PRE- FEASIBILITY REPORT (In terms of provision of EIA Notification 2006) For

Size: px
Start display at page:

Download "PRE- FEASIBILITY REPORT (In terms of provision of EIA Notification 2006) For"

Transcription

1 PRE- FEASIBILITY REPORT (In terms of provision of EIA Notification 2006) For Amendment to Zinc Smelter (2, 50,000 TPA) and CPP (100 MW) (F. No. J-11011/279/2006-IA. II (I) dated 6 th December 2006) By: HINDUSTAN ZINC LIMITED, CHANDERIYA LEAD ZINC SMELTER, PUTHOLI , CHITTORGARH, RAJASTHAN To: Ministry of Environment & Forests (MoEF) New Delhi September,

2 TABLE OF CONTENTS 1. Executive Summary Need for Proposal Technology &Process description The major raw materials, products, byproducts and residues are as under Environmental aspect and pollution control... 8 A. Air:... 8 B. Water:... 9 C. Solid /Hazardous waste: Legal Aspect Site Analysis: Proposed infrastructure Rehabilitation and Resettlement(R&R) Plan Project Schedule and Cost Estimates Analysis of Proposal

3 1. Executive Summary Chanderiya Lead-Zinc Smelter (CLZS)is the one of the largest zinc-lead smelting complexes in the world. At CLZS, Zinc is produced by hydrometallurgical route in Hydro-1 & Hydro-2 and Pyro-metallurgical route in Pyro unit. The hydrometallurgical smelting process is a Roast, Leach and Electro-winning process. In this process, Zinc concentrate is oxidized in the roaster and sent to leaching & purification plant to produce a zinc sulphate solution and through electrolysis zinc cathodes are produced which are further melted and casted into zinc ingots. Main Iron residue generated from leaching is Jarosite which is being stabilized by addition of lime and cement. The product is called Jarofix which is stockpiled at Jarofix yard and needs recurring land. In Fuming process the weak acid leach residue containing zinc, iron and sulfur are fed to fuming furnace. Zinc is fumed, iron is slagged, and Sulfur is oxidized to SO 2, characterized in the Zinc fuming furnace. The iron slagging and Sulfur oxidation are performed in a single step process, by smelting the residues in a furnace comprising an oxidizing gas mixture (oxygen), and by feeding a solid reducing agent (coal) to the melt. The process achieves the oxidation of Sulfur and the slagging of Iron, while simultaneously achieving the reduction and the fuming of metals such as Zinc. Zinc bearing residues are transported to the fume oxide treatment plant where zinc is leached and lead/silver is recovered for further treatment. Waste heat generated in the above process is converted to steam and the same is utilized in producing ~ 21MW power. To accomplish this project, HZL has conducted an operational feasibility study from Xmetech Zinc, South Korea and found to be feasible. Fuming technology is established technology, now-a-days used to eliminate Jarosite formation and improve zinc & lead recovery and to produce environmentally friendly clean slag which is used in the cement industry. The project is proposed to be installed within the existing factory premises and hence no additional land is to be acquired. This project will generate additional power from waste heat and will be self- of 11000M 3 as sufficient. Water requirement for this project will be met within the quantity specified in the Environment Clearance. (Reference EC NO- F. No. J /279/2006-IA. II (I) dated 6 th December 2006). 3

4 2. Need for Proposal The proposed project will be set up at Hydro-2 Zinc smelter which is within CLZS premises. The proposal is for the Amendment in Environmental clearance of2,10,000mt (Phase 2)hydro II Zinc smelter which was a part of environmental clearance granted for 2, 50,000 TPA, Zinc and CPP of100 MW. Jarosite process is currently used in hydrometallurgical Zinc smelters to removee iron from Zinc concentrate. Jarosite as a hazardous waste is neutralized and fixed by addition of lime & cement and converted into Jarofix which is stable material and then stored in Jarofix yard. With this proposed project, recurring land requirement and generation of hazardous waste are eliminated wherein Iron is slagged and utilized in Cement Industry. Existing Hydro 1 smelter having capacity MT of Zinc metal will continue to operate through Jarosite process route. 3. Technology &Process description The hydrometallurgica smelting process is a Roast, Leach and Electro-winning process. In this process, Zinc concentrate is oxidized in the roaster and sent to leaching & purification plant to produce a zinc sulphate solution and through electrolysis to produce zinc cathodes which are further melted and casted into zinc ingots. Iron residue generated from leaching is Jarosite, a waste which is being stabilized by addition of lime and cement. The product is called Jarofix which is stockpiled at Jarofix yard and needs recurring land. To eliminate Jarosite generation, it is proposed to set up fuming process (Pyro metallurgical process) within existing leaching circuit of hydro -2 Zinc Smelter. Leaching Process: The leaching section includes neutral leaching, where zinc oxide along with other metal oxides are leached with weak sulphuric acid. The solution goes to purification section whereas the neutral leaching thickener underflow is pumped to weak acid leaching to dissolve part of zinc oxide. The residue containing zinc ferrite is pumped to Jarosite section where at high temperature zinc ferrite is disintegrated into Zinc sulphate and Iron sulphate. Iron is precipitated as Jarosite which after addition of 4

