ANTHILL COPPER DEPOSIT

Size: px
Start display at page:

Download "ANTHILL COPPER DEPOSIT"

Transcription

1 4 December ANTHILL COPPER DEPOSIT Mineral Resource Estimate Submitted to: Qi Deng CST Minerals Lady Annie Pty Ltd REPORT Report Number. Distribution: Qi Deng Rev1

2 Record of Issue Company Client Contact Version Date Issued Method of Delivery CST Minerals Lady Annie Pty Ltd CST Minerals Lady Annie Pty Ltd Qi Deng Jay Klopper Michael Feldman Joseph Fellows Rev0 4/12/12 Joseph Fellows Rev1 20/12/12 4 December Report No Rev1

3 Study Limitations This Document has been provided by Golder Associates Pty Ltd ( Golder ) subject to the following limitations: This Document has been prepared for the particular purpose outlined in Golder s proposal and no responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for any other purpose. The scope and the period of Golder s Services are as described in Golder s proposal, and are subject to restrictions and limitations. Golder did not perform a complete assessment of all possible conditions or circumstances that may exist at the site referenced in the Document. If a service is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not assume that any determination has been made by Golder in regards to it. Conditions may exist which were undetectable given the limited nature of the enquiry Golder was retained to undertake with respect to the site. Variations in conditions may occur between investigatory locations, and there may be special conditions pertaining to the site which have not been revealed by the investigation and which have not therefore been taken into account in the Document. Accordingly, additional studies and actions may be required. In addition, it is recognised that the passage of time affects the information and assessment provided in this Document. Golder s opinions are based upon information that existed at the time of the production of the Document. It is understood that the Services provided allowed Golder to form no more than an opinion of the actual conditions of the site at the time the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings, or any laws or regulations. Any assessments made in this Document are based on the conditions indicated from published sources and the investigation described. No warranty is included; either expressly or implied, that the actual conditions will conform exactly to the assessments contained in this Document. Where data supplied by the client or other external sources, including previous site investigation data, have been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is accepted by Golder for incomplete or inaccurate data supplied by others. Golder may have retained subconsultants affiliated with Golder to provide Services for the benefit of Golder. To the maximum extent allowed by law, the Client acknowledges and agrees it will not have any direct legal recourse to, and waives any claim, demand, or cause of action against, Golder s affiliated companies, and their employees, officers and directors. This Document is provided for sole use by the Client and is confidential to it and its professional advisers. No responsibility whatsoever for the contents of this Document will be accepted to any person other than the Client. Any use which a third party makes of this Document, or any reliance on or decisions to be made based on it, is the responsibility of such third parties. Golder accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this Document. 4 December Report No Rev1

4 Table of Contents 1.0 SUMMARY... 4 RESOURCE ASSUMPTIONS AND METHODOLOGY... 4 MINERAL RESOURCE STATEMENT... 5 MINE PLANNING ASSUMPTIONS... 8 IN-PIT MINERAL RESORUCE STATEMENT INTRODUCTION Scope of Work Effective Dates Site Visits Data Audits Software Modelling Framework DRILL HOLE DATA Drilling ANTHILL RESOURCE ESTIMATE Geological Interpretation Data Preparation Default grades Resource Domains Mineralisation domains Oxidation Domains Domain Boundary Analysis Compositing Top Cuts Variograms Block Modelling Grade Estimation Model Validation Classification Previous Mineral Resource Estimate December Report No Rev1 1

5 4.9 Mineral Resource Statement MINE PLANNING Block Model Whittle Optimisation Pit Optimisation Block Model Economic Parameters Mining Costs and Parameters Processing Costs and Parameters Pit Slope Angles Pit Optimisation Results PIT DESIGN Mine Design Parameters Mining Methodology Processing Methodology Mine Design Mineral Inventory IN-PIT MINERAL RESORUCES TABLES Table 1-1: Anthill Mineral Resource... 5 Table 1-3: Anthill In-pit Mineral Resources with Dilution and Mining Loss... 9 Table 4-1: Anthill Proportion of Assayed and Unassayed samples within Mineralised Envelope Table 4-2: Anthill Pearson Correlation Coefficients for Resource Domain Samples Table 4-3: Anthill Length Weighted Sample Statistics for the Copper Mineralisation Domain Table 4-4: Anthill Top Cuts by Domains Table 4-5: Anthill Variogram Models Table 4-6: Anthill Block Model Framework Table 4-7: Anthill Model Fields Table 4-8: Anthill Default Grades by Domain Table 4-9: Anthill Global Mean and Variance Comparison for mineralised domain Table 5-4: Economic Parameters Table 5-5: Mining Costs Table 5-6: Mining Recovery and Dilution Table 5-7: Processing Costs Table 5-8: Residual Copper December Report No Rev1 2

6 Table 5-9: Production Constraints Table 6-1: Pit Design Parameters Table 6-2: Additional Variables Table 6-3: Anthill In-Pit Mineral Inventory without Dilution or Mining Loss Table 7-1: Anthill iin-ppit Mineral Resources with Dilution and Mining Loss FIGURES Figure 1: Anthill Location Plan of Drilling and Mineralisation Interpretation Figure 2: Anthill Summary of Resource Drilling by Drilling Method Figure 3: Anthill Summary of Resource Drilling Meters by Drilling Method and Year Drilled Figure 4: Anthill Number of Drill Holes by Survey Method Figure 5: Anthill Oblique View (looking north northeast) of Drill Holes and Mineralisation Wireframe Interpretation Figure 6: Anthill Oblique View (looking north northeast) of Drill Holes and Top of Fresh Surface Wireframe Figure 7: Anthill Global Grade Distribution for Copper, Calcium, Magnesium and Density Figure 8: Anthill Grade Trend Plots across the Oxide-Transitional and Transitional-Sulphide Contacts Figure 9: Anthill Grade Trend Plots across the Copper Domain Boundary Figure 10: Anthill Histogram of Drill Hole Sample Length and Box Plot of Length by Year Drilled Figure 11: Anthill Log-Probability Plots of Copper, Calcium, Magnesium and Density for 3 m Drill Hole Composites by Copper Domain (CUDOM) Figure 12: Anthill Log-Probability Plots of Copper, Calcium and Magnesium and Density for 3 m Drill Hole Composites by Oxide Domain (OXIDE) Figure 13: Anthill Box Plots of Copper, Calcium and Magnesium and density for 3 m Drill Hole Composites by oxide domain (OXIDE) Figure 14: Anthill Variograms for horizontal mineralisation Figure 15: Anthill Variogram models for vertical mineralisation (unfolded using wireframes) Figure 16 Anthill Swath Plots for Copper in the x and y Directions Figure 17: Mining Costs by Depth Figure 18: Anthill Marginal Copper Cut-off Grade vs. Calcium Figure 19: Whittle Optimal Pit Shells Anthill Figure 20: Anthill East Whittle Pit Section N Figure 21: Anthill West Whittle Pit Section N Figure 22: Anthill Pit Plan View Figure 23: Anthill East Section N Figure 24: Anthill West Section N December Report No Rev1 3

7 1.0 SUMMARY The Lady Annie project is situated in northwest Queensland, Australia and is approximately 120 km to the north of the town of Mt Isa. copper deposits within the area are hosted by a sedimentary sequence of siltstone, sandstone and dolomitic sandstone and minor quartzite. Mineralisation is structurally controlled and occurs predominately as malachite with minor azurite, chrysocolla, cuprite and rare native copper within the oxidised sediments. The Anthill copper deposit is situated approximately 40 km south of the Mt Kelly plant. The Anthill mineral resource estimates are based on drilling and interpretations of the geology and mineralisation by on site CST Minerals Lady Annie Pty Ltd (CST) geologists. Golder Associates Pty Ltd (Golder) where engaged by CST to review the data and geology interpretations and complete the resource estimate using CAE Datamine Studio software. Resource Assumptions and Methodology This mineral resource estimates are based on a number of factors and assumptions: Only reverse circulation and diamond drill hole data were used for estimating the mineral resource. AMG grid coordinates has been used for the evaluation. Datamine mining software was used for building the block model and grade estimation and reporting. Copper mineralisation envelopes were interpreted by CST in two-dimensional cross-sections and then wireframed to produce three dimensional solid models. A nominal 0.2% Cu lower threshold was used to define the copper mineralisation envelopes. Additional surfaces defining the orientation of the mineralisation was also modelled by CST for use in building the local anisotropy model for grade estimation. Detailed topographic pre-mining surface covering the deposit was supplied by CST. Oxidation domains were interpreted by CST from geological logging, calcium-magnesium grades and copper sequential assays. They include oxide, transitional and fresh material which broadly defines the degree of oxidation of the rock. These domains broadly determine the copper minerals likely to occur within the rock and consequently the copper recoveries by acid leaching. Statistical and geostatistical analysis was conducted on drill hole sample assays composited to 3 m down-hole interval lengths on a copper domain basis. Prior to compositing the samples within the copper domains that had no copper assay were assigned a default grade of 0.01% Cu. Top cuts were applied to the drill hole sample data prior to grade estimation to limit the effect of outlier samples. A parent block dimension of 10 m by 10 m by 10 m was used. The parent blocks were allowed to split into 4 by 4 by 4 sub-blocks with seam filling in the vertical direction to a resolution of 2.5 m near copper domain boundaries to improve estimation of the volume and to a resolution of 1 m near topography. This results in a minimum block size of 2.5 m by 2.5 m by 1 m. Hard boundaries were used for estimating copper grades within the copper domains with soft boundaries across oxide domain contacts. Calcium and magnesium were estimated using hard boundaries across the oxide domain contacts and soft boundaries across the copper domains. Grade estimation was conducted using ordinary kriging (OK) for copper, calcium and magnesium. Copper grades were estimated by copper mineralisation domains while calcium and magnesium grades were estimated using oxidation domains. Default grades were assigned to blocks that were not estimated. Copper was assigned a default of 0.01% Cu while calcium and magnesium were assigned defaults by oxide domain using the mean grades of the drill hole samples. 4 December Report No Rev1 4

