Matthew A. Nowak, PWS Senior Project Manager

Size: px
Start display at page:

Download "Matthew A. Nowak, PWS Senior Project Manager"

Transcription

1 New England Environmental, Inc. Environmental Consulting 15 Research Drive Amherst MA (p) (f) SUMMARY Mr. Nowak has extensive experience as an environmental professional, most notably in the natural gas pipeline industry. As a senior project manager, his responsibilities include the oversight of all activities required to bring projects to a successful completion. Mr. Nowak has extensive experience permitting natural gas pipeline projects with the Federal Energy Regulatory Commission (FERC). His FERC filing experience includes Prior Notice Blanket Certification, Conventional 7(c) Filings, and the National Environmental Policy Act (NEPA) Pre-Filing Process. Mr. Nowak is very knowledgeable with the regulatory requirements of the US Army Corps of Engineers (USACE), US Fish and Wildlife Service (USFWS), US Environmental Protection Agency (EPA), and other Federal, state and local permitting agencies. Mr. Nowak s expertise also includes pipeline routing studies, facility siting studies, wetland and ecological field surveys, wetland restoration and mitigation, erosion and sediment control methods, and construction oversight and environmental compliance monitoring. Mr. Nowak s skill set also includes related engineering, survey, design and mapping functions. Mr. Nowak is well versed in report writing, data organization, cost estimating, and QA/QC. EXPERTISE EDUCATION Project Management Federal, State and Local Environmental Permitting FERC 7(c) Applications and Coordination Wetland and Ecological Field Studies Environmental Permitting in MA, CT, RI, NH, NY, PA, WV, OH, NJ, DE, MD, KS, MO and TX University of Massachusetts Amherst Amherst, Massachusetts M.S. Plant and Soil Science, February 2009 University of Massachusetts Amherst B.S. Environmental Science, May 2001 Amherst, Massachusetts Holyoke Community College Holyoke, Massachusetts A.S. Environmental Science, February 1999 CREDENTIALS Certified Professional Wetland Scientist #1662 OSHA 40-Hour HAZWOPER OSHA 10-Hour Construction Safety & Health Training Heartsaver First Aid CPR AED Certified EXPERIENCE New England Environmental, Inc Present Responsible for project management of pipeline, private utility, and public infrastructure projects; from routine operation and maintenance to large expansion projects. Mr. Nowak has the knowledge and capabilities to manage projects from the initial planning stages through field surveys, permitting, construction and post-construction monitoring. He is highly experienced with natural resource assessments, wetland delineation and assessment, habitat evaluations, invasive species assessments and other complex ecologically-focused surveys and studies. Mr. Nowak performs federal, state and local/ regional environmental permitting throughout the northeast United States.

2 EXPERIENCE Hatch Mott MacDonald Principal Project Scientist/ Associate Mr. Nowak provided professional environmental consulting services for public infrastructure, land development and utility projects. His specialty was natural gas industry projects. He managed and coordinated environmental services on transmission, gathering/mid-stream and distribution pipeline systems throughout the northeastern United States. The projects ranged in size from large expansion projects to small operation and maintenance projects, including rehabilitation and integrity management projects. Services included FERC applications and coordination, environmental/ecological field studies, environmental permitting, regulatory agency coordination and meetings. PROFESSIONAL TRAINING MEMBERSHIPS Fluvial Geomorphology and Stream Crossing Guidelines, BSCES/MALSCE, 2006 Hydrogeology of Wetlands: Determining Groundwater Elevations for Successful Replications, AMWS, 2005 New England Regional Soil Science Certificate, University of Massachusetts, 2005 Secondary and Cumulative Impacts on Wetlands; Research Conference, SWS, 2004 Field Indicators for Identifying Hydric Soils In New England, Version 3, AMWS, 2004 Beyond Haybales: Erosion Control and Stabilization, SSSSNE, 2003 Protecting River and Stream Continuity, MACC, 2003 Identification of Winter Woody Plants, Tiner, 2002 Performing Work in the Riverfront in Massachusetts, DEP Circuit Rider, 2002 Wetlands and Open Space Law, MACC, 2002 Banks and the Massachusetts Wetlands Protection Act, DEP Circuit Rider, 2002 Wetland Delineation, University of Massachusetts, 2002 Hydric Soils, University of Massachusetts, 2001 Wetland Plant Identification, University of Massachusetts, 2001 Vernal Pools, Jackson, 2000 Society of Soil Scientists of Southern New England Society of Wetland Scientists Millennium Pipeline Company, L.L.C., Minisink Compressor Project, FERC-Regulated Project, NY Environmental Project Manager responsible for all aspects of agency consultation, site selection, wetlands delineation, rare species coordination, FERC Environmental Report, and Federal, state, and local environmental permitting. Also responsible for overall management of air, noise and cultural resource services. The project consisted of a new 12,260 horsepower gas-fired compressor station. Eastern Shore Natural Gas, Worcester County Extension Project, FERC-Regulated Project, DE & MD Environmental Project Coordinator responsible for all aspects of agency consultation, route selection, wetlands delineation, rare species coordination, FERC Prior Notice Filing, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource services. The project consisted of 20 miles of 16-inch diameter natural gas pipeline. National Fuel Gas, West-to-East Project, FERC-Regulated Project, PA Environmental Project Manager responsible for all aspects of agency consultation, route selection, wetlands delineation, rare species field surveys, FERC Environmental Report, and Federal, state, and local environmental permitting. The project crossed a National Forest, 5 State Forests, 2 State Parks, and 2 State Game Lands. Also responsible for overall management of cultural resource services. The project consisted of 80 miles of 24-inch diameter natural gas pipeline. National Fuel Gas/Empire Pipeline, Tioga County Extension Project, FERC-Regulated Project, NY & PA Environmental Project Manager responsible for all aspects of agency consultation, environmental route selection, wetlands delineation, rare species field surveys, FERC Environmental Report, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource services. The project consisted of 17 miles of 24-inch diameter natural gas pipeline.

