1 15 Resource Planning PowerPoint Slides by Jeff Heyl For Operations Management, 9e by Krajewski/Ritzman/Malhotra 21 Pearson Education 15 1 Resource Planning At the heart of any organization Starts t with sales and operations plans and plans the input A process relative to the firm s competitive priorities and an important part of managing supply chains

2 Enterprise Resource Planning What an ERP system does Integrating the firm s functional areas Used by many different types of organizations How ERP systems are designed Single comprehensive database Managers to monitor all of the company s products at all locations and at all times Information is automatically updated in the all applications when transactions occur Streamlines the data flows throughout the organization Requires a careful analysis of major processes Significant changes in ERP systems - interoperability 15 3 Enterprise Resource Planning Back-Office Processes Manufacturing Material planning Scheduling Human Resources Benefits Payroll Data Analysis Product costing Job costs ERP System Front-Office Processes Sales and Marketing Sales s Pricing system Accounting and Finance Accounts payable and receivable General ledgers Asset management Figure 15.1 ERP Application Modules Supply-Chain Management Forecasting Purchasing Distribution Customer Service Field service Quality

3 Materials Requirements Planning MRP is a computerized information system to manage dependent demand and schedule s Translates the master production schedule into for all subassemblies, components, and raw materials through the MRP explosion Dependent demand Quantity required varies with the production plans of other items Component Parent 15 5 MRP Inputs Authorized master production schedule Other sources of demand Inventory transactions Inventory records MRP explosion Bills of materials Engineering and process designs Material plan Figure 15.2 Material Requirements Plan Inputs

4 Demand Patterns Order 1 on day 3 Order 1 on day 8 15 Bicycles 1 Rims (a) Parent Re point Day Day (b) Component demand Figure 15.3 Lumpy Dependent Demand Resulting from Continuous Independent Demand 15 7 Bill of Materials A record of all components of an item Shows the parent-component relationship The usage quantities are derived from engineering and process design Five common terms End items Intermediate items Subassemblies Purchased items Part commonality (sometimes called standardization of parts or modularity)

5 Bill of Materials Back slats Seat cushion Leg supports Seat-frame boards Back legs Front legs A Ladder-back chair Figure 15.4 BOM for a Ladder-Back Chair 15 9 Bill of Materials A Ladder-back chair B (1) Ladder-back subassembly C (1) Seat subassembly D (2) Front legs E (4) Leg supports F (2) G (4) H (1) I (1) Back legs Back slats Seat frame Seat cushion Figure 15.4 BOM for a Ladder-Back Chair J (4) Seat-frame boards

6 Master Production Schedule (MPS) Details how many end items will be produced within specified periods of time It breaks the sales and operations plan into specific product schedules Create a prospective MPS and test whether it meets the schedule with available resources Sums of quantities must equal sales and operational plan Production must be allocated efficiently over time Capacity limitations and bottlenecks may be determined Master Production Schedule (MPS) April May Ladder-back chair Kitchen chair Desk chair Aggregate production plans for chair family Figure 15.5 MPS for a Family of Chairs

7 Master Production Schedule (MPS) Authorized production plan Prospective master production schedule Are resources available? No Yes Material planning Authorized master production schedule Figure 15.6 Master Production Scheduling Process Developing a MPS Step 1: Calculate projected on-hand inventories on-hand On-hand MPS quantity at end = at + due at start of this week end of last week of this week this week where: = max(forecast, Customer s booked) 55 chairs Inventory = currently + in stock MPS quantity ( for week 1) 38 chairs already promised for delivery in week 1 = 17 chairs

8 Developing a MPS Item: Ladder-back chair Quantity on Hand: 55 Forecast Customer s (booked) on-hand MPS quantity April Explanation: Forecast is less than booked s in week 1; projected on-hand balance = = 17. Explanation: Forecast exceeds booked s in week 2; projected on-hand balance = = 13. The shortage signals a need to schedule an MPS quantity for completion in week 2. MPS start Figure 15.7 Master Production Schedule for s 1 and Developing a MPS Step 2: Determine the timing and size of MPS quantities The goal is to maintain a nonnegative projected on-hand balance As shortages are detected, MPS quantities should be scheduled to cover them Inventory = 17 chairs in at the + end of week 1 MPS quantity of 15 chairs Forecast of 3 chairs = 137 chairs

9 Application 15.1 Determine the MPS for Product A that has a 5-unit policy and 5 units on hand. The demand forecast and booked s are shown in the partially completed plan given in the Student Notes. The lead time is one week. Here is the completed plan. You might want to ask a question or two on how they would respond to a customer request for a specific week and quantity Application 15.1 SOLUTION Item: Product A Order Policy: 5 units Time: 1 week Quantity on Hand Forecast Customer s (booked) on-hand MPS quantity MPS start Available-topromise (ATP)

10 Application 15.1 SOLUTION Item: Product A Order Policy: 5 units Time: 1 week Quantity on Hand Forecast Customer s (booked) on-hand MPS quantity MPS start Available-topromise (ATP) Master Production Schedule (MPS) Available-to-promise (ATP) The quantity of an end item that marketing can promise to deliver on specific dates It is the difference between customer s already booked and the quantity that operations is planning to produce Freezing the MPS Reconciling the MPS with sales and operations plans

11 Master Production Schedule (MPS) Item: Ladder-back chair Order Policy: 15 units Time: 1 week Quantity on Hand: 55 April May Forecast Customer s booked on-hand MPS quantity MPS start t Explanation: The time needed to assemble 15 chairs is 1 week. The assembly department must start assembling chairs in week 1 to have them ready by week 2. Explanation: On-hand balance = = 137. The MPS quantity is needed to avoid a shortage of 3 17 = 13 chairs in week 2. Figure 15.8 Master Production Schedule for s Master Production Schedule (MPS) Item: Ladder-back chair Order Policy: 15 units Time: 1 week Quantity on Hand: 55 April May Forecast Customer s booked on-hand MPS quantity MPS start t Available-topromise (ATP) Explanation: The total of customer s booked until the next MPS receipt is 38 units. The ATP = 55 (on-hand) + (MPS quantity) 38 = 17. Explanation: The total of customer s booked until the next MPS receipt is = 59 units. The ATP = 15 (MPS quantity) 59 = 91 units.. Figure 15.9 MPS Record with an ATP Row

