AWMA SPCC & FRP Workshop

Size: px
Start display at page:

Download "AWMA SPCC & FRP Workshop"

Transcription

1 AWMA SPCC & FRP Workshop Facility Response Plans (40 CFR 112 Subpart D) Des Moines, IA November 2013 Gene Taylor, PE

2 FRP Program Goal is to ensure that SH facilities have adequate oil spill response capabilities Plans must address responding, to the maximum extent practicable, to a Worst Case Discharge (WCD) of oil and to a substantial threat of such a discharge Plan also addresses small and medium discharges as appropriate Coordinate with LEPC

3 Section 2.9 Determination of Applicability of Facility Response Plans SPCC facilities must document whether they meet the FRP applicability criteria by completing Certification of the Applicability of the Substantial Harm Criteria If a facility has the potential to cause substantial harm to environment in the event of a discharge, the facility must prepare and submit a FRP ( )

4 Significant and Substantial Harm Factors Frequency of past spills Proximity to navigable waters Age of oil storage tanks Other facility specific and region-specific criteria (e.g., impacts on public health)

5

6

7 Secondary Containment Must have secondary containment that will contain the capacity of the largest AST within the area plus sufficient freeboard for precipitation Freeboard should be based on regional rainfall patterns Facilities in some states (e.g. Alaska, Hawaii, Washington) will require more freeboard Containment measures: dikes, berms, retaining walls, drainage systems, spill or retention ponds

8

9 Cause Injury Measurable adverse change Long or short-term Chemical, physical, or viability of the natural resource Direct of indirect

10 Planning Distance Estimate distance a discharged material may travel from the facility Use EPA Planning Distance Calculations 40 CFR 112 Appendix C, Attachment C-III Includes formulas for moving water, still water, tidal areas, and overland

11 Moving Navigable Waters Primary concern is transport of oil in navigable waters during adverse weather conditions Calculations take into account Velocity of the water body, and Time interval for arrival of response resources

12 Moving Navigable Waters D = V x T x C D = distance downstream from a facility within which F&W&S environments could be injured or a PWS intake could be shut down in the event of a discharge (miles) V = velocity of the river/navigable water of concern (ft/sec) [Chezy-Manning equation] T= substantial harm planning time (hrs) C = constant conversion factor 0.68 secmile/hr-ft (3600 sec/hr 5280 ft/mile)

13 Moving Water - Example Calculation For V = 2.73 ft/sec (determined using Chezy-Manning equation) T = 27 hours D = (2.73 ft/sec) x (27 hrs) x (0.68 sec-mile/hr-ft) = 50 miles downstream planning distance

14 Still Water Accounts for spread of discharged oil over the surface of the still water body Spreading Formula: A 1 = 10 5 x V 3/4 x C A 2 = (π r 2 ) / 2 Solve for radius (r) and then adjust for wind or wave action

15 Overland Criteria: Spills on land reaching navigable waters Discharged oil over land may enter a storm drain or open concrete channel intended for drainage - assume that once oil reaches such an inlet, it will flow to a navigable water

16

17 Fish & Wildlife & Sensitive Areas Designations: Legal designation Evaluations rendered by area committees or members of the federal OSC As determined based on local scientific knowledge, responder experience, and community priorities See DOC/NOAA Guidance for Facility and Vessel Response Plans: Fish and Wildlife and Sensitive Environments (59 FR 14713, March 29, 1994)

18 Examples of F&W&S Environments Wetlands Wildlife Areas National Parks Wildlife Refuges State Parks Wild & Scenic Rivers Endangered Species Habitats Wilderness Areas Marine Sanctuaries Estuarine Reserves Conservation Areas Recreation Areas National Forests Research National areas Heritage Program areas Land Trust Historical & Archaeolog. sites & parks

19

20 Public Drinking Water Intakes Discharges that would shut down a public drinking water intake Conduct Planning Distance Calculations Identify all public water intakes within this distance Must have at least 15 service connections and serve at least 25 individuals Includes collection, treatment, storage and distribution facilities

