMME 1. What is the ADP? The Audit Development Programme (ADP) is a period of

More information

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE The purpose of the health and safety questionnaire is to provide Clients with assurances that all companies on

More information

The safe management and control of Temporary Works

The safe management and control of Temporary Works The safe management and control of Temporary Works What are TW s? The HSE describe Temporary Works (TW s) as; an engineered solution that may include any structure, provision for access, item or technique

More information

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015 for Inspecting and Certifying Buildings and Works Building Control Regulations 1997 to 2015 September, 2016 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1

More information

Procedure UE PR Access to the United Energy Electricity Network. Document UE PR 0001

Procedure UE PR Access to the United Energy Electricity Network. Document UE PR 0001 Access to the United Energy Electricity Network Document UE PR 0001 Procedure UE PR 0001 This procedure outlines the requirements for access to work on or near the UE electricity network for the performance

More information

Temporary Works Forum (TWf) Chairman: Bill Hewlett MA CEng FICE Secretary: John Carpenter CEng, FICE, FIStructE, CFIOSH

Temporary Works Forum (TWf) Chairman: Bill Hewlett MA CEng FICE Secretary: John Carpenter CEng, FICE, FIStructE, CFIOSH TW/11/027 Rev F (issued: February 12). Rev G (minor changes March 12) COMPETENCIES OF THE TWC 1 1 Background It is important that those individuals appointed to the roles of Temporary Works Coordinators

More information

AUDIT OF LEAD DRILLERS & DRILLING SUPPORT OPERATIVES

AUDIT OF LEAD DRILLERS & DRILLING SUPPORT OPERATIVES AUDIT OF LEAD DRILLERS & DRILLING SUPPORT OPERATIVES Welcome to the British Drilling Associations Audit scheme. The Audit has undergone a major review and upgrade in 2015 and now conforms to the latest

More information

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control

More information

Acting Up and Secondment Policy and Procedures

Acting Up and Secondment Policy and Procedures Acting Up and Secondment Policy and Procedures Version Number: V2.0 Name of originator/author: Deputy Director of Workforce and Organisational Development Name of responsible committee: JNCC & Trust Management

More information

DIT HEALTH AND SAFETY OFFICE

DIT HEALTH AND SAFETY OFFICE DIT HEALTH AND SAFETY OFFICE POLICY TITLE: Policy on Health and Safety Training for Staff REVISION NO.: 4 NUMBER OF PAGES: 14 DATE OF ISSUE: Adopted by DIT Health & Safety Committee 22 nd November 2011

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies

Guidance for Airport Operators Designating Known Suppliers of Airport Supplies Aviation Security Guidance for Airport Operators Designating Known Suppliers of Airport Supplies CAP 1260 Published by the Civil Aviation Authority 2015 Civil Aviation Authority Aviation House Gatwick

More information

Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE

Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE Introduction Curo Group have a statutory duty to ensure that construction projects and works are managed effectively in

More information

QUALIFICATION SPECIFICATION

QUALIFICATION SPECIFICATION QUALIFICATION SPECIFICATION Level 3 Diploma in Engineering Construction Maintenance (RQF) Contains the following pathways: - Electrical - Instrumentation and control - Mechanical QS-Engineering Construction

More information

HFM Asset Management Contractor Induction Queens Riverside Apartments

HFM Asset Management Contractor Induction Queens Riverside Apartments HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

Pipelines Safety Regulations 1996

Pipelines Safety Regulations 1996 Pipelines Safety Regulations 1996 ACoP and Guidance to support amendments to Regulations 25 and 26 covering Pipeline Emergency Plan Testing and Charging Pipelines Safety Regulations 1996 ACoP and Guidance

More information

Discipline Specific Guidelines: Chemical Engineering

Discipline Specific Guidelines: Chemical Engineering Engineering Council of South Africa Discipline Specific Guidelines: Chemical Engineering Acceptable Training for Registration as Professional Engineers It is recommended that Candidate Engineers (CEs)

More information

Environment Agencies Statement on Radioactive Waste Advisers

Environment Agencies Statement on Radioactive Waste Advisers Environment Agencies Statement on Radioactive Waste Advisers Document Ref: RWA-S-1 Version 1.0 Publication date: 24 May 2011 Contents 1 Executive Summary... 3 2 Introduction... 4 3 Background... 4 3.1

More information

Field Instruction. All Horizon Power workers who work in and around excavations.

