Schedule D3. Data Item Descriptions. Quality Assurance

Size: px
Start display at page:

Download "Schedule D3. Data Item Descriptions. Quality Assurance"

Transcription

1 DID, Front Cover QA Document Identifier Number: [* insert VSY Document #] Rev: 1 Title: DID Front Cover Quality Assurance Ship applicability: All Document Owner: [* insert name] Document Approver: [* insert name] Master Template Ref: DID Front Cover QA Project: [*insert name] Type Organisation Area Supplier VSY Supplier Code SWBS DID QA Subcontracts / SCM [* insert name] [* insert VSY number] [* insert VSY number] Schedule D3 Data Item Descriptions Quality Assurance Prepared by: Vancouver Shipyards Co. Ltd. 50 Pemberton Ave. North Vancouver, BC, Canada, V7P 2R2 Tel: (604) Fax: (604) Vancouver Shipyards Co. Ltd Unclassified Page 1 of 1 Intellectual Property Rights owned by Vancouver Duplicate 1of 2 Shipyards Co. Ltd ]

2 Quality Plan Rev 2 Document Identifier Number: [* insert VSY document number] Rev: 1 Title: Quality Plan Ship applicability: All Master Template Ref: DID QA201 Quality Plan Project: All Type Organisation Area Supplier VSY Supplier Code SWBS DID Supply Chain Subcontracts / SCM [*insert name] [* insert VSY number] [* insert VSY number] Data Item Description Quality Plan QA201 Prepared by: Vancouver Shipyards Co. Ltd. 50 Pemberton Ave. North Vancouver, BC, Canada, V7P 2R2 Tel: (604) Fax: (604) Date:06 Apr 16 Vancouver Shipyards Co. Ltd Template ref: QA201 Quality Plan Unclassified Page 1 of 4

3 Quality Plan Rev 2 Quality Plan QA201 Purpose The purpose of the Quality Plan (QP) is to detail the Supplier s specific quality arrangements, practices, processes, procedures, resources and activities pertaining to the development, design, manufacture, testing and release of the Work performed under the Subcontract. The QP shall, as much as possible and consistent with the requirements set out below, utilise the same management tools and methods already in use by the Supplier to manage and monitor its own business. The QP will be referenced by the Purchaser when conducting Supplier audits. References This DID must be read in conjunction with Schedule A (General Conditions) and the corresponding SOW reference. Preparation Instructions This Data Item shall comply with the general format, content and preparation instructions set out in Part 1 (Introduction) of Schedule D1 (SOW) and Part 1 of Schedule D2 (SDRL). Format and Content The QP shall include as a minimum: 1 title page; 2 contents and amendment record 3 introduction, Subcontract description, definitions, abbreviations, etc ; 4 purpose and scope of QP; 5 details of the Supplier s quality management system and scope of ISO 9001 registration 6 details of the organisation, roles and responsibilities and the interfaces relevant to this Subcontract lists of applicable standards, specifications, QA/QC documentation and certification records relevant to the Subcontract; 7 quality risks associated with the SOW and Supplier s method of operation; 8 a list of all processes and procedures relevant to the Subcontract and available during supplier audits 9 the specific arrangements for providing assurance of the satisfactory quality of Deliverables from the Supplier and the Supplier s lower tier suppliers and the measures to be adopted to ensure compliance. Include (or make reference to) all major lower tier suppliers, scope of supply, activities, and show the Supplier s proposed involvement; 10 If contractually required provide the specific Regulatory, Statutory and National Standard: (a) Classification Society material certification and traceability requirements relevant to the Subcontract; (b) Classification Society Rules and Regulations for Classification of Ships (c) Classification Society Register Survey Procedures/ Marine Survey Procedures Manual Template ref: QA201 Quality Plan Unclassified Page 2 of 4

