1 Layout Design For Operations - From Concept to Execution Or How to Put Both You and the Layout in the Same Room Rockville MER 2013 Bob Reid

2 Layout Design for Operations From Concept to Execution MER 2013

3

4 Part 1 Design Concepts Starting with a spare room What to do with the door What do we want the railroad to be or if you don t know where you re going almost any road will get you there Essential elements Make it fit! Use of narrow scenes Photos of the real thing to get you started

5 What we want the railroad to be Something that will fit into a small space Aisles large enough to permit more than one operator - at least in most places A sense of going from here to there OR a reason for the railroad to exist - this is the fun part Single track main to force train meets Avoidance of hidden track

6 Starting Points Spare bedroom 9 by 11 (maybe 10 by 12 with a small closet) or smaller its easy to design a layout to fit in a gym Preferable but not necessary: Door Modification to eliminate swing into room Pocket; Bi-fold; Double; Sliding No door - curtain Door rehung to swing out Permissible to have removable track section or to have a gate.

7 Problems with inswing doors Swing the door out; bifold, double In a small space the room for the door swing is about 4 sq ft or 4% and it cuts off the around the wall loop

8 A 4 x 8 Sheet of Plywood? Takes tons of room for outside aisles and can be put above almost nothing. Hollow core doors 14, 18, 20, 22, 26 OR cut your own

9 Essential Layout Elements Home base for operations. Engine house station-water coal oil fuel Track(s) for coaches MOW Fuel deliveries At least one classification track At least one staging/interchange track Destination(s) reason for existence At least one passing track A provision for continuous running??

10 Basic Oval = 40 in 10x12 36 in 9x11

11 Oval with center peninsula = 55 Small room or hollow core door. Passing, class, depot, interchange Home base Destination Staging, passing, interchange

12 Design Lessons Learned All essential elements in a simple design Upper double ended track is used as arrival/departure; classification; run around; interchange; passing; station Lower double ended track is used as passing; staging; interchange Plan can coexist in the room with other needs if the loop is hung above the level of the furniture and removable modules are used for the other elements

13 A larger more complicated plan uses the space previously wasted by the simple oval 10x12=50

14 Design Lessons Learned False front industries to save space Trees screening staging eliminate hidden track Use of peninsula as both yard and destination maximizes space utilization Wye permits turning entire consists Double sided backdrop separates scenes and extends apparent length of run

15 A 3d view

16 Optimizing the Center Peninsula Adding a turnback curve (i.e. BLOB) : 1. Extends the main line run 2. Allows two crews to work yards/industries at the same time 3. Effectively divides the room into separate scenes expanding the illusion of distance

17 Peninsulas with turn back curves require planning so they will fit Formula for success B = Outer benchwork section A = Aisle L = Loop = 2*radius +4 Simple Formula = 2B + 2A +L But choosing a minimum radius is important How to choose one that will work?

18 How era affects minimum radius or a good reason to choose an era (and location) Small locos, shays and cars Mike, Pacific, Mallet cars Berkshire, Northern, cars axle diesels(f, GP), cars axle units and cars 1980-Present AC s and cars The larger the loco and the longer the average car length the broader the radius

19 Standards help you figure out what will fit 2B+2A+L Minimum Average Wide N Scale Benches 2B = 6 2B = 20 2B = 16 2B= 12 Aisles (2) A = 36 A2.5=48 A = 40 A2.5=48 Loops L(20)=44 L(24)=52 L(30)=64 L(17)=36 Total Need Options Increase Radius Add 2 nd loop

20 A word on aisle width 24 aisles waste space 24 aisles will not allow two persons to pass A person (plumpish) requires 20 two people require 28 to pass back to back (front to front gets a little tricky) So..one 20 aisle plus one 28 passing aisle equals 2.5 aisles in 48 Narrow aisles can cause problems in double deck railroads (more later)

21 Center peninsula with two sides r = 20

22 Broad Radii in a small room interferes with operation because crews have to cross the center peninsula to follow their train BOTTLENECK

23 Factors to consider when using very broad radius If broader radius is used operators must jump from side to side while operating which disrupts following the trains Broad radii also reduce the amount of yard and industrial opportunities and consumes space in the corners Operators will be going from side to side so aisle width at the end of the peninsula becomes more of an issue

24 Stacked Loops allows broader radii/longer run, uses the vertical space in the room 70-76

25 Stacked loops with radii eliminates aisle jumping and separates the destinations. Uneven aisle widths(20 and 28 ) allow for more space where activity will be greatest

26 Lessons Learned Use of vertical space expands main line run (and everything else) Put wider aisles next to yards and other design elements where operators will congregate

27 In small spaces or O scale (gasp) switchbacks can be your friend

28 A Railroad On the Go An N Scale Timesaver in 4 with staging and #6 turnouts Only 6 pounds

29 And here it is in operation in the Florida Keys during Flagler s 100 th anniversary

30 Modeling narrow scenes

31 Adjusting structures to fit

32 Sawmill has been opened up to make a more linear structure

33 And sign added to cover the roof where Walther s attached the sorting shed

34 Seneca Rocks sawmill (you are standing in the log pond)

35 Kitbashed Industry: Open up a standard structure. In this case one end wall was cut to serve as both the right and left end walls and the other three were used for the front.