12 Inventory Record Inventory transactions are the basic building blocks of up-to-date records Transactions include releasing new s, receiving scheduled, adjusting due dates for scheduled, withdrawing, canceling s, correcting errors, rejecting shipments, and verifying losses and stock returns Inventory records divide the future into time periods called time buckets Keep track of levels and component replenishment needs Inventory Record The time-phase information contained in the record consists of: on-hand on-hand balance at end of week t Inventory on or planned = hand at end of + in week t 1 week t in week t

13 Inventory Record The on-hand calculations for each week in Figure 15.1 are as follows 1: = 117 s 2 and 3: = 117 4: = 3 5: 3 + = 3 6: = 153 7: = 273 8: = Inventory Record Item: C Description: Seat subassembly on-hand 37 Lot Size: units Time: 2 weeks Explanation: are the total demand for the two chairs. on-hand in week 1 is = 117 units. Figure 15.1 MRP Record for the Seat Subassembly

14 Inventory Record Item: C Description: Seat subassembly on-hand 37 Figure Completed Inventory Record for the Seat Subassembly Lot Size: units Time: 2 weeks Without a planned receipt in week 4, a shortage of 3 units will occur: = 3 units. Adding the planned receipt brings the balance to = 227 units. Offsetting for a 2-week lead time puts the corresponding planned release back to week 2. The first planned receipt lasts until week 7, when projected would drop to = 43 units. Adding the second planned receipt brings the balance to = 187 units. The corresponding planned release is for week 5 (or week 7 minus 2 weeks) Planning Factors Planning lead time For purchased items planning lead time is the time allowed for receiving a shipment from the supplier For manufactured the planning lead time consists of estimates for Setup time Processing time Materials handling time between operations Waiting time

15 Planning Factors Lot-sizing rules Fixed quantity (FQO) rule maintains the same quantity each time an is issued Could be determined by quantity discounts, truckload capacity, minimum purchases, or EOQ Planning Factors Periodic quantity (POQ) rule allows a different quantity for each issue but tends to issue the at predetermined time intervals POQ lot size to arrive in week t Total gross = for P week, including week t on-hand balance at end of week t 1 Figure shows the application of the POQ rule for P =

16 Planning Factors The first using P = 3 is (POQ lot size) = for weeks 4, 5, and 6 Inventory at end of week 3 (POQ lot size) = ( ) 117 = 153 units Planning Factors Figure The POQ (P = 3) Rule for the Seat Subassembly

17 Planning Factors Lot-for-lot (L4L) rule where the lot size covers the gross of a single week L4L lot size to arrive in week t = for week t on-hand balance at end of week t 1 Figure shows the application of the L4L (L4L lot size) Inventory balance = in week 4 at end of week 3 (L4L lot size) = = 3 units Planning Factors Figure The L4L Rule for the Seat Subassembly

18 Application 15.2 Item H1-A is a produced item (not purchased) with an quantity of 8 units. Complete the rest of its MRP record using the fixed quantity (FOQ) rule SOLUTION Item: H1-A Description: Chair seat assembly Lot Size: FOQ = 8 units Time: 4 weeks on-hand Application 15.2 Item H1-A is a produced item (not purchased) with an quantity of 8 units. Complete the rest of its MRP record using the fixed quantity (FOQ) rule SOLUTION Item: H1-A Description: Chair seat assembly Lot Size: FOQ = 8 units Time: 4 weeks on-hand

19 Application 15.3 Now complete the H1-A record using a POQ rule. The P should give an average lot size of 8 units. Assume the average weekly are 2 units. P = 8 2 = 4 weeks Application 15.3 SOLUTION Item: H1-A Lot Size: POQ = 4 Description: Chair seat assembly Time: 4 weeks on-hand

20 Application 15.3 SOLUTION Item: H1-A Lot Size: POQ = 4 Description: Chair seat assembly Time: 4 weeks on-hand Application 15.4 Revise the H1-A record using the lot-for-lot (L4L) Rule. (Complete the highlighted section) SOLUTION Item: H1-A Description: Chair seat assembly Lot Size: FOQ = 8 units Time: 4 weeks on-hand

21 Application 15.4 Revise the H1-A record using the lot-for-lot (L4L) Rule. (Complete the highlighted section) SOLUTION Item: H1-A Description: Chair seat assembly Lot Size: FOQ = 8 units Time: 4 weeks on-hand Planning Factors Comparing lot-sizing rules FOQ: = 181 units POQ: = 6 units L4L: = units

22 Planning Factors Lot sizes affect costs and setup and ing costs The FOQ rule generates a high level of average because it creates remnants The POQ rule reduces the amount of average onhand because it does a better job of matching quantity to The L4L rule minimizes investment, but it also maximizes the number of s placed Planning Factors Safety stock for dependent demand items with lumpy demand (gross ) is helpful only when future gross, the timing i or size of scheduled, and the amount of scrap that will be produced are certain Safety stock is used for end items and purchased items to protect against fluctuating customer s and unreliable suppliers

23 Planning Factors Figure Inventory Record for the Seat Subassembly Showing the Application of a Safety Stock Outputs from MRP MRP explosion Routings and time standards Action notices Releasing new s Adjusting due dates Material plan Priority reports Dispatch lists Supplier schedules Capacity reports Capacity planning Finite capacity scheduling Input-output control Figure MRP Outputs Manufacturing resources plan Performance reports Cost and price data

24 MRP Explosion Translates the MPS and other sources of demand into the needed for all of the subassemblies, components, and raw materials the firm needs to produce parent items An item s gross are derived from three sources The MPS for immediate parents that are end items The planned for parents below the MPS level Any other not originating in the MPS, such as the demand for replacement parts MRP Explosion C(1) Seat subassembly bl H(1) Seat frame I(1) Seat cushion J(4) Seat-frame boards Figure BOM for the Seat Subassembly

25 MRP Explosion Item: Seat subassembly Lot size: units time: 2 weeks on-hand Figure MRP Explosion of Seat Assembly Components MRP Explosion Item: Seat subassembly Lot size: units time: 2 weeks Figure MRP Explosion of Seat Assembly Components

26 MRP Explosion Item: Seat subassembly Lot size: units time: 2 weeks Item: Seat frames Lot size: 3 units Item: Seat cushion Lot size: L4L time: 1 week time: 1 week 3 on-hand 4 on-hand Figure MRP Explosion of Seat Assembly Components MRP Explosion Item: Seat subassembly Lot size: units time: 2 weeks Usage quantity: 1 Usage quantity: 1 Item: Seat frames Lot size: 3 units Item: Seat cushion Lot size: L4L time: 1 week time: 1 week 3 on-hand 4 on-hand Figure MRP Explosion of Seat Assembly Components