4 Quality Plan Rev 2 (d) IAC Recommendation 47 Shipbuilding & Repair Quality Standard (SARQS) (e) ASTM F2016 Standard Practice for Establishing Standard Practice for Establishing Shipbuilding Quality Requirements for Hull Structure, Outfitting, and Coatings 11 procedures for configuration management and change control processes; 12 reference to measurement, analysis and improvement activities including a schedule of internal audits specific to the Subcontract and its requirements; 13 procedures for processing non-conformance reports and concession requests; 14 in addition for any Software supply, the Supplier shall comply with the requirements of Part 3 (Engineering) of the SOW and include a Software Quality Plan; 15 contact details for the Supplier s Independent QA/QC representative; 16 details of the Inspection and Test Plan including all Hold Points and Witness points for the Purchaser and Classification Society; and 17 in the event that the Work includes fabrication of part or parts of a Ship, the QP shall include the following additional information: (a) scope of Classification Society activities; (b) list of Dimensional control procedures; (c) list of Welding Procedure, Procedure Qualification Records and Welder Qualification records; and (d) list of Applicable NDT procedures. 18 The Supplier must report on the progress of the Manufacturing Information (MI) development in Monthly Progress Reports. 19 If contractually required the Supplier must provide full access to the developing MI and the ability to inspect the MI as it is produced. Manufacturing Information includes but is not limited to: (a) Work or shop orders and drawings (b) Bill of materials, (c) Special instructions and tools, (d) Dimensional and accuracy control requirements (e) QC and Testing requirements, (f) Vendor and loose parts installation details, (g) Hazard assessments, (h) Weight control information (i) Process improvement documents. Template ref: QA201 Quality Plan Unclassified Page 3 of 4

5 Quality Plan Rev 2 Template ref: QA201 Quality Plan Unclassified Page 4 of 4

6 Concession Application Document Identifier Number: [* insert VSY document number] Rev: 1 Title: Concession Application Ship applicability: All Master Template Ref: DID QA202 Concession Application Project: All Type Organisation Area Supplier VSY Supplier Code SWBS DID Supply Chain Subcontracts / SCM NA NA NA Data Item Description Concession Application QA202 Prepared by: Vancouver Shipyards Co. Ltd. 50 Pemberton Ave. North Vancouver, BC, Canada, V7P 2R2 Tel: (604) Fax: (604) Vancouver Shipyards Co. Ltd Unclassified Page 1 of 2

7 Concession Application Concession Application QA202 Purpose The Concession Application is the method for the Supplier to request acceptance of a non-conforming Deliverable or Item of a Deliverable. References This DID must be read in conjunction with Schedule A (General Conditions) and the corresponding SOW reference. Preparation Instructions This Data Item shall comply with the general format, content and preparation instructions set out in Part 1 (Introduction) of Schedule D1 (SOW) and Part 1 of Schedule D2 (SDRL). Format and Content The Concession Application shall be prepared in Supplier s format to include: 1. the Supplier s name and address; 2. the description of the Equipment / System being supplied under the Subcontract (description / quantity / period / batch / lot number/ Specifications / drawing number and issue / Supplier s part number / NATO stock number (if available) / Purchaser s part number,, etc ); 3. the Agreement number; 4. the Covering Purchase Order number; 5. the SWBS number; 6. the Supplier s Non-Conforming Request (NCR) number will be the concession reference number; 7. a description of the non-conformance and proposal for corrective action; 8. reference to previous concessions of a similar type (if any); 9. impact on Subcontract requirements. e.g. effect on the Purchaser s Technical Requirements, Supplier s Specifications, Delivery Dates, limitation in use of performance, etc ; 10. endorsement by Supplier; 11. endorsement by the Purchaser s Technical Authority. i.e. person responsible for the design (when appropriate); 12. field for decision by the Purchaser s Subcontract Authority; and 13. field for comment by the Purchaser s Subcontract Authority, including recommendations for any further action required. e.g. Subcontract amendment, product recall, etc Unclassified Page 2 of 2

8 Inspection and Test Plan Document Identifier Number: [* insert VSY document number] Rev: 1 Title: Inspection and Test Plan Ship applicability: All Master Template Ref: DID QA203 Project: All Type Organisation Area Supplier VSY Supplier Code SWBS DID Supply Chain Subcontracts / SCM NA NA NA Data Item Description Inspection and Test Plan QA203 Prepared by: Vancouver Shipyards Co. Ltd. 50 Pemberton Ave. North Vancouver, BC, Canada, V7P 2R2 Tel: (604) Fax: (604) Vancouver Shipyards Co. Ltd Unclassified Page 1 of 2