36 Signature Scene: I model Oct. 1, 1925 so general stores and delivery wagons are essential

37 1925: The age of steam

38 Grain Elevator Complex

39 Center of spiral aisle

40 Center looking back

41 Blob

42 Next section of Spiral

43 Overpass

44 Sawmill/Packing plant end

45 Outer aisle at rear

46 Outer Aisle at Rear Exit

47 Opposite Staging

48 Petersburg

49 Staging

50 Elkins End

51 Part 2 The Fun Stuff!! Multi-lap layouts Double decks Junctions and two railroads in one room Use of modular elements universal design to fit all spaces Altering published designs The 70% rule for upper deck width Messing with a classic Armstrong railroad Put the railroad on narrow shelves My Allegheny and Shenandoah

52 Three Laps Around

53 Shelf Design

54 Multi-lap design

55 Blackwater Canyon

56 Western Maryland

57 Vertical thinking and Combining Design Elements Tracks on Multiple levels o Multiple lines in the same space o Double decks Lap tracks to gain elevation eliminate space wasting helixes Dividing the layout into modules so it will fit More than one railroad in the same room

58 Beyond 80 run use the room as the helix introduction of lap tracks Use track around the outside wall of the room. I call them lap tracks. Go further up the space is free Use an around the wall ramp(s) between stacked loops or between decks to gain separation between levels (8-10 ) per lap Trains are never hidden Mountain climbing grades and helper districts are exposed so the action can be enjoyed

59

60 RR-Track V4 software used

61

62 Combining Large and Small Radii in the Same Railroad Use a broader radius curve at or near the outside of the room. You can add a prototypical junction station where the interchange line crosses the smaller home line. Depict your favorite class one (SF, N&W, C&O, PRR) and have it interchange with a local short line.

63 Confluence Junction in 9 x11

64 Confluence Junction Lap Track

65 Confluence Junction Destination Level

66 Lessons Learned Use of lap tracks provide full 17 of separation between decks without a helix Divided central peninsula results in a semi mushroom design and a raised floor provides easy access Use of 30 radius is possible for the simple outer oval trackage needed by big steam, 86 coaches or modern diesels and rolling stock

67 Modular Thinking In N, HO, ON30: Published plans can be modified/combined as shown below Harbor Module Main Module

68 Modules can fit anywhere and can be connected with around the room lap tracks

69 A simple modular plan for (almost) any space with lots of operation Spare room 8x9 to 12x14 Double deck on one wall only Logging theme (coal, steel, autos) Use of car ferry for interchange Could be ON30, SN*, HO, N Center section could be removable for storage in a closet or under a bed

70 Switchbacks gain elevation. Logging branch occupies space above main yard. Industrial section connects sawmill with logging camp Door Rehung 13

71

72 The sawmill module can be located as needed then 2 smaller modules attached from each end

73 Switchbacks gain elevation. Logging branch occupies space above main yard. Industrial section connects sawmill with logging camp Door Rehung 13

74 Revised lower level

75 Revised middle level

76 Revised Upper level

77 Changes made Radius expanded to 24 Aisles now 7 feet no peninsula Room can more easily be multi use Much larger continuous run lap Expanded yard and industrial areas

78 Lap tracks the helix killer Connect levels with narrow ramps to make a modest grade lap around the room A thin fascia on the outside edge of the lap track painted blue hides the supports and the track the track appears to float on the backdrop At the end of the room opposite the peninsula add a passing track and/or an industrial area Modify the grade so that the industrial areas are flat

79 A word on double decked railroads Tight aisles mean you do not have room to back away from the railroad to view the lower deck. The upper deck will interfere with the view of the lower deck. If possible narrow the upper deck or move the track on the lower deck nearer the aisle If all else fails keep both decks narrow

80 Narrowing the upper deck can make a big difference 70% works well 100% 70%

81 70% rule and illumination

82 Use a gate to hold multiple levels: a 4 piano hinge supports the structure

83 A word about train lengths Double deck railroads with their longer main lines assume somewhat greater train lengths Everything in the layout must be kept in sync. Use a standard loco, plus a fixed number of freight car lengths for everything. i.e. - loco at 12 plus 12 cars at 5.5 = 77 Staging Passing tracks Yard departure and arrival tracks

84 I m too old for a duck under! John Armstrong s Atlantic and White Mountain 20 custom Designed Track Plans, John Armstrong, 1994, Kalmbach, used with permission

85 Upper level Atlantic and White Mountain 20 custom Designed Track Plans, John Armstrong, 1994, Kalmbach, used with permission

86 OMG! A redo of John s plan First, so I don t get accused of layout design heresy, this was my all time favorite plan for a bedroom for many years Great sense of going somewhere Strong purpose(s) for the railroad Logging Marble Wharf services both passengers and freight

87 So what s wrong with it? Helix in prominent entranceway position A large percentage of main is hidden track Aisles less than 20 in several places leaves minimal work space There is no place for crew to pass unless one of you ducks under the layout Limited staging Most of us do not have a stairway next to our layout bedroom to use

88 Changes

89 Atlantic and Green Mountain

90 Atlantic and Green Mountain

91 What have we accomplished? No helix 9x11 not 10x12 #6 s not #5 s Wider aisles lots of crew passing points Staging tracks added under first level Car ferry added Section under stairs eliminated

92 Recap running time at 25 scale miles per hour Oval minutes Branch minutes Peninsula minutes Stacked loops minutes 1 Lap minutes 2 laps minutes Second deck minutes No duckunder minutes

93 Allegheny and Shenandoah Large room example of a double deck railroad with no helix Upper decks at 70% of the width of lower Aisles at 30 minimum 30 radius Layout depicts Strasburg, Va to Parsons, WV

94 Shenandoah and Allegheny

95 A & S RR Upper

96 Lessons Learned Z shape of room led to a 11 9 waist where the formulas made sure it would fit. Spiral double decked peninsula added 350 to the main line run Moving the stairs 9 away from the wall allowed egress to the center of the RR Construction using ¾ plywood and David Barrow on steroids 8 double deck sections. 24 Subroadbed widths maximum Room prep and backdrop painting at the benchwork phase saved time and hassle

97 Track Design Software I use RR Track software and 3rdPlanit. RR Track is not like CAD. It s more like sectional track with unlimited sizes and radii. There are libraries for most scales and popular manufacturers. It will do layers, rudimentary scenery, grades etc. but none of that is necessary to meet design needs. 3DPlanit is harder to use but can produce more picturesque plans.

