1 T-Mobile L 700 CUP Conditional Use Permit Report Date: October 20, 2016 Owner: Lloyd Construction Applicant: Crown Castle Developer: Crown Castle Location: 99 North 600 West Parcel: 00:0005: acres Zone: I-1 Industrial Zone General Plan: Industrial Land Use Authority: Planning Commission Action Type: Administrative Planner: Jamie Baron, Planner Summary Planning Commission Staff Report Thursday, October 27, 2016 The Conditional Use Permit is to allow T-Mobile to update the antennas to an existing nonconforming monopole. Recommendation Staff recommends the Planning Commission approve the Conditional Use Permit as outlined in the Recommendation and Alternatives section of the staff report. Request The application is requesting a Conditional Use Permit approval to upgrade and change the antennas on an existing monopole, including 3 additional antennas. Background On September 27, 2016, the City received an application for CUP for a Telecommunications Facility. The facility is an existing nonconforming monopole. Prior to the current Telecommunications ordinance, the pole was approved.

2 The pole is 100 tall and does not meet the current height or setback regulations. The applicant is requesting the CUP to change out the 6 antennas and add 3 more. The current code does not specify how many antennas can be on a single pole and encourages co-location. Due to the nonconforming status of the pole, a CUP is required, which gives the Planning Commission discretion of waiving the height and setback requirements. Process Section states that a nonconforming monopole may have height and setback requirements waives as a Conditional Use Permit that is approved by the Planning Commission. General Plan Staff Finding: Consistent. The application has come before the Planning Commission for consideration to waive the height and setback requirements. The land use map of the General Plan indicates this site as Industrial. Staff Finding: Consistent. The property is zoned as I-1 Industrial. Code Requirements The following is a summary of the code requirements. For a full analysis, see the attached checklist (Exhibit C). The application Can Comply with the code requirements as follows: Development Standards The existing tower exceeds the maximum height requirements, and does not meet the setback requirements Expansion, Alteration, and Nonconforming Uses The height and setback requirements of the existing pole may be waived by the Planning Commission as a CUP. Recommendation and Alternatives Staff Recommended Option Approval I move to approve the T-Mobile Conditional Use Permit with the Findings and Conditions in the Staff Report: Findings 1. The application complies with the Development Code. 2. The application is consistent with the General Plan.

3 Conditions: 1. All other code requirements shall be met. 2. Any other conditions or changes as articulated by the BODY:. Alternative 1 - Continuance I move to continue the T-Mobile Conditional Use Permit to another meeting, with direction to the applicant and Staff on information and / or changes needed to render a decision, as follows: Alternative 2 Denial I move to deny the T-Mobile Conditional Use Permit with the Findings below: 1. The T-Mobile Conditional Use Permit is not consistent with the General Plan, as articulated by the Planning Commission:, and/or, 2. The T-Mobile Conditional Use Permit is not consistent with Section of the Code, as articulated by the Planning Commission:. Exhibits: A. Map [Page 4] B. Development Images [Pages 5-16] C. Checklist [Pages 17-18]

4 Wasatch County Online Map T-Mobile CUP Location Map Printed: 10/20/2016 Site Wasatch County, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, Feet USGS, AeroGRID, IGN, and the GIS User Community ,200 The boundary lines shown here have been generated for the internal use of Wasatch County and should only be used for general reference purposes. Questions concerning ownership boundary locations should be directed to a title company, attorney, or licensed land surveyor. Wasatch County makes no warranty as to the accuracy or usefulness of this information. The end user of this information assumes all responsibility concerning this information's appropriate use.

5

6

7 DocuSign Envelope ID: 611B C8-A5C B5237

8

9

10

11

12

13

14

15

16 Certificate Of Completion Envelope Id: 611B C8A5C B5237 Status: Completed Subject: SL02600A_825412_Lloyd_Construction_T-Mobile 700 MHz S&S CDs_REV 0_ pdf Source Envelope: Document Pages: 11 Signatures: 11 Envelope Originator: Certificate Pages: 1 Initials: 0 Jordan Stanga AutoNav: Enabled EnvelopeId Stamping: Enabled Canonsburg, PA jordan.stanga@crowncastle.com Time Zone: (UTC-05:00) Eastern Time (US & Canada) IP Address: Record Tracking Status: Original 9/20/ :43:26 AM Holder: Jordan Stanga jordan.stanga@crowncastle.com Location: DocuSign Signer Events Signature Timestamp Andrew Fandozzi andrew.fandozzi@crowncastle.com Senior Project Engineer Crown Castle Security Level: , Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Using IP Address: In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Sent: 9/20/ :44:19 AM Viewed: 9/20/ :51:16 AM Signed: 9/20/ :52:05 AM Notary Events Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/20/ :44:19 AM Certified Delivered Security Checked 9/20/ :51:16 AM Signing Complete Security Checked 9/20/ :52:05 AM Completed Security Checked 9/20/ :52:05 AM