9 Inspection and Test Plan Inspection and Test Plan PM203 Purpose The Inspection and Test Plan is intended to provide instructions to Suppliers on the standards and contents of the Supplier s Inspection and Test Plans (ITP) to meet the Purchaser s Technical Requirements. The purpose of the ITP is to detail the Supplier s specific quality control arrangements for the product realisation from material suborders, manufacture, inspection, test, integration and Final Acceptance of the Equipment, SPT and Spares. The ITP shall, as much as possible and consistent with the requirements set out below, utilise the same management tools and methods already in use by the Supplier to manage and monitor its own business. References This DID must be read in conjunction with Schedule A (General Conditions) and the corresponding SOW reference. Preparation Instructions This Data Item shall comply with the general format, content and preparation instructions set out in Part 1 (Introduction) of Schedule D1 (SOW) and Part 1 of Schedule D2 (SDRL). Format and Content The ITP shall comply with the requirements of [*] and shall include as a minimum: 1 title page; 2 contents, amendment record and distribution etc ; 3 introduction, subcontract description, definitions, abbreviations etc ; 4 purpose and scope of ITP; 5 sequential stages and activities including manufacture, testing, acceptance and release; 6 reference to the controlling procedures; 7 Provisional and Final Acceptance criteria; 8 verification records; and 9 involvement by the Supplier, Purchaser, the Classification Society and other third parties. Unclassified Page 2 of 2

10 Certificate of Conformance Document Identifier Number: [* insert VSY document number] Rev: 1 Title: Certificate of Conformance Ship applicability: All Master Template Ref: DID QA204 Certificate of Conformance Project: All Type Organisation Area Supplier VSY Supplier Code SWBS DID Supply Chain Subcontracts / SCM NA NA NA Data Item Description Certificate of Conformance QA204 Prepared by: Vancouver Shipyards Co. Ltd. 50 Pemberton Ave. North Vancouver, BC, Canada, V7P 2R2 Tel: (604) Fax: (604) Vancouver Shipyards Co. Ltd Unclassified Page 1 of 2

11 Certificate of Conformance Certificate of Conformance QA204 Purpose The Certificate of Conformity (CoC) is intended to assure the Purchaser that the Work undertaken by the Supplier and the Supplier s lower tier suppliers complies with the requirements of the Subcontract. References This DID must be read in conjunction with Schedule A (General Conditions) and the corresponding SOW reference. Preparation Instructions This Data Item shall comply with the general format, content and preparation instructions set out in Part 1 (Introduction) of Schedule D1 (SOW) and Part 1 of Schedule D2 (SDRL). Format and Content The Certificate of Conformity shall include as a minimum: 1 Description of the Equipment; 2 SWBS #; 3 Agreement #: 4 Covering Purchase Order # 5 Purchaser s part numbers; 6 Supplier s part numbers; 7 NATO Stock Number (if codified); 8 issue and modification status of each Equipment, SPT and Spare SWBS #; 9 identification of any outstanding Defects, deficiencies, non-conformances or equivalent terminology; 10 statement of any concessions or production permits; 11 where applicable, a statement of calibration status supported with a valid Certificate of Calibration showing date of calibration and calibration period [or when recalibration is required]; 12 Items of the Equipment or Spares subject to shelf life the expiry date/dates must be stated; 13 lifting load handling data must be included where applicable; 14 The following statement: We hereby certify that the Equipment, SPT or Spares detailed herein have been inspected, tested and conform in all respects with the requirement of the Subcontract. The quality control and assurance arrangements adopted in respect of the items have accorded with the conditions of our ISO 9001 registration. 15 The Certificate of Conformity shall be signed by the Supplier s Quality Manager or his nominated representative. Unclassified Page 2 of 2