3 Eastern Shore Natural Gas, Mainline Extension Project, FERC-Regulated Project, PA Environmental Project Manager responsible for all aspects of agency consultation, research, environmental route selection, wetlands delineation, rare species field surveys, FERC Environmental Report, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource services. The project consisted of 8 miles of 16-inch diameter natural gas pipeline. Eastern Shore Natural Gas, Expansion Project, FERC-Regulated Project, PA and DE Environmental Project Manager for approximately 55 miles of natural gas pipeline composed of seven (7) segments. The pipeline segments crossed several wetlands and 30+ streams/ waterbodies. Managed the filing of all Federal, state, and local environmental permitting activities pertaining to wetlands and waterbodies, stormwater management, hydrostatic testing, erosion and sediment control, and endangered species. Field work consisted of wetland delineation and wetland functional assessment. Responsible for FERC Environmental Report, data requests and implementation plan. Dominion Resource Services, Clarington Project, FERC-Regulated Project, OH & WV Environmental Project Manager responsible for all aspects of agency consultation, wetlands delineation, rare species field surveys, FERC Environmental Report, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource, air quality and noise/sound services. The project consisted of upgrades and modifications to two (2) compressor stations and two (2) meter stations. Columbia Gas Transmission, Line 1655 North Replacement Project, FERC-Regulated Project, PA Environmental Project Manager responsible for all aspects of agency consultation, environmental route selection, wetlands delineation, rare species field surveys, FERC Abbreviated Environmental Report, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource services. The project consisted of 3.4 miles of 12-inch diameter natural gas pipeline. Columbia Gas Transmission, Line 8012 Replacement Project, FERC-Regulated Project, WV Environmental Project Manager responsible for all aspects of agency consultation, research, environmental route selection, wetlands delineation, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource services. The project consisted of 2.3 miles of 12- inch diameter natural gas pipeline. Columbia Gas Transmission, Rockport Efficiency Project, FERC-Regulated Project, WV Environmental Project Manager responsible for all aspects of agency consultation, wetlands delineation, rare species field surveys, FERC Abbreviated Environmental Report, and Federal, state, and local environmental permitting. Also responsible for overall management of cultural resource services. Duke Energy, G1 Replacement, FERC-Regulated Project, MA Scientist for the 1-mile replacement of an existing natural gas pipeline. Filed environmental permits and assisted with the preparation of the FERC Section 7(c) Application submittal. ETC Northeast Pipeline, L.L.C., Tichenal Extension Project, WV Environmental Project Manager responsible for all aspects of agency consultation, route selection, wetlands delineation, rare species coordination, and Federal, state, and local environmental permitting. The project consisted of 5 miles of dual 12-inch and 16-inch diameter natural gas midstream pipelines. Antero Resources Appalachian Corporation, Midstream/Gathering Projects, WV Environmental Project Coordinator responsible for all aspects of agency consultation, research, route selection, wetlands delineation, rare species coordination, and Federal, state, and local environmental permitting for approximately 15 natural gas midstream/gathering projects. Holyoke Gas and Electric Department, Smith s Ferry Gas Main Extension, Holyoke, MA Environmental Project Manager for the installation of 3.72 miles of an 8-inch diameter natural gas distribution line. Services included wetland delineation, environmental permitting, agency consultation and coordination, and client representation at various meetings and public hearings with regulatory agencies.