5 lime and cement converted into Jarofix and stored in Jarofix yard. The zinc sulphate solution is recycled to neutral leaching via pre neutralization section. Details of processes: S No. Existing Process 1 Roaster and acid plant Roaster and Acid plant(no change) 2 Leaching Leaching(No change) 3 Iron removal as Jarofix via Jarosite Iron removal as a Slag via Fumer Route Route (Amendment) 4 Purification Purification(unchanged) 5 Electrolysis Electrolysis(No change ) 6 Coal Based Thermal Power Plant Coal Based Thermal Power Plant (No change) A flow diagram of Existing flow sheet (Hydro metallurgy process) and proposed flow sheet (Pyro metallurgical fuming process) is attached as Annexuree I. Pyro Metallurgical fuming Process is composed of three areas, zinc fuming area, fume oxide treatment area and halide removal area. Zinc fuming Process: In the fuming process the weak acid leaching underflow is filtered, dried and fed to fuming furnaces (2 No s)in series where at elevated temperatures Zinc is fumed and Iron is converted into slag. Coal is added for raising the temperature and also creating reducing atmosphere. Air/Oxygen is added for combustion. The slag so produced is removed from the bottom of the furnace. The zinc oxide from furnaces in form of off gas is captured in boiler and gas cleaning section &used for SO 2 scrubbing and the same slurry will be sent to the fume oxide treatment section. In the process of the zinc fuming, saturated steam is generated at the waste heat boiler and the saturated steam is used to produce electricity (~ 21 MW) from the waste heat. The main equipments in this section are as follows: 1. Fuming Furnaces with Hygiene Stack 2. Waste heat recovery boilers 3. Turbine- Generator set with auxiliaries 4. ESP & Bag Filter 5. Filter Presses 6. Quench Tower 7. Raw material section with Stack 8. Coal Handling & Pulverizing Plant Proposed Process 5

6 9. Oxygen & Nitrogen Plant 10. Slag Granulation system Zinc Oxide Treatmentt Process: The off gases are scrubbed by zinc oxide slurry in the scrubber before discharging to atmosphere through stack. The scrubbed slurry is thickened and filtered to recover cake which is treated in Decomposition tower. The slurry is filtered; the ZnSO 4 solution is recycled to neutral leaching section whereas Lead and Silver is recovered in the form of cake. The SO 2 gas generated in Decomposition tower is sent for further treatment in existing acid plant. The Major Equipments in this section are: 1. Scrubber with Stack 2. Thickeners 3. Filter presses 4. Reactors 5. Decomposition Tower Halide Removal section Halide removal process is needed to remove halide (Halides are compounds containing halogens). When halide (including the other impurities) in the zinc solution (which was earlier recycled to neutral leaching section from zinc oxide treatment section) increases, the hydrolysis process will be applied to remove halide. After then, de-halide fume oxide leaching solution will be fed to the neutral leaching section. The solid residues collected in the bottom of the hydrolysis thickener are filtered and cake (Geothite residue) is produced. Annually 2000 MT of goethite cake shall be generated which shall be disposed in SLF area. The major equipments in this section are: 1. Filter presses 2. Thickeners 3. Reactors Flow sheet of the Fumer Process is attached as Annexure II 6

7 3.1 The major raw materials, products, byproducts and residues are as under: S No Item Description Product 1 Zinc Thermal 2 Power By product 3 Pb-Ag cake 4 Cu Spiess Sulphuric 5 acid(98.5%) 6 Slag Waste heat 7 power Unit Hazardous waste Capacity as per Earlier EC Revised capacity Remarks MTPA No Change MW No Change MTPA Amendedd 1 MTPA Amendedd 1 2 MTPA No Change MTPA Amendedd 3 Internally MW Amendedd Consumed 8 Jarosite MTPA Amended* 9 Geothite cake Utilities MTPA Amendedd 10 Water M No Change 11 Land Raw Material Ha No Change 12 Coal For power MTPA No Change 13 Coal for Fumer MTPA Amendedd 14 Fuel(HSD) KLPA Amendedd * Jarosite Process will be adopted till process stabilization and during Process upsets. 1. Processed in existing Pyro smelter for recovery of metal. 2. Sold to fertiliser industry 3. Sold to cement manufacturers Hazardous wastes like RO rejects, ETP sludge, Cobalt cake, co mud, enrichment cake, and spent catalyst etc., will continue to existing authorization and will continue to dispose in the existing s quantity of waste oil /used oil generated will remain the same a Treatment /Disposal Disposed in SLF ooler cake, anode o generate as per secure land fill. The and will be sold to 7