27 MRP Explosion Item: Seat subassembly Lot size: units time: 2 weeks Usage quantity: 1 Usage quantity: 1 Item: Seat frames Lot size: 3 units Item: Seat cushion Lot size: L4L time: 1 week time: 1 week 3 on-hand 4 on-hand Figure MRP Explosion of Seat Assembly Components MRP Explosion Item: Seat subassembly Lot size: units time: 2 weeks Item: Seat frames Lot size: 3 units Item: Seat cushion Lot size: L4L time: 1 week time: 1 week 3 on-hand on-hand Figure MRP Explosion of Seat Assembly Components

28 MRP Explosion Item: Seat frames Lot size: 3 units time: 1 week Item: Seat cushion Lot size: L4L time: 1 week 3 3 Item: Seat-frame boards Lot size: 15 units time: 1 week on-hand 2 Figure MRP Explosion of Seat Assembly Components MRP Explosion Item: Seat frames Lot size: 3 units time: 1 week Item: Seat cushion Lot size: L4L time: 1 week 3 3 Usage quantity: 4 Item: Seat-frame boards Lot size: 15 units time: 1 week 12 on-hand 2 Figure MRP Explosion of Seat Assembly Components

29 MRP Explosion Item: Seat frames Lot size: 3 units time: 1 week Item: Seat cushion Lot size: L4L time: 1 week 3 3 Item: Seat-frame boards Lot size: 15 units time: 1 week 12 on-hand Figure MRP Explosion of Seat Assembly Components Other Important Reports Action notice Capacity planning (CRP) Theory of constraints principles can be applied to keep bottleneck operations fed by adjusting some lot sizing rules or occasionally overriding planned Priority reports Manufacturing resource planning (MRP II)

30 MRP and the Environment Consumer and government concern about the deterioration of the natural environment has driven manufacturers to reengineer their processes to become more environmentally friendly Companies can modify their MRP systems to help track these waste and plans for their disposal Application 15.5 A firm makes a product (Item A) from three components (intermediate Items B and D, and purchased item C). The latest MPS for product A calls for completion of a 25-unit in week k8, and dits lead dtime is 2 weeks. The master schedule and bill of material for Product A are given below. Item: End Item A Time: 2 wks MPS quantity 25 MPS start

31 Application 15.5 Develop a material plan for items B, C, and D, given the following data. Blank MRP records are provided d in the Student Notes, and the completed records are shown on the next slide. A B(1) C(1) D(2) C(2) B(1) Item Data Category B C D Lot-sizing rule POQ (P = 5) FOQ = 1 L4L time 2 weeks 1 week 3 weeks None 1 (week 1) None Beginning 8 C(2) Application 15.5 SOLUTION An item s gross cannot be derived until all of its immediate parents are processed. Thus we must begin with Item D. Its only immediate parent is item A, and its planned production plan is shown by the MPS start row. Note the 2- for-1 usage quantity when deriving D s gross. Item: D Lot Size: L4L Description: Time: 3 weeks 5 on-hand

32 Application 15.5 We can do item B next, because the planned production quantities for its two immediate parents (A and D) are known. Item C cannot be done yet, because one of its parents is item B, and its PORs are still unknown. Item: B Lot Size: POQ = 5 Description: Time: 3 weeks on-hand Application 15.5 We can do item B next, because the planned production quantities for its two immediate parents (A and D) are known. Item C cannot be done yet, because one of its parents is item B, and its PORs are still unknown. Item: B Lot Size: POQ = 5 Description: Time: 3 weeks 5 25 on-hand

33 Application 15.5 Finally we can do Item C, because we now know the planned production quantities of both of its immediate parents (A and B). Note that the usage quantity for its parent B is 2-for-1. Item: C Lot Size: 1 Description: Time: 1 week on-hand Resource Planning for Service Providers Dependent demand for services Restaurants Airlines Hospitals Hotels Bill of resources (BOR)

34 Bill of Resources Level 1 Discharge Level 2 Intermediate care Level 6 Preoperative care (Angiogram) Level 3 Postoperative care (Step down) Level 4 Postoperative care (Intensive) Nurse (6 hr) MD (1 hr) Therapy (1 hr) Bed (24 hr) Lab (3 tests) Kitchen (1 meal) Pharmacy (1 medicines) Level 5 Surgery (b) Level 6 Preoperative care (Angiogram) Level 7 Preoperative care (Testing) Figure BOR for Treating an Aneurysm (a) Solved Problem 1 Refer to the bill of materials for product A shown in Figure If there is no existing and no scheduled, how many units of items G, E, and D must be purchased to produce 5 units of end item A? A LT = 1 B (3) C (1) LT = 2 LT = 3 D (1) E (2) F (1) D (1) LT = 3 LT = 6 LT = 1 LT = 3 Figure BOM for Product A G (1) LT =

35 Solved Problem 1 SOLUTION Five units of item G, 3 units of item E, and 2 units of item D must be purchased to make 5 units of A. The usage quantities shown in Figure indicate that 2 units of E are needed to make 1 unit of B and that 3 units of B are needed to make 1 unit of A; therefore, 5 units of A require 3 units of E(2 3 5 = 3). One unit of D is consumed to make 1 unit of B, and 3 units of B per unit of A result in 15 units of D(1 3 5 = 15); 1 unit of D in each unit of C and 1 unit of C per unit of A result in another 5 units of D(1 1 5 = 5). The total to make 5 units of A are 2 units of D(15 + 5). The calculation of for G is simply = 5 units Solved Problem 2 The policy is to produce end item A in lots of 5 units. Using the data shown in Figure 15.2 and the FOQ lot-sizing rule, complete the projected on-hand and MPS quantity rows. Then complete the MPS start t row by offsetting the MPS quantities for the final assembly lead time. Finally, compute the available-to-promise for item A. If in week 1 a customer requests a new for 3 units of item A, when is the earliest date the entire could be shipped?