4 South Jersey Gas Company, Piney Hollow Pipeline Installation, Monroe Township, Middlesex County, NJ Scientist for the installation of a regulator station and approximately 15 miles of new 16-inch diameter natural gas pipeline. Services include wetland delineation, field survey party chief for resource area location and mapping, and environmental permitting. Algonquin Gas Transmission, LLC, a subsidiary of Spectra Energy, 2007 Integrity Management Project, Various Sites, MA, CT and RI Environmental Project Manager for the installation of launchers, receivers, valve replacements, and associated piping modifications for 13 sites. Oversaw all environmental services including wetland delineation and assessment, state and local environmental permitting, agency consultation and coordination, and client representation at various meetings and public hearings with regulatory agencies. Tennessee Gas Pipeline Company, McBride Groundbed Project, Wales, MA Environmental Project Manager for the replacement and re-route of an existing cathodic protection groundbed system. Oversaw all activities required to bring the project to successful completion. Services included wetland delineation, wetland mitigation, environmental permitting, agency consultation and coordination, and client representation at various meetings and public hearings with regulatory agencies. Tennessee Gas Pipeline Company, Groundbed Replacement, Schodack, NY Environmental Project Manager for the partial replacement and re-route of an existing cathodic protection groundbed system. Oversaw all activities required to bring the project to successful completion, including wetland delineation, field survey, drafting, wetland mitigation, agency consultation and coordination, and environmental permitting. Tennessee Gas Pipeline Company, Low Potential Maintenance, Stratford, CT Scientist for cathodic protection maintenance activities on an existing 16-inch diameter high- pressure natural gas pipeline. Maintenance activities included the installation of approximately 350 feet of groundbed header cable, 2,800 feet of SPL anode cable, replacement of cast iron river weights with concrete river weights, and pipeline recoating where necessary. Services included the research, coordination, and preparation of the Town of Stratford Inland Wetland and Watercourses Application and on-site environmental inspection of the previously mentioned construction activities. Environmental inspection services included the monitoring of trench dewatering, erosion/sedimentation control barrier placement, segregation of trench topsoil, and placement of corduroy (timber) mats for work within wetlands. Algonquin Gas Transmission Company, a subsidiary of Spectra Energy, Natural Gas Pipeline Construction, Sharon, MA Scientist for the construction of approximately 1,200 feet of new 8-inch diameter natural gas pipeline. Services included the research, coordination, and preparation of a Wetlands Protection Act Notice of Intent, a MA Department of Environmental Protection Water Quality Certification, an Environmental Notification Form required under MEPA, and a USACE Application for Category II Programmatic General Permit. South Jersey Gas Co., Route 50 Pipeline Installation, Estell Manor, Atlantic County, NJ Scientist for installation of approximately 4.7 miles of new 20-inch diameter natural gas pipeline within existing paved roadways. Services include wetland delineation and field survey party chief for resource area location and mapping, and the research, coordination, and preparation of a New Jersey Pinelands Commission Application. South Jersey Gas Company, Avalon Boulevard Pipeline Installation, Middle Township and Avalon Borough, Cape May County, NJ Scientist for the installation of approximately 3.7 miles of new 8-inch diameter natural gas pipeline. The route follows the shoulder of Avalon Boulevard, crossing beneath four estuarine waterways by means of directional drilling. Services include wetland delineation of adjacent tidal marsh and the research, coordination, and preparation of applicable permit applications.

5 South Jersey Gas Company, New Pipeline Installation, Egg Harbor and Hamilton Townships, Atlantic County, NJ Scientist for the installation of approximately 11.2 miles of new 24-inch diameter natural gas pipeline. Services include wetland delineation, wetland functional assessment, field survey party chief for wetland/ resource area location and mapping, mitigation of disturbed wetlands, preparation of all applicable environmental permit applications, and assistance with rare flora surveys. Rare Flora species included Barratt s Sedge (Carex barrattii), Knieskern s Beaked-Rush (Rhynchospora knieskernii), Small-Head beaked- Rush (Rhynchospora microcephala), Pale Beaked-Rush (Rhynchospora pallida), Slender Nut-Rush (Scleria minor), Pine Barren Gentian (Gentiana autumnalis), and Pine Barren Reedgrass (Calamovilfa brevipilis). Tennessee Gas Pipeline Company, Concord Lateral Rehabilitation, Various Sites, NH Scientist for low potential and anomaly maintenance activities along the existing Concord Lateral natural gas pipelines. Services included wetland delineations, environmental inspection, and the coordination and filing of Minimum Impact Expedited Permit Applications for 18 sites within five towns. Environmental inspection services included the monitoring of trench dewatering, erosion/sedimentation control barrier placement, and segregation of trench topsoil. Algonquin Gas Transmission Company (a subsidiary of Spectra Energy), Q-3 Project, City of Quincy, Norfolk County, MA Scientist and Surveyor for the construction of approximately 1,500 feet of new 8-inch diameter natural gas pipeline. Services included the document research and field surveys to support the preparation of a Massachusetts Wetlands Protection Act Notice of Intent. Marathon-Ashland Pipeline LLC, Cardinal Pipeline Project, OH and WV Environmental Inspector on a 150-mile petroleum products pipeline project. Supervised environmental construction contractors during post-construction clean-up required to bring the project into compliance with US Army Corps of Engineers Permit. Provided oversight and instructed environmental contractors on protection of wetlands and watercourses, mitigation of disturbed wetlands and watercourses, slope and stream bank stabilization, mulching and seeding of pipeline right-of-way, placement of erosion and sediment control barriers, installation of water breaker bars, and placement of curlex erosion control fabric. Daily field inspection logs, including photo documentation, was provided. Tennessee Gas Pipeline Company, East Branch Housatonic River Restoration and Stabilization, Pittsfield, MA Scientist, Surveyor, and CAD Operator for the river bank stabilization of the Housatonic River due to stream erosion threatening an existing natural gas pipeline. Bio-engineering principals were utilized, caution was taken not to disturb contaminated soils adjacent to the site, and consideration was taken for rare and endangered species known to inhabit the river. Services include Department of Environmental Protection (DEP) file reviews, existing conditions and as-built field surveys, design drafting, and environmental permitting. Tennessee Gas Pipeline Company, Massachusetts Rehabilitation, Various Sites, MA Scientist, Surveyor, and CAD Operator for the installation of launchers and receivers and anomaly repairs making the pipeline ready for in-line inspections. Services included surveying and drafting, along with assisting in wetland delineations and environmental permitting. Tennessee Gas Pipeline Company, New York Rehabilitation, East Eden to Hopewell, NY Scientist and Survey Party Chief for natural gas pipeline launcher and receiver installations, mainline valve replacements, and anomaly repairs. Services included wetland delineations, topographic surveys and Global Positioning System (GPS) in the New York State Plane coordinate system.

