Complying with Dam Safety Regulations The Sleepy Hollow Lake Story

Size: px
Start display at page:

Download "Complying with Dam Safety Regulations The Sleepy Hollow Lake Story"

Transcription

1 Sleepy Hollow Lake Dam National Inventory of Dams # NY00142 NY State ID# Complying with Dam Safety Regulations The Sleepy Hollow Lake Story Association of Property Owners of Sleepy Hollow Lake Unit Randy Road Athens, NY (518)

2 Association Manager Association of Property Owners of Sleepy Hollow Lake

3 The Community Private Homeowners Association Developed in the 1970 s Governed by the SHL Board of Directors through Protective Covenants and By-Laws Staffing Administrative - 5 Maintenance - 11 Public Safety 24/7-19 Seasonal Lifeguards/ID Checkers 30 Water Treatrment Plant - 3 Waste Water Treatment Plant - 3

4 The Lake Our Reservoir 324 acres 2 ½ miles long 70-feet deep at deepest 17-miles of shoreline Boating, Swimming, Fishing, Waterskiing

5

6 Amenities Lodge Beach 2-Pools 2-Tennis Courts Tennis Club 2-Basketball Courts Several Parks Infrastructure 22 Miles of Roads Water Treatment Plant 2-Water Towers Fire Hydrants Wastewater Treatment Plant (Pressurized System) 3-Pump Stations DAM

7 The Dam Completed in 1973 Murderers Creek Class A drinking water reservoir Class A fresh surface waters A source of water supply for drinking Recreation and fishing Class C High Hazard Dam

8 Sleepy Hollow Dam Athens, NY

9 Dam Construction Data Earthen Dam with Clay Soil Core Embankment (Earth) Concrete Spillway Drainage System Regulating Outlet Plunge Pool Downstream Channels Monitoring Instrumentation

10 Spillway Components OGEE WEIR TRAINING WALLS CHUTE APRON - SLAB RETAINING ( WING ) WALLS

11

12 Chimney Drain & Base Drains

13 Outlet Works Regulating outlet is a 48 diameter concrete pipe controlled by a mechanically activated sluice gate. Downstream Channel Spillway empties directly into original Murderer s Creek the regulating outlet into an auxillay channel that directs flow to the creek and out to the Hudson River

14

15 Monitoring Instrumentation PIEZOMETER WELLS A piezometer is a small diameter observation well used to measure the hydraulic head of groundwater. SHL dam has 15 wells

16

17 Critical Dam Data Dam Length: 753 Feet Dam depth: 150 at top to 350 ft at bottom Year Complete: 1973 River: Murderers Creek Reservoir: 3.9 Billion Gallons of Water Raw Water Intakes: 5-feet and 15-feet deep Filtration Plant Capacity: 2 Million Gallons per day Watershed: 13.3 Square Miles Dam Elevation: 82.5 Feet Spillway Elevation: 70 feet Spillway Type: Ogee Spillway dimensions: 80 x 550

18

19

20 Dam Safety Revisions EAP Due August Submitted June 2008 Inspection and Maintenance Plan Due August 2010 Completed January 2010 Engineering Assessment Due August 2012 and every 10-years after Annual Certification by January 31 each year beginning 2010

21 Sleepy Hollow Lake Dam Emergency Action Plan The Plan Inundation Map Notification Flow Chart Engineering Assessment Inspection and Maintenance Plan Action Items Table-Top Physical Drill Promulgation and Concurrence Continuing Education Networking

22 EMERGENCY ACTION PLAN NATIONAL INVENTORY OF DAMS #NY00142 SLEEPY HOLLOW LAKE DAM Association of Property Owners of Sleepy Hollow Lake, Inc Unit Randy Road Athens, NY (518) Sleepy Hollow Lake Copyright 1999

23 TABLE OF CONTENTS I. NOTIFICATION FLOWCHART 1 II. STATEMENT OF PURPOSE.. 5 III. PROJECT DESCRIPTION. 6 IV. EMERGENCY DETECTION, EVALUATION, & CLASSIFICATION. 8 V. GENERAL RESPONSIBILITIES UNDER THE EAP 11 A. DAM OWNER RESPONSIBILITIES. 11 B. RESPONSIBILITY FOR NOTIFICATION. 13 C. RESPONSIBILITY FOR EVACUATION.. 14 D. RESPONSIBILITY FOR DECLARATION OF WATER EMERGENCY 14 E. RESPONSIBILITY FOR TERMINATION AND FOLLOW-UP 14 F. PROVISIONS FOR SECURITY MEASURES 15 G. EAP COORDINATOR RESPONSIBILITY 15 VI. PREPAREDNESS 16 VII. INUNDATION MAPS 18 APPENDICES A. Figures 1. Regional Vicinity Map 2. Dam Location Map B. Procedures By Classification C. Plans for Training, Exercising, Updating and Posting the EAP D. Site-Specific Concerns E. Guidance Documents for the Dam Operator 1. Dam Incident Report Form 2. Visual Inspection Checklist & Diagram

