Bill of material. A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials
|
|
- Gregory Gardner
- 5 years ago
- Views:
Transcription
1 Bill of material A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials FP A B C x y z 1
2 Manufacturing cycle Manufacturing cycle may be expressed using different degrees of detail For management purposes, it represents significant manufacturing operations in relation to a specific level of the bill of material 2
3 Relationship between bill of material and manufacturing cycles A X a f B C k j D 3
4 The Production Planning and Control (PPC) process Hierarchical decomposition in phases with different: timeframes objectives constraints detail of the production plan 4
5 PPC process phases Demand management Aggregate planning Master production scheduling (MPS) Inventory management and material requirements planning Scheduling Production control 5
6 Sales production interaction The interaction between the sales and production areas works both ways, as the sales department must: forecast demand, to provide input for production respond to customer requests, using information provided by production 6
7 Forecasting demand Forecasting errors may be reduced by: making aggregate forecasts (e.g. product families) making detailed forecasts close to the current time Consequently: forecasts for more distant periods should be as aggregate as possible detailed forecasts (individual items) should refer to periods close to the current time 7
8 Forms of product aggregation Product families (groups of items with the same characteristics) Average products (virtual, statisticallysignificant product) Basic products, personalised after the order according to customer specifications 8
9 Demand forecast techniques (1) Time-series models: are based on the assumption that the future is a function of the past; they look at what has happened over a period of time and use a series of past data to make a forecast Requirements: availability of adequate series of past data stability of the causes on which past demand was based 9
10 Demand forecast techniques (2) Regression models: use past data to allow identification of relationships between demand and some of the independent variables that influence it Requirements: valid hypotheses of correlation between demand and independent variables forecasts of the future values of independent variables must be more reliable than direct demand forecasts 10
11 Responding to customer requests: information requirements (1) MTS: access to information on stocks of finished products access to information on the future availability of finished products (ATP, Available To Promise) ATO: access to information on stocks of modules access to information on the future availability of modules (ATP) knowledge of assembly lead times product configuration management 11
12 Responding to customer requests: information requirements (2) MTO: access to information on the future availability of production capacity knowledge of production (manufacturing + assembly) lead times PTO: access to information on the future availability of production capacity knowledge of production lead times knowledge of purchasing lead times 12
13 Responding to customer requests: information requirements (3) ETO: estimate of the future availability of resources estimate of lead times of the various activities and their precedence relationships estimate of costs 13
14 Configuration bill Represents the components that may be chosen depending on customer requests (usually in the context of ATO) Computer Keyboard.. Keyboard 1 Keyboard 2 Keyboard 3 14
15 Product configuration In the context of ATO there is the problem of configuring the product based on the customer requests The product configuration manager is a tool that allows us to select the elements of the configuration bill using different logics 15
16 Product configuration: example Computer A Disk Optional Keyboard CPU 80 GB External disk Keyboard GB DVD Keyboard 2 Keyboard 3 At least one Optional One and only one Fixed 16
KEY ISSUES in Advanced Operations Management. Timo Seppälä
KEY ISSUES in Advanced Operations Management Timo Seppälä Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing
More informationPrinciples of Operations Management: Concepts and Applications Topic Outline Principles of Operations Planning (POP)
Principles of Operations Management: Concepts and Applications Topic Outline Principles of Operations Planning (POP) Session 1: Operation Management Foundations Describe how today s business trends are
More informationTU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning
TU-E2020 ADVANCED OPERATIONS MANAGEMENT Master Production Scheduling Material Requirements Planning Schedule for classes 26.10 Introduction to the Course / TS 27.10 Different models of Planning for Production
More informationAPICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS
APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS About this Topic Outline This outline details the concepts and applications coved in all five of the APICS Principles of
More informationMaterials and Resource Requirements Planning
CHAPTER FIFTEEN Materials and Resource Requirements Planning McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Where We Are Now Relationships Sustainability Globalization