6 Tennessee Gas Pipeline Company, Rehabilitation, Various Sites, OH Scientist for the environmental resource inventory and assessment relative to meter stations and main line valve sites. Services included wetland delineation of wetland resources, including preparation of data sheets and the use of Global Positioning System (GPS) for resource area location. Tennessee Gas Pipeline Company, New England Rehabilitation, Barkhamsted, CT Scientist and Surveyor for the replacement of approximately 850 feet of existing natural gas pipeline across the Farmington River s West Branch. Services included assistance with the determination of construction methods and procedures to ensure minimal long-term impact to wetland and watercourse resources. This project included extensive research and coordination of various site-specific environmental issues associated with the National Wild and Scenic River status, nearby salmon hatchery, habitat protection, water diversion, and erosion controls. Coordinated and filed permit applications with the Barkhamsted Conservation Commission, Connecticut Department of Environmental Protection, and the US Army Corps of Engineers. Tennessee Gas Pipeline Company, Beverly-Salem Lateral Replacement, Wilmington and Reading, MA Scientist for the replacement of approximately one mile of existing natural gas pipeline. Services included wetland delineations and water boundary resource designations. Tennessee Gas Pipeline Company, Test Lead Relocation, Longmeadow, MA Environmental Project Manager for rare plant surveys in the Connecticut River floodplain. Rare species included Green Dragon (Arisaema dracontium), Gray s Sedge (Carex grayi), Swamp-Dock (Rumex verticillatus), and Many-Fruited False-Loosestrife (Ludwigia polycarpa). Tennessee Gas Pipeline Company, Londonderry Replacement Project, MA and NH Surveyor for the replacement of 19.3 miles of 8-inch diameter pipeline with a 20-inch diameter pipeline using the same pipeline trench and existing right-of-way footprint. Conducted condemnation surveys, river and stream details, and road crossing details. Tennessee Gas Pipeline Company, Niagara Mohawk Pipeline, Albany, NY Surveyor for the construction of 2.5 miles of new 16-inch diameter pipeline. Performed existing conditions topographic surveys and construction layout. Tennessee Gas Pipeline Company, Berkshire Power Project, Agawam, MA Surveyor for the construction of a new 8-inch diameter pipeline. Performed existing conditions topographic surveys and construction layout.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. October 11, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. October 11, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 October 11, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. May 24, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. May 24, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 May 24, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. July 9, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. July 9, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 July 9, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. October 12, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. October 12, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 October 12, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Mailing Address: P.O. Box 1642 Houston, TX June 10, 2015

Mailing Address: P.O. Box 1642 Houston, TX June 10, 2015 5400 Westheimer Court Houston, TX 77056-5310 713.627.5400 main Mailing Address: P.O. Box 1642 Houston, TX 77251-1642 June 10, 2015 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. November 15, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. November 15, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 November 15, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Tennessee Gas Pipeline Company L.L.C Louisiana Street Suite 1000 Houston, Texas

Tennessee Gas Pipeline Company L.L.C Louisiana Street Suite 1000 Houston, Texas THIS IS NOT A PAID ADVERTISEMENT 0BPublic Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. 1BCENAP-OP-R-2015-0802-65 Application No. In Reply

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 8-4-16) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 5-4-18) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

S.R. 3024, SECTION 28S BRIDGE REPLACEMENT PROJECT OVER THE EAST BRANCH OF WHITE CLAY CREEK Photograph No. No. 1 1 Facing upstream at the at the East Branch of White of White Clay Creek from the S.R. S.R.

More information

By Mark Gallagher Princeton Hydro LLC. From FERC Leidy Line EA

By Mark Gallagher Princeton Hydro LLC. From FERC Leidy Line EA By Mark Gallagher Princeton Hydro LLC. From FERC Leidy Line EA Pipelines in the Landscape Both photographs attributed to Delaware Riverkeeper Network Natural Resource Impacts Associated with Pipelines

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No. CENAP-OP-R In Reply Refer to: REGULATORY BRANCH

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No. CENAP-OP-R In Reply Refer to: REGULATORY BRANCH THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. CENAP-OP-R-2016-0160-24 Application No. In Reply Refer

More information

TOWN OF WINDSOR, CONNECTICUT INLAND WETLANDS & WATERCOURSES COMMISSION. 1. APPLICANT Name: Phone: Address: Cell:

TOWN OF WINDSOR, CONNECTICUT INLAND WETLANDS & WATERCOURSES COMMISSION. 1. APPLICANT Name: Phone: Address: Cell: TOWN OF WINDSOR, CONNECTICUT INLAND WETLANDS & WATERCOURSES COMMISSION This application form is intended to expedite the work of the Town Staff, the Town Inland Wetlands and Watercourses Commission, and

More information

Public Notice PUBLIC NOTICE 30 DAY PUBLIC NOTICE

Public Notice PUBLIC NOTICE 30 DAY PUBLIC NOTICE PUBLIC NOTICE Date: January 30, 2015 Comment Period Ends: February 28, 2015 Reply by Mail to: Kirk Bargerhuff; or by email to: Kirk.E.Bargerhuff@usace.army.mil Engineering/Planning 696 Virginia Road Concord,

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

ENVIRONMENTAL & NATURAL RESOURCES Part of a diversified family of solutions. jmt.com

ENVIRONMENTAL & NATURAL RESOURCES Part of a diversified family of solutions. jmt.com ENVIRONMENTAL & NATURAL RESOURCES Part of a diversified family of solutions jmt.com 1 Services Regulatory Permits/Agency Coordination Stream/Wetland Assessment & Restoration Natural Resources Investigations