21

22 Reportable Spills 10,000 gals Discharge that reaches navigable waters or adjoining shorelines in a quantity that may be harmful Harmful discharge Violates applicable water standards Causes a film or sheen or discoloration of the surface of the water of adjoining shoreline Causes a sludge or emulsion to be deposited beneath the surface of the water of upon adjoining shorelines

23 Petitions to Reclassify A facility that has been significantly upgraded within 5 years of a spill 10,000 gals can petition the RA to remove the facility from the category of substantial harm Example upgrades: Replace tanks Add secondary containment

24 Key FRP Elements Emergency Response Action Plan Facility name, type, location, owner/operator Emergency notification, equipment, personnel, and evacuation information Potential spill hazards and previous spills Small (<2,100 gals), Medium (2,100-36,000 gals), Worst Case Scenarios and response actions

25 Key FRP Elements (cont.) Discharge detection procedures and equipment Detailed implementation plan for containment and disposal Facility and response self-inspection; training, exercises, drills, and meeting logs Diagrams Security

26 FRP Revision Review FRP every 5 yrs or less per RA schedule Revise & resubmit FRP within 60 days if a change will materially affect the response to a Worst case Discharge: Facility configuration Change in oil Change in capabilities of Response Orgs Material change in response equipment, procedures, or ERAP implementation Personnel, phone, response org changes don t need RA approval, make as you go

27 FRP Training & Drills Response training for spill response personnel Recommend base on USCG Training Elements for Oil Spill Response Functional training Lesson plans Drill/exercise program Satisfactory if follow National Preparedness for Response Exercise Program

28 FRP Resources Model Plan: 40 CFR 112, Appendix F FRP Checklist Facility Response Planning Compliance Assistance Guide Exercise Verification Checklist Region VII FRP contacts: John Frey ( ) and Todd Campbell

29 For More Information Oil Spill Homepage Spill Prevention, Control and Countermeasures Rule /index.htm Gene Taylor 319/ ,

30 Questions?

PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY. Environmental Management Act M328

PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY. Environmental Management Act M328 PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF ENVIRONMENT AND CLIMATE CHANGE STRATEGY Environmental Management Act Ministerial Order No. M328 I, George Heyman, Minister of Environment and

More information

SECONDARY CONTAINMENT RAINWATER MANAGEMENT

SECONDARY CONTAINMENT RAINWATER MANAGEMENT ENVIRONMENTAL STANDARD OPERATING PROCEDURE 30 SECONDARY CONTAINMENT RAINWATER MANAGEMENT 1. Version, Date. 1, 1 April 2012 2. Purpose. This Environmental Standard Operating Procedure (ESOP) summarizes

More information

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i Appendix F Section

More information

RESOLUTION BASELINE HYDROLOGIC & GEOTECHNICAL DATA GATHERING ACTIVITIES PRELIMINARY SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN

RESOLUTION BASELINE HYDROLOGIC & GEOTECHNICAL DATA GATHERING ACTIVITIES PRELIMINARY SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN RESOLUTION BASELINE HYDROLOGIC & GEOTECHNICAL DATA GATHERING ACTIVITIES PRELIMINARY SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN Prepared by: 102 Magma Heights Superior, Arizona 85273 (520) 689-9374

More information

Sector Houston-Galveston Incident Management Division. MST3 Braedon Burleson

Sector Houston-Galveston Incident Management Division. MST3 Braedon Burleson Sector Houston-Galveston Incident Management Division MST3 Braedon Burleson 11 Coast Guard Missions By law, the Coast Guard has 11 missions: Ports, waterways, and coastal security Drug interdiction Aids

More information

The Revised SPCC Regulations

The Revised SPCC Regulations The Revised SPCC Regulations OSC Readiness Training Phoenix, Arizona Thursday, November 18, 2004 U.S. Environmental Protection Agency Office of Emergency Management Oil Program www.epa.gov/oilspill Agenda

More information

CHAPTER 1: ENVIRONMENTAL AND EMERGENCY RESPONSE PLANNING

CHAPTER 1: ENVIRONMENTAL AND EMERGENCY RESPONSE PLANNING This chapter summarizes: The importance of spill prevention Emergency Response Plans applicable to fuel facilities that must be in place before a spill occurs Preliminary spill mitigation strategies 1.1