98 Golden spikes are very hard to find (and expensive) so the virtual variety was pressed into service here

99 Railroad room before spiral peninsula was constructed sawmill at upper left

100 Peninsula benchwork. The Z shape of the aisle is apparent.

101 Ceiling light reaches the lower level backdrop using the 70% upper deck rule thereby eliminating the need for lighting under the upper deck and allowing for thinner upper deck thickness and fascia

102 Staging and Class Yards

103 Why no one ever built a line from Strasburg, VA to Parsons, WV Layout in red West Virginia in black

104 Modular Industry occupies only 10 by about 4 feet

105 Consolidated Coal Mine also has been built in a straight line tipples at left

106 Schmidt s Sasparilla

107 Wicked Wanda s

108 General Store Panorama

109 Logging Branch is only 12 wide

110 Log Donkey and Hoist

111 Design tools You might want to do something easier than using a computer program. 1. Plan your space using the Squares method and figure out where the blobs will fit. 2. Use a domino or design element approach as advocated by Tony Koester or David Barrow. 3. Think in three dimensions. Staging can always be either above or below the layout and a lap track can be used to reach staging areas. 4. Use the formulas devise your own if needed!

112 Packing Plant

113 Tim s Tannery

114 Kitbashed Store from Art Curren s book

115 SP Trestle design per Joe Fugate s video

116 Thanks it s been a hoot Rbobreid@gmail.com

First Annual Indian Nations Division Layout Design Challenge

First Annual Indian Nations Division Layout Design Challenge First Annual Indian Nations Division Layout Design Challenge At the Layout Design & Operations Weekend, March 18-20, 2011 Our First Challenge As part of the second Layout Design and Operations Weekend

More information

Willoughby Line Yard Design Strategies for small yard design

Willoughby Line Yard Design Strategies for small yard design Willoughby Line Yard Design Strategies for small yard design I needed a small yard for my double deck layout. Here is a quick account of how I worked out some of the design issues in the yard design for

More information

GETTING STARTED IN MODEL RAILROAD OPERATIONS: A SIMPLE SWITCH LIST SYSTEM Arthur Boyd C&P Junction October 2013

GETTING STARTED IN MODEL RAILROAD OPERATIONS: A SIMPLE SWITCH LIST SYSTEM Arthur Boyd C&P Junction October 2013 GETTING STARTED IN MODEL RAILROAD OPERATIONS: A SIMPLE SWITCH LIST SYSTEM Arthur Boyd C&P Junction October 2013 From Train Layout to Model Railroad As model railroaders, we make models of the real thing

More information

The first space option is a single outer bay of a three-car garage. This is roughly 10' by 22' (see drawing below).

The first space option is a single outer bay of a three-car garage. This is roughly 10' by 22' (see drawing below). Bay Area SIG Meet Design Challenge 2006 Thanks for being part of our third Design Challenge. We are trying a couple of new wrinkles this year to respond to attendee feedback and hopefully encourage more

More information

FROM FREELANCE TO PROTOTYPE

FROM FREELANCE TO PROTOTYPE FROM FREELANCE TO PROTOTYPE Ways to improve your layout s representation of the prototype without doing a total makeover GAYLORD GILL OCTOBER 2018 1 Model Railroading A Continuum Toylike appeals to the

More information

Layout design element. in N scale. It was time for a new railroad to realize new objectives. By Daryl Kruse//Photos by the author

Layout design element. in N scale. It was time for a new railroad to realize new objectives. By Daryl Kruse//Photos by the author Layout design element Modeling UP s in N scale It was time for a new railroad to realize new objectives By Daryl Kruse//Photos by the author 16 Model Railroad Planning 2013 Geneva Sub 1. In the model and

More information

How I Got My Golden Spike Award. Presented by Jeff Jarr

How I Got My Golden Spike Award. Presented by Jeff Jarr How I Got My Golden Spike Award Presented by Jeff Jarr If you are new to the Achievement Program (AP), we recommend that you take a look at the Golden Spike Award. Although the Golden Spike Award is not

More information

Oroville Track Change Proposal December 21, 2012 Robert Schott

Oroville Track Change Proposal December 21, 2012 Robert Schott Oroville Track Change Proposal December 21, 2012 Robert Schott SMRHS Board of Directors: Please consider this proposal to change the track and industrial configuration at Oroville. I believe this proposal

More information

DOWNLOAD PDF MODEL RAILROADING HANDBOOK

DOWNLOAD PDF MODEL RAILROADING HANDBOOK Chapter 1 : Ho Model Railroading Handbook by Robert Schleicher The Ho Model Railroading Handbook [Robert Schleicher] on blog.quintoapp.com *FREE* shipping on qualifying offers. Introduces model making

More information

GARDEN RR INFRASTRUCTURE PLANNING

GARDEN RR INFRASTRUCTURE PLANNING GARDEN RR INFRASTRUCTURE PLANNING What do you want your RR to do? Industries, towns or simply an operating layout (track and nothing else)? Basic Loop Most common and simplest. Must consider minimum radius.