12 DRACAS Report Document Identifier Number: [* insert VSY document number] Rev: 1 Title: Defect Recording and Corrective Action System Report Ship applicability: All Master Template Ref: DID QA210 DRACAS Report Project: All Type Organisation Area Supplier VSY Supplier Code SWBS DID Supply Chain Subcontracts / SCM NA NA NA Data Item Description Defect Recording and Corrective Action System Report QA210 Prepared by: Vancouver Shipyards Co. Ltd. 50 Pemberton Ave. North Vancouver, BC, Canada, V7P 2R2 Tel: (604) Fax: (604) Vancouver Shipyards Co. Ltd Unclassified Page 1 of 2

13 DRACAS Report Defect Recording and Corrective Action System Report QA210 Purpose The purpose of the Defect Recording and Corrective Action System (DRACAS) is to capture the failures, remedies and improvements relating to Defects in the Deliverables. References This DID must be read in conjunction with Schedule A (General Conditions) and the corresponding SOW reference. Preparation Instructions This Data Item shall comply with the general format, content and preparation instructions set out in Part 1 (Introduction) of Schedule D1 (SOW) and Part 1 of Schedule D2 (SDRL). Format and Content 1 Supplier s format. 2 The DRACAS Report shall contain all Defects and corrective relating to the Equipment and/or Deliverable Software. Unclassified Page 2 of 2

Schedule D3. Data Item Descriptions. Quality Assurance

Schedule D3. Data Item Descriptions. Quality Assurance DID, Front Cover QA Document Identifier Number: [* insert VSY Document #] Rev: 1 Title: DID Front Cover Quality Assurance Ship applicability: All Document Owner: [* insert name] Document Approver: [* insert

More information

Schedule D3. Data Item Descriptions. Finance

Schedule D3. Data Item Descriptions. Finance DID Front Cover Finance Document Identifier Number: [* insert VSY Document #] Rev: 1 Title: DID Front Cover Finance Ship applicability: All Document Owner: [* insert name] Document Approver: [* insert

More information

ARTICLES OF AGREEMENT

ARTICLES OF AGREEMENT Document No: [*insert number] Agreement number: [*insert number] ARTICLES OF AGREEMENT RELATING TO THE DESIGN, MANUFACTURE, SUPPLY AND SUPPORT OF [* insert description of the Equipment / System] for the

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

TURBO MACH A DIVISION OF VT SAA

TURBO MACH A DIVISION OF VT SAA TERMS AND CONDITIONS PAGE: 1 OF 5 1. PURPOSE To define specific terms and conditions for the purchase of product, materials and services. 2. SCOPE All products, materials and services purchased for use

More information

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0) TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...

More information

QUALITY ASSURANCE REQUIREMENTS

QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS PRETORIA QUALITY ASSURANCE REQUIREMENTS SPACE AT MUCKLENEUK CAMPUS, PRETORIA Page 1 1.1 QUALITY ASSURANCE REQUIREMENTS In undertaking the works (including all incidental services

More information

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST

NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST Edition C Version 1 DECEMBER 2017 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION Published

More information

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements Document 0000000000000045 Rev: State: RELEASED see Smarteam for approval authorities This document is applicable only to suppliers of Production Items as defined below and their sub-tier suppliers. Non-

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

DOCUMENT CONTROL INFORMATION

DOCUMENT CONTROL INFORMATION DOCUMENT CONTROL INFORMATION System: Document Title: Document Status: Quality Manual Approved 5 11/5/2014 Current Document Revision Details Formal review. Added section 2, 3. Revised section 5.5.2, 6.2,

More information

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner A. SCOPE This document contains requirements for conducting business with Tri Star Metals, LLC and its customers. It is applicable to suppliers that provide

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015 Clause A - Quality System Requirements All references to the term Government in any of the documents referenced below shall be replaced with the term Curtiss-Wright and/or the Government. All references

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

Clauses applicable only when specified by Q-number on the purchase order.

Clauses applicable only when specified by Q-number on the purchase order. Clauses applicable only when specified by Q-number on the purchase order. Q1 Certification of Raw Materials. Seller shall provide with each shipment, a certification of conformance to ARROW s specification

More information

CERTIFICATE OF REGISTRATION

CERTIFICATE OF REGISTRATION 03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.

