1 Presentation to DLA Worldwide Energy Conference April 2017 Overview of EPA s Facility Response Plan Rule J. Troy Swackhammer U.S. EPA, Office of Emergency Management

2 Presentation Overview I. Introduction Overview of FRP statute and regulation Hazard Evaluation/Vulnerability Analysis II. FRP Training and Exercise Requirements III. Implementing a GIUE IV. Evaluating GIUE Performance 2

3 Oil Pollution Act of 1990 and Clean Water Act Section 311(j)(5) of CWA, amended by OPA 1990 A Facility Response Plan shall: (i) be consistent with the requirements of the National Contingency Plan and Area Contingency Plans; (ii) identify the qualified individual having full authority to implement removal actions, and require immediate communications between that individual and the appropriate Federal official and the persons providing personnel and equipment pursuant to clause (iii); 3

4 Oil Pollution Act of 1990 and Clean Water Act (continued) (iii) identify, and ensure by contract or other means approved by the President the availability of, private personnel and equipment necessary to remove to the maximum extent practicable a worst case discharge (including a discharge resulting from fire or explosion), and to mitigate or prevent a substantial threat of such a discharge; (iv) describe the training, equipment testing, periodic unannounced drills, and response actions of persons on the vessel or at the facility, to be carried out under the plan to ensure the safety of the vessel or facility and to mitigate or prevent the discharge, or the substantial threat of a discharge; (v) be updated periodically; and (vi) be resubmitted for approval of each significant change. 4

5 National Spill Of National Significance (SONS) Exercise Regional Spill Contingency Planning Framework Area Exercise National Contingency Plan National Response Team 16 Federal Agencies Area Contingency Plans Regional Response Team Federal agencies, State and Local government Local / Facility Area 1 Area 2 Facility Exercise Area Sub-Areas Facility Response Plans Facility owner/operator Spill response contractors Facility 1 Facility 2 Facility 5

6 Number of FRP Facilities by EPA Region ,689 Current Count : 4,585 FRP Plan holders 6

7 Regulatory History July 1, 1994: Final Rule published in the Federal Register; plans due Aug. 30, 1994 October 20, 1997: EPA denies a petition to amend the FRP rule for animal fats and vegetable oils (AFVOs) June 30, 2000: EPA promulgates a Final Rule amending FRP requirements for facilities that handle, store or transport AFVOs; plans due July 31, 2000 Establishes different factors calculating on-water and onshore recovery capabilities for worst case discharge of AFVOs 7

8 EPA s FRP Regulation 40 CFR part 112, Sections and , Appendices C - F Requirements to prepare plans to respond to worst-case discharge of oil Substantial harm criteria include [112.20(f)(1)]: 42,000 gallons or more in oil storage capacity and transfers oil over water to/from vessel 1 million gallons or greater in oil storage capacity, and Inadequate secondary containment; or Could impact fish and wildlife or sensitive environment; or Could shut down a public drinking water intake; or Experienced reportable discharge of 10,000 gallons or more in last 5 years Other factors as determined by Regional Administrator EPA must approve the plans for significant and substantial harm facilities. 8

9 FRP-Specific Appendices C Substantial Harm Criteria Applicability criteria flowchart (Attachment C-I) Template for certification form (Attachment C-II) Procedures for calculation of planning distance (including oil transport on moving water, still water or tidal waters, and overland transport) D Worst Case Discharge Planning Volume Onshore storage or production facilities with single or multiple tanks E Required Response Resources for FRPs Consideration given for oil group (petroleum, AFVOs, etc.) and operating environment (rivers and canals, inland, Great Lakes, oceans) F Model Facility Specific Response Plan 9

10 Substantial Harm Criteria: EPA RA Determination Owner/operator applied self-identification criteria improperly Owner/operator applied self-identification criteria properly, but RA still believes the facility poses the risk of substantial harm based on criteria in (f)(2): Type of transfer operation Oil storage capacity Lack of secondary containment Proximity to fish and wildlife and sensitive environments and other areas determined by the RA to possess ecological value Proximity to drinking water intakes Spill history Other site-specific characteristics and environmental factors that the RA determines to be relevant (f)(2) 10

11 Relevant FRP Content Emergency Response Action Plan (ERAP) Facility Information Information about Emergency Response Hazard Evaluation Response Planning Levels (including WCD calculation) 6. Discharge Detection Systems 7. Plan Implementation 8. Self-Inspection, Drills/Exercises, and Response Training 9. Diagrams 10.Security Systems 11.Response Plan Cover Sheet 11

12 Hazard Identification Develop schematic drawing Label using numbers from the tank and surface impoundment (SI) forms Identical to schematic drawing in SPCC plan Describe facility operations Loading/unloading of transportation vehicles (trucks, railroad cars, vessels, etc.) Activities such as scheduled venting, piping repair or valve maintenance, repair or replacement Material involved in transfer operations Secondary containment volume associated with bulk storage containers and transfer points Normal daily throughput and impacts of (h)(4) changes in throughput Appendix F, Sec

13 Vulnerability Analysis Addresses the potential effects of an oil spill (to human health, property, or the environment) Using planning distance, identify the following areas within the trajectory of a discharge and discuss the vulnerability of each: - Water intakes - Endangered flora & fauna - School & medical facilities - Transportation routes - Residential areas & businesses - Utilities - Wetlands & other sensitive environments - Fish & wildlife areas - Lakes and streams - Recreational parks (e.g. public parks) - Other areas of economic importance (h)(4) Appendix F, Sec

14 Example Planning Distance What resources could be affected? Facility 14

15 FRP Spill Response Planning Levels Planning scenario Oil volume Small 2,100 gallons or less Medium Greater than 2,100 gallons but less than or equal to 36,000 gallons or 10 percent of largest tank at facility, whichever is less Worst Case Calculated based on type of facility, number of containers, whether secondary containment is adequate, and capacity of largest aboveground storage tank (AST). Often the capacity of the largest AST. 15