8 Density values were estimated by oxidation domain. Default density values based on the mean density by oxide domain were assigned to blocks that were not estimated. Dynamic anisotropy was used during grade estimation to accommodate the varying directions (dip and dip direction) of the mineralisation. This method uses local estimates of dip and dip direction that are used to orient the search ellipse and variogram models for grade estimation rather than using a global lookup table based on domain. Validation of the models included visual inspection in three dimensions comparing the model against the drill hole data, comparison of the mean grades of the estimated against the mean grade of the composite drill hole data, and generation of swath plots (comparison of average grade by section). Resource classification was assigned to the block model using the following parameters: Measured : at least 4 drill holes within a radius of 30 m (i.e. 20 m by 20 m drill spacing) : at least 4 drill holes within a radius of 60 m (i.e. 40 m by 40 m drill spacing) Inferred : less than 4 drill holes within a radius of 60 m (i.e. > 40 m by 40 m drill spacing) Mineral Resource Statement The total Anthill (Anthill West, Anthill Link, Anthill East) Mineral Resource estimate within the copper mineralisation envelopes by resource classification is presented in Table 1-1, Table 1-2 and Table 1-3. The Mineral Resource estimate for Anthill East replaces the previous estimate for Anthill East with only minimal change. The Mineral Resources for Anthill West and Anthill Link are maiden estimates. Mineralisation is continuous across Anthill but have been separated into two principal zones (Anthill East and Anthill West) separated by a lower grade zone (Anthill Link). Table 1-1: Anthill Mineral Resource as at October Cut-off Cu % Resource Category Tonnage (Mt) Cu (%) Ca (%) Mg (%) Measured Inferred Total Measured Inferred Total December Report No Rev1 5

9 Table 1-2: Mineral Resource Estimate for Anthill at a 0.2% Cu as at October Area Category OXIDE *Tonnes (Mt) Cu (%) Ca (%) Mg (%) Oxide Measured Transitional Sulphide Total Oxide Transitional East Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Transitional Sulphide Total Link Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional West Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional TOTAL Sulphide Total Oxide Inferred Transitional Sulphide Total TOTAL *Totals may not add up due to rounding 4 December Report No Rev1 6

10 Table 1-3: Mineral Resource Estimate for Anthill at a 0.3% Cu as at October Area Category OXIDE *Tonnes (Mt) Cu (%) Ca (%) Mg (%) Oxide Measured Transitional Sulphide Total Oxide Transitional East Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Transitional Sulphide Total Link Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional West Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional TOTAL Sulphide Total Oxide Inferred Transitional Sulphide Total TOTAL *Totals may not add up due to rounding 4 December Report No Rev1 7

11 No mining has been undertaken over the Anthill deposits. This Mineral Resource estimate is based upon and accurately reflects data compiled or supervised by Mr Matthew Nimmo, Principal Geologist, who is a Member of the Australasian Institute of Mining and Metallurgy and a full time employee of Golder Associates Pty Ltd. Mr Nimmo has sufficient experience that is relevant to the style of mineralisation and the type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mine Planning Assumptions The following items are to be taken into account when considering this assessment: No mining lease is currently held for the Anthill deposit so all material remains in-pit Mineral Resource inventory. A cut-off grade which varies with material type (i.e. oxide or transition), calcium estimate and haulage distance. Heap leaching and electro winning parameters and operating costs provided by CST for the processing rate of t of copper per annum, based on costs and recoveries predicted from the existing operation at Lady Annie. Sulphide resource is not amenable to acid heap leaching and is excluded from the assessment of in-pit Mineral Resources. Geotechnical parameters are based on previous work by Coffey Pty Ltd. Survey data of surfaces and previous workings provided by CST. Golder completed Whittle pit optimisations using a USD3.00/lb copper price, with a pit shell selected on the basis that the spot copper price at the time of the optimisation was in excess of USD3.24/lb. The copper price used for mine planning is USD3.00/lb. Evaluations are based on a long term exchange rate of 0.80:1 AUD:USD. The economics and cut-off grades of the project are dependent on calcium grade and oxidation type. Higher calcium levels increase acid consumption and consequently increase operating costs. The cutoff grades used to estimate in-pit Mineral Resources are based on both copper and calcium grades estimated in the Mineral Resource block model. Furthermore, copper recovery is also affected by high calcium of the transition ore which further increases the cut-off grade producing a step change in the cut-off grade calculation. Marginal cut-off grades used in the in-pit Mineral Resource for Anthill are estimated from the following equation: 0.42%+0.06%, 2%; = 0.49%+0.06%, >2%. In-pit mineral inventory are based only on the Measured and Mineral Resources contained within the final pit designs, based on variable copper cut-off grades described above. The Mineral Resource modifying factors for conversion to in-pit mineral inventory includes dilution of 5% assuming a copper grade of 0.2% Cu and mining recovery of 97.5%. 4 December Report No Rev1 8

12 In-Pit Mineral Resource Statement The Mineral Resources considered feasible for economic extraction are based on the pit design and include modifying factors with mining dilution of 5% at 0.2% Cu and mining losses of 2.5%. These are summarised in Table 7-1. The current pit design includes an additional 27.4 Mt of waste giving an overall strip ratio of 7.9 t/t. Table 1-4: Anthill In-Pit Mineral Resources with Dilution and Mining Loss Deposit Name West East Combined Resource Category Measured Measured Measured Material Type Tonnage (Mt) Cu (%) Contained Cu (kt) Ca (%) Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total December Report No Rev1 9

13 2.0 INTRODUCTION CST Minerals Lady Annie Pty Ltd (CST) requested Golder Associates Pty Ltd (Golder) to estimate the Mineral Resource for the Anthill copper deposit. Lady Annie project is located approximately 120 km north of Mount Isa in northwest Queensland. It is accessed via the sealed Mt Barkly highway and then the unsealed McNamarras Road. Mining at Lady Annie is at two separate areas, including the Lady Annie area (Lady Annie and Lady Brenda deposits) and the Mt Kelly area (Mt Clarke, Flying Horse, Mt Kelly and Swagman deposits). The Anthill deposit is located approximately 40km south of the Mt Kelly plant. CopperCo began mining operations at the Lady Annie copper mine in 2007 targeting copper oxide ore for processing by heap leaching followed by solvent extraction and electrowinning. In 2009 Cape Lambert Lady Annie Exploration Pty Ltd (CLLAE) purchased the operations with CST entering into a Share Sale agreement to acquire 100% of CLLAE. CST recommenced mining at Lady Annie in September Scope of Work The scope of work includes estimating Mineral Resource and Mineral Reserves for the Anthill copper deposit. CST provided the following: Drill hole data (assays, lithology, collar, survey, bulk density) as ASCII comma delimited files Geological interpretations used in the estimation which included: copper mineralisation (at 0.2% Cu nominal cut-off) and oxidation wireframes Topography wireframes Report on QAQC Drill hole exclusion lists Golder performed the following tasks as part of the Mineral Resource estimation scope of work: Data validation Review geological interpretations Statistical analysis of drill hole assays Variography Block modelling Grade estimation using ordinary kriging (OK) for copper, calcium and magnesium as well as estimation using inverse distance (IDW) and nearest neighbour (NN) Model validation Resource reporting 2.2 Effective Dates The effective date for the resource estimate, based on the delivery date of the drilling data, is 3/09/. 2.3 Site Visits Matthew Nimmo, B.Sc. (Hons), MAIG, employed by Golder Associates Pty Ltd as Principal Geologist visited the site on two separate occasions. The first visit occurred during 20 November 2011 to 24 November December Report No Rev1 10

14 The purpose of this visit was: inspection of drilling and site, review current resource model and review current geological interpretation. The second site visit occurred during 24 January to 28 January. The purpose of this visit was to obtain latest drill hole data, review status of geological interpretation, setup modelling framework and observe grade control processes. Frank McManus, B.Eng, B.Sc., MBA, who was employed by Golder Associates Pty Ltd at the time as Principal Mining Engineer, visited the site on two separate occasions. The first visit occurred during 21 December 2011 to 22 December 2011 for the purpose of reviewing mine planning and ore grading operations. The second visit occurred during 30 January to 2 February and was for obtaining information and data to facilitate undertaking Whittle optimisation and estimating Ore Reserves. 2.4 Data Audits Golder has not undertaken detailed data audits of the drill hole data used in Mineral Resource estimation for the Anthill copper deposit. A brief review of the QAQC information provided by CST shows no major concerns with the quality of the drill hole sample assaying being conducted by CST. The drill hole data was first imported into a temporary Microsoft Access database where the following data integrity checks and data adjustments were performed: Check for duplicate records Check for overlaps Replace null values for assays with -9 to mark missing assays Replace other negative assay values with half detection limit (typically 0.005) Insert records to replace gaps within the assay table and set values to -9 Check for excessive deviation in survey Check for cross-table consistency Flag drill holes for exclusion by setting the field KEEP=0 After data checks were performed in Access, the data was then exported out to comma delimited text files. Only the required fields for resource modelling were exported. 2.5 Software Studio 3 version Released from CAE Datamine Corporate Limited was used for drill hole sample domain encoding (flagging), building the block model, grade estimation and resource tabulation. Proprietary Golder software was used for variography and the R version ( ) from the R Foundation for Statistical Computing was used for statistical data analysis and plotting. 2.6 Modelling Framework The modelling framework consists of a series of Datamine macros to perform the following tasks: Set global modelling parameters Import drill hole data in comma delimited format and desurvey the drill holes Flag the drill hole data with the copper mineralisation and oxide domains and composite to regular intervals Construct the block model 4 December Report No Rev1 11

15 Estimate dip and dip direction into the block model Estimate copper, calcium and magnesium grades Deplete the block model by removing cells above the latest pit wireframe Assign resource classification to the block model Report grade and tonnage The modelling framework was tested and validated extensively on the Lady Annie copper deposit. Modelling and estimation parameters were also optimised on the Lady Annie copper deposit. The grid coordinates used for all projects is AMG AGD84. 4 December Report No Rev1 12

16 3.0 DRILL HOLE DATA CST supplied the drill hole data for the Anthill copper deposit via on the 3 September. The data was supplied as Microsoft Excel format files (exported from the CST geological database) which were then exported to comma delimited text files. The data included tables for sample assays ( records), drill hole collar (7846 records), drill hole survey ( records), lithology ( records), alteration ( records), core recovery (6973 records), geotechnical logging (6981 records), magnetic susceptibility ( records), logged minerals (7966 records), structural logging (1429 records), veins (5968 records), QAQC sampling (8606 duplicates, standards), and bulk density (1581 records). This data covers a much broader area than the Anthill deposit. The interpretation wireframes generated by CST onsite were supplied as AutoCAD dxf file format and included: base of oxidation, top of sulphide, copper mineralisation surfaces, and copper mineralisation solid wireframes. 3.1 Drilling The Anthill drill hole data was restricted to immediate surrounding area of the Anthill deposit covers the area (in MGA coordinates) me mn to me mn and comprises 754 drill holes with a mix of drilling types. Reverse circulation (RC) drilling (481 drill holes) accounts for 64% of the drilling. Drill spacing varies from less than 20 m to over 100 m and averages approximately 20 m by 40 m. A summary of the drill holes for Anthill is presented in Figure 2 and Figure 3. The drilling was completed between 1972 and. Majority of the drilling meters was completed in 2010 (12%), 2011 (19%) and (46%) using predominantly reverse circulation and diamond drilling methods. The methods used are: DD 14% of drill holes Diamond core drilling method DD_MET 1% of drill holes Diamond core drilling method for metallurgical test work PD <1% of drill holes Percussion drilling method RAB 2% of drill holes Rotary Air Blast (RAB) drilling method RC 70% of drill holes Reverse Circulation (RC) drilling method RCDD 12% of drill holes RC pre-collar with DD tail TCH 1% of drill holes Trench WB <1% of drill holes Water Bore Figure 1 shows the location of the drill holes in MGA coordinates. Only the reverse circulation and diamond drill holes were used for estimating grades. Additionally, drill holes that have no assay data in the database were also flagged for exclusion. These include: 5 DD_MET diamond drill holes (BURMET006, BURMET010A, BURMET011 to BURMET013) Down hole surveys at Anthill have been collected using a range of methods. Majority (58%) of the drill holes were surveyed using a REFLEX camera on approximately 30 m intervals. For 15% of the drill holes the survey method is not recorded in the database. 4 December Report No Rev1 13