8 registered recyclers. Ash generation from CPP will remain the same and will be sold to cement/brick manufacturers. Details attached as per annexure III 3.2 Environmental aspect and pollution control A. Air: SO 2 generated from furnaces get treated in zinc oxide scrubber and shall be vent out through stack of suitable height. The acid mist emission shall be within the prescribed limit. The gases from the decomposition unit will go to existing acid plant, which is fully adequate to treat the same. The Acid plant is designed to treat gases so as to produce 900 MTPD of acid. The overall acid production will remain within the approved capacity of 900MTPD.In Acid plant, we have adopted state of the art of Double conversion and double absorption technology and Super Cesium coated V 2 O 5 catalyst at our acid plant. The pollution control equipment/facilities are having adequate control and interlocks to limit the process variations and trip in case of process upsets. Hygiene bag filter will be used for collection of particulate matter in Coal handling area, RMH area and all transfer points and gases shall be vent out through stack of suitable height. The particulate emission shall be within the prescribed limit of CPCB norms. Hygiene bag filter will be used for collection of particulate matter in furnace tapping floor, lance port, feed port and all transfer points and gases shall be vented through stack of suitable height. The particulate matter emission shall be within the prescribed limit of CPCB norms. The following measuress shall continue to be adopted in the proposed plant also: All the plant roads will be made of concrete. Mechanized truck mounted vacuum sweeper will continue to be deployed to sweep and collect the dust from road Monitoring of fugitive emission during internal transportationn Material transferr points will be provided with de-dusting system Raw material will be transported through special trippers Existing truck tyre washing system shall continue to be used Bag filters and other pollution control equipments be adequately installed for operation and maintained properly. 8

9 B. Water: Water requirement will be around 2400m 3, which will be within Environment Clearance No. F. No. J-11011/279/2006-IA.II (I) dated 6 th December 2006 for Zinc Smelter (2, 50,000 TPA) & CPP (100 MW). The revised water balance is attached: Annexure IV C. Solid /Hazardous waste: The proposed Projectwill generate MTPA of non-hazardous slag which is saleable. The same will be a used as a raw material in cement industry and further conserve natural resources MTPA of Goethitee cake will be generated from halide removal section. It will be disposed in existing Secured land Fill after stabilization. 3.3 Legal Aspect There is No litigation in the proposed project boundary 4. Site Analysis: It s already an industrial site. Annexure V 5. Proposed infrastructure The proposed amendment is planned within the existing Chanderiya smelting complex and existing infrastructure is sufficient to cater the need. 6. Rehabilitation and Resettlement(R&R) Plan No R&R is envisaged as no land is being acquired. 7. Project Schedule and Cost Estimates Project will commissioned within 24 months from the date of issuance of consent to establish. Project cost ~Rs. 500 Cr. 8. Analysis of Proposal Environmental Improvement after Fumer Circuit 9

10 Being concerned with the upkeep of environmental safety and ecological balance, the proposed projects is environmental improvements in nature in the existing CLZS smelters within its premises and mainly aims at waste minimization. Following are the environmental key features of the project: A. Saving of land Resources Currently process is generating Jarosite as waste which is neutralized and fixed by addition of lime & cement and converted into Jarofix which is stable material and then stored in jarofix yard. Zinc ferrite Fumer will generate usable slag and remove the liability of land, for storage of Jarofix B. Saving of other resources Jarofix process consumes other resource like cement & lime. Fumer operation will reduce the consumptionn of lime and cement. C. Usable Slag Generation Fumer slag will be used in cement industry and following will be industry and cement industry the benefit to zinc C.1 Slag consumption before Kiln Fumer Slag contains ~7.6% lime and ~43% Fe 2 O 3. This will reduce consumption of CaCO 3 of 17000MTPA in cement industry and reduce carbon footprint by ~7700 MT C.2 Slag consumption after Kiln as Clinker As slag will be used after Clinker it will reduce carbon foot print of cement industry by ~ MT along with of CaCO 3 of ~17000MTPA D. Power generation from waste Heat Waste heat recovery based power generation would be ~21 MWH of energy. Out of ~ 21 MWH productions, ~11 MWH will be used in Fumer project. Therefore, fumer is self-sufficient for energy requirement and will provide extra Approx 10 MWH which will be utilized in complex E. Recovery of metals Fumer process in addition to improving the environment also helps in recovering Lead, silver & copper from zinc concentrate. 10

11 LIST OF ANNEXURES 1. ANNEXURE - I Flow diagram of Existing flow sheet (Hydro metallurgy process) and proposed flow sheet (Pyro metallurgical fuming process) 2. ANNEXURE - II Flow sheet of Fumer process 3. ANNEXURE - III Solid waste generation 4. ANNEXURE - IV Water Requirement 5. ANNEXURE - V Location maps showing CLZS location, Hydro-2 location, and project site layout 11

12 ANNEXURE - I 12

13 Existing flow sheet and amended flow sheet 13

14 ANNEXURE II Flow sheet of Fumer process 14

15 ANNEXURE III Solid waste generation S No Hazardous waste 1 Process Residue 1.1 Cooler cake 1.2 Anode mud 1.3 Enrichment cake Category of HW Unit Authorised Quantity 7.2 MTPA MTPA MTPA MTPA ETP sludge 7.4 MTPA Spent 17.2 KL catalyst 4 Waste oil 5.1 KL Used oil 5.1 KL Revised Quantity Hazardous waste disposal practice Sold to Registered Recyclers / Disposed off in SLF Disposed off in SLF Recycled in leaching process/ Disposal in SLF Sold to Registered Recyclers /Disposed in SLF Disposed off in SLF Disposed off in SLF Sold to Registered Recyclers Sold to Registered Recyclers 15