More information

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN Rose-Hulman Institute of Technology Main Campus, South Campus, and Oxbridge Table of Contents SECTION 1.0 Purpose 2.0 Regulatory Reference 3.0 Scope 4.0

More information

FACILITY RESPONSE PLAN REVIEW CHECKLIST

FACILITY RESPONSE PLAN REVIEW CHECKLIST FACILITY RESPONSE PLAN REVIEW CHECKLIST Fixed / Mobile Facility Name: Facility ID: 1 st Reviewer: Date: 2 nd Reviewer: Date: Guidance for completing the Facility Response Plan Review Checklist for Fixed

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE 5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE This section discusses the effect of the Proposed Action on navigable waterways, and the Proposed Action s consistency with coastal zone policies. 5.5.1 Navigable

More information

Compliance with the USEPAs Section 404(b)(1) Guidelines

Compliance with the USEPAs Section 404(b)(1) Guidelines Compliance with the USEPAs Section 404(b)(1) Guidelines February 13, 2015 Regulatory Program Workshop Lisa Gibson Regulatory Permit Specialist US Army Corps of Engineers, Sacramento District US Army Corps

More information

Substances Hazardous Materials Spill Rule

Substances Hazardous Materials Spill Rule Substances Hazardous Materials Spill Rule Clean Water Act Section 311(j)(1)(c) Implementation Presented at REGFORM 2016 Hazardous Waste Seminar Robert Hanley, Ph.D. October 18, 2016 www.trcsolutions.com

More information

SPCC PLAN - REGULATION CHANGE - SUMMARY AND NEW REGULATIONS EFFECTIVE AUGUST 16, 2005

SPCC PLAN - REGULATION CHANGE - SUMMARY AND NEW REGULATIONS EFFECTIVE AUGUST 16, 2005 SPCC PLAN - REGULATION CHANGE - SUMMARY AND NEW REGULATIONS EFFECTIVE AUGUST 16, 2005 ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 112 Oil Pollution Prevention and Response; Non-Transportation-Related Onshore

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

Spill Response Procedures

Spill Response Procedures Spill Response Procedures [your municipality] Purpose: The purpose of this Standard Operating Procedure (SOP) is to provide guidance for the proper response and corrective actions to be followed in the

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

Nationwide Permit General Conditions

Nationwide Permit General Conditions Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific

More information

FACT PATTERN THE RESERVATION

FACT PATTERN THE RESERVATION FACT PATTERN THE RESERVATION Great Lakes Tribal Reservation Surrounded by Big River National Forest Big River flows through Reservation and into Big Lake General Environmental Concerns Wild rice areas

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

Sustainable Non-Agriculture Land Management

Sustainable Non-Agriculture Land Management Forest, Wetlands and Habitat Verification Checklist A boxed risk level indicates the level required for environmental assurance verification. Bold black print indicates a violation of state or federal

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015 Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015 Mack Overton, VP Industrial Services KERAMIDA, Inc. Stormwater Rule Purpose is to limit

More information

California Hazardous Materials Spill / Release Notification Guidance

California Hazardous Materials Spill / Release Notification Guidance California Hazardous Materials Spill / Release Notification Guidance To Report all significant releases or threatened releases of hazardous materials: First Call: 9-1-1 (or local emergency response agency)

More information

Spill Prevention, Control, and Countermeasures Plan / Groundwater Protection Plan

Spill Prevention, Control, and Countermeasures Plan / Groundwater Protection Plan Spill Prevention, Control, and Countermeasures Plan / Groundwater Protection Plan Berea College Berea, Kentucky for Berea College June 2003 Revised June 2008 Revised June 2013 Spill Prevention, Control,

More information

Colorado Department of Agriculture, DPI

Colorado Department of Agriculture, DPI Colorado Department of Agriculture, DPI NPDES Title 35 Article 10 Pesticide Applicators Act and its Associated Rules and Regulations NPDES CDA s roll and goals: Provide general overview of NPDES requirements,