More information

QUALITY ASSURANCE / QUALITY CONTROL POLICY

QUALITY ASSURANCE / QUALITY CONTROL POLICY QUALITY ASSURANCE / QUALITY CONTROL POLICY TABLE OF CONTENTS SI. NO. DETAILS 1. Introduction 2. Quality Policy and Objectives 3. Organization 4. Contract Review 5. Document and Data Control 6. Purchasing

More information

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio QMS-20 2016 FEC QUALITY MANUAL Federal Equipment Company 5298 River Rd Cincinnati, Ohio 45233 www.federalequipment.com www.fecheliports.com www.usdrillhead.com www.orionseals.com www.tkf.com REVISION:

More information

TASK REQUIREMENTS. Supplier Quality Requirements

TASK REQUIREMENTS. Supplier Quality Requirements This document is applicable only to suppliers of Production Items as defined below and their subtier suppliers. Non-Production Item suppliers are not subject to this document. This document specifies the

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

MASTER LIST OF OBJECTIVE QUALITY EVIDENCE (OQE) ATTRIBUTES. Introduction. List of OQE Attributes Applicable to Parts

MASTER LIST OF OBJECTIVE QUALITY EVIDENCE (OQE) ATTRIBUTES. Introduction. List of OQE Attributes Applicable to Parts CORPORATE MANAGEMENT SYSTEM MASTER LIST OF OBJECTIVE QUALITY EVIDENCE (OQE) ATTRIBUTES APPLICABILITY SHIPS DOCUMENT ID REVISION PUBLISHED DATE CMS-50503 5.0 22/05/2018 Introduction This document lists

More information

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax: SUBCONTRACTOR QUALITY SYSTEM QUESTIONNAIRE General: Company Name: Address: City: State: Zip: Country: Telephone: Fax: Business Information: Primary Products/Services: Type of Business: Manufacturing Distributor

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements 1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager Scope: This process outlines the Exotic Tool Welding (ETW) quality control terms and conditions levied to suppliers providing product or service for ETW. The QA codes identified on the purchase order correlate

More information

Supplier Assessment Questionnaire Audit Date : On-Site Audit Self Assessment Audit

Supplier Assessment Questionnaire Audit Date : On-Site Audit Self Assessment Audit Diemasters Manufacturing Inc. Diemasters Manufacturing Inc. 2100 Touhy Ave. Elk Grove Village, Illinois 60007 Phone: 847.640.9900 Fax: 847.640.6292 Supplier Assessment Questionnaire Audit Date : On-Site

More information

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001

QUALITY SYSTEM REQUIREMENTS FOR Manufacturer YFTFC001 PURPOSE: This specification outlines the Quality System requirements for Young & Franklin/Tactair Fluid ontrols suppliers. It is intended to assure that articles purchased from approved suppliers are as

More information

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary BS2482 TIMBER BOARDS ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With:

More information

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION Project Procedures BASIS OF OPERATION 09/21/2012 PAGE 1 OF 13 1.0 PURPOSE The purpose of this procedure is to establish the basis of operations that ensures that Project activities, including engineering,

More information

NUCLEAR QUALITY ASSURANCE MANUAL

NUCLEAR QUALITY ASSURANCE MANUAL NUCLEAR QUALITY ASSURANCE MANUAL COLUMBIANA HI TECH 1621 Old Greensboro Road, Kernersville, NC 27284 INTRODUCTION The Columbiana Hi Tech. Nuclear Quality Assurance Manual for 10 CFR Part 71, Subpart H,

More information

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth QUALITY ASSURANCE PROVISIONS FOR PURCHASE ORDER This document includes all Quality Assurance Provisions and definition available for inclusion on purchase orders and subcontracts issued by, Inc.,,, referenced

More information

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution. the latest, approved revision of this document please refer to the website (external) or master list (internal). Replaces: QP-06-200 Original issue date: May 22, 2003 1.0 PURPOSE 1.1 The Objective of this

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd. BS EN ISO 3834

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd. BS EN ISO 3834 Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd. TWIN 19 th January 2015 BS EN ISO 3834 Why is it important, and what s in it for you 1 EN