17 Planning Review Checklist Project Name: T-Mobile L 700 CUP Project Type: Conditional Use Permit Date Received: September 27, 2016 Date Reviewed: Planning Commission Date: City Council Date: N/A Owner: Lloyd Construction Applicant: Crown Castle Developer: Crown Castle Location: 99 North 600 West Parcel(s): 00:0005: acres Zone: I-1 Industrial General Plan Designation: Industrial Current Use: Cellular Tower Adjacent Uses: Cellular Tower, DMV, Single Family Residential, Industrial Land Use Authority: Planning Commission Action Type: Administrative Planner: Jamie Baron, Planner Previous Meetings: Previous Approvals: General Review DRC: 10/12/2016: No concerns. Other Departments: Other Requirements: Code Review Telecommunication Facilities Location: The facility is an existing non-conforming tower Uses: Monopole in Industrial Zone Permitted Development Standards: o Monopoles with Platform Maximum Height and Width. The maximum height of the monopole or monopole antenna shall be thirty-five (35) feet. The antennas and antenna mounting structures on the monopole shall not exceed eight 1

18 feet (8') in height or fifteen feet (15') in width. The antenna itself shall not exceed ten feet (10') in height. Can Comply. The pole is existing and is 100 in height and may be permitted as a conditional use permit for a nonconforming use. The tallest antenna is 8 in height Expansion, Alteration, and Nonconforming Uses o As part of the Conditional Use permit approval for modification of an existing monopole, the Planning Commission may waive the height and setback requirements for approved co-location monopoles in existence prior to this ordinance which are located within the I-1 Industrial Zone. Can Comply. The application is before the Planning Commission to allow for antennas to be upgraded while allowing for the pole to remain as is. This would require the planning commission to waive the height and setbacks. 2

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS Section 900 - Intent The intent and purpose of this Article is to establish general guidelines for the sitting of commercial telecommunications

More information

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS The tower permit is based on the following: 1. The architect or engineer, upon request, must submit to the building

More information

BOARD OF ZONING APPEALS CASE SUMMARY FOR VARIANCE REQUEST Huger Street

BOARD OF ZONING APPEALS CASE SUMMARY FOR VARIANCE REQUEST Huger Street BOARD OF ZONING APPEALS CASE SUMMARY FOR VARIANCE REQUEST 1409 Huger Street January 10, 2017 at 10:00 A.M. City Council Chambers, 1737 Main Street, 3 rd Floor Columbia, South Carolina Case Number: Subject

More information

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS: 8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS: SECTION I. INTRODUCTION WHEREAS, the Federal Communications Commission

More information

Ordinance Number AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS

Ordinance Number AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS Tower Ordinance Ordinance Number 12-03 AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS BE IT ORDAINED BY THE CITY COUNCIL OF

More information

WIND ENERGY CONVERSION SYSTEMS APPLICATION

WIND ENERGY CONVERSION SYSTEMS APPLICATION Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 WIND ENERGY CONVERSION SYSTEMS APPLICATION 535.690. Purpose.

More information

ARTICLE XIII. COMMUNICATION TOWERS

ARTICLE XIII. COMMUNICATION TOWERS ARTICLE XIII. COMMUNICATION TOWERS Section 13.1. Purposes. The general purpose of this Section is to regulate the placement, construction, and modification of communication towers, support structures,

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, CA 95814-2671 www. CityofSacramento.org PUBLIC HEARING September 11, 2014 To: Members of the Planning and Design Commission

More information

CHAPTER 43 WIRELESS TELECOMMUNICATIONS TOWERS

CHAPTER 43 WIRELESS TELECOMMUNICATIONS TOWERS WIRELESS TELECOMMUNICATIONS TOWERS 43-1-1 CHAPTER 43 WIRELESS TELECOMMUNICATIONS TOWERS 43-1-1 PURPOSE. The purpose of this Chapter is to establish general guidelines for the siting of wireless communications