17 Anthill East=Red, Anthill Link=Blue, Anthill West=Orange Figure 1: Anthill Location Plan of Drilling and Mineralisation Interpretation Figure 2: Anthill Summary of Resource Drilling by Drilling Method 4 December Report No Rev1 14

18 Figure 3: Anthill Summary of Resource Drilling Meters by Drilling Method and Year Drilled Figure 4: Anthill Number of Drill Holes by Survey Method The predominant down hole survey method for each drill hole is summarised in Figure 4. The methods used are: COLLAR 3% of drill holes. Collar sight records are assigned to collar surveys at surface from geologist measurements on the drill rig. COMPASS (compass survey of rig setup) <8% of drill holes. EASTMAN (Eastman single shot survey) <1% of drill holes. ESTIMATE less than <1% of drill holes. NR 15% of drill holes. REFLEX (Reflex multi or single shot tool) 58% of drill holes. SS (Reflex single shot tool) 12% of drill holes. TAP 3% of drill holes. 4 December Report No Rev1 15

19 4.0 ANTHILL RESOURCE ESTIMATE 4.1 Geological Interpretation The interpretation of the copper mineralisation and oxidation was completed by CST geologists at the Lady Annie mine site. Copper mineralisation was interpreted using a 0.2% Cu lower cut-off grade while oxidation relied on the geological logging of weathering and the available copper sequential assay data. A set of closed perimeters were constructed on oblique section lines with different orientations for Anthill East and Anthill Link, and Anthill West. Three-dimensional solids wireframes were then constructed from the closed perimeters by CST. The mineralisation was interpreted as a single domain. Additional wireframe surfaces representing the copper mineralisation were developed for the purpose of estimating dip and dip direction into the block model for grade estimation by dynamic anisotropy. The solid wireframe of the 0.2% Cu mineralisation is presented in Figure 5. The top of fresh rock surface wireframe is shown in Figure 6. Wireframe Interpretations at 0.2% Cu cut-off: Anthill East=Red, Anthill Link=Blue, Anthill West=Orange Figure 5: Anthill Oblique View (looking north northeast) of Drill Holes and Mineralisation Wireframe Interpretation 4 December Report No Rev1 16

20 Figure 6: Anthill Oblique View (looking north northeast) of Drill Holes and Top of Fresh Surface Wireframe Drill hole sample grade distributions for all data are presented as histogram and log probability plots in Figure 7. The log probability plot for copper confirms that the distribution is approximately log normal and continuous from 0.2% Cu to 20% Cu. For calcium and magnesium there is clearly a bimodal distribution evident in the histogram and log probability plots attributed to oxidation of the host rock. 4 December Report No Rev1 17

21 Figure 7: Anthill Global Grade Distribution for Copper, Calcium, Magnesium and Density 4 December Report No Rev1 18

22 4.2 Data Preparation Database preparation steps are described in Section 2.0. In summary they include: Data validation and corrections Exclusion of unreliable drill holes and drill holes with no assays Assignment of default grades to all missing assays of 0.01 for Cu Flagging of resource, geology and oxidation domains Compositing drill holes Application of top cuts Default grades Table 4-1 lists the number of missing samples by domain. Selective sampling is a significant problem for calcium and magnesium with 54% of the samples within the copper mineralisation not assayed. To avoid any bias due to the missing samples a default grade of 0.01 for Cu was assigned to all unassayed intervals in both waste and mineralisation domains. No default grades were assigned to calcium and magnesium due to the significant number of missing samples. The default grades were applied prior to compositing. Table 4-1: Anthill Proportion of Assayed and Unassayed samples within Mineralised Envelope Domain Element Samples Missing % Missing CUDOM=1 (resource domains) CUDOM=0 (waste) Total Cu % Ca % Mg % Total Cu % Ca % Mg % Resource Domains Geological domains are used to distinguish and divide areas of different mineralisation style or statistical character. Domains attempt to create zones of statistical stationarity (i.e. consistency) where structure and controls are constant. When achieved, the domains are then suitable for statistical and geostatistical analysis and for grade estimation Mineralisation domains Interpretation of the copper mineralisation by CST has only defined one copper mineralisation domain. This domain represents material that exceeds the 0.2% Cu nominal cut-off grade. A domain field (CUDOM) has been added to the drill hole data and block model with the following domains: CUDOM = 0 Waste material with copper below 0.2% Cu CUDOM = Oxidation Domains Ore material with copper greater than or equal to 0.2% Cu The boundaries define three domains flagged in the block model by applying the surface wireframes to the mineralised domain blocks. The domains include: 4 December Report No Rev1 19

23 OXIDE = 2 recovery Oxidised material with copper predominantly as oxide minerals and good leach OXIDE = 1 OXIDE = 0 Transitional material with copper as oxide, native copper and some sulphides Sulphide zone with copper dominated by sulphide species and poor leach recovery Domain Boundary Analysis Due to the very high difference in grade for calcium and magnesium between the oxide and transitional zones a contact analysis was undertaken to quantify the grade trends across the oxide boundaries and across the copper domain boundary. Grade trend plots for copper, calcium and magnesium across the oxide domain contacts and copper domain boundary are presented in Figure 8 and Figure 9. For the contact between the oxide and transitional zones, the grade trend for calcium and magnesium shows a more rapid transition across the contact then for copper over a range of 1 to 3 m from the contact. Copper shows a gradual decrease in grade across the boundary with no noticeable dramatic grade changes near the boundary. A hard boundary between oxide and transitional is appropriate for estimating calcium and magnesium while a soft boundary for copper is more appropriate. A visual check of copper grades near the oxide-transitional boundary showed no indication of high grade copper terminating at or near the boundary. Copper grades appear to smoothly transition across the contact. For the transitional and sulphide contact there is no discernible change in grade trend across the contact for copper, calcium or magnesium. A soft boundary is considered appropriate for estimating copper, calcium and magnesium. However, a hard boundary is considered for grade estimation to ensure elevated calcium and magnesium values do not impact on the estimation of calcium and magnesium for the oxide zone. The grade trend for copper across the copper domain boundary shows a slight step change in copper grade and no change in calcium and magnesium grades. A hard boundary is considered appropriate for estimating copper while a soft boundary is considered appropriate for calcium and magnesium. Figure 8: Anthill Grade Trend Plots across the Oxide-Transitional and Transitional-Sulphide Contacts 4 December Report No Rev1 20

24 Figure 9: Anthill Grade Trend Plots across the Copper Domain Boundary Based on the contact analysis copper grades are estimated by copper domain using hard boundaries and calcium and magnesium grades are estimated by oxide domain using hard boundaries (soft boundaries for copper domain). Due to sparseness of the density data no contact analysis was performed for density. It is assumed that density values across the oxidation boundaries show sharp changes and no change across the copper domain boundary Compositing Drill hole sampling length (Figure 10) with majority of the samples being 1 m in length. A composite length of 3 m was determined to be the most appropriate given the block dimensions, estimation parameters, and grade control selectivity. Log-probability plots of the 3 m drill hole composite samples for copper, calcium and magnesium by copper domain (CUDOM) are illustrated in Figure 11 and in Figure 12 for oxidation domains (OXIDE). Box plots summarising the distributions by oxidation domain are presented in Figure 13. Copper exhibits an approximately log-normal distribution with an artificial grade break at 0.1% Cu for the copper domain samples due to internal dilution within the copper domain. There is a slight change in the logprobability plot for copper at approximately 0.5% Cu. The log-probability plot and box plot of copper by oxide domain reveals a slight increase in mean grade within the oxide zone. This increase in grade is not evident on the contact plots in Figure 8. 4 December Report No Rev1 21

25 Figure 10: Anthill Histogram of Drill Hole Sample Length and Box Plot of Length by Year Drilled Figure 11: Anthill Log-Probability Plots of Copper, Calcium, Magnesium and Density for 3 m Drill Hole Composites by Copper Domain (CUDOM) 4 December Report No Rev1 22

26 Figure 12: Anthill Log-Probability Plots of Copper, Calcium and Magnesium and Density for 3 m Drill Hole Composites by Oxide Domain (OXIDE) Calcium and magnesium exhibit evidence of population mixing within the copper and oxidation domains. There are two calcium and magnesium zones that can be defined by grade from the log-probability plots. These are: 1) Ca < ~9% and Mg < ~5% 2) Ca >= ~9% and Mg >= ~5% From the log-probability plots there are limited samples within the range of 0.1-9% Ca and 0.1-5% Mg. This is attributed to the complete depletion of calcium and magnesium in the oxide zone and the sharp transition in the grade profile across the oxide-transitional boundary where grades jump from <1% Ca-Mg to >7 to 9% Ca-Mg. Calcium and magnesium grades appear to be a good proxy for defining the oxide-transitional boundary. The strong mixing of populations within the oxide domains for calcium and magnesium suggest that precise definition of the oxide boundaries is difficult. Observations of the oxidation profile in the Lady Annie pit verify the complexity of the oxide boundary. Therefore, the location of the oxidation boundaries are considered to be approximate and pose significant risk in ore loss due to high calcium and magnesium in areas close to the oxide-transitional boundary. 4 December Report No Rev1 23

27 Figure 13: Anthill Box Plots of Copper, Calcium and Magnesium and density for 3 m Drill Hole Composites by oxide domain (OXIDE) Table 4-2 lists the Pearson correlation coefficients for copper, calcium and magnesium for samples within the copper mineralisation envelope. Calcium and magnesium are highly correlated (0.95 Pearson correlation coefficient) while copper shows no correlation with calcium and magnesium. Copper also shows no correlation with Density for oxide and transitional zones and slight correlation with Density for sulphide zone. Table 4-2: Anthill Pearson Correlation Coefficients for Resource Domain Samples Density Element Cu Ca Mg All Oxide Transition Sulphide Cu Ca Mg For the 0.2% Cu mineralised domain, where selective sampling and the effect of default grades is minimal, it is possible to compare the length weighted average grades for the original samples and 3 m composites (Table 4-3). Note the reduction in copper mean grade relates to the introduction of 0.01% Cu default grades for the small number of missing assay. 4 December Report No Rev1 24