16 Scenario Description For each scenario, address factors that affect response efforts, including: Spill volume Material discharged Location of discharged material Direction of spill pathway Proximity to wells, waterways, drinking water intakes, fish and wildlife, and sensitive environments Weather or aquatic conditions Likelihood that the discharge will travel offsite Probability of a chain reaction of failures Available remediation equipment Circumstances and contributing factors (e.g. loading/unloading, facility maintenance, facility piping, pumping stations and pumps, bulk storage containers, vehicle refueling, age and condition of facility and components) 16

17 Response Planning Levels WCD Calculation (continued) Onshore Storage Facilities with Multiple Tanks If all aboveground storage If all ASTs have inadequate tanks (ASTs) have adequate secondary containment: secondary containment: WCD = capacity of largest AST WCD = total capacity of all ASTs If one or more AST(s) without adequate secondary containment: WCD = total capacity of all ASTs without adequate secondary containment + capacity of largest AST within adequate secondary containment Note: permanently manifolded tanks are calculated as one AST [Appendix D, Part A.2] 17

18 Response Planning Levels WCD Calculation (continued) Onshore Storage Facilities with Multiple Tanks and Groups of Oil If a facility handles, stores, or transports oil from different oil groups, the facility must calculate the worst case discharge for each oil group separately, unless the oil group constitutes < 10% by volume. [Appendix E, Part 7] 18

19 Response Planning Levels Example Onshore Facility-Adequate Secondary Containment and WCD (continued) What are the small, medium and worst case discharge planning volumes for this hypothetical facility? Oil Group Total Storage Capacity (gallons) % of Total Facility Storage Capacity, 12,160,000 gallons 1 (gasoline/kerosene) 6,205, (diesel/heating oil) 4,205, (lube oil) 1,000, , (boiler fuel) The facility must calculate the worst case discharge for each oil group separately, unless the oil group constitutes < 10% by volume. 19

20 Diagrams Site plan diagram Drainage diagram Evacuation plan Diagrams showing locations of tanks, drums, OFE (electrical), surface impoundments, plus secondary containment systems (location and capacities [follow SPCC plan] (h)(9) Appendix F, Sec

21 Diagrams Site Plan Diagram includes and identifies: Entire facility to scale ASTs, USTs, drum storage areas, process buildings, transfer areas, and electrical equipment containing oil Contents and capacities of bulk oil storage tanks, drum storage sites, and surface impoundments Secondary containment systems, locations and capacities Hazardous material storage sites (including materials stored and capacity Locations of communication equipment and emergency response equipment The interface between EPA regulated facilities and the portion regulated by other agencies (for complexes only) 21

22 Presentation Overview I. Introduction II. FRP Training and Exercise Requirements FRP content relevant to exercise and drill Spill response planning levels and scenarios Revised PREP guidelines III. Implementing a GIUE IV. Evaluating GIUE Performance 22

23 Relevant FRP Content Emergency Response Action Plan (ERAP) Facility Information Information about Emergency Response Hazard Evaluation Response Planning Levels Discharge Detection Systems Plan Implementation Self-Inspection, Drills/Exercises, and Response Training 9. Diagrams 10.Security Systems 11.Response Plan Cover Sheet 23

24 FRP Training and Exercise Requirements Requirements for training and program of drills/exercises Training ( (b)) Train personnel involved in oil spill response activities Recommendation that training program be based on USCG s Training Elements for Oil Spill Response Alternative program is acceptable, subject to approval by the Regional Administrator Facility Response Drills/Exercises ( (c)) Develop a program of drills/exercises, including evaluation procedures Program that follows National Preparedness for Response Exercise Program (PREP) will satisfy the requirement Alternative program is acceptable, subject to approval by the Regional Administrator 24

25 FRP Training and Exercise Requirements (continued) Purpose of Exercise: Demonstrate timely, properly conducted response that follows the FRP with adequate equipment for a small discharge. Exercise Type: Plan holder Exercises: Initiated by facility owner/operator External Exercises: Government-initiated (e.g., GIUE) and area exercises 25

26 Self-Inspection, Drills/Exercises, and Response Training Use the National Preparedness and Response Exercise Program (PREP) guidelines or equivalent Combination of internal and external exercises Range of exercises covering all aspects of the FRP over a 3-year cycle Satisfies all OPA-mandated Federal Oil Pollution Response Exercise Requirements All alternative programs must be approved by the Regional Administrator prior to implementation Facility receives credit for Area or Facility-specific exercises for actual response to a spill if: Plan was utilized for response PREP objectives were met The response was properly evaluated, documented, and self-certified 26

27 2016 National Preparedness for Response Exercise Program (PREP) Guidelines Revised PREP guidelines became available April 11, 2016 in a USCG FRN (81 FR 21362). Guidelines became effective June 10, PREP was developed to establish a workable exercise program that meets the intent of section 4202(a) of the Oil Pollution Act of 1990 (OPA 90). PREP provides a mechanism for compliance with rule-related exercise requirements. See EPA link at: 27

28 PREP Guidelines Revisions by EPA Added OSRO familiarization training recommendation to Section 2. Added flexibility on the lengths of containment boom and alternatives to booming systems for inland plan holders in Section 2. Alternatives include underflow dams, temporary containment dams, weirs and culvert plugs. No substantive changes made to EPA s Section 4. 28

29 2016 PREP Guidelines OSRO Familiarization Training OSRO Involvement in Equipment Deployment Exercises Plan holders are encouraged to conduct familiarization training with each OSRO cited in the response plan to provide information such as equipment launching locations, tides and currents of the local area, and any other logistical problems or information specific to the particular area. This familiarization training may include a walk-through or actual equipment deployment as appropriate, such that each OSRO can be made aware of any logistical problems related to equipment deployment. It is the plan holder's responsibility to ensure that the OSRO has 29 completed response exercise requirements.

30 2016 PREP Guidelines Booming Systems Oil Response Systems Section 4. Booming Systems. Booming systems include protective and containment boom not exercised as part of a skimming or ISB system described above; 1,000 feet (or total amount of boom listed in plan, whichever is less, particularly for inland plan holders located near small water bodies) of each protective or containment boom system or alternative system listed in the plan and relied on by the plan holder in meeting response equipment capability requirements should be deployed. 30

31 2016 PREP Guidelines Alternatives to Booming Systems Section 4. Booming Systems (cont d) h. Alternative systems, particularly for inland plan holders, may include the following: i. Temporary dams ii. Underflow dams iii. Weirs iv. Inflatable diaphragms for drainage culverts These alternative systems may be used by the plan holder in the initial response to an oil discharge in conjunction with booming systems, which may be used further downstream 31 in the planning distance.