Field Instruction. All Horizon Power workers who work in and around excavations. 6.4 Excavation work and directional drilling Purpose This instruction provides the minimum requirements for: All Horizon Power workers who work in and around excavations. All Horizon Power workers who

More information

BISHOP WORDSWORTH S SCHOOL REDUNDANCY PROCEDURE

BISHOP WORDSWORTH S SCHOOL REDUNDANCY PROCEDURE BISHOP WORDSWORTH S SCHOOL INTRODUCTION REDUNDANCY PROCEDURE 1. The Governing Body seeks to ensure, as far as possible, security of employment for employees by forward planning. However, it is recognised

More information

Designer and CDM Co-ordinator Guidance

Designer and CDM Co-ordinator Guidance Designer and CDM Co-ordinator Guidance Fewer than five employees Health and Safety 1 CONTENTS INTRODUCTION...5 Further reading / additional resources...5 Note to suppliers...6 QUESTION 1: POLICY AND ORGANISATION...8

More information

CODE HEALTH AND SAFETY COMMITTEE. Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals

CODE HEALTH AND SAFETY COMMITTEE. Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals CODE HEALTH AND SAFETY COMMITTEE Student Safety: A Guide for Supervisory Officers, Principals and Vice-Principals June 2013 About this guide Developed by a team of educators and health and safety professionals

More information

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed of Security Operations BS EN ISO 9001: 2008 : 21/10/2016 Manual No. 1 Issued to Managing Director Authorised By Date Issued 21/10/2016 Controlled / Uncontrolled when printed SECTION: 0 Index Page 2 Note

More information

Guidelines on the management body of market operators and data reporting services providers

Guidelines on the management body of market operators and data reporting services providers Guidelines on the management body of market operators and data reporting services providers 28 September 2017 ESMA70-154-271 Table of Contents 1 Scope... 3 2 Definitions... 4 3 Purpose... 5 4 Compliance

More information

Transitions Between Signalling Systems

Transitions Between Signalling Systems Rail Industry Standard RIS-0036-CCS Issue One Date December 2016 ` Transitions Between Signalling Systems Synopsis This standard sets out the requirements for managing the transition between running lines

More information

Designer and CDM Co-ordinator Guidance

Designer and CDM Co-ordinator Guidance Designer and CDM Co-ordinator Guidance Five or more employees 1 CONTENTS INTRODUCTION...4 Further reading / additional resources...4 QUESTION 1: POLICY AND ORGANISATION...5 Guidance...5 What you need to

More information

Contribute towards school decisions regarding the development and improvement of the premises.

Contribute towards school decisions regarding the development and improvement of the premises. JOB TITLE: Facilities Manager SCALE: Kent Range 10 RESPONSIBILITY TO: Business Development Manager RESPONSIBILITIES AND DUTIES To assist the Business Development Manager (BDM) in all aspects of The Beacon

More information

UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE

UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE 1.0 INTRODUCTION 1.1 The Electricity at Work Regulations 1989 came into force on 1 April 1990. The

More information

IOSH Electrical Safety in the Food industry Case study: LV Electrical safety rules. Jackie Wooldridge Governance H&S Adviser 18th Nov 2010

IOSH Electrical Safety in the Food industry Case study: LV Electrical safety rules. Jackie Wooldridge Governance H&S Adviser 18th Nov 2010 IOSH Electrical Safety in the Food industry Case study: LV Electrical safety rules Jackie Wooldridge Governance H&S Adviser 18th Nov 2010 Northern Foods who are we? Northern Foods makes great tasting food.

More information

- 1 - CATHAY PACIFIC AIRWAYS LIMITED. Corporate Governance Code. (Amended and restated with effect from 1st January 2016)

- 1 - CATHAY PACIFIC AIRWAYS LIMITED. Corporate Governance Code. (Amended and restated with effect from 1st January 2016) - 1 - CATHAY PACIFIC AIRWAYS LIMITED (Amended and restated with effect from 1st January 2016) This Code sets out the corporate governance practices followed by the Company. The Board and its responsibilities

More information

Section 22. Scope of section. Accreditation. Eligibility Criteria

Section 22. Scope of section. Accreditation. Eligibility Criteria Section 22 Accreditation of Audit Firms, Reporting Accountants, Reporting Accountant Specialists and IFRS Advisers to provide accounting and/or advisory services to applicant issuers Scope of section The

More information

To cover instructional sessions for undergraduate and post graduate students in all teaching laboratories, mechanical and electrical.