28 Table 4-3: Anthill Length Weighted Sample Statistics for the Copper Mineralisation Domain Data Set Variable Samples Missing Min Max Mean Var CV Median Raw Samples Composites (3 m) Cut Composites Cu E Ca E Mg Cu E Ca E Mg Cu E Ca E Mg Top Cuts The presence of outliers (or extreme values), and the need to apply top-cut values (or capping, where samples above a certain threshold are assigned the top-cut value) to sample populations was assessed using a number of techniques: Examination of grade distributions using probability plots, see Figure 11 Statistical assessment of the grade distributions, see Table 4-3 Examination of the spatial locations of identified outlier samples Top cuts defined in Table 4-4 are roughly equivalent to the 99.5 th percentile of the mineralised samples and do not have a significant impact on the average grade. Sample statistics in Table 4-3 indicates that the average has been reduced by the top cuts by relatively small margins. A top-cut of 0.2% Cu was used to prevent overestimation of grades within the waste domain since the grades above 0.2% Cu were not domained in the interpretation. It is assumed that the continuity of grades above 0.2% within the waste domain is limited. Table 4-4: Anthill Top Cuts by Domains CUDOM Cu % Ca % Mg % Variograms The 3 m composite drill hole samples with top-cuts applied were used for variogram analysis. Traditional semi-variograms provided erratic results in some instances while inverted correlograms are more robust and display better structure. Correlograms were used for all variogram modelling. All semi-variograms were scaled to the domain variance. Correlogram models are presented in Figure 14 and Figure 15 and listed in Table 4-5. Variogram models were primarily based on the inverted experimental correlograms. The drill hole data was subset into two geostatistical domains based on overall geometry. These domains represent the flat predominately oxide mineralisation and the steep predominately sulphide mineralisation. The steep mineralisation was unfolded to the centre line of the steep mineralisation wireframes to mimic the dynamic anisotropy method used for grade estimation. Variogram analysis was undertaken for each geostatistical domain separately. 4 December Report No Rev1 25

29 Figure 14: Anthill Variograms for horizontal mineralisation Figure 15: Anthill Variogram models for vertical mineralisation (unfolded using wireframes) Additional variogram parameters used in most cases for the unfolded variogram calculation include: Two structure spherical models with common nugget and incremental sill levels Lag distance of 10 m Horizontal search angle of 20 o Vertical search angle of 12 o Horizontal distance of 15 m Vertical distance of 15 m across the unfolded plane The variogram models for both geostatistical domains are similar in structure, range and sill and are similar to the variogram models used for the previous Anthill East Mineral Resource estimate (refer to the Golder Technical Report titled: Lady Annie Copper Mine, Mineral Resource Estimate, dated 31 July ). Table 4-5: Anthill Variogram Models Variable Nugget Spherical Structure 1 Spherical Structure 2 C0 C1 Cross Strike Range H1 Down Dip Strike C2 Cross Strike Range H2 Down Dip Strike Cu Block Modelling The block model contains blocks representing copper mineralisation and waste material. The model was built in Datamine Studio 3 software using the model framework defined in Table 4-6 and with additional block attributes listed in Table December Report No Rev1 26

30 Blocks were added to the model using the interpreted three-dimensional wireframe defining the copper mineralisation (CUDOM). The oxidation wireframe was used to add the OXIDE value to existing blocks while the original topography (pre mining) was used to add blocks for waste. A parent block size of 10 m by 10 m by 10 m was used. The parent blocks were allowed to split into 4 by 4 by 4 (2.5 m by 2.5 m by 2.5 m) subblocks to ensure reasonable resolution of the mineralisation boundaries. Table 4-6: Anthill Block Model Framework Parameter Easting Northing RL Model origin Model limit Model extent (m) Parent block dimensions (m) Number of parent blocks Minimum sub-block size for domains (m) Table 4-7: Anthill Model Fields Variable Type Description CUDOM numeric Cu domain code (1=mineralisation 0=waste) OXIDE numeric Oxidation (0=fresh, 1=transitional, 2=oxide) CU numeric Estimated Cu % block value CA numeric Estimated Ca % block value MG numeric Estimated Mg % block value SG numeric Estimated block in-situ dry bulk density t/m 3 RESCAT numeric Resource classification (0=unclassified, 2=, 3=Inferred) 4.5 Grade Estimation Ordinary kriging (OK) was used to estimate copper into the block model. The variogram models presented in Table 4-5 were used for estimation. Copper was estimated separately for each copper domain using a hard boundary between domains (soft boundaries between oxide domains). That is, only those samples falling within the domain being estimated are used to inform the block estimate. Inverse Distance (ID) with a power of 2 was used to estimate calcium and magnesium. Both were estimated separately for each oxide domain using hard boundaries (soft boundary for copper domains). Grades were estimated on a parent block basis using block discretisation of 3 by 3 by 3. Copper was also estimated using inverse distance and nearest neighbour (NN) while calcium, magnesium were also estimated using nearest neighbour. These estimates were used to validate the OK and ID estimates. Each domain was estimated separately. To ensure that all blocks in the model had values for copper, calcium, magnesium and density, a three pass elliptical search strategy was used for selecting the neighbouring composite drill hole samples for estimation. Those blocks that were not estimated in the third pass were assigned default grades listed in Table 4-8. Copper defaults were assigned regardless of domain while calcium, magnesium and density were assigned by oxide domain. 4 December Report No Rev1 27

31 Table 4-8: Anthill Default Grades by Domain Domain CODE Cu % Ca % Mg % Bulk Density t/m 3 CUDOM OXIDE Dimensions of the search ellipse radii were based on the ranges of the variogram models for copper. The search pass ellipse radii used are: PASS 1: 30 m by 30 m by 10 m PASS 2: 60 m by 60 m by 20 m (pass 1 expanded by a factor of 2) PASS 3: 120 m by 120 m by 40 m (pass 1 expanded by a factor of 4) A minimum of 6 and maximum of 14 composites per estimate and a maximum of 3 composites per drill hole were selected. The required minimum number of samples per estimate was relaxed to 1 sample for the third search pass. To improve local grade estimates the Datamine Studio dynamic anisotropy method for grade estimation was used. The dynamic anisotropy method requires local estimates of dip and dip direction in the block model that are used in orienting the search ellipse and variogram model. To estimate the dip and dip direction into the block model the mineralisation surfaces were used to construct a point set with each point positioned at the centre of gravity for each triangle and the dip and dip direction calculated from the triangle. This point set was then used in estimating dip and dip direction into the block model. The estimate values were then rounded to two decimal places. 4.6 Model Validation Validation of the block model included: Visual inspection of the grade estimates. Global mean and variance comparisons. Review of estimation quality parameters such as number of number of samples, slope of regression, kriging variance, and average distance of samples. SWATH plots (Figure 16). These include comparison of block model and declustered composite grade averages for North-South and vertical slices. 4 December Report No Rev1 28

32 Figure 16 Anthill Swath Plots for Copper in the x and y Directions A comparison of the global mean and variance between the declustered composites and the volume weighted block model estimates for each combined domain is provided for copper in Table 4-9. The mean grades compare favourably and indicate no significant bias. Table 4-9: Anthill Global Mean and Variance Comparison for mineralised domain Sample/ Model Cu Ca Mg Mean Var Mean Var Mean Var Samples - cut Nearest Neighbour Samples OK Estimates Classification Mineral Resource classification was assigned on the basis of a target drill spacing of: Measured : at least 4 drill holes within a radius of 30 m (i.e. 20 m by 20 m drill spacing) : at least 4 drill holes within a radius of 60 m (i.e. 40 m by 40 m drill spacing) Inferred : less than 4 drill holes within a radius of 60 m (i.e. > 40 m by 40 m drill spacing) 4.8 Previous Mineral Resource Estimate The previous Mineral Resource estimate (Table 4-12 and Table 4-13) for Anthill only included the Anthill East deposit. For the current Anthill Mineral Resource estimate the Anthill East resource had only changed slightly (2% drop in tonnes and 5% increase in copper grade) due to changes in the variogram model. 4 December Report No Rev1 29

33 Table 4-10: Anthill Mineral Resource estimate at a 0.2% Cu as at March Deposit Category OXIDE **Tonnes (Mt) Cu (%) *Ca (%) *Mg (%) Anthill East Measured Inferred Oxide Transitional Total Oxide Transitional Sulphide Total Oxide Transitional Sulphide Total Total * Due to the sparseness of Ca & Mg assays the Ca & Mg estimates are indicative only **Totals may not add up due to rounding Table 4-11: Anthill Mineral Resource estimate at a 0.3% Cu as at March Deposit Category OXIDE **Tonnes (Mt) Cu (%) Ca (%) Mg (%) Anthill East Measured Inferred Oxide Transitional Total Oxide Transitional Sulphide Total Transitional Sulphide Total Total * Due to the sparseness of Ca & Mg assays the Ca & Mg estimates are indicative only **Totals may not add up due to rounding 4.9 Mineral Resource Statement The global Mineral Resource estimate for the Anthill (Anthill West, Anthill Link, Anthill East) copper deposit is presented in Table 4-12 and Table The Mineral Resource estimate for Anthill East replaces the previous estimate for Anthill East with only minimal change. The Mineral Resources for Anthill West and Anthill Link are maiden estimates. Mineralisation is continuous across Anthill but have been separated into two principal zones (Anthill East and Anthill West) separated by a lower grade zone (Anthill Link). No mining has been undertaken over the Anthill deposits. 4 December Report No Rev1 30