More information

Oil and Gas Energy. Transforming Ideas for the Energy We Use. gaiconsultants.com/energy

Oil and Gas Energy. Transforming Ideas for the Energy We Use. gaiconsultants.com/energy Oil and Gas Energy Transforming Ideas for the Energy We Use gaiconsultants.com/energy Oil and Gas Focused on Your Goals World energy markets are rapidly expanding with the United States poised to be a

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2015-1060-24 February 2, 2018 Application

More information

Public Hearing December 12, 2013

Public Hearing December 12, 2013 Public Hearing December 12, 2013 Commission s Water Transmission System Finished Water Transmission System South Transmission Main South Transmission Main Route South Main Replacement Route from Provin

More information

The PennEast Pipeline Project

The PennEast Pipeline Project The Project About the Project AGL Resources; NJR Pipeline Company; PSEG Power; South Jersey Industries; Spectra Energy and UGI Energy Services (UGIES) comprise Company, LLC. Over $1 billion investment

More information

Public Notice: Wetland/Waterway/Water Quality Regulations

Public Notice: Wetland/Waterway/Water Quality Regulations Public Notice: Wetland/Waterway/Water Quality Regulations Pursuant to M.G.L. c.30a, the MA Department of Environmental Protection (DEP) gives notice of its intent to revise the following regulations under

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: OCTOBER 23 THROUGH OCTOBER

More information

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA REPLV TO ATTENTION OF: DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-M April15, 2014 PUBLIC NOTICE NO. SAM-2014-00275-TMZ

More information

ATTACHMENT A -1 PERMIT APPLICATION FORM

ATTACHMENT A -1 PERMIT APPLICATION FORM Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County ATTACHMENT A -1 PERMIT APPLICATION FORM Revised April 2017 3150-PM-BWEW0036A

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 9-22-17) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 1-2-19) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

Errata sheet for the Connecticut General Permits May 2, 2017

Errata sheet for the Connecticut General Permits May 2, 2017 Errata sheet for the Connecticut General Permits May 2, 2017 The Corps of Engineers, New England District, has compiled this list of corrections and clarifications for the Connecticut General Permits that

More information

Public Notice U.S. Army Corps In Reply to Application Number of Engineers

Public Notice U.S. Army Corps In Reply to Application Number of Engineers Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS(HERITAGE GREEN DEVELOPMENT/RD Baltimore District XING, CULVERTS, LOT FILL & SWM POND) 2006-63551 PN 15-21 Comment

More information

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012 DuPage County Stormwater Ordinance Update- Wetlands and Buffers PRESENTED BY: MARY BETH FALSEY WETLAND SPECIALIST Wetlands Section 15-18.A.1.a: If a Stormwater Administrator has the expertise, he/she can

More information

PUBLIC NOTICE for Permit Application

PUBLIC NOTICE for Permit Application PUBLIC NOTICE for Permit Application 30-Day Notice Issue Date: January 13, 2016 Expiration Date: February 12, 2016 US Army Corps of Engineers No: NWP-2005-426 Oregon Department of State Lands No: 58607-RF

More information

Response: Eastern Shore will require additional permanent easement and temporary workspace (TWS) in the following municipalities:

Response: Eastern Shore will require additional permanent easement and temporary workspace (TWS) in the following municipalities: 2. There are multiple properties throughout the Chester County portion of the 2017 Expansion Project area which contain preservation easements on them. Eastern Shore Natural Gas Company should be aware

More information

ATTACHMENT A -1 PERMIT APPLICATION FORM

ATTACHMENT A -1 PERMIT APPLICATION FORM Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Wyoming County ATTACHMENT A -1 PERMIT APPLICATION FORM Revised April 2017 3150-PM-BWEW0036A

More information

ADDISON NATURAL GAS PROJECT Phase 2 Middlebury Community Meeting. February 27, 2013 Middlebury VFW Post 7823

ADDISON NATURAL GAS PROJECT Phase 2 Middlebury Community Meeting. February 27, 2013 Middlebury VFW Post 7823 ADDISON NATURAL GAS PROJECT Phase 2 Middlebury Community Meeting February 27, 2013 Middlebury VFW Post 7823 0 Agenda Vermont Gas Natural Gas Economics Review of the Addison Natural Gas Project Discuss

More information

Chapter 105 Dam Safety and Waterway Management

Chapter 105 Dam Safety and Waterway Management Chapter 105 Dam Safety and Waterway Management An overview PA Department of Environmental Protection Bureau of Watershed Management Division of Waterways, Wetlands, & Stormwater Management Purpose The

More information

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013 BL ENGLAND & RELIABILITY PIPELINE PROJECT September 27, 2013 PRESENTATION OUTLINE Utility Service in New Jersey South Jersey Gas overview Project background Existing system infrastructure Reliability considerations

More information

Roanoke County Board of Supervisors. October 14, 2014

Roanoke County Board of Supervisors. October 14, 2014 Roanoke County Board of Supervisors October 14, 2014 Who is Mountain Valley Pipeline, LLC Joint venture of EQT Corporation and NextEra Energy EQT: Leading Appalachian natural gas production and transmission

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FIELD INSPECTION REPORT Date August 4, 2016 Project Transcontinental Gas Pipe Line Company, L.L.C./Sabine Pass Liquefaction, L.L.C. & Sabine Pass LNG, L.P. Gulf Trace Expansion Project Cameron, Calcasieu,

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: MARCH 19 THROUGH MARCH 25,