36 Solved Problem 2 Item: A Order Policy: 5 units Time: 1 week 9 1 Forecast Customer s (booked) on-hand MPS quantity 5 MPS start Available-topromise (ATP) Figure 15.2 MPS Record for End Item A Solved Problem 2 SOLUTION The projected on-hand for the second week is on-hand at end of week 2 On-hand MPS quantity = in + due in week 2 week 1 Requirements in week 2 = = 5 units where are the larger of the forecast or actual customer s booked for shipment during this period. No MPS quantity is required. Without an MPS quantity in the third period, a shortage of item A will occur: = 35. Therefore, an MPS quantity equal to the lot size of 5 must be scheduled for completion in the third period. Then the projected on-hand for the third week will be =

37 Solved Problem 2 Figure shows the projected on-hand inventories and MPS quantities that would result from completing the MPS calculations. The MPS start row is completed by simply shifting a copy of the MPS quantity row to the left by one column to account for the 1-week final assembly lead time. Also shown are the available-to-promise quantities. In week 1, the ATP is Available-topromise in week 1 On-hand MPS quantity = quantity in + in week 1 week 1 Orders booked up to week 3 when the next MPS arrives = (3 + 2) = 5 units Solved Problem 2 The ATP for the MPS quantity in week 3 is Available-to- promise in week 3 MPS quantity = in week 3 Orders booked up to week 7 when the next MPS arrives = 5 ( ) = 35 units The other ATPs equal their respective MPS quantities because no s are booked for those weeks. As for the new for 3 units in week 1, the earliest it can be shipped is week 3 because the ATP for week 1 is insufficient. If the customer accepts the delivery date of week 3, the ATP for week 1 will stay at 5 units and the ATP for week 3 will be reduced to 5 units. This acceptance allows the firm the flexibility to immediately satisfy an for 5 units or less, if one comes in. When the MPS is updated next, the customer s booked for week 3 would be increased to 35 to reflect the new s shipping date

38 Solved Problem 2 Figure Completed MPS Record for End Item A Solved Problem 3 The MPS start quantities for product A calls for the assembly department to begin final assembly according to the following schedule: 1 units in week 2; 2 units in week 4; 12 units in week 6; 18 units in week 7; and 6 units in week 8. Develop a material plan for the next 8 weeks for items B, C, and D. The BOM for A is shown in Figure 15.22, and data from the records are shown in Table A LT = 2 B (1) C (2) LT = 1 LT = 2 D (1) LT = 3 Figure BOM for Product A

39 Solved Problem 3 TABLE 15.1 INVENTORY RECORD DATA Item Data Category B C D Lot-sizing rule POQ (P=3) L4L FOQ = 5 units time 1 week 2 weeks 3 weeks None 2 (week 1) None Beginning (on-hand) SOLUTION We begin with items B and C and develop their records, as shown in Figure The MPS for product A must be multiplied by 2 to derive the gross for item C because of the usage quantity. Once the planned for item C are found, the gross for item D can be calculated Solved Problem 3 Item: B Lot Size: POQ (P = 3) Time: 1 week on-hand Figure Inventory Records for Items B, C, and D

40 Solved Problem 3 Item: C Lot Size: L4L Time: 2 weeks on-hand Figure Inventory Records for Items B, C, and D Solved Problem 3 Item: D Lot Size: FOQ =5 units Time: 1 week on-hand Figure Inventory Records for Items B, C, and D

41

Resource Planning. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Resource Planning. Copyright 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resorce Planning 15 1 Resorce Planning At the heart of any organization Starts with sales and operations plans and plans the inpt reqirements A process relative to the firm s competitive priorities and

More information

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning IE PRODUCTION INFORMATION SYSTEMS Course Notes Lecture #.A Material Requirements Planning IE Bilkent University Manufacturing Planning and Control System Routing file Resource planning Bills of material

More information

Material Requirements Planning (MRP) and ERP 14. Outline

Material Requirements Planning (MRP) and ERP 14. Outline Material Requirements Planning (MRP) and ERP 14 1 Outline Global Company Profile: Wheeled Coach Dependent Demand Dependent Inventory Model Requirements MRP Structure MRP Management 2 1 Outline - Continued

More information

Materials and Resource Requirements Planning

Materials and Resource Requirements Planning CHAPTER FIFTEEN Materials and Resource Requirements Planning McGraw-Hill/Irwin Copyright 2011 by the McGraw-Hill Companies, Inc. All rights reserved. Where We Are Now Relationships Sustainability Globalization

More information

Enterprise Resource Planning

Enterprise Resource Planning Resource Planning Enterprise Resource Planning What Is ERP? Software designed for organizing and managing business processes Modules share information across all business functions Can share customer sales

More information

Yuji Yamamoto PPU411. Today s topic. What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system

Yuji Yamamoto PPU411. Today s topic. What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system Yuji Yamamoto PPU411 Today s topic What is MPS and MRP Developing MPS How to make MRP Enterprise Resource Planning Kanban system 1 Production planning and scheduling Demand Production planning 1,400pcs/m

More information

Materials Requirements Planning

Materials Requirements Planning Materials Requirements Planning Independent and Dependent Demand Independent Demand A Dependent Demand B(4) C(2) D(2) E(1) D(3) F(2) Independent demand is uncertain. Dependent demand is certain. Dependent

More information

THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP)

THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP) THE USE OF SPREADSHEETS TO TEACH MASTER PRODUCTION SCHEDULE (MPS) AND MATERIALS REQUIREMENTS PLANNING (MRP) Richard E. Crandall, Appalachian State University, CIS Department, Raley Hall, Boone, NC 28608,

More information

Chapter 18. Materials Requirements Planning

Chapter 18. Materials Requirements Planning 1 Chapter 18 Materials Requirements Planning Material Requirements Planning 2 Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed to produce

More information

Oman College of Management and Technology

Oman College of Management and Technology Oman College of Management and Technology Course 803303 PIS Chapter 7 Material Requirements Planning (MRP) CS/MIS Department What is MRP? (Material Requirements Planning) Is a basic tool for performing

More information

Manajemen Persediaan. MRP Lot For Lot. Modul ke: Fakultas FEB. Program Studi Manajemen

Manajemen Persediaan. MRP Lot For Lot. Modul ke: Fakultas FEB. Program Studi Manajemen Modul ke: 10 Manajemen Persediaan MRP Lot For Lot Fakultas FEB Program Studi Manajemen Learning Objectives Describe the conditions under which MRP is most appropriate. Describe the inputs, outputs, and

More information

Material Resources Planning

Material Resources Planning Operations and Supply Planning PGDM 2018-20 Material Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management 170 Introduction Computerised information system Aids in planning