More information

HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2

HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2 HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2 Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm

More information

LU Rev. Ord. Supp. 12/03

LU Rev. Ord. Supp. 12/03 55-30 WIRELESS TELECOMMUNICATIONS TOWERS AND ANTENNAS. [Added 7-21-03 by Ord. No. 2003-18] A. Purpose. The purpose of this section is to establish general guidelines for the siting of wireless communications

More information

CONDITIONAL USE PERMITS (CUP):

CONDITIONAL USE PERMITS (CUP): April 2, 2001 Memo To: From: Re: Telecommunication Service Providers David Less, City Planner CITY REQUIREMENTS FOR TELECOM TOWERS AND ANTENNAS Effective March 2001, the City s new telecommunication ordinance

More information

ARTICLE X TRANSMISSION TOWER REGULATIONS

ARTICLE X TRANSMISSION TOWER REGULATIONS ARTICLE X TRANSMISSION TOWER REGULATIONS 10.1 - PURPOSE The purposes of the following regulations are to: facilitate the provision of wireless service facilities and services to the community; minimize

More information

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house): R-1A - ZONING REVIEW WORKSHEET Note: The items below must be reviewed and found in compliance prior to issuance of a zoning permit. Therefore, the appropriate data must be shown on the survey/lot development

More information

LEGIS TIVE IMPLEMENTATION GUIDELINES

LEGIS TIVE IMPLEMENTATION GUIDELINES LEGIS TIVE IMPLEMENTATION GUIDELINES HB 2365 WIRELESS FACILITIES; RIGHTS-OF-WAY GUIDE August, 2017 The HB 2365 Guide, published as a service to the members of the League of Arizona Cities and Towns, does

More information

Administrative Hearing Staff Report. CLEARWIRE XEROX BUILDING CONDITIONAL USE PLNPCM East 500 South Hearing date: November 12, 2009

Administrative Hearing Staff Report. CLEARWIRE XEROX BUILDING CONDITIONAL USE PLNPCM East 500 South Hearing date: November 12, 2009 Administrative Hearing Staff Report CLEARWIRE XEROX BUILDING CONDITIONAL USE PLNPCM2009-01023 675 East 500 South Hearing date: November 12, 2009 Planning Division Department of Community & Economic Development

More information

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY

More information

USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY. Adam Gold Geog 591

USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY. Adam Gold Geog 591 USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY Adam Gold Geog 591 Introduction The Soil and Water Assessment Tool (SWAT) is a hydrologic transport model with an objective to predict

More information

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007: LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates

More information

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 Section 1. Purpose and Intent The purpose of this article is to regulate the placement, construction and modification of small wind energy systems while promoting

More information

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems: CHAPTER 408: RENEWABLE ENERGY SYSTEMS Renewable Energy Systems are accessory uses which include Solar Energy Systems and Wind Energy Systems that provide supplemental energy to residential, nonresidential,

More information

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee: ORDINANCE NO. AN ORDINANCE TO AMEND CHAPTER 300, ZONING ORDINANCE, CITY OF WAUKEE, IOWA, BY AMENDING SECTION 301.8 TO ADD PROVISIONS REGULATING SOLAR ENERGY SYSTEMS BE IT ORDAINED by the City Council of

More information

Property Address: Builder: Phone #: Address:

Property Address: Builder: Phone #:  Address: SEPTIC NEW RESIDENTIAL CONSTRUCTION RESIDENTIAL REMODEL COMMERCIAL REMODEL NEW COMMERCIAL PLAN REVIEW RESPONSE Property Address: Builder: #: Address: REQUIRED DOCUMENTATION FOR SUBMITTALS ORDINANCE SECTION

More information

VILLEURBANNE MASTER ASSOCIATION

VILLEURBANNE MASTER ASSOCIATION VILLEURBANNE MASTER ASSOCIATION Architectural Guidelines and Standards revised: 5/98 TABLE OF CONTENTS Page I. Architectural Guidelines and Standards 1-4 II. Architectural Change Application Form 5-6 III.