More informationBicycle. Wheels. 15 Minute Tip Talk July 5, 2018 BoM 101. Background
15 Minute Tip Talk July 5, 2018 BoM 101 Background A bill of materials (BOM) is an extensive list of raw materials, components, and assemblies required to construct, manufacture, or repair a product or
More informationA Decision Support Tool for. Planning Bills of Material
A Decision Support Tool for Planning Bills of Material Michael Cunningham, CIM Research Unit, University College Galway, Ireland. Paul Higgins, CIM Research Unit, University College Galway, Ireland. Jim
More informationWhat is ERP? Source: Wikipedia
Brad Staats What is ERP? Enterprise resource planning (ERP) systems integrate internal and external management information across an entire organization. The purpose of ERP is to facilitate the flow of
More informationPriority for MRP. Run MRP based on actual orders, forecasts or static requirements. Run MRP simulations until you re satisfied with the plans
WHY CHOOSE PRIORITY? WORLD S MOST CONFIGURABLE ERP tailor fields, screens, menus, reports, stationery drag and drop workflows business rules, automated data entry, automated repetitive tasks Priority for
More informationMaterial Resources Planning
Operations and Supply Planning PGDM 2018-20 Material Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management 170 Introduction Computerised information system Aids in planning
More informationResources Planning. Introduction
Operations Management - II PGDM 2017-19 Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District, Hyderabad-
More informationManufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.
Manufacturing Functionlity in Microsoft Dynamics GP Gain complete control over your inventory, production and orders. Control your Inventory Costing and Inventory Control Are you confident and in control
More informationMaterials Requirements Planning
Materials Requirements Planning Independent and Dependent Demand Independent Demand A Dependent Demand B(4) C(2) D(2) E(1) D(3) F(2) Independent demand is uncertain. Dependent demand is certain. Dependent
More informationChapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD
Chapter 6 RESOURCE PLANNING SYSTEMS Prepared by Mark A. Jacobs, PhD LEARNING OBJECTIVES You should be able to: Describe the hierarchical operations planning process in terms of materials planning (APP,
More informationBreakdown. Learn the implications of the breakdown field in Item Master Data
Breakdown Learn the implications of the breakdown field in Item Master Data Boyum Solution IT A/S beas tutorial TABLE OF CONTENTS 1. INTRODUCTION... 2 2. Process... 2 2.1. Mode of procurement in beas...
More informationTU-C2020 Operations Management. Timo Seppälä
TU-C2020 Operations Management Timo Seppälä Operations management Operations management is an activity of managing the resources which create and deliver services and products Slack et al., 2012 Inputs
More informationChapter 18. Materials Requirements Planning
1 Chapter 18 Materials Requirements Planning Material Requirements Planning 2 Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed to produce
More informationMPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 -
CPIM(Certified In Production & Inventory Management) MPR Sample Test. 1. Which of the following would NOT be a key operating objective? A. Inventory dollars. B. Shipment dollars. C. Factory location selection.
More informationSCM Workshop, TU Berlin, October 17-18, 2005
H.-O. Günther Dept. of Production Management Technical University of Berlin Supply Chain Management and Advanced Planning Systems A Tutorial SCM Workshop, TU Berlin, October 17-18, 2005 Outline Introduction:
More informationEngineer to Order In Microsoft Dynamics NAV
Microsoft Dynamics NAV is a robust ERP system which is designed to handle a broad spectrum of manufacturing requirements. It includes several unique features which support engineering-to-order (ETO) manufacturing
More informationTPPE37 Manufacturing Control
TPPE37 Manufacturing Control Contents Lecure 5 Master Production Scheduling in in different Manufacturing environments Tools and techniques Distribution requirements planning Master Production Scheduling
More informationAPACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies
APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies It's an integrated and modular software that provides management tools to the operational areas of a manufacturing
More informationSupply Chain Management Gestão da Cadeia de Suprimentos
Supply Chain Management Gestão da Cadeia de Suprimentos Bachelor major and graduate programs on Industrial Engineering and Mechanical Engineering www.feg.unesp.br/scm Prof. Valerio Salomon www.feg.unesp.br/salomon
More informationProduction Management and Scheduling
Production Management and Scheduling Meet Your Due Dates Your production process can be simple or complex, time consuming or quick, but one thing remains constant the drive to meet your customer s delivery
More informationHybrid Manufacturing Methods
Hybrid Manufacturing Methods The following manufacturing execution and costing methods are supported in SyteLine. These methods can be combined in a single environment so that the optimal method is used
More information7/14/2010. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall.