34 The Mineral Resource estimate within the interpreted copper mineralisation is: At 0.2% Cu cut-off: Measured Inferred TOTAL 3.7 Mt at 0.70% Cu, 0.9% Ca, 0.6% Mg 12.8 Mt at 0.56% Cu, 1.7% Ca, 1.0% Mg 4.2 Mt at 0.38% Cu, 3.6% Ca, 2.2% Mg 20.7 Mt at 0.55% Cu, 1.9% Ca, 1.2% Mg At 0.3% Cu cut-off: Measured Inferred TOTAL 3.0 Mt at 0.79% Cu, 0.8% Ca, 0.5% Mg 8.7 Mt at 0.71% Cu, 1.9% Ca, 1.2% Mg 2.1 Mt at 0.52% Cu, 6.0% Ca, 3.6% Mg 13.8 Mt at 0.70% Cu, 2.3% Ca, 1.4% Mg The total mineral resource estimate within the copper mineralisation envelopes by oxidation is: At 0.2% Cu cut-off: Oxide Transitional Sulphide TOTAL 14.8 Mt at 0.54% Cu, 0.3% Ca, 0.3% Mg 3.0 Mt at 0.63% Cu, 5.8% Ca, 3.3% Mg 2.9 Mt at 0.53% Cu, 6.3% Ca, 3.8% Mg 20.7 Mt at 0.55% Cu, 1.9% Ca, 1.2% Mg At 0.3% Cu cut-off: Oxide Transitional Sulphide TOTAL 8.9 Mt at 0.73% Cu, 0.3% Ca, 0.3% Mg 2.4 Mt at 0.74% Cu, 5.6% Ca, 3.2% Mg 2.5 Mt at 0.57% Cu, 6.2% Ca, 3.7% Mg 13.8 Mt at 0.70% Cu, 2.3% Ca, 1.4% Mg This Mineral Resource estimate is based upon and accurately reflects data compiled or supervised by Mr Matthew Nimmo, Principal Geologist, who is a Member of the Australasian Institute of Mining and Metallurgy and a full time employee of Golder Associates Pty Ltd. Mr Nimmo has sufficient experience that is relevant to the style of mineralisation and the type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves. 4 December Report No Rev1 31

35 Table 4-12: Anthill Mineral Resource Estimate at a 0.2% Cu as at October Area Category OXIDE *Tonnes (Mt) Cu (%) Ca (%) Mg (%) Oxide Measured Transitional Sulphide Total Oxide Transitional East Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Transitional Sulphide Total Link Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional West Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional TOTAL Sulphide Total Oxide Inferred Transitional Sulphide Total TOTAL *Totals may not add up due to rounding 4 December Report No Rev1 32

36 Table 4-13: Anthill Mineral Resource Estimate at a 0.3% Cu as at October Area Category OXIDE *Tonnes (Mt) Cu (%) Ca (%) Mg (%) Oxide Measured Transitional Sulphide Total Oxide Transitional East Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Transitional Sulphide Total Link Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional West Sulphide Total Oxide Inferred Transitional Sulphide Total Total Oxide Measured Transitional Sulphide Total Oxide Transitional TOTAL Sulphide Total Oxide Inferred Transitional Sulphide Total TOTAL *Totals may not add up due to rounding 4 December Report No Rev1 33

37 5.0 MINE PLANNING 5.1 Block Model The geological model used was an_0912md.dm, which is described in Table 4-6 and Table 4-7. Table 4-12 summarises the Mineral Resources for the Anthill deposit at a 0.2% Cu cut-off. Table 5-1 describes the major variables common to both block models. Table 5-1: Major Variables in Geological Model Variable Type Description CUDOM OXIDE CU CA numeric Cu domain code (1=main zone, 0=waste) numeric Oxidation (0=fresh, 1=transitional, 2=oxide) numeric Estimated Cu % block value numeric Estimated Ca % block value MG numeric Estimated Mg % block value SG numeric Estimated block in-situ dry bulk density t/m 3 RESCAT numeric Resource classification (0=unclassified, 2=, 3=Inferred) MINED numeric Mined flag (0=not mined, 1=removed by open pit) AREA numeric Mining area (1=East Zone, 2=Transition Zone, 3=West Zone Both block models use a 10x10x10m parent cells and 2.5x2.5x1m sub cells 5.2 Whittle Optimisation A Datamine script was used to create additional block model columns necessary to the Whittle Four-X software pit optimisation; which includes: PCAF: Processing Costs discussed in detail in section RockType: A three digit number representing RESCAT (first digit), OXIDE (second digit) and AREA (third digit) Pit Optimisation Block Model The block model was imported into Whittle software from Datamine. Table 5-2 summarises the Whittle model definition. Both parent and sub block sizes were maintained from the original block model. Table 5-2: Whittle Parameters (an_0912_whittle.mod) X (Easting) Y (Northing) Z (RL) Block size (m) Model origin Extent (m) Number Blocks Table 5-3 summarises the in-situ pit material by rock type within the Whittle optimisation model. For the base optimisation only Measured and Mineral Resources were used. These reconcile with the original two resource models. 4 December Report No Rev1

38 Table 5-3: Optimised Pit Resources (an_0912_whittle.mod where CUDOM=1) Resource Classification Weathering Type Deposit Name Rocktype Code Tonnage (Mt) Cu Grade (%) Measured Oxide East Measured Transition East Oxide East Transition East Sulphide East Inferred Oxide East Inferred Transition East Inferred Sulphide East Oxide Transition Transition Transition Sulphide Transition Inferred Oxide Transition Inferred Transition Transition Inferred Sulphide Transition Measured Oxide West Measured Transition West Measured Sulphide West Oxide West Transition West Sulphide West Inferred Oxide West Inferred Transition West Inferred Sulphide West Economic Parameters The basic economic parameters were provided by CST and are summarised in Table 5-4. Table 5-4: Economic Parameters Parameter Value Copper Price (US$/lb) 3.00 Exchange Rate (AUD:USD) 1.00:0.80 Selling Costs (including transport of concentrate) 159A$/t Cu Royalty 4.4% Administration costs for the site and corporate overheads of $12.6M per annum were not included as a unit cost per tonne. In interpreting the undiscounted values provided by the mine optimisations, the combined total should be reduced by life of mining operations (in years) multiplied by $12.6M. This was a corporate decision by CST to maximise the mine life based on a marginal cut-off grade scenario which maximises resource usage. 4 December Report No Rev1

39 5.3.1 Mining Costs and Parameters Mining costs include both fixed costs and depth dependent costs. Fixed costs are shown in Table 5-5, and total cost by depth is shown in Figure 17. The depth dependent costs are calculated on 10 m bench steps to match the parent block model size. Table 5-5: Mining Costs Mining Activity Cost A$/bcm rock Excavators 0.83 Dozers 0.63 Supervision 0.14 Miscellaneous (lighting, dewater, reclaim) 0.15 Drilling and Blasting Variable by Depth (1.65 to 1.91) Ancillary Equipment Variable by Depth (0.61 to 0.79) Haulage Variable by Depth (1.92 to 4.48) 350 Total Mining Cost by Depth mrl $0.00 $1.00 $2.00 $3.00 $4.00 $5.00 $6.00 $7.00 $8.00 $9.00 $10.00 $/bcm Figure 17: Mining Costs by Depth Mining recovery and dilution assumptions are summarised in Table 5-6 based on values used by CST mining. Table 5-6: Mining Recovery and Dilution Mining Recovery 95% Mining Dilution 2% Processing Costs and Parameters Processing costs include incremental ore costs, grade control, road transport, ROM loading, acid costs, and other ore related costs, and are summarised in Table 5-7 Incremental ore costs cover the difference between hauling waste to the waste dump and ore to stockpiles. Since it is cheaper to haul to the transfer stockpiles this component is negative. Road transport is hauling the ore from stockpile to ROM and costs. 4 December Report No Rev1

40 Processing costs for optimisation includes all other aspects of processing the ore including leaching, solvent extraction and electrowinning. The processing costs comprise a fixed component and a variable component based on acid consumption. Acid costs 210 $/t and the acid consumption costs are based on calcium grades as follows: Acid Costs ($/t ore) = Calcium Grade (%) * 4.66 Table 5-7: Processing Costs Mining Activity Cost A$/t ore Incremental Ore costs between mrl 250 and mrl 290,-0.64 otherwise Grade Control 0.75 Road Transport 6.50 ROM loading 0.51 Other Fixed Processing Costs Acid Costs Ca * 4.66 The process recovery is based on an assumed residual copper component left in the heap after leaching and is shown in Table 5-8. Table 5-8: Residual Copper Ore Description Residual Cu (%) Calcium below 2% 0.15% Calcium above 2% 0.22% The metal recovery is therefore estimated as: Recovery = (Cu% - Residual Cu%)/ Cu% The marginal cut-off grade for the Anthill deposit is described by the function below. 0.42%+0.06%, 2%; = 0.49%+0.06%, >2%. The first expression is primarily used for oxide ore, the second is used mainly for transition ore. These functions are also shown in Figure 18. Note that transition ore can have very high calcium grades pushing the economic cut-off above 1% Cu as each 1% of Ca will increase the cut-off by 0.06% Cu. 4 December Report No Rev1

41 1.50 Marginal Cutoff (Cu%) Marginal Cutoff does not include Mining Costs but is economic to process if it is mined anyway y = 0.06x Transition Oxide y = 0.06x Ca % Figure 18: Anthill Marginal Copper Cut-off Grade vs. Calcium The pit optimisation used a number of constraints based on current mining practices to limit the annual production to reasonable limits. These constraints are shown in Table 5-9. Copper metal production was found to be the limiting constraint in all cases. Table 5-9: Production Constraints Variable Mine Plant Copper Produced Constraint 12.6 Mtpa 2.96 Mtpa tpa 5.4 Pit Slope Angles An overall slope angle of 40 has been used for all pit walls. This was derived from the 2009 optimisation by Snowden which was based on their wall measurements at the site. 5.5 Pit Optimisation Results Pit optimisation was carried out on all Anthill deposits. Results show there is no connection of pits between Anthill West and Anthill East. Table 5-10, Table 5-11 and Table 5-12 summarise the results for the Anthill West, Anthill East and the combined optimisations respectively. 4 December Report No Rev1

42 Table 5-10: Summary of Results Anthill West Case Pit Rev Fact. Slope Angle Mine Life (yrs) Rock (Mt) Strip Ratio Ore (Mt) Grade (% Cu) Cu Prod (kt) Undisc Cash Flow ($M) Cost ($/rec t) a b c d Table 5-11: Summary of Results Anthill East Case Pit Rev Fact. Slope Angle Mine Life (yrs) Rock (Mt) Strip Ratio Ore (Mt) Grade (% Cu) Cu Prod (kt) Undisc Cash Flow ($M) Cost ($/rec t) a b c d Table 5-12: Summary of Results Anthill Combined Case Pit Rev Fact. Slope Angle Mine Life (yrs) Rock (Mt) Strip Ratio Ore (Mt) Grade (% Cu) Cu Prod (kt) Undisc Cash Flow ($M) Cost ($/rec t) a b c d Figure 19 shows a plan view of the Whittle optimised pit shells. Figure 20 and Figure 21 show sections through the pits with all blocks that exceed the marginal cut-off grade calculated on a block by block basis. Due to the depth of the ore the stripping ratio is high which limits the pit sizes. 4 December Report No Rev1

43 Anthill West Anthill East Figure 19: Whittle Optimal Pit Shells Anthill Anthill East Figure 20: Anthill East Whittle Pit Section N Anthill West Figure 21: Anthill West Whittle Pit Section N 4 December Report No Rev1