More information

Denver, Front Range. Designing, scenicking, and operating a double-deck layout

Denver, Front Range. Designing, scenicking, and operating a double-deck layout Denver, Designing, scenicking, and operating a double-deck layout Front Range 54 MODEL RAILROADER 2010 Kalmbach AUGUST Publishing 1999 Co. This material may not be reproduced in any form without permission

More information

How to use card cards to enhance running your Railroad

How to use card cards to enhance running your Railroad How to use card cards to enhance running your Railroad Operations is simulating the day-to-day activities of a real railroad Picking up freight, Assembling trains, Delivering cars to consignees, Sorting

More information

A Quick & Easy Start for Operations. A Clinic for Beginners

A Quick & Easy Start for Operations. A Clinic for Beginners A Quick & Easy Start for Operations A Clinic for Beginners Operations: Meaning and Myths Operation includes: Purposeful movement of rail cars and trains Simulation of some aspects of real railroading Fun

More information

Layout Design for Operations. Steve Davis Tom Vanden Bosch

Layout Design for Operations. Steve Davis Tom Vanden Bosch Layout Design for Operations Steve Davis Tom Vanden Bosch What IS Model RR Operations? OUR Opinion: A model railroad designed for Operations is designed to replicate the look, feel, purpose and tasks of

More information

Card Order Update Training March 2011

Card Order Update Training March 2011 Card Order Update Training March 2011 TOPICS Operations Why, What & How Call Board Yards & Permissions Operating Tips Manifests Interactive Lessons Card Order Basics What are we trying to do? Railroads

More information

Introduction to Model Railroad Operations

Introduction to Model Railroad Operations Introduction to Model Railroad Operations Based on original by: Dave Cochrun & Kathy Sparks Revised by: Marshall Abrams Visit the Abrams Railroad Empire at http://abrams-railroad.potomac-nmra.org/ 1 Welcome!

More information

2020 DISPLAY REGULATIONS

2020 DISPLAY REGULATIONS ATLANTA 2020 DISPLAY REGULATIONS IWF 2020 DISPLAY REGULATIONS Your exhibit booth display must comply with the regulations as outlined here. Please refer to your exhibit space confirmation letter or contract

More information

YARDMASTERS GUIDE. South Central Region

YARDMASTERS GUIDE. South Central Region PRR RDG WM YARDMASTERS GUIDE No. 7 Effective 12:01 AM, EASTERN STANDARD TIME, Wednesday, June 13, 1956 South Central Region FOR THE GOVERNMENT OF EMPLOYEES ONLY Jeffry A. Warner Superintendent Section

More information

IWF Safety Guidelines

IWF Safety Guidelines 2018 The purpose for the display rules and height restrictions is to provide visibility to all exhibitors. At the same time, these regulations should maintain the inherent benefits of differing exhibit

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

Tools and techniques to create an operating scheme

Tools and techniques to create an operating scheme Tools and techniques to create an operating scheme BY DOUG LEE MEMBER OF LAYOUT DESIGN (LDSIG) AND OPERATIONS (OpSIG) SPECIAL INTEREST GROUPS PRESENTED TO CALGARY MODEL RAILWAY SOCIETY OCTOBER 14 2018,

More information

21 STORAGE SYSTEM. From QUALITY BRAND :

21 STORAGE SYSTEM. From QUALITY BRAND : 21 STORAGE SYSTEM Locker File cabinet...1117 1118 Racking Heavy duty racking...1125 1131 Light duty racking... 1122 Medium duty racking...1123 1124 Steel Shelving Steel shelving... 1119 Tool Storage AIDS

More information

Railroading Merit Badge Workbook

Railroading Merit Badge Workbook Merit Badge Workbook This workbook can help you but you still need to read the merit badge pamphlet. This Workbook can help you organize your thoughts as you prepare to meet with your merit badge counselor.

More information

PROJECT IDEA CATALOG. FREE! Take one. Get inspired! 84LUMBER.COM

PROJECT IDEA CATALOG. FREE! Take one. Get inspired! 84LUMBER.COM PROJECT IDEA CATALOG FREE! Take one. Get inspired! 84LUMBER.COM Gambrel Barns These oversized barns maximize your storage space. They re easy to build, using our engineered truss brackets, providing a

More information

M i c h i g a n Accessible Homes

M i c h i g a n Accessible Homes M i c h i g a n Accessible Homes RAMP DESIGN The first and most critical aspect of an accessible home is getting into it. Usually, there are one or more steps up to an entrance, which make getting into

More information

NWP Op Session Orientation

NWP Op Session Orientation NWP Op Session Orientation Welcome to my rendition of the Northwestern Pacific. This layout is the third incarnation of this concept; construction started in 2003 and the beginnings of operation began

More information

Country Club Historic District Architecture Review Committee

Country Club Historic District Architecture Review Committee Country Club Historic District Architecture Review Committee Project: 378 Lafayette St November 8, 018 Dear Landmark Preservation, Our committee would recommend the project @ 378 Lafayette, Rear Addition,

More information

Cape May Point Zoning

Cape May Point Zoning Cape May Point Zoning Review and recommendations. Asher Associates - March 17, 2015 CAPE MAY POINT ZONING 1 Introduction Every town balances the ebb and flow of growth. Too much zoning strangles it, not

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Turnouts and Yard Tracks TM 2.1.8 Prepared by: Signed document on file 21 June 09 George Harris Date Checked by: Signed document on file 15 July 09 Thomas Carroll Date Approved by:

More information

Virtual Railroading. Computer Based Operations Using Railroading Simulators. Rich Blake

Virtual Railroading. Computer Based Operations Using Railroading Simulators. Rich Blake Virtual Railroading Computer Based Operations Using Railroading Simulators Rich Blake slugsmasher@oakharbor.net www.steammachine.com/slugsmasher Overview Track planning methods for OPS Rail simulators

More information

2. Action plan tasks. These tasks are more complicated and cannot be easily completed without good thought and planning. These are some examples:

2. Action plan tasks. These tasks are more complicated and cannot be easily completed without good thought and planning. These are some examples: Tool 4 For Effective Action Plans, GAS IT At the most basic level, a manager s job is to get stuff done. The management part comes into play because a manager must get stuff done by directing the actions

More information

TOO BIG, BORING, OR UGLY. Lane Kendig Lane Kendig, inc.