15 Resource Planning PowerPoint Slides by Jeff Heyl For Operations Management, 9e by Krajewski/Ritzman/Malhotra 21 Pearson Education 15 1 Resource Planning At the heart of any organization Starts t with
More informationUniversity of Puerto Rico Mayagüez Campus Industrial Engineering Department
University of Puerto Rico Mayagüez Campus Industrial Engineering Department Research Study Titled: Teaching Industrial Engineering to Generation Y Students through Computer Games National Science Foundation
More informationAdvanced Planning in Supply Chains - Illustrating the Concepts Using an SAP APO Case Study. 3 SAP APO Module Matrix and General Principles
Advanced Planning in Supply Chains - Illustrating the Concepts Using an SAP APO Case Study 3 SAP APO Module Matrix and General Principles Contents 3 SAP APO Module Matrix and General Principles 3.1 Module
More informationThe Merging of MPS and Order Acceptance in a Semi-Order-Driven Industry : A Case Study of the Parasol Industry
The Merging of MPS and Order Acceptance in a Semi-Order-Driven Industry : A Case Study of the Parasol Industry Watcharee Wattanapornprom 1,2 and Tieke Li 1,2 1 Dongling School of Economics and Management,
More informationFunctional Area Systems Production / Operation Systems
Functional Area Systems Production / Operation Systems Lecture Outline 5 Part 4 Instructor: Trevor Nadeau Examples: Functional Area Info Systems 2 Functional Area Information Systems 3 Computers in Manufacturing
More informationMASTER PRODUCTION SCHEDULE (MPS)
MASTER PRODUCTION SCHEDULE (MPS) Anticipated build schedule for manufacturing end products (or product options) A statement of production, not a statement of market demand MPS takes into account capacity
More informationSeventh Annual National Conference on Enterprise Computing 2015 Marist College
Seventh Annual National Conference on Enterprise Computing 2015 Marist College Creating Learning Experiences for Undergraduate Students to Better Understand Production Management, Master Production Scheduling
More informationDIPLOMARBEIT. Capacitated Lot Sizing and Scheduling An alternative approach for the parallel machine case.
DIPLOMARBEIT Capacitated Lot Sizing and Scheduling An alternative approach for the parallel machine case. Verfasserin Kathrin Gorgosilits 0002659 Angestrebter akademischer Grad Magistra der Sozial- und
More information02/10/2016. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems
ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 4 ACS-1803 Introduction to Information Systems Examples:
More informationInfor ERP LN 6.1 Enterprise Planning. User's Guide for Order Planning
Infor ERP LN 6.1 Enterprise Planning User's Guide for Order Planning Copyright 2008 Infor All rights reserved. The word and design marks set forth herein are trademarks and/or registered trademarks of
More informationAVANTUS TRAINING PTE LTD
Manufacturing II in Microsoft Dynamics NAV 2009 Course 80261A: 3 Days; Instructor-Led About this Course This three-day course explores the advanced manufacturing functionality of Microsoft Dynamics NAV
More informationBill of Materials in Microsoft Dynamics AX 2012
Course 80339A: Bill of Materials in Microsoft Dynamics AX 2012 Course Details Course Outline Module 1: Bill of Materials Overview This chapter provides an overview of the Microsoft Dynamics AX 2012 Bill
More informationLINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING. Linear programming is suitable to determine the best aggregate plan.
LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING Linear programming is suitable to determine the best aggregate plan. Recall that linear programming assumes all variables are continuously divisible.
More informationHS-OWL UniTS Operations management Process design
Process design Introduction Products, services and the processes which produce them all have to be designed. Design is an activity (mainly conceptual) which must produce a solution that will achieve a
More informationEXAM GUIDELINES FOR LOGISTICS SYSTEMS (TRL3708)
EXAM GUIDELINES FOR LOGISTICS SYSTEMS (TRL3708) Dear Student, Please note that the upcoming exams will be marking the end of our second semester, and I hope you have had an interesting and informative
More informationDoes MRP Have a Role in a Volatile Marketplace?
Does MRP Have a Role in a Volatile Marketplace? Peter Milroy, CMA CMS Montera Inc. Cambridge, ON Innovation February 17-19, 2011 Cambridge, Ontario Who is CMS Montera? CMS Montera provides management solutions
More informationOracle Configure to Order
Oracle Configure to Order Process Guide Release 12.2 Part No. E48832-01 September 2013 Oracle Configure to Order Process Guide, Release 12.2 Part No. E48832-01 Copyright 2000, 2013, Oracle and/or its affiliates.
More information9. What are the activities within the scope of production planning? 1. Aggregate production planning
UNIT-II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 1. Define Process Planning Process planning involves determining the sequence of processing and assembly steps that must be accomplished
More informationI Promise Marrying Materials and Capacity to Determine Realistic Promise Dates
I Promise Marrying Materials and Capacity to Determine Realistic Promise Dates -- A Technology Presentation -- Duncan Patrick CMS Montera Inc. Pete Milroy CMS Montera Inc. September 21, 2016 2016 TOCICO.
More informationA PRODUCTION MANAGEMENT EXPERT SYSTEM DEVELOPED IN TIRS
A PRODUCTION MANAGEMENT EXPERT SYSTEM DEVELOPED IN TIRS D Toal 1, T Coffey 1, P Smith 2, A Skehill 1 1. Department of Electronics and Computer Engineering University of Limerick, Limerick, Ireland. Fax
More informationOracle Configure to Order
Oracle Configure to Order Process Guide Release 12.1 Part No. E13692-03 August 2010 Oracle Configure to Order Process Guide, Release 12.1 Part No. E13692-03 Copyright 2000, 2010, Oracle and/or its affiliates.
More informationIntroductory Exercise: The Trucks Case
Prelude 7 ERP Introductory Exercise: The Trucks Case G. Baglin and Ch. van Delft HEC Paris Introductory Exercise: The Trucks Case - 2 - Objective of this exercise Assumptions and notations This exercise
More informationLesson 1: Introduction to Production, Planning, and Control (PPC) Systems
1. Production, Planning and Control (PPC). This module covers: An introduction to Production, Planning and Control. Guidelines on Sales and Operations Planning (S&OP) and Aggregate Planning. Definition
More informationERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk E2-201 Information Systems September 27, 2006 2 Sales Finished and packaged
More informationMBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar
MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar L2 Project Scope Management www.notes638.wordpress.com Project Scope Management Scope initiation/planning Scope definition Issue
More informationA Short Introduction
A Short Introduction Presented by Carol Ptak and Chad Smith, co-authors Orlicky s Material Requirements Planning, Third Revised Edition What is the Problem we are Solving? Today s formal planning systems
More informationStrategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance
Strategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance Jan Olhager and Erik Selldin Linkoping University, Department of Management and Engineering,
More informationMaster Production Scheduling - Is it still relevant?
