Engineering Acceptance of Rail Vehicles

Size: px
Start display at page:

Download "Engineering Acceptance of Rail Vehicles"

Transcription

1 Engineering Acceptance of Rail Vehicles Synopsis This document defines, where applicable, a process, known as the Engineering Acceptance process, to confirm that a rail vehicle conforms to the relevant Mandatory Requirements. This document contains requirements that are amended under the Railway Group Standards Code () as a small scale change. Reference to the amended requirements is made in the Issue Record. All other parts of the document are unchanged from the previous issue.. Copyright in the s is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. RSSB Members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group Standards, Rail Safety and Standards Board Limited accepts no responsibility for, and excludes all liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from s may be reproduced. Content approved by: Rolling Stock Standards Committee on 04 September 2009 Authorised by RSSB on 07 October 2009 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2009 Rail Safety and Standards Board Limited

2 This page has been left blank intentionally

3 Page 1 of 43 Contents Section Description Page Part A Issue record 2 Technical Content 2 Responsibilities 2 Compliance 2 Health and safety responsibilities 2 Supply 2 Part B 1 Purpose 3 2 Scope 3 3 Definitions 3 4 The context of Engineering Acceptance in the overall Acceptance Process 4 5 Introduction 5 6 Engineering Acceptance Requirements 5 7 Vehicles Temporarily Withdrawn from Service 11 8 Modifications and Engineering Change 11 9 Limitations Safety performance Responsibilities Process integrity Appeals Provision of information Records 16 Appendices A Rail vehicles in international traffic 18 B Certification of Conformance 19 C Type conformance testing 22 D Engineering Acceptance Certification 24 E Procedure to obtain a Transit Movement (Engineering Acceptance) Certificate 26 F Certificates 27 G Suspension and withdrawal of certification 35 H Requirement for Engineering Acceptance of non-compliant vehicles for limited use on heritage or special service trains 36 I This Appendix not used J Safety examination 38 K Requirements applicable to a CCB 40 L Requirements applicable to a VAB 41 M Vehicle construction 42 References 43 RSSB 1

4 Page 2 of 43 Issue Record Part A This document will be updated when necessary by distribution of a complete replacement. Revisions in the reissued document will be marked by a vertical black line in the right hand margin adjacent to the revision. Issue Date Comments One June 1995 Superseded GM/TT0109 & GM/TT0181 Two October 2000 Supersedes GM/RT2002 and GM/RC2501 This document has not been marked with vertical black lines because of extensive revisions. Three December 2009 Supersedes issue 2 Small scale amendment relates only to the scope of this document, inclusion of Certificate of Engineering Acceptance definition and deletion of the first four paragraphs of section 5. Technical Content The technical content of this document was approved by Rolling Stock Standards Committee on 04 September Responsibilities Compliance Health and Safety Responsibilities Supply [No longer relevant.] This comes into force and is to be complied with from 06 February In issuing this document, RSSB makes no warranties, express or implied, that compliance with all or any documents published by RSSB is sufficient on its own to ensure safe systems of work or operation. Each user is reminded of its own responsibilities to ensure health and safety at work and its individual duties under health and safety legislation. The authoritative version of this document is available at Uncontrolled copies of this document can be obtained from Communications, RSSB, Block 2 Angel Square, 1 Torrens Street, London EC1V 1NY, telephone or enquiries@rssb.co.uk. Other Standards and associated documents can also be viewed at 2 RSSB

5 Page 3 of 43 1 Purpose 2 Scope Part B This document mandates the principles related to Engineering Acceptance of rail vehicles. Engineering Acceptance is used to confirm that a rail vehicle conforms to the relevant Mandatory Requirements of s. The overall scope of s is set out in the Railway Group Standards Code. The requirements of this document apply only when the Engineering Acceptance process, using Vehicle Acceptance Bodies (VAB) and Conformity Certification Bodies (CCB), is used to confirm that a rail vehicle conforms to the relevant mandatory requirements of s. An example of an application of this process is when it is mandated by a duty holder s safety management system, such as the PWRA arrangements managed by Network Rail. Alternative processes for confirming that a rail vehicle conforms to all relevant mandatory standards are permitted, subject to the requirements of Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS), and Railway Interoperability Regulations (2006) (RIR). Where this document refers to route acceptance in accordance with GO/RT3270 it should be read as a reference to the process for assessment of compatibility of rolling stock and infrastructure as set out in GE/RT8270 issue 2 or later. 3 Definitions Certificate of Conformance The formal declaration by a Conformance Certification Body (CCB) that the rail vehicle(s) conforms to the relevant Mandatory Requirements within a specific area of certification, ie, by design, as constructed, or as planned to be maintained. Certificate of Engineering Acceptance The declaration by a Railway Undertaking, or by a Notified Body or a Competent Person employed or contracted by a Railway Undertaking, that a rail vehicle conforms to all of the relevant mandatory standards (including authorised deviations), see GM/RT2453. Class A group of vehicles which have similar design and operating characteristics. Conformance Certification Body (CCB) A body with authority from the Directorate to issue specified Certificates of Conformance for rail vehicles on its behalf. The Directorate The Safety & Standards Directorate of Railtrack. Engineering Acceptance The process whereby conformance of vehicles to the Mandatory Requirements is confirmed and certificated. Engineering Change A change to a rail vehicle, including control software, in the area of design, construction or maintenance which affects conformance to the Mandatory Requirements. Heritage Services Passenger services where the predominant element consists of the re-creation of railway services of a bygone era. RSSB 3

6 Page 4 of 43 Mandatory Requirements The requirements mandated in the s listed in the Trains Section in the current Catalogue of s, including the additional Engineering Acceptance list at the end of that section. Regular Service A normal repetitive service that operates for the routine carriage of passengers and/or goods and which is not classified as heritage or special services. Special Services Services that are specially arranged in connection with particular events or occasions, including charters, excursions, football specials, short-term substitution in the event of non-availability of the normally rostered stock, and emergency use. Statement of Notification A statement by a CCB submitted with the Design Conformance Certificate, identifying critical areas for review under the conformance certification for construction and/or maintenance. Type Conformance Test A test conducted on a vehicle, or part thereof, truly representative of the class, to demonstrate conformance with one or more Mandatory Requirements. Train Operator The duty holder of the Railway Safety Case under which the vehicle concerned will operate on Railtrack Controlled Infrastructure. Vehicle Acceptance Body (VAB) A body with authority from the Directorate to issue Certificates of Engineering Acceptance. 4 The context of Engineering Acceptance in the overall Acceptance Process 4.1 The process leading to operation of a rail vehicle on Railtrack Controlled Infrastructure requires: acceptance of a Railway Safety Case; Route Acceptance (see GO/RT3270); registration of the rail vehicle on the Rolling Stock Library (see GM/RT2453). Engineering Acceptance forms part of the Route Acceptance process. Figure 1 shows these activities in diagrammatic form. 4.2 The acceptance process defined in this document is additional to and separate from the requirements for rail vehicles to be approved by Her Majesty s Railway Inspectorate (HMRI) in accordance with the Railways and Other Transport Systems (Approval of Works, Plant and Equipment) Regulations RSSB

7 Page 5 of 43 5 Introduction [Paragraphs 1, 2, 3 and 4 have been deleted.] This document describes the process required for the issue of a Certificate of Engineering Acceptance. Engineering Acceptance is achieved by a demonstration that the vehicle conforms to the Mandatory Requirements. The confirmation that a rail vehicle conforms to the Mandatory Requirements and the issue of corresponding certificates is carried out by CCBs and VABs who are accredited to perform this work by the Directorate. The process leading to Engineering Acceptance is normally in two stages, as shown in the upper part of Figure 1 and summarised below. Stage 1: Confirmation that the vehicle has been designed to be safe and to interwork safely, that it has been built to that safe design and that the maintenance planned will ensure the vehicle remains safe throughout its operational life. The rail vehicle is checked for conformance to the Mandatory Requirements relating to vehicle design, vehicle construction and maintenance. A separate Certificate of Conformance is issued for each area by a CCB. Stage 2: An independent review of the conformance certification and the evidence supporting the certification is then carried out by a VAB who, when satisfied that appropriate Certificates of Conformance have been issued upon the presentation of adequate supporting evidence, issues a Certificate of Engineering Acceptance to complete the process. For the types of rail vehicle indicated below, simplified processes are defined. a) Road-Rail Vehicles (RRVs). b) Rail Mounted Maintenance Machines (RMMMs). c) Rail vehicles working in international traffic (including RIV vehicles registered in Great Britain and foreign registered, and those subject to Bi-lateral agreements). 6 Engineering Acceptance Requirements 6.1 Vehicles subject to Engineering Acceptance Every rail vehicle to be operated on Railtrack Controlled Infrastructure shall have a valid Certificate of Engineering Acceptance confirming its conformance to the applicable Mandatory Requirements. 6.2 When Engineering Acceptance is required A new Certificate of Engineering Acceptance shall be obtained in each of the following cases. a) A new or uncertificated rail vehicle is to be operated on Railtrack Controlled Infrastructure. A rail vehicle that was registered in the Rolling Stock Library on 31 March 1994 to operate on British Rail controlled infrastructure shall be considered to have received Engineering Acceptance to operate on Railtrack Controlled Infrastructure on that date. b) An engineering change is made to a rail vehicle in an area covered by Mandatory Requirements, whether affecting its degree of conformance or not (see also section 8.1). RSSB 5

8 Page 6 of 43 c) The existing certification for a rail vehicle expires or becomes invalid and the vehicle is required to continue operating. 6.3 Obtaining Engineering Acceptance The design, construction and maintenance arrangements of a rail vehicle shall be demonstrated to a CCB(s) as being appropriate to the safe operation and safe interworking of the vehicle on Railtrack Controlled Infrastructure. The CCB(s), upon satisfactory demonstration of conformance with the Mandatory Requirements, will issue Certificates of Conformance for each appropriate aspect as indicated in section The Certificates of Conformance, together with any requested supporting evidence, shall be submitted to a VAB which, when satisfied that the vehicle conforms and will continue to conform with the Mandatory Requirements, will issue a Certificate of Engineering Acceptance as indicated in section Simplified processes for specific vehicle types For certain types of rail vehicle, where the full two stage process described in section 6.3 would be too complex for the limited risks involved, simplified processes applying within the framework of this document are as follows: a) For RRVs Engineering Acceptance requirements are contained in Railway Group Standard GM/RT1300. b) For RMMMs Engineering Acceptance requirements are contained in Railway Group Standard GM/RT2402. c) For Trains and Light Rail or Metro Vehicles for shared running on Railtrack Controlled Infrastructure Engineering Acceptance requirements are contained in GM/RT2452. d) For all internationally registered rail vehicles (both Great Britain and foreign registered), and working in international traffic, a Certificate of Engineering Acceptance shall be provided in accordance with the alternative process defined in Appendix A of this document. The vehicles shall be regarded as having satisfied the requirements of Engineering Acceptance by the international registration process. It should be noted that plant and machinery, which is mounted on a rail vehicle for its operation, shall be classified as an on-track machine if it meets both the following criteria: It can move or be moved by rail outside a possession; It is rail mounted whether directly, or indirectly using a host vehicle, when operating. Where such a host vehicle is used, the combination of the host vehicle and the plant and machinery shall be subject to Engineering Acceptance as an on-track machine independently of any Engineering Acceptance relevant to the host vehicle when used for other purposes. It is permissible for relevant aspects of the latter certification to be taken into account (for example, brake system performance would not require duplicate evaluation if the mass of the plant and machinery resulted in the host vehicle remaining at its certificated gross laden weight). 6.5 Applicable Mandatory Requirements The vehicle shall conform to the Mandatory Requirements contained in Railway Group Standards which are: a) relevant to the vehicle concerned; b) applicable by virtue of the compliance or implementation clause of the individual document concerned. 6 RSSB

9 Page 7 of Exemption from Mandatory Requirements Exemption from any of the Mandatory Requirements shall be expressly approved and only as detailed in 6.6.1, and Vehicles for regular services For a new or modified vehicle, or a vehicle subject to change of operation, where: a) a change to the is proposed and the vehicle will fully comply with the revised Mandatory Requirements, a Certificate of Non- Compliance (NC) shall be obtained in accordance with GA/RT6001 granting exemption from the current requirement in the interim. b) further development is to be undertaken in order to fully comply with the Mandatory Requirements, a Certificate of Temporary Non-Compliance (TNC) shall be obtained in accordance with GA/RT6004, granting temporary exemption from the current requirement. c) full compliance with Mandatory Requirements is deemed impractical and a permanent NC is required, a Certificate of Derogation (DGN) shall be obtained in accordance with GA/RT6006 granting permanent exemption from the requirement(s). In such cases Certificates of Engineering Acceptance will not be granted until exemption from the Mandatory Requirements has been obtained. The introduction of revised or additional Mandatory Requirements is possible during a build of new vehicles which have already been certificated, and the new vehicles require modification prior to delivery or during commissioning in order to comply with the original contract requirements. In such circumstances exemption from these revised or additional Mandatory Requirements shall only be granted by a derogation, applied for in accordance with section c) above. Exemption will not usually be granted where retrospective compliance with the revised or additional Mandatory Requirements is required. The introduction of revised or additional Mandatory Requirements is possible between the certification of an original build of vehicles and a future build to the original certificated design. Where the future build is within 5 years of the contract for the original build, exemption from these revised or additional Mandatory Requirements shall only be granted by a derogation in accordance with section c) above. Exemption will not usually be granted where retrospective compliance with the revised or additional Mandatory Requirements is required. Derogations granted for the original build shall not transfer to any future build and application shall be specifically made for similar derogations required for the future build. Any future build beyond the 5 year period shall conform to the Mandatory Requirements applicable at the date of certification of the future build Vehicles to be re-introduced for regular services Where it is proposed to re-introduce a non-compliant vehicle into regular service on Railtrack Controlled Infrastructure the following shall apply: a) Where the non-compliant vehicle is of a class that has had continuous registration, exemption from the Mandatory Requirements shall be subject to the vehicle complying with a certificated maintenance plan and undergoing Engineering Acceptance. It shall be demonstrated to the VAB that the design and construction of the vehicle are unchanged from vehicles of the same type in registered operational status. (See GM/RT2453). b) Where the non-compliant vehicle is of a class that has not had continuous registration but previously operated on the former British Rail infrastructure, a derogation shall be obtained in accordance with section c) above, except where the vehicle being introduced is a direct replacement for a withdrawn vehicle. (See GM/RT2453). RSSB 7

10 Page 8 of 43 If the vehicle is of a type first introduced not more than 25 years prior to the proposed date of re-introduction, and also remains within its original design life, granting of such a derogation shall be provisional upon the vehicle undergoing Engineering Acceptance and it being demonstrated to the VAB that the design and construction of the vehicle are unchanged from those of its former operational status, and that it had operated safely in service. If the vehicle is of a type first introduced more than 25 years before the proposed date of re-introduction, or it is outside its original design life, the current Mandatory Requirements shall apply. The safety of its former operation in service shall not be sufficient evidence to support Engineering Acceptance. In either case the vehicle shall comply with Mandatory Requirements that impose retrospective action Vehicles for heritage or special services only Where it is proposed to introduce a non-compliant vehicle to Railtrack Controlled Infrastructure for use on Heritage or special service trains, a derogation shall be obtained, in accordance with section c) above. It is permissible to submit a single request for a derogation covering all areas of NC for the complete vehicle, subject to the request outlining the principal areas of NC. Granting of such a derogation shall be provisional upon the vehicle undergoing Engineering Acceptance, prior to registration, as defined in Appendix H, and subject to the vehicle not exceeding an annual mileage limit of 15,000 miles. The vehicle shall comply with Mandatory Requirements that impose retrospective action. Additional requirements for steam locomotives are contained in GM/RT Certificate types The requirements for obtaining each certificate type are as indicated below Certificates of Conformance Certificates of Conformance provided in accordance with the procedure and the requirements governing their issue described in Appendix B, cover each of the three areas. a) A Certificate of Conformance for Vehicle Design shall confirm the vehicle design has been scrutinised in accordance with the mandatory process and has been found to conform to the relevant Mandatory Requirements. The design scrutiny process, excepting for RRVs and RMMMs (see section 6.8.1), is defined in GM/RT2001. The CCB will specify any type conformance testing it specifically requires to provide evidence in support of its design conformance verification. b) A Certificate of Conformance for Vehicle Construction shall confirm the vehicle has been constructed to the certificated design (including materials, processes, tests, measurements and sources of supply). Certification of conformance of each rail vehicle shall be by: a Certificate of Conformance for Vehicle Construction issued by a CCB in accordance with Appendix M of this document; or a Declaration of Conformity issued by the manufacturer in accordance with the criteria specified in EN when it is qualified to do so by an appropriately approved external authority subject to prior agreement in writing by the Directorate. An equivalent national, international or industry system may be used in place of the EN qualification only if it is accepted in writing by the Directorate. 8 RSSB

11 Page 9 of 43 The Certificate of Conformance shall also confirm that a documented safety examination is carried out prior to release of the vehicle onto Railtrack Controlled Infrastructure (see Appendix J), the scope and content of which shall be confirmed by the CCB as covering critical issues identified under build conformance. c) A Certificate of Conformance for Vehicle Maintenance shall confirm that the maintenance plan for the vehicle has been scrutinised and considered appropriate to ensure the vehicle s continued conformance with the relevant mandatory standards throughout its operational life. The essential maintenance requirements and supporting documentation are defined in: i) GM/RT2004 for all vehicles including those in ii) and iii) below; ii) GM/RT1300 additional requirements for RRVs; iii) GM/RT2402 additional requirements for RMMMs; iv) GM/RT2003 for steam locomotives Certificates of Engineering Acceptance Certificates of Engineering Acceptance are of two types. a) A Certificate of Engineering Acceptance shall confirm the satisfactory completion of the conformance certification referred to in section The procedure for issuing a Certificate of Engineering Acceptance and the requirements governing its issue are described in Appendix D. b) A Transit Movement (Engineering Acceptance) Certificate shall confirm that the current condition of a specific vehicle is safe for it to make a defined movement on Railtrack Controlled Infrastructure. The certificate permits, for example, the required transfer of a non-conforming vehicle for repair or other pre-service attention, and the movement of a non-conforming vehicle of historic interest to a specific location for display. The exceptional circumstances when a Transit Movement (Engineering Acceptance) Certificate may be used, the process for obtaining a certificate and the requirements governing its issue are detailed in Appendix E. 6.8 Certificates Required The following certificates shall be obtained as appropriate Road-rail vehicles and rail mounted maintenance machines a) A Certificate of Conformance for Maintenance; b) A Certificate of Engineering Acceptance. A Certificate of Conformance for Vehicle Design is not required for RRVs or RMMMs. The design is scrutinised by the VAB in accordance with the following standards which identify the process, the essential design requirements and supporting documentation. GM/RT requirements for RRVs. GM/RT requirements for RMMMs Vehicles undergoing Type Conformance testing a) A Certificate of Conformance for Design (conditional); b) A Certificate of Conformance for Construction; c) A Certificate of Engineering Acceptance (conditional) Vehicles in international traffic under RIV regulations a) A Certificate of Engineering Acceptance (marked for international traffic); RSSB 9

12 Page 10 of Non-conforming vehicles re-introduced for regular services (of a continuously registered class) a) A Certificate of Conformance for Maintenance; b) A Certificate of Engineering Acceptance Non-conforming vehicles re-introduced for regular services (not of a continuously registered class) a) A Certificate of Conformance for Design (where re-introduced more than 25 years after first introduction); b) A Certificate of Conformance for Construction (where re-introduced more than 25 years after first introduction); c) A Certificate of Conformance for Maintenance; d) A Certificate of Engineering Acceptance Vehicles for heritage or special services only a) A Certificate of Conformance for Maintenance; b) A Certificate of Engineering Acceptance (maximum validity of 12 months) Vehicles for single-journey only movements a) A Transit Movement (Engineering Acceptance) Certificate (maximum validity of 14 days, except as stated in Appendix E) All other vehicles (including on-track machines) a) A Certificate of Conformance for Design; b) A Certificate of Conformance for Construction; c) A Certificate of Conformance for Maintenance; d) A Certificate of Engineering Acceptance. 6.9 Vehicle coverage by certificates The number of vehicles that may be covered by a single certificate, and the number of similar certificates that may apply to a single vehicle, are as indicated in sections to of this document Certificates of Conformance for Design and Construction a) It shall be permissible for up to ten current Certificates of Conformance for Vehicle Design, or for Vehicle Construction, to exist for a rail vehicle at any given time. Once ten current Certificates exist, any further certification shall incorporate and supersede the previous ten certificates. b) It shall be permissible to obtain Certificates of Conformance for Vehicle Design or Vehicle Construction for an individual rail vehicle or groups of similar rail vehicles (including a fixed formation multiple unit set) subject to the conditions defined in Appendix B, Sections B5 and B Certificates of Conformance for Maintenance a) Only one current Certificate of Conformance for Maintenance shall exist for a given rail vehicle. b) It shall be permissible to obtain a Certificate of Conformance for Maintenance for a class of vehicles, identified by number range Certificates of Engineering Acceptance a) Only one current Certificate of Engineering Acceptance shall exist for a given rail vehicle. 10 RSSB

13 Page 11 of 43 b) It shall be permissible to obtain a Certificate of Engineering Acceptance for an individual rail vehicle or a group of similar rail vehicles (including a fixed formation multiple unit set) subject to the conditions defined in Appendix D, Section D Type Conformance Tests Type Conformance Tests identified by the CCB, as indicated in section a), shall be carried out in accordance with the requirements in Appendix C. Type Conformance Tests fall into the following categories: a) Tests that are not specific to the rail industry and in which the essential knowledge relates to the specialism rather than the application (for example, component life testing); b) Tests that are specific to the rail industry and in which specialist knowledge of the railway environment is essential. Such tests include, but not exclusively: Vehicle ride tests; Track force tests; δq/q tests; Brake tests (parking brake and dynamic tests); Bogie rotation tests; Pantograph sway and pantograph forces tests; Vehicle sway tests. Type Conformance Tests within this category shall only be carried out by suppliers qualified under the principles described in GM/RT2450 as competent and experienced in the carrying out of testing of such components. 7 Vehicles temporarily Withdrawn From Service 8 Modifications and Engineering Change 7.1 Requirements for Certificates of Conformance The Engineering Acceptance certification for vehicles withdrawn from operation for a period not exceeding 12 months shall remain valid only where the Maintenance Plan (see GM/RT2004) provides for alternative maintenance requirements appropriate to the period of its withdrawal and provides for a documented safety examination prior to re-introduction to Railtrack Controlled Infrastructure. 8.1 Requirements for Certificates of Conformance Certificates of Conformance shall be required for modifications to rail vehicles that affect areas forming part of conformance to the Mandatory Requirements. New certificates are still required in the case where the modification or engineering change is considered to improve an already compliant performance relative to the Mandatory Requirement(s), the new certificates providing confirmation that such conformance of the modified vehicle has been demonstrated. 8.2 Vehicles registered on 31 March 1994 In the case of a rail vehicle that was currently registered in the Rolling Stock Library on 31 March 1994 to operate on British Rail controlled infrastructure, any change made subsequent to that date affecting the conformance of the rail vehicle to the Mandatory Requirements shall be subject to the Engineering Acceptance process and duly certificated. 8.3 New components and alternative material Certificates of Conformance shall be required for the introduction of a new component or alternative material within an area affecting conformance if it is not RSSB 11

14 Page 12 of 43 physically a direct replacement for an existing item, or does not perform an identical function, or is not similar in performance or weight to its predecessor. A Certificate of Conformance for Construction is not required in the case of a like-for-like replacement of equivalent or improved specification. 8.4 Collision-damaged vehicles Certificates of Conformance shall be required for collision-damage repaired vehicles if it has been necessary to depart from the previously accepted design of the vehicle, including its structural configuration and materials, in order to achieve the repair. In such circumstances a Certificate of Engineering Acceptance shall be required supported by Certificates of Conformance for Vehicle Design and Vehicle Construction. Where it is considered the repair does not require re-certification, that decision shall be endorsed by a VAB in writing. 8.5 Fleet modifications Appropriate certificates of Conformance and Engineering Acceptance shall be obtained for the modified condition and RSL shall be notified as each vehicle is transferred from the original Engineering Acceptance certificate to the new certificate. The new certificates shall contain the numbers of all vehicles to be modified. Prior to release of each vehicle onto Railtrack Controlled Infrastructure it shall be subject to a documented safety examination (see Appendix J). 9 Limitations 9.1 Compatibility with the infrastructure Limitations on the operability of the vehicle determined by its compatibility with the infrastructure shall be identified, including the swept envelope (see GM/RT2149) and the Route Availability number (see GE/RT8006). It should be noted that the Engineering Acceptance process does not determine whether a vehicle can operate on a particular route, but verifies the determination of the data that is to be provided for consideration under the Route Acceptance process defined in GO/RT Compatibility with the Mandatory Requirements Limitations on the operability of the vehicle determined by engineering considerations with respect to the Mandatory Requirements shall be identified. Such operational scope and limitations of the vehicle shall be defined on the Certificates of Engineering Acceptance and Certificates of Conformance for the vehicle. Such limitations may, for example, limit the maximum speed of the vehicle or its load carrying capacity. Where the imposition of limitations on the use of an otherwise non-conforming rail vehicle is necessary in order to ensure conformance with the Mandatory Requirements, the CCB and VAB shall define those limitations on the relevant certificates. The limitations defined in section 6.6 shall be defined where applicable. All limitations on the Certificates of Conformance, applicable to the rail vehicle, shall be taken into consideration by a VAB. It is permissible for a VAB to impose additional or alternative limitations to ensure conformance to the Mandatory Requirements. 9.3 Conditional certification Where a new rail vehicle is being introduced into operation and the maintenance requirements are under development or can only be developed with in-service experience, it is permissible for the CCB to issue a conditional Certificate of Conformance for Vehicle Maintenance if it is satisfied that appropriate controls are in place to ensure the safety of the rail vehicle. The conditional Certificate of Conformance will have a specified expiry date and the vehicle shall not be operated beyond that date without the issue of a superseding certificate. Where the conformance of a new or modified vehicle with the Mandatory Requirements can only be verified by a type conformance test, it is permissible 12 RSSB

15 Page 13 of 43 to issue Certificates of Conformance for Vehicle Design and Engineering Acceptance with special limitations. Such certificates with limitations will only be issued after completion of a risk analysis, relating to those areas in which conformance has not been demonstrated, undertaken by the VAB in conjunction with the Design CCB and the demonstration to their satisfaction that adequate control measures are in place. The conditional Certificate of Conformance will have a specified expiry date to cover the anticipated period of testing only and the vehicle shall not be operated beyond that date. 10 Safety Performance 10.1 All vehicles Where evidence is received indicating that the continued safety of a vehicle s operation can no longer be relied upon, it shall be permissible for the Directorate to withdraw that vehicle s certification. Except where safety is immediately prejudiced, the operator shall be given notice as required by Appendix G Non-conforming vehicles In the case of non-conforming vehicles, or class of vehicles, registered in the Rolling Stock Library on 31 March 1994 or granted a derogation against the mandatory standards, it shall be permissible for the Directorate to give notice of its intention to permanently withdraw that vehicle s certification as required by Appendix G. Such withdrawal shall only be permissible where the nonconformance increasingly prejudices the ability of the vehicle or class of vehicles, to continue operating safely (see also Appendix G). 11 Responsibilities 11.1 The train operator The responsibilities of the train operator for Engineering Acceptance are as indicated in sections and Certification of Conformance and Engineering Acceptance The train operator, in seeking to obtain Certificates of Conformance for each area of conformance, and a Certificate of Engineering Acceptance, shall be responsible for the following. a) Provision to the CCB and VAB of a listing of the vehicles for which certification is sought. b) Identification to the CCB and VAB of the area(s) of the rail vehicle to be certificated. For an unregistered rail vehicle this shall normally be all the parts of the rail vehicle for which there are Mandatory Requirements. For a rail vehicle subject to an engineering change this shall normally be the area(s) of the rail vehicle which has been subject to, or affected by, the engineering change. c) Provision to the CCB and VAB of details of the design/modification status of the rail vehicle for which certification is sought. d) Provision to the CCB and VAB of such evidence as they consider necessary to assess conformance to the relevant Mandatory Requirements in the area(s) being certificated, including other areas affected. e) Provision to the CCB(s) for Construction and Maintenance, and to the VAB, of all Statements of Notification submitted with the Design Conformance Certificate, identifying critical areas for review under the conformance certification for construction or maintenance (see Appendices B10 and D1). f) Provision to the CCB and VAB of details or copies of all relevant current certification of the rail vehicle under Engineering Acceptance. For rail vehicles that were deemed to meet the requirements of Engineering Acceptance on 31 March 1994, this shall include a declaration with respect to RSSB 13

16 Page 14 of 43 any part of the rail vehicle that has remained unchanged since that date and for which no certification under Engineering Acceptance exists. It is permissible for the train operator to use different CCBs for each area of conformance Maintenance of Certification Records The train operator shall: a) maintain documented records of all Certificates together with any appended limitations and restrictions; b) maintain an effective storage and indexed retrieval system for all Certificates of Conformance and Engineering Acceptance relating to its registered vehicles, whether operational or non-operational. The system shall provide security and protection of the records; c) maintain a register recording the issue of all certificates and any appended limitations and restrictions; d) maintain appropriate records to permit verification of the Engineering Acceptance status of all vehicles it operates on Railtrack Controlled Infrastructure. Where a vehicle is regularly operated by several train operators, each train operator shall retain a copy of the Certificate of Engineering Acceptance, identifying the holder of the original certification and supporting documentation The involvement of third parties in the process Where a train operator has not been identified it is permissible for a competent third party such as a vehicle manufacturer or leasing company to carry out the train operator s responsibilities described in sections and of this document. See also GO/RT3270. Simultaneous discharging of the responsibilities by more than one party shall not be permitted. This is to ensure that modifications which may adversely impact on one another, with respect to the Mandatory Requirements, are not processed simultaneously but in isolation to one another. a) The manufacturer is permitted to carry out the responsibilities until such time as the vehicle ownership is transferred to the purchasing organisation. b) The vehicle owner is permitted to carry out the responsibilities until such time as the operation of the vehicle is licensed to a train operator. c) The train operator is permitted to engage a competent person or organisation to carry out the responsibilities but, in such a case, the accountability shall remain legally vested in the train operator. That single party shall ensure that all CCBs and VABs carrying out certification relative to the vehicle are aware of all work in hand affecting compliance of that vehicle with mandatory standards. CCBs and VABs will only accept certification requests from the appropriate party as indicated in this section (see Appendices B1 b) and D1 b) ) The Directorate The Directorate shall be responsible for. a) administration of the procedure for the Engineering Acceptance and registration of rail vehicles. b) having suitable procedures and arrangements in place to satisfy itself that certification of rail vehicles is being carried out in accordance with the 14 RSSB

17 Page 15 of 43 requirements of this document and shall ensure that the requirements in Appendices K and L are met. c) determining and implementing a process for directing organisations to act as VABs and/or CCBs on its behalf. d) determining and implementing standards of competence to be required of organisations seeking to act as VABs and/or CCBs on its behalf, and of representatives of those organisations who are to act as authorised signatories. e) qualifying and authorising competent organisations and their representatives. f) maintaining a register of qualified VABs and CCBs, and of their authorised signatories. g) making available, to any body reasonably requiring the information, lists of accredited CCBs and VABs. h) auditing the CCBs and VABs to confirm that the process is being applied in a manner that ensures system safety and safe interworking on Railtrack Controlled Infrastructure. Where evidence is obtained that a CCB or VAB has not satisfactorily discharged its responsibilities in respect of the Engineering Acceptance process, the accreditation and work of the organisation shall be reviewed by the Directorate. If considered necessary, the Directorate shall suspend or withdraw the accreditation of the organisation or signatory concerned. Any re-instatement of recognition shall only be granted with the written authority of the Directorate. i) honouring certificates previously issued by a VAB or CCB no longer operating as such, as long as the certificates remain valid. In this situation, the control of the certificate rests with the Directorate. It shall be permissible for the Directorate to employ a Managing Agent to discharge some or all of the duties ascribed to it in this document in connection with the accreditation and auditing of CCBs and VABs. In such circumstances the Directorate shall have processes in place to confirm that those duties are being discharged correctly. The legal accountability remains vested in the Directorate. 12 Process Integrity 12.1 Suspension of Engineering Acceptance In the event that the rail vehicle ceases to conform to the Mandatory Requirements, the train operator shall notify the CCB/VABs issuing the certificate of Engineering Acceptance and the certification shall be withdrawn in accordance with the procedure defined in Appendix G. Where the Directorate or the certificating CCB/VAB becomes aware of the situation independently, the certification shall be withdrawn in accordance with Appendix G. The train operator shall, on request for information, co-operate with a member of the Railway Group, CCB or VAB obtaining evidence indicating that the rail vehicle no longer conforms to the Mandatory Requirements. Where the train operator refuses requests for confirmation of continued conformance, the Directorate shall be notified Certification irregularities If evidence of tampering or misuse of any Certificate of Conformance or Certificate of Engineering Acceptance is obtained or received, the matter shall be immediately reported to the Directorate. RSSB 15

18 Page 16 of Appeals 14 Provision of Information Any party to a dispute regarding the application of the Engineering Acceptance process may appeal to the Directorate For Route Acceptance The train operator shall submit vehicle information to the Rolling Stock Acceptance Board for Route Acceptance in accordance with GO/RT3270. It shall include, but not exclusively, the following: a) Certificate of Engineering Acceptance as defined in this document; b) Certificates of Derogation, Non-Compliance or Temporary Non-Compliance where applicable; c) the Route Availability number as defined in GE/RT8006; d) a swept envelope portfolio as defined in GM/RT Records 15.1 Copies of Certificates Copies of all certificates appropriate to their activities shall be retained by: a) the CCB/VAB; b) the train operator Life of records Sufficient records and documents pertaining to certification of Vehicle Design, Vehicle Construction, Vehicle Maintenance and Engineering Acceptance shall be maintained in confirmation of the vehicle s conformance for a period of 3 years after the end of the operational life of the vehicle on Railtrack Controlled Infrastructure. Other records and documentation, including those on RSL, shall be retained for a period of 3 years after the certification it supports becomes invalid Supporting evidence Where a certificate is superseded by another of similar type, the supporting evidence shall be retained in accordance with section 15.2 of this document. Where one certificate incorporates and supersedes a number of previous certificates, the supporting evidence for the superseded certificates is deemed to become supporting evidence for the superseding certificate. 16 RSSB

19 Page 17 of 43 Figure 1 The role of Engineering Acceptance with Route Acceptance Other Route/ Vehicle Issues Certificates of Conformance Vehicle Vehicle Maintenance Design Construction ORGANISATIONS INVOLVED Certificate of Engineering Acceptance Train Operator or Third Party and Conformance Certification Body Certificate of Technical Acceptance (Optional - see GO/RT3270) Train Operator or Third Party and Vehicle Acceptance Body Certificate of Authority to Operate (see GO/RT3270) Train Operator or Third Party and the infrastructure controller Registration as operational on RSL (see GM/RT2453) Train Operator and the = Engineering Acceptance Activity RSSB 17

20 Page 18 of 43 Appendix A Rail Vehicles In International Traffic A1 Vehicles subject to RIV regulations The engineering risks associated with the use of foreign registered rail vehicles subject to RIV regulations and working in international traffic are controlled by those regulations. For registration in Great Britain of rail vehicles under RIV regulations, the train operator shall have obtained technical approval for the rail vehicle from a UIC member railway. The approval shall be documented and detail all the relevant UIC leaflet s, ERRI reports and RIV regulations against which conformance has been confirmed. All rail vehicles (both Great Britain and foreign registered) compliant with the above shall be regarded as having satisfied the requirements of Engineering Acceptance by this process. This shall be confirmed by a Certificate of Engineering Acceptance boldly marked INTERNATIONAL VEHICLE (RIV) CONFORMING TO UIC REQUIREMENTS issued by a VAB approved by the Directorate for the certification of such vehicles. A2 Vehicles subject to bi-lateral agreements between railway administrations Vehicles that do not comply fully with the requirements of the RIV shall have those elements that do not comply, or that may be affected by that NC, scrutinised in accordance with the relevant Mandatory Requirements before issue of a Certificate of Engineering Acceptance. This shall be confirmed by a Certificate of Engineering Acceptance boldly marked INTERNATIONAL VEHICLE SUBJECT TO BI-LATERAL AGREEMENT issued by a VAB approved by the Directorate for the Certification of such vehicles. The certificate shall give details of which aspects of the vehicle have been assessed against the Mandatory Requirements and which against RIV/UIC requirements A3 Additional requirements The additional requirements to be met before operation on Railtrack Controlled Infrastructure are given in GO/RT3270 and GM/RT2453. A4 Limit of application The above process shall only be applied to vehicles operating in international traffic and shall not be applied to vehicles which, though used on other railway administrations, are to be introduced onto Railtrack Controlled Infrastructure for operation which in itself does not constitute international traffic. 18 RSSB

21 Page 19 of 43 Appendix B Certification of Conformance B1 The CCB, on receipt of an application for conformance certification, shall be responsible for: a) verifying that it is authorised by the Directorate to carry out the certification requested; b) verifying that the application is from an authorised party as defined in section of this document; c) identifying all the relevant Mandatory Requirements, including the document number and issue of ; d) systematically satisfying itself that the rail vehicle, or engineering change to the rail vehicle, conforms to each individual relevant Mandatory Requirement; e) in the case of Certificates of Conformance for Design, agreeing a test specification, including pass/fail criteria, for those aspects of the design in which conformance with the Mandatory Requirements can only be demonstrated by testing, and verifying that the vehicle s conformance has been demonstrated; f) in the case of Certificates of Conformance for Construction, obtaining evidence that an appropriate and documented safety examination is to be carried out on each vehicle prior to its release onto Railtrack Controlled Infrastructure; g) in the case of Certificates of Conformance for Maintenance, obtaining evidence that an appropriate safety examination exists, to be carried out after maintenance attention and prior to release onto Railtrack Controlled Infrastructure, within the Maintenance Plan; h) issuing a Certificate of Conformance bearing a statement of the scope and Mandatory Requirements against which conformance has been demonstrated. B2 On the Certificate of Conformance, the CCB shall: a) define, where a permits conformance to one or more of several optional criteria (for example, meets one particular braking requirement), the particular criteria for which conformance has been demonstrated; b) identify operational limitations necessary to maintain conformance with the Mandatory Requirements, sequentially numbering each individual limitation; c) list all subsidiary certificates of exemption applicable to the rail vehicle and obtained as indicated in Section 6.6. B3 Prior to carrying out the appropriate scrutiny for a certificate of conformance, the CCB shall: a) identify and assess the areas of risk within the scope of the certification; b) determine the scope and depth of the scrutiny of the design, construction or Maintenance Plan appropriate to the assessed risk; c) produce a log, recording in summary the decision chain. RSSB 19

Traincrew Access to and Egress from Railway Vehicles

Traincrew Access to and Egress from Railway Vehicles Traincrew Access to and Egress from Synopsis This document mandates requirements for traincrew access to and egress from railway vehicles. This document contains requirements that are amended under the

More information

Reporting High Risk Defects

Reporting High Risk Defects Railway Industry Standard RIS-8250-RST Issue One Date December 2016 Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects

More information

Testing Railway Safety Critical Workers for Drugs and Alcohol

Testing Railway Safety Critical Workers for Drugs and Alcohol Document ceases to be in force and is superseded by Railway Group Standard Critical Workers for Drugs Synopsis This document mandates common requirements for drug and alcohol testing of staff carrying

More information

Reporting High Risk Defects

Reporting High Risk Defects Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects on rail vehicles, their components, systems, subsystems and related

More information

Qualification of Suppliers of Safety Critical Engineering Products and Services

Qualification of Suppliers of Safety Critical Engineering Products and Services Rail Industry Standard RIS-2450-RST Date December 2016 Qualification of Suppliers of Safety Critical Engineering Synopsis This document sets out requirements for the qualification of suppliers of safety

More information

Steam Locomotive Operation

Steam Locomotive Operation Rail Industry Standard RIS-3440-TOM Issue One Date December 2016 Steam Locomotive Operation Synopsis This document sets out risk control measures to manage the operation of steam locomotives on GB mainline

More information

Transitions Between Signalling Systems

Transitions Between Signalling Systems Rail Industry Standard RIS-0036-CCS Issue One Date December 2016 ` Transitions Between Signalling Systems Synopsis This standard sets out the requirements for managing the transition between running lines

More information

Defective On-Train Equipment. Defective On-Train Equipment. Railway Group Standard. GO/RT3437 Issue. Eight Date December 2015

Defective On-Train Equipment. Defective On-Train Equipment. Railway Group Standard. GO/RT3437 Issue. Eight Date December 2015 Railway Group Standard RIS-3437-TOM Iss 1 with effect from 04/03/2017 Synopsis This document mandates the requirements relating to the production of contingency plans, which have to be applied when on-train

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

Rail Industry Standard for High Visibility Clothing

Rail Industry Standard for High Visibility Clothing Rail Industry Standard RIS-3279-TOM Issue One Date December 2016 Rail Industry Standard for High Visibility Clothing Synopsis This document sets out the minimum requirements for high visibility clothing.

More information

Infrastructure Based Train Detection Systems

Infrastructure Based Train Detection Systems Infrastructure Based Train Detection Synopsis This document sets out requirements and guidance on infrastructure based train detection systems. Copyright in the Railway Group documents is owned by Rail

More information

RIS RIS-2700-RST. Rail Industry Standard for Verification of Conformity of Engineering. Change to Rail Vehicles. Rail Industry Standard

RIS RIS-2700-RST. Rail Industry Standard for Verification of Conformity of Engineering. Change to Rail Vehicles. Rail Industry Standard RIS This document contains one or more pages which contain colour Published by: Copyright 2016 Rail Safety and Standards Board Limited RIS-2700-RST Engineering Change to Rail Vehicles Issue One: March

More information

Structural. requirements for windscreens and. windows on railway vehicles

Structural. requirements for windscreens and. windows on railway vehicles To be superseded by GMRT2100 Iss 4 published on Railway 04/12/2010 Group Standard Structural requirements for windscreens and windows on railway vehicles Synopsis This document prescribes the loading cases

More information

RIS RIS-1800-ENE. Rail Industry Standard for Network and Depot Interface Management Isolation Documentation. Rail Industry Standard

RIS RIS-1800-ENE. Rail Industry Standard for Network and Depot Interface Management Isolation Documentation. Rail Industry Standard RIS This document is a voluntary standard, produced by at the request of the industry. Duty holders may choose to mandate it through internal instructions/procedures or contract conditions. Published by

More information

Vehicle Registration, Marking and Numbering

Vehicle Registration, Marking and Numbering Vehicle Registration, Marking and Synopsis This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network. Copyright

More information

Rail Vehicle Maintenance

Rail Vehicle Maintenance Rail Vehicle Maintenance Synopsis This document sets out the arrangements by which continued conformity to standards, known as the Maintenance Plan, is achieved together with the requirements for the provision

More information

Weekly Operating Notice, Periodical Operating Notice and the Sectional Appendix

Weekly Operating Notice, Periodical Operating Notice and the Sectional Appendix Rail Industry Standard RIS-3215-TOM Issue One Date December 2016 Weekly Operating Notice, Periodical Operating Notice and the Synopsis This document sets out the arrangements for the production of information

More information

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8645 Issue One: June 2014 Rail Industry Guidance Note Issue record Issue

More information

Qualification of Suppliers of Safety Critical Engineering Products and Services

Qualification of Suppliers of Safety Critical Engineering Products and Services Qualification of Suppliers of Safety Critical Engineering Products and Services Signatures removed from electronic version Submitted by George Clayton Nominated Responsible Manager Approved by Colin Boocock

More information

Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles

Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles Air Quality and Lighting Environment for Traincrew Inside Railway Vehicles Signatures removed from electronic version Submitted by... D. Boocock Nominated Responsible Manager Approved by... C.P. Boocock

More information

Terminal Tracks - Managing the Risk

Terminal Tracks - Managing the Risk Railway Group Standard Terminal Tracks - Managing the Risk Synopsis This standard defines the arrangements to be provided on terminal tracks to arrest a train and protect people, stations and structures

More information

Bridge Strikes from Road Vehicles or Waterborne Vessels

Bridge Strikes from Road Vehicles or Waterborne Vessels Railway Group Standard Bridge Strikes from Road Vehicles or Waterborne Vessels Synopsis This document mandates requirements for the management of the risks to the operational railway from road vehicles

More information

ERTMS/ETCS National Values

ERTMS/ETCS National Values ERTMS/ETCS National Values Synopsis This document mandates requirements for a process to determine or revise a set of values of ERTMS/ETCS National Values. Copyright in the s is owned by Rail Safety and

More information

Registration, Identification and Data to be Displayed on Rail Vehicles

Registration, Identification and Data to be Displayed on Rail Vehicles Registration, Identification and Data to be Displayed on Rail Vehicles Synopsis This document mandates the requirements for the identification of rail vehicles, the requirements for the registration of

More information

Uncontrolled When Printed Superseded by GEGN8573 Iss 4 on 05/03/2016

Uncontrolled When Printed Superseded by GEGN8573 Iss 4 on 05/03/2016 GN This document contains guidance that is amended under the Railway Group Standards Code (Issue Three) as a small scale change. Reference to the amended section is made in the Issue record. All other

More information

ATOC. Approved Code of Practice Transfer of Safety Performance Information Train Driving. Withdrawn Document. Association of Train Operating Companies

ATOC. Approved Code of Practice Transfer of Safety Performance Information Train Driving. Withdrawn Document. Association of Train Operating Companies Uncontrolled When Printed Approved Code of Practice /APCOP001 Date: 18 th January 2000 Association of Train Operating Companies Approved Code of Practice Transfer of Safety Performance Information Train

More information

ATOC. Approved Code of Practice Approvals process for GSM-R Cab Mobile Fitment. Issue 2-8 th November Uncontrolled When Printed

ATOC. Approved Code of Practice Approvals process for GSM-R Cab Mobile Fitment. Issue 2-8 th November Uncontrolled When Printed ATOC ATOC Approved Code of Practice ACOP/EC/01009 Association of Train Operating Companies Issue 2-8 th November 2010 Approved Code of Practice Approvals process for GSM-R Cab Mobile Fitment Synopsis To

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

Principles of the Railway Industry Supplier Qualification Scheme

Principles of the Railway Industry Supplier Qualification Scheme RISQS/001 Issue 1.2 Date: December 2015 Principles of the Railway Industry Supplier Qualification Scheme Copyright 2013 Rail Safety and Standards Board Limited. This document is subject to copyright protection.

More information

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION 1. Introduction We, Network Rail Infrastructure Limited ( Network Rail ), object to the above Bill being promoted by Strathclyde Passenger Transport

More information

Technical Requirements for Axle Counters

Technical Requirements for Axle Counters Technical Requirements for Axle Counters Synopsis This document mandates the technical requirements for the design of train detection systems using axle counters. Signatures removed from electronic version

More information

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION, Regulation (EC) No 1071/2009 of the European Parliament and of the Council of 21 October 2009 establishing common rules concerning the conditions to be complied with to pursue the occupation of road transport

More information

Working of Passenger Trains over Non- Passenger Lines

Working of Passenger Trains over Non- Passenger Lines Working of Passenger Trains over Non- Submitted by... Roger Merryweather Nominated Responsible Manager Approved by... Michael Harwood Chairman, Operations Standards Subject Committee Authorised by... Ken

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2001L0018 EN 21.03.2008 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B DIRECTIVE 2001/18/EC OF THE EUROPEAN PARLIAMENT

More information

Control, Safe Use and Operation of Plant and Equipment

Control, Safe Use and Operation of Plant and Equipment Date: DEC 93 Control, Safe Use and Operation of Plant and British Railways Board British Railways Board Page 1 of 5 Part A Synopsis A procedural standard outlining the framework of managerial responsibilities

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government

More information

ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators

ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators Uncontrolled When Printed ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators Submitted by --------------------------------------------------------- Gary Cooper Director,

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

GENERAL TERMS AND CONDITIONS FOR USING THE JUVENTUS eprocurement PORTAL

GENERAL TERMS AND CONDITIONS FOR USING THE JUVENTUS eprocurement PORTAL GENERAL TERMS AND CONDITIONS FOR USING THE JUVENTUS eprocurement PORTAL 1 INTRODUCTION JUVENTUS Football Club S.p.A. (hereinafter "JUVENTUS") is data controller of JUVENTUS eprocurement, an e-business

More information

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast)

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast) 02012L0034 EN 24.12.2016 001.001 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL EXPLANATORY NOTES INTRODUCTION 1. As required under Rule 9.3.2A of the Parliament s Standing Orders, these Explanatory Notes are published to accompany the

More information

Licensee Design Authority Capability

Licensee Design Authority Capability Title of document ONR GUIDE Licensee Design Authority Capability Document Type: Unique Document ID and Revision No: Nuclear Safety Technical Assessment Guide NS-TAST-GD-079 Revision 3 Date Issued: April

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

Axle Counters : Code of Practice for Resetting and Restoration to Service

Axle Counters : Code of Practice for Resetting and Restoration to Service Axle Counters : for Resetting and Restoration to Service Synopsis This gives the best practice requirements for the resetting and restoration to service of axle counters, in support of Railway Group Standard

More information

DAIMLER GROUP NORTH AMERICAN COMPANIES

DAIMLER GROUP NORTH AMERICAN COMPANIES DAIMLER GROUP NORTH AMERICAN COMPANIES General Purchasing Conditions for IT Part G Lease of Standard Software 1 Subject Matter / Scope of Performance 1.1 General The terms and conditions of this Part G

More information

This electronic edition is licensed to for 1 copy. International Maritime Organization

This electronic edition is licensed to for 1 copy. International Maritime Organization This electronic edition is licensed to 0309317 for 1 copy. International Maritime Organization ISM Code INTERNATIONAL SAFETY MANAGEMENT CODE and guidelines on implementation of the ISM Code 2010 Edition

More information

COMMUNICATIONS WITH THE INTERNATIONAL BUREAU

COMMUNICATIONS WITH THE INTERNATIONAL BUREAU GUIDE TO THE INTERNATIONAL REGISTRATION OF MARKS B.I. 1 PART B PROCEDURE CHAPTER I: GENERAL INTRODUCTION This Chapter is concerned with procedural matters which are of interest both to applicants and holders

More information

Certification Processes for NDT Operatives, Equipment & Facilities Used for Inspecting Rail Vehicles

Certification Processes for NDT Operatives, Equipment & Facilities Used for Inspecting Rail Vehicles Page 1 of 37 Certification Processes for NDT Operatives, Equipment & Facilities Used for Inspecting Rail Vehicles Signatures removed from electronic version Submitted by... G A Clayton Nominated Responsible

More information

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22.

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22. STATUTORY INSTRUMENTS SUPPLEMENT No. 13 5th May, 2017 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government.

More information

Use of Simulation in Railway Vehicle Acceptance Procedures

Use of Simulation in Railway Vehicle Acceptance Procedures Use of Simulation in Railway Vehicle Acceptance Procedures Javier Pérez & Paul Allen Bjorn Van Uem November 2004 Introduction Tests required for vehicle acceptance are expensive, complex and time consuming

More information

Maritime Rules Part 19: Maritime Transport Operator Certification and Responsibilities

Maritime Rules Part 19: Maritime Transport Operator Certification and Responsibilities Maritime Rules Part 19: Maritime Transport Operator Certification and Responsibilities ISBN 978-0-478-39031-5 Published by Maritime New Zealand, PO Box 25620, Wellington 6146, New Zealand Maritime New

More information

Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0

Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0 Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/010 Copyright 2011 Rail Safety

More information

Auditing of Swedish Enterprises and Organisations

Auditing of Swedish Enterprises and Organisations Auditing of Swedish Enterprises and Organisations March 1st 2018 version 2018:1 1 General Application 1.1 These General Terms govern the relationship between the auditor ( the Auditor ) and the client

More information

ILAC Mutual Recognition Arrangement: Policy and Management ILAC-P4:06/2017

ILAC Mutual Recognition Arrangement: Policy and Management ILAC-P4:06/2017 ILAC Mutual Recognition Arrangement: Policy and Manag ement ILAC-P4:06/ /2017 ILAC International Laboratory Accreditation Cooperation ILAC is the international authority on laboratory, inspection body,

More information

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0 ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT Version 3.0 II Copyright notice 2016 ISCC System GmbH This ISCC document is protected by copyright. It is freely available from the ISCC website or upon

More information

WHS Change Management

WHS Change Management Page 1 of 6 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons in the mission / ministry

More information

Guidance on Gauging. Withdrawn Document Uncontrolled When Printed. Signatures removed from electronic version

Guidance on Gauging. Withdrawn Document Uncontrolled When Printed. Signatures removed from electronic version Railway Group Guidance Note Guidance on Gauging Synopsis This Guidance Note forms a compendium of knowledge and advice relating to all aspects of gauging. Signatures removed from electronic version Submitted

More information

ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment

ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment December 2012 1. 1 2. Second edition published by the Office of Rail Regulation, December 2012 This guidance

More information

Technical Requirements for Dispatch of Trains from Platforms

Technical Requirements for Dispatch of Trains from Platforms Railway Group Standard Technical Requirements for Dispatch of Trains from Platforms Synopsis This document mandates the minimum technical requirements for the facilities used in dispatching trains from

More information

Fleet Operator Recognition Scheme standards

Fleet Operator Recognition Scheme standards Fleet Operator Recognition Scheme standards Version 3.2 9 April 2015 Page ii Contents 1 Introduction 1 1.1 What is the Fleet Operator Recognition Scheme? 1 1.2 Terminology 1 1.3 Scheme administrator 2

More information

Materials and Qualification Procedures for Ships

Materials and Qualification Procedures for Ships Materials and Qualification Procedures for Ships Approval Procedure for Laboratories Engaged in Testing of Coating Systems in Accordance with IACS Z17 and IMO MSC.215(82) and/or IMO MSC.288(87). Revision

More information

TruckSafe Operator Business Rules and Code of Conduct

TruckSafe Operator Business Rules and Code of Conduct Operator Business Rules and Code of Conduct Contents 1.0 Business Rules and Code of Conduct 3 2.0 Decision Making Bodies 4-6 3.0 Purpose 6 4.0 How the Rules will be amended 6 5.0 Introduction 6 6.0 Entry

More information

Conditions of Award. Royal Society Funding Schemes

Conditions of Award. Royal Society Funding Schemes Conditions of Award Royal Society Funding Schemes These Conditions of Award set out the standard terms and conditions for all Royal Society Awards. The Conditions of Award should be read in conjunction

More information

IACS. Recommendation 74 A GUIDE TO MANAGING MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS OF THE ISM CODE. (April 2001) (Rev.

IACS. Recommendation 74 A GUIDE TO MANAGING MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS OF THE ISM CODE. (April 2001) (Rev. IACS Recommendation A GUIDE TO MANAGING MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS OF THE ISM CODE (April 2001) (Rev.1, May 2008) IACS A GUIDE TO MANAGING MAINTENANCE April 2001/Rev.1 2008 IACS -

More information

Basic ALO knowledge Briefing. RRV Safety Improvement Programme

Basic ALO knowledge Briefing. RRV Safety Improvement Programme Basic ALO knowledge Briefing RRV Safety Improvement Programme 1 Disclaimer In issuing this document for its stated purpose, the RRV Safety Improvement Programme & Network Rail makes no warranties, express

More information

Guidance Document. RMP Template for Farm Dairies Export Eligible Milk. 11 December 2015

Guidance Document. RMP Template for Farm Dairies Export Eligible Milk. 11 December 2015 Guidance Document RMP Template for Farm Dairies Export Eligible Milk 11 December 2015 A guidance document issued by the Ministry for Primary Industries Title Guidance Document: RMP Template for Farm Dairies

More information

Intermaritime Certification Services (ICS) QUALITY MANAGEMENT SYSTEM INSTRUCTIVE FOR ISM-CODE

Intermaritime Certification Services (ICS) QUALITY MANAGEMENT SYSTEM INSTRUCTIVE FOR ISM-CODE 1.0 TITLE: 2.0 OBJECTIVES This Instructive reflect, as applicable, the IMO Resolution A.1022 (26) "Guidelines on the Implementation of the ISM-Code by Administrations" and the IMO Resolution A.741 (18)

More information

REGULATIONS FOR PRODUCT/SERVICE CERTIFICATION

REGULATIONS FOR PRODUCT/SERVICE CERTIFICATION CONTENTS 1. PURPOSE AND SCOPE 2. REQUIREMENTS FOR CERTIFICATION 3. GENERAL PRINCIPLES AND GUARANTEES FOR THE CLIENT 4. STATUTORY AND REGULATORY REQUIREMENTS AND LEGALITY CONTROL LIMITS 5. CERTIFICATION

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

THE SUPPLY OF MACHINERY (SAFETY) REGULATIONS 2008

THE SUPPLY OF MACHINERY (SAFETY) REGULATIONS 2008 THE SUPPLY OF MACHINERY (SAFETY) REGULATIONS 2008 GUIDELINES ON THE APPOINTMENT OF UK NOTIFIED BODIES TO UNDERTAKE INSPECTION AND CERTIFICATION FOR THE PURPOSES OF THE CONFORMITY ASSESSMENT PROCEDURES

More information

INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM

INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM KINGDOM OF SAUDI ARABIA INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM COMPREHENSIVE PROCEDURES and GUIDELINES INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM COMPREHENSIVE PROCEDURES AND GUIDELINES November

More information

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road Response to a Bridge Strike at a Bridge carrying the Railway over a Road A Protocol for Highway and Road Managers, Emergency Services and Bridge Owners NR/GPG/CIV/008 3 rd March 2009 Note This protocol

More information

RULES FOR THE ISSUE OF CERTIFICATION OF SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS, FOOD AND FEED, TECHNICAL/CHEMICAL AND BIOENERGY APPLICATIONS

RULES FOR THE ISSUE OF CERTIFICATION OF SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS, FOOD AND FEED, TECHNICAL/CHEMICAL AND BIOENERGY APPLICATIONS RULES FOR THE ISSUE OF CERTIFICATION OF SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS, FOOD AND FEED, TECHNICAL/CHEMICAL AND BIOENERGY APPLICATIONS In force as from 08/09/2015 RINA Services S.p.A. Via Corsica,

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review

More information

Management of Safety Related Control, Command and Signalling System Failures

Management of Safety Related Control, Command and Signalling System Failures Rail Industry Standard RIS-0707-CCS Issue One Date September 2016 Management of Safety Related Control, Command and Signalling System Failures Synopsis This standard sets out requirements for sharing information

More information

RAIL SAFETY AND STANDARDS BOARD

RAIL SAFETY AND STANDARDS BOARD RAIL SAFETY AND STANDARDS BOARD Railway Group Standard WORKING MANUAL FOR RAIL STAFF FREIGHT OPERATIONS Working Manual for Rail Staff Freight Train Operations Page i Railway Group Standard Issue Two Date

More information

TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY

TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY D7-24 5-2004 FOREWORD This Part of SASO s Technical Directives is Adopted

More information

Guidelines. Approval of rolling stock

Guidelines. Approval of rolling stock BUNDESAMT FÜR VERKEHR OFFICE FÉDÉRAL DES TRANSPORTS UFFICIO FEDERALE DEI TRASPORTI FEDERAL OFFICE OF TRANSPORT Guidelines Articles 6a, 7 and 8 of the Ordinance on the Construction and Operation of Railways

More information

TÜV SÜD BABT Production Quality Certification Scheme

TÜV SÜD BABT Production Quality Certification Scheme TÜV SÜD BABT Production Quality Certification Scheme The Production Quality Certification Scheme for Manufacturers A Certification Body of Copyright TÜV SÜD BABT 2014 Page 1 of 38 CONTENTS Page AMENDMENT

More information

Conditions of Award. Royal Society Newton International Fellowships funded under the Newton Fund

Conditions of Award. Royal Society Newton International Fellowships funded under the Newton Fund Conditions of Award Royal Society Newton International Fellowships funded under the Newton Fund These Conditions of Award set out the standard terms and conditions for all Royal Society Newton International

More information

Appendix B Maintenance Control Manual Template

Appendix B Maintenance Control Manual Template Appendix B Maintenance Control Manual Template MAINTENANCE CONTROL MANUAL TELATE OTAR PART 39 SUBPART E OPTION ONE AND TWO The purpose of this Maintenance Control Manual (MCM) Guidance Document is to assist

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 9.11.2013 Official Journal of the European Union L 299/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 1116/2013 of 6 November 2013 amending Regulation (EU) No 185/2010

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

This part of the Works Information sets out the obligations of the Contractor with regards to:

This part of the Works Information sets out the obligations of the Contractor with regards to: Works Information Volume 2B Part 13 Assurance, Records and Certification Part 13 Assurance, Records and Certification 13.1 Introduction The Contractor self-certifies the quality of the works. This part

More information

CHAPER 4 CUSTOMS PROCEDURES AND TRADE FACILITATION

CHAPER 4 CUSTOMS PROCEDURES AND TRADE FACILITATION CHAPER 4 CUSTOMS PROCEDURES AND TRADE FACILITATION Article 4.1 : Scope and Objectives 1. This Chapter shall apply, in accordance with the Parties respective international obligations and customs law, to

More information

Total Support for SAP HANA Appliances

Total Support for SAP HANA Appliances Statement of Work for Services 1. Scope of Work Total Support for SAP HANA Appliances IBM will provide the services specified in this Statement of Work: "IBM Total Solution Support for SAP In- Memory Appliances

More information

SAI Global Full Service Team

SAI Global Full Service Team General information regarding elements of the certification process is described below. A degree of flexibility and options in the certification process are available so please feel free to contact us

More information

FRAMEWORK BORDER-CROSSING AGREEMENT

FRAMEWORK BORDER-CROSSING AGREEMENT ANNEX 4: FRAMEWORK BORDER-CROSSING AGREEMENT Framework Agreement between the Government of the Republic of XXX and the Government of the Republic of XXX on Border Dispatching for Rail Transport The Government

More information

Guideline for Bridge Safety Management February 2012

Guideline for Bridge Safety Management February 2012 Guideline for Bridge Safety Management February 2012 Table of Contents Foreword Part A General 0.1 Definitions 0.2 Scope 0.3 Application 0.4 Responsibility Part B Bridge Safety Assurance 1.1 Scope 1.2

More information

CIM Uniform Rules Concerning the Contract of International Carriage of Goods by Rail (CIM - Appendix B to the Convention)

CIM Uniform Rules Concerning the Contract of International Carriage of Goods by Rail (CIM - Appendix B to the Convention) CIM Uniform Rules Concerning the Contract of International Carriage of Goods by Rail (CIM - Appendix B to the Convention) Title I General Provisions Article 1 Scope 1 These Uniform Rules shall apply to

More information

COUNCIL DIRECTIVE of 15 July 1991 concerning the placing of plant protection products on the market (91/414/EEC) (OJ L 230, , p.

COUNCIL DIRECTIVE of 15 July 1991 concerning the placing of plant protection products on the market (91/414/EEC) (OJ L 230, , p. 1991L0414 EN 01.02.2007 016.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL DIRECTIVE of 15 July 1991 concerning

More information

Contaminated Land - Managing the Risk

Contaminated Land - Managing the Risk Contaminated Land - Managing the Risk Signatures removed from electronic version Submitted by... Peter Wigley Nominated Responsible Manager Approved by... Tom Stevenson Chairman, Civil Engineering Subject

More information

Operating Requirements Manual 11 October 2015 Version 1

Operating Requirements Manual 11 October 2015 Version 1 Operating Requirements Manual 11 October 2015 Version 1 Contents 1 Introduction 1 2 Interface Risk Management 2 2.1 Interface Risk Assessment 2 2.2 Interface Risk Management Plan 4 2.3 Provision of Assistance

More information

EMVCo Type Approval. Terminal ESD Evaluation Administrative Process. Version 2.3. July 2014

EMVCo Type Approval. Terminal ESD Evaluation Administrative Process. Version 2.3. July 2014 EMVCo Type Approval Terminal ESD Evaluation Administrative Process Version 2.3 July 2014 Page 1 Legal Notice This document summarizes EMVCo s present plans for type approval testing services and policies

More information

Official Journal of the European Communities COUNCIL DIRECTIVE 1999/36/EC. of 29 April on transportable pressure equipment

Official Journal of the European Communities COUNCIL DIRECTIVE 1999/36/EC. of 29 April on transportable pressure equipment L 138/20 1.6.1999 COUNCIL DIRECTIVE 1999/36/EC of 29 April 1999 on transportable pressure equipment THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty establishing the European Community, and

More information

Level 3 Certificate for Traffic Office ( )

Level 3 Certificate for Traffic Office ( ) Level 3 Certificate for Traffic Office (3438-02) Qualification handbook 501/2233/2 www.cityandguilds.com May 2011 Version 1.2 (July 2011) About City & Guilds As the UK s leading vocational education organisation,

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements 1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality

More information

Certificate of Acceptance

Certificate of Acceptance Class II FSP Switchgear Assembly (Type: FSP01 and FSP02) Product Description Product Image Class II FSP Switchgear Assembly (Type: FSP02) for 650V Signalling Power Supplies. Scope of Acceptance Full acceptance

More information