16 ANNEXURE IV Water Requirement Water requirement of CLZS location S. No Section Quantity 1 Pyro ( ISF + Sinter) Ausmelt H CPP (154 MW) H-II CPP (100 MW) 6000 Total CLZS Complex Water requirement of H-II & 100 MW CPP Existing S. No Section Quantity 1 H-II CPP (100 MW) 6000 Total Water requirement after amendment ( H-II & 100 MW CPP) S. No Section Quantity 1 CPP (100 MW) Fumer H-II 4200 Total UOM UOM UOM 16

17 ANNEXURE V Location maps showing CLZS location, Hydro-2 location, and project site layout Files attached as: Chanderiya layout.pdf Hydro-2 layout with project site.pdf project site.jpeg 17

18

19 ARH RG TTO CHI TO PROPOSED 2 6 SITE FOR PROJECT 18 ARH 4 RG W A L K PROPOSED 10 W A Y WALK WAY WALK WAY SLUDGE HANDLING ROAD ROAD TO CHI TTO 21 SITE PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 13 D:\E drive data\plant& ROAD Lay out\lay OUT 08\CIFB R-22.dwg, PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

20

PRE- FEASIBILITY REPORT terms of provision of EIA Notification. For

PRE- FEASIBILITY REPORT terms of provision of EIA Notification. For PRE- FEASIBILITY REPORT (In terms of provision of EIA Notification 2006) For Amendment to Zinc Smelter (2, 50,000 TPA) and CPP (100 MW) (F. No. J-11011/279/2006-IA. II (I) dated 6 th December 2006) By:

More information

CLEANER PRODUCTION GUIDELINES IN SMELTING INDUSTRIESS

CLEANER PRODUCTION GUIDELINES IN SMELTING INDUSTRIESS 2015 CLEANER PRODUCTION GUIDELINES IN COPPER SMELTING INDUSTRIESS Gujarat Cleaner Production Centre (Established by Industries & Mines Department, GoG) ENVIS Centre on: Cleaner Production/Technology Supported

More information

Outotec Hydrometallurgical Nickel Plants and Processes

Outotec Hydrometallurgical Nickel Plants and Processes Outotec Hydrometallurgical Plants and Processes Our expertise and experience provide the path to optimized solutions and complete plants for the production of highquality nickel, from a wide range of nickel

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

2nd International Workshop on Metals Recovery from Mining Wastes - M2R

2nd International Workshop on Metals Recovery from Mining Wastes - M2R This presentation has been prepared for 2nd International Workshop on Metals Recovery from Mining Wastes - M2R2 2012 - It contains intellectual property belonging to Xstrata Technology The information

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

POLLUTION CONTROL IN RECYCLING INDUSTRY

POLLUTION CONTROL IN RECYCLING INDUSTRY POLLUTION CONTROL IN RECYCLING INDUSTRY 1. Introduction - Recycling industry frequently causes pollution to the environment. It is either the same or more than any other industrial activities. For example,

More information

ENVIRONMENTAL STATEMENT FOR THE YEAR

ENVIRONMENTAL STATEMENT FOR THE YEAR ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,

More information

Copper Smelting Slideshow

Copper Smelting Slideshow Copper Smelting Slideshow What is copper smelting? The method of extracting pure elemental copper (Cu) from copper concentrate (CuFeS 2 ). Smelting Furnace Smelting is carried out in a structure called

More information

EXTRACTIVE METALLURGY

EXTRACTIVE METALLURGY EXTRACTIVE METALLURGY Extractive metallurgy is the practice of removing valuable metals from an ore and refining the extracted raw metals into a purer form. In order to convert a metal oxide or sulfide

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

9/12/2018. Course Objectives MSE 353 PYROMETALLURGY. Prerequisite. Course Outcomes. Forms of Assessment. Course Outline

9/12/2018. Course Objectives MSE 353 PYROMETALLURGY. Prerequisite. Course Outcomes. Forms of Assessment. Course Outline Kwame Nkrumah University of Science & Technology, Kumasi, Ghana MSE 353 PYROMETALLURGY Course Objectives Understand the fundamental concepts of pyrometallurgy Understand the concepts of materials and energy

More information

Modified Zincex Process by Técnicas Reunidas

Modified Zincex Process by Técnicas Reunidas The Modified ZINCEX TM Process is an advantageous smelting hydrometallurgical process licensed by Técnicas Reunidas to produce ultra-pure Zinc cathodes and enable the recovery of other valuable metals.