24

25

26 Table Top November 2009 Working with Local and State EMS AAR NYSEMO REGION II The tabletop exercise was valuable and well-organized to bring all the agencies together for numerous reasons. The time for all the necessary personnel to meet is before an actual incident occurs in order to develop a relationship based on trust and respect. There are many examples of disasters being managed more proficiently if the significant staff had worked together previously. Also, this exercise revealed what supplies, equipment and personnel are available during a disaster from different agencies.

27 Physical Drill Greene County Emergency Services and New York State Office of Emergency Management DamEx10 Sleepy Hollow Lake Dam Alert and Notification Drill 25 September 2010 AFTER ACTION REPORT/IMPROVEMENT PLAN

28 Participating Organizations Athens Fire Department Catskill Fire Department Coxsackie Fire Department Greene County Emergency Services Greene County Sheriff American Red Cross Sleepy Hollow Association West Athens Lime Street Fire

29 Promulgation and Concurrence A Form must be submitted for all EAP s to indicate that consultation with local emergency managers has been completed. The owner is required to be fully familiar with the entire EAP, as the owner is responsible for the implementation of the EAP in the event of an emergency. An EAP is useful only if it accurately reflects site conditions, is kept up to date, and the roles of the various participants are understood and agreed to. It is the responsibility of each dam owner to develop an EAP tailored to their dam, and to coordinate the EAP with County Emergency Managers, other emergency responders, and local officials. The dam owner should seek to work with county and local emergency managers to develop a planning team that is aware of the dam, conditions at the dam site, and the unique conditions that must be considered should a dam incident occur.

30 Engineering Assessment Hydraulics and Hydrology Spillway Capacity The dam must handle a design flow rate of ½ the probable maximum flood = must handle drainage runoff imposed by a hurricane event Old standard HMR-33analysis New standard HMR 51/52 Stability Analysis Spillway and Ogee Weir Slope Stability Analysis of Earthen Dam

31 Inspection & Maintenance Plan Quarterly Inspection by staff Piezometer Readings Overgrowth of Vegetation Animal Burrows Annual Staff meetings Regular inspections by P.E. Dan Proper, Proper and O Leary Engineering Monitoring Points

32

33

34 Continuing Education Opportunities NYS DEC FEMA National Dam Safety Program Technical Seminar in Emmitsburg, MD every February ASDSO Association of State Dam Safety Officials Annual Conference Regional Conferences Publications

35 Networking Sharing of information Village of Athens Confirming Engineering advice NRCS Learn from others Experiences NYS Chapter of Dams??

36 Thank You! Laurel Mann (518)

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Project Authorization USDA's Small Watershed Program is carried out under the

More information

Instructions and Helpful Tips for Preparation of Emergency Action Plans

Instructions and Helpful Tips for Preparation of Emergency Action Plans Instructions and Helpful Tips for Preparation of Emergency Action Plans Maryland Department of the Environment Dam Safety Division October 2016 Adapted from 2007 NRCS Publication and FEMA 64 Emergency

More information

DEKALB COUNTY DEPARTMENT OF WATERSHED

DEKALB COUNTY DEPARTMENT OF WATERSHED DEKALB COUNTY DEPARTMENT OF WATERSHED DAM SAFETY THE MISSED RISK IN PLAIN SIGHT 11/9/2017 Sandra L. Glenn, P.E. Sandy A. Smith 1 AGENDA 1 7 INTRODUCTION 2 3 4 5 6 BASIC TERMINOLOGY DWM DAMS WHAT WE LEARNED

More information

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Name of Dam: Inspection Date: Current Weather: Weather During Last Week: Name of Creek,

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

Developments in the Safety and Security of Mining Industry Dams

Developments in the Safety and Security of Mining Industry Dams Developments in the Safety and Security of Mining Industry Dams John W. Fredland, P.E. Civil Engineer / Dam Safety Officer Mine Safety and Health Administration Tailings and Mine Waste `08 Conference Dam-Safety