More information

MATERIAL REQUIREMENT PLANNING

MATERIAL REQUIREMENT PLANNING 2 MATERIAL REQUIREMENT PLANNING MGT2405, University of Toronto, Denny Hong-Mo Yeh Material requirement planning is not only a technique for planning material requirements. It is also a logic that relates

More information

PRODUCTION SCHEDULING PART-A

PRODUCTION SCHEDULING PART-A PRODUCTION SCHEDULING PART-A 1. List out any five priority sequencing rules. (Nov-2017) First come, first served (FCFS) Last come, first served (LCFS) Earliest due date (EDD) Shortest processing time (SPT)

More information

Resources Planning. Introduction

Resources Planning. Introduction Operations Management - II PGDM 2017-19 Resources Planning Vinay Kumar Kalakbandi Assistant Professor Operations Management Survey No. 38, Cherlaguda Village, Shamshabad Mandal, RR District, Hyderabad-

More information

PLANNING FOR PRODUCTION

PLANNING FOR PRODUCTION PLANNING FOR PRODUCTION Forecasting Forecasting is the first major activity in the planning, involving careful study of past data and present scenario to estimate the occurence, timing or magnitude of

More information

MASTER PRODUCTION SCHEDULE (MPS)

MASTER PRODUCTION SCHEDULE (MPS) MASTER PRODUCTION SCHEDULE (MPS) Anticipated build schedule for manufacturing end products (or product options) A statement of production, not a statement of market demand MPS takes into account capacity

More information

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD Chapter 6 RESOURCE PLANNING SYSTEMS Prepared by Mark A. Jacobs, PhD LEARNING OBJECTIVES You should be able to: Describe the hierarchical operations planning process in terms of materials planning (APP,

More information

Note 8: Materials Requirements Planning

Note 8: Materials Requirements Planning Note 8: Materials Requirements Planning In materials requirements planning (MRP), orders for component parts are timed to coincide with the production schedule of the products in which they are used. We

More information

LOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements

LOT SIZING IN MRP. Week Gross requirements Scheduled receipts Projected available balance Net Requirements LOT SIZING IN MRP The net data is subjected lot sizing Lot sizes developed can satisfy the net for one or more weeks The basic trade-off involves the elimination of one or more setups at the expense of

More information

A typical manufacturing plant

A typical manufacturing plant CHAPTER6: PRODUCTION PLANNING & CONTROL Production planning is concerned with the determination of production, inventory, and work force levels to meet fluctuating demand A typical manufacturing plant

More information

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Master Production Scheduling Material Requirements Planning TU-E2020 ADVANCED OPERATIONS MANAGEMENT Master Production Scheduling Material Requirements Planning Schedule for classes 26.10 Introduction to the Course / TS 27.10 Different models of Planning for Production

More information

Notes for Production and Operations Management- I

Notes for Production and Operations Management- I Notes for Production and Operations Management- I Factors affecting Process Design Decisions Nature of product/service demand Degree of vertical integration Production Flexibility Degree of automation

More information

MATERIAL AND CAPACITY REQUIREMENTS PLANNING (MRP AND CRP) Part -1. Dr. Mahmoud Abbas Mahmoud Al-Naimi Assistant Professor

MATERIAL AND CAPACITY REQUIREMENTS PLANNING (MRP AND CRP) Part -1. Dr. Mahmoud Abbas Mahmoud Al-Naimi Assistant Professor MATERIAL AND CAPACITY REQUIREMENTS PLANNING (MRP AND CRP) Part -1 Al-Naimi Assistant Professor Industrial Engineering Branch Department of Production Engineering and Metallurgy University of Technology

More information

Material Requirements Planning (MRP), chap 15

Material Requirements Planning (MRP), chap 15 Material Requirements Planning (MRP), chap 15 Chapter 15: Learning Outcomes When you complete this chapter you should be able to: 1. Develop a product structure 2. Build a gross requirements plan 3. Build

More information

Introduction Manufacturing Data Management

Introduction Manufacturing Data Management Introduction Data Data ERP LX Product Integration CAP Rough Cut CAP MRP Detail Finite Forward Scheduling Daily Work Center Available Daily Work Center Available Daily Work Center Available INV Inventory

More information

Chapter 6 Resource Planning Systems

Chapter 6 Resource Planning Systems Chapter 6 Resource Planning Systems TRUE/FALSE 1. The resource and operations planning done by operations managers is intended to balance capacity and output. 2. MRP is the production planning system intended

More information

AUTOSIMPLY. Manufacturing Order. Features. About AutoSimply

AUTOSIMPLY. Manufacturing Order. Features. About AutoSimply AUTOSIMPLY Manufacturing Order About AutoSimply Autosimply is a Sage Developer Partner since 2004. Founded by a group of ACCPAC consultants with over 10 years project experience, we know and understand

More information

UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING

UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING UNIT II PRODUCTION PLANNING AND CONTROL AND COMPUTERISED PROCESS PLANNING 2 Process Planning Product design for each product has been developed in the design department. To convert the product design into

More information

How much money can you add to the bottom line with good inventory management?

How much money can you add to the bottom line with good inventory management? Inventory Management Key Concepts: Inventory are those stocks or items used to support production (raw materials and work-in-process items), supporting activities (maintenance, repair, and operating supplies),

More information

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS About this Topic Outline This outline details the concepts and applications coved in all five of the APICS Principles of

More information

An integrated Business Case Study U i ng i Microsoft fft D ynam cs NA N V NAV 2009 V enna Austria 28/10/2009

An integrated Business Case Study U i ng i Microsoft fft D ynam cs NA N V NAV 2009 V enna Austria 28/10/2009 Using Ui Microsoft ftd Dynamics NAV2009 Vienna, Austria 28/10/2009 Cronus International Ltd. Scenarios & Steps G/L Setup VAT Subsystem Financial Reporting Dimensions Analysis Views Account Schedules Budgets

More information

FEATURES IN TRIMIT FURNITURE 2017

FEATURES IN TRIMIT FURNITURE 2017 FEATURES IN TRIMIT FURNITURE 2017 This document provides an overview of the most important features available in TRIMIT Furniture, as they are available in version 2017 of December 2016. The purpose of

More information

Al-Qadisiya Journal For Engineering Sciences Vol. 4 No. 3 Year 2011

Al-Qadisiya Journal For Engineering Sciences Vol. 4 No. 3 Year 2011 COMPUTER-AIDED SELECTION OF THE OPTIMAL LOT SIZING SYSTEM (CALS) Farah Kamil Abd Muslim Department of Mechanics Technical Institute/ Dewanya ABSTRACT A lot of works have been done by the researchers to