44 6.0 PIT DESIGN 6.1 Mine Design Parameters The pits were designed using a revenue factor of 1.08 (3.24USD/lb). This was chosen to maximise the resource usage with minimal impact on project value (~5%). An overall slope angle of 35 degrees was selected to match the berm and batter heights provided by the client. Slope design parameters were provided by CST and are presented in Table 6-1. Table 6-1: Pit Design Parameters Domain Batter Height Batter Angle Berm Width Above 290 m RL 20 m 50 8 m Below 290 m RL 20 m 60 8 m All haul roads used by mine equipment have been designed to accommodate Caterpillar 777F dump trucks. The overall haul road width of 25 m based on current mine design. For single lane traffic roads 15 m wide roads have been used. In particular this width is used to gain access to the bottom two benches. The maximum haul road gradient is 11% based on current mining practices. 6.2 Mining Methodology Mining is currently being undertaken using normal truck and shovel operation. Excavators (6.7m 3 ) load 82 t trucks. Blasting is done on 3.5 m or 3 m flitches used to make up 10 m benches. Most of the pit uses double benching for a total batter height of 20 m. Waste material will be hauled to waste dumps adjacent to the mining areas. Ore will be hauled to the crusher ROM (Mount Clarke and Flying Horse) or to ROM stockpiles adjacent to the pit that will then be carted using road-train to the crusher ROM stockpile. 6.3 Processing Methodology Once at the crusher ROM the ore goes through a series of processes to extract the copper which include: Crushing Agglomeration Stacking Sulphuric Acid Leaching Solvent Extraction Electrowinning Heap leach solution costs are increased by high levels of calcium (as carbonate). CST has advised that the maximum average calcium levels in the leach heaps should be 3%. This constraint has been applied on a pit total basis and scheduling will be required to maintain this limit on a heap pad basis. 6.4 Mine Design Mine design was carried out on a Mining block model which was based on the Resource block model (anw_0912.dm). The mine design was based on the pit optimisation Case D shell December Report No Rev1

45 The mining model (an_0912.bmf) had additional variables added based on the Whittle costs and calculations to facilitate mine planning. These are defined in Table 6-2. Table 6-2: Additional Variables Variable Description Model Calculation mcutoff Marginal Cu cut-off grade iff(ca gt 2, * ca, * ca) pit Whittle pit shell number Imported from Whittle results file A plan view of the Anthill pits design is shown in Figure 22. Figure 23 is a cross section through the East Pit and Figure 24 is a section through the West Pit. Anthill West Anthill East Figure 22: Anthill Pit Plan View Anthill East Figure 23: Anthill East Section N 4 December Report No Rev1

46 Anthill West Figure 24: Anthill West Section N 6.5 Mineral Inventory The mineral resources were reported within the pit designs together with the waste material as shown in Table 6-3. These figures are before dilution and mining loss. Table 6-3: Anthill In-Pit Mineral Inventory without Dilution or Mining Loss Deposit West East Combined Resource Category Measured Measured Measured Material Type Tonnage (Mt) Cu (%) Contained Cu (kt) Ca (%) Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total The pit also includes 27.4 Mt of waste. The ore tonnes are lower than the whittle optimisation due to ramp requirements; which restricted the ramp design from reaching some of the ore in the base of the pits. The overall tonnage was reduced by 4% with the ore being reduced by 14% when compared to the Whittle Optimisation. 4 December Report No Rev1

47 Once a mineral inventory was calculated a dilution of 5% material at 0.2% Cu was applied along with a 2.5% mining loss to convert the material into an Ore Reserve. There is no Inferred material within the designed pits. Anthill is a greenfield site with no mining having been carried out at this time. 7.0 IN-PIT MINERAL RESOURCES No Ore Reserves are reported due to the lack of a current mining lease. The in-pit Mineral Resource inventory is summarised in Table 7-1. This includes dilution and mining recovery and should convert directly to Ore Reserves once a mining lease is secured. Table 7-1: Anthill In-Pit Mineral Resources with Dilution and Mining Loss Deposit West East Combined Resource Category Measured Measured Measured Material Type Tonnage (Mt) Cu (%) Contained Cu (kt) Ca (%) Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total Transition Oxide Total The section below is a set of Ore Reserve criteria filled in for Anthill. This is provided in preparation for eventual conversion of the in-pit Mineral Resource to Ore Reserves which should follow the successful application for a mining lease covering the Anthill resource and pit designs Estimation and Reporting of Ore Reserves Criteria Mineral Resource Estimate for Conversion to Comments The Mineral Resource model for the Anthill Deposit was developed by Golder Associates Pty Ltd as part of an ongoing planning for the Lady Annie project. The stated In-pit Mineral Resource is inclusive of the main resource statement. 4 December Report No Rev1

48 Criteria Ore Reserves Comments Study Status The Lady Annie Project is located 120 km North of Mt Isa. It consists of three areas Lady Annie (Lady Annie and Lady Brenda), Mt Kelly (Mt Clarke, Flying Horse and Swagman) and Anthill (Anthill West and Anthill East). The Anthill deposit is located 40km south of the Mt Kelly plant. CopperCo began mining operations in CopperCo went into voluntary liquidation in November Mining stopped in November 2008 and production from the treatment plant in December 2009 when the project was placed on a care and maintenance basis. In June 2009 Cape Lambert Lady Annie Exploration Ltd (CCLAE) purchased the operations. CST acquired 100% of CCLAE and recommenced mining operations at Lady Annie in September Cut-off Parameters Mining Factors or Assumptions Metallurgical Factors or Assumptions Cost and Revenue Factors Market Assessment Other Classification Audit/Previous Studies 0.42%+0.06% Ca, Ca 2%; Cu 0.49%+0.06% Ca, Ca>2%. The cut-off is based on both the copper content for revenue and the calcium content that affects the processing cost due to acid consumption. The Resource model has block size of 10x10x10m with sub cells down to 2.5x2.5x1m. A dilution of 5% at 0.2% Cu and a mining loss of 2.5% were used. The Ore Reserves are reported within a pit design which is based on a Whittle open pit optimisation. The optimisation was carried out including Measured and Mineral Resource categories. The optimisation used a copper price of US$3.00/lb. The pit selected was the 1.08 revenue factor shell (price US$3.24/lb). This was chosen as it matches the current metal price and meets CST s corporate objective to maximise the resource size. This results in a 3% loss of value when applying the base case metal price of US$3.00/lb. The overall pit slopes used for the design are based on previous optimisations carried out by Snowden which used measured actual pit slopes at the site. The operation involves a heap leach followed by solvent extraction and electrowinning. The metal recovery is based on experience at the site and uses a residual copper grade left in the heap to estimate recovery. Residual grades are 0.15% Cu for Ca < 2% and 0.22% Cu for Ca 2%. Recovery = (Cu-Residual)/Cu Costs are based on history or budgets. Acid cost is an important variable and is increased for increased calcium grade. The base price assumed is US$3.00/lb Cu with an exchange rate of USD$0.8 = AUD$1 Copper is produced as LME Grade A equivalent cathode with a nominal production of 25 kt/a. The Lady Annie mine is operating with all its necessary approvals and licenses however the Anthill deposit is not within an approved mining lease at this time. There is Measured, and Inferred Mineral Resources within the model. The Measured and Mineral Resources within the designed pits have not been converted to Proved and Probable Ore Reserves (Measured to Proved, to Probable) as yet due to the lack of current mining lease. Snowden carried out a Resource estimation on the Anthill Deposit in May 2011 which was 6.5 Mt at 0.86% Cu compared to 13.8 Mt at 0.7% Cu (cut-off 0.3% Cu) in this report. 4 December Report No Rev1

49 Report Signature Page GOLDER ASSOCIATES PTY LTD Matthew Nimmo Principal Geologist Ross Bertinshaw Principal MN/JH/MN A.B.N Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation. w:\min\2011\ _cst\correspondence out\ r-rev1-anthill_resource_estimate_.docx 4 December Report No Rev1

50

For personal use only

For personal use only ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au

More information

For personal use only

For personal use only 4 APRIL 2013 D Zone Mineral Resource Increases by 34% to 20.7 million tonnes with a significant increase in contained Cu and Fe Highlights Overall D Zone Mineral Resource tonnage has increased by 5.2 million

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

Attention: Chris Zerga, General Manager and President Scorpio Gold Corporation

Attention: Chris Zerga, General Manager and President Scorpio Gold Corporation Memorandum To: Mineral Ridge Gold, LLC Attention: Chris Zerga, General Manager and President Scorpio Gold Corporation From: Todd Wakefield, Ian Crundwell, and Mike Drozd of Date: 10 July 2017 Re: Mineral

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

ASX ANNOUNCEMENT 12 MAY 2016

ASX ANNOUNCEMENT 12 MAY 2016 ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of

More information

209 million 36.1% Fe

209 million 36.1% Fe ASX ANNOUNCEMENT 29 August 2011 ASX Code: BDR MAIDEN IRON ORE RESOURCE ON BEADELL S MINING CONCESSION - BRAZIL 209 million tonnes @ 36.1 Fe Beadell Resources Limited ( Beadell ) is pleased to announce

More information

The competent person in mine-site evaluation and responsibilities for study design, management and findings

The competent person in mine-site evaluation and responsibilities for study design, management and findings The competent person in mine-site evaluation and responsibilities for study design, management and findings Sufficient information Balanced Transparency Not Misleading Unambiguous Clear All relevant information

More information

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT ABN 46 006 045 790 14 th December 2010 ASX ANNOUNCEMENT Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA Cullen Resources Limited (ASX:CUL) (Cullen) is pleased to report the maiden JORC

More information

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011 15 February 2012 ASX: AOH, FSE: A2O RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011 Emerging copper producer, Altona Mining Limited ( Altona ) (ASX: AOH) today announced that Mount Isa Mines Limited (

More information

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE ASX RELEASE 11 December 2012 NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE Independently prepared JORC Ore Reserve for Nolans Bore to support a 22 year mine life; 95% of Measured and Indicated Resources

More information

Maiden Inferred Iron Ore Resources for Gum Flat

Maiden Inferred Iron Ore Resources for Gum Flat 30 April 2009 The Manager ASX Announcements Maiden Inferred Iron Ore s for Gum Flat Lincoln Minerals Limited ( LML ) is pleased to announce Inferred s for its Gum Flat Iron Ore Project on southern Eyre

More information

For personal use only

For personal use only 3 AUGUST 2016 ASX/MEDIA RELEASE AERIS RESOURCES LIMITED (ASX: AIS) UPDATED ORE RESERVE ESTIMATE FOR THE TRITTON DEPOSIT CONTAINED COPPER INCREASES BY 32% Aeris Resources Limited (ASX: AIS) (Aeris or Company)

More information

Estimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition.

Estimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition. Estimation of Open Cut Mining Recovery and Mining Dilution By Kent Bannister, ARMIT, FAusIMM (CP), CEO Kent Bannister Pty Ltd, (KBPL) Summary Loss and dilution of Mineral Resource grade occurs during mining

More information

Maiden Ore Reserve for Anglo Saxon Gold Project

Maiden Ore Reserve for Anglo Saxon Gold Project ABN 44 009 157 439 Company Announcement 20 June 2017 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com Maiden

More information

Mount Gibson Iron Limited ABN

Mount Gibson Iron Limited ABN Mount Gibson Iron Limited ABN 87 008 670 817 Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY INTERNATIONAL BASE METALS LIMITED OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY 21 NOVEMBER 2013 Frank Bethune Ken Maiden Andre Genis Karl Hartmann PRESENTED BY FRANK BETHUNE AND KEN MAIDEN Disclaimer 2 This

More information

For personal use only

For personal use only ASX ASX ANNOUNCEMENT ANNOUNCEMENT th 15 15th January January 2018 2018 For personal use only PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA HIGHLIGHTS Pacific Bauxite has acquired the

More information

Trading Symbol: TSXV: BMC News Release No Shares Outstanding: 166,283,160 May 8 th, 2013

Trading Symbol: TSXV: BMC News Release No Shares Outstanding: 166,283,160 May 8 th, 2013 Head Office 247 Dill Road, RR 1 Windsor, NS, Canada, B0N 2T0 Trading Symbol: TSXV: BMC News Release No. 12-13 Shares Outstanding: 166,283,160 May 8 th, 2013 T (902) 472 3520 F (902) 472 3521 www.buchansminerals.com

More information

2007 MINERAL RESOURCE & ORE RESERVE EXPLANTATORY NOTES

2007 MINERAL RESOURCE & ORE RESERVE EXPLANTATORY NOTES 2007 MINERAL RESOURCE & ORE RESERVE EXPLANTATORY NOTES The accompanying statement of Mineral Resources and Ore Reserves conforms to the Australasian Code for Reporting of Exploration Results, Mineral Resources

More information

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Awak Mas DFS Optimisation - Metallurgical Breakthrough 10 October 2017 Awak Mas DFS Optimisation - Metallurgical Breakthrough Whole of Ore leach testwork delivers improved metallurgical recoveries. Gold recoveries range from 92% - 98% vs previous flotation-leach

More information

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa ASX ANNOUNCEMENT 21 DECEMBER 2011 Australian Securities Exchange Code: NST Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa Highlights High-grade results of up to

More information

For personal use only

For personal use only KEY POINTS Reserves and Resources Update For further information, please contact: Peter Bird Managing Director Heemskirk Consolidated Limited ABN 18 106 720 138 Level 5 303 Collins Street Melbourne Victoria

More information

ABM Hits 3000 Ounce Target from Trial Mining

ABM Hits 3000 Ounce Target from Trial Mining ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 12 th December 2013 ABM Hits 3000 Ounce Target from Trial Mining ABM Resources NL ( ABM or The Company ) presents an update on the Trial Mining and Processing at

More information

Optimal Selection of Selective Mining Unit (SMU) Size

Optimal Selection of Selective Mining Unit (SMU) Size Optimal Selection of Selective Mining Unit (SMU) Size Oy Leuangthong (oy@ualberta.ca), Chad Neufeld (neufeld@ualberta.ca), and Clayton V. Deutsch (cdeutsch@ualberta.ca) Department of Civil and Environmental

More information

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors

More information

As with previous editions of the Joint

As with previous editions of the Joint Quality control and public reporting in industrial minerals Andrew Scogings*, IM Correspondent, Jacqui Coombes** As with previous editions of the Joint Ore Reserves Committee (JORC) code the 2012 edition

More information

For personal use only

For personal use only ASX Announcement October 2014 WILGERUP HEMATITE IRON ORE PROJECT General Manager 23 rd October 2014 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam

More information

Significant cobalt and manganese mineralisation identified at Ketchowla

Significant cobalt and manganese mineralisation identified at Ketchowla ABN 64 123 993 233 ASX Announcement 17 January ABN 64 123 2017 993 233 Significant cobalt and manganese mineralisation identified at Ketchowla Highlights Ketchowla Cobalt Manganese Project exploration

More information

SECTION 1 SAMPLING TECHNIQUES AND DATA

SECTION 1 SAMPLING TECHNIQUES AND DATA Silvergrass East Table 1 The following table provides a summary of important assessment and reporting criteria used at Silvergrass East for the reporting of Mineral Resources and Ore Reserves in accordance

More information

Australasian Code for Reporting of Mineral Resources and Ore Reserves

Australasian Code for Reporting of Mineral Resources and Ore Reserves 1999 Edition Australasian Code for Reporting of Mineral Resources and Ore Reserves (The JORC Code) Prepared by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian

More information

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director Cash flow from gold sales New project developments Exploration success The information in this presentation that relates to

More information

SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT

SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE SEPTEMBER 16, 2013 SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the

More information

Bisha Mining Share Company

Bisha Mining Share Company Bisha Mining Share Company Asmara Mining Conference 2014 Bisha Mine Geology Activities Samson Ephrem Mine Geologist October 2014 Forward Looking Statements This Presentation contains forward-looking statements

More information

AGM - Lorena Gold Project

AGM - Lorena Gold Project AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors

More information

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources 24 October 2017 Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources Georgian Mining Corporation Drilling Update from KB Gold Zone 2 and New Gold Discovery Georgian Mining Corporation (

More information

ASX Release ASX Code: YTC

ASX Release ASX Code: YTC HERA DEFINITIVE FEASIBILITY STUDY TO BE EXPANDED Hera DFS scope to be expanded to include the assessment of mining and treatment of high grade copper ores from the Nymagee Copper Mine together with additional

More information

GRADE CONTROL BLENDING AND SELECTIVITY FOR OPTIMAL PROCESS PERFORMANCE AT THE SKORPION ZINC MINE, NAMIBIA G B GNOINSKI

GRADE CONTROL BLENDING AND SELECTIVITY FOR OPTIMAL PROCESS PERFORMANCE AT THE SKORPION ZINC MINE, NAMIBIA G B GNOINSKI GRADE CONTROL BLENDING AND SELECTIVITY FOR OPTIMAL PROCESS PERFORMANCE AT THE SKORPION ZINC MINE, NAMIBIA G B GNOINSKI Namzinc (Pty) Ltd, Private Bag 2003, Rosh Pinah, Namibia Tel: +264 63 271 2408, Fax:

More information

For personal use only

For personal use only 1 SCOPING STUDY CONFIRMS PROFITABLE POTENTIAL OF HASTINGS HEAVY RARE EARTH PROJECT The Manager Company Announcements Office Australian Securities Exchange 4th Floor, 20 Bridge Street SYDNEY NSW 2000 Hastings

More information

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE 28 December 2011 BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE Highlights The Ore Reserve has been established and a new Life of Mine plan for Southern Operations has been developed with economic

More information

For personal use only

For personal use only ASX Announcement 25 February 2016 Mulga Rock Project Definitive Feasibility Study Update Vimy Resources Limited ( Vimy ASX: VMY) is pleased to provide the following operational update on the Mulga Rock

More information

For personal use only. Cummins Range Rare Earths Project

For personal use only. Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

Geology and mineral resources of the Kylylahti Mine

Geology and mineral resources of the Kylylahti Mine Geology and mineral resources of the Kylylahti Mine asenteella - tuurilla törmäillen; harkiten harmitta Jari Juurela Altona Mining Ltd Geology Manager - Finland 24.04.2014 Disclaimer and JORC Compliance

More information

White Dam Gold Project Dump Leach

White Dam Gold Project Dump Leach ALTA 2015 White Dam Gold Project Dump Leach A division of Midas Engineering Group Mineral Engineering Technical Services PO Box 5778 St Georges Tce WA 6831 P: (+61 8) 9421 9000 F: (+61 8) 9325 8311 ABN

More information

QUARTERLY REPORT March 2011

QUARTERLY REPORT March 2011 QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The

More information

For personal use only

For personal use only Level 3, 24 Outram Street, West Perth WA 6005 PO Box 497, West Perth WA 6872 Australia T: +61 8 9220 2300 F: +61 8 9220 2309 ABN 19 055 719 394 ASX Announcement Media Release 20 May 2015 HIGH GRADE HEMATITE

More information

For personal use only

For personal use only HAMMER METALS LIMITED PRESENTATION June 2016 ABN. 87 095 092 158 Mining 2015 Resources Convention 2015 Queensland Explorer of the Year CORPORATE SUMMARY Russell Davis Chairman Alex Hewlett Executive Director

More information

Tri-K feasibility study update

Tri-K feasibility study update Tri-K feasibility study update Feasibility study work to date confirms technical viability of low cash cost operation Mining licence application process commenced, based on technical information submitted

More information

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

EXCELLENT NICKEL LEACHING TESTWORK RESULTS ASX AND MEDIA RELEASE - 22 FEBRUARY 2007 EXCELLENT NICKEL LEACHING TESTWORK RESULTS Metallica is pleased to report that excellent results have been received from ongoing nickel leaching testwork on NORNICO

More information

Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec

Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec Highlights SGS Geostat has determined a base case Inferred mineral

More information

TINKA RESOURCES LIMITED

TINKA RESOURCES LIMITED TINKA RESOURCES LIMITED #1305 1090 WEST GEORGIA STREET VANCOUVER, B.C. V6E 3V7 Tel: (604) 685 9316 Fax (604) 683 1585 Website: www.tinkaresources.com TSXV & BVL: TK OTCPK: TKRFF NEWS RELEASE November 8,

More information

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE APRIL 7, 2014 PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the Company ) is pleased to

More information

EXCO S PROJECT PIPELINE. Unlocking the Value

EXCO S PROJECT PIPELINE. Unlocking the Value EXCO S PROJECT PIPELINE Unlocking the Value EXCO RESOURCES N.L. 20 AUGUST 2010 Wholesale Investors Forum Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking

More information

Mount Weld Mineral Resource and Ore Reserve Update 2015

Mount Weld Mineral Resource and Ore Reserve Update 2015 5 October 2015 Mount Weld Mineral Resource and Ore Reserve Update 2015 Lynas Corporation Limited (ASX:LYC, OTC:LYSDY) announces that the Mount Weld Mineral Resource and Ore Reserves have been updated as

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information

For personal use only

For personal use only Report to shareholders 16 July 2012 Intrepid Mines Limited ASX and TSX : IAU Inquiries regarding this report and Company business may be directed to: Brad Gordon Managing Director Chief Executive Officer,

More information

Ore Reserves and Mineral Resources Statements 30 June 2013

Ore Reserves and Mineral Resources Statements 30 June 2013 ASX Release / 22 August 2013 Ore Reserves and Mineral Resources Statements 30 June 2013 Ore Reserves at 30 June 2013: 77.8 Mt @ 2.1 g/t Au for 5.24 million ounces of contained gold The acquisition of Gold