Master Production Scheduling - Is it still relevant? In the 1980s and 1990s Master Production Scheduling was a big thing. Practically all serious manufacturing companies has a Master Production Scheduler,
More information<Insert Picture Here> Project Manufacturing Overview
Project Manufacturing Overview The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any
More informationCLIMBING THE S&OP MATURITY LADDER CASE STUDIES. Luc Girouard Sr Solution Director, Inspirage April 19th, 2018
CLIMBING THE S&OP MATURITY LADDER CASE STUDIES Luc Girouard Sr Solution Director, Inspirage April 19th, 2018 WHAT IS THE #1 PLANNING TOOL IN THE WORLD? 2 3 APPROACH TO A BETTER PROCESS DYNAMIC, CONTINUOUS,
More informationInventory classification based on decoupling points
Production & Manufacturing Research An Open Access Journal ISSN: (Print) 2169-3277 (Online) Journal homepage: http://www.tandfonline.com/loi/tpmr20 Inventory classification based on decoupling points Joakim
More informationAPICS CPIM-MPR. Certified in Production and Inventory Management - Master Planning of Resources.
APICS CPIM-MPR Certified in Production and Inventory Management - Master Planning of Resources http://killexams.com/exam-detail/cpim-mpr QUESTION: 96 When quantitative data are being evaluated, a very
More informationUNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING
UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 2 Process Planning Product design for each product has been developed in the design department. To convert the product design into
More informationNational Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING)
PRODUCTION PLANNING (AGGREGATE PLANNING) Concerned with the overall operations of an organisation over a specified time horizon Determines the efficient way of responding (allocating resources) to market
More informationPLANNING FOR PRODUCTION
PLANNING FOR PRODUCTION Forecasting Forecasting is the first major activity in the planning, involving careful study of past data and present scenario to estimate the occurence, timing or magnitude of
More informationCLIMBING THE S&OP CASE STUDIES MATURITY LADDER: Dean Jones, Inspirage Vejle - October 2nd, Copyright Inspirage. All rights reserved.
CLIMBING THE S&OP MATURITY LADDER: CASE STUDIES Dean Jones, Inspirage Vejle - October 2nd, 2018 WHAT IS THE #1 PLANNING TOOL IN THE WORLD? 2 EXCEL 3 APPROACH TO A BETTER PROCESS DYNAMIC, CONTINUOUS, AND
More informationUniversity of Groningen. Patterns of order processing Welker, Geertruida
University of Groningen Patterns of order processing Welker, Geertruida IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's PDF) if you wish to cite from it. Please check the
More informationHistory IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning
IE PRODUCTION INFORMATION SYSTEMS Course Notes Lecture #.A Material Requirements Planning IE Bilkent University Manufacturing Planning and Control System Routing file Resource planning Bills of material
More informationS&OP Checklist How To Implement
S&OP Checklist How To Implement 1. 2. 3. Project team - we have identified the executive champion, steering committee or executive group responsible for supporting and monitoring progress, and the design
More informationINTEGRATED. Reservations, Tracking, and Action Messages. Microsoft Dynamics NAV 5.0. Technical White Paper
INTEGRATED Microsoft Dynamics NAV 5.0 Reservations, Tracking, and Action Messages Technical White Paper This paper provides a conceptual and technical overview of the reservations, tracking an actions
More informationTHE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP)
THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP) Richard E. Crandall, Appalachian State University, CIS Department, Raley Hall, Boone, NC 28608,
More informationA typical manufacturing plant
CHAPTER6: PRODUCTION PLANNING & CONTROL Production planning is concerned with the determination of production, inventory, and work force levels to meet fluctuating demand A typical manufacturing plant
More informationAbout this Course This two-day instructor-led course introduces the features of Bill of Materials functionality in Microsoft Dynamics AX 2012.