More information

SOLAR ENERGY SYSTEMS APPLICATION

SOLAR ENERGY SYSTEMS APPLICATION For reasonable accommodations or alternative formats please contact 311 at 612-673-3000. People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000. TTY users call 612-673-2157

More information

MEMORANDUM. Authority and Restrictions under Proposed O.R.C regarding Small Cell Facilities and Wireless Support Structures in the Public Way

MEMORANDUM. Authority and Restrictions under Proposed O.R.C regarding Small Cell Facilities and Wireless Support Structures in the Public Way MEMORANDUM TO: FROM: Ohio Municipal Corporations Lindsay Miller DATE: January 17, 2018 RE: Authority and Restrictions under Proposed O.R.C. 4939 regarding Small Cell Facilities and Wireless Support Structures

More information

ARTICLE 11.5 STANDARDS FOR TELECOMMUNICATIONS ANTENNAE AND TOWERS

ARTICLE 11.5 STANDARDS FOR TELECOMMUNICATIONS ANTENNAE AND TOWERS ARTICLE 11.5 STANDARDS FOR TELECOMMUNICATIONS ANTENNAE AND TOWERS SECTION 1151. PURPOSES. This ordinance is designed and intended to balance the interests of the residents of the City of Duluth, telecommunications

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

ZONING ADMINISTRATOR AGENDA

ZONING ADMINISTRATOR AGENDA COMMUNITY DEVELOPMENT SERVICES PLANNING SERVICES ZONING ADMINISTRATOR AGENDA May 14, 2014 City Council Chambers 3:00 PM 1. 911 Arguello Street (Crown Castle on behalf of Sprint) Use Permit and Architectural

More information

Cassadaga Wind Project Exhibit 6. Wind Power Facilities

Cassadaga Wind Project Exhibit 6. Wind Power Facilities Case No. 14-F-0490 1001.6 Exhibit 6 Wind Power Facilities WIND POWER FACILITIES (a) Factors Considered During Placement of Wind Turbines (Setback Requirements/Recommendations/Fall-Down Distances) The primary

More information

SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS

SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS Model ordinance for wind energy systems (00228999).DOC NMA 12/20/16; 11/30/15 SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS These regulations have not been reviewed by an attorney.

More information

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES PECO is offering cash incentives for qualified Combined Heat and Power (CHP) technology projects 1 to encourage the development of projects that improve

More information

TELECOMMUNICATION STRUCTURES

TELECOMMUNICATION STRUCTURES Procedure # 0025-P01 Department: Planning and Development Services Effective Date: October 24, 2011 Division: Planning Approval Level: Council Section/Function: N/A Revision #: 1 1.0 PURPOSE 1.1. This

More information

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING # 5 ) UN-74-16 THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: November 9, 2016 Item: UN-74-16 Prepared by: Marc

More information

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES City of Bullhead City Development Services/Public Works Permit Submittal Requirements FENCES Contact Information: Building Division (928) 763-0124 Planning & Zoning Division (928) 763-0123 Engineering

More information

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI 49315 616-878-9155/Fax 616-878-0699 Applicant to complete all items in Section I, II, III, IV, V Note: Separate applications

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan Requirements for Obtaining Building Permits City of Coldwater, Michigan Any owner, owner s builder, architect or agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

DRINKING WATER IMPACT FEE FACILITY PLAN AND IMPACT FEE ANALYSIS (HAL Project No.: 360.07.300) OCTOBER 2017 CITY OF SARATOGA SPRINGS DRINKING WATER IMPACT FEE FACILITY PLAN AND IMPACT FEE ANALYSIS (HAL

More information

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows: SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities

More information

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE ADEM Form 305 8-02 1 July 10, 2002 M E M O R A N D U M TO: FROM: RE: Applicants Seeking a Permit for Solid Waste

More information

A. Provide for the appropriate location and development of antennas and towers within the city;

A. Provide for the appropriate location and development of antennas and towers within the city; Section 1325 - Antennas and Towers 1325.01 Purpose and Intent. In order to accommodate the communication needs of residents and business while protecting the public health, safety and general welfare of

More information

Re-Roof Permit Checklist

Re-Roof Permit Checklist Re-Roof Permit Checklist The following items are required with submission of your building permit application: 2 copies of completed Re-Roof permit application Roof Pressure Sheet completed as applicable

More information

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in

More information

TOWN OF HARRISON TOWER ORDINANCE

TOWN OF HARRISON TOWER ORDINANCE TOWN OF HARRISON TOWER ORDINANCE ENACTED: JUNE 9, 1999 A True Copy ATTEST: Judith E. Colburn, Town Clerk TOWN OF HARRISON Proposed Telecommunications Towers, Antennas and Associated Facilities Ordinance