TOO BIG, BORING, OR UGLY. Lane Kendig Lane Kendig, inc. TOO BIG, BORING, OR UGLY Lane Kendig Lane Kendig, inc. 1950s - Little Boxes 2003 - Big Boxes MAJOR PROBLEMS Monopoly Houses Monotony Too Big House Tear Downs MONOTONY Lack of Interest and Deadening Sameness

More information

MILWAUKEE-STYLE STATION AND TRAIN SHED

MILWAUKEE-STYLE STATION AND TRAIN SHED HO Scale Structure Kit 933-2943 MILWAUKEE-STYLE STATION AND TRAIN SHED Thanks for purchasing this Cornerstone Series kit. All parts are styrene, so use compatible glue and paint. Please read the instructions

More information

PROTOTYPICAL Planogram: StorgeBuild + DeckBoxes Bay Name: StorgeBuild + DeckBoxes 4.4

PROTOTYPICAL Planogram: StorgeBuild + DeckBoxes Bay Name: StorgeBuild + DeckBoxes 4.4 Bay Name: StorgeBuild + DeckBoxes 4.4 1 of 10 1 1 72" from floor to bottom of AV Photo is for reference of POP placement only. Refer to your store specific POG for actual layout. Instructions: [Aisle Violators]

More information

DISPATCHER. Time Table and Train Order Dispatching Lessons Burnt Hills and Big Flats Railroad Employee Training

DISPATCHER. Time Table and Train Order Dispatching Lessons Burnt Hills and Big Flats Railroad Employee Training Time Table and Train Order Dispatching Lessons Burnt Hills and Big Flats Railroad Employee Training Photos by author DISPATCHER Steve Prevette Burnt Hills & Big Flats RR Introduction This presentation

More information

Railway Alignment Design and Geometry

Railway Alignment Design and Geometry Railway Alignment Design and Geometry Pasi Lautala, Michigan Tech University Tyler Dick, HDR, Inc. Topics Horizontal and Vertical geometry Clearances Turnout design Structures and loading 1 REES Module

More information

The IE & W Railway. A short history on the design, construction and reconstruction of a large permanent elevated Gauge One track

The IE & W Railway. A short history on the design, construction and reconstruction of a large permanent elevated Gauge One track The IE & W Railway A short history on the design, construction and reconstruction of a large permanent elevated Gauge One track IE & W Railway Chronology 1 Fall 1993 Route first laid out with garden hose

More information

Design for Operations Lessons from Rocks and Water Steve Prevette Burnt Hills & Big Flats RR

Design for Operations Lessons from Rocks and Water Steve Prevette Burnt Hills & Big Flats RR Design for Operations Lessons from Rocks and Water Steve Prevette Burnt Hills & Big Flats RR Photos by author Intro This is a refinement of a clinic given last year in Atlanta We will look at considerations

More information

RESIDENTIAL STAIRWAYS, HANDRAILS,

RESIDENTIAL STAIRWAYS, HANDRAILS, City Of Austin 500 Fourth Avenue N.E. Austin, Minnesota 55912-3773 Building Department 507-437-9950 Fax 507-437-7101 RESIDENTIAL STAIRWAYS, HANDRAILS, *A Building permit is required for any alteration

More information

11. Smart Storage for building supplies

11. Smart Storage for building supplies Smart Storage for building supplies Builders merchants and large DIY stores selling building supplies offer a challenge in terms of efficient storage that can also be practical in a modern retail environment.

More information

Cluster 2/Module 2 (C2/M2): Introduction to Network Design.

Cluster 2/Module 2 (C2/M2): Introduction to Network Design. 1 Cluster 2/Module 2 (C2/M2): Introduction to Network Design. This presentation is one of the support materials prepared for the capacity building program Building Leaders in Urban Transport Planning (LUTP).

More information

Railroad Surveys, Profiles and Topographic Surveys

Railroad Surveys, Profiles and Topographic Surveys PDHonline Course L108 (2 PDH) Railroad Surveys, Profiles and Topographic Surveys Instructor: Harvey A. Crouch, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax:

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

Fortified For Safer Living

Fortified For Safer Living Fortified For Safer Living Module 5: Windborne Debris and Opening Protection In this module we re going to look at windborne debris. It s one of the issues that comes up in situations with high winds.

More information

MILT-Pro. Built-in units and control centres for halls

MILT-Pro. Built-in units and control centres for halls MILT-Pro Built-in units and control centres for halls Space The MILT-Pro built-in units provide its design solution offer a large range of applications in commercial, manufacturing and warehouse spaces.

More information

Main Floor Plan Scale: 1/8"=1'-0"

Main Floor Plan Scale: 1/8=1'-0 16'-0" 1 6'-6" 1 36'-0" Future Deck 10'-6" 4'-11" 4'-11" 10'-6" 36'-0" Future Deck 1 6'-6" 1 16'-0" 6068 3030 3030 6068 1 20'-9 1/2" 20'-9 1/2" 1 D/W D/W 26'-4" 24'-8" 2'-0" '-4" '-4" '- 1/2" 20'-10 1/2"

More information

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS

ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS ELEVATORS & SERVICE LIFTS FREIGHT HOIST MAST LIFTS FREIGHT HOIST SCISSOR LIFTS ELEVATING DOCK SCISSOR LIFTS DOCK LEVELLERS McGrath Industries Ltd. 2017. All rights reserved. Ed04, CJM. ELEVATORS SERVICE

More information

Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual

Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual Revised January 11, 2011 Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual HK-22no 22 Firebox RR 5 Shawville Québec J0X 2Y0 Voice 819.647.5092 Fax 819.647.6082 email mheat@heatkit.com

More information

Width (2012 IRC SectionR ) Exception: The width of spiral stairways shall be in accordance with the section for spiral stairways.