More information

VII - WATER CONTROL PLAN

VII - WATER CONTROL PLAN VII - WATER CONTROL PLAN 7-01. General Objectives. Regulation of Saylorville Lake in conjunction with Lake Red Rock provides flood control benefits along both the Des Moines and Mississippi Rivers. Additionally,

More information

East Branch Dam Safety Initiative

East Branch Dam Safety Initiative East Branch Dam Safety Initiative STATUS REPORT November 2016 SUMMARY The primary objective of our Dam Safety Program is to maintain public safety by ensuring the dams we own and operate are safe and risks

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

Visual Inspection Checklist

Visual Inspection Checklist APPENDIX Q. Visual Inspection Checklist Thispageintentionallyleftblank. VISUAL INSPECTION CHECKLIST CITY OF AUBURN PUBLIC WORKS DEPARTMENT INSPECTION YEAR: TYPE OF INSPECTION: (Informal, Regular, Formal):

More information

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District

DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District DAM SAFETY Chena River Lakes Flood Control Project U.S. Army Corps of Engineers, Alaska District COL Reinhard Koenig, PE Commander, USACE Alaska District Patricia S. Opheen, PE Chief, Engineering Division

More information

Limited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii

Limited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii Limited Visual Dam Safety Inspections OA00017 Wahiawa Dam Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May 2006 Dam

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

Application for a Dam Permit Ash Basin No. 1

Application for a Dam Permit Ash Basin No. 1 Application for a Dam Permit Ash Basin No. 1 for the Sunbury Generating Station Shamokin Dam, Pennsylvania submitted to Commonwealth of Pennsylvania Department of Environmental Protection Bureau of Waterways

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Coal Combustion Residuals Inflow Design Flood Control System Plan

Coal Combustion Residuals Inflow Design Flood Control System Plan gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment

More information

Dam Safety Inspection Checklist

Dam Safety Inspection Checklist Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing

More information

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

McElroy s Run Impoundment Coal Combustion Residual Annual Report

McElroy s Run Impoundment Coal Combustion Residual Annual Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia GAI Project Number: C150917.01 January 2016 Prepared for: Allegheny Energy Supply Company,

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:

More information

Coal Combustion Residuals Unit Structural Stability Assessment

Coal Combustion Residuals Unit Structural Stability Assessment Coal Combustion Residuals Unit Structural Stability Assessment Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C1500035.00

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

ROLE OF THE FIRM IN THE PROJECT

ROLE OF THE FIRM IN THE PROJECT PROJECT DESCRIPTION Lake Loramie Dam is a Class I dam located in Lake Loramie State Park in Minster, Ohio. Lake Loramie originally served as the high feeder water supply for the Miami-Erie Canal that began

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Volume II: Hazard Annex Dam Failure

Volume II: Hazard Annex Dam Failure Volume II: Hazard Annex Dam Failure Causes and Characteristics of Dam Failure Dam Characteristics Dams are impervious structures that block the flow of water in a river or stream, capturing water behind

More information

WELCOME TO POND 101 OREGON WATER RESOURCES DAM SAFETY SECTION. John Falk, PE

WELCOME TO POND 101 OREGON WATER RESOURCES DAM SAFETY SECTION. John Falk, PE WELCOME TO POND 101 OREGON WATER RESOURCES DAM SAFETY SECTION John Falk, PE MISCONCEPTION 101 This is my own property..so I guess it s really none of your %*&^`!# business if I want to build a pond. R

More information

McElroy s Run Impoundment Structural Stability Assessment Report

McElroy s Run Impoundment Structural Stability Assessment Report Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia October 2016 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company

More information

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:

More information

APPENDIX III Hydrologic and Hydraulic Evaluations

APPENDIX III Hydrologic and Hydraulic Evaluations APPENDI III Hydrologic and Hydraulic Evaluations Hydrologic and Hydraulic Analysis Related to Compliance Requirements South Fly Ash Pond, Boiler Slag Pond and Clearwater Pond Kyger Creek Power Plant, Gallia

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

VICINITY MAP AND SITE MAP. Page 1 of 9

VICINITY MAP AND SITE MAP. Page 1 of 9 INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Glades Reservoir Environmental Impact Statement (EIS)

Glades Reservoir Environmental Impact Statement (EIS) Glades Reservoir Environmental Impact Statement (EIS) Permit Application #SAS-2007-00388 Public Scoping Meeting Proposed Operational Plan/Scenarios March 2012 Glades Reservoir Environmental Impact Statement

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA Overview Romania has built 2,617 dams out of which 246 are large and medium dams and 1260 are small dams, as per

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

If any questions arise concerning this application, please contact us.