More information

SUPPLIER QUALITY SYSTEM SURVEY

SUPPLIER QUALITY SYSTEM SURVEY SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company

More information

Procurement Quality Assurance Requirements

Procurement Quality Assurance Requirements 1. REQUIREMENTS 1.1 Quality System This document provides the minimum Quality System Requirements to externally provided processes, products and services to Superior Thread Rolling (STR). Suppliers must

More information

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App Superecedes: QPOL-1001.24 Section: REVISION CONTRO LOG REVISION CONTROL LOG Number Rev Rev Date SS Description of Change By Chk App QPOL-0001 18 02-JAN-12 A Review & Update Quality Manual JD CN JD QPOL-0001

More information

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined

More information

NQA-1 Graded Approach, 55-Gallon Drum Summary

NQA-1 Graded Approach, 55-Gallon Drum Summary 1, Organization 2, Quality Assurance program 3, Design 4, Procurement Document 5, Instructions, procedures, and Drawings 100 Basic 200 Structure and Responsibility 201 General 202 Delegation of Work 300

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION Edition D Version 1 JUNE 2016 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION

More information

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14 Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual

More information

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd.

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd. Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd. Nuclear Supply Chain TWI Aberdeen 8 October 2015 BS EN ISO 3834 Why is it important, and

More information

Manufacture of welded products - Welding workshop

Manufacture of welded products - Welding workshop CLASS PROGRAMME Approval of manufacturers DNVGL-CP-0352 Edition April 2016 Manufacture of welded products - Welding workshop The electronic pdf version of this document, available free of charge from http://www.dnvgl.com,

More information

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Status: Latest Revision Date Revision Orig Abstract: This document describes the tailored quality management system for the build

More information

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS NATO STANDARD AQAP-2310 NATO QUALITY ASSURANCE REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS Edition B Version 1 DECEMBER 2017 NORTH ATLANTIC TREATY ORGANIZATION ALLIED QUALITY ASSURANCE PUBLICATION

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 1.0 PURPOSE To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC. 2.0 APPLICATION When (QAM) Appendix 8.4 is specified on the purchase order,

More information

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert 1.0 Purpose This document defines PECO-Astronics (PECO) purchased material flow-down requirements. Additional specifications may also apply and will be documented on the purchase order; all requirements

More information

Replaces: Not applicable.

Replaces: Not applicable. Page 1/12 SCOPE - defines the quality requirements for purchasing materials, parts and services that may affect product quality of Airborne items. does not include requirements for design and development

More information

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work.

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work. Labour and Advanced Education Guide for the preparation of quality programs for licensing of companies performing BPE regulated work. Company Name: QC Program issue#: Revision# Overview: 1. This guideline

More information

Supply Chain Quality Assurance (SCQA) Page 1 of 6

Supply Chain Quality Assurance (SCQA) Page 1 of 6 Supply Chain Quality Assurance (SCQA) Page 1 of 6 1. QUALITY ASSURANCE SYSTEM: Supplier shall maintain a Quality Assurance System fully compliant with ISO 9000 or equivalent. 2. QUALITY ASSURANCE SYSTEM:

More information

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. REF ONLY-DATA MANAGEMENT: 1 ST (2) PAGES IS NOT PART OF FORM 1135. QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised. FORM 1135 QUALITY ASSURANCE CLAUSES

More information

PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS

PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS Document: QC 22-001 Revision: T Date: 6/5/14 PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS Approved By Claude Rigsby Sourcing Manager Approved By Doug Nixon Manager,Quality Assurance PPG Industries,

More information

PURCHASING AND RECEIVING INSPECTION

PURCHASING AND RECEIVING INSPECTION PURCHASING AND RECEIVING INSPECTION Rev Issued To Title Date Signed By Rev 0 Management Team 12-03-07 ###### Rev 1 Management Team 19-04-07 ###### Rev 2 Management Team 25-05-09 ###### Rev 3 Management