More information

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area Thaddeus L. Cohen, AIA Secretary November 2006 CONTENTS Part 1 - Summary

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Tier I Qualified Facility SPCC Plan

Tier I Qualified Facility SPCC Plan This document constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in 112.3(g)(1). This document addresses

More information

Hazardous Waste Small Quantity Generator Checklist

Hazardous Waste Small Quantity Generator Checklist Facility Name DEQ Representative(s) EPA ID NUMBER Date 1. Does the generator ever accumulate a quantity of hazardous waste greater than 6,000 kilograms? (If YES, then use 5. Generator Checklist or Unauthorized

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

3-13 Other Required Findings and Regulatory Compliance

3-13 Other Required Findings and Regulatory Compliance Affected Environment and Environmental Consequences 3-13 Other Required Findings and Regulatory Compliance 3-13.1 Short-term Uses and Long-term Productivity NEPA requires consideration of the relationship

More information

Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan

Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan BOEM Gulf of Mexico Sand Management Working Group October, 205 Justin McDonald, P.E. US Army Corps of Engineers

More information

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the

More information

ANCHORAGE STORMWATER MANUAL

ANCHORAGE STORMWATER MANUAL ANCHORAGE STORMWATER MANUAL Volume 2 Construction Practices (Stormwater Treatment Plan Review Guidance Manual) Version 1.0 DRAFT July 2017 This page intentionally left blank July 2017 TABLE OF CONTENTS

More information

Eska Creek Preliminary Feasibility Analysis

Eska Creek Preliminary Feasibility Analysis Introduction Eska Creek Preliminary Feasibility Analysis This report examines the feasibility issues of energy and economics for a 1.8 MW hydroelectric project on Eska Creek (project). The Project is located

More information

OIL SPILL COOPERATIVE Member Newsletter

OIL SPILL COOPERATIVE Member Newsletter Member Newsletter JULY 2013 VOLUME 2 ISSUE 7 IN THIS ISSUE Year in Review: 2016 Spills World Class or World Leading? Coop Exercises 2016 Low-impact Spill Response WCSS Oil Spill Contingency Phone App Open

More information

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District PUBLIC NOTICE US Army Corps of Engineers, Honolulu District Regulatory Office (CEPOH-RO) Public Notice Date: March 16, 218 Building 23 Expiration Date: March 3, 218 Fort Shafter, Hawaii 9688-44 Permit

More information

The project will be conducted in partnership with the Nez Perce Tribe.

The project will be conducted in partnership with the Nez Perce Tribe. DECISION MEMO Tributary to Brushy Fork Culvert Replacements Private Land USDA Forest Service, Northern Region Powell Ranger District Nez Perce Clearwater National Forests Idaho County, Idaho I. Decision

More information

The VGP: From the Old to the New

The VGP: From the Old to the New The VGP: From the Old to the New Sean Ramach NPDES Programs Branch, Region 5 U.S. Environmental Protection Agency 09/06/2013 This presentation is informational only and does not provide official EPA regulatory

More information

HAMMOND DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS. I Am The Key

HAMMOND DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS. I Am The Key HAMMOND DEPOT ESOHMS ORIENTATION GUIDE FOR CONTRACTORS AND VISITORS I Am The Key Statement of Acceptance: I have received, read and accepted the information contained in this depot orientation guide and

More information

Navigating the Permit Process for Desalination LBWD Experience

Navigating the Permit Process for Desalination LBWD Experience Navigating the Permit Process for Desalination LBWD Experience AWWA Desalination Symposium May 8, 2006 Long Beach Water Department Tai Tseng, P.E. 1 Presentation Outline Long Beach Overview Permits for

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 1949 Industrial Park Road, Room 140 Conway, South Carolina 29526 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office

More information

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Paul Barnes, Manager - Atlantic Canada & Arctic NOTES 2015 St. John s, NL April 27, 2015 Overview Who is CAPP? Oil and Gas Lifecycle