If any questions arise concerning this application, please contact us. Cherokee Rivers Company, LLC 390 Timber Laurel Lane Lawrenceville, GA 30043 Office of the Secretary Federal Energy Regulatory Commission Mail Code: DHAC, PJ-12 888 First Street, N.E. Washington, D.C. 20426

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

Report. Environmental Water Demands. Butte County Department of Water and Resource Conservation Integrated Water Resources Plan.

Report. Environmental Water Demands. Butte County Department of Water and Resource Conservation Integrated Water Resources Plan. Report Butte County Department of Water and Resource Conservation Integrated Water Resources Plan s June 2004 s Section 1 - Introduction 1.1 Project Description This project is a preliminary investigation

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

What s Wrong with this Picture?

What s Wrong with this Picture? Ulster County, PO Box 1800, 244 Fair Street, Kingston NY 12402 January 18, 2011 Dear Concerned Ulster County Citizens, According to U.S. Supreme Court Justice Oliver Wendell Holmes, A river is more than

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

MWRA s Climate Change Strategy

MWRA s Climate Change Strategy Massachusetts Water Resources Authority MWRA s Climate Change Strategy Frederick A. Laskey Executive Director June 15, 2018 Changing Precipitation Quantity and Patterns Currently, we average 104 rain events

More information

DAM SAFETY PRESENTATION REGULATORY REQUIREMENTS FOR DAM ENGINEERING ASSESSMENTS IN NEW YORK Allan Estivalet, PE

DAM SAFETY PRESENTATION REGULATORY REQUIREMENTS FOR DAM ENGINEERING ASSESSMENTS IN NEW YORK Allan Estivalet, PE Lower Hudson Regional Conference Carmel, NY DAM SAFETY PRESENTATION REGULATORY REQUIREMENTS FOR DAM ENGINEERING ASSESSMENTS IN NEW YORK Allan Estivalet, PE July 24, 2015 NEW YORK STATE DAM SAFETY REGULATIONS

More information

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River

WEST POINT PERTINENT DATA. GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River WEST POINT PERTINENT DATA GENERAL Location (damsite) Troup County GA, Chambers County AL, miles above mouth of Chattahoochee River 201.4 Drainage area, Buford Dam to West Point Dam, square miles 2,406

More information

DRAFT MASTER PLAN RICHFIELD HERITAGE PRESERVE. Environmental OCTOBER 2016

DRAFT MASTER PLAN RICHFIELD HERITAGE PRESERVE. Environmental OCTOBER 2016 DRAFT MASTER PLAN RICHFIELD HERITAGE PRESERVE OCTOBER 2016 Environmental DesignGroup STREETSBORO RD SITE BROADVIEW ROAD RICHFIELD HERITAGE PRESERVE 336 ACRES CLEAN OHIO CLEAN OHIO OVIATT RD RECAP FEBRUARY

More information

4.4.6 Underground Detention

4.4.6 Underground Detention 4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention

More information

INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT

INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT Lower AQC Impoundment Kansas City Power & Light Company La Cygne Generating Station File No. 27216294.00 Prepared by: SCS ENGINEERS 7311 West 130th

More information

DESIGN CRITERIA FOR TERMINAL STORAGE RESERVOIRS

DESIGN CRITERIA FOR TERMINAL STORAGE RESERVOIRS DESIGN CRITERIA FOR TERMINAL STORAGE RESERVOIRS Joint Booster Pump Station #3 Reservoir Nicole Rutigliano, P.E. May 29, 2014 PROJECT BACKGROUND Integrated Pipeline Project 149 miles of pipeline 3 booster

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake Upper Lightning Lake Water Level Management Environmental Assessment Worksheet Attachment D Design Report for Upper Lightning Lake DESIGN REPORT for Upper Lightning Lake Wetland Enhancement MN-332-2 I

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Flood Control District of Maricopa County Dam Safety Program

Flood Control District of Maricopa County Dam Safety Program 2015 Annual ASCE/ASHE State Conference Flood Control District of Maricopa County Dam Safety Program Presented by: Tom Renckly, P.E. Dam Safety Branch Manager PPM Division, FCDMC Powerline FRS 2 Background

More information

Massachusetts Water Resources Authority Severe Weather Preparedness For MWRA Coastal Facilities

Massachusetts Water Resources Authority Severe Weather Preparedness For MWRA Coastal Facilities Massachusetts Water Resources Authority Severe Weather Preparedness For MWRA Coastal Facilities October 16, 2013 Water System Not Threatened All MWRA dams, dikes, spillways and appurtenances are inspected

More information

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam ASDSO September 10, 2008 John Rutledge - Freese & Nichols, Inc. Chuck Easton - Freese & Nichols, Inc. Janis Murphy - Freese & Nichols, Inc.