More information

Waste heat recovery based power plant at Hindustan Zinc Limited, Chanderia

Waste heat recovery based power plant at Hindustan Zinc Limited, Chanderia Waste heat recovery based power plant at Hindustan Zinc Limited, Chanderia MONITORING REPORT Version: 1.1 Date: 24 th Aug 2007 Verified Emission Reductions (VERs): 1 st July 2005 30 th March 2007 Hindustan

More information

Waste Treatment and Utilization in Heavy Metal Metallurgy

Waste Treatment and Utilization in Heavy Metal Metallurgy M2R2 Waste Treatment and Utilization in Heavy Metal Metallurgy Jiang Kaixi BGRIMM Apr. 12-13, 2012, Santiago, Chile 1 Introduction Production of top ten non-ferrous metals in China Ranking the position

More information

OUTOTEC ROASTING SOLUTIONS

OUTOTEC ROASTING SOLUTIONS OUTOTEC ROASTING SOLUTIONS Outotec roasting solutions are based on our decades of experience in developing processing technologies for concentrates and ores. Safe, easy, and cost-efficient to operate,

More information

FLASH ROASTING OF SULPHIDE CONCENTRATES AND LEACH RESIDUES USING A TORBED* REACTOR

FLASH ROASTING OF SULPHIDE CONCENTRATES AND LEACH RESIDUES USING A TORBED* REACTOR FLASH ROASTING OF SULPHIDE CONCENTRATES AND LEACH RESIDUES USING A TORBED* REACTOR C. E. Dodson, Torftech (Canada) Inc., 2395 Speakman Drive, Mississauga, Ontario L5K 1B3, Canada V. I. Lakshmanan, R. G.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

The below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh.

The below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh. EIA Review of Nalwa integrated steel plant (NSPL) Background Nalwa integrated steel plant (0.198 MTPA sponge iron), located near village Taraimal, Raigarh district, Chhattisgarh proposes to expand its

More information

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2 THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II

More information

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT: INTRODUCTION Himalaya Alkalies& Chemicals ltd will setup Caustic soda Plant of 400 MTPD. The Plant site is situated in Village Johron, Kala Amb, Tehsil Nahan, District Sirmaur, Himachal Pradesh. It is

More information

Cansolv Technologies Inc. Alberta NOx and SOx Control Technologies Symposium April 9, Rick Birnbaum

Cansolv Technologies Inc. Alberta NOx and SOx Control Technologies Symposium April 9, Rick Birnbaum A Novel SO 2 Scrubbing Process For Industrial SO 2 Emission Control Alberta NOx and SOx Control Technologies Symposium April 9, 2008 Rick Birnbaum rick.birnbaum@cansolv.com OUTLINE Gas Absorption Solutions

More information

Development status of the EAGLE Gasification Pilot Plant

Development status of the EAGLE Gasification Pilot Plant Development status of the EAGLE Gasification Pilot Plant Gasification Technologies 2002 San Francisco, California, USA October 27-30, 2002 Masaki Tajima Energy and Environment Technology Development Dept.

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Gujarat Cleaner Production Centre (Established by Industries & Mines Department, GoG) ENVIS Centre on: Cleaner Production/Technology Supported by:

Gujarat Cleaner Production Centre (Established by Industries & Mines Department, GoG) ENVIS Centre on: Cleaner Production/Technology Supported by: 2015 Cleaner Production Guidelines G in Aluminium Smelting Sector Gujarat Cleaner Production Centre (Established by Industries & Mines Department, GoG) ENVIS Centre on: Cleaner Production/Technology Supported

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and. Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the

More information

A Review of Sulfide Smelting Process Gas Handling Systems

A Review of Sulfide Smelting Process Gas Handling Systems A Review of Sulfide Smelting Process Gas Handling Systems Paykan Safe Gas Cleaning Technologies 4950 North O Connor Road Suite 250 Irving, Texas, U.S.A. 75062 1.0 SMELTER PROCESS GAS CHARACTERISTICS Off-gas

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

Proposals for new NFM BAT conclusions for Ferro-Alloys production

Proposals for new NFM BAT conclusions for Ferro-Alloys production EUROPEAN COMMISSION JOINT RESEARCH CENTRE Institute for Prospective Technological Studies Sustainable Production and Consumption Unit European IPPC Bureau Seville, 26 May 2011 Proposals for new NFM BAT

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

Air Emissions During the Thermal Treatment Processing of Aluminium Smelter Spent Potlining (SPL) Material

Air Emissions During the Thermal Treatment Processing of Aluminium Smelter Spent Potlining (SPL) Material Air Emissions During the Thermal Treatment Processing of Aluminium Smelter Spent Potlining (SPL) Material Graham Taylor (AECOM) Kevin Cooper (Regain Services) September, 2010 ALUMINIUM PRODUCTION PROCESS

More information

Exploration, mining and metals production & Boliden Kokkola Justin Salminen

Exploration, mining and metals production & Boliden Kokkola Justin Salminen Exploration, mining and metals production & Boliden Kokkola Justin Salminen Kokkola Material Week 30.10.2018 Boliden Kokkola 1 04.11.2018 Boliden in a nutshell A world-class mining and smelting company

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN

REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN FOR INCREMENTAL INCREASE IN PRODUCTION CAPACITY DUE TO PROCESS OPTIMIZATION FROM 359 KTPA to 371 KTPA AUGMENTATION IN ALUMINIUM METAL PRODUCTION

More information

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB) Brief Note Prakash Industries Limited (PIL) is existing Integrated Steel Plant located at Hathneora, Champa Villages, Janjgir-Champa District, Chhattisgarh. Existing plant has obtained Environment Clearance

More information

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY By N. Ramachandran, Ion Exchange (India) Ltd Large quantities of water are required to produce steel and steel products - typically 180-200 m 3 of water per

More information

Ms. Valérie Léveillé Cansolv Technologies, Inc. Thys Claassens Chemical Initiatives