More information

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any South Australian Explorers Conference 2008 Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysis

More information

Australia s New Nickel

Australia s New Nickel Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra

More information

For personal use only

For personal use only BUILDING A COPPER COMPANY IN BRAZIL Investor Update Feb 2013 1 Disclaimer The announcement may contain certain forward-looking statements. Words anticipate, believe, expect, forecast, estimate, likely,

More information

WEATHERED BIF TESTWORK AT KAURING EXHIBITS POTENTIAL FOR COARSE GRAINED HEMATITE PRODUCT

WEATHERED BIF TESTWORK AT KAURING EXHIBITS POTENTIAL FOR COARSE GRAINED HEMATITE PRODUCT ASX Release 7 April 2014 ASX code: MAU 22 Delhi Street West Perth WA 6005 PO Box 1388 West Perth WA 6872 Telephone 08 9226 1777 Facsimile 08 9485 2840 info@magres.com.au www.magres.com.au WEATHERED BIF

More information

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL Head Office 247 Dill Road, RR 1 Windsor, NS, Canada, B0N 2T0 Trading Symbol: TSXV: BMC News Release No. 10-12 Shares Outstanding: 150,898,545 May 3 rd, 2012 T (902) 472 3520 F (902) 472 3521 www.buchansminerals.com

More information

For personal use only

For personal use only ASX Market Update/Media release Monday 22 August 2016 Metals of Africa Reports Further Exceptional Metallurgical Results High grade chemical-free Flotation Testwork at Montepuez Project delivers >98% TGC

More information

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE ASX ANNOUNCEMENT 8 June 2016 MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE Open pit mining optimisation results demonstrate the potential for multiple low strip ratio, open pit operations across a range

More information

Gum Creek Gold Project Free Milling Scoping Study

Gum Creek Gold Project Free Milling Scoping Study 18 March 2016 ASX: PAN Highlights Gum Creek Gold Project Free Milling Scoping Study Mining Inventory of 4.9Mt at 1.94g/t Au for 309koz gold based on material from Swan, Swift and Howards Resources Average

More information

For personal use only

For personal use only 27 April 2017 ASX Announcement March 2017 Quarterly Activities Report Summary Chelkar - Assay High Grade Potash Mineralisation Present Bankable Feasibility Study Advances for Satimola Project JV with Chongqing

More information

3D Modelling & Mine Planning Software. Comprehensive tools provide a competitive advantage from exploration to rehabilitation.

3D Modelling & Mine Planning Software. Comprehensive tools provide a competitive advantage from exploration to rehabilitation. 3D Modelling & Mine Planning Software Comprehensive tools provide a competitive advantage from exploration to rehabilitation. Maptek Vulcan, the world s premier 3D mining software solution, allows users

More information

Prominent Hill underground Reserve growth continues, mine life extended to 2029

Prominent Hill underground Reserve growth continues, mine life extended to 2029 21 NOVEMBER 2017 Prominent Hill underground Reserve growth continues, mine life extended to 2029 18 per cent growth in underground Ore Reserve to 39Mt @ 1.7% copper equivalent i extends Prominent Hill

More information

RUNRUNO GOLD MOLYBDENUM PROJECT FEASIBILITY STUDY AND RESOURCE UPDATE

RUNRUNO GOLD MOLYBDENUM PROJECT FEASIBILITY STUDY AND RESOURCE UPDATE RUNRUNO GOLD MOLYBDENUM PROJECT FEASIBILITY STUDY AND RESOURCE UPDATE Metals Exploration Plc ( Metals Ex or the Company ), the Pacific Rim natural resources exploration and development company, announced

More information

Mount Gibson Iron Limited ABN

Mount Gibson Iron Limited ABN Mount Gibson Iron Limited ABN 87 008 670 817 Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au

More information

Underground Metals Solutions

Underground Metals Solutions Underground Metals Solutions INTEGRATED PLANNING TOOLS FOR UNDERGROUND METALS OPERATIONS An Integrated Platform Strong technical solutions tailored to specialized industry needs Deswik has developed a

More information

LANDORE RESOURCES LIMITED

LANDORE RESOURCES LIMITED LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) PRESS RELEASE PRESS RELEASE PRESS RELEASE PRESS RELEASE PRESS RELEA JUNIOR LAKE PROPERTY IRON ORE DEPOSIT 27 th October 2008 Exploration by Landore has confirmed

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

2014 MINERAL RESOURCES AND ORE RESERVES

2014 MINERAL RESOURCES AND ORE RESERVES 9 October 2014 ASX & MEDIA RELEASE 2014 MINERAL RESOURCES AND ORE RESERVES The Directors of Saracen Mineral Holdings Limited (ASX: SAR) ( Saracen or the Company ), are pleased to advise the updated Mineral

More information

For personal use only

For personal use only NEWS RELEASE DECEMBER 20, 2013 NEW HIGH-GRADE COPPER PROSPECT SECURED IN CHILE Guayacán copper-gold prospect returns surface channel samples grading up to 4.13% Cu Key Points: Option secured over prospective

More information

For personal use only

For personal use only ASX RELEASE 26 FEBRUARY 2015 DIRECT SHIPPING BAUXITE CONFIRMED FOR METALLICA NEAR ITS NEW WEIPA MINE SITE Highlights of new bauxite assays for Area A at Urquhart Point (Cape York, Qld): New assay results

More information

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate

More information

Papua New Guinea Mineral resources and ore reserves

Papua New Guinea Mineral resources and ore reserves Harmony Annual Report 2009 139 Papua New Guinea and ore reserves Geology: Papua New Guinea (PNG) lies at the northern end of the Australian Plate and has three major components: a continental cratonic

More information

The World s Next HIGH GRADE Vanadium Mine

The World s Next HIGH GRADE Vanadium Mine The World s Next HIGH GRADE Vanadium Mine December 2017 Gabanintha Vanadium Project One of the highest grade vanadium deposits being advanced globally, with a Mineral Resource of 92.8Mt Massive High Grade

More information

REPORT ON ASSESSMENT OF THE QA/QC PROGRAM FOR DIAMOND DRILLING CAMPAIGNS

REPORT ON ASSESSMENT OF THE QA/QC PROGRAM FOR DIAMOND DRILLING CAMPAIGNS La Josefina Project May 2010 REPORT ON ASSESSMENT OF THE QA/QC PROGRAM FOR 2007 2008-2009 DIAMOND DRILLING CAMPAIGNS Written by: Horacio Puigdomenech. Reviewed by: Gustavo Fernandez. P.Geo. Luis Rodrigo

More information

For personal use only

For personal use only MAIDEN GOLD RESOURCE FOR TICK HILL TAILINGS Diatreme Resources Limited is an Australian based diversified mineral explorer with significant projects in WA and QLD. The Board and senior personnel exhibit

More information

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel: 930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com April 22, 2014 SBB NR 14-05 SBB TSX SABINA GOLD & SILVER REPORTS SIGNIFICANT

More information

Critical Rare Earths A Strategic Investment Opportunity Investor Presentation November 2014

Critical Rare Earths A Strategic Investment Opportunity Investor Presentation November 2014 Critical Rare Earths A Strategic Investment Opportunity Investor Presentation November 2014 May 13 Hastings Rare Metals (ASX: HAS) 1 Disclaimer All currency amounts are in AUD$ unless stated otherwise.

More information

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

Report No. A13575 Part 5

Report No. A13575 Part 5 CIL Extractive Testwork conducted upon Heap Leach (x2) and Drillhole (x2) Composites from the Mt Todd Gold Project for Vista Gold Australia Pty Ltd Report No. A13575 Part 5 April 2013 The results contained

More information

For personal use only. Minerals Explorer in South Korea

For personal use only. Minerals Explorer in South Korea Minerals Explorer in South Korea Forward-looking and Competent Person Statement Certain statements contained in this presentation constitute forward looking statements. Such forward-looking statements

More information

Monitoring and analysis of production waste blasts at the Cadia Hill Gold Mine

Monitoring and analysis of production waste blasts at the Cadia Hill Gold Mine Monitoring and analysis of production waste blasts at the Cadia Hill Gold Mine Dr. Sedat Esen Metso Minerals Process Technology (Asia-Pacific) Dr Italo Onederra Senior Research Engineer - Mining Research

More information

Study on Gonka Deposit and Taurus Extension

Study on Gonka Deposit and Taurus Extension Study on Gonka Deposit and Taurus Extension RNS Number : 7037N Hummingbird Resources PLC 02 February 2016 Hummingbird Resources plc ('Hummingbird' or 'the Company') Study on Gonka Deposit and Taurus Extension

More information

For personal use only

For personal use only ACN. 000 317 251 Time lodged with ASX: 11.20am (Brisbane) MARKET RELEASE 30th December 2014 ROCKLANDS COPPER PROJECT (CDU 100%) MINING UPDATE LAS MINERALE NATIVE COPPER ORE ZONE - SOME OF THE WORLDS HIGHEST

More information

Activities Report Quarter Ended 31 st March 2015

Activities Report Quarter Ended 31 st March 2015 ASX & Media Release ASX Code AZM 30 th April 2015 www.azumahresources.com.au Investment Highlights: Wa Project: 2.0Moz Mineral Resource including 1.3Moz Measured & Indicated 624,000oz Ore Reserves at 2.14

More information

THE NOLANS RARE EARTHS PROJECT

THE NOLANS RARE EARTHS PROJECT THE NOLANS RARE EARTHS PROJECT Gavin Lockyer Managing Director August 2015 DISCLAIMER Important Notice This presentation contains certain statements which may constitute forward-looking statements. Such

More information

Valence Industries Australia s Only Graphite Producer

Valence Industries Australia s Only Graphite Producer Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Christopher S. Darby MD & CEO SAEM Conference Adelaide Manufacturing Our Carbon Future TM Valence

More information

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd.

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd. DISCLAIMER This document is for the private information and benefit only of the client for whom it was prepared and the particular purpose previously advised to Ausenco Services Pty Ltd. The contents of

More information

For personal use only

For personal use only 24 August 2015 PROPOSED COAL SEAM ACCESS AT BUCK CREEK NO.2 MINE CONFIRMS LOW CAPITAL COST HIGHLIGHTS: Shallow depth of coal seam (100 to 125 feet / 30 to 38 metres) at proposed Buck Creek No. 2 Mine allows

More information

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION Thermal Coal: Indonesia - Kalimantan In Major Coal Provinces South and East Kalimantan Close to Asian Markets # 1 thermal coal

More information

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines ENT_112_NST Principal Authors: Matt Keenan, BEng Hons (Mining), BComm (Man) J-1391-Sokor

More information