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I

Yale Hydroelectric Project FERC Project No APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I APPLICATION FOR NEW LICENSE FOR MAJOR PROJECT Volume I Executive Summary Initial Statement Exhibit A - Description of the Project Exhibit B - Project Operation and Resource Utilization Exhibit C - Construction

More information

Additional information about MCD may be found at

Additional information about MCD may be found at The Miami Conservancy District Request for Qualifications Engineering Services for Regional Flood Protection System SOQ for Dam Concrete Wall Drain April 26, 2018 Request for Qualifications The Miami Conservancy

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

National Inventory of Dams Overview

National Inventory of Dams Overview National Inventory of Dams Overview NID Data Team 26 May 2015 US Army Corps of Engineers NID Definition Congressionally authorized database documenting dams in the United States and its territories Maintained

More information

Mossyrock Dam/Riffe Lake Update

Mossyrock Dam/Riffe Lake Update Mossyrock Dam/Riffe Lake Update Generation Manager Pat McCarty Mossyrock Community Center March 3, 2017 AGENDA Overview Background Seismicity Current risks Temporary risk reduction methods Path forward

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: APRIL 19, 2017 PERIODIC

More information

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226 17 October 2016 134 N. La Salle Street, Suite 300 Chicago, Illinois 60602 PH 312.658.0500 FAX 312.658.0576 www.geosyntec.com Via Email Mr. William Neal, P.E. Technological Specialist DTE Electric Company

More information

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update United States Army Corps of Engineers Addicks and Barker Dam Safety Update COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers March 9, 2016 US Army Corps of Engineers

More information

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared for: FirstEnergy Generation, LLC 76 South Main St Akron, Ohio 44308 2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared by: 10211 Wincopin Circle, Floor 4 Columbia,

More information

El Dorado Forebay Dam Modification Project

El Dorado Forebay Dam Modification Project FREQUENTLY ASKED QUESTIONS El Dorado Forebay Dam Modification Project What is El Dorado Forebay Dam and Reservoir? The El Dorado Forebay Dam and Reservoir was constructed in 1923 as a key part of the El

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Chapter VII. Falls Lake Project -- Water Control Plan

Chapter VII. Falls Lake Project -- Water Control Plan Chapter VII. Falls Lake Project -- Water Control Plan (This January 2000 revision incorporates approved structural and guide curve changes made at Falls Dam per 1994 EA/1995 FONSI to address storage shortage.)

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

2017 ANNUAL DAM AND DIKE INSPECTION REPORT 2017 ANNUAL DAM AND DIKE INSPECTION REPORT ASH PONDS WELSH POWER PLANT CASON, TEXAS November, 2017 Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS-17-067

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

EMERGENCY ACTION PLAN ASH SURGE BASIN AND BYPASS BASIN POWERTON STATION APRIL 2017

EMERGENCY ACTION PLAN ASH SURGE BASIN AND BYPASS BASIN POWERTON STATION APRIL 2017 EMERGENCY ACTION PLAN ASH SURGE BASIN AND BYPASS BASIN POWERTON STATION APRIL 2017 This Emergency Action Plan (EAP) has been prepared pursuant to Title 40 of the Code of Federal Regulations (CFR) Part

More information

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

LAKE CHEMUNG DAM LOCATION MAP

LAKE CHEMUNG DAM LOCATION MAP LAKE CHEMUNG DAM LOCATION MAP LAKE CHEMUNG DAM OUTLET LAKE CHEMUNG DAM From: deq-wrd-qreq To: Steve Nagy Subject: RE: flood or low flow discharge request (ContentID - 168812) Date: Friday, June 26, 2015

More information

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT

More information

LAKE SHELBYVILLE MASTER PLAN KASKASKIA RIVER WATERSHED SHELBYVILLE ILLLINOIS

LAKE SHELBYVILLE MASTER PLAN KASKASKIA RIVER WATERSHED SHELBYVILLE ILLLINOIS LAKE SHELBYVILLE MASTER PLAN KASKASKIA RIVER WATERSHED SHELBYVILLE ILLLINOIS 1.1. PROJECT AUTHORIZATION CHAPTER 1 - INTRODUCTION Federal laws provide that land and water areas of Department of the Army