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R November 21, 2017

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R November 21, 2017 THIS IS NOT A PAID ADVERTISEMENT Public Notice U.S. Army Corps of Engineers Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-00716

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FIELD INSPECTION REPORT Date May 22, 2018 Project Northern Natural Gas Company Cedar Station Upgrade Project Dakota County, Minnesota Authority: Sections 7(c) Personnel FERC Staff: Company Staff: S. Xiah

More information

Errata sheet for the Connecticut General Permits March 26, 2019

Errata sheet for the Connecticut General Permits March 26, 2019 Errata sheet for the Connecticut General Permits March 26, 2019 The Corps of Engineers, New England District, has compiled this list of corrections and clarifications for the Connecticut General Permits

More information

Environmental Law and Railroads

Environmental Law and Railroads Environmental Law and Railroads September 12, 2007 Suzanne Echevarria Case Study in Non-Compliance Railroad worker was responsible for every detail of the safe and efficient maintenance and construction

More information

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the

More information

Programmatic General Permit Army Corps of Engineers Connecticut Addendum

Programmatic General Permit Army Corps of Engineers Connecticut Addendum Programmatic General Permit Army Corps of Engineers Connecticut Addendum DEP USE ONLY NAE#: DEP #: PGP Screening Date: Determinations: Eligible Category 2 Eligible Category 1 Individual Permit Print or

More information

Guidance on Repairs to Interstate Natural Gas Pipelines Pursuant to FERC Regulations (July 2005)

Guidance on Repairs to Interstate Natural Gas Pipelines Pursuant to FERC Regulations (July 2005) Guidance on Repairs to Interstate Natural Gas Pipelines Pursuant to FERC Regulations (July 2005) I. Guidance on Activities Allowed Under the FERC Regulations The guidance we 1 are providing here is to

More information

Notice No Closing Date: September 12, 2016

Notice No Closing Date: September 12, 2016 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

Public Notice ISSUED: July 17, 2014 EXPIRES: August 17, 2014

Public Notice ISSUED: July 17, 2014 EXPIRES: August 17, 2014 APPLICANT: Wisconsin Gas, LLC Public Notice ISSUED: July 17, 2014 EXPIRES: August 17, 2014 REFER TO: MVP-2013-01136-KDZ SECTION: 404 - Clean Water Act SECTION: 10 - Rivers and Harbors Act 1. APPLICATION

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 7, 2017

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 7, 2017 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-00042 September 7, 2017 Application

More information

ATTACHMENT A -1 PERMIT APPLICATION FORM

ATTACHMENT A -1 PERMIT APPLICATION FORM Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lebanon County ATTACHMENT A -1 PERMIT APPLICATION FORM Revised April 2017 3150-PM-BWEW0036A

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2018-0567-46 September 20, 2018 Application

More information

Oil & Gas. Capabilities & Qualifications. Part of a diversified family of services. www. jmt.com. An Employee Owned Company

Oil & Gas. Capabilities & Qualifications. Part of a diversified family of services. www. jmt.com. An Employee Owned Company Oil & Gas Capabilities & Qualifications Part of a diversified family of services www. jmt.com An Employee Owned Company Company Overview In This Brochure: Oil & Gas Industry Experience Environmental Permitting

More information

Pilgrim Pipeline and its Environmental and Regulatory Conflicts June 14, 2016

Pilgrim Pipeline and its Environmental and Regulatory Conflicts June 14, 2016 Pilgrim Pipeline and its Environmental and Regulatory Conflicts June 14, 2016 From FERC Leidy Line EA By Mark Gallagher Princeton Hydro LLC. Pipelines in the Landscape estimated 4,600 miles of new interstate

More information

DOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Special Protection Waters

DOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Special Protection Waters DOCKET NO. D-2014-008-1 DELAWARE RIVER BASIN COMMISSION Special Protection Waters Columbia Gas Transmission LLC, Columbia Pipeline Group Line 1278 Line K Replacement Project Natural Gas Pipeline and Temporary

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Tennessee Gas Pipeline. Tennessee Gas Pipeline Company 300 Line Project No Net Loss Reforestation Plan

Tennessee Gas Pipeline. Tennessee Gas Pipeline Company 300 Line Project No Net Loss Reforestation Plan Tennessee Gas Pipeline Tennessee Gas Pipeline Company 300 Line Project No Net Loss Reforestation Plan Project Overview PROJECT FACILITIES Pipeline Facilities Eight loop segments of 30-inch diameter pipeline

More information

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0 Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee

More information

FERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG

FERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC or Commission) prepared this Environmental Impact Statement (EIS) to assess the environmental issues associated with the construction

More information

Additional information can be found at or

Additional information can be found at   or Gulf South Pipeline Company, LP is a subsidiary of Boardwalk Pipeline Partners, LP, and is primarily engaged in the transportation and storage of natural gas. Our interstate natural gas pipeline system

More information

ABBREVIATED NOTICE OF RESOURCE AREA DELINEATION YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS MARCH 2004 PREPARED FOR

ABBREVIATED NOTICE OF RESOURCE AREA DELINEATION YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS MARCH 2004 PREPARED FOR ABBREVIATED NOTICE OF RESOURCE AREA DELINEATION YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS MARCH 2004 PREPARED FOR YANKEE ATOMIC ELECTRIC COMPANY 49 YANKEE ROAD ROWE, MASSACHUSETTS 01367 PREPARED