Width (2012 IRC SectionR ) Exception: The width of spiral stairways shall be in accordance with the section for spiral stairways. City of Republic Community Development Department Stairways Width (2012 IRC SectionR311.7.1) REVISION DATE: JANUARY 2017 Stairways shall not be less than 36 inches in clear width at all points above the

More information

RS-5 District Schedule

RS-5 District Schedule District Schedule 1 Intent The intent of this Schedule is generally to maintain the existing single-family residential character of the District by encouraging new development that is compatible with the

More information

Modern Fire Station kit in HO scale

Modern Fire Station kit in HO scale Modern Fire Station kit in HO scale This kit includes all building parts milled in white styrene plastic, Plastruct brick sheet and clear window glazing. All parts fit together but may need light sanding

More information

How to Construct a Feral Enclosure

How to Construct a Feral Enclosure How to Construct a Feral Enclosure by Bob Breeze For questions and further information: bob.breeze@gmail.com April 2016 Please note, this is a living document. If you need further information or would

More information

311.7 Stairways Width Headroom. Exception: Walkline Stair treads and risers Tread depth.

311.7 Stairways Width Headroom. Exception: Walkline Stair treads and risers Tread depth. 311.7 Stairways. 311.7.1 Width. Stairways shall not be less than 36 inches (914 mm) in clear width at all points above the permitted handrail height and below the required headroom height. Handrails shall

More information

Village of Glencoe 675 Village Court, Glencoe, Illinois

Village of Glencoe 675 Village Court, Glencoe, Illinois Village of Glencoe 675 Village Court, Glencoe, Illinois 60022 847-835-4111 March 1, 2002 June, 2002 Clarifications Added Dear Homeowner, Architect, and Contractor: The attached materials will help you

More information

MODELING THE CEMENT MILLS OF THE BANGOR & PORTLAND BRANCH

MODELING THE CEMENT MILLS OF THE BANGOR & PORTLAND BRANCH MODELING THE CEMENT MILLS OF THE BANGOR & PORTLAND BRANCH Modeling examples of the Portland Cement Mills RPM Valley Forge 2014 By Paul Cappelloni AGENDA Background Portland Cement Process Traffic In and

More information

LEDGESTONE & Ledgestone radius

LEDGESTONE & Ledgestone radius LEDGESTONE & radius FRESTANDING & LANDSCAPE WALL 105 Wall LEDGESTONE WALL A Stone look wall for Landscape and Engineered heights The universal size (4 in. high x 8 in. deep x 12 in. long) and efficient

More information

West Valley Community Design Guidelines & Process Review. November 6, 2015

West Valley Community Design Guidelines & Process Review. November 6, 2015 West Valley Community Design Guidelines & Process Review November 6, 2015 Context Adjacent homes drainage ravine West Valley Homes East Valley Homes willows golf course and housing Site Character West

More information

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller Product Description The Delta Level 1000 is one of our ranges of hinged lip dock levellers. Dock levellers are indispensable for

More information

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,

More information

Upgrading Rail Lines for Higher Speeds

Upgrading Rail Lines for Higher Speeds Upgrading Rail Lines for Higher Speeds Railroad Infrastructure Diagnosis and Prognosis David E. Staplin, PE University of Nevada Las Vegas, October 16, 2018 Upgrading Rail Lines for Higher Speeds A Perspective

More information

Disclaimer for Review of Plans

Disclaimer for Review of Plans Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.

More information

Slave Housing Data Base

Slave Housing Data Base Slave Housing Data Base Building Name: Tuckahoe Plantation, Quarter B Evidence Type: Extant Site ID: Historical Site Name: Tuckahoe Plantation City or Vicinity: County: Goochland State: Virginia UTM: @NW

More information

Container City I & II Trinity Bouy Wharf London England

Container City I & II Trinity Bouy Wharf London England Container City I & II Trinity Bouy Wharf London England Container City I Built in 2001, in 5 months Originally 3 stories providing 12 work studios across 4800 sq. ft. High demand required the addition

More information

SCRATCHBUILDING ROLLING STOCK WITH STYRENE. By Gene Deimling

SCRATCHBUILDING ROLLING STOCK WITH STYRENE. By Gene Deimling SCRATCHBUILDING ROLLING STOCK WITH STYRENE By Gene Deimling GETTING STARTED Documentation Design Sketch Core Construction Boxcars and Reefers Caboose Exterior Surfaces Details Tips on how to add finishing

More information

EXPANDABLE DWELLING SYSTEM FOR CHEAP AND FAST ERECTION AND DISMANTLING

EXPANDABLE DWELLING SYSTEM FOR CHEAP AND FAST ERECTION AND DISMANTLING EXPANDABLE DWELLING SYSTEM FOR CHEAP AND FAST ERECTION AND DISMANTLING Pavel Truksa Summary Our idea consists in providing the simplest possible unfolding structures, in particular for temporary housing.

More information

storage solutions storage solutions ibrary

storage solutions storage solutions ibrary storage solutions storage solutions ibrary RTA RTA Library Library Shelving Shelving Record Record Master Master Case-Style Case-Style Library Library Shelving Shelving Easy-Trak Easy-Trak Mobile Mobile

More information

Floor Plan. *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line.