Bill of Materials in Microsoft Dynamics AX 2012 Course 80339A: 2 Days; Instructor-Led About this Course This two-day instructor-led course introduces the features of Bill of Materials functionality in
More informationVersion Countries: US, CA Setup and User Manual
Version 1.0.2.1 Countries: US, CA Setup and User Manual For Microsoft Dynamics 365 Business Central Last Update: January 31, 2019 Contents Description... 4 Business Central Editions... 4 Features... 4
More informationGBI - Introductory Course 6/11/2015
SAP University Alliances Version 2.11 Authors Bret Wagner Stefan Weidner Production Planning and Execution (PP) Product 6.0 EhP4 Global Bike Inc. Level Beginner Focus Cross-functional integration Production
More informationNaviCloud Sphere. NaviCloud Pricing and Billing: By Resource Utilization, at the 95th Percentile. A Time Warner Cable Company.
NaviCloud Sphere NaviCloud Pricing and Billing: By Resource Utilization, at the 95th Percentile June 29, 2011 A Time Warner Cable Company NaviCloud Sphere Pricing, Billing: By Resource Utilization, at
More informationA decision aid for make-to-order and make-to-stock classification
Chapter 3 A decision aid for make-to-order and make-to-stock classification Managers in food processing industries find it difficult to decide which products to make to order and which products to stock.
More informationWHITE PAPER. Control Manufacturing Costs with Odoo Open ERP
WHITE PAPER Control Manufacturing Costs with Odoo Open ERP USA ODOO WHITE PAPER 1 The challenge of controlling costs looms large in many manufacturing sectors but clearing this hurdle is not insurmountable.
More informationOperations & Supply Planning
Operations & Supply Planning PGDM 2017-19 Sales & Operations Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District,
More informationPRODUCTION SCHEDULING PART-A
PRODUCTION SCHEDULING PART-A 1. List out any five priority sequencing rules. (Nov-2017) First come, first served (FCFS) Last come, first served (LCFS) Earliest due date (EDD) Shortest processing time (SPT)
More informationLM043: Production Management and Material Requirements Planning
LM043: Production Management and Material Requirements Planning LM043 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: The overall aim of this course is to provide participants with the knowledge,
More informationInventory Management 101 Basic Principles SmartOps Corporation. All rights reserved Copyright 2005 TeknOkret Services. All Rights Reserved.
Inventory Management 101 Basic Principles 1 Agenda Basic Concepts Simple Inventory Models Batch Size 2 Supply Chain Building Blocks SKU: Stocking keeping unit Stocking Point: Inventory storage Item A Loc
More informationInfor LN Enterprise Planning User Guide for Order Planning
Infor LN Enterprise Planning User Guide for Order Planning Copyright 2018 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains
More informationNote 8: Materials Requirements Planning
Note 8: Materials Requirements Planning In materials requirements planning (MRP), orders for component parts are timed to coincide with the production schedule of the products in which they are used. We
More informationPresented by: Purdianta, ST.,MT
Presented by: Purdianta, ST.,MT Introduction Modern organizations are considered highly complex networks of business units Each business unit realizes a part of the organization s business process Complexity
More informationPlanning. Planning Horizon. Stages of Planning. Dr. Richard Jerz
Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages
More informationThe fit of Industry 4.0 applications in manufacturing logistics a multiple case study
The fit of Industry 4.0 applications in manufacturing logistics a multiple case study Jo Wessel Strandhagen, Erlend Alfnes, Jan Ola Strandhagen, Logan Reed Vallandingham Department of Mechanical and Industrial
More informationEXAM - MB Microsoft Dynamics AX 2012 R3 Trade and Logistics. Buy Full Product.