More information

Maine s Land Use Regulations and Erosion Control Techniques

Maine s Land Use Regulations and Erosion Control Techniques Maine s Land Use Regulations and Erosion Control Techniques Protecting Maine s Air, Land and Water Colin Clark 441-7419 colin.a.clark@maine.gov Tom Gilbert 441-8031 thomas.gilbert@maine.gov Jim Rodrigue

More information

Natural Gas Pipeline Expansion Activity

Natural Gas Pipeline Expansion Activity Natural Gas Pipeline Expansion Activity Energy Finance 2015 March 19, 2015 John A. Rosenkranz Principal North Side Energy, LLC Upswing in Gas Pipeline Development Source: Federal Energy Regulatory Commission

More information

October 25, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

October 25, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 October 25, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION PERMIT GUIDELINES FOR PHASED NPDES STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY PERMITS, CHAPTER 102 EROSION AND SEDIMENT

More information

PUBLIC NOTICE. Issue Date: June 27, DAY NOTICE Expiration Date: August 26, 2018 Corps File Number: NWO MTH

PUBLIC NOTICE. Issue Date: June 27, DAY NOTICE Expiration Date: August 26, 2018 Corps File Number: NWO MTH PUBLIC NOTICE Omaha District Issue Date: June 27, 2018 60 DAY NOTICE Expiration Date: August 26, 2018 Corps File Number: NWO-2018-01140-MTH Helena Regulatory Office 10 West 15 th Street, Suite 2200 Helena,

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND INTRODUCTION AND BACKGROUND Duke Energy Carolinas, LLC (Duke) operated the Dillsboro Hydroelectric Project under a license from the Federal Energy Regulatory Commission (FERC No. 2602). The Project is

More information

Public Notice. Public Notice No. CENAP-OP-R June 19, 2017

Public Notice. Public Notice No. CENAP-OP-R June 19, 2017 Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2017-178 June 19, 2017 Application No. In Reply Refer to: REGULATORY

More information

PUBLIC NOTICE for Permit Application

PUBLIC NOTICE for Permit Application PUBLIC NOTICE for Permit Application 30-Day Notice Issue Date: March 27, 2012 Expiration Date: April 25, 2012 US Army Corps of Engineers No: NWP-2005-384 Oregon Department of State Lands No: Unknown Interested

More information

Spectra Energy: Moving Ahead, Gaining Momentum

Spectra Energy: Moving Ahead, Gaining Momentum 8 th ANNUAL PLATTS PIPELINE EXPANSION & DEVELOPMENT CONFERENCE HOUSTON, TX SEPTEMBER 17, 2013 Spectra Energy: Greg Crisp Director, Business Development Safe Harbor Statement Some of the statements in this

More information

MOUNTAINEER XPRESS. Columbia Pipeline Group

MOUNTAINEER XPRESS. Columbia Pipeline Group MOUNTAINEER XPRESS Columbia Pipeline Group C169566.indd 1 TABLE OF CONTENTS CPG AT A GLANCE THE PLAN/PROJECT COMPONENTS COMMITMENT TO KEEPING YOU INFORMED PROJECT BENEFITS SAFETY FREQUENTLY ASKED QUESTIONS

More information

June 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

June 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 June 6, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy for the Environmental Services Association of Nova Scotia By Krista Hilchey Wetland Specialist, Nova Scotia Environment To

More information

August 31, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

August 31, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 August 31, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Public Notice. CENAB-OPR-P P24 (Lime Spring Run)

Public Notice. CENAB-OPR-P P24 (Lime Spring Run) U.S. Army Corps of Engineers Baltimore District Public Notice In Reply to Application Number CENAB-OPR-P-2016-00168-P24 (Lime Spring Run) PN-17-16 Comment Period: April 3, 2017 to May 3, 2017 THE PURPOSE

More information

An Employee-Owned Company

An Employee-Owned Company An Employee-Owned Company October 28, 2016 Conestoga Township Floodplain Administrator 3959 Main Street Conestoga, PA 17516 Re: Atlantic Sunrise Project Central Penn Line South Conestoga Township, Lancaster

More information

Record of Decision for Issuing a Presidential Permit to Champlain Hudson Power Express,

Record of Decision for Issuing a Presidential Permit to Champlain Hudson Power Express, This document is scheduled to be published in the Federal Register on 10/01/2014 and available online at http://federalregister.gov/a/2014-23421, and on FDsys.gov [6450-01-P] DEPARTMENT OF ENERGY (OE Docket

More information

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT

FEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT FIELD INSPECTION REPORT Date July 10 and 11, 2018 Project WBI Energy Transmission, Inc. Valley Expansion Project Clay County, Minnesota; and Cass County, North Dakota Authority: Section 7(c) Personnel

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT Public Notice U.S. Army Corps Permit Application No: SWG-2015-00114 Of Engineers Date Issued: 18 October 2018 Galveston District Comments Due: 19 November 2018 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate. FEDERAL ENERGY REGULATORY COMMISSION ENVIRONMENTAL COMPLIANCE MONITORING PROGRAM WEEKLY SUMMARY REPORT NEXUS GAS TRANSMISSION PROJECT DOCKET NO.: CP16-22-000 FOR THE PERIOD: NOVEMBER 13 THROUGH NOVEMBER

More information

October 12, Lenox Township Floodplain Administrator 222 S.R Nicholson, PA 18446

October 12, Lenox Township Floodplain Administrator 222 S.R Nicholson, PA 18446 An Employee-Owned Company October 12, 2016 Lenox Township Floodplain Administrator 222 S.R. 2016 Nicholson, PA 18446 Re: Atlantic Sunrise Project Central Penn Line North Lenox Township, Susquehanna County