More information

Last Updated March 15, 2016

Last Updated March 15, 2016 CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 Last Updated March 15, 2016 Information

More information

Definitions. The following words and phrases, when used in this article, shall have the following meanings respectively ascribed to them:

Definitions. The following words and phrases, when used in this article, shall have the following meanings respectively ascribed to them: Section 10.516 Fences (a) Definitions. The following words and phrases, when used in this article, shall have the following meanings respectively ascribed to them: Adjacent owner shall mean any person

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

ORDINANCE NO. _5063. The Board of Supervisors of the County of Santa Cruz ordains as follows: SECTION I

ORDINANCE NO. _5063. The Board of Supervisors of the County of Santa Cruz ordains as follows: SECTION I ORDINANCE NO. _5063 AN ORDINANCE AMENDING SUBDIVISION (d) OF SECTION 13.10.170 AND SECTION 13.10.400, AND ADDING COUNTY CODE SECTIONS 13.10.444, 13.10.445, 13.10.446 AND 13.10.447, ESTABLISHING A PLEASURE

More information

SIGN AREA (SQ. FT.): SIGN DIMENSIONS: STREET FRONTAGE OF PROPERTY (ft):

SIGN AREA (SQ. FT.): SIGN DIMENSIONS: STREET FRONTAGE OF PROPERTY (ft): JOB SITE ADDRESS: CITY OF CHELAN SIGN PERMIT APPLICATION FORM Planning and Community Development P.O. Box 1669, 135 E. Johnson Chelan, WA 98816 (509) 682-8017 Fax: (509) 682-8050 DATE APPLIED: PERMIT NO.:

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

WIND ENERGY CONVERSION SYSTEMS

WIND ENERGY CONVERSION SYSTEMS CHAPTER 159 WIND ENERGY CONVERSION SYSTEMS 159.01 Purpose and Intent 159.05 Location 159.02 Definitions 159.06 Design and Technical Standards 159.03 General Regulations 159.07 Abandonment and Removal Procedure

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

Department of Planning Services Division of Planning Phone: 302/ FAX: 302/

Department of Planning Services Division of Planning Phone: 302/ FAX: 302/ Kent County SARAH E. KEIFER, AICP Director of Planning Services Department of Planning Services Division of Planning Phone: 302/744-2471 FAX: 302/736-2128 STAFF RECOMMENDATION REPORT Application Number

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270) CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY 42141 Phone: (270) 651-3921 Fax: (270) 651-9553 Permit # Filing Date: Total Fee: Property Property Owner: Subdivision: Lot #

More information

DIGITAL BILLBOARD WORKSHOP

DIGITAL BILLBOARD WORKSHOP DIGITAL BILLBOARD WORKSHOP City Council February 25, 2010 Purpose of workshop: 1. Assess the possibility of reducing the existing inventory of billboards while allowing the introduction of digital billboards.

More information

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS OKLAHOMA COUNTY PLANNING COMMISSION 320 ROBERT S. KERR, SUITE 101 OKLAHOMA CITY, OKLAHOMA 73102 RESIDENTIAL BUILDING PERMIT REQUIREMENTS Oklahoma County issues building permits for the unincorporated areas

More information

ARTICLE 70, Use Regulations Controlling Industrial Zones

ARTICLE 70, Use Regulations Controlling Industrial Zones ARTICLE 70, Use Regulations Controlling Industrial Zones Article 70: Industrial Zones 118-700. Industrial Zone No. 1. [Amended effective 12-20-1944; 11-1-1962; 9-25-1981; 12-10- 1982; 9-13-1985; 6-29-1990;

More information

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion

More information

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Victorville Landfill SunEdison Solar Project Public Notice/Application No.: SPL-2014-00689-PKK Project:

More information

OWNER S AFFIDAVIT. I, certify that I am the owner of the property described as: ADDRESS: LOT: BLOCK: SUBDIVISION:

OWNER S AFFIDAVIT. I, certify that I am the owner of the property described as: ADDRESS: LOT: BLOCK: SUBDIVISION: DEVELOPMENT SERVICES DIVISION 3521 NW 43 rd Avenue Lauderdale Lakes, FL 33319 (954) 535-2480 Fax (954) 731-5309 www.lauderdalelakes.org OWNER S AFFIDAVIT ATTENTION: BUILDING OFFICIAL I, certify that I