More information

Chapter 12. Enterprise Resource Planning

Chapter 12. Enterprise Resource Planning Chapter 12 Enterprise Resource Planning Enterprise Resource Planning (ERP) Organizes and manages a company s business processes by sharing information across functional areas Connects with supply-chain

More information

IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set

IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov 2017 Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set 1 1 x 12 = 12 M a) Forecasts are estimates of occurrence, timing or

More information

Priority for MRP. Run MRP based on actual orders, forecasts or static requirements. Run MRP simulations until you re satisfied with the plans

Priority for MRP. Run MRP based on actual orders, forecasts or static requirements. Run MRP simulations until you re satisfied with the plans WHY CHOOSE PRIORITY? WORLD S MOST CONFIGURABLE ERP tailor fields, screens, menus, reports, stationery drag and drop workflows business rules, automated data entry, automated repetitive tasks Priority for

More information

Production Activity Control

Production Activity Control Production Activity Control Here the progress of manufacturing operations in the workshop is recorded. Also the material transactions tied to the Open WO s are entered. Open Work Order Maintenance Window

More information

LFL. KEYWORDS: Lot sizing techniques, Material requirements planning.

LFL. KEYWORDS: Lot sizing techniques, Material requirements planning. COMPUTER-AIDED SELECTION OF THE OPTIMAL LOT SIZING SYSTEM (CALS) Farah Kamil Abd Muslim Department of Mechanics Technical Institute/ Dewanya ABSTRACT A lot of works have been done by the researchers to

More information

KEY ISSUES in Advanced Operations Management. Timo Seppälä

KEY ISSUES in Advanced Operations Management. Timo Seppälä KEY ISSUES in Advanced Operations Management Timo Seppälä Production as a value creation process Operations system forms the transformation process between the inputs and the outputs of a manufacturing

More information

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 -

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 - CPIM(Certified In Production & Inventory Management) MPR Sample Test. 1. Which of the following would NOT be a key operating objective? A. Inventory dollars. B. Shipment dollars. C. Factory location selection.

More information

Microsoft Dynamics 365 Business Central

Microsoft Dynamics 365 Business Central Microsoft Dynamics 365 Business Central Capability Guide Dynamics 365 BC Premium: Everything in Essential Service Management Manufacturing Microsoft Dynamics 365 Business Central is a comprehensive business

More information

APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies

APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies It's an integrated and modular software that provides management tools to the operational areas of a manufacturing

More information

CP-81 The best waze to get to destination MRP! Paul Whiteman Lexell Blue Susan Pucciano Lexell Blue

CP-81 The best waze to get to destination MRP! Paul Whiteman Lexell Blue Susan Pucciano Lexell Blue CP-81 The best waze to get to destination MRP! Paul Whiteman Lexell Blue Susan Pucciano Lexell Blue Agenda Introductions Manufacturing Maturity and MRP Roadmap System Configuration and Master Data Setup

More information

For course bookings or enquiries, please contact our Service Desk on or us at

For course bookings or enquiries, please contact our Service Desk on or  us at CONTENTS Overview of Education and Training Courses Offered 3 SYSPRO Administration And Reporting 5 System Administration 6 SYSPRO Reporting Services 7 General Ledger Report Writer 10 SYSPRO Financials

More information

Infor ERP LN 6.1 Enterprise Planning. User's Guide for Order Planning

Infor ERP LN 6.1 Enterprise Planning. User's Guide for Order Planning Infor ERP LN 6.1 Enterprise Planning User's Guide for Order Planning Copyright 2008 Infor All rights reserved. The word and design marks set forth herein are trademarks and/or registered trademarks of

More information

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders. Manufacturing Functionlity in Microsoft Dynamics GP Gain complete control over your inventory, production and orders. Control your Inventory Costing and Inventory Control Are you confident and in control

More information

WEBTECH ERP WEBTECH SYSTEM

WEBTECH ERP WEBTECH SYSTEM WEBTECH SYSTEM Plot No 11, 2nd Floor, Shri Nagar, IT Park Road, Near Gayatri Nagar, Parsodi, Nagpur 440025 (INDIA) Telephone: +91 0712-6605019 Mobile: 09096038065 Email: info@webtechsystem.in www.webtechsystem.in

More information

Oracle Sales and Operations Planning (S&OP) Cloud - Revenue and Cost Calculations

Oracle Sales and Operations Planning (S&OP) Cloud - Revenue and Cost Calculations Oracle Sales and Operations Planning (S&OP) Cloud - Revenue and Cost Calculations This document provides some details on how the aggregate planning engine in S&OP Cloud calculates data for revenue and

More information

ISE480 Sequencing and Scheduling

ISE480 Sequencing and Scheduling ISE480 Sequencing and Scheduling INTRODUCTION ISE480 Sequencing and Scheduling 2012 2013 Spring term What is Scheduling About? Planning (deciding what to do) and scheduling (setting an order and time for

More information

MORE MATERIAL REQUIREMENT PLANNING

MORE MATERIAL REQUIREMENT PLANNING 3 MORE MATERIAL REQUIREMENT PLANNING MGT2405, University of Toronto, Denny Hong-Mo Yeh More about MRP Logic Suppose there are two products, X and Y, and the item master, BOM and gross requirement for MPS

More information

What is ERP? Source: Wikipedia

What is ERP? Source: Wikipedia Brad Staats What is ERP? Enterprise resource planning (ERP) systems integrate internal and external management information across an entire organization. The purpose of ERP is to facilitate the flow of

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Operational Logistics Management (OLM612S)

Operational Logistics Management (OLM612S) Ester Kalipi (M.LSCM.; B. Hons Logistics; B-tech. BA.; Dip. BA.; Cert. BA.) Operational Logistics Management (OLM612S) Unit 2: Logistics Planning 21 February 2018 Table of contents Unit Objectives The

More information

MODULE 7: ORDER PROMISING. Module Overview

MODULE 7: ORDER PROMISING. Module Overview MODULE 7: ORDER PROMISING Module Overview A company must give customers accurate delivery information for sales orders and it must correctly estimate the receipt date of purchase and transfer orders. In

More information

Cost Accounting. Unbeaten Path. BPCS S Systems Logic for Calculating Routing Costs CST Unbeaten Path International Ltd.