Microsoft EXAM - MB6-703 Microsoft Dynamics AX 2012 R3 Trade and Logistics Buy Full Product http://www.examskey.com/mb6-703.html Examskey Microsoft MB6-703 exam demo product is here for you to test the
More informationOracle Supply Chain Management Cloud: Order to Cash
Oracle Supply Chain Management Cloud: Order to Cash (includes Order Management, Pricing, Configurator, Global Order Promising, Inventory Management, Supply Chain Financial Orchestration, and Advanced Fulfillment)
More informationManufacturing and Service Process Structures
CHAPTER FIVE Manufacturing and Service Process Structures McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Where We Are Now Relationships Sustainability Globalization
More informationCAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi
CAD/CAM CHAPTER ONE INTRODUCTION Dr. Ibrahim Naimi Production System Facilities The facilities in the production system are the factory, production machines and tooling, material handling equipment,
More information7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction
CAD/CAM Dr. Ibrahim Al-Naimi Chapter one Introduction 1 2 3 Production System Facilities The facilities in the production system are the factory, production machines and tooling, material handling equipment,
More informationProduction I in Microsoft Dynamics AX 2009
Tel: 905 270 7700 Fax: 905 270 7915 www.bdo.ca/solutions BDO Canada LLP - Solutions 1 City Centre Drive Suite 1700 Mississauga, ON L5B 1M2 Canada Course 80022A: Production I in Microsoft Dynamics AX 2009
More informationConnecting S&OP to the Shop Floor: Here s How!
Connecting S&OP to the Shop Floor: Here s How! J. E. Boyer Company, Inc. John E. Boyer, President Copyright 2004 by J. E. Boyer Company, Inc. No portion of this article may be reproduced in whole or in
More informationTitle: Implementing Oracle Discrete manufacturing in an Engineer to Order environment. Characteristics of typical Engineer to Order Environment
Title: Implementing Oracle Discrete manufacturing in an Engineer to Order environment Name : Somnath Majumdar Company : Infosys Technologies Executive Summary Companies today are moving towards customized
More informationManish Naik Senior Consultant Enterprise Solutions Infosys Technologies Ltd.
A Complete Guide to Oracle ASCP s Inline Forecast Consumption Solution Manish Naik Senior Consultant Enterprise Solutions Infosys Technologies Ltd. Author Introduction Manish Naik is a Senior Consultant
More informationStop Planning Semiconductor Chips Like Potato Chips!
epaper Series Version A.1.0 Stop Planning Semiconductor Chips Like Potato Chips! Overview It s no surprise that the Semiconductor industry is very asset-intensive, with long leadtimes and expensive capital
More informationMaking Components Available in a Mass Customization System. Brett C. Holker
Making Components Available in a Mass Customization System by Brett C. Holker A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree In Technology Management
More informationCUSTOMER INTRODUCTION
Study Guide SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1610) C_TS420_1610 How to Prepare for Your Certification Exam CUSTOMER INTRODUCTION The "SAP Certified
More informationENOVIA Variant Configuration Central
ENOVIA Variant Configuration Central Reducing product diversity while maintaining a competitive advantage is a business challenge many companies face today. System engineers and product planners use ENOVIA
More informationEnterprise 7.1 Supply Chain Planner
KAMATSOFT Enterprise 7.1 Supply Chain Planner White Paper Girish N. Kamat 10/28/2009 This white paper provides review of the capabilities and technical details of Supply Chain Planning module of Enterprise/7
More informationMANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW
MANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW Al-Naimi Assistant Professor Industrial Engineering Branch Department of Production Engineering and Metallurgy University
More informationJD Edwards EnterpriseOne Quality Management
JD Edwards EnterpriseOne Quality Management Overview Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not
More informationCoordinating Multi-Period Capacity Allocation and Order Scheduling via Optimization and Simulation
The 7th International Symposium on Operations Research and Its Applications (ISORA 08) Lijiang, China, October 31 Novemver 3, 2008 Copyright 2008 ORSC & APORC, pp. 274 281 Coordinating Multi-Period Capacity
More informationOperational Logistics Management (OLM612S)
Ester Kalipi (M.LSCM.; B. Hons Logistics; B-tech. BA.; Dip. BA.; Cert. BA.) Operational Logistics Management (OLM612S) Unit 2: Logistics Planning 21 February 2018 Table of contents Unit Objectives The
More information