More information

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY (ADD TO ARTICLE 2) WIND ENERGY DEFINITIONS: Ambient: Ambient is defined as the sound pressure level exceeded ninety (90) percent of the time. Anemometer:

More information

THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following:

THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following: AN ORDINANCE OF THE TOWNSHIP OF LONGSWAMP TOWNSHIP, BERKS COUNTY, PENNSYLVANIA, AMENDING THE TOWNSHIP ZONING ORDINANCE TO ADD ARTICLE VIIA WHICH PROVIDES PROVISIONS FOR THE REGULATION OF SOLAR ENERGY SYSTEMS

More information

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES A deck/patio permit is required for all construction including decks, renovation of existing decks/patio, paver patios, and retaining walls (over 30 inches).

More information

City of Augusta SIDEWALK REPLACEMENT PROGRAM

City of Augusta SIDEWALK REPLACEMENT PROGRAM CONDITIONS 1. This program is designed to replace older public sidewalks in the City. 2. This program will not cover new sidewalks, driveways or sidewalks from the public sidewalk to the dwelling or business.

More information

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official DEVELOPMENT SERVICES PO Box 1110 Tampa, FL 33601-1110 DEVELOPMENT SERVICES DEPARTMENT Date: May 12, 2017 To: From: SUBJECT: Interested Parties John L. Barrios, CBO, Building Official THRESHOLD BUILDINGS

More information

The following materials and documents are required in order for you to obtain a Building Permit:

The following materials and documents are required in order for you to obtain a Building Permit: Imperial Municipal Services 263 Northland Drive Rockford, MI 49341 (616)863-9294 or 1-800-442-2794 Fax: (616)863-9298 E-mail: info@imsinspections.com Algoma Township 10531 Algoma Ave. NE Rockford, MI 49341-7108

More information

Marbella Isles Homeowners Association, Inc.

Marbella Isles Homeowners Association, Inc. REQUEST FOR ARCHITECTURAL REVIEW Please Note: There is a $25.00 non-refundable processing fee for all requests. The application will not be processed if it is not included with application. Make check

More information

SECTION 5 EXCEPTIONS AND MODIFICATIONS

SECTION 5 EXCEPTIONS AND MODIFICATIONS Sec. 5-1 Walls and Fences. SECTION 5 EXCEPTIONS AND MODIFICATIONS All walls and fences shall be erected or constructed in compliance with the provisions of this section. These regulations shall not prohibit

More information

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses:

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses: ARTICLE VI - RESIDENTIAL DISTRICT R-1 6-1 USE REGULATIONS In Residential District R-1, structures to be erected or land to be used shall be for one or more of the following uses: 6-1.1 Single-family dwellings.

More information

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES NON-RESIDENTAL BUILDING PERMIT APPLICATION FORM PART I Location of Property Address, Zoning District, Parcel Number and Lot & Block must be provided on all

More information

SITE DEVELOPMENT PLAN

SITE DEVELOPMENT PLAN SITE DEVELOPMENT PLAN Current Planning Division 410 E. 5th Street Loveland, CO 80537 (970) 962-2523 eplan-planning@cityofloveland.org www.cityofloveland.org/dc Updated 1-15-18 This application is used

More information

Newcastle Wind Energy Ordinance

Newcastle Wind Energy Ordinance Newcastle Wind Energy Ordinance 1.0 Title 2.0 Authority 3.0 Purpose 4.0 Definitions 5.0 Applicability 6.0 Conflict and Severability 7.0 Effective Date 8.0 Classification of Wind Energy Facilities 9.0 Administration

More information

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC PERMIT APPLICATION REQUIREMENTS MANDATORY DOCUMENTS: NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC 1. COMPLETED NEW COMMERCIAL or MULTIFAMILY PERMIT APPLICATION

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Legacy Existing Homes Design Guidelines and Submittal Requirements

Legacy Existing Homes Design Guidelines and Submittal Requirements Owners are required to submit plans for all new site work, landscaping, structures, improvements, and other items placed on a lot or exterior of any existing structure (the Improvements ). New home construction

More information

SECTION 25: RENEWABLE ENERGY ORDINANCE

SECTION 25: RENEWABLE ENERGY ORDINANCE SECTION 25: RENEWABLE ENERGY ORDINANCE This Ordinance is established to regulate the installation and operation of Renewable Energy Systems within Cottonwood County not otherwise subject to siting and

More information

APPLICATION FOR PORCH / DECK PERMIT

APPLICATION FOR PORCH / DECK PERMIT Department of Neighborhood Services and Inspections 625 52nd Street, Room 100, Kenosha, WI 53140 Phone: 262.653.4263, Fax: 262.653.4254 APPLICATION FOR PORCH / DECK PERMIT Permit Fee: $60.00, Zoning Plan

More information

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Fair Oaks / Orange Grove Specific Plan - Limited Commercial District 3, Sub-district "d.