32 2016 PREP Guidelines Alternatives to Booming Systems Government-Initiated Unannounced Exercises Non-Transportation-Related Facilities Regulated by the EPA Performance metrics to think about for FRP development: Arrival of containment boom and/or alternative systems as specified in the FRP within one hour of detection of the discharge and subsequent successful deployment. For alternative systems using temporary dams or underflow dams, simulated installation of these systems according to the FRP is expected to be performed for a successful GIUE. For plans using both containment boom and alternative systems, successful boom deployment and simulated installation of the alternative systems is expected for a successful GIUE. 32

33 PREP Exercise Components Element Frequency* Initiating Authority Notes QI Notification Exercises Quarterly Facility owner At least one exercise conducted during or operator non-business hours. Emergency Procedures Exercises Quarterly Facility owner Optional: can be used by facilities as an or operator unannounced exercise. Incident Management Team Tabletop Exercise Annually Facility owner At least one exercise every 3 years must or operator involve a worst-case discharge scenario. Equipment Deployment Exercises GovernmentInitiated Unannounced Exercises Semiannually Facility owner or operator (Annual for OSROdependent) Triennially EPA, USCG If OSRO-owned equipment is identified in the Plan, the OSRO equipment must also be deployed and operated. OSRO must provide documentation to facility owner or operator, if OSRO dependent. If successfully completed, the facility can only be subject to a GIUE once every 3 years. * At least one exercise per year must be unannounced. 33

34 Response Capability: Small Discharge Appendix E, Section 3.3: The response resources shall, as appropriate, include: Equipment Capacity Timeline Citation Containment Boom* 1,000 feet or Twice the length of the largest vessel that regularly conducts oil transfers to or from the facility (whichever is greater) Means of deploying within 1 hour of the discovery of an oil discharge Appendix E, Section Oil Recovery Devices Effective daily recovery capacity equal to the amount of oil discharged in a small discharge or greater Available at the facility within 2 hours of the discovery of an oil discharge Appendix E, Section Oil Storage Capacity Daily storage capacity equivalent to twice the effective daily recovery capacity, unless the owner/operator can show that a lower capacity is adequate Available at the facility Appendix E, Section 12.2 * Other means of containment may be appropriate for inland facility (see next slide) 34

35 Containment Boom Alternatives Tie-in to Appendix E, Section 3.3.1, As Appropriate For example: Alternative strategy may be more appropriate for inland facilities, where spill pathway could be a dry drainage pathway or small stream Alternatives include: Underflow dams Temporary containment dams (soil, etc.) Inflatable diaphragms, culvert plugs 35

36 Presentation Overview I. Introduction II. FRP Training and Exercise Requirements III. FRP Inspections and GIUEs FRP Inspections Preparing for GIUE During the GIUE IV. Evaluating GIUE Performance 36

37 FRP-related Inspection Activities QI Interview Evaluate overall knowledge of the person(s) identified as QI or key personnel in the Plan and who would be charged with directing/performing response actions. Field inspection Verify the implementation of the preparedness measures described in the FRP. Government-Initiated Unannounced Exercise Verify that facility is able to activate its plan and respond to a simulated discharge incident. 37

38 QI Interview Verify that QI understands responsibilities and is the person responsible for implementing the facility s FRP. Discussion topics, regarding the handling of a worst-case discharge: Discharge discovery and assessment Notifications and mitigation measures Temporary storage of recovered product and contaminated materials Treatment and disposal of contaminated materials Roles and responsibilities of response team and other facility or contractor employees Incident command and control Training, exercise, and evaluation 38

39 Field Inspection Hazard evaluation and vulnerability analysis Are assumptions reasonable given facility conditions? Review discharge history, areas where discharges could occur, anticipated spill pathway (e.g., storm drains) Are there vulnerable sites not considered in the plan (e.g., water intakes, residential or recreational areas, wetlands)? Worst-case discharge scenario and planned response actions Are assumptions regarding volume and failure mode reasonable? Confirm tankage and secondary containment Have there been changes in the facility characteristics not reflected in the current version of the Plan? 39

40 Field Inspection (continued) Spill response equipment Type and amount available at the facility? Adequate quantities? Readily accessible? In working condition? Contract with Oil Spill Removal Organization? Is it current? Discharge detection equipment and procedures Review logs and records of equipment inspection, assess employee knowledge of required procedures Security measures Implementation of emergency cut-offs, fencing, locking of valves, and lighting, as required under the SPCC rule. 40

41 Presentation Overview I. Introduction II. FRP Training and Exercise Requirements III. Implementing a GIUE IV. Evaluating GIUE Performance 41

42 Authority for Conducting Drills/Exercises Oil Pollution Act of (j)(6)(A): Equipment Inspections 311(j)(7): Tests of Facility Removal Capability Exercises improve preparedness; practice makes perfect 42

43 Initiating the GIUE Inform the QI that you are at the facility to conduct an unannounced exercise Provide GIUE drill letter, if used Certain regions send letters in advance to all regional facilities, some do not provide letters Go over exercise guidelines with QI Start the exercise clock Discharge has just been discovered Oil has already reached water Overall exercise duration is up to 4 hours 43

44 During the GIUE Evaluate command post and response activities Intervene only for issues of health or safety Examples: personal flotation devices, imminent harm to personnel or third party Only QI should modify scenario exercised when site conditions are inconsistent with scenario described in the Plan Example: new construction which changes path of a waterway QI should identify a probable scenario and exercise that specific scenario 44

45 Evaluating GIUE Performance PREP Evaluation Factors: Conducting proper notifications Arrival of containment boom as specified in the FRP within one hour of detection of the discharge and subsequent successful deployment ( boom in the water ); Arrival of oil recovery devices as specified in the approved response plan within two hours of detection of the discharge and the subsequent successful operation/simulated recovery; Demonstrating the availability of adequate storage capacity for recovered oil; and Properly conducting the exercise considering the size of a small discharge including skill and competency of responders and material readiness of response equipment. 45