More information

CCR Rule Annual Inspection Report 2

CCR Rule Annual Inspection Report 2 Inspection Description An ARCADIS team performed the Trimble County Gypsum Storage Pond (GSP) 2015 annual inspection by a qualified professional engineer. The overall goal of the inspection was to ensure

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Natural and Engineered Wetlands for Stormwater Management

Natural and Engineered Wetlands for Stormwater Management Natural and Engineered Wetlands for Stormwater Management Dan Hitchcock, Ph.D., P. E. Baruch Institute of Coastal Ecology and Forest Science Clemson University Georgetown, SC Prominence and Diversity of

More information

CCR Certification: Initial Written Post-Closure Plan (d) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Certification: Initial Written Post-Closure Plan (d) for the Ash Pond at the A.B. Brown Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square. Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

East Branch Dam Elk County, Pennsylvania Interim Risk Reduction Measures

East Branch Dam Elk County, Pennsylvania Interim Risk Reduction Measures June 2009 East Branch Dam Elk County, Pennsylvania Interim Risk Reduction Measures Environmental Assessment East Branch Dam Elk County, Pennsylvania Interim Risk Reduction Measures Environmental Assessment

More information

University Park Campus Stormwater Presentation

University Park Campus Stormwater Presentation University Park Campus Stormwater Presentation OPP Stormwater Management Training and Education Series The University has a holistic approach to stormwater and wastewater management, as well as potable

More information

Lewisville Dam. Draft Dam Safety Modification Environmental Assessment Public Review

Lewisville Dam. Draft Dam Safety Modification Environmental Assessment Public Review Lewisville Dam Draft Dam Safety Modification Environmental Assessment Public Review Stacy Gray (Project Manager) U.S. Army Corps of Engineers, Fort Worth District 27 September 2016 US Army Corps of Engineers

More information

Short title. This chapter may be cited as the "Kern County Plumbing Code."

Short title. This chapter may be cited as the Kern County Plumbing Code. Chapter 17.20 PLUMBING CODE Sections: 17.20.010 Short title. 17.20.020 Applicability. 17.20.030 Uniform Plumbing CodeBAdopted. 17.20.040 Uniform Plumbing CodeBProvisions not adopted. 17.20.050 Uniform

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Travers Reservoir Rehabilitation Project Irrigation Technical Conference Lethbridge, AB June 2, 2010

Travers Reservoir Rehabilitation Project Irrigation Technical Conference Lethbridge, AB June 2, 2010 Travers Reservoir Rehabilitation Project 2010 Irrigation Technical Conference Lethbridge, AB June 2, 2010 Location Plan Western Irrigation District Headworks CALGARY Eastern Irrigation District Headworks

More information

November 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project

November 15, The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project November 15, 2017 The Round Valley Reservoir Structures Refurbishment and Resource Preservation Project OVERVIEW Team Introduction About the NJWSA About Round Valley About the Project Project Components

More information

Reservoir Drought Operations

Reservoir Drought Operations Reservoir Drought Operations Kevin J. Landwehr, P.E., D.WRE Chief, Hydrology and Hydraulics Branch 4 March 2013 Purpose Awareness of Drought Contingency Plans 2012/13 Reservoir Operations Drought Management

More information

INSTALLATION AND HYDROLOGIC RESPONSE OF THE PENN STATE LOW HEAD WEIRS

INSTALLATION AND HYDROLOGIC RESPONSE OF THE PENN STATE LOW HEAD WEIRS INSTALLATION AND HYDROLOGIC RESPONSE OF THE PENN STATE LOW HEAD WEIRS Larry Fennessey, James Hamlett, and Rob Cooper University Park Campus The Pennsylvania State University University Park, Pennsylvania

More information

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES

TOLEDO BEND PROJECT FERC NO DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES TOLEDO BEND PROJECT FERC NO. 2305 DRAFT LICENSE APPLICATION EXHIBIT E - ENVIRONMENTAL EXHIBIT 2.0 PROPOSED ACTION AND ALTERNATIVES May 2011 Copyright 2011.Sabine River Authority of Texas and Sabine River

More information

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM May 1, 2013 DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM Name of Dam: Glenwood Lake Dam Westchester County, NY, NYSDEC ID No. 215-0184 NATDAM ID No. NY13618 Hazard Potential:

More information

STRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT Bremo Power Station CCR Surface Impoundment: North Ash Pond ~,Dominion Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff,

More information