More information

Pipeline Services. 110 South Edison Avenue Tampa, Florida (813) , (813) fax

Pipeline Services. 110 South Edison Avenue Tampa, Florida (813) , (813) fax Pipeline Services 110 South Edison Avenue Tampa, Florida 33606 (813) 259-1085, (813) 259-1086 fax www.birkitt.com FIRM PROFILE Birkitt Environmental Services, Inc. (BES) was formed in 1996 in Tampa, Florida

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No. CENAP-OP-R In Reply Refer to:

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No. CENAP-OP-R In Reply Refer to: THIS IS NOT A PAID ADVERTISEMENT 0BPublic Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. 1BCENAP-OP-R-2014-01236 Application No. CENAP-OP-R-2014-01236

More information

Williams Transco Pipeline

Williams Transco Pipeline open house Williams Transco Pipeline Williams Transco pipeline is a major transporter of natural gas, delivering much of the natural gas consumed in the northeastern and southeastern United States. Transco

More information

May 24, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

May 24, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 May 24, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

MONONGAHELA RIVER, WV

MONONGAHELA RIVER, WV Hydropower Project License Summary MONONGAHELA RIVER, WV MORGANTOWN LOCK AND DAM HYDROELECTRIC PROJECT (P-13762) POINT MARION LOCK AND DAM HYDROELECTRIC PROJECT (P-13771) Photo Credit: U.S. Army Corps

More information

Grants Announced June 16, 2014 from the Hurricane Sandy Coastal Resiliency Competitive Grant Program

Grants Announced June 16, 2014 from the Hurricane Sandy Coastal Resiliency Competitive Grant Program Connecticut Grants Announced June 16, 2014 from the Hurricane Sandy Coastal Resiliency Competitive Grant Program Enhancing Mill River's Flood Resiliency and Habitat Corridor Mill River Collaborative Grant

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT I-~ I II I " I US Army Corps of Engineers New England District 66 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management

More information

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES EXHIBIT JC-6 BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PETITION OF JERSEY CENTRAL POWER & LIGHT COMPANY PURSUANT TO N.J.S.A. 40:55D-19 FOR A DETERMINATION THAT THE OCEANVIEW

More information

SECTION 6 POTENTIAL ENVIRONMENTAL EFFECTS AND MITIGATION MEASURES

SECTION 6 POTENTIAL ENVIRONMENTAL EFFECTS AND MITIGATION MEASURES SECTION 6 POTENTIAL ENVIRONMENTAL EFFECTS AND MITIGATION MEASURES Supplemental Municipal Consultation Filing The Interstate Reliability Project 6. POTENTIAL ENVIRONMENTAL EFFECTS AND MITIGATION MEASURES

More information

Minnesota EAW Supplement

Minnesota EAW Supplement Appendix I: Minnesota EAW Supplement Lower Pool 2 Channel Management Study: Boulanger Bend to Lock and Dam No. 2 Minnesota EAW Item Identification A supplement prepared for the Minnesota DNR to identify

More information

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016

Public Notice. Public Notice No. Date: April 8, 2016 CENAP-PL-E Comment Period Closes: May 9, 2016 Public Notice Public Notice No. Date: April 8, 2016 CENAP-PL-E-16-02 Comment Period Closes: May 9, 2016 USACE Philadelphia District: http://www.nap.usace.army.mil COBBS CREEK FISH PASSAGE PROJECT SECTION

More information

New Jersey Natural Gas Market Update

New Jersey Natural Gas Market Update March 25, 2015 Mullica Hill, NJ New Jersey Natural Gas Market Update Presentation to: SNJDC Natural Gas Seminar Tom Kiley Northeast Gas Association Issues Regional Market Developments New Jersey Gas Market

More information

MVP Variance Request Form

MVP Variance Request Form E-1 4/5/2018 Requested By: Adam Slone Spread: E Variance Type: WS Variance Sequence Request Prepared By *: Megan Neylon Number: 001 Station: N/A To: N/A Milepost: 142 To: 142 Ancillary Sheets Other Agency

More information

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS POST OFFICE BOX 4970 JACKSONVILLE, FLORIDA May 9, 2016

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS POST OFFICE BOX 4970 JACKSONVILLE, FLORIDA May 9, 2016 DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS POST OFFICE BOX 4970 JACKSONVILLE, FLORIDA 32232 REPLY TO ATTENTION OF May 9, 2016 Regulatory Division North Permits Branch Jacksonville

More information

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast

CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast CBIA Energy Conference Natural Gas- Coming to Your Neighborhood Soon October 10, 2013 Cromwell, Connecticut Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe

More information

Responses to Comments from State Agencies

Responses to Comments from State Agencies Summary of Comment Letters Received from State Agencies This section provides responses to comments received on the draft environmental document from state agencies. Comment Code Agency S-1 California

More information

Public Notice ISSUED: May 16, 2014 EXPIRES: May 30, 2014

Public Notice ISSUED: May 16, 2014 EXPIRES: May 30, 2014 APPLICANT: U.S. Army Fort McCoy Public Notice ISSUED: May 16, 2014 EXPIRES: May 30, 2014 REFER TO: MVP-2010-00359-JWD SECTION:404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge dredged and fill

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 1-22-18) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 J O I N T P U B L I C N O T I C E CHARLESTON AND SAVANNAH DISTRICTS- US ARMY

More information