More information

THE CORPS REGULATORY AUTHORITY

THE CORPS REGULATORY AUTHORITY Regulatory Branch THE CORPS REGULATORY AUTHORITY THE U.S. ARMY CORPS OF ENGINEERS REGULATORY AUTHORITY IS BASED UPON 1. SECTION 10 OF THE RIVERS AND HARBORS ACT OF 1899 (RHA) AND 2. SECTION 404 OF THE

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

Completion Instructions for the Industrial SWP3 Template

Completion Instructions for the Industrial SWP3 Template Introduction Completion Instructions for the Industrial SWP3 Template The Oklahoma Department of Environmental Quality (DEQ) has created a template to help you develop your Stormwater Pollution Prevention

More information

Facility Oil Spills The Failure to Properly Establish a Circumstantial Evidence Case

Facility Oil Spills The Failure to Properly Establish a Circumstantial Evidence Case By CDR Scott Klinke Overview Recently, the Coast Guard has initiated some civil penalty cases that alleged that a facility was the source of a discharge of oil into a U.S. navigable waterway via a storm

More information

Rhode Island Stormwater Design and Installations Standards Manual

Rhode Island Stormwater Design and Installations Standards Manual Rhode Island Stormwater Design and Installations Standards Manual Public Workshop Required Management Volume Calculations and Redevelopment Considerations March 22, 2011 Presentation Outline Recap of How

More information

INTRODUCTION. NOS Priorities Roadmap, p. 3

INTRODUCTION. NOS Priorities Roadmap, p. 3 INTRODUCTION In the United States, almost 40 percent of the population lives in coastal shoreline counties. These counties contribute $6.6 trillion, or just under half of the country s gross domestic product,

More information

Pipeline & Hazardous Materials Safety Administration (PHMSA)

Pipeline & Hazardous Materials Safety Administration (PHMSA) Pipeline & Hazardous Materials Safety Administration (PHMSA) Notice of Proposed Rulemaking: Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains PHMSA Office of Hazardous Materials

More information

ES Storage, Handling, and Management of Hazardous Materials Document Identification Number Date: April

ES Storage, Handling, and Management of Hazardous Materials Document Identification Number Date: April ES-301-4.11 Storage, Handling, and Management of Hazardous Materials Document Identification Number ES-301-4.11 Date: April 4. 2018 Document Owner: Debe Loya 1) Activity Description: Storage, Handling,

More information

SUMMARY: The Coast Guard is establishing a safety zone at: McCormick & Baxter superfund site, Old Mormon Slough, Stockton,

SUMMARY: The Coast Guard is establishing a safety zone at: McCormick & Baxter superfund site, Old Mormon Slough, Stockton, This document is scheduled to be published in the Federal Register on 10/01/2013 and available online at http://federalregister.gov/a/2013-23859, and on FDsys.gov 9110-04-P DEPARTMENT OF HOMELAND SECURITY

More information

Nevada Department of Transportation (NDOT)

Nevada Department of Transportation (NDOT) Nevada Department of Transportation (NDOT) Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities NDOT STORMWATER COMPLIANCE & ENFORCEMENT Table of Contents Page # STORM WATER

More information

Before we get to the E&SC

Before we get to the E&SC Erosion and Sedimentation Control on Mine Sites Ashley Rodgers, PE Assistant Regional Engineer NC DENR DEMLR RRO Before we get to the E&SC There are major differences in the application and review process

More information

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake 2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation

More information

The boxes of compliance

The boxes of compliance The boxes compliance (and why they matter.) The information presented here is accurate as March 2007 but may change in the future should regulations change or programs be revised. How Do You Deal With

More information

Cross-Cutting Environmental Laws A Guide for Federal/State Project Officers

Cross-Cutting Environmental Laws A Guide for Federal/State Project Officers Cross-Cutting Environmental Laws A Guide for Federal/State Project Officers Endangered Species Act National Historic Preservation Act Archeological and Historic Preservation Act Wild and Scenic Rivers

More information

Study: Gallatin Coal Plant

Study: Gallatin Coal Plant Study: Gallatin Coal Plant Presented by Helen Li, Policy Intern, Tennessee Environmental Council Photo: http://www.metropulse.com/news/2012/nov/14/power-play-tvas-plans-gallatin-plant-draw-ire-envi/ Table

More information

Understanding Environmental Impacts of Horticulture

Understanding Environmental Impacts of Horticulture Lesson A1 3 Understanding Environmental Impacts of Horticulture Unit A. Horticultural Science Problem Area 1. Exploring the Horticulture Industry Lesson 3. Understanding Environmental Impacts of Horticulture

More information

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation INTRODUCTION This has been prepared in compliance with the requirements of

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

Additional criteria for approval of sanitary landfill facility permit to install applications.