Floor Plan. *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line. Floor Plan Symbols Floor Plan *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line. *Residential floor plans are generally

More information

Introduction to Model Railroad Operations

Introduction to Model Railroad Operations Introduction to Model Railroad Operations Based on original by: Dave Cochrun & Kathy Sparks Revised by: Marshall Abrams April 2, 2011 1 Welcome! Why Operations? You ve built your empire, what do you do

More information

Laney College Childcare Center Renovation 900 Fallon Street Oakland, CA 94607

Laney College Childcare Center Renovation 900 Fallon Street Oakland, CA 94607 LANEY COLLEGE CHILDCARE CENTER RENOVATION DOCUMENT 00 9113 ADDENDA BID NO. 18-19/09 Peralta Community College District Laney College Childcare Center Renovation 900 Fallon Street Oakland, CA 94607 October

More information

Document G808. Project Data CONSTRUCTION DOCUMENTS DATE IDENTIFICATION DESIGN DEVELOPMENT DATE IDENTIFICATION INITIAL INFORMATION DATE IDENTIFICATION

Document G808. Project Data CONSTRUCTION DOCUMENTS DATE IDENTIFICATION DESIGN DEVELOPMENT DATE IDENTIFICATION INITIAL INFORMATION DATE IDENTIFICATION Document G808 TM 2001 Project Data PROJECT: (Name and address) PROJECT NUMBER: CONTRACTOR: (Name and Address) ARCHITECT: (Name and Address) OWNER S APPROVALS/AGREEMENTS INITIAL INFORMATION DATE IDENTIFICATION

More information

FOLDING ACCESS CONTROL PARTITION (FOLDING BARRIER)

FOLDING ACCESS CONTROL PARTITION (FOLDING BARRIER) FOLDING ACCESS CONTROL PARTITION (FOLDING BARRIER) Folding Access Control Partition s unique free standing design requires no ceiling or floor track and quickly positions in place. Rod Link Straight Pattern

More information

FOLDING CONTAINER HOUSE: AMH-4000 SERIES GENERAL AMH-4120 DIMENSIONS AND WEIGHT PICTURES:

FOLDING CONTAINER HOUSE: AMH-4000 SERIES GENERAL AMH-4120 DIMENSIONS AND WEIGHT PICTURES: FOLDING CONTAINER HOUSE: AMH-4000 SERIES GENERAL 1. The standard container for various purposes is suitable for international container transport. It is of appropriate external dimensions and has connections

More information

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign

More information

Table of Contents. Certificates and approvals Colour palette...52

Table of Contents. Certificates and approvals Colour palette...52 Table of Contents "krono-plan" facade systems...2 1. Introduction...3 2. Facade system...4 3. Gaps and joints between the Kronoplan laminate panels...5 4. Corners...6 5. Visible joints. Aluminium structure

More information

Expanding Your Market

Expanding Your Market U.S. Department of Justice Civil Rights Division Disability Rights Section Expanding Your Market Maintaining Accessible Features in Retail Establishments Introduction More than 50 million Americans with

More information

Americans with Disabilities Act Accessibility Survey

Americans with Disabilities Act Accessibility Survey Americans with Disabilities Act Accessibility Survey Self-Evaluation and Transition Plan Sarpy County Impound Facility 14242 S. 156th St. Springfield, Nebraska 68159 Prepared by Sarpy County Facilities

More information

CaneSIG: Modelling Loco Depots. Qunaba Mill loco shed, c 1968 (above) and the newer shed in the same location, 1975 (below); David Mewes photos.

CaneSIG: Modelling Loco Depots. Qunaba Mill loco shed, c 1968 (above) and the newer shed in the same location, 1975 (below); David Mewes photos. Qunaba Mill loco shed, c 1968 (above) and the newer shed in the same location, 1975 (below); David Mewes photos. Jim Hutchinson & A C Lynn Zelmer Qunaba Mill Loco Sheds 1 1999-2004 Qunaba Mill s Loco Sheds

More information

Construction Procedures

Construction Procedures Construction Procedures 2014 Rev. 1.6 1 Introduction This manual presents the methods and procedures necessary for the proper erection of a LOCK+LOAD retaining wall. problems later during the service life

More information

Appendix B To the Overview of Church-Based Volunteer Host Sites

Appendix B To the Overview of Church-Based Volunteer Host Sites Appendix B To the Overview of Church-Based Volunteer Host Sites Facility Preparation 1 Table of Contents Page Shower Buildings Example 3 Bunk Bed Construction Examples 7 Photo Example of Room Dividers

More information

JORACK. Storage Solutions from Design to Installations.

JORACK. Storage Solutions from Design to Installations. JORACK Storage Solutions from Design to Installations Profile Jorack, the range of Industrial racks from Josts is a perfect storage solution for all types of items, as the design allows the span to be

More information

PROF. PAUL C. KING RA New York City College of Technology. Learning Community. Spring 2011

PROF. PAUL C. KING RA New York City College of Technology. Learning Community. Spring 2011 Phase 3 Stage 2: ADDING THE STAIRS : ATRIUM & 2 EGRESS STAIRS Overview: We will add three stairs to the lab building. One will connect an extension of the second level slab to the atrium space and two

More information

HOW TO BUILD Garden Walls Frestanding & Landscape Walls

HOW TO BUILD Garden Walls Frestanding & Landscape Walls HOW TO BUILD Garden Walls Frestanding & Landscape Walls 10 Cambridge Wall Book Garden walls This layout depicts a common application of landscape and freestanding designs together in one wall with Columns