Ms. Valérie Léveillé Cansolv Technologies, Inc. Thys Claassens Chemical Initiatives CANSOLV SO 2 SCRUBBING SYSTEM: REVIEW OF COMMERCIAL APPLICATIONS FOR SMELTER SO 2 EMISSIONS CONTROL Ms. Valérie Léveillé Cansolv Technologies, Inc. Thys Claassens Chemical Initiatives ABSTRACT As new legislation

More information

An Overview of the Zincor Process

An Overview of the Zincor Process Southern African Pyrometallurgy 2006, Edited by R.T. Jones, South African Institute of Mining and Metallurgy, Johannesburg, 5-8 March 2006 An Overview of the Zincor Process J.P. van Dyk Zinc Corporation

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

19 th Zinc and its Markets Seminar May 4 th 6 th, 2015 Radisson Blu Royal Hotel, Helsinki, Finland. Welcome address. Robin Lindahl

19 th Zinc and its Markets Seminar May 4 th 6 th, 2015 Radisson Blu Royal Hotel, Helsinki, Finland. Welcome address. Robin Lindahl 19 th Zinc and its Markets Seminar May 4 th 6 th, 2015 Radisson Blu Royal Hotel, Helsinki, Finland Welcome address Robin Lindahl EVP President of Metals, Energy & Water Business area What does the industry

More information

Heat and electricity from waste Sysav s waste-to-energy plant

Heat and electricity from waste Sysav s waste-to-energy plant December 2009 Heat and electricity from waste Sysav s waste-to-energy plant SYSAV Box 50344, SE-202 13 Malmö, Sweden Phone +46 40-635 18 00 Fax +46 40-635 18 10 www.sysav.se epost@sysav.se Waste as fuel

More information

Metals Recovery and recycling in zinc industry

Metals Recovery and recycling in zinc industry Metals Recovery and recycling in zinc industry Dr. Justin Salminen Boliden Kokkola Kokkola Material Week 1.11.2017 Boliden Kokkola 1 19.11.2017 Boliden operates mines and smelters in Nordic countries Main

More information

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes 89 90 Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes Tongling Non-Ferrous Metals Group copper smelter Image credit: nerin.com 91 Analysis IV Environmental

More information

Rönnskär Smelter. A versatile and environmentally well adopted Non Ferrous Metal smelter

Rönnskär Smelter. A versatile and environmentally well adopted Non Ferrous Metal smelter Rönnskär Smelter A versatile and environmentally well adopted Non Ferrous Metal smelter Michael Borell Environmental developer, Rönnskär Michael.borell@boliden.com Bolidens Rönnskär Smelter in 1930 Construction

More information

PRODUCTION AND REFINING OF METALS (electrolytic C25); PRETREATMENT OF RAW MATERIALS

PRODUCTION AND REFINING OF METALS (electrolytic C25); PRETREATMENT OF RAW MATERIALS CPC - C22B - 2017.08 C22B PRODUCTION AND REFINING OF METALS (electrolytic C25); PRETREATMENT OF RAW MATERIALS Metallurgical or chemical processes for producing or recovering metals from metal compounds,

More information

Perspective on Coal Utilization Technology

Perspective on Coal Utilization Technology Perspective on Coal Utilization Technology 21st Annual International Pittsburgh Coal Conference on 14-16 September, 2004 Naokazu Kimura Director, Wakamatsu Research Institute J-Power/EPDC Agenda - About

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under

More information

June, Central Pollution Control Board. (Ministry of Environment, Forest & Climate Change, Government of India)

June, Central Pollution Control Board. (Ministry of Environment, Forest & Climate Change, Government of India) Standard Operating Procedure and Checklist of Minimal Requisite Facilities for utilization of hazardous waste under Rule 9 of the Hazardous and Other Wastes (Management and Transboundary movement) Rules,

More information

The Chemical Industry and Climate Change. A Snapshot from India

The Chemical Industry and Climate Change. A Snapshot from India The Chemical Industry and Climate Change A Snapshot from India B.H. Rahill Lead Environmental Specialist South Asia Environment June 14, 2006 Presentation Outline The Indian Situation (Part of) LBNL Benchmarking

More information

Energy Production Systems Engineering

Energy Production Systems Engineering Welcome to Energy Production Systems Engineering USF Polytechnic Engineering tom@thomasblairpe.com Session 10: Environmental Controls Spring 2012 Plant Environmental Control Systems Power plant Environmental

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

fgunqlrku ftad fyfevsm PIN Code

fgunqlrku ftad fyfevsm PIN Code lh-ih-ih-]t+koj ekbzul HINDUSTAN ZINC LIMITED CPP, Zawar Mines fiu dksm & 313901 fgunqlrku ftad fyfevsm PIN Code 313901 ftyk & mn;iqj (jkt.) Telephone - (0294) 2726600, Fax-2726243 Dist - Udaipur (Raj.)