Cost Accounting. Unbeaten Path. BPCS S Systems Logic for Calculating Routing Costs CST Unbeaten Path International Ltd. Cost Accounting BPCS S Systems Logic for Calculating Routing Costs Unbeaten Path CST.12 CST.13 ❶ ❷ ❸ ❹ ❺ ❻ ❼ For a given item, the system goes to the Routing file to determine the Workcenter number. At

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Examination. Telephone: Please make your calculations on Graph paper. Max points: 100

Examination. Telephone: Please make your calculations on Graph paper. Max points: 100 KPP227 TEN1 Production and Logistics Planning Examination Course: Production and Logistics Planning Date: 2014-01-14 Number of hours: 5 hours Group: Freestanding course Course code: KPP227 Examination

More information

FEATURES IN TRIMIT FURNITURE BASED ON BUSINESS CENTRAL

FEATURES IN TRIMIT FURNITURE BASED ON BUSINESS CENTRAL FEATURES IN TRIMIT FURNITURE BASED ON BUSINESS CENTRAL Date: 14-12-2018 This document provides an overview of the most important features available in TRIMIT Furniture based on Microsoft Dynamics 365 Business

More information

GBI - Introductory Course 6/11/2015

GBI - Introductory Course 6/11/2015 SAP University Alliances Version 2.11 Authors Bret Wagner Stefan Weidner Production Planning and Execution (PP) Product 6.0 EhP4 Global Bike Inc. Level Beginner Focus Cross-functional integration Production

More information

Successfully completing this course helps the reader prepare for the Microsoft Dynamics NAV Manufacturing certification exam.

Successfully completing this course helps the reader prepare for the Microsoft Dynamics NAV Manufacturing certification exam. MICROSOFT DYNAMICS NAV COURSE OUTLINE 1) MICROSOFT DYNAMICS NAV MANUFACTURING Module 1: Manufacturing Course Overview This module provides an overview of the Microsoft Dynamics NAV Manufacturing course.

More information

Hybrid Manufacturing Methods

Hybrid Manufacturing Methods Hybrid Manufacturing Methods The following manufacturing execution and costing methods are supported in SyteLine. These methods can be combined in a single environment so that the optimal method is used

More information

University of Puerto Rico Mayagüez Campus Industrial Engineering Department

University of Puerto Rico Mayagüez Campus Industrial Engineering Department University of Puerto Rico Mayagüez Campus Industrial Engineering Department Research Study Titled: Teaching Industrial Engineering to Generation Y Students through Computer Games National Science Foundation

More information

Management Information Systems, Sixth Edition. Chapter 3: Business Functions and Supply Chains

Management Information Systems, Sixth Edition. Chapter 3: Business Functions and Supply Chains Management Information Systems, Sixth Edition Chapter 3: Business Functions and Supply Chains Objectives Identify various business functions and the role of ISs in these functions Explain how ISs in the

More information

Manufacturing ERP. Delivering flexibility, Managing Complexity & providing optimal service

Manufacturing ERP. Delivering flexibility, Managing Complexity & providing optimal service Manufacturing ERP Delivering flexibility, Managing Complexity & providing optimal service idempiere allows us to build an interface which is custom made for the work done by the employee. It helps them

More information

What is MRP (I, II, III) 1. MRP-I

What is MRP (I, II, III) 1. MRP-I What is MRP (I, II, III) 1. MRP-I Introduction: Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes. Although

More information

Process Strategy and Sustainability

Process Strategy and Sustainability 7 Process Strategy and Sustainability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl 7-1 Process

More information

Net Requirements Plan. The logic of net requirements. MRP Planning Sheet. Gross Requirements Schedule

Net Requirements Plan. The logic of net requirements. MRP Planning Sheet. Gross Requirements Schedule Net Requirements Plan The logic of net requirements Gross Requirements Schedule MRP Planning Sheet Safety Stock BOMs, inventory records, purchase and production quantities may not be perfect Consideration

More information

Production Management and Scheduling

Production Management and Scheduling Production Management and Scheduling Meet Your Due Dates Your production process can be simple or complex, time consuming or quick, but one thing remains constant the drive to meet your customer s delivery

More information

INTEGRATED. Reservations, Tracking, and Action Messages. Microsoft Dynamics NAV 5.0. Technical White Paper

INTEGRATED. Reservations, Tracking, and Action Messages. Microsoft Dynamics NAV 5.0. Technical White Paper INTEGRATED Microsoft Dynamics NAV 5.0 Reservations, Tracking, and Action Messages Technical White Paper This paper provides a conceptual and technical overview of the reservations, tracking an actions

More information

Manufacturing Resource Planning

Manufacturing Resource Planning Outline Manufacturing Resource Planning MRP The Strategic Importance of Short- Term Scheduling Scheduling Issues Forward and Backward Scheduling Scheduling Criteria Outline Continued Scheduling Process-Focused

More information

Warehouse and Production Management with SAP Business One

Warehouse and Production Management with SAP Business One Warehouse and Production Management with SAP Business One React to change based on facts and real-time insights Inventory represents one of the largest expenses for many small and midsize businesses.

More information

One Software to manage your entire bakery business.

One Software to manage your entire bakery business. One Software to manage your entire bakery business. Why choose ibake ERP : ibake ERP is an enterprise-class ERP solution for bakeries that manages POS, front office, manufacturing, warehouse, inventory

More information

Breakdown. Learn the implications of the breakdown field in Item Master Data

Breakdown. Learn the implications of the breakdown field in Item Master Data Breakdown Learn the implications of the breakdown field in Item Master Data Boyum Solution IT A/S beas tutorial TABLE OF CONTENTS 1. INTRODUCTION... 2 2. Process... 2 2.1. Mode of procurement in beas...

More information

Test-king.C_TSCM42_65.80 Questions

Test-king.C_TSCM42_65.80 Questions Test-king.C_TSCM42_65.80 Questions Number: C_TSCM42_65 Passing Score: 800 Time Limit: 120 min File Version: 4.9 http://www.gratisexam.com/ C_TSCM42_65 SAP Certified Application Associate - Production -

More information

Enterprise Information Systems

Enterprise Information Systems Instructor: Kevin Robertson Enterprise Information Systems Lecture Outline 6/7 Learning Objectives 1. Explain how organizations support business activities by using information technologies across the

More information

Sanjay Srinivas PH:

Sanjay Srinivas PH: Microsoft Dynamics AX 2012 Training course Content [Financials I, II, and Fixed Assets] Financials I Financials I course introduces the student to the Microsoft Dynamics AX 2012 General Ledger Accounting

More information

Glossary for Sales and Operations Planning, Sales Forecasting and Master Scheduling

Glossary for Sales and Operations Planning, Sales Forecasting and Master Scheduling Glossary for Sales and Operations Planning, Sales Forecasting and Master Scheduling Definitions are from books on these subjects by Tom Wallace and Bob Stahl ABC Classification The grouping of items based

More information

Create a Standard Cost Estimate. Hint: The marking allowance is done by the instructor.