Additional criteria for approval of sanitary landfill facility permit to install applications. 3745-27-07 Additional criteria for approval of sanitary landfill facility permit to install applications. (A) General criteria. The director shall not approve any permit to install application for a sanitary

More information

OUR GOAL IS TO PREVENT SPILLS ENTIRELY

OUR GOAL IS TO PREVENT SPILLS ENTIRELY OUR GOAL IS TO PREVENT SPILLS ENTIRELY OUR GOAL IS TO NEVER HAVE AN OIL SPILL, AND THE INDUSTRY TAKES EXTENSIVE PRECAUTIONS TO PREVENT SPILLS FROM OCCURRING. TOPICS FOR DISCUSSION WHAT ARE OUR PRIMARY

More information

Developments in the Safety and Security of Mining Industry Dams

Developments in the Safety and Security of Mining Industry Dams Developments in the Safety and Security of Mining Industry Dams John W. Fredland, P.E. Civil Engineer / Dam Safety Officer Mine Safety and Health Administration Tailings and Mine Waste `08 Conference Dam-Safety

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303) PUBLIC NOTICE US Army Corps of Engineers Omaha District Application No: NWO-2017-01366-DEN Project: Douglas Lane Tributary Stabilization Project Applicant: Town of Castle Rock Waterway: Douglas Lane Tributary

More information

Hazardous Waste Generator Improvements Rule

Hazardous Waste Generator Improvements Rule Hazardous Waste Generator Improvements Rule Amy Potter Unit Coordinator AWMA Regulatory Update May 10, 2017 2 INTRODUCTION TO HAZARDOUS WASTE GENERATOR RULES Have not changed significantly since 1980 Majority

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Climate Data Training Session April 26, 2017 Ontario Science Centre

Climate Data Training Session April 26, 2017 Ontario Science Centre Adaptive Management To Address Climate Change Uncertainty in EA Process A Case Study of the Don Mouth Naturalization and Port Lands Flood Protection Project EA (DMNP EA) Climate Data Training Session April

More information

Outline for. Protected Areas Management Planning

Outline for. Protected Areas Management Planning Outline for Protected Areas Management Planning Level One: Community-based protected area management organizations and Level Two: Conservation organizations / Non-governmental organizations Outline for

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS

WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS WATER CODE TITLE 2. WATER ADMINISTRATION SUBTITLE D. WATER QUALITY CONTROL CHAPTER 26. WATER QUALITY CONTROL SUBCHAPTER A. ADMINISTRATIVE PROVISIONS Sec. 26.001. DEFINITIONS. As used in this chapter: (1)

More information

BASF Corporation Title: Environmental Release Reporting Procedure. Individual Unit Function: Ecology Procedure No.: EC04 Page: 1 of 14

BASF Corporation Title: Environmental Release Reporting Procedure. Individual Unit Function: Ecology Procedure No.: EC04 Page: 1 of 14 Procedure No.: EC04 Page: 1 of 14 RECORD OF REVISIONS Date Revision Number Details of Change 09/03 1 Volatile Organic Compound (2.13) definition was added. LDEQ phone numbers were updated. Title V Excursion

More information

SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) REGULATION

SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) REGULATION SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) REGULATION 40 CFR part 112 A Facility Owner/Operator s Guide to Oil Pollution Prevention authority of Section 311(j)(1)(C) of the Federal Water Pollution

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

Northern Frontier Northern Homeland

Northern Frontier Northern Homeland Northern Frontier Northern Homeland THE REPORT OF THE MACKENZIE VALLEY PIPELINE INQUIRY Volume Two Terms and Conditions Mr. Justice THOMAS R. BERGER ii NORTHERN FRONTIER, NORTHERN HOMELAND - Mackenzie