More information

Section V.D.3. Guidance by source category: Annex C, Part II Source Categories. Secondary aluminium production

Section V.D.3. Guidance by source category: Annex C, Part II Source Categories. Secondary aluminium production Section V.D.3. Guidance by source category: Annex C, Part II Source Categories Secondary aluminium production Coordinated by Mr. Patrick Finlay (Canada) Draft Guidelines on Best Available Techniques (BAT)

More information

Technology Gap Assessment

Technology Gap Assessment INDIAN CEMENT INDUSTRY Technology Gap Assessment By Ashutosh Saxena Joint Director & Anil Kumar Group Manager National Council for Cement and Building Materials INDIAN CEMENT INDUSTRY Installed capacity

More information

List of dangerous and non-dangerous wastes which can be received and treated at Hydrometal

List of dangerous and non-dangerous wastes which can be received and treated at Hydrometal Authorisations List of dangerous and non-dangerous wastes which can be received and treated at Hydrometal Authorisation of "Députation Permanente du Conseil Provincial de Liège» in its «meeting» of 01

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR EXPANSION OF ALUMINA REFINERY (FROM 1.5 TO 3.0 MTPA) & CAPTIVE CO-GENERATION POWER PLANT (FROM 90 TO 150 MW) OF UTKAL ALUMINA INTERNATIONAL LIMITED AT DORAGUDA, RAYAGADA DIST,

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

Environment Statement

Environment Statement Paradeep Phosphates Limited Environment Statement 2017-18 ENVIRONMENT MANAGEMENT DEPARTMENT M/s PARADEEP PHOSPHATES LIMITED PPL TOWNSHIP PARADEEP-754145 JAGATSINGHPUR (ODISHA) Page 1 of 14 Environment

More information

Copper Cliff Smelter Complex

Copper Cliff Smelter Complex December 2013 Toxic Reduction Plan Summaries Copper Cliff Smelter Complex Carbon monoxide Sulphur dioxide Particulate Matter (TSP, PM10, PM2.5) Nitrogen oxides VOCs Toxic Substance Reduction Plan Summaries

More information

Mark Stevenson Ecobat Technologies

Mark Stevenson Ecobat Technologies Mark Stevenson Ecobat Technologies Secondary Lead 50 years ago The history of secondary lead and its operations are quite different to those of the primaries In many countries it was just been considered

More information

SULPHUR FROM SMELTER GASES AND SULPHATE-RICH EFFLUENTS. Jannie Maree Environmentek CSIR. Dieks Theron Key Structure Holdings

SULPHUR FROM SMELTER GASES AND SULPHATE-RICH EFFLUENTS. Jannie Maree Environmentek CSIR. Dieks Theron Key Structure Holdings SULPHUR FROM SMELTER GASES AND SULPHATE-RICH EFFLUENTS Jannie Maree Environmentek CSIR Dieks Theron Key Structure Holdings Ryneth Nengovhela Environmentek CSIR Patrick Hlabela Environmentek CSIR ABSTRACT

More information

12.0 Predicted Environmental - Impact & Mitigation measures

12.0 Predicted Environmental - Impact & Mitigation measures 12.0 Predicted Environmental - Impact & Mitigation measures 12.1 The Assessment of the Impact on Environment by The High Vacuum Atomic Molecular Distillation Process: There are Positive impacts of the

More information

Indium facility at the Auby smelter

Indium facility at the Auby smelter Indium facility at the Auby smelter 20 September 2012 Xavier Constant Technology Manager, Auby smelter Important Notice This presentation has been prepared by the management of Nyrstar NV (the "Company").

More information

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Introduction Flue Gas Desulfurization is a process of removing

More information

Technical Presentation on Spent Pot lining Management & Red Mud

Technical Presentation on Spent Pot lining Management & Red Mud Technical Presentation on Spent Pot lining Management & Red Mud 0 Bharat Aluminium Company Ltd, Korba & Vedanta limited, Jharsuguda & Lanjigarh OUR PRESENCE 1 Jharsuguda Smelter Capacity 3,615 MW 1.75

More information

LAKHERI CEMENTWORKS Lakheri, Dist-Bundi, Rajasthan

LAKHERI CEMENTWORKS Lakheri, Dist-Bundi, Rajasthan NOTE ON ENVIRONMENTAL IMPACTS DUE TO USE OF PET COKE, LIGNITE IN ADDITION TO COAL IN CEMENT PLANT AND CAPTIVE POWER PLANT FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE EC Granted :MoEF letter no. J-11011/ 250/2003

More information

INTEC ZINC TECHNOLOGY

INTEC ZINC TECHNOLOGY Introduction INTEC ZINC TECHNOLOGY A paper for the First International Conference on Mining, Mineral Processing, Metallurgical and Environmental Engineering Zanjan, 1517 September, 2013 D. Sammut, Project

More information

Coupling gasification and metallurgical applications

Coupling gasification and metallurgical applications Coupling gasification and metallurgical applications Robert Pardemann, Tanja Schaaf, Jochen Grünig, Katharina Förster, Andreas Orth International Freiberg Conference on IGCC & XtL Technologies 12 16 June

More information

Post Combustion CO 2 Capture Scale Up Study

Post Combustion CO 2 Capture Scale Up Study Post Combustion CO 2 Capture Scale Up Study Prachi Singh and Mike Haines International Greenhouse Gas R&D programme 6 th International Conference on Clean Coal Technologies (CCT 2013) 12-16 th May 2013