46 Evaluating GIUE Performance (continued) Debrief with QI/facility personnel and OSROs. Consequences of pass/fail A facility that successfully completes a GIUE cannot be subject to another GIUE for 3 years Failure of a GIUE may require the planholder to participate in additional unannounced exercises, revise the existing response plan, or both. In the event of GIUE failure, the Region may choose to perform further inspection of the facility. In certain instances, EPA may revoke approval of FRP on the basis of GIUE performance until changes are made. Based on failure of a GIUE, the FRP coordinator may recommend to upgrade the facility to a significant and substantial harm facility. Follow-up Verify implementation of recommended improvements. 46

47 GIUE Problem Areas Reminder: Goal is to observe how a facility implements their FRP; we are evaluating their performance against their FRP. Examples of GIUE failure field observations: Contractor identified in the Plan did not arrive at the facility during the duration of the exercise. Facility personnel or OSRO were unable to deploy a containment boom due to access issues, inappropriate equipment, lack of training with equipment. Copy of the FRP was not available at the facility, so personnel could not implement the Plan. Facility lacked communications equipment identified in the FRP Site selected for boat and boom placement was not consistent with the FRP. The Plan contained incorrect telephone numbers for spill notifications (state agency, NRC, local responders). Facility was unable to notify appropriate entities. 47

48 Boom Deployment Problems Can facility personnel and/or OSRO deploy the boom? Is the boom properly deployed? Do they have the required equipment? Do they have access to boom deployment sites and anchor points? Proper anchoring, proper flotation, proper tension No twists or gaps? Is the boom properly rated for the stream flow rate? Is the boom maintained in a way to allow for rapid deployment? Does the facility have the appropriate hardware needed to link boom sections and stake the boom???? 48

49 Follow-up from Regions after an Inspection or GIUE Immediately following an inspection or exercise, EPA will leave a Notice of Inspection form (coming). If there are field deficiencies, EPA will follow-up with a letter, typically within days. Plan amendment may be required as a result of field deficiencies. Successful completion of a GIUE is typically documented in a letter as well. Unsuccessful completion may lead to follow-up exercise. 49

50 Questions? HQ Contact: J. Troy Swackhammer R3 Coordinator: Arlin Galarza-Hernandez SPCC/FRP Inspector/Coordinator

Spill Prevention, Control and Countermeasures (SPCC) 40 CFR 112. For Bulk Facilities

Spill Prevention, Control and Countermeasures (SPCC) 40 CFR 112. For Bulk Facilities Spill Prevention, Control and Countermeasures (SPCC) 40 CFR 112 For Bulk Facilities Do you have an oil? The list of Petroleum and Non-petroleum oils subject to the Clean Water Act requirements can be found

More information

EPA REGION 2 UPDATE. Presenter: Francesco Maimone Physical Scientist Date: October 10, 2017 For: 5 th NY Storage Tank Conference

EPA REGION 2 UPDATE. Presenter: Francesco Maimone Physical Scientist Date: October 10, 2017 For: 5 th NY Storage Tank Conference EPA REGION 2 UPDATE Presenter: Francesco Maimone Physical Scientist Date: October 10, 2017 For: 5 th NY Storage Tank Conference \ Environmental Protection Agency THIS PRESENTATION WILL COVER SPCC & FRP

More information

AWMA SPCC & FRP Workshop

AWMA SPCC & FRP Workshop AWMA SPCC & FRP Workshop Facility Response Plans (40 CFR 112 Subpart D) Des Moines, IA November 2013 Gene Taylor, PE FRP Program Goal is to ensure that SH facilities have adequate oil spill response capabilities

More information

EPA Region 2 Update. Presenter: Francesco Maimone Oil Enforcement Coordinator Date: November 9, 2016 For: 4 th NY Storage Tank Conference

EPA Region 2 Update. Presenter: Francesco Maimone Oil Enforcement Coordinator Date: November 9, 2016 For: 4 th NY Storage Tank Conference EPA Region 2 Update 1 Presenter: Francesco Maimone Oil Enforcement Coordinator Date: November 9, 2016 For: 4 th NY Storage Tank Conference \ Environmental Protection Agency 2 Overview of Tank-Related Regulatory

More information

Produced Water Quality Recyling & Reuse CFR112 -SPCC Kathleen Atencio, Preparedness Unit Chief

Produced Water Quality Recyling & Reuse CFR112 -SPCC Kathleen Atencio, Preparedness Unit Chief Produced Water Quality Recyling & Reuse 2016 40CFR112 -SPCC Kathleen Atencio, Preparedness Unit Chief Legal disclaimer EPA has made every effort to ensure the accuracy of this presentation. However, please

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV-000018-008 LNG Project Page 2 of 14 CONTENTS 1.0

More information

FACILITY RESPONSE PLAN REVIEW CHECKLIST

FACILITY RESPONSE PLAN REVIEW CHECKLIST FACILITY RESPONSE PLAN REVIEW CHECKLIST Fixed / Mobile Facility Name: Facility ID: 1 st Reviewer: Date: 2 nd Reviewer: Date: Guidance for completing the Facility Response Plan Review Checklist for Fixed

More information

A COMPARISON OF WEST COAST CONTINGENCY PLANNING REQUIREMENTS FOR OIL HANDLING FACILITIES AND VESSELS

A COMPARISON OF WEST COAST CONTINGENCY PLANNING REQUIREMENTS FOR OIL HANDLING FACILITIES AND VESSELS PACIFIC STATES BRITISH COLUMBIA OIL SPILL TASK FORCE A COMPARISON OF WEST COAST CONTINGENCY PLANNING REQUIREMENTS FOR OIL HANDLING FACILITIES AND VESSELS ALASKA BRITISH COLUMBIA CALIFORNIA OREGON WASHINGTON

More information

PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY. Environmental Management Act M328

PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY. Environmental Management Act M328 PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY Environmental Management Act Ministerial Order No. M328 I, George Heyman, Minister of Environment and