To cover instructional sessions for undergraduate and post graduate students in all teaching laboratories, mechanical and electrical. Wolfson School of Mechanical, Electrical & Manufacturing Engineering Senior Technician Job Ref: REQ17075 As part of the University s ongoing commitment to redeployment, please note that this vacancy may

More information

Asbestos Management Plan

Asbestos Management Plan Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 2 April 2013 Contents Contents 1.1. Introduction... 4 1.2. Policy Statement... 4 2

More information

CDM 2015 In Practice. Craig Foyle CFIOSH IMaPS / Raymond Bone CMIOSH CFaPS. Version 1.0

CDM 2015 In Practice. Craig Foyle CFIOSH IMaPS / Raymond Bone CMIOSH CFaPS. Version 1.0 CDM 2015 In Practice Craig Foyle CFIOSH IMaPS / Raymond Bone CMIOSH CFaPS Version 1.0 Speakers Craig Foyle Involved in engineering construction / construction projects for over twenty years working in

More information

Training Policy & Procedure Page 1 of 11

Training Policy & Procedure Page 1 of 11 Training Policy & Procedure Page 1 of 11 Training & Development Policy Purpose Training Commitment This policy outlines dnata UK s ongoing commitment to ensuring that all employees have access to learning,

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

Portable Appliance Testing

Portable Appliance Testing Portable Appliance Testing 1. PURPOSE 1.1 The purpose of this procedure is to provide a standardised system for the inspection and testing of portable electrical appliances throughout the University, to

More information

Annexure B Section 22

Annexure B Section 22 Annexure B Section 22 Accreditation of Audit Firms, Reporting Accountants, Reporting Accountant Specialists and IFRS Advisers to provide accounting and/or advisory services to applicant issuers Scope of

More information

Lone Working Policy Reference DP113

Lone Working Policy Reference DP113 Responsible Person: Business Director Committee: Pupil, Parent & Community Last Review: November 2017 Next Review: November 2020 The Governing Board of Hazel Grove High School recognises its obligations

More information

Principles of the Railway Industry Supplier Qualification Scheme

Principles of the Railway Industry Supplier Qualification Scheme RISQS/001 Issue 1.2 Date: December 2015 Principles of the Railway Industry Supplier Qualification Scheme Copyright 2013 Rail Safety and Standards Board Limited. This document is subject to copyright protection.

More information

Audit & Risk Committee Charter

Audit & Risk Committee Charter Audit & Risk Committee Charter Status: Approved Custodian: Executive Office Date approved: 2014-03-14 Implementation date: 2014-03-17 Decision number: SAQA 04103/14 Due for review: 2015-03-13 File Number:

More information

Level 3 Certificate for Traffic Office ( )

Level 3 Certificate for Traffic Office ( ) Level 3 Certificate for Traffic Office (3438-02) Qualification handbook 501/2233/2 www.cityandguilds.com May 2011 Version 1.2 (July 2011) About City & Guilds As the UK s leading vocational education organisation,

More information

SERVICE LEVEL PROCEDURE

SERVICE LEVEL PROCEDURE SERVICE LEVEL PROCEDURE METERING PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.3 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE:

More information

Supervision Guideline for Electrician to Lineworker Apprentices

Supervision Guideline for Electrician to Lineworker Apprentices Supervision Guideline for Electrician to Lineworker Apprentices This Guideline has been developed by the Victorian Electricity Supply Industry (VESI) Skills and Training Reference Committee to provide

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

Construction (Design and Management) Safety Guidance Document

Construction (Design and Management) Safety Guidance Document Construction (Design and Management) Safety Guidance Document Lead Directorate and Service: Corporate Resources - Human Resources, Safety Services Effective Date: April 2011 Contact Officer/Number Garry

More information

version 1 / 96 R Green Stars Hotel Environmental Management System

version 1 / 96 R Green Stars Hotel Environmental Management System Environmental Management Manual for Hotels in Hong Kong version 1 / 96 R Green Stars Hotel Environmental Management System 2002 Acknowledgements: This document is a revised version of the manual published

More information

AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS. Effective for Peer Reviews Commencing on or After January 1, 2009

AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS. Effective for Peer Reviews Commencing on or After January 1, 2009 AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS Effective for Peer Reviews Commencing on or After January 1, 2009 Guidance for Performing and Reporting on Peer Reviews Copyright 2008 by American

More information

Work Health and Safety Management Systems and Auditing Guidelines

Work Health and Safety Management Systems and Auditing Guidelines Work Health and Safety Management Systems and Auditing Guidelines 5th edition, September 2013 (Updated May 2014) Work Health and Safety Management Systems and Auditing Guidelines These Guidelines are a