More information

Tech Ord Supplier Quality Survey. Supplier Survey Evaluation

Tech Ord Supplier Quality Survey. Supplier Survey Evaluation Tech Ord Supplier Quality Survey Supplier Name: Address: City: State: Zip: Phone: Fax: Complete and Return to: Tech Ord, a Division of AMTEC 47600 180th St. Clear Lake, SD, 57226 Attention: Quality Manager

More information

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items REVISION RECORD The latest issue to this document is the version that is available on the Lockheed Martin

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

TABLE OF CONTENTS. 1.0 INTRODUCTION Page SCOPE Page REFERENCES Page REQUIREMENTS Page QUALITY ASSURANCE Page 8

TABLE OF CONTENTS. 1.0 INTRODUCTION Page SCOPE Page REFERENCES Page REQUIREMENTS Page QUALITY ASSURANCE Page 8 TABLE OF CONTENTS 1.0 INTRODUCTION Page 3 2.0 SCOPE Page 3 3.0 REFERENCES Page 4 4.0 REQUIREMENTS Page 5 5.0 QUALITY ASSURANCE Page 8 6.0 SUBMITTALS Page 9 7.0 PREPARATION FOR SHIPMENT Page 10 Page 2 of

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions Quality Requirements 1-9 are Mandatory on all Purchase Orders for products or services

More information

CONTRACT CONDITIONS, TECHNICAL, STANDARD FOR

CONTRACT CONDITIONS, TECHNICAL, STANDARD FOR CONTRACT CONDITIONS, TECHNICAL, STANDARD FOR SUBTITLE : PART 4: PRODUCTION PROGRAMMES SUMMARY : ARMSCOR S TECHNICAL CONTRACT REQUIREMENTS FOR PRODUCTION PROGRAMMES. KEY WORDS : TECHNICAL CONTRACT CONDITIONS,

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product

More information

Cargotec Supplier Requirements

Cargotec Supplier Requirements Cargotec Supplier Requirements 2015-02-17 CSR V2.0 1 Management Responsibility... 6 1.1 Business Plan... 6 1.2 Key Performance Indicators... 6 1.3 Financial Stability... 6 1.4 Quality Management System...

More information

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 QUALITY MANAGEMENT SYSTEM... 2 2.1 Quality Management

More information

Hull Survey for New Construction

Hull Survey for New Construction (July 2006) (Rev.1 Mar 2007) (Corr.1 Oct 2007) (Rev.2 Apr 2009) (Corr.1 August 2012) Hull Survey for New Construction 1. Scope The scope of this UR includes the following main activities: 1.1 Examination

More information

Pressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b

Pressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b QMS written description verification CHECKLIST AB-518b Company Name: Company Address: Title of the written description of the management system or manual(s): Person responsible for the overall management

More information

REVISIONS. App Sud. App PC. App Thom 2011/12/31 AA 2011/12/31 NK 2012/08/09 N/A AA 2015/07/20

REVISIONS. App Sud. App PC. App Thom 2011/12/31 AA 2011/12/31 NK 2012/08/09 N/A AA 2015/07/20 1/5 REVISIONS Rev 1 2 Description Document format and number changed. Previous number 1402-00.01.811 roved for use in Thompson No Changes Rev n by KC 2011/12/1 KC 2011/12/1 Sud 2011/12/1 2011/12/1 PC Thom

More information

ACCREDITATION OF BOILER AND PRESSURE VESSEL REPAIR OR ALTERATION ORGANIZATIONS

ACCREDITATION OF BOILER AND PRESSURE VESSEL REPAIR OR ALTERATION ORGANIZATIONS ACCREDITATION OF BOILER AND PRESSURE VESSEL REPAIR OR ALTERATION ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300

More information

Supplier Quality System Requirements Rev # 1 Aug 30, 2013

Supplier Quality System Requirements Rev # 1 Aug 30, 2013 Supplier Quality System Requirements Rev # 1 Aug 30, 2013 1. SUPPLIER SELECTION AND RISK ASSESSMENT: Precision Plate Ltd. Purchasing and Quality Management will conduct Supplier Evaluations and Supplier

More information

ACCREDITATION OF FITTING MANUFACTURERS

ACCREDITATION OF FITTING MANUFACTURERS ACCREDITATION OF FITTING MANUFACTURERS TSSA GUIDE FOR REVIEW TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor, Centre Tower