More information

SPILL CONTINGENCY PLANNING REGULATION

SPILL CONTINGENCY PLANNING REGULATION Environmental Management Act SPILL CONTINGENCY PLANNING REGULATION B.C. Reg. 186/2017 Deposited October 13, 2017 and effective October 30, 2017 Consolidated Regulations of British Columbia This is an unofficial

More information

CHAPTER 1: ENVIRONMENTAL AND EMERGENCY RESPONSE PLANNING

CHAPTER 1: ENVIRONMENTAL AND EMERGENCY RESPONSE PLANNING This chapter summarizes: The importance of spill prevention Emergency Response Plans applicable to fuel facilities that must be in place before a spill occurs Preliminary spill mitigation strategies 1.1

More information

Bringing RP 1174 Onshore Hazardous Liquid Pipeline Emergency Preparedness and Response to Life in Your Organization

Bringing RP 1174 Onshore Hazardous Liquid Pipeline Emergency Preparedness and Response to Life in Your Organization Bringing RP 1174 Onshore Hazardous Liquid Pipeline Emergency Preparedness and Response to Life in Your Organization Recent PHMSA Rules Created Pipeline & Hazardous Materials Safety Administration (PHMSA)

More information

Streamlining the SPCC Process

Streamlining the SPCC Process Streamlining the SPCC Process Presented by Mike Shoemaker, P.E., Wenck, Roswell, GA Scott Christensen, Delta Air Lines, Atlanta, GA Agenda Introductions Wenck/Delta Overviews SPCC Overview SPCC Amendment

More information

Facility Response Planning

Facility Response Planning United States Environmental Protection Agency Facility Response Planning COMPLIANCE ASSISTANCE GUIDE U.S. EPA Oil Program Center Ariel Rios Building 1200 Pennsylvania Avenue (5203G) Washington, DC 20460

More information

Is your installation meeting the requirements?

Is your installation meeting the requirements? Is your installation meeting the requirements? Randy S. Waibel Managing Associate April 8, 2003 Background: The Oil Pollution Prevention Regulations, commonly known as the SPCC Regulations, contained at

More information

Spill Prevention, Control and Countermeasure Plans (SPCC)

Spill Prevention, Control and Countermeasure Plans (SPCC) Spill Prevention, Control and Countermeasure Plans (SPCC) 10/12/2007 1 Who Is Required to Have a SPCC Plan? Any fixed facility that could reasonably be expected to discharge oil into or upon navigable

More information

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C3.1 Purpose... C3-1 C3.2 Responsibility of Implementation... C3-2 C3.3

More information

APPENDIX D HAZARD EVALUATIONS / WORST CASE DISCHARGE CALCULATIONS

APPENDIX D HAZARD EVALUATIONS / WORST CASE DISCHARGE CALCULATIONS APPENDIX D HAZARD EVALUATIONS / WORST CASE DISCHARGE CALCULATIONS D.1 Hazard Identification 2 D.1.1 Tank Leak, Rupture or Overfill 2 D.1.2 Tank Truck Leak or Overfill 2 D.1.3 Piping or Valve Rupture or

More information

The New (and final) SPCC Rule

The New (and final) SPCC Rule Brett D. Smith, PE, PG OVERVIEW History of the Spill Rule (40 CFR Part 112) July 2002 final rule - changes December 2006 amendments - changes BREAK - 15 minutes Definitions of key terms 40 CFR 112 - exempt

More information

SECONDARY CONTAINMENT RAINWATER MANAGEMENT

SECONDARY CONTAINMENT RAINWATER MANAGEMENT ENVIRONMENTAL STANDARD OPERATING PROCEDURE 30 SECONDARY CONTAINMENT RAINWATER MANAGEMENT 1. Version, Date. 1, 1 April 2012 2. Purpose. This Environmental Standard Operating Procedure (ESOP) summarizes

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03 Department Title: Safety Department Page: 1 Department Title: Safety Department

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY - REGION III 1650 Arch Street (3HS32) Philadelphia, Pennsylvania

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY - REGION III 1650 Arch Street (3HS32) Philadelphia, Pennsylvania UNITED STATES ENVIRONMENTAL PROTECTION AGENCY - REGION III 1650 Arch Street (3HS32) Philadelphia, Pennsylvania 19103-2029 ACKNOWLEDGMENT AND RECORD OF SPCC/FRP INSPECTION SPCC CASE NUMBER: FRP REGIONAL

More information

Spill Response Procedures

Spill Response Procedures Spill Response Procedures [your municipality] Purpose: The purpose of this Standard Operating Procedure (SOP) is to provide guidance for the proper response and corrective actions to be followed in the

More information

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN REQUIREMENTS

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN REQUIREMENTS engineers scientists architects constructors SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN REQUIREMENTS PLANS, CONTAINMENT, SITE MANAGEMENT CLEAN WATER ACT Section 311 of the Clean Water Act (CWA) Addresses

More information

RISK BULLETIN. Spill Prevention, Control, And Countermeasures (SPCC) Guidelines

RISK BULLETIN. Spill Prevention, Control, And Countermeasures (SPCC) Guidelines RISK BULLETIN Spill Prevention, Control, And Countermeasures (SPCC) Guidelines INTRODUCTION The intent of the Spill Prevention, Control, and Countermeasures (SPCC) rule is to prevent oil products from

More information

Pipeline & Hazardous Materials Safety Administration (PHMSA)

Pipeline & Hazardous Materials Safety Administration (PHMSA) Pipeline & Hazardous Materials Safety Administration (PHMSA) Notice of Proposed Rulemaking: Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains PHMSA Office of Hazardous Materials

More information

Substances Hazardous Materials Spill Rule

Substances Hazardous Materials Spill Rule Substances Hazardous Materials Spill Rule Clean Water Act Section 311(j)(1)(c) Implementation Presented at REGFORM 2016 Hazardous Waste Seminar Robert Hanley, Ph.D. October 18, 2016 www.trcsolutions.com

More information

Jeff Waters Emergency Responder Office of Emergency Response Florida Department of Environmental Protection

Jeff Waters Emergency Responder Office of Emergency Response Florida Department of Environmental Protection Jeff Waters Emergency Responder Office of Emergency Response Florida Department of Environmental Protection Objectives Who is FDEP-OER? The role of the local fire department Responding to different size