More information

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN A DETAILS OF THE CLIENT Client / Address: C PURPOSE OF THE REPORT Purpose for which this report is required: E PARTICULARS OF THE CONTRACTOR Trading Title: Address: DOMESTIC ELECTRICAL INSTALLATION PERIODIC

More information

CURRICULUM DEVELOPMENT ADVISORY

CURRICULUM DEVELOPMENT ADVISORY CURRICULUM DEVELOPMENT ADVISORY WORK-AT-HEIGHT COURSE FOR ASSESSORS Version 1.1 1 September 2014 Workplace Safety and Health Council, Ministry of Manpower (MOM), Singapore All rights reserved. This document

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

HSE statement on radiation protection advisers

HSE statement on radiation protection advisers HSE statement on radiation protection advisers The requirements of this Statement came into effect on 31 March 2007 Purpose Introduction Criteria of core competence Assessing bodies Suitable RPA's Annex

More information

TÜV SÜD BABT Production Quality Certification Scheme

TÜV SÜD BABT Production Quality Certification Scheme TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT

More information

The Power Industry (England)

The Power Industry (England) The Power Industry (England) Latest framework version? Please use this link to see if this is the latest issued version of this framework: afo.sscalliance.org/frameworkslibrary/index.cfm?id=fr01588 Issue

More information

Managing Contractors (Scotland)

Managing Contractors (Scotland) Managing Contractors (Scotland) University Health and Safety Policy Author: Health & Safety Services 1 Managing Contractors Procedures (Scotland) to support University Health and Safety Policy CONTENT

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

BOARD CHARTER TOURISM HOLDINGS LIMITED

BOARD CHARTER TOURISM HOLDINGS LIMITED BOARD CHARTER TOURISM HOLDINGS LIMITED INDEX Tourism Holdings Limited ( thl ) - Board Charter 2 1. Governance at thl 2 2. Role of the Board 3 3. Structure of the Board 4 4. Matters Relating to Directors

More information

East Riding of Yorkshire Council Corporate Health and Safety Policy

East Riding of Yorkshire Council Corporate Health and Safety Policy East Riding of Yorkshire Council Corporate Health and Safety Policy Lead Directorate and Service: Corporate Resources - Human Resources, Safety Services Effective Date: June 2016 Date Due for Review: June

More information

INDUCTION POLICY AND PROCEDURE

INDUCTION POLICY AND PROCEDURE Summary INDUCTION POLICY AND PROCEDURE New members of staff require an induction period to enable them to settle in to their new place of work. This policy sets out the framework and responsibilities for

More information

URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS

URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS SCOPE OF WORK. Introduction The SCOPE OF WORK as minimum will be carried out within the client oil exploration and development

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy 1. Introduction Risk assessment is a pivotal concept in health and safety risk management. However, it is often seen as a bureaucratic or a complex process. Neither is true. Risk

More information

Contractor s Guide to Applying for Permit to Dig/Excavate

Contractor s Guide to Applying for Permit to Dig/Excavate Contractor s Guide to Applying for Permit to Dig/Excavate Page 1 of 15 Contractor s Guide to Applying for Permit to Dig/Excavate Contents Purpose... 3 Inclusion Group... 3 1. Pre commencement worksite

More information

AUDIT COMMITTEE TERMS OF REFERENCE

AUDIT COMMITTEE TERMS OF REFERENCE AUDIT COMMITTEE TERMS OF REFERENCE 1. Membership 1.1 The Audit Committee of (the Company ) acting as trustee-manager of HK Electric Investments (the Trust ) was established by resolution of the board (the

More information

CDM FAQ Sheet

CDM FAQ Sheet CDM 2015 - FAQ Sheet 1. The change to the regulations means Domestic works are now included. What if you are doing DIY in your own house? Do the regulations apply to this? If the home owner is doing the

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

Terms of Reference for Mind Committees

Terms of Reference for Mind Committees Terms of Reference for Mind Committees General notes relating to all committees 1. Committee Structure 1.1. The trustees at a Council of Management meeting in accordance with its Memorandum and Articles

More information

This policy defines the responsibilities of both Line Managers and Human Resources.

This policy defines the responsibilities of both Line Managers and Human Resources. Safer Recruitment Background PACT regards people as its greatest asset and attaches importance to the procedures for recruitment and selection being clearly understood by Line Managers. Human Resources

More information

Health and Safety Training University Policy, Organisation and Arrangements

Health and Safety Training University Policy, Organisation and Arrangements Health and Safety Training University Policy, Organisation and Arrangements Issued with the approval of the Health and Safety Committee Revised: April 2013 Health and Safety Training Introduction 1 Policy

More information