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Fair Oaks / Orange Grove Specific Plan - Limited Commercial District 3, Sub-district d. PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DATE: TO: Hearing Officer SUBJECT: Minor Conditional Use Permit #6401 LOCATION: APPLICANT: ZONING DESIGNATION: GENERAL PLAN DESIGNATION: CASE PLANNER:

More information

City of Kitchener. Telecommunication Tower and Antenna Protocol. October 1, Table of Contents. Site Selection Design & Landscaping

City of Kitchener. Telecommunication Tower and Antenna Protocol. October 1, Table of Contents. Site Selection Design & Landscaping - - 1 - - City of Kitchener Telecommunication Tower and Antenna Protocol October 1, 2010 Table of Contents Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction and Objectives

More information

CHAPTER 6 Supplemental Standards

CHAPTER 6 Supplemental Standards CHAPTER 6 Supplemental Standards 6.00.00 GENERALLY...2 6.01.00 TELECOMMUNICATIONS FACILITIES...2 6.01.01 Generally...2 6.01.02 Collocation of Antennas Required...2 6.01.03 Permissible Locations for Telecommunications

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information

Administrative Hearing Staff Report

Administrative Hearing Staff Report Administrative Hearing Staff Report CenturyLink Utility Boxes 175 N A St Conditional Use PLNPCM2013-00320 Public Right-of-Way at approximately 165-175 North A St Hearing date: July 11, 2013 Planning Division

More information

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING # 17 ) UN-101-14 DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN-101-14 Prepared by: Robert Eastman GENERAL

More information

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) SECTION: 10-28-1: Purpose 10-28-2: Application 10-28-3: Declaration of Conditions 10-28-4: Site Plan Drawing 10-28-5: Compliance with State Building Code

More information

APPLICATION FOR SOLAR PERMIT

APPLICATION FOR SOLAR PERMIT APPLICATION FOR SOLAR PERMIT Permit Application Application Checklist o New York State Unified Solar Permit Application for Roof Mounted Systems 12kW or less. (Includes Electrical Permit Application) o

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Demolition Alteration (requires HRER if over 45

More information

LAND USE INFORMATION SHEET

LAND USE INFORMATION SHEET LAND USE INFORMATION SHEET 1 RE: Utility Facilities including Power Plant Facilities Utility Facility Transmission Lines Utility Service Lines The purpose of this information sheet is to clarify the definitions

More information

Scott Eagle Attack Thermal Imaging Camera

Scott Eagle Attack Thermal Imaging Camera Scott Eagle Attack Thermal Imaging Camera Notice is hereby given that the City of Des Peres is seeking sealed bids from qualified vendors for the purchase of a Scott Eagle Attack Thermal Imaging Camera.

More information

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: DESCRIPTION OF PROJECT: ESTIMATED VALUE: ADDRESS SUBDIVISION BLOCK: LOT: ZONING: PROPERTY INFORMATION

More information

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations

More information

Franklin County Communique to the Planning Board

Franklin County Communique to the Planning Board Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR

More information

Wind Turbine Zoning for CERTs

Wind Turbine Zoning for CERTs Turbine Northwest Energy Workshop August 3rd, 2006 University of Minnesota Crookston Mark Lindquist The Minnesota Project www.mnproject.org The Model Ordinance Project Collaboration of: The Minnesota Project

More information

+AaAAPP. When planning please be aware of utility, walking and riding easements as well as County Ordinances.

+AaAAPP. When planning please be aware of utility, walking and riding easements as well as County Ordinances. +AaAAPP Date Office Rec d Date ARC Rec d Hold Date Approved Date Crooked River Ranch Residential Property Improvement Application The Crooked River Ranch Architectural Committee ( ARC) must review and

More information

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT DATE: NOVEMBER 16, 2016 TO: FROM: BOARD OF ZONING APPEALS KELVIN PARKER, ZONING ADMINISTRATOR SUBJECT: APPEAL OF THE HEARING OFFICERS DECISION:

More information