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

THE INDUSTRIAL PRODUCTION OF SULPHURIC ACID AND ITS USEFULNESS

THE INDUSTRIAL PRODUCTION OF SULPHURIC ACID AND ITS USEFULNESS TOPIC: THE INDUSTRIAL PRODUCTION OF SULPHURIC ACID AND ITS USEFULNESS VENUE: COLLEGE OF SCIENCE AND TECHNOLOGY (CST) CONFERENCE ROOM DATE: FRIDAY, APRIL 7, 2017. TIME: GUEST SPEAKER: 11.00AM MR. SAMUEL

More information

Cansolv Technologies Inc. Air and Waste Management Association South Coast AQMD May 14, Rick Birnbaum

Cansolv Technologies Inc. Air and Waste Management Association South Coast AQMD May 14, Rick Birnbaum A Versatile SO 2 Scrubbing Process For Industrial SO 2 Emission Control Air and Waste Management Association South Coast AQMD May 14, 2008 Rick Birnbaum rick.birnbaum@cansolv.com OUTLINE Gas Absorption

More information

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION UDK 621.311.22:502.174 Dip.el.eng. Igor SEKOVSKI NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION Abstract Today people make a lot of analysis, of work of

More information

Slag Valorisation Symposium

Slag Valorisation Symposium Proceedings of the Fourth International Slag Valorisation Symposium Zero Waste 15-17 April 2015 Leuven, Belgium Editors Annelies Malfliet and Yiannis Pontikes COMBINED METAL AND SLAG VALORISATION AT METALLO-

More information

How to make the plants of today comply with the requirements of tomorrow

How to make the plants of today comply with the requirements of tomorrow Title How to make the plants of today comply with the requirements of tomorrow Authors Dr. Christian Fröhling General Manager Energy and Environmental Technology Dr. Peter Hemmling Senior Specialist Energy

More information

Soda Ash ( Sodium carbonate) Manufacture

Soda Ash ( Sodium carbonate) Manufacture Soda Ash ( Sodium carbonate) Manufacture Pertinent properties Mol. Wt. 106 M.P. 851deg.C. B.P. Decomposes Soluble in water 8.9 gm/100gm at 20 deg.cel. Grade s: 99% sodium carbonate washing soda ( Na 2

More information

Lecture 35. NPK Fertilizers Nitrophosphate Route

Lecture 35. NPK Fertilizers Nitrophosphate Route Lecture 35 NPK Fertilizers Nitrophosphate Route Phosphate sources must be converted into a form which can be taken up by plants ( available ). This can be achieved by using the integrated Nitrophosphate

More information

Recycling Metal-Rich Industrial Byproducts

Recycling Metal-Rich Industrial Byproducts Recycling Metal-Rich Industrial Byproducts Paul Queneau Consulting Metallurgical Engineer The Bear Group Golden, Colorado Pqueneau@mines.edu Center for Resource Recovery and Recycling Graduate Seminar

More information

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : pb.rastogi@nic.in Telefax

More information

3/25/2013. Addressing Climate Change at Hindustan Zinc. HZL Operation-Mines. HZL Case study at CII-ITC Seminar _ Rampura Agucha Mine

3/25/2013. Addressing Climate Change at Hindustan Zinc. HZL Operation-Mines. HZL Case study at CII-ITC Seminar _ Rampura Agucha Mine Addressing Climate Change at Hindustan Zinc 1 HZL Operation-Mines Rajpura Dariba Mine Ore Production Capacity: 0.90 mtpa. Rampura Agucha Mine Ore Production Capacity: 6.15 mtpa. Kayar Mine (Planned) 0.30

More information

Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available Techniques in the Cement and Lime Manufacturing Industries

Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available Techniques in the Cement and Lime Manufacturing Industries EUROPEAN COMMISSION Integrated Pollution Prevention and Control (IPPC) Reference Document on Best Available Techniques in the December 2001 Executive Summary EXECUTIVE SUMMARY This Reference Document

More information

High Efficiency Agro Based Integrated Chemical Recovery Plant at M/S Bindals Papers Mills Ltd.

High Efficiency Agro Based Integrated Chemical Recovery Plant at M/S Bindals Papers Mills Ltd. Zonal-18/101 High Efficiency Agro Based Integrated Chemical Recovery Plant at M/S Bindals Papers Mills Ltd. VIMAL KISHORE PRESIDENT, BINDALS PAPERS MILLS RAHUL JAIN GM (RECOVERY), BINDALS PAPERS MILLS

More information

National Award for Excellence in Water Management

National Award for Excellence in Water Management National Award for Excellence in Water Management - 2008 16-17 Dec-2008 Sterlite Industries ((I)) Limited,, Tuticorin,, Tamilnadu Global Presence Vedanta Resources Indian Operations ZAMBIA Company Product

More information

Construction and Сommissioning of ERAMET SiMn + EMM Plant in Gabon

Construction and Сommissioning of ERAMET SiMn + EMM Plant in Gabon Construction and Сommissioning of ERAMET SiMn + EMM Plant in Gabon ABSTRACT Patrice L HUILLIER, COO, ERAMET-COMILOG In 2009, ERAMET-COMILOG the world leader producer of refined Manganese alloys and one

More information