More information

APPENDIX A. NEPA Assessment Checklist

APPENDIX A. NEPA Assessment Checklist APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,

More information

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions MPCA use only White-MPCA Canary-Site copy Delta record Project Name / Location MN R100001-C000 Stormwater

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Waste categories can include solid waste, exploration and production waste, universal waste, and hazardous waste

Waste categories can include solid waste, exploration and production waste, universal waste, and hazardous waste Hazardous Waste Every year, 3.36 billion lbs of toxic waste is disposed of or released into the environment Waste categories can include solid waste, exploration and production waste, universal waste,

More information

SCHEDULE A. Fuel Farm Operations Manual

SCHEDULE A. Fuel Farm Operations Manual SCHEDULE A Fuel Farm 1. Geographic Location of the Facility G.P.A. Bulk Fuel Storage Facility Harbor of Refuge Piti, GU 96913 The Guam Power Authority Bulk Fuel Storage Facility is located on the Eastern

More information

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS 38.05.850 Applicants must complete all sections of this application. In addition, applicants

More information

SITE SPECIFIC SPILL PLAN For use of this form, see the Installation Spill Contingency Plan; the proponent is DPW-ENRD

SITE SPECIFIC SPILL PLAN For use of this form, see the Installation Spill Contingency Plan; the proponent is DPW-ENRD POST THIS PAGE PROMINENTLY AT EACH HAZARDOUS WASTE SATELLITE ACCUMULATION POINT, 90-DAY HW SITE, HAZARDOUS MATERIAL STORAGE AREA, AND SPCC CONTAINER STORAGE AREA Spill Response Call 911 for all spills

More information

Culvert Sizing procedures for the 100-Year Peak Flow

Culvert Sizing procedures for the 100-Year Peak Flow CULVERT SIZING PROCEDURES FOR THE 100-YEAR PEAK FLOW 343 APPENDIX A: Culvert Sizing procedures for the 100-Year Peak Flow A. INTRODUCTION Several methods have been developed for estimating the peak flood

More information

COMPLIANCE ASSISTANCE VISIT REPORT

COMPLIANCE ASSISTANCE VISIT REPORT Georgia Department of Natural Resources 2 Martin Luther King, Jr. Dr., S.E., Suite 1066 East, Atlanta, Georgia 30334 Mark Williams, Commissioner Environmental Protection Division F. Allen Barnes, Director

More information

Permit Number: 1900B Expiration Date: July 15, 2021

Permit Number: 1900B Expiration Date: July 15, 2021 Expiration Date: July 15, 2021 GENERAL PERMIT WATER POLLUTION CONTROL FACILITIES CLASS V GEOTHERMAL FLUIDS INJECTION DURING GEOTHERMAL EXPLORATION ISSUED TO: GEN19 /NWR File No. Department of Environmental

More information

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)

Draft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment) Draft the Scope of the Environmental Assessment) March 2012 Page left intentionally blank I II Page left intentionally blank III TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 APPLICATION

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN FOR RUTGERS, THE STATE UNIVERSITY OF NEW JERSEY. Camden Campus Camden, New Jersey

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN FOR RUTGERS, THE STATE UNIVERSITY OF NEW JERSEY. Camden Campus Camden, New Jersey SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN FOR RUTGERS, THE STATE UNIVERSITY OF NEW JERSEY Camden Campus Camden, New Jersey Original Date of Plan: May 2015 Date of Last Plan Amendment: Date of Last

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Sea Level Rise: Impacts, Adaptation and Information Gaps

Sea Level Rise: Impacts, Adaptation and Information Gaps University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 28th, 10:00 AM - 12:00 PM Sea Level Rise: Impacts, Adaptation and Information Gaps Jeffrey R.

More information

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM Page 1 of 10 INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM S A N F R A N C I S C O P U B L I C U T I L I T I E S C O M M I S S I O N Wastewater Enterprise/Collection System Division 3801

More information

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction

More information