More information

REN. LONE STAR TREBLE LECTRIC "ELECTRIFIED SERIES" Sold by MONTGOMERY WARD 1962 thru 1964

REN. LONE STAR TREBLE LECTRIC ELECTRIFIED SERIES Sold by MONTGOMERY WARD 1962 thru 1964 Rev December 28, 2018 Yardmaster REN N TRAK arennard@yahoo.com LONE STAR TREBLE - 0 - LECTRIC - 1960 - "ELECTRIFIED SERIES" Sold by MONTGOMERY WARD 1962 thru 1964 LONE STAR TREBLE - 0 - LECTRIC - 1960

More information

You dream it. We build it. ELEVATORS

You dream it. We build it. ELEVATORS You dream it. We build it. ELEVATORS RAM can help you tailor your Crystal Elevator to be a focal point in your home with stunning architectural features or it can be tucked away for seamless and simple

More information

MAGNUMSTONE. Large-Block Retaining Wall System

MAGNUMSTONE. Large-Block Retaining Wall System MAGNUMSTONE Large-Block Retaining Wall System MagnumStone is a wet-cast, large, retaining wall system that was developed with both the engineer and contractor in mind. The 5,000 PSI concrete provides high

More information

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2017 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

SAWMILL TIMBER UK LTD HIGH QUALITY FENCING, SHEDS & DECKING SUPPLIED & FITTED

SAWMILL TIMBER UK LTD HIGH QUALITY FENCING, SHEDS & DECKING SUPPLIED & FITTED SAWMILL TIMBER UK LTD HIGH QUALITY FENCING, SHEDS & DECKING SUPPLIED & FITTED A Good fence makes a good neighbour NOVEMBER 2017 Call: 01924 374953 Freephone: 0808 1553710 Email: office@the-sawmill.co.uk

More information

Priority 2 Access to Goods & Services

Priority 2 Access to Goods & Services Based on the 2010 ADA Standards for Accessible Design Project Building Location Date Surveyors Contact Information The layout of the building should allow people with disabilities to obtain goods and services

More information

DALAL FLAT PACK MODULAR UNITS

DALAL FLAT PACK MODULAR UNITS DALAL FLAT PACK MODULAR UNITS TECHNICAL SPECIFICATIONS MATERIAL Floor Roof Walls Doors Windows Electrical Works Main and Secondary Galvanized steel framing. Marine Plywood with PVC for dry areas and Cement

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory 191-192 Baizid Bostami Road, Nasirabad Industrial Area, Chittagong 24 May 2014 The Alliance for Bangladesh Worker Safety Page 1/13 24 May 2014 Introduction

More information

Values That Matter PLAN CERTIFICATION WORKSHEET

Values That Matter PLAN CERTIFICATION WORKSHEET Values That Matter PLAN CERTIFICATION WORKSHEET Builder Name: Main Floor: sq. ft. Plan Name/Number: Upper Floor: sq. ft. Contact Person: Total: sq. ft. Phone: Email: For any item labeled as (option), you

More information

33 Track & Layout Planning Mistakes to Avoid

33 Track & Layout Planning Mistakes to Avoid 33 Track & Layout Planning Mistakes to Avoid By Robert Anderson FREE TO GIVE AWAY AND SHARE This Special Report is free for you to give away and share. You can email it to friends, give it away on Facebook,

More information

Building the Yardmaster s Office. Mat Thompson

Building the Yardmaster s Office. Mat Thompson Building the Yardmaster s Office Mat Thompson http://ocrrnet.ipage.com Bill s Yard Office Page 56 Details for a Working Yard by Bill Darnaby My Version Some Thoughts Some thoughts about - Modeling without

More information

POWAY STATION ALL SCALE MODEL RAILROAD CLUB a California 501c3 Non-Profit Corporation

POWAY STATION ALL SCALE MODEL RAILROAD CLUB a California 501c3 Non-Profit Corporation ALL SCALE MODEL RAILROAD CLUB a California 501c3 Non-Profit Corporation www.powaystation.org This document describes the steps to be followed to certify that a module complies with the Poway Station MODULE

More information

Dispatch Your Trains! Elements of Train Dispatching, a how to clinic By Steve Breezy Gust and Rick Kang

Dispatch Your Trains! Elements of Train Dispatching, a how to clinic By Steve Breezy Gust and Rick Kang Dispatch Your Trains! Elements of Train Dispatching, a how to clinic By Steve Breezy Gust and Rick Kang Most of us enjoy, appreciate, and strive to model detailed rolling stock, motive power, structures,

More information

ABOUT US THE THAXTERS RANGE

ABOUT US THE THAXTERS RANGE BROCHURE ABOUT US Thaxters of Holt Ltd ceased trading in August 2014 at which time the new company Thaxters Timber and Forestry Ltd was set up to continue the business and to take it forward for the next

More information

Prototype Administration for a Prototype Club: The way it worked then; the way it works now

Prototype Administration for a Prototype Club: The way it worked then; the way it works now Prototype Administration for a Prototype Club: The way it worked then; the way it works now Naomi Jeffery Petersen & James Murrie Sunshine Prototype Rail Seminar October 2008 Naperville, Illinois 2 Our

More information

CCB BROWN BAG December 10, 2015

CCB BROWN BAG December 10, 2015 CCB BROWN BAG December 10, 2015 Designing Library Spaces That Work Preparing a Building Program for Your Library Georgeann Burch & Fred Schlipf Graduate School of Library & Information Science University

More information

Storcoor. Products & Services Brochure WHERE STORAGE NEEDS MEET INNOVATIVE SOLUTIONS

Storcoor. Products & Services Brochure WHERE STORAGE NEEDS MEET INNOVATIVE SOLUTIONS Storcoor Products & Services Brochure WHERE STORAGE NEEDS MEET INNOVATIVE SOLUTIONS Storcoor.COM 2 About Us Storage Coordinators Broomall, PA Headquarters Founded in 1990, Storage Coordinators, Inc. has

More information