More information

SPCC 40 CFR Part 112 Overview

SPCC 40 CFR Part 112 Overview SPCC 40 CFR Part 112 Overview Spill Prevention, Control, and Countermeasure Kim Churchill Region 5 SPCC Coordinator Summit County Safety Council November 15 th 2018 Legal Disclaimer This presentation is

More information

SPCC 40 CFR Part 112 Overview

SPCC 40 CFR Part 112 Overview SPCC 40 CFR Part 112 Overview Mark W. Howard Office of Emergency Management HQ Kim Churchill Region 5 SPCC Coordinator Jon Gulch Region 5 Oil On-Scene Coordinator Compliance Assistance Conference October

More information

SPCC 40 CFR Part 112 Lets Get Into the Weeds

SPCC 40 CFR Part 112 Lets Get Into the Weeds SPCC 40 CFR Part 112 Lets Get Into the Weeds Mark W. Howard Office of Emergency Management - HQ Compliance Assistance Conference October 30, 2018 Legal Disclaimer This presentation is meant to provide

More information

LEGISLATURE 2017 BILL

LEGISLATURE 2017 BILL 0-0 LEGISLATURE LRB-/ 0 AN ACT to create 0. () (h),.0 (),.,.,. and. () (a). of the statutes; relating to: preparation and response required by railroad corporations in the event of discharge of transported

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Spill Prevention Control and Countermeasure Plan Buckeye Brine, LLC Riverside Recycling Facility Tuscarawas, Ohio

Spill Prevention Control and Countermeasure Plan Buckeye Brine, LLC Riverside Recycling Facility Tuscarawas, Ohio Spill Prevention Control and Countermeasure Plan Buckeye Brine, LLC Riverside Recycling Facility Tuscarawas, Ohio December, 2013 SPCCP - Revision 1.0.0 Page 2 of 7 A. Foreword Buckeye Brine, LLC is committed

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DOCUMENT NUMBER: 260-0500-001 TITLE: Policy for Coordinating Immediate Responses and Final Remediation of Releases

More information

RESOLUTION BASELINE HYDROLOGIC & GEOTECHNICAL DATA GATHERING ACTIVITIES PRELIMINARY SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN

RESOLUTION BASELINE HYDROLOGIC & GEOTECHNICAL DATA GATHERING ACTIVITIES PRELIMINARY SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN RESOLUTION BASELINE HYDROLOGIC & GEOTECHNICAL DATA GATHERING ACTIVITIES PRELIMINARY SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN Prepared by: 102 Magma Heights Superior, Arizona 85273 (520) 689-9374

More information

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 Summary of LAE ONTARIO 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 2. Information (editorial, revised, new): LO G 1 (revised) LO NGS 1 (revised) LO G 2 (revised) LO SEW 2 (revised) LO G 6 (revised) LO

More information

IN THE MATTER of a CONTRAVENTION. of the OIL AND GAS ACTIVITIES ACT. [SBC 2008] Chapter 36. Before. The BC OIL & GAS COMMISSION. Case File

IN THE MATTER of a CONTRAVENTION. of the OIL AND GAS ACTIVITIES ACT. [SBC 2008] Chapter 36. Before. The BC OIL & GAS COMMISSION. Case File IN THE MATTER of a CONTRAVENTION of the OIL AND GAS ACTIVITIES ACT [SBC 2008] Chapter 36 before The BC OIL & GAS COMMISSION Case File 2017-061 BETWEEN The BC Oil & Gas Commission AND Pavilion Energy Corporation

More information

Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities. Olmsted County Environmental Resources Department

Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities. Olmsted County Environmental Resources Department Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities Olmsted County Environmental Resources Department October 2011 Why? This stormwater training program was developed to

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections

CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections Con Appendix FINAL US Army Garrison, Hawaii October 2015 CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections Storm Water Management Plan CON Appendix F REQUIREMENT In

More information

SPILL PREVENTION & RESPONSE

SPILL PREVENTION & RESPONSE Revision Page: Page 1 of 13 Purpose The purpose of this plan is to document spill prevention and response requirements. Each HOUSTON, INC work site will develop a spill prevention and response plan based

More information

Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to

Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A-310.65 to 310.77 North Carolina Department of Environment and Natural Resources Division

More information

The Revised SPCC Regulations

The Revised SPCC Regulations The Revised SPCC Regulations OSC Readiness Training Phoenix, Arizona Thursday, November 18, 2004 U.S. Environmental Protection Agency Office of Emergency Management Oil Program www.epa.gov/oilspill Agenda

More information

Environmental Management for Bureau-Wide Schools. Spill Prevention, Control, and Countermeasure Plans. Ryan Eberle, P.E. Kleinfelder Tempe, AZ

Environmental Management for Bureau-Wide Schools. Spill Prevention, Control, and Countermeasure Plans. Ryan Eberle, P.E. Kleinfelder Tempe, AZ Environmental Management for Bureau-Wide Schools Spill Prevention, Control, and Countermeasure Plans Ryan Eberle, P.E. Kleinfelder Tempe, AZ SPCC Presentation Outline Regulatory Background SPCC Rule Contents

More information

APPENDIX E HORIZONTAL DIRECTIONAL DRILL EXECUTION PLAN

APPENDIX E HORIZONTAL DIRECTIONAL DRILL EXECUTION PLAN APPENDIX E HORIZONTAL DIRECTIONAL DRILL EXECUTION PLAN 35 Horizontal Directional Drilling - Execution Plan Note: This form shall be used on all HDD watercourse crossings (including rivers, sloughs, public

More information

Facility Name Facility Address City State Zip Telephone Number. Owner or Operator Name Owner or Operator Address City State Zip

Facility Name Facility Address City State Zip Telephone Number. Owner or Operator Name Owner or Operator Address City State Zip Tier I Qualified Facility SPCC Plan This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in 112.3(g)(1).

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

Hazardous Materials and Chemicals

Hazardous Materials and Chemicals Standard Operating Procedures Hazardous Materials and Chemicals Last Modified: JAN 2013 1 of 11 Hazardous Materials and Chemicals I PURPOSE To ensure that controls are in place to minimize the risk to

More information

APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN.

APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN. Revised 02/01 APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM Facility Name: Facility ID No.: ODEQ Permit No.: Reference No.: _ Application Type: Date: (New/Modify/Renewal)

More information

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup

Massachusetts Department of Environmental Protection Bureau of Waste Site Cleanup A. THIS FORM IS BEING USED TO: (check one) 1. Log Date: 10/24/2017 Log Time: 11:18 AM PM 2. Assign a (RTN) to a Release or TOR Report. a. Reportable Release or TOR. b. Release that is Less Than the Reporting

More information

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts

Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management

More information

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015 Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015 Mack Overton, VP Industrial Services KERAMIDA, Inc. Stormwater Rule Purpose is to limit

More information

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements OCTC Operational Excellence & Sustainability Committee Meeting March 17, 2016 Gary M. Glass (513) 352-6765 Gary.Glass@ThompsonHine.com

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED FLINT HILLS RESOURCES, LP MARSHALL TANK FARM EXPANSION

More information

Pipeline and Informed Planning Alliance (PIPA) Recommended Practice Evaluation Worksheet For Pipeline Operators. Draft 12/15/2011

Pipeline and Informed Planning Alliance (PIPA) Recommended Practice Evaluation Worksheet For Pipeline Operators. Draft 12/15/2011 Pipeline and Informed Planning Alliance () Recommended Evaluation Worksheet For Pipeline Operators Draft 12/15/2011 Checklist for Pipeline Operator Recommended Evaluation The Pipelines and Informed Planning

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Gunnedah Quarry Products Pty Ltd Prepared by Tim MacKellar, Gunnedah Quarry Products Document created 13.10.13 Reviewed 10.10.14 Reviewed 12.10.15 Reviewed 02.02.18

More information

White Bay 6 Marine Park & Refuelling Facility

White Bay 6 Marine Park & Refuelling Facility White Bay 6 Marine Park & Refuelling Facility Pollution Incident Response Plan White Bay 6 Wharf, Balmain, NSW 2041 1 1 Pollution Incident Response Plan Spill response procedures have been detailed in

More information

LARGE QUANTITY GENERATOR CHECKLIST

LARGE QUANTITY GENERATOR CHECKLIST Facility: Date: LARGE QUANTITY GENERATOR CHECKLIST Note: The Oklahoma Hazardous Waste Management Regulations [OK Adm. Code (OAC) 252:205] incorporates by reference at OAC 252:205-3-2 the applicable federal

More information

HAMMOND DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS. I Am The Key

HAMMOND DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS. I Am The Key HAMMOND DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS I Am The Key Statement of Acceptance: I have received, read and accepted the information contained in this depot orientation guide and

More information

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems Manitoba Water Stewardship Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems Date: June 2007 Prepared for Office of Drinking Water

More information

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective

More information

Montreal Pipe Line Limited Emergency Management Program:

Montreal Pipe Line Limited Emergency Management Program: Montreal Pipe Line Limited Emergency Management Program: Introduction: As stated in the Montreal Pipe Line Limited (MPLL) Corporate Policy on the Environment MPLL will manage our business with the goal

More information

Complying with Dam Safety Regulations The Sleepy Hollow Lake Story

Complying with Dam Safety Regulations The Sleepy Hollow Lake Story Sleepy Hollow Lake Dam National Inventory of Dams # NY00142 NY State ID# 209-3977 Complying with Dam Safety Regulations The Sleepy Hollow Lake Story Association of Property Owners of Sleepy Hollow Lake

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement and Contracts Dept., MA-29 November 13,

More information

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN Rose-Hulman Institute of Technology Main Campus, South Campus, and Oxbridge Table of Contents SECTION 1.0 Purpose 2.0 Regulatory Reference 3.0 Scope 4.0

More information

Spill Contingency Plan. ATGA993 Pretoria Rural

Spill Contingency Plan. ATGA993 Pretoria Rural Spill Contingency Plan ATGA993 Pretoria Rural Table of Contents Contents... 2 1. Introduction... 3 1.1 Purpose and scope... 3 1.2 Company environmental policy... 3 1.3 Project description... 3 1.4 Site

More information

Public Notice: Wetland/Waterway/Water Quality Regulations

Public Notice: Wetland/Waterway/Water Quality Regulations Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under

More information

Facility Name Facility Address City State Zip Telephone Number. Owner or Operator Name Owner or Operator Address City State Zip

Facility Name Facility Address City State Zip Telephone Number. Owner or Operator Name Owner or Operator Address City State Zip Tier II Qualified Facility SPCC Plan This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in

More information

SPILL PREVENTION AND CONTROL (SPC) PLAN FOR OIL STORAGE AREAS TULANE UNIVERSITY

SPILL PREVENTION AND CONTROL (SPC) PLAN FOR OIL STORAGE AREAS TULANE UNIVERSITY SPILL PREVENTION AND CONTROL (SPC) PLAN FOR OIL STORAGE AREAS TULANE UNIVERSITY Office of Environmental Health and Safety (504) 988-5486 FAX (504) 988-1693 Date: May 5, 2009 Revised: November 23, 2009

More information

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS PDF Version [Printer-friendly - ideal for printing entire document] NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS Published by Quickscribe Services Ltd. Updated To: [includes Federal Regulation SOR/2016-134

More information

GENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER

More information

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS These conditions ensure that activities carried out under Nationwide Permits (NWPs) do not

More information

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

STORM WATER POLLUTION PREVENTION PLAN (SWPPP) STORM WATER POLLUTION PREVENTION PLAN (SWPPP) Name of Tenant and Facility Date: Emergency Contact: Title: Phone: INSTRUCTIONS FOR MERRILL FIELD TENANTS TO OBTAIN COVERAGE UNDER THE NPDES STORM WATER DISCHARGE

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) Established 1907 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP) DATE: JULY 2018 Version Date Section Modified 1 July 2018 All Reason for Modification Original Management Plan Review Team MCC Environmental,