Create a Standard Cost Estimate. Hint: The marking allowance is done by the instructor. Unit 9 Exercise 41 479 Create a Standard Cost Estimate Business Example Now that you have changed the BOM and the routing you need to calculate the cost for your finished product T-F1## again. You run

More information

Supply Planning in Microsoft

Supply Planning in Microsoft Supply Planning in Microsoft Dynamics NAV 2013 Technical White Paper Supply Planning in Microsoft Dynamics NAV 2013... 4 Central Concepts of the Planning System... 5 Planning Parameters... 5 Planning Starting

More information

1. MRP Module. 2. Record. 2.1 Material Requirement Planning

1. MRP Module. 2. Record. 2.1 Material Requirement Planning Mrp 1. MRP Module In the MRP module you can insert and/or automatically create your production plans, calculate and list in different ways your material and semi products requirements needed to realise

More information

Inventories are important to all types of

Inventories are important to all types of 12 Inventory Management PowerPoint Slides by Jeff Heyl For Operations Management, 9e by Krajewski/Ritzman/Malhotra 2010 Pearson Education 12 1 Inventory Management Inventories are important to all types

More information

Introduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES

Introduction. Introduction. Introduction LEARNING OBJECTIVES LEARNING OBJECTIVES Valua%on and pricing (November 5, 2013) LEARNING OBJECTIVES Lecture 9 Control 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order quantity (EOQ) to determine how

More information

Infor LN Enterprise Planning User Guide for Order Planning

Infor LN Enterprise Planning User Guide for Order Planning Infor LN Enterprise Planning User Guide for Order Planning Copyright 2018 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains

More information

Connecting S&OP to the Shop Floor: Here s How!

Connecting S&OP to the Shop Floor: Here s How! Connecting S&OP to the Shop Floor: Here s How! J. E. Boyer Company, Inc. John E. Boyer, President Copyright 2004 by J. E. Boyer Company, Inc. No portion of this article may be reproduced in whole or in

More information

Custom Manufacturing Guide DBA Software Inc.

Custom Manufacturing Guide DBA Software Inc. Contents 3 Table of Contents 1 Introduction 4 2 Why You Need Custom Manufacturing 5 3 Total Control Workflow 8 4 Custom Manufacturing Sequence of Events 10 5 Advance Setup - Standard Processes 12 6 Advance

More information

Production Management Fall 2006 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm

Production Management Fall 2006 Odette School of Business University of Windsor. Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm Name (print, please) ID Production Management 73-604 Fall 2006 Odette School of Business University of Windsor Midterm Exam 2 Solution Thursday, November 23, 5:30 6:50 pm Instructor: Mohammed Fazle Baki

More information

MANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW

MANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW MANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW Al-Naimi Assistant Professor Industrial Engineering Branch Department of Production Engineering and Metallurgy University

More information

Introduction to Production Planning

Introduction to Production Planning Introduction to Production Planning Production Planning: what does it deal with? 2 The Production Manager question is: WHAT ( which product ), WHEN ( considered some time horizon ), HOW ( with which materials

More information

Bill of material. A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials

Bill of material. A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials Bill of material A bill of material (BOM) represents the structural links between finished products, intermediate items, components and raw materials FP A B C x y z 1 Manufacturing cycle Manufacturing

More information

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations JIT and Lean Operations Outline Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations Eliminate Waste Remove Variability Improve

More information

Requirements Planning Implementation Guide Release 9.2

Requirements Planning Implementation Guide Release 9.2 [1]JD Edwards EnterpriseOne Applications Requirements Planning Implementation Guide Release 9.2 E63942-04 April 2018 Describes how to set up and use JD Edwards EnterpriseOne Requirements Planning to create

More information

Oracle ERP Cloud Period Close Procedures

Oracle ERP Cloud Period Close Procedures Oracle ERP Cloud Period Close Procedures Release 13 O R A C L E W H I T E P A P E R A U G U S T 2 0 1 7 Table of Contents Introduction 8 Chapter 1 Period Close Dependencies 9 Chapter 2 Subledger Accounting

More information

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer May 2017 CloudSuite Industrial Where Did APS Come From? APS grew out of the convergence of two movements.

More information

There are three options available for coping with variations in demand:

There are three options available for coping with variations in demand: Module 3E10 Operations management for Engineers - Crib 1 (a) Define the theoretical capacity of a manufacturing line. Explain why the actual capacity of a manufacturing line is often different from its

More information

Inventory Replenishment

Inventory Replenishment Inventory Replenishment Release 2015 Disclaimer This document is provided as-is. Information and views expressed in this document, including URL and other Internet Web site references, may change without

More information

SAP Material Master A Practical Guide. Matthew Johnson

SAP Material Master A Practical Guide. Matthew Johnson SAP Material Master A Practical Guide Matthew Johnson TABLE OF CONTENTS Table of Contents Preface 7 1 Introduction 11 2 Material Master Basics 17 2.1 Material master structure 17 2.2 Creating and accessing

More information

QMRP Base System. Highlights:

QMRP Base System. Highlights: The QMRP Base System consists of the menu and security systems, inventory control, product structure processing, product costing, and manufacturing order processing. Additional functionality is provided

More information

PRODUCTION PLANNING ANDCONTROL AND COMPUTER AIDED PRODUCTION PLANNING Production is a process whereby raw material is converted into semi-finished products and thereby adds to the value of utility of products,

More information

MANUFACTURING ERP SOFTWARE NEEDS ASSESSMENT CHECKLIST BY SHELDON NEEDLE

MANUFACTURING ERP SOFTWARE NEEDS ASSESSMENT CHECKLIST BY SHELDON NEEDLE MANUFACTURING ERP SOFTWARE NEEDS ASSESSMENT CHECKLIST BY SHELDON NEEDLE This needs assessment tool has two levels of checklists for 32 manufacturing software applications that are typically available in