More information

Meggitt Oregon Purchase Order Quality Notes

Meggitt Oregon Purchase Order Quality Notes QP-1 QP-2 QP-3 QP-4 QP-5 QP-6 QP-7 QP-8 Inspection System: Supplier shall maintain an inspection system that complies with ISO 9001; AS9100; Meggitt Supplier Quality Requirements Document - MPRC-10, or

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR STRUCTURAL STEEL APPROVED FABRICATOR INSPECTION PROGRAMS 1.0 PURPOSE EC 020-2014 (Adopted

More information

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: Gear Technology 10671 Civic Center Drive Rancho Cucamonga, CA 91730 GENERAL INFORMATION Attn: Manager of Quality

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS A-1 QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS Prepared/Approved By: Director of Quality Assurance Sr. Production/Sr. Supply Chain Manager Micro

More information

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES Page 1 SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES Notice: A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed

More information

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd.

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd. Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd. How can I become a Responsible Welding Coordinator (RWC) to comply with ISO 3834 and ISO 14731-1?

More information

Application Document Submittal for AISC Certification - Fabricators and Manufacturers

Application Document Submittal for AISC Certification - Fabricators and Manufacturers This document submittal checklist applies to Building Fabricators, Bridge Fabricators, Hydraulic Fabricators and Metal Component Manufacturers. The Fracture Critical endorsement is only available to Bridge

More information

Contents: 1) Introduction: QUALITY PROCUREMENT PLANNING QA/QC TECHNICAL SUPPORT

Contents: 1) Introduction: QUALITY PROCUREMENT PLANNING QA/QC TECHNICAL SUPPORT Contents: 1) Introduction, 2) Procurement Vendor Inspection 3) Customer Approved Suppliers List 4) Suppliers Inspection & Test Plan Matrix 05) Suppliers Evaluation Assessment 6) Quality Plan Requirements

More information

[Project Name] Project Quality Management Plan (PQMP) [Sub-Project, phase, etc.] [Company] [Company Address]

[Project Name] Project Quality Management Plan (PQMP) [Sub-Project, phase, etc.] [Company] [Company Address] This template is downloaded from project-management.magt.biz [Company] [Company Address] Tel: Fax: [Company Phone] [Company Fax] [Company E-mail] May 16, 2015 [Ref. number] Marc Arnecke, PMP [Project Name]

More information

QUALITY ASSURANCE PROTOCOL (QAP)

QUALITY ASSURANCE PROTOCOL (QAP) PREFACE This Standard details the level of documentation that PVT.LTD (IET) will provide during a contract for fabricating tank(s) or portable equipment s. Extensive documentation is required for this

More information

Supplier questionnaire. 1. Organisation Details (Mandatory) Quality Department Details (or representative)

Supplier questionnaire. 1. Organisation Details (Mandatory) Quality Department Details (or representative) In order to register your organisation as an approved supplier on our List of Approved Suppliers in accordance with the requirements of our Quality Management System, ISO9001 and AS9120 standards as revised,

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

Qualification of manufacturers of special materials

Qualification of manufacturers of special materials SERVICE SPECIFICATION DNVGL-SE-0079 Edition June 2016 Qualification of manufacturers of special materials The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY A PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A" 1. SOFTWARE QUALITY PROGRAM. This attachment establishes the software quality requirements

More information

MAUS Quality Assurance Documentation for ISO: 9001 Certification and Accreditation

MAUS Quality Assurance Documentation for ISO: 9001 Certification and Accreditation MAUS Quality Assurance Documentation for ISO: 9001 Certification and Accreditation Overview: MAUS Quality Assurance software is designed to help organisations develop their own customised Quality Manual,

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Revision History Rev. Date Description of Change 1 9/23/16 New Release 2 6/7/17 Added to 9.2: Notify G&W immediately of any potential non-conforming product or any similar product

More information

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses Supplementary Quality Assurance Clauses The Supplementary Quality Assurance Clauses specified on the face of the attached Purchase Order are listed below. Your compliance with these requirements is necessary

More information