More information

TITLE 9. ENVIRONMENT STATE WATER CONTROL BOARD

TITLE 9. ENVIRONMENT STATE WATER CONTROL BOARD November 2, 2005 TITLE 9. ENVIRONMENT STATE WATER CONTROL BOARD Title of Regulation: 9 VAC 25-780. Local and Regional Water Supply Planning (adding 9 VAC 25-780-10 through 9 VAC 25-780-190). Statutory

More information

SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr

SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES Policy No. 6100.042.2016 Draft Div Pol Yr Supersedes No. 6100.042.1994 Final x Div Pol Yr Date: August 25, 2016 Pages 11 Topic:

More information

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION Community Development Department 949 E 2 nd Ave Durango, CO 81301 (970) 375-4810 fax (970) 375-4848 Contact Information City of Durango

More information

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE Amended November 2014 PIPELINE PERFORMANCE MEASURES - OVERVIEW Introduction The National Energy Board (Board) took action in March

More information

LARGE QUANTITY GENERATOR (LQG) OF HAZARDOUS WASTE

LARGE QUANTITY GENERATOR (LQG) OF HAZARDOUS WASTE LARGE QUANTITY GENERATOR (LQG) OF HAZARDOUS WASTE Iowa Waste Reduction Center / University of Northern Iowa 319-273-8905 or 1-800-422-3109 40 CFR 262 August 2015 Do these regulations apply to my operation?

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

file:///users/rachelhood/library/containers/com.apple.mail/dat...

file:///users/rachelhood/library/containers/com.apple.mail/dat... U.S. ENVIRONMENTAL PROTECTION AGENCY POLLUTION/SITUATION REPORT (E13611) Exxon Pipeline Mayflower Arkansas Oil Spill - Removal Polrep UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Region VI Subject: POLREP

More information

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN LOWER BAKER GENERATION PLANT BAKER DAM ROAD CONCRETE, WASHINGTON AUGUST 25, 2008

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN LOWER BAKER GENERATION PLANT BAKER DAM ROAD CONCRETE, WASHINGTON AUGUST 25, 2008 SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN LOWER BAKER GENERATION PLANT 47256 BAKER DAM ROAD CONCRETE, WASHINGTON AUGUST 25, 2008 FOR PUGET SOUND ENERGY File No. 0186-634-03 August 25, 2008 Puget

More information

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake Enbridge Oil Spill Augusta Galesburg Morrow Lake Release Site Area August 4, 2010 Area Area August 5, 4, 2010 Area August September 5, 20, 2010 2012 Area September 20, 2012 September 17, 2014 Talmadge

More information

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds

More information

Mid Missouri River SACP. April 16, Mid-Missouri River Sub-Area Contingency Plan

Mid Missouri River SACP. April 16, Mid-Missouri River Sub-Area Contingency Plan Mid Missouri River SACP April 16, 2015 Mid-Missouri River Sub-Area Contingency Plan April 16, 2015 Mid Missouri River SACP April 16, 2015 For Further Information and/or Updating the Mid-Missouri River

More information

SECTION TEMPORARY SEWER BYPASS PUMPING

SECTION TEMPORARY SEWER BYPASS PUMPING PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall provide a complete sewer bypassing system including, but not limited to, the following: 1. Developing a sewer bypassing plan 2. Developing a spill

More information

Sulcor Pollution Incident Response Management Plan (PIRMP)

Sulcor Pollution Incident Response Management Plan (PIRMP) Sulcor Pollution Incident Response Management Plan (PIRMP) The Sulcor Limestone open cut mine is located 30Km north-west of Tamworth NSW. The limestone mined by conventional drill and blast processes is

More information

City of Guelph Transfer of Review Procedures 7 March, 2017

City of Guelph Transfer of Review Procedures 7 March, 2017 Step 1-Determine where the project is located on the City of Guelph Vulnerability Map If the project is found not to be located in a vulnerability area with a vulnerability score of 8 or higher (See Attachment

More information

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled

More information

Storm Water Pollution Prevention Plan for CES Gravel #3800

Storm Water Pollution Prevention Plan for CES Gravel #3800 David Lewis Cell: (870) 310-2757 Rickey Vaughn Cell: (870) 310-9602 Buddy McAdams Cell: (870) 310-8733 Local (870) 881-8830 Fax: (870) 881-8809 LICENSED, BONDED & INSURED Howard Cupp, Jr. Cell: (870) 314-2877

More information

California Hazardous Materials Spill / Release Notification Guidance

California Hazardous Materials Spill / Release Notification Guidance California Hazardous Materials Spill / Release Notification Guidance To Report all significant releases or threatened releases of hazardous materials: First Call: 9-1-1 (or local emergency response agency)

More information

Part 2.0 Non-Numeric Effluent Limitations

Part 2.0 Non-Numeric Effluent Limitations 2017 NH Small MS4 General Permit Page 50 of 67 report on its findings and progress towards making the practices allowable. (Information available at: http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/addressingbarrier2lid.pdf

More information

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Kevin P. Walker C&S Engineers, Inc. Best Management Practices! Best Management Practices (BMPs) are measures and/or controls used to prevent

More information

Table of Contents Implementation Guidance for the Regulations Mandated by the Maritime Transportation Security Act of 2002 (MTSA) for Facilities

Table of Contents Implementation Guidance for the Regulations Mandated by the Maritime Transportation Security Act of 2002 (MTSA) for Facilities Table of Contents Implementation Guidance for the Regulations Mandated by the Maritime Transportation Security Act of 2002 (MTSA) for Facilities Enclosure (1) Plan Review Guidance Flowchart Enclosure (2)

More information

Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities

Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities Discussion AT&T requested additional clarification on two issues: 1. Mobile refueling vehicles

More information

ANCHORAGE STORMWATER MANUAL

ANCHORAGE STORMWATER MANUAL ANCHORAGE STORMWATER MANUAL Volume 2 Construction Practices (Stormwater Treatment Plan Review Guidance Manual) Version 1.0 DRAFT July 2017 This page intentionally left blank July 2017 TABLE OF CONTENTS

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

SCOTIA DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS. I Am The Key

SCOTIA DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS. I Am The Key SCOTIA DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS I Am The Key Statement of Acceptance: I have received, read and accepted the information contained in